Bank collapse monitoring and early warning evaluation method based on stable slope ratio calculation

Through the method based on stable slope ratio calculation, combined with actual measurement and mathematical model of water and sand, the future river trend evolution of the river section is analyzed, and the limitations of the collapse monitoring and early warning method in the existing technology on future risk changes are solved, and the collapse rank is achieved dynamic early warning and risk assessment have improved prevention and control capabilities.

CN118965688APending Publication Date: 2024-11-15ANHUI & HUAI RIVER WATER RESOURCES RES INST
View PDF 0 Cites 5 Cited by

Patent Information

Application Number
CN202410929558.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing collapse monitoring and early warning methods have limitations in monitoring future risk changes. The engineering method is costly and cannot predict underwater shore slope instability. The non-engineering method is highly subjective and fails to fully consider the correlation between factors.

Method used

Using a method based on stable slope ratio calculation, the future river trend evolution of the river section is analyzed through multiple measurements, large-scale actual measurement section data and non-uniform sand unsaturated sand transport model, and combined with the bank protection project, blue, orange and red warnings are divided into Level and correct the warning level to reflect possible disaster losses after the collapse of the bank.

Benefits of technology

It has achieved early warning of the current division of bank collapse levels and dynamic changes in the future bank collapse risks, improved the ability to prevent and control and respond to the bank collapse disaster before bank collapse, and reduced the impact of the disaster caused by bank collapse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118965688A_ABST
    Figure CN118965688A_ABST
Patent Text Reader

Abstract

The invention relates to a bank collapse monitoring, early warning and evaluation method based on stable slope ratio calculation, which belongs to the technical field of hydrological early warning and comprises the following steps of: recommending a stable slope ratio of each river reach after classifying according to different river patterns and different geological sections by utilizing multi-measurement-time and large-range actually measured section data; a non-uniform sand unsaturated sand transport model is constructed, future river regime evolution and bank slope change of each river reach are analyzed, and a predicted slope ratio value is obtained; the stable slope ratio of each section is compared with a predicted slope ratio value, and early warning grades are preliminarily divided according to whether bank protection projects exist or not; and in combination with the conditions of river regime evolution of the river reach, possible disaster-causing loss after bank collapse and the like, correcting the early warning level, dividing riverway bank collapse risk levels of different regions, and drawing an early warning zoning map. According to the method, the current river bank situation and the future development situation are comprehensively considered, division of current bank collapse grades and early warning of future bank collapse risk dynamic changes are achieved, the pre-disaster prevention and emergency disposal capacity of bank collapse can be improved, and the disaster influence caused by bank collapse emergencies is reduced or relieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a bank collapse monitoring, early warning and evaluation method based on stable slope ratio calculation, belonging to the technical field of hydrological early warning. Background Art

[0002] In the evolution of natural alluvial plain rivers, bank collapse is an extremely common natural phenomenon. However, in recent years, due to the combined effects of climate change, river regulation, water conservancy hub construction and operation, and high-intensity artificial sand mining, the river channel scouring and silting evolution has become drastic and frequent, and the stress conditions of the river bank soil have changed, which has led to the continuous increase in the intensity of bank collapse, which has not only further changed the river plane morphology and caused the adjustment of the upstream and downstream river regimes, but also brought adverse effects on river flood control, river regime, navigation, shoals and shoreline protection and utilization, and has become a major geological disaster in alluvial plain rivers. Therefore, the research on bank collapse monitoring, early warning and assessment is particularly important.

[0003] For bank collapse monitoring and early warning, two methods are usually used: engineering methods and non-engineering methods. The specific practice of the engineering method is usually to bury a number of stress, strain, and displacement sensors, deploy real-time video monitoring probes, and conduct dynamic monitoring of dangerous sections in combination with daily inspections and basic data mapping; non-engineering methods are mainly analysis and evaluation methods, which comprehensively consider the factors affecting bank collapse, such as river geological boundaries, river conditions, and human activities, and use different mathematical evaluation methods based on measured terrain, geology, engineering and other data to conduct early warning and evaluation of the current status of the river. At present, both of the above methods have certain pertinence and limitations. 1) The engineering method can only be used for dangerous sections that have already appeared, and it cannot monitor dangerous sections that may appear; secondly, the engineering method is mainly used to monitor changes in land terrain. In fact, bank collapse is often caused by the instability of underwater slopes; thirdly, this method requires a lot of manpower and material costs, and the operation and management costs are high. 2) Due to the different flow boundaries and geological conditions of banks in different river sections, the collapse mechanism of river banks is also different. Non-engineering methods usually use mathematical methods, such as fuzzy decision theory and hierarchical analysis method, to evaluate different factors affecting bank collapse based on expert scoring, which is highly subjective. Secondly, basically only the individual weight of each factor is considered in the evaluation, and the correlation between factors is rarely considered. Thirdly, the current analysis and evaluation methods only analyze the collected data and evaluate the current river banks, without considering the changes in the risk level of the river banks in the future. Summary of the invention

[0004] The present invention provides a bank collapse monitoring, early warning and assessment method based on stable slope ratio calculation, which comprehensively considers the current status and future development of the river bank, and based on the comparison between the stable slope ratio and the predicted slope ratio, realizes the classification of the current bank collapse level and the early warning of the dynamic changes of the future bank collapse risk.

[0005] A bank collapse monitoring and early warning evaluation method based on stable slope ratio calculation includes the following steps:

[0006] Step S1, using multiple times and a large range of measured cross-section data, classifying according to different river types and different geological sections, and recommending stable slope ratios for each river section;

[0007] Step S2: construct a non-uniform unsaturated sediment transport model, analyze the future river regime evolution and bank slope changes of each river section, and obtain the predicted slope ratio;

[0008] Step S3, comparing the stable slope ratio of each river section determined in step S1 with the slope ratio predicted in step S2, determining the warning bank section where bank collapse may occur, and preliminarily dividing the river section into blue stable bank section, orange warning bank section and red dangerous bank section according to whether there is a bank protection project.

[0009] Step S4, based on the warning level initially divided in step S3, combined with the river flow evolution such as deep-channel swing and water flow dynamic axis, the possible disaster losses to flood control, water supply, navigation, ecology and river-related projects after bank collapse, etc., the warning level is revised, the river bank collapse risk level in different areas is divided, and the river bank collapse warning zoning map is drawn.

[0010] The stable slope ratio is defined as the maximum slope ratio of the sand layer in a river section under certain river types and geological conditions. The specific approach is to classify and sort the measured data over the years according to the river type and geological conditions, perform mathematical statistics on the measured slope ratios of each section over the years, first obtain the maximum slope ratio of each section, then sort the maximum slope ratio values ​​of each measured section, and select the 5th percentile value as the recommended stable slope ratio value for this river section. This method is equivalent to approximating the critical slope ratio from the scale of time and space. If the selected section data range is wide and has experienced the effects of various water and sand conditions over time, the stable slope ratio determined thereby is very close to the critical slope ratio, and it can be used to replace the critical value to judge the stability of the bank slope, and there is a basis for it.

[0011] Preferably, in step S1 of the present invention, measured cross-sectional data from multiple measurements and a large range are collected, classified according to different river types such as straight, curved and branched and different geological sections, and then the river section where the bank protection project is implemented is deducted, and the maximum slope ratio of each measured section is calculated, and the largest slope ratio in each river section is taken as the recommended stable slope ratio value for this river section.

[0012] Preferably, in step S2 of the present invention, the theory of non-uniform and unbalanced sediment transport is adopted to construct a water-sediment mathematical model, and a water-sediment series including a typical flood year is selected as a boundary to predict changes in the water level, nearshore flow velocity, water flow dynamic axis, deep-water swing, riverbed scouring and silting in the river channel, and to analyze the future river flow evolution and bank slope changes of each river section to obtain the predicted slope ratio of each section;

[0013] Preferably, in step S3, the warning level is preliminarily divided according to the comparison between the predicted slope ratio and the stable slope ratio, and the specific method is as follows:

[0014] 1) For river sections without bank protection works, when the predicted slope ratio is less than 0.9 times the stable slope ratio, the bank slope is relatively stable and is initially classified as a blue bank section; when the predicted slope ratio is between 0.9 and 1.0 times the stable slope ratio, there is a hidden danger of bank slope stability, which is defined as an orange warning bank section; when the predicted slope ratio is greater than or equal to the stable slope ratio, the river bank will be very unstable and may collapse at any time, which is defined as a red dangerous bank section;

[0015] 2) For river sections with bank protection projects, the bank sections where the predicted slope ratio does not change or decreases slightly are defined as general bank sections. Otherwise, attention needs to be paid and early warning needs to be strengthened.

[0016] Preferably, in step S4, the warning level initially divided in S3 is revised in combination with the evolution of the river flow and the possible disaster losses after the bank collapse. The specific method is as follows:

[0017] For the bank section where the deep gully swings towards the river bank, the warning level is raised by one level. If the deep gully swings away, the warning level is lowered by one level. Based on the river bank protection and utilization plan, if the collapse of the bank has an impact on flood control, water supply, shipping, ecology and river-related projects, the warning level is raised by one level.

[0018] The present invention adopts the above technical solution and has the following advantages compared with the prior art:

[0019] It fully considers the factors affecting bank collapse that may cause disasters and losses after bank collapse, and considers the implementation and completeness of the bank protection project. It has clear ideas and comprehensive content, and can well reflect the actual situation of the river bank. The present invention can not only evaluate the current river bank, but also predict the changes in the risk level of the river bank in the future, realize the classification of the current bank collapse level and the early warning of the dynamic changes in the risk of bank collapse in the future, which is helpful to improve the prevention and control of bank collapse before the disaster and the emergency response capabilities, reduce or mitigate the disaster impact caused by the sudden bank collapse, and has broad application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The technical solution of the present invention is described in detail below with reference to the accompanying drawings.

[0021] Figure 1 This is an operation flow chart of a bank collapse monitoring and early warning evaluation method based on stable slope ratio calculation;

[0022] Figure 2 Predicted slope ratio changes in some sections;

[0023] Figure 3 River bank collapse warning zoning map of Fengtai Xinjiandui in the Anhui section of the Huaihe River DETAILED DESCRIPTION

[0024] Example

[0025] The embodiment of the present invention takes the Fengtai Xinjian bank section of the Anhui section of the Huaihe River as an example. The Fengtai Xinjian bank section of the Anhui section of the Huaihe River is an alluvial plain river. The river bank geological structure is mostly binary structure, the river bank resistance is poor, and the river regime changes violently and frequently. The stable slope ratio of the river section is calculated, and the water-sediment mathematical model is used to predict the future changes in the river bank slope ratio. The stability of the bank is evaluated by combining the factors affecting the bank collapse, such as river type, geology, river regime evolution, and possible disaster losses after bank collapse. It provides a demonstration for the stability evaluation of the Huaihe River bank and provides technical support for the competent departments to improve their ability to prevent and control bank collapse disasters and emergency response.

[0026] like Figure 1 As shown, a bank collapse monitoring and early warning evaluation method based on stable slope ratio calculation includes the following steps:

[0027] S1: Collect, collate and analyze basic data and recommend stable slope ratios for each river section

[0028] Collect multiple measurements and a wide range of measured cross-section data, classify them according to different river types such as straight, curved and branched and different geological sections, deduct the river sections where the bank protection project is implemented, calculate the maximum slope ratio of each measured section, and take the largest slope ratio in each river section as the recommended stable slope ratio value for this river section.

[0029] Specific example: Collect measured cross-section data of the newly built bank section of Fengtai in the Anhui section of the Huaihe River in 1992, 1998, 2009, 2013, 2021, 2022 and 2023. The river bank of this section is a curved river type. The geology is mainly the outer beach of the embankment. The surface is mainly distributed with ①2 layers of sandy loam and fine sand. The soil structure of this layer is loose, with medium permeability and poor anti-seepage and anti-impact capabilities. No bank protection project has been implemented in this section. Mathematical statistics of the measured slope ratios of this section over the years were performed, and the 5th percentile value of the slope ratio was selected as the stable slope ratio of the river bank, which is 0.25.

[0030] Table 1 Statistical values ​​of measured cross-section slope parameters

[0031]

[0032] S2: Build a water-sediment model to obtain the predicted slope ratio

[0033] The theory of non-uniform and unbalanced sediment transport is adopted to construct a water-sediment mathematical model. A water-sediment series including a typical flood year is selected as the boundary to predict changes in the water level, nearshore flow velocity, flow dynamic axis, deep-channel swing, riverbed scouring and siltation in the river channel. The future evolution of river flow and changes in bank slopes in each river section are analyzed to obtain the predicted slope ratio of each section.

[0034] Specific example: Using the theory of non-uniform and unbalanced sediment transport, a mathematical model of water and sediment in the newly built Fengtai section of the Huaihe River in Anhui Province is established. The model range is from Lutaizi to Xiashankou; the inlet boundary of the model is the Lutaizi hydrological station, with given daily average flow, sediment content, and suspended load gradation; the outlet boundary is the Xiashankou water level station, with given daily water level process. The model parameters were calibrated, and the difference between the simulated and measured flood peak water levels was 0.10m. The relative errors of the peak values ​​of flow and sediment content did not exceed 10%, and the model accuracy could meet the requirements. It is predicted that the plan morphology of this river section is relatively stable, the amplitude of deep gullies is small, there is no major planar change in the river channel, and the water flow trend is relatively stable. The mainstream of the river channel flows downward along the right bank, and the beach suddenly expands to the left bank after turning. The top impact point of the mainstream during the flood season is biased towards the left bank. The underwater riverbed deep gullies are slightly scoured as a whole, with an average scouring volume of about 0.3 meters. The predicted slope ratio values ​​of each section are shown in Table 2, and the changes in the predicted slope ratios of some sections are shown in Table 2. Figure 2 .

[0035] Table 2 Predicted slope ratio values ​​for each section

[0036]

[0037]

[0038] S3: Compare the predicted slope ratio in S3 with the stable slope ratio in S1, and preliminarily divide the warning level.

[0039] For river sections without bank protection projects, when the predicted slope ratio is less than 0.9 times the stable slope ratio, the bank slope is relatively stable and is preliminarily divided into a blue bank section; when the predicted slope ratio is between 0.9 and 1.0 times the stable slope ratio, there is a hidden danger of bank slope stability and an advance warning should be given; when the predicted slope ratio is greater than or equal to the stable slope ratio, the river bank will be very unstable and may collapse at any time, and is defined as a red dangerous bank section.

[0040] Specific example: According to the mathematical statistics results in S1, the recommended stable slope ratio of this river section is 0.25. This river bank is a river section without bank protection projects. Combined with the predicted slope ratio values ​​of each section in S2, it can be compared: the predicted slope of section 21+295 to section 21+745 is between 0.9 and 1.0 times the stable slope ratio, which is preliminarily divided into an orange warning river section; the predicted slope ratio of section 21+745 to section 22+711 is less than 0.9 times the stable slope ratio, which is preliminarily divided into a blue general river section; the predicted slope ratio of section 22+711 to section 23+185 is greater than the stable slope ratio, which is preliminarily divided into a red dangerous river section.

[0041] S4: Modify the warning level and draw a warning zoning map.

[0042] On the basis of the preliminary warning levels divided in step S3, the warning levels are revised in combination with the evolution of river conditions such as deep-channel swings and water flow dynamic axes, and the possible disaster losses to flood control, water supply, shipping, ecology and river-related projects after bank collapse, etc. The risk levels of river bank collapse in different regions are divided, and a river bank collapse warning zoning map is drawn.

[0043] Specific example: From the prediction of the water-sediment model in step S2, it can be seen that the plane shape of this river section is relatively stable, the swing amplitude of the deep channel is small, there is no major plane change in the river channel, and the water flow trend is relatively stable. The main stream of the river channel flows down along the right bank, and the beach suddenly expands after turning to the left bank. The main stream top rush point is biased towards the left bank during the flood season. The underwater riverbed deep channel is slightly scoured as a whole, with an average scouring amount of about 0.3 meters. The initial warning level remains unchanged; according to the protection and utilization plan of the important river channel shoreline in the Huaihe River Basin, this section is located in the shoreline protection area, 450m downstream from the Huaihe River Bridge of Jiqi Expressway, and this section is located in the water source protection area of ​​Maoji Water Plant. In terms of the degree of hazard, the narrowest part of this section of beach is 47m away from the embankment, and the width of the rest of the beach is between 47m and 102m. There is no bank protection project. The collapse of the bank may affect the safety of the flood control project of the Raojing section of the Huaibei embankment, and affect the shoreline planning and water supply safety. Therefore, it is determined that the degree of hazard caused by the collapse of the bank in the dangerous section of Fengtai Xinjian Team of the Huaihe River is very high, and the warning level is revised. The river section from section 21+295 to section 21+745 is an orange warning river section; the river section from section 21+745 to section 22+711 is a blue general river section; the river section from section 22+711 to section 23+185 is a red dangerous river section.

[0044] According to the correction results of the warning level, the risk levels of river bank collapse in different regions are divided, and a river bank collapse warning zoning map is drawn, with different blue, orange and red symbols to show different bank collapse warning levels. Figure 3 Shown is the river bank collapse warning zoning map of Fengtai Xinjian Team in the Anhui section of the Huaihe River.

[0045] In the above embodiments, the present invention fully considers the factors affecting bank collapse, such as different river types, geology, river flow evolution, and possible disaster losses after bank collapse, and considers the implementation and completeness of the bank protection project. It has clear ideas and comprehensive content, and can well reflect the actual situation of the river bank. The present invention can not only evaluate the current river bank, but also predict the changes in the risk level of the river bank in the future, realize the classification of the current bank collapse level and the early warning of the dynamic changes in the risk of bank collapse in the future, which is helpful to improve the prevention and control of bank collapse before the disaster and the emergency response capabilities, reduce or mitigate the disaster impact caused by the sudden bank collapse, and has broad application prospects.

[0046] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A bank collapse monitoring and early warning evaluation method based on stable slope ratio calculation, characterized in that: The following steps are involved: Step S1, using multiple times and a large range of measured cross-section data, classifying according to different river types and different geological sections, and recommending stable slope ratios for each river section; Step S2: construct a non-uniform unsaturated sediment transport model, analyze the future river regime evolution and bank slope changes of each river section, and obtain the predicted slope ratio; Step S3, comparing the stable slope ratio of each river section determined in step S1 with the slope ratio predicted in step S2, determining the warning bank section where bank collapse may occur, and preliminarily dividing the river section into a blue stable bank section, an orange warning bank section, and a red dangerous bank section according to whether there is a bank protection project; Step S4, based on the warning level initially divided in step S3, combined with the evolution of the river flow of the deep channel swing and the water flow dynamic axis, and the possible disaster losses to flood control, water supply, shipping, ecology and river-related projects after the bank collapse, the warning level is revised, the river bank collapse risk level in different areas is divided, and the river bank collapse warning zoning map is drawn.

2. The method for monitoring and early warning of bank collapse based on stable slope ratio calculation according to claim 1 is characterized by: In step S1, the measured cross-sectional data of multiple measurements and a large range are collected, and after being classified according to different river types such as straight, curved and branched and different geological sections, the river sections where the bank protection project is implemented are deducted, and the measured slope ratios of each section over the years are mathematically statistically analyzed, the maximum slope ratio value of each measured section is calculated, the maximum slope ratio values ​​of each measured section are ranked, and the 5th percentile value is selected as the recommended stable slope ratio value of this river section.

3. The method for monitoring and early warning of bank collapse based on stable slope ratio calculation according to claim 1 is characterized by: In step S2, the theory of non-uniform and unbalanced sediment transport is used to construct a water-sediment mathematical model. The water-sediment series including the typical flood year is selected as the boundary to predict the water level in the river channel, the nearshore flow velocity, the water flow dynamic axis, the deep channel swing, and the riverbed scouring and siltation changes. The future river flow evolution and bank slope changes of each river section are analyzed to obtain the predicted slope ratio of each section.

4. The method for monitoring and early warning of bank collapse based on stable slope ratio calculation according to claim 1 is characterized by: In step S3, the warning level is initially divided according to the comparison between the predicted slope ratio and the stable slope ratio. The specific method is as follows: 1) For river sections without bank protection works, when the predicted slope ratio is less than 0.9 times the stable slope ratio, the bank slope is relatively stable and is initially classified as a blue bank section; when the predicted slope ratio is between 0.9 and 1.0 times the stable slope ratio, there is a hidden danger of bank slope stability, which is defined as an orange warning bank section; when the predicted slope ratio is greater than or equal to the stable slope ratio, the river bank will be very unstable and may collapse at any time, which is defined as a red dangerous bank section; 2) For river sections with bank protection projects, the bank sections where the predicted slope ratio does not change or decreases slightly are defined as general bank sections. Otherwise, attention needs to be paid and early warning needs to be strengthened.

5. The method for monitoring and early warning of bank collapse based on stable slope ratio calculation according to claim 1 is characterized by: In step S4, the warning level initially divided in S3 is revised in combination with the evolution of river flow and the possible disaster losses after bank collapse. The specific method is as follows: For the bank section where the deep gully swings towards the river bank, the warning level is raised by one level. If the deep gully swings away, the warning level is lowered by one level. Based on the river bank protection and utilization plan, if the collapse of the bank has an impact on flood control, water supply, shipping, ecology and river-related projects, the warning level is raised by one level.

Citation Information

Cited By

  • Early warning method for riverway bank collapse based on soil surface displacement acceleration trend analysis

    CN119916402A

  • Beach bank collapse prediction method and system based on dynamic mechanism and machine learning

    CN120336998A

  • Risk assessment method and system based on port and navigation project seabed erosion and deposition monitoring

    CN120655108A

  • Sandy river bank collapse real-time monitoring and early warning method

    CN120998012A

  • Multi-index evaluation method for river regime stability of bifurcated reach

    CN122264637A