Multi-domain general computing resource collaborative deployment optimization method and device, equipment and medium

Through the optimization method of collaborative deployment of multi-domain computing resources, the challenge of optimizing the allocation of distribution system resources in new power systems is solved, low-cost resource guarantee is achieved, and the distribution system is ensured when facing changes in renewable energy and electrification loads. Run efficiently.

CN118965654APending Publication Date: 2024-11-15STATE GRID ELECTRIC POWER ECONOMIC RES INST IN NORTHERN HEBEI TECH CO LTD +1
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411058681.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the new power system, how to efficiently and economically realize the digital transformation and optimal resource allocation of power distribution systems, and cope with the uncertain challenges brought about by high proportion of renewable energy access, rapid growth of electrification loads, and the opening of the power market.

Method used

Through the optimization method of collaborative deployment of multi-domain computing resources, the total communication delay of each service in the distribution network is determined, the service quality function and resource abundance are calculated, the communication resources and computing resources deployment are optimized, the cost model is built to minimize the investment scale, and to ensure that Resource abundance meets the preset level.

Benefits of technology

The lower limit of the demand for multi-domain synesthesia computing resources of differentiated concurrent space-time related business flows is explored, and a low-cost implementation path is provided to ensure effective resource guarantees for the distribution system from the perspective of economic utility consistency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118965654A_ABST
    Figure CN118965654A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of communication, and particularly relates to a multi-domain general computing resource collaborative deployment optimization method and device, equipment and a medium. According to the method, when the resource adequacy does not meet the preset level, the communication resources and the computing power resources in the power distribution network are optimally deployed; wherein a general computing resource deployment cost model is constructed by taking the minimum cost after optimization of general computing resource deployment as a target and taking the condition that the resource adequacy meets a preset level as a constraint condition; and solving the model to obtain an optimal communication resource and computing power resource deployment scheme. According to the scheme, the demand lower limit of different differentiated concurrent time-space associated service flows for multi-domain general computing resources can be ascertained, and meanwhile, a low-cost implementation path is provided for effective guarantee of general computing resource demand under the perspective of economic-utility consistency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of communication technology, and specifically relates to a method, device, equipment and medium for collaborative deployment optimization of multi-domain computing resources. Background Art

[0002] At present, the global power industry is in a period of rapid change. With the rapid growth of high proportion of renewable energy and electrification load, the uncertainty of distribution system leads to the fundamental change of distribution network operation mode and resource allocation mode due to the level of digital intelligence. The data perception of new distribution system has exploded and the spatial distribution of data units is more extensive. With the widespread application of renewable energy and the opening of power market, the operation and management mode of new power system is changing. These changes require distribution system to have more flexible and intelligent resource allocation strategy to adapt to the changing demand and supply. In the context of digital intelligence, on the one hand, the development trend of digital intelligence requires distribution system to adopt more flexible and intelligent strategies in resource deployment. This may include the use of advanced data analysis tools to predict power demand, optimize energy distribution, integrate distributed energy resources, etc.; on the other hand, business modeling of distribution system becomes particularly important. This involves how to efficiently design and operate distribution network to adapt to the changing demand and technical environment.

[0003] In the new power system, the supporting potential of telecom computing resources is determined by the upper limit of the comprehensive service quality for differentiated high-concurrency new distribution business flows. How to efficiently and economically realize the digital transformation and optimal allocation of resources in the distribution system to cope with the uncertain challenges brought about by the high proportion of renewable energy access, the rapid growth of electrification load and the opening of the power market is an important issue that needs to be solved urgently. Summary of the invention

[0004] The purpose of the present invention is to provide a method, device, equipment and medium for collaborative deployment optimization of multi-domain computing resources. By economically deploying multi-domain computing resources, business flow support is reasonably guaranteed, and the lower limit of the demand for multi-domain computing resources for differentiated concurrent spatiotemporal-related business flows from the perspective of investment scale is explored, providing a low-cost implementation path for effectively ensuring its support potential.

[0005] In order to achieve the above object, the present invention adopts the following technical solution:

[0006] In a first aspect, the present invention provides a method for optimizing the coordinated deployment of multi-domain computing resources, including the following:

[0007] Determine the total communication delay of each service in the distribution network respectively;

[0008] Based on the total communication delay of each service, a service quality function of the corresponding service is calculated; based on the service quality function of each service, a resource adequacy of the distribution network is calculated;

[0009] When the resource abundance does not meet the preset level, the communication resources and computing resources in the distribution network are optimally deployed; wherein, with the minimum cost after the optimized deployment as the goal and the resource abundance meeting the preset level as the constraint condition, a general computing resource deployment cost model is constructed;

[0010] Solve the above-mentioned computing resource deployment cost model to obtain the optimal communication resource and computing resource deployment plan.

[0011] Furthermore, the total communication delay of the service is composed of transmission delay and unloading delay, and the calculation formula is:

[0012]

[0013] in, represents the total communication delay of the nth task of the jth service in the ith area; t qu represents the unloading delay of the corresponding task, t tr Indicates the transmission delay of the corresponding task; is the data volume of the nth task of the jth service in the i-th area; The computing resources required for the nth task of the jth service in the i-th area; F i is the CPU cycle frequency of the ith area; b ij The bandwidth allocated to the jth service in the ith area.

[0014] Furthermore, the resource abundance function λ is calculated as follows:

[0015]

[0016] Among them, t ij is the total communication delay of the jth service in the i-th station area; represents the total communication delay of the nth task of the jth service in the ith area; K represents the number of tasks corresponding to a certain service; θ i,j is the service quality function of the jth service in the ith area; T ij is the maximum delay of the jth service in the ith area under the QoS requirement; λ is the resource abundance of the distribution network; L is the total number of tasks in the distribution network; M is the number of areas, L i is the total number of services in the ith area.

[0017] Furthermore, the general computing resource deployment cost model is constructed as follows:

[0018]

[0019] Among them, w is the total cost function of resource deployment; b represents the scale of deployed communication resources; and f represents the scale of deployed computing resources.

[0020] Furthermore, the total cost function of resource deployment is calculated as follows:

[0021] w=wb+wf

[0022] wb=bα

[0023] wf=fβ

[0024] Among them, w b is the communication resource deployment cost, w f is the computing resource deployment cost; α is the communication resource cost influencing factor, β is the computing resource cost influencing factor, α, β>0.

[0025] In a second aspect, the present invention provides a multi-domain computing resource collaborative deployment optimization device, comprising:

[0026] A delay determination module, used to determine the total communication delay of each service in the distribution network;

[0027] A data calculation module, used to calculate the service quality function of the corresponding service based on the total communication delay of each service; and calculate the resource abundance of the distribution network based on the service quality function of each service;

[0028] A model building module, used for optimizing the deployment of communication resources and computing resources in the distribution network when the resource abundance does not meet the preset level; wherein, the cost of optimizing the deployment is minimized as the goal, and the resource abundance meets the preset level as the constraint condition, to build a general computing resource deployment cost model;

[0029] The model solving module is used to solve the general computing resource deployment cost model to obtain the optimal communication resource and computing power resource deployment plan.

[0030] Furthermore, in the delay determination module, the total communication delay of the service is composed of transmission delay and unloading delay, and the calculation formula is:

[0031]

[0032] in, represents the total communication delay of the nth task of the jth service in the ith area; t qu represents the unloading delay of the corresponding task, t tr Indicates the transmission delay of the corresponding task; is the data volume of the nth task of the jth service in the i-th area; The computing resources required for the nth task of the jth service in the i-th area; F i is the CPU cycle frequency of the ith area; b ij The bandwidth allocated to the jth service in the ith area.

[0033] Furthermore, in the data calculation module, the resource abundance function λ is calculated as follows:

[0034]

[0035] Among them, t ij is the total communication delay of the jth service in the i-th station area; represents the total communication delay of the nth task of the jth service in the ith area; K represents the number of tasks corresponding to a certain service; θ i,j is the service quality function of the jth service in the ith area; T ij is the maximum delay of the jth service in the ith area under the QoS requirement; λ is the resource abundance of the distribution network; L is the total number of tasks in the distribution network; M is the number of areas, L i is the total number of services in the ith area.

[0036] According to a third aspect of the present invention, an electronic device is provided, comprising a processor and a memory, wherein the processor is used to execute a computer program stored in the memory to implement the above-mentioned multi-domain computing resource collaborative deployment optimization method.

[0037] According to a fourth aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by a processor, the multi-domain computing resource collaborative deployment optimization method as described above is implemented.

[0038] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0039] The method of the present invention sets the value of the resource abundance function that meets the communication requirements under the existing computing power resource scale, and calculates the feasible domain of communication resources and the feasible domain of computing power resources based on the value of the resource abundance function that meets the communication requirements; determines the various costs of resource deployment, and based on each of the costs, as well as the feasible domain of communication resources and the feasible domain of computing power resources, takes the cumulative service quality lower limit as a constraint, and takes minimizing the total investment scale as the goal to construct a collaborative incremental deployment model for general computing resources; and solves to obtain the optimal configuration scheme for general computing resources. This scheme can be used to find out the lower limit of the demand for multi-domain inter-comprehensive computing resources for different differentiated concurrent spatiotemporal-related business flows, and at the same time, provides a low-cost implementation path for effectively ensuring the demand for its general computing resources from the perspective of economic-utility consistency. A multi-domain general computing resource collaborative deployment optimization device, electronic device, and computer-readable storage medium provided by the present invention also solve the problems raised in the background technology section. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0041] Figure 1 A schematic diagram of a multi-domain computing resource collaborative deployment optimization method according to an embodiment of the present invention;

[0042] Figure 2 is a comparison diagram of simulation results in an embodiment of the present invention;

[0043] Figure 3 This is a structural block diagram of a multi-domain computing resource collaborative deployment optimization device according to an embodiment of the present invention;

[0044] Figure 4 The present invention is a structural block diagram of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0045] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0046] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present application belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit exemplary embodiments according to the present invention.

[0047] Example 1

[0048] like Figure 1As shown, an embodiment of the present invention provides a method for optimizing the collaborative deployment of multi-domain computing resources, including the following:

[0049] Step S1: Determine the total communication delay of each service in the distribution network respectively.

[0050] Step S2: Calculate the service quality function of the corresponding service based on the total communication delay of each service; and calculate the resource abundance of the distribution network based on the service quality function of each service.

[0051] Step S3: When the resource abundance does not meet the preset level, the communication resources and computing resources in the distribution network are optimally deployed; wherein, a general computing resource deployment cost model is constructed with the goal of minimizing the cost after the optimized deployment and with the resource abundance meeting the preset level as a constraint.

[0052] Step S4: Solve the general computing resource deployment cost model to obtain the optimal communication resource and computing resource deployment plan.

[0053] The above scheme takes the system investment cost as the target and the resource abundance and feasible domain of general computing resources as the constraints, and explores the lower limit of the demand for general computing resources for differentiated business flows in the new distribution network from the perspective of investment scale.

[0054] In a more specific embodiment of the present invention, a multi-domain computing resource collaborative deployment optimization method is also provided, including the following specific steps:

[0055] Step S100: Determine the total communication delay of each service in the distribution network respectively.

[0056] In an optional embodiment, the total communication delay of the service is composed of transmission delay and unloading delay, and the calculation formula is:

[0057]

[0058] in, represents the total communication delay of the nth task of the jth service in the ith area; t qu represents the unloading delay of the corresponding task, t tr Indicates the transmission delay of the corresponding task. is the data volume of the nth task of the jth service in the i-th area; The computing resources required for the nth task of the jth service in the i-th area; F i is the CPU cycle frequency of the ith area; b ij The bandwidth allocated to the jth service in the ith area.

[0059] Step S200: Calculate the service quality function of the corresponding service based on the total communication delay of each service; and calculate the resource abundance of the distribution network based on the service quality function of each service.

[0060] In an optional embodiment, the resource abundance function λ under the existing investment scale of the distribution network is calculated by the following formula:

[0061]

[0062] Among them, t ij is the total communication delay of the jth service in the i-th station area; represents the total communication delay of the nth task of the jth service in the ith area; K represents the number of tasks corresponding to a certain service;

[0063] θ i,j is the service quality function of the jth service in the ith area; T ij is the maximum delay of the jth service in the i-th area under the QoS requirement;

[0064] λ is the resource abundance of the distribution network; L is the total number of tasks in the distribution network;

[0065] M is the number of stations, L is i is the total number of services in the ith area;

[0066] Step S300: When the resource abundance does not meet the preset level, the communication resources and computing resources in the distribution network are optimally deployed; wherein, a general computing resource deployment cost model is constructed with the goal of minimizing the cost after the optimized deployment and with the resource abundance meeting the preset level as a constraint.

[0067] It should be noted that if the resource abundance function λ is less than 1, the high-reliability communication requirements of all terminals in the distribution network cannot be met under the existing investment scale, and collaborative incremental deployment of computing resources is required.

[0068] Therefore, the preset level is set to 1 in this scheme.

[0069] Specifically, a general resource deployment cost model based on continuous power function curve fitting is constructed. At this time, the total cost function of resource deployment is defined as w, and the calculation formula is as follows:

[0070] w=wb+wf

[0071] wb=bα

[0072] wf=fβ

[0073] Among them, w b is the communication resource deployment cost, w fis the computing resource deployment cost; α is the communication resource cost influencing factor, and β is the computing resource cost influencing factor (α, β>0);

[0074] Construct the feasible domains of communication and computing resource deployment respectively and use them as constraints of the model:

[0075] C1:b≥0

[0076] C2:f≥0

[0077] Among them, b represents the scale of deployed communication resources; f represents the scale of deployed computing resources.

[0078] Based on the above cost function and the feasible domain of communication / computing resource deployment, the general computing resource deployment cost model is constructed as follows:

[0079]

[0080] Step S400, solving the general computing resource deployment cost model to obtain the optimal communication resource and computing resource deployment plan.

[0081] In an optional embodiment, the optimization problem is solved by the CVX toolbox in MATLAB to obtain a communication resource and computing resource deployment plan that meets a preset resource abundance level as the optimal plan.

[0082] In order to verify the multi-domain computing resource collaborative deployment optimization method proposed in the present invention, it is simulated and compared with the single-type communication / computing resource deployment method in the same network environment.

[0083] MATLAB is used as the simulation tool, and the system simulation environment parameters are set as follows:

[0084] 1) The number of distribution areas in the distribution network is 2;

[0085] 2) The business type in the distribution network is 2;

[0086] 3) The number of tasks generated concurrently by the two types of business are 50 and 50 respectively;

[0087] 4) The total number of tasks concurrently generated by various businesses in the distribution network is 100;

[0088] 5) The QoS constraint delays of the two types of services are 10000ms and 5000ms respectively;

[0089] 6) The size of the data packet generated by each service ranges from 0 to 1000KB;

[0090] 7) The total cost parameter test accuracy of resource deployment is 1.

[0091] The above parameters are not constant, and some parameters can be changed as needed for different simulation contents.

[0092] Figure 2 It is the comparison result of the multi-domain computing resource collaborative deployment optimization method described in an embodiment of the present invention and the single-type communication / computing resource deployment method under the same network environment.

[0093] It can be seen that the multi-domain computing resource collaborative deployment optimization method proposed in the present invention is more economical than the single-type communication / computing resource deployment method.

[0094] The simulation results show that with the increase of the distribution network abundance function, the deployment costs of different schemes show an increasing trend; under the same simulation environment, the coordinated deployment cost of the general computing resources calculated by the method of the present invention has economic advantages under each abundance function; at the same time, as the maximum value of the abundance function is approached, the deployment cost gap under different schemes continues to increase, and the cost of the method of the present invention is significantly lower than the cost of a single resource deployment scheme.

[0095] Example 2

[0096] like Figure 3 As shown, based on the same inventive concept as the above embodiment, the present invention also provides a multi-domain computing resource collaborative deployment optimization device, including:

[0097] A delay determination module, used to determine the total communication delay of each service in the distribution network;

[0098] A data calculation module, used to calculate the service quality function of the corresponding service based on the total communication delay of each service; and calculate the resource abundance of the distribution network based on the service quality function of each service;

[0099] A model building module, used for optimizing the deployment of communication resources and computing resources in the distribution network when the resource abundance does not meet the preset level; wherein, the cost of optimizing the deployment is minimized as the goal, and the resource abundance meets the preset level as the constraint condition, to build a general computing resource deployment cost model;

[0100] The model solving module is used to solve the general computing resource deployment cost model to obtain the optimal communication resource and computing power resource deployment plan.

[0101] In the delay determination module, the total communication delay of the service is composed of transmission delay and unloading delay, and the calculation formula is:

[0102]

[0103] in, represents the total communication delay of the nth task of the jth service in the ith area; t qurepresents the unloading delay of the corresponding task, t tr Indicates the transmission delay of the corresponding task; is the data volume of the nth task of the jth service in the i-th area; The computing resources required for the nth task of the jth service in the i-th area; F i is the CPU cycle frequency of the ith area; b ij The bandwidth allocated to the jth service in the ith area.

[0104] In the data calculation module, the resource abundance function λ is calculated as follows:

[0105]

[0106] Among them, t ij is the total communication delay of the jth service in the i-th station area; represents the total communication delay of the nth task of the jth service in the ith area; K represents the number of tasks corresponding to a certain service; θ i,j is the service quality function of the jth service in the ith area; T ij is the maximum delay of the jth service in the ith area under the QoS requirement; λ is the resource abundance of the distribution network; L is the total number of tasks in the distribution network; M is the number of areas, L i is the total number of services in the ith area.

[0107] Example 3

[0108] like Figure 4 As shown, the present invention also provides an electronic device 100 for implementing a method for optimizing the collaborative deployment of multi-domain computing resources; the electronic device 100 includes a memory 101, at least one processor 102, a computer program 103 stored in the memory 101 and executable on at least one processor 102, and at least one communication bus 104.

[0109] The memory 101 can be used to store the computer program 103. The processor 102 implements the steps of the multi-domain computing resource collaborative deployment optimization method of Example 1 by running or executing the computer program stored in the memory 101 and calling the data stored in the memory 101.

[0110] The memory 101 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data (such as audio data) created according to the use of the electronic device 100, etc. In addition, the memory 101 may include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other non-volatile solid-state storage devices.

[0111] At least one processor 102 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The processor 102 may be a microprocessor or any conventional processor, etc. The processor 102 is the control center of the electronic device 100, and uses various interfaces and lines to connect various parts of the entire electronic device 100.

[0112] The memory 101 in the electronic device 100 stores a plurality of instructions to implement a method for optimizing the coordinated deployment of multi-domain computing resources, and the processor 102 can execute the plurality of instructions to implement:

[0113] Step S1: Determine the total communication delay of each service in the distribution network respectively.

[0114] Step S2: Calculate the service quality function of the corresponding service based on the total communication delay of each service; and calculate the resource abundance of the distribution network based on the service quality function of each service.

[0115] Step S3: When the resource abundance does not meet the preset level, the communication resources and computing resources in the distribution network are optimally deployed; wherein, a general computing resource deployment cost model is constructed with the goal of minimizing the cost after the optimized deployment and with the resource abundance meeting the preset level as a constraint.

[0116] Step S4: Solve the general computing resource deployment cost model to obtain the optimal communication resource and computing resource deployment plan.

[0117] Example 4

[0118] If the module / unit integrated in the electronic device 100 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable media may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory and read-only memory (ROM, Read-Only Memory).

[0119] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0120] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0121] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0122] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0123] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0124] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for optimizing the collaborative deployment of multi-domain computing resources. It is characterized in that These include: Determine the total communication delay of each service in the distribution network respectively; Based on the total communication delay of each service, a service quality function of the corresponding service is calculated; based on the service quality function of each service, a resource adequacy of the distribution network is calculated; When the resource abundance does not meet the preset level, the communication resources and computing resources in the distribution network are optimally deployed; wherein, with the minimum cost after the optimized deployment as the goal and the resource abundance meeting the preset level as the constraint condition, a general computing resource deployment cost model is constructed; Solve the above-mentioned computing resource deployment cost model to obtain the optimal communication resource and computing resource deployment plan.

2. The multi-domain computing resource collaborative deployment optimization method according to claim 1, It is characterized in that The total communication delay of a service consists of transmission delay and unloading delay, and the calculation formula is: t ijn =t qu +t tr Among them, t ijn represents the total communication delay of the nth task of the jth service in the ith area; t qu represents the unloading delay of the corresponding task, t tr Indicates the transmission delay of the corresponding task; is the data volume of the nth task of the jth service in the i-th area; The computing resources required for the nth task of the jth service in the i-th area; F i is the CPU cycle frequency of the ith area; b ij The bandwidth allocated to the jth service in the ith area.

3. The multi-domain computing resource collaborative deployment optimization method according to claim 2, It is characterized in that The calculation formula of resource abundance function λ is as follows: Among them, t ij is the total communication delay of the jth service in the i-th station area; represents the total communication delay of the nth task of the jth service in the ith area; K represents the number of tasks corresponding to a certain service; θ i,j is the service quality function of the jth service in the ith area; T ij is the maximum delay of the jth service in the ith area under the QoS requirement; λ is the resource abundance of the distribution network; L is the total number of services in the distribution network; M is the number of areas, L i is the total number of services in the ith area.

4. The multi-domain computing resource collaborative deployment optimization method according to claim 3, It is characterized in that The cost model for building general computing resource deployment is as follows: Among them, w is the total cost function of resource deployment; b represents the scale of deployed communication resources; and f represents the scale of deployed computing resources.

5. The multi-domain computing resource collaborative deployment optimization method according to claim 4, It is characterized in that The total cost function of resource deployment is w and the calculation formula is as follows: w=wb+wf wb=bα wf=fβ Among them, w b is the communication resource deployment cost, w f is the computing resource deployment cost; α is the communication resource cost influencing factor, β is the computing resource cost influencing factor, α, β>0.

6. A multi-domain computing resource collaborative deployment optimization device, It is characterized in that include: A delay determination module, used to determine the total communication delay of each service in the distribution network; A data calculation module, used to calculate the service quality function of the corresponding service based on the total communication delay of each service; and calculate the resource abundance of the distribution network based on the service quality function of each service; A model building module, used for optimizing the deployment of communication resources and computing resources in the distribution network when the resource abundance does not meet the preset level; wherein, with the minimum cost after the optimized deployment as the goal and the resource abundance meeting the preset level as the constraint condition, a general computing resource deployment cost model is constructed; The model solving module is used to solve the general computing resource deployment cost model to obtain the optimal communication resource and computing power resource deployment plan.

7. The multi-domain computing resource collaborative deployment optimization device according to claim 6, It is characterized in that In the delay determination module, the total communication delay of the service is composed of transmission delay and unloading delay, and the calculation formula is: t ijn =t qu +t tr in, represents the total communication delay of the nth task of the jth service in the ith area; t qu represents the unloading delay of the corresponding task, t tr Indicates the transmission delay of the corresponding task; is the data volume of the nth task of the jth service in the i-th area; The computing resources required for the nth task of the jth service in the i-th area; F i is the CPU cycle frequency of the ith area; b ij The bandwidth allocated to the jth service in the ith area.

8. The multi-domain computing resource collaborative deployment optimization device according to claim 7, It is characterized in that In the data calculation module, the resource abundance function λ is calculated as follows: Among them, t ij is the total communication delay of the jth service in the i-th station area; represents the total communication delay of the nth task of the jth service in the ith area; K represents the number of tasks corresponding to a certain service; θ i,j is the service quality function of the jth service in the ith area; T ij is the maximum delay of the jth service in the ith area under the QoS requirement; λ is the resource abundance of the distribution network; L is the total number of tasks in the distribution network; M is the number of areas, L i is the total number of services in the ith area.

9. An electronic device, It is characterized in that It comprises a processor and a memory, wherein the processor is used to execute a computer program stored in the memory to implement the multi-domain computing resource collaborative deployment optimization method as described in any one of claims 1 to 5.

10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores at least one instruction, and when the at least one instruction is executed by the processor, the multi-domain computing resource collaborative deployment optimization method as described in any one of claims 1 to 5 is implemented.

Citation Information

Cited By

  • Cooperative scheduling method and system for general computing resources of master station layer

    CN121056415A

  • Distributed computing power resource collaborative deployment method based on multi-scale time delay constraint

    CN121814668A

  • A distributed computing resource collaborative deployment method based on multi-scale time delay constraint

    CN121814668B