Impact turbine simulation system and method
By designing an impact turbine simulation system, simulating the operating characteristics of the turbine and calculating the rotation speed, the problem of relying on field tests in the existing technology is solved, the operation efficiency and safety of the hydropower station are improved, and high-precision simulation of the impact turbine is achieved.
Patent Information
- Application Number
- CN202411007809.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-15
AI Technical Summary
In the existing turbine speed control system, there are few simulation research on impact turbines, which usually relies on field tests, which increases the operating risks and costs of power stations. The simplified orifice outflow model cannot fully reflect the complex dynamic characteristics of impact turbines. .
An impact turbine simulation system is designed, including simulation input module, impact turbine simulation module, unit speed simulation module and simulation output module. By obtaining the position information of the needle relay and the folding gear position information, the operating characteristics parameters of the turbine are simulated. And calculate the speed and power of the hydrowheel generator set to replace the traditional field test system.
High-precision simulation of impact turbines is realized, the risks and costs of field tests are reduced, the operation efficiency and safety of hydropower stations are improved, and the gap in the simulation research of impact turbines in the existing technology is filled.
Smart Images

Figure CN118965738A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of hydropower unit control and simulation, and in particular to a pulse turbine simulation system and method. Background Art
[0002] As the core technical equipment of a hydropower station, the turbine speed control system plays a vital role in ensuring the safety and stable operation of the entire power system. The system ensures the continuity and reliability of power output by accurately controlling the operating parameters of the turbine. However, in order to verify and optimize the performance of the turbine speed control system, a large number of field tests are usually required. These tests are not only costly, but also may bring potential risks to the normal operation of the power station and the stability of the power grid.
[0003] Among the existing turbine regulation technologies, the simulation models and algorithms of reaction turbines have been widely studied and applied, and have achieved remarkable results. However, for impulse turbines, there are relatively few existing simulation studies, and simplified orifice outflow models are usually used, which cannot fully reflect the complex dynamic characteristics of impulse turbines in actual operation. Therefore, the functional verification and parameter adjustment of the impulse turbine speed control system currently rely mainly on field tests, which undoubtedly increases the risk and cost of power station operation.
[0004] The preceding description is intended to provide general background information and does not necessarily constitute prior art. Summary of the invention
[0005] In response to the above technical problems, the present application provides a pulse turbine simulation system and method, which can realize the simulation of the pulse turbine, replace the traditional field test system, and improve the operating efficiency and safety of the hydropower station.
[0006] In order to solve the above technical problems, the present application provides a Pelton turbine simulation system, comprising a simulation input module, a Pelton turbine simulation module, a unit speed simulation module and a simulation output module connected in sequence;
[0007] The simulation input module is used to obtain the position information of the needle servomotor and the position information of the deflector, and input the position information of the needle servomotor and the position information of the deflector into the impulse turbine simulation module;
[0008] The impulse turbine simulation module is used to simulate the operating characteristic parameters of the turbine based on the received position information of the needle servomotor and the deflector;
[0009] The unit speed simulation module is used to calculate and simulate the speed of the hydro-generator unit based on the operating characteristic parameters and load conditions of the turbine;
[0010] The simulation output module is used to output the rotation speed and power of the hydro-generator set obtained by simulation calculation to the speed governor.
[0011] Further, in some embodiments of the present application, the simulation input module includes a needle servomotor position input unit and a deflector servomotor position input unit;
[0012] The needle servomotor position input unit is connected to the impulse turbine simulation module and is used to convert the acquired needle servomotor position information into a needle servomotor position signal, and transmit the needle servomotor position signal to the impulse turbine simulation module;
[0013] The baffle relay position input unit is connected to the impulse turbine simulation module, and is used to convert the acquired baffle relay position information into a baffle relay position signal, and transmit the baffle relay position signal to the impulse turbine simulation module.
[0014] Further, in some embodiments of the present application, the impulse turbine simulation module includes a nozzle flow calculation unit, a water hammer pressure calculation unit, a static water head setting unit, a working water head calculation unit and a turbine output calculation unit;
[0015] The nozzle flow calculation unit is connected to the needle servomotor position input unit and the water hammer pressure calculation unit, respectively, and is used to calculate the nozzle flow based on the needle servomotor position signal;
[0016] The water hammer pressure calculation unit is connected to the nozzle flow calculation unit and the working water head calculation unit respectively, and is used to calculate the water hammer pressure based on the nozzle flow;
[0017] The static water head setting unit is connected to the working water head calculation unit and is used to set a set value of the static water head;
[0018] The working water head calculation unit is connected to the water hammer pressure calculation unit, the static water head setting unit and the turbine output calculation unit respectively, and is used to calculate the actual working water head of the turbine based on the setting values of the water hammer pressure and the static water head;
[0019] The water turbine output calculation unit is connected to the unit speed simulation module and is used to calculate the output of the water turbine.
[0020] Further, in some embodiments of the present application, the impulse turbine simulation module further includes an impulse turbine efficiency calculation unit and an impulse turbine working flow calculation unit;
[0021] The impulse turbine efficiency calculation unit is connected to the needle servomotor position input unit, the working water head calculation unit and the turbine output calculation unit, respectively, and is used to calculate the efficiency of the turbine based on the needle servomotor position signal and the working water head;
[0022] The impulse turbine working flow calculation unit is connected to the nozzle flow calculation unit, the baffle servo position input unit and the turbine output calculation unit respectively, and is used to calculate the working flow of the turbine based on the baffle servo position signal and the nozzle flow;
[0023] The water turbine output calculation unit is used to calculate the output of the water turbine according to the efficiency of the water turbine, the working flow rate and the actual working water head.
[0024] Further, in some embodiments of the present application, the impulse turbine simulation module further includes a needle servomotor servomotor simulation unit and a deflector servomotor servomotor simulation unit;
[0025] The needle servomotor servomotor simulation unit is connected to the needle servomotor position input unit and the nozzle flow calculation unit, respectively, and is used to simulate the actual movement of the needle servomotor after receiving the control signal based on the needle servomotor position signal;
[0026] The baffle servo follow-up simulation unit is respectively connected to the baffle servo follow-up simulation unit and the impulse turbine working flow calculation unit, and is used to simulate the actual movement of the baffle servo after receiving the control signal based on the baffle servo position signal.
[0027] Further, in some embodiments of the present application, the unit speed simulation module includes a hydro-generator unit load setting unit and a unit speed calculation unit;
[0028] The load setting unit of the hydro-generator set is connected to the speed calculation unit of the set and is used to set the load condition of the hydro-generator set;
[0029] The unit speed calculation unit is connected to the turbine output calculation unit, the hydro-generator load setting unit and the simulation output module respectively, and is used to calculate the speed of the hydro-generator according to the output of the turbine and the load condition of the hydro-generator.
[0030] Further, in some embodiments of the present application, the simulation output module includes a unit speed output unit and a unit power output unit;
[0031] The unit speed output unit is connected to the unit speed calculation unit and is used to convert the speed of the hydro-generator unit into a speed signal for output;
[0032] The unit power output unit is connected to the turbine output calculation unit and is used to convert the turbine output into an output signal for output.
[0033] Further, in some embodiments of the present application, the system further includes a speed regulator;
[0034] The speed governor is connected to the unit speed output unit, the unit power output unit and the impulse turbine simulation module respectively, and is used to adjust the control parameters of the turbine according to the speed signal and the output signal, and feed back the control signal generated according to the control parameters to the impulse turbine simulation module.
[0035] Furthermore, in some embodiments of the present application, the simulation input module adopts AD7606 analog quantity acquisition chip, the impulse turbine simulation module and the unit speed simulation module both adopt ARM chip RK3562J, and the simulation output module adopts conversion chip DAC8728.
[0036] Accordingly, the present application also provides a Pelton turbine simulation method, which is executed in the Pelton turbine simulation system as described above, and comprises the following steps:
[0037] Obtaining the position information of the needle servomotor and the deflector;
[0038] Based on the needle servomotor position information and the deflector position information, the operating characteristic parameters of the water turbine are simulated, wherein the operating characteristic parameters include nozzle flow, water hammer pressure, working water head, water turbine efficiency, water turbine working flow and water turbine output;
[0039] Calculate and simulate the speed and power of the hydro-generator set based on the operating characteristic parameters and load conditions of the hydro-generator;
[0040] The speed and power of the hydro-generator set obtained through simulation calculation are output to the speed governor.
[0041] Implementing the embodiments of the present application has the following beneficial effects:
[0042] As described above, the present application provides an impulse turbine simulation system and method, wherein the impulse turbine simulation system includes a simulation input module, an impulse turbine simulation module, a unit speed simulation module and a simulation output module connected in sequence; the simulation input module is used to obtain the needle servomotor position information and the deflector position information, and input the needle servomotor position information and the deflector position information into the impulse turbine simulation module; the impulse turbine simulation module is used to simulate the operating characteristic parameters of the turbine based on the received needle servomotor position information and the deflector position information; the unit speed simulation module is used to calculate and simulate the speed of the hydro-generator set based on the operating characteristic parameters and load conditions of the turbine; the simulation output module is used to output the speed and power of the hydro-generator set obtained by simulation calculation to the speed governor. The impulse turbine simulation system and method provided in the present application, through the integration of a simulation input module, an impulse turbine simulation module, a unit speed simulation module and a simulation output module, has a simple structure, is easy to operate, can reflect the working status and performance of the turbine in real time, and provide instant feedback for the control and operation of the hydropower station. It replaces the traditional field test system to realize the simulation research of the impulse turbine. Without increasing the actual operation risk, it provides a simulation system that can perform function verification and parameter adjustment on the impulse turbine governor, helping managers to reduce the workload and cost of on-site testing of the impulse turbine governor, thereby improving the operation efficiency and safety of the hydropower station, and filling the gap in the existing technology of lack of simulation research on the impulse turbine. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] The drawings herein are incorporated into the specification and constitute a part of the specification, illustrate embodiments consistent with the present application, and together with the specification are used to explain the principles of the present application. In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the description of the embodiments are briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor.
[0044] Figure 1 It is a structural schematic diagram of a first implementation mode of the impulse turbine simulation system provided in the embodiment of the present application;
[0045] Figure 2 It is a structural schematic diagram of a second implementation mode of the impulse turbine simulation system provided in the embodiment of the present application;
[0046] Figure 3 It is a structural schematic diagram of a third implementation mode of the impulse turbine simulation system provided in the embodiment of the present application;
[0047] Figure 4It is a flow chart of the impulse turbine simulation method provided in the embodiment of the present application.
[0048] Illustrations: 100-simulation input module; 200-impact turbine simulation module; 300-unit speed simulation module; 400-simulation output module; 1-needle servo position input unit; 2-baffle position input unit; 3-needle servo follow-up simulation unit; 4-baffle servo follow-up simulation unit; 5-nozzle flow calculation unit; 6-water hammer pressure calculation unit; 7-static water head setting unit; 8-working water head calculation unit; 9-impact turbine efficiency calculation unit; 10-impact turbine working flow calculation unit; 11-turbine output calculation unit; 12-hydraulic generator set load setting unit; 13-unit speed calculation unit; 14-unit speed output unit; 15-unit power output unit.
[0049] 100. Simulation input module; 200. Impulse turbine simulation module; 300. Unit speed simulation module; 40. Simulation output module; 1. Needle servo position input unit; 2. Baffle position input unit; 3. Needle servo follow-up simulation unit; 4. Baffle servo follow-up simulation unit; 5. Nozzle flow calculation unit; 6. Water hammer pressure calculation unit; 7. Static water head setting unit; 8. Working water head calculation unit; 9. Impulse turbine efficiency calculation unit; 10. Impulse turbine working flow calculation unit; 11. Turbine output calculation unit; 12. Hydro-generator load setting unit; 13. Unit speed calculation unit; 14. Unit speed output unit; 15. Unit power output unit
[0050] The realization of the purpose, functional features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings. The above-mentioned drawings have shown clear embodiments of this application, which will be described in more detail later. These drawings and textual descriptions are not intended to limit the scope of the concept of this application in any way, but to illustrate the concept of this application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0051] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.
[0052] It should be noted that, in this article, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "includes a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element. In addition, components, features, and elements with the same name in different embodiments of the present application may have the same meaning or different meanings, and their specific meanings need to be determined by their explanation in the specific embodiment or further combined with the context of the specific embodiment.
[0053] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0054] In the subsequent description, the suffixes such as "module", "component" or "unit" used to represent elements are only used to facilitate the description of the present application, and have no specific meanings. Therefore, "module", "component" or "unit" can be used in a mixed manner.
[0055] The turbine speed control system is an important equipment of the hydropower station and an important guarantee for the safety and stability of the power system. In the turbine control system, the dynamic characteristics of the turbine have an important impact on the stability of the hydropower unit control system and the power grid connected to it. In order to ensure the control performance of the turbine speed control system, a large number of field tests are required. These may bring hidden dangers to the safe and stable operation of the power station and the power grid. To this end, a large number of tests and adjustments can be carried out through simulation tests. For the widely used reaction turbine, a large number of studies have been conducted on simulation models and algorithms, and many research results have been achieved. However, in these studies, there is basically no content related to the impulse turbine speed control system. In the simulation calculation of the power system and a large number of studies, there are more studies and descriptions on the reaction turbine model. The model of the impulse turbine often adopts a simplified orifice outflow model, which cannot reflect the true characteristics of the impulse turbine. Therefore, the functional verification and parameter adjustment of the impulse hydropower unit speed control system can only be achieved through field tests.
[0056] In order to meet the control requirements of an impulse turbine unit whose baffles are controlled by switches, an embodiment of the present application provides an impulse turbine simulation system and method.
[0057] See also Figure 1 , Figure 11 is a schematic diagram of the structure of the first embodiment of the impulse turbine simulation system provided in the embodiment of the present application. The impulse turbine simulation system provided in the embodiment may specifically include a simulation input module 100, an impulse turbine simulation module 200, a unit speed simulation module 300 and a simulation output module 400 connected in sequence;
[0058] The simulation input module 100 is used to obtain the position information of the needle servomotor and the position information of the deflector, and input the position information of the needle servomotor and the position information of the deflector into the impulse turbine simulation module 200;
[0059] The impulse turbine simulation module 200 is used to simulate the operating characteristic parameters of the turbine based on the received needle servomotor position information and the deflector position information;
[0060] The unit speed simulation module 300 is used to calculate and simulate the speed of the hydro-generator unit based on the operating characteristic parameters and load conditions of the hydro-turbine;
[0061] The simulation output module 400 is used to output the rotation speed and power of the hydro-generator set obtained by simulation calculation to the speed governor.
[0062] Specifically, the impulse turbine simulation device provided in this embodiment includes a simulation input module 100, an impulse turbine simulation module 200, a unit speed simulation module 300 and a simulation output module 400; the simulation input module 100 includes two input modules. One is a nozzle servo position or a speed governor control output measurement unit, and the obtained signal is sent to the nozzle flow calculation unit in the impulse turbine simulation module 200, and the other is a deflector actual position measurement or a deflector control signal measurement unit output by the speed governor, and the obtained signal is sent to the impulse turbine working flow calculation unit in the impulse turbine simulation module 200; the impulse turbine simulation module 200 is connected to the unit speed output unit through the unit speed calculation unit through one way, and is directly connected to the unit power output unit through the other way; the unit speed simulation module 300, the output is connected to the unit speed output unit; the simulation output module includes two parts: the unit speed output unit and the unit power output unit.
[0063] like Figure 1As shown, the impulse turbine simulation system provided in this embodiment specifically includes a simulation input module 100, an impulse turbine simulation module 200, a unit speed simulation module 300 and a simulation output module 400 which are connected in sequence, the output end of the simulation input module 100 is connected to the input end of the impulse turbine simulation module 200 to ensure that the input signal can be directly transmitted to the simulation module, the output end of the impulse turbine simulation module 200 is connected to the input end of the unit speed simulation module 300 to transmit the calculated turbine output to the speed simulation module, and the output end of the unit speed simulation module 300 is connected to the input end of the simulation output module 400 to transmit the calculated unit speed information to the output module.
[0064] Among them, the simulation input module, as the starting point of the simulation system, receives and processes external signals to provide initial data for the simulation. The simulation input module can include sensors or interfaces for obtaining the position signals of the nozzle servomotor and the deflector, which reflect the control output of the turbine governor. The impulse turbine simulation module simulates the operating characteristics of the turbine according to the input signals, including flow, pressure, efficiency and output. The module calculates the key parameters of the turbine nozzle flow, water hammer pressure, working head, etc. according to the input nozzle servomotor and deflector position signals through built-in algorithms and models, and further calculates the efficiency and output of the turbine. The unit speed simulation module calculates and simulates the speed of the turbine generator set according to the output and load conditions of the turbine. The module receives the output of the turbine output calculation unit, and determines the speed of the turbine generator set through the speed calculation algorithm in combination with the load setting. The simulation output module outputs the unit speed and power obtained by simulation calculation in an appropriate form for feedback control or display. The module may include a digital-to-analog converter and a signal processing circuit to convert digital signals into analog signals or communication signals for use by the speed governor or other systems.
[0065] This embodiment uses advanced ARM or DSP technology, and the simulation system can accurately simulate the operating characteristics of the impulse turbine, including the position control of the needle relay and the deflector, so as to achieve high-precision simulation of the dynamic behavior of the turbine; the system can process the input signal in real time, respond quickly and output the simulation results, and meet the power system's demand for real-time simulation. This is crucial for the stable operation and control of the power system; the simulation system replaces the field test, reduces the direct operation of the actual turbine and the power grid, and reduces the safety hazards and risks caused by the field test. This is of great significance for ensuring the safe and stable operation of the hydropower station and the power grid; the simulation system can simulate the operating characteristics of the turbine under different working conditions, and provide a reliable platform for the functional verification and parameter adjustment of the governor. This helps to optimize the control strategy of the turbine, improve its operating efficiency and response speed, reduce the field test through the simulation system, reduce the test cost and time, and improve the economic benefits of the hydropower station. At the same time, the reusability of the simulation system also reduces the maintenance cost in long-term operation.
[0066] Further, in some embodiments, the simulation input module includes a needle servomotor position input unit and a deflector servomotor position input unit;
[0067] A needle servomotor position input unit is connected to the impulse turbine simulation module and is used to convert the acquired needle servomotor position information into a needle servomotor position signal, and transmit the needle servomotor position signal to the impulse turbine simulation module;
[0068] The baffle relay position input unit is connected to the impulse turbine simulation module, and is used for converting the acquired baffle relay position information into a baffle relay position signal, and transmitting the baffle relay position signal to the impulse turbine simulation module.
[0069] Specifically, the simulation input module in this embodiment includes a needle servomotor position input unit and a deflector position input unit, and these two units are responsible for receiving key position signals in the turbine speed control system. Among them, the needle servomotor position input unit receives the actual position signal of the needle servomotor, which reflects the state of the speed governor control output, converts the mechanical position into an electrical signal through a sensor, and then converts it into a digital signal through an analog-to-digital converter (such as an AD7606 chip) for subsequent processing. The deflector position input unit receives the actual position signal of the deflector, which also reflects the control output of the speed governor. Similar to the needle servomotor position input unit, signal acquisition and conversion are performed through sensors and analog-to-digital converters.
[0070] like Figure 2As shown, the output end of the needle servomotor position input unit 1 is connected to the first input end of the impulse turbine simulation module 200, and the output end of the diverter position input unit 2 is connected to the second input end of the impulse turbine simulation module 200. In a specific embodiment, the needle servomotor position input unit measures the needle servomotor position or collects the control amount of the needle servomotor position calculated by the governor, and the diverter position input unit measures the actual position of the diverter servomotor or collects the diverter control command output by the governor.
[0071] In this embodiment, by accurately collecting the position signals of the needle servomotor and the deflector, the simulation module can truly reflect the operating characteristics of the turbine under different control states. The simulation results can be used for feedback control of the speed governor to improve the operating efficiency and stability of the turbine.
[0072] Further, in some embodiments, the impulse turbine simulation module includes a nozzle flow calculation unit, a water hammer pressure calculation unit, a static water head setting unit, a working water head calculation unit and a turbine output calculation unit;
[0073] a nozzle flow calculation unit, connected to the needle servomotor position input unit and the water hammer pressure calculation unit, respectively, and used to calculate the nozzle flow based on the needle servomotor position signal;
[0074] A water hammer pressure calculation unit is connected to the nozzle flow calculation unit and the working water head calculation unit respectively, and is used to calculate the water hammer pressure based on the nozzle flow;
[0075] A static water head setting unit, connected to the working water head calculation unit, is used to set a set value of the static water head;
[0076] The working water head calculation unit is connected to the water hammer pressure calculation unit, the static water head setting unit and the turbine output calculation unit respectively, and is used to calculate the actual working water head of the turbine based on the set values of the water hammer pressure and the static water head;
[0077] The turbine output calculation unit is connected to the unit speed simulation module and is used to calculate the turbine output.
[0078] Specifically, the impulse turbine simulation module 200 in this embodiment includes a nozzle flow calculation unit 5, a water hammer pressure calculation unit 6, a static water head setting unit 7, a working water head calculation unit 8 and a turbine output calculation unit 11. Among them, the nozzle flow calculation unit 5 calculates the flow through the nozzle according to the output signal of the nozzle needle servomotor position input unit 1, uses the position signal of the nozzle needle servomotor as input, and calculates the flow according to the geometric relationship between the nozzle and the servomotor and the principle of fluid mechanics. The water hammer pressure calculation unit 6 calculates the water hammer pressure according to the output of the nozzle flow calculation unit 5, and calculates the water hammer pressure by combining the flow and the turbine design parameters using the principle of fluid dynamics. The static water head setting unit 7 provides a set value of the static water head as the basis for calculating the working water head. The static water head is a preset parameter, usually based on the installation position of the turbine and the water level of the reservoir. The working water head calculation unit 8 combines the static water head and the water hammer pressure rise value to calculate the actual working water head of the turbine. The working water head is a key parameter affecting the efficiency and output of the turbine, and is determined by the difference between the static water head and the water hammer pressure. The turbine output calculation unit 11 calculates the turbine output according to the working water head and flow rate. The turbine output is a measure of its ability to convert water energy into mechanical energy. The output is calculated according to the working water head and flow rate, as well as the design parameters of the turbine.
[0079] like Figure 2 As shown, the output of the nozzle flow calculation unit 5 is connected to the input of the water hammer pressure calculation unit 6, the output of the water hammer pressure calculation unit 6 is connected to the input of the working water head calculation unit 8, the working water head calculation unit 8 receives the output of the static water head setting unit 7, and combines it with the output of the water hammer pressure to calculate the working water head, and the output of the working water head calculation unit 8 is connected to the input of the turbine output calculation unit 11.
[0080] In this embodiment, through the coordinated work of the above-mentioned units, the impulse turbine simulation module can simulate the performance of the turbine under different working conditions, including key parameters such as flow, pressure, head and output.
[0081] Further, in some embodiments, the impulse turbine simulation module further includes an impulse turbine efficiency calculation unit and an impulse turbine working flow calculation unit;
[0082] The impulse turbine efficiency calculation unit is connected to the needle servomotor position input unit, the working water head calculation unit and the turbine output calculation unit respectively, and is used to calculate the efficiency of the turbine based on the needle servomotor position signal and the working water head;
[0083] The impulse turbine working flow calculation unit is connected to the nozzle flow calculation unit, the baffle servo position input unit and the turbine output calculation unit respectively, and is used to calculate the working flow of the turbine based on the baffle servo position signal and the nozzle flow;
[0084] The turbine output calculation unit is used to calculate the turbine output according to the turbine efficiency, working flow and actual working water head.
[0085] Specifically, the impulse turbine simulation module 200 in this embodiment also includes an impulse turbine efficiency calculation unit 9 and an impulse turbine working flow calculation unit 10. The impulse turbine efficiency calculation unit 9 is used to calculate the efficiency of the turbine, that is, the efficiency of converting water energy into mechanical energy. The unit receives the output signal of the nozzle relay position input unit 1 and the third output terminal signal of the working head calculation unit 8. Through these signals, combined with the principles of fluid mechanics and mechanical energy conversion, the efficiency of the turbine is calculated. The impulse turbine working flow calculation unit 10 is used to calculate the actual working flow of the turbine, which is another key parameter affecting the output and efficiency of the turbine. The unit receives the output signal of the deflector position input unit 2 and the second output terminal signal of the nozzle flow calculation unit 5. The working flow of the turbine is calculated according to the position of the deflector and the flow of the nozzle. The turbine output calculation unit 11 comprehensively considers the working head, efficiency and working flow to calculate the output of the turbine.
[0086] like Figure 2 As shown, the first input end of the impulse turbine efficiency calculation unit 9 is connected to the output end of the nozzle needle relay position input unit 1, the second input end is connected to the third output end of the working water head calculation unit 8, and the output end is connected to the second input end of the turbine output calculation unit 11. The first input end of the impulse turbine working flow calculation unit 10 is connected to the output end of the deflector position input unit 2, the second input end is connected to the second output end of the nozzle flow calculation unit 5, and the output end is connected to the third input end of the turbine output calculation unit 11.
[0087] By adding the calculation of efficiency and working flow, the simulation module of this embodiment can simulate the performance of the turbine more comprehensively and provide more accurate simulation results. These results can be used for feedback control of the governor, optimize the operating state of the turbine, and improve power generation efficiency.
[0088] Further, in some embodiments, the impulse turbine simulation module further includes a needle servomotor servomotor simulation unit and a deflector servomotor servomotor simulation unit;
[0089] The needle servomotor servomotor simulation unit is connected to the needle servomotor position input unit and the nozzle flow calculation unit respectively, and is used to simulate the actual movement of the needle servomotor after receiving the control signal based on the needle servomotor position signal;
[0090] The baffle servo follow-up simulation unit is respectively connected to the baffle servo follow-up simulation unit and the impulse turbine working flow calculation unit, and is used to simulate the actual movement of the baffle servo after receiving the control signal based on the baffle servo position signal.
[0091] Specifically, the impulse turbine simulation module 200 in this embodiment also includes a needle relay follower simulation unit 3 and a deflector relay follower simulation unit 4. Among them, the needle relay follower simulation unit 3 is used to simulate the actual movement of the needle relay after receiving the control signal to ensure that the position of the needle is synchronized with the control signal. The unit receives the output signal of the needle relay position input unit 1, and calculates the actual position of the needle relay by simulating the follow-up system model, which may be based on control theory and mechanical dynamics. The deflector relay follower simulation unit 4 is used to simulate the actual movement of the deflector after receiving the control signal to ensure that the position of the deflector is synchronized with the control signal. The unit receives the output signal of the deflector position input unit 2, and calculates the actual position of the deflector relay by simulating the follow-up system model.
[0092] like Figure 3 As shown, the input end of the needle servomotor simulation unit 3 is connected to the output end of the needle servomotor position input unit 1, the first output end of the needle servomotor simulation unit 3 is connected to the first input end of the nozzle flow calculation unit 5, and provides simulation data of the needle position to calculate the nozzle flow, and the second output end of the needle servomotor simulation unit 3 is connected to the first input end of the impulse turbine efficiency calculation unit 9, and provides simulation data of the needle position to calculate the turbine efficiency. The input end of the deflector servomotor simulation unit 4 is connected to the output end of the deflector position input unit 2, and the output end of the deflector servomotor simulation unit 4 is connected to the first input end of the impulse turbine working flow calculation unit 10, and provides simulation data of the deflector position to calculate the working flow.
[0093] By simulating the actual action of the servo system, the simulation device can more realistically reflect the dynamic response of the turbine in actual operation, thereby improving the accuracy and practicality of the simulation. These simulation results can be used for feedback control of the governor, optimizing the operating state of the turbine, and improving power generation efficiency and system stability.
[0094] Further, in some embodiments, the unit speed simulation module includes a hydro-generator unit load setting unit and a unit speed calculation unit;
[0095] The load setting unit of the hydro-generator set is connected to the speed calculation unit of the set and is used to set the load condition of the hydro-generator set;
[0096] The unit speed calculation unit is connected to the turbine output calculation unit, the turbine generator unit load setting unit and the simulation output module respectively, and is used to calculate the speed of the turbine generator unit according to the turbine output and the load condition of the turbine generator unit.
[0097] Specifically, the unit speed simulation module 300 in this embodiment is composed of a hydro-turbine generator set load setting unit 12 and a unit speed calculation unit 13. The hydro-turbine generator set load setting unit 12 allows the user to set or simulate the load conditions of the hydro-turbine generator set. Load conditions are key factors affecting turbine speed and power generation efficiency. Users can input or adjust load parameters through this unit, and these parameters will serve as one of the inputs for unit speed calculation. The unit speed calculation unit 13 is used to calculate the speed of the hydro-turbine generator set based on the output of the turbine and the set load conditions. By receiving the output of the turbine from the turbine output calculation unit 11 and the output load condition of the hydro-turbine generator set load setting unit 12, the speed of the hydro-turbine generator set is determined using a speed calculation method.
[0098] like Figure 2 As shown, the output end of the load setting unit 12 of the turbine generator set is connected to the first input end of the unit speed calculation unit 13 to provide load information. The first output end of the turbine output calculation unit 11 is connected to the second input end of the unit speed calculation unit 13 to provide turbine output data.
[0099] Through modular design and closed-loop control, the simulation device of this embodiment can simulate the speed changes of the turbine under different load conditions, providing important data and analysis tools for the design, testing and operation of the turbine. The simulation results can be used for feedback control of the speed governor to improve the operating efficiency and stability of the turbine.
[0100] Further, in some embodiments, the simulation output module includes a unit speed output unit and a unit power output unit;
[0101] The unit speed output unit is connected to the unit speed calculation unit and is used to convert the speed of the hydro-generator unit into a speed signal for output;
[0102] The unit power output unit is connected to the turbine output calculation unit and is used to convert the turbine output into an output signal for output.
[0103] Specifically, the simulation output module in this embodiment is composed of a unit speed output unit and a unit power output unit. The unit speed output unit is used to convert the output of the unit speed calculation unit into a signal that can be used by the actual speed governor, such as an analog voltage or current signal, or a digital signal, and convert the digital signal into an analog signal through a digital-to-analog converter (such as DAC8728), or send the digital signal to the speed governor through a communication interface. The unit power output unit is used to convert the output of the turbine output calculation unit into a signal reflecting the power size of the turbine, which is used for power regulation feedback of the actual speed governor. It is also possible to use a digital-to-analog converter to convert the calculated digital power value into an analog signal, or send a digital signal through a communication interface.
[0104] like Figure 2 As shown, the output end of the unit speed calculation unit 13 is connected to the input end of the unit speed output unit 14 to ensure that the speed information can be accurately transmitted. The second output end of the turbine output calculation unit 11 is connected to the input end of the unit power output unit 15 to ensure that the power information can be accurately transmitted.
[0105] Through closed-loop control in this embodiment, the simulation system can adjust the operating parameters of the turbine in real time, optimize its operating performance, and improve power generation efficiency and system stability. The output of the simulation output module can also be used for operator monitoring and analysis to provide real-time unit operating status information.
[0106] Further, in some embodiments, the system further comprises a speed regulator;
[0107] The speed governor is connected to the unit speed output unit, the unit power output unit and the impulse turbine simulation module respectively, and is used to adjust the control parameters of the turbine according to the speed signal and the output signal, and feed back the control signal generated according to the control parameters to the impulse turbine simulation module.
[0108] Specifically, the impulse turbine simulation system in this embodiment also includes a speed governor, which is connected to the unit speed output unit, the unit power output unit and the impulse turbine simulation module respectively. The unit speed output unit outputs the calculated speed information of the turbine generator set and provides it to the speed governor as a feedback signal. The output of the unit speed calculation unit is processed (possibly through a digital-to-analog converter) and converted into a signal that can be recognized by the speed governor, such as an analog voltage or current signal; the unit power output unit outputs the calculated turbine power information and provides it to the speed governor as a feedback signal for power regulation. The output of the turbine output calculation unit is processed and converted into a power signal that can be recognized by the speed governor. The input end of the speed governor receives the unit speed and power signals from the simulation output module, adjusts the control parameters of the turbine according to these signals, and the control algorithm inside the speed governor calculates the control quantity that needs to be adjusted according to the received speed and power signals, such as the position of the nozzle needle relay or the position of the deflector. The output end of the speed governor outputs the control signal calculated by the speed governor, which is used to control the needle relay and deflector of the turbine. The speed governor generates control signals based on the internal algorithm and the feedback signals received. These signals are fed back to the turbine simulation module through the simulation input module to form a closed-loop control.
[0109] This embodiment forms a closed-loop control system by connecting the output of the simulation output module to the input of the speed regulator, and connecting the output of the speed regulator to the simulation input module. The stability and responsiveness of the turbine operation can quickly adapt to changes in grid demand and turbine operating conditions. The combination of the simulation system and the actual speed regulator allows the simulation results to be directly used in actual control, improving the practicality and accuracy of the simulation.
[0110] Furthermore, in some embodiments, the simulation input module uses the AD7606 analog quantity acquisition chip, the impulse turbine simulation module and the unit speed simulation module both use the ARM chip RK3562J, and the simulation output module uses the conversion chip DAC8728.
[0111] Specifically, the simulation input module in this embodiment adopts the AD7606 analog quantity acquisition chip. AD7606 is a high-precision analog-to-digital converter that can accurately collect analog signals of the nozzle relay position and the deflector position, and convert them into digital signals for subsequent module processing. The impulse turbine simulation module and the unit speed simulation module use the ARM chip RK3562J. ARM chips are widely used in embedded systems for their efficient processing capabilities and low energy consumption. As a digital signal processor (DSP), RK3562J can quickly perform complex mathematical operations to meet the requirements of the simulation module for real-time and calculation accuracy. The simulation output module uses a DA conversion chip DAC8728. DAC8728 is a high-precision digital-to-analog converter that is responsible for converting the digital signals obtained by simulation calculations into analog signals for use by the speed regulator or other forms of output.
[0112] To sum up, the impulse turbine simulation system provided in this embodiment has a simple structure and is easy to operate through the integration of a simulation input module, an impulse turbine simulation module, a unit speed simulation module and a simulation output module. It can reflect the working status and performance of the turbine in real time, provide instant feedback for the control and operation of the hydropower station, and replace the traditional field test system to realize the simulation research of the impulse turbine. Without increasing the actual operation risk, a simulation system is provided that can perform function verification and parameter adjustment on the impulse turbine governor, helping managers to reduce the workload and cost of on-site testing of the impulse turbine governor, thereby improving the operation efficiency and safety of the hydropower station, and filling the gap in the existing technology for the lack of simulation research on the impulse turbine.
[0113] Correspondingly, this embodiment also provides a pulse turbine simulation method, wherein the meanings of the terms are the same as those in the above-mentioned pulse turbine simulation system, and specific implementation details can refer to the description in the system embodiment.
[0114] See also Figure 4 , Figure 4 The flowchart of the impulse turbine simulation method provided in this embodiment is as follows. The test method is executed in the impulse turbine simulation system as described above. The specific flow of the impulse turbine simulation method is as follows:
[0115] S1. Get the needle servo position information and deflector position information;
[0116] S2. Based on the position information of the nozzle servo and the deflector, simulate the operating characteristic parameters of the turbine, the operating characteristic parameters including nozzle flow, water hammer pressure, working water head, turbine efficiency, turbine working flow and turbine output;
[0117] S3. Calculate and simulate the speed and power of the turbine generator set based on the operating characteristic parameters and load conditions of the turbine;
[0118] S4. Output the speed and power of the hydro-generator set obtained by simulation calculation to the speed governor.
[0119] In a specific embodiment, first, the speed regulator control output is collected through the simulation input module, the needle servomotor position or the speed regulator control output is measured, the needle servomotor position is measured by the needle servomotor position input unit or the control quantity of the needle servomotor position calculated by the speed regulator is collected; the actual position of the deflector is measured or the deflector control signal output by the speed regulator is measured; the actual position of the deflector servomotor is measured by the deflector position input unit or the deflector control command output by the speed regulator is collected.
[0120] Then, according to the needle servomotor position control target value measured by the needle servomotor position input unit, the needle servomotor servo simulation unit calculates the actual position of the needle servomotor according to the established servo system model. If the needle servomotor position input unit measures the position of the needle servomotor, this step is not required. At the same time, according to the control command of the deflector measured by the module deflector position input unit, the deflector servomotor servo simulation unit calculates the actual position of the deflector servomotor according to the established deflector model. If the deflector position input unit measures the position of the deflector servomotor, this step is not required.
[0121] Next, the nozzle flow calculation unit calculates the nozzle flow Q according to the impulse turbine needle servomotor stroke S measured by the needle servomotor position input unit (or calculated by the needle servomotor servomotor simulation unit) and the dynamic head H calculated by the working head calculation unit; the water hammer pressure calculation unit calculates the water hammer pressure of the water diversion system according to the calculated nozzle flow Q; the static water head setting unit is used to set the static working water head H0 to be calculated and simulated; the working water head calculation unit calculates the turbine working water head H according to the static working water head set by the static water head setting unit and the water hammer pressure rise value calculated by the water hammer pressure calculation unit. The impulse turbine efficiency calculation unit calculates the turbine efficiency according to the needle servomotor stroke S measured by the needle servomotor position input unit (or calculated by the needle servomotor servomotor simulation unit) and the turbine working water head calculated by the working head calculation unit. The impulse turbine working flow calculation unit calculates the impulse turbine flow according to the baffle position measured by the baffle position input unit (or calculated by the baffle relay follow-up simulation unit) and the nozzle flow Q calculated by the nozzle flow calculation unit. The turbine output calculation unit calculates the turbine output P according to the turbine head H calculated by the working head calculation unit, the turbine efficiency k obtained by the impulse turbine efficiency calculation unit, and the turbine flow Q1 obtained by the impulse turbine working flow calculation unit.
[0122] Next, the load setting unit of the hydro-generator set sets the load of the set. The speed calculation unit of the set calculates the speed of the hydro-generator set according to the turbine output obtained by the turbine output calculation unit and the load output set by the load setting unit of the hydro-generator set.
[0123] Finally, the unit speed output unit outputs the unit speed obtained by simulation calculation, generates a corresponding square wave signal to the actual speed governor as the unit frequency signal feedback for control, and realizes closed-loop simulation. The unit power output unit outputs the simulated power reflecting the power size of the impulse turbine, which can be used as the feedback signal for power regulation of the actual speed governor to realize closed-loop simulation.
[0124] It can be seen that the impulse turbine simulation method provided in this embodiment can replace the traditional field test system to realize the simulation research of the impulse turbine. Without increasing the actual operation risk, the function of the impulse turbine governor can be verified and the parameters can be adjusted, thereby improving the operation efficiency and safety of the hydropower station, and filling the gap in the existing technology for the simulation research of the impulse turbine.
[0125] That is, the above description is only an embodiment of the present application, and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the specification and drawings of the present application, such as the mutual combination of technical features between the embodiments, or direct or indirect application in other related technical fields, are also included in the patent protection scope of the present application.
[0126] In addition, for structural elements with the same or similar characteristics, the present application may use the same or different reference numerals for identification. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more features. In the description of the present application, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.
[0127] In this application, the word "for example" is used to mean "used as an example, illustration or description". Any embodiment described as "for example" in this application is not necessarily interpreted as being more preferred or more advantageous than other embodiments. In order to enable any person skilled in the art to implement and use the present application, the present application provides the above description. In the above description, various details are listed for the purpose of explanation.
[0128] It should be understood that those skilled in the art will recognize that the present application can be implemented without using these specific details. In other embodiments, well-known structures and processes will not be elaborated in detail to avoid unnecessary details that make the description of the present application obscure. Therefore, the present application is not intended to be limited to the embodiments shown, but is consistent with the widest range of principles and features disclosed in the present application.
Claims
1. A impulse turbine simulation system, characterized in that: It includes a simulation input module, an impulse turbine simulation module, a unit speed simulation module and a simulation output module which are connected in sequence; The simulation input module is used to obtain the position information of the needle servomotor and the position information of the deflector, and input the position information of the needle servomotor and the position information of the deflector into the impulse turbine simulation module; The impulse turbine simulation module is used to simulate the operating characteristic parameters of the turbine based on the received position information of the needle servomotor and the deflector; The unit speed simulation module is used to calculate and simulate the speed of the hydro-generator unit based on the operating characteristic parameters and load conditions of the turbine; The simulation output module is used to output the rotation speed and power of the hydro-generator set obtained by simulation calculation to the speed governor.
2. The impulse turbine simulation system according to claim 1, characterized in that: The simulation input module includes a needle servomotor position input unit and a deflector servomotor position input unit; The needle servomotor position input unit is connected to the impulse turbine simulation module and is used to convert the acquired needle servomotor position information into a needle servomotor position signal, and transmit the needle servomotor position signal to the impulse turbine simulation module; The baffle relay position input unit is connected to the impulse turbine simulation module, and is used to convert the acquired baffle relay position information into a baffle relay position signal, and transmit the baffle relay position signal to the impulse turbine simulation module.
3. The impulse turbine simulation system according to claim 2, characterized in that: The impulse turbine simulation module includes a nozzle flow calculation unit, a water hammer pressure calculation unit, a static water head setting unit, a working water head calculation unit and a turbine output calculation unit; The nozzle flow calculation unit is connected to the needle servomotor position input unit and the water hammer pressure calculation unit, respectively, and is used to calculate the nozzle flow based on the needle servomotor position signal; The water hammer pressure calculation unit is connected to the nozzle flow calculation unit and the working water head calculation unit respectively, and is used to calculate the water hammer pressure based on the nozzle flow; The static water head setting unit is connected to the working water head calculation unit and is used to set a set value of the static water head; The working water head calculation unit is connected to the water hammer pressure calculation unit, the static water head setting unit and the turbine output calculation unit respectively, and is used to calculate the actual working water head of the turbine based on the setting values of the water hammer pressure and the static water head; The water turbine output calculation unit is connected to the unit speed simulation module and is used to calculate the output of the water turbine.
4. The impulse turbine simulation system according to claim 3, characterized in that: The impulse turbine simulation module also includes an impulse turbine efficiency calculation unit and an impulse turbine working flow calculation unit; The impulse turbine efficiency calculation unit is connected to the needle servomotor position input unit, the working water head calculation unit and the turbine output calculation unit, respectively, and is used to calculate the efficiency of the turbine based on the needle servomotor position signal and the working water head; The impulse turbine working flow calculation unit is connected to the nozzle flow calculation unit, the baffle servo position input unit and the turbine output calculation unit respectively, and is used to calculate the working flow of the turbine based on the baffle servo position signal and the nozzle flow; The water turbine output calculation unit is used to calculate the output of the water turbine according to the efficiency of the water turbine, the working flow rate and the actual working water head.
5. The impulse turbine simulation system according to claim 4, characterized in that: The impulse turbine simulation module also includes a needle servomotor servomotor simulation unit and a deflector servomotor servomotor simulation unit; The needle servomotor servomotor simulation unit is connected to the needle servomotor position input unit and the nozzle flow calculation unit, respectively, and is used to simulate the actual movement of the needle servomotor after receiving the control signal based on the needle servomotor position signal; The baffle servo follow-up simulation unit is respectively connected to the baffle servo follow-up simulation unit and the impulse turbine working flow calculation unit, and is used to simulate the actual movement of the baffle servo after receiving the control signal based on the baffle servo position signal.
6. The impulse turbine simulation system according to claim 3, characterized in that: The unit speed simulation module includes a hydro-generator unit load setting unit and a unit speed calculation unit; The load setting unit of the hydro-generator set is connected to the speed calculation unit of the set and is used to set the load condition of the hydro-generator set; The unit speed calculation unit is connected to the turbine output calculation unit, the hydro-generator load setting unit and the simulation output module respectively, and is used to calculate the speed of the hydro-generator according to the output of the turbine and the load condition of the hydro-generator.
7. The impulse turbine simulation system according to claim 6, characterized in that: The simulation output module includes a unit speed output unit and a unit power output unit; The unit speed output unit is connected to the unit speed calculation unit and is used to convert the speed of the hydro-generator unit into a speed signal for output; The unit power output unit is connected to the turbine output calculation unit and is used to convert the turbine output into an output signal for output.
8. The impulse turbine simulation system according to claim 7, characterized in that: The system also includes a speed governor; The speed governor is connected to the unit speed output unit, the unit power output unit and the impulse turbine simulation module respectively, and is used to adjust the control parameters of the turbine according to the speed signal and the output signal, and feed back the control signal generated according to the control parameters to the impulse turbine simulation module.
9. The impulse turbine simulation system according to claim 1, characterized in that: The simulation input module adopts AD7606 analog quantity acquisition chip, the impulse turbine simulation module and the unit speed simulation module both adopt ARM chip RK3562J, and the simulation output module adopts conversion chip DAC8728.
10. A method for simulating an impulse turbine, characterized in that: The impulse turbine simulation system according to any one of claims 1 to 9 comprises the following steps: Obtaining the position information of the needle servomotor and the deflector; Based on the needle servomotor position information and the deflector position information, the operating characteristic parameters of the water turbine are simulated, wherein the operating characteristic parameters include nozzle flow, water hammer pressure, working water head, water turbine efficiency, water turbine working flow and water turbine output; Calculate and simulate the speed and power of the hydro-generator set based on the operating characteristic parameters and load conditions of the hydro-generator; The speed and power of the hydro-generator set obtained through simulation calculation are output to the speed governor.