Nuclear power station overhaul performance management system and nuclear power station overhaul performance management method

Through the knowledge management, configuration and planning management of the performance management system of the overhaul performance management system of the nuclear power plant, the problems of low efficiency, opacity of information and data islands in traditional overhaul management are solved, the refinement of the overhaul plan and the efficiency of the overhaul plan are achieved, and the performance of overhaul is improved. and information sharing.

CN118966869APending Publication Date: 2024-11-15SANMEN NUCLEAR POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410979392.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The performance management of traditional nuclear power plant overhaul performance management has poor effectiveness, inconsistent standards, low efficiency, low accuracy, opaque information, poor critical path management, data islands, and unclear responsible persons, resulting in poor stability of the overhaul plan, large deviation in execution, and untimely reporting. , problems such as untimely feedback on experience.

Method used

A performance management system for overhaul of nuclear power plant was designed, including the knowledge management layer of nuclear power plant, knowledge configuration layer, overhaul plan management layer and overhaul activity management layer. Through data input, storage, integration and disambiguation, operation and maintenance information and resource information are configured, and the operation and maintenance information and resource information are planned. Maintenance activities form a maintenance plan for single equipment, dynamically adjust the plan, realize key path management, and display key element data through the data display layer to provide performance appraisal and evaluation functions.

Benefits of technology

The prediction and management of implementation deviations and planning deviations of special activities for overhaul special activities has been realized, the dataization of overhaul performance has been improved, the meticulous formulation and implementation of overhaul plan has been enhanced, the performance of overhaul has been improved, information sharing and risk management have been realized, and the status of the power station has been ensured. Real-time display and optimization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118966869A_ABST
    Figure CN118966869A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of nuclear power, and particularly relates to a nuclear power station overhaul performance management system and method. According to the nuclear power station overhaul performance management system disclosed by the invention, through close cooperation among the nuclear power station knowledge management layer, the nuclear power station knowledge configuration layer, the overhaul plan management layer and the overhaul activity management layer, prediction and management of overhaul special activity execution deviation, overhaul execution deviation, overhaul planning deviation and unit overhaul distribution are realized; and unit factor prediction and optimization are realized. The datamation of the overhaul performance is realized, and a grasp is provided for the overhaul performance management; and the overhaul performance is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of nuclear power technology, and in particular relates to a nuclear power plant overhaul performance management system and method. Background Art

[0002] Nuclear power unit overhaul refers to the production activities of periodically shutting down the reactor for a long time to ensure the safe, reliable, stable and economical operation of the unit according to the aging characteristics of the equipment and the requirements of the technical specifications, and completing the maintenance, modification, inspection and testing that cannot be carried out during normal operation. The weight of the impact on the unit capacity factor is more than 90%. Overhaul is a comprehensive activity with the most concentrated tasks, the most complex logic, the widest scope, the most coordination factors, the most intensive high-risk work and the highest management requirements in nuclear power plant production activities. The performance management of traditional nuclear power plant overhaul is maintained manually, and there are problems in overhaul planning, such as poor effectiveness, inconsistent standards, low efficiency and accuracy, poor display effect and easy errors, opaque overhaul information display, frequent ticket skipping and other ticket omissions. In terms of overhaul preparation, the stability of the overhaul plan is poor; the integrity and accuracy of resources such as overhaul personnel, documents, equipment, spare parts, tools, etc. are low; due to incomplete information, extensive management, the management of overhaul key paths is not refined, and the professional attention is poor; the statistics of overhaul key paths are too large, and the window analysis report data cannot fully display the current status of the unit; the person in charge is unclear, the key path lacks a handle, and the workflow, data flow and business flow of power plant production and overhaul activities are limited to the flow and storage in this system. Each professional business process is basically a "data island" and cannot become a production factor shared by overhaul participants, which greatly reduces the value of data. In the overhaul implementation stage, there are problems such as poor effectiveness of key path information dissemination; poor attention to the key path and untimely promotion; poor measurement and contrast, and weak promotion. In the overhaul summary stage, there are problems such as untimely overhaul summary, isolated overhaul reports of various departments, professions, and activities, inconsistent information; untimely overhaul records, power plant management system data cannot fully and correctly display the current status of the power plant; untimely feedback on overhaul experience. Summary of the invention

[0003] In order to overcome the problems existing in the related technologies, a nuclear power plant overhaul performance management system and method are provided.

[0004] According to one aspect of an embodiment of the present disclosure, a nuclear power plant overhaul performance management system is provided, the system comprising: a nuclear power plant knowledge management layer, a nuclear power plant knowledge configuration layer, an overhaul plan management layer, and an overhaul activity management layer;

[0005] The knowledge management layer of nuclear power plants is used for inputting, storing, integrating and disambiguating various types of information in nuclear power plants;

[0006] The knowledge configuration layer of a nuclear power plant is used to configure the operation and maintenance information and resource information of each single device based on the data of the knowledge management layer of the nuclear power plant, taking the single device of the nuclear power plant as the unit. The operation and maintenance information includes maintenance, preventive maintenance, testing, and inspection activities for the single device. The resource information includes the manpower, documents, spare parts, tools, and environmental condition information corresponding to the single device. The operation and maintenance information and resource information of each single device serve as the basic information for the single plan and the overall overhaul plan; the knowledge configuration layer of the nuclear power plant sets activity performance indicators and activity role indicators to reflect the performance data of activities and activity roles, which are displayed in the data display layer of the nuclear power plant; the knowledge configuration layer of the nuclear power plant can analyze the overhaul risk, plan the maintenance distribution scenario, design modules for key maintenance activities of the nuclear power plant, and predict the status and factors of the nuclear power plant based on the configuration data;

[0007] The overhaul plan management layer is used to coordinate and coordinate the knowledge resources, equipment and systems of the nuclear power plant according to the knowledge configured in the knowledge configuration layer, plan key maintenance activities and forecast scenarios, and form maintenance plans, professional maintenance plans, test and inspection plans, comprehensive plans and key indicator management for individual equipment; the overhaul plan management layer dynamically adjusts various plans and key paths according to the output information of the nuclear power plant knowledge configuration layer; and formulates overhaul performance goals through plan formulation and deviation management;

[0008] The overhaul activity management layer is used to coordinate data to form execution work orders including information related to manpower, documents, tools, and spare parts according to the plan formed by the planning management layer, and to send each execution work order to the associated execution team and scenario management team;

[0009] Nuclear power plant data display layer: This layer is used to display the data of key elements of nuclear power plant overhaul.

[0010] In a possible implementation, the nuclear power plant knowledge management layer includes a first module, a second module and a third module;

[0011] The first module is used to obtain nuclear power plant information from other systems of the nuclear power plant according to preset rules. It is the management layer of nuclear power plant information. Nuclear power plant information includes more than 60 basic information and change information of elements such as human resources, equipment status, system status, file records, spare parts, tools, periodic activity cycle changes, nuclear power plant environment and experience feedback;

[0012] The second module presets the data standard dictionary and fusion layer. The data standard dictionary collects the standard results of nuclear power plant information and is a normative standard; the fusion layer is used to compare, transform, fuse and unify the nuclear power plant data information entering the fusion layer and the standard dictionary to obtain clear concepts and unambiguous nuclear power plant information data;

[0013] The third module presets the encoding rules and machine learning models for nuclear power plant information data. The third module can encode regular nuclear power plant information data according to the preset encoding rules. The third module can also classify and encode irregular nuclear power plant information data through machine learning models, so that the data information input into the knowledge management layer of the nuclear power plant can be intelligently identified to form digital portraits of key information such as people, equipment, facilities, documents, and tools, which are included in the calculation process as calculation parameters.

[0014] In one possible implementation, if a new situation arises during the execution process, the information of the new situation is processed in sequence through the nuclear power plant knowledge management layer, the nuclear power plant knowledge configuration layer, the overhaul plan management layer, and the overhaul activity management layer to obtain deviation control information, and the deviation control information is issued to the associated execution team and scenario management team of the corresponding execution work order; the overhaul activity management layer is the performance execution layer, which has the functions of intelligent planning and correction of overhaul deviation control and execution deviation management.

[0015] In one possible implementation, the nuclear power plant data display layer can display overhaul key project planning, critical path videos, internal and external supervision and evaluation, cost performance evaluation, overhaul life cycle planning, overhaul project forecasts, maintenance activity execution, plan execution display and forecasts, and performance in units of people. The nuclear power plant data display layer has performance appraisal and evaluation functions.

[0016] In one possible implementation, the system also includes: a nuclear power plant data search engine layer, which is used to realize the retrieval function of various types of information in the nuclear power plant overhaul performance management system, the retrieval function includes simple retrieval, advanced retrieval and semantic retrieval, and intelligent data push is performed based on the user portrait of each user.

[0017] In a possible implementation, the system also includes: a basic capability layer for performing user information management, organizational structure management, user authority management, log management, audit management, and security management.

[0018] According to one aspect of an embodiment of the present disclosure, a method for managing nuclear power plant overhaul performance is provided.

[0019] Step 1: Nuclear power plant knowledge input, inputting the key information of the nuclear power plant into the nuclear power plant knowledge management layer, where the key information includes nuclear power plant human resources, equipment status, system status, document records, spare parts, tools, periodic activity cycle changes, power plant environment and experience feedback;

[0020] Step 2: Knowledge fusion. The knowledge management layer of the nuclear power plant has set up a data standard dictionary and data information fusion function, which can compare, transform and fuse the input information data to form a unified and conceptually clear and unambiguous multiple data information, and give each data information a systematic code so that the input data information can be recognized and calculated by the computer, and the personnel, equipment, documents, facilities, tools, and activities are portrayed and included in the calculation process as parameters;

[0021] Step 3: Assign points to knowledge and performance indicators. According to the contribution of each element of the overhaul activity to the overhaul performance, assign standardized scores to each element. The elements of the overhaul activity include personnel, equipment, facilities, documents, tools, activities, and nuclear power plant environment. Standardized data is used as performance indicator statistics. In addition, overhaul risks are analyzed, maintenance scenarios are planned, overhaul progress management is designed, and nuclear power plant status factors are predicted.

[0022] Step 4, knowledge configuration, taking the single equipment of the nuclear power plant as the unit, configure the manpower, documents, spare parts, tools, and environmental conditions information configured for the equipment's maintenance, preventive maintenance, testing, and inspection activities as the basic information for the single plan and the overall overhaul plan, forming a knowledge map with the single equipment as the core, as the data basis for the statistics of the comprehensive overhaul performance, single work performance, and personnel performance;

[0023] Step 5, plan management, configure relevant knowledge according to the knowledge configuration layer, coordinate and coordinate the knowledge resources and equipment and system conditions of the nuclear power plant, intelligently plan key maintenance activities and prediction scenarios, and form maintenance plans for single equipment, professional maintenance plans, test and inspection plans, comprehensive plans and key indicator management; the overhaul plan management layer dynamically adjusts various plans and key paths according to the output information of the nuclear power plant knowledge configuration layer; through plan formulation and deviation management, the overhaul performance goals are formulated;

[0024] Step 6: Plan implementation and management. The implementation and management of the overhaul plan is a key step in performance implementation. It is used to form execution work orders including manpower, documents, tools, and spare parts information based on the plan formed in step 5, according to the data of the configuration layer coordinated by the plan management layer, and issue tasks to the execution team and scenario management team.

[0025] Step 7, display of plan implementation results. Display of plan implementation results is a step to reflect the status of the unit and the status of key elements of the unit in real time. This step displays the status of the nuclear power plant unit elements and real-time audio-visual scenes of key activities. It also displays the overhaul key project planning, overhaul life cycle planning, overhaul project forecasts, maintenance activity execution (overhaul performance management), plan execution display and forecast, and performance in units of people.

[0026] In a possible implementation, in step 3, the irregular data information is given a systematic code through machine learning and manual intervention preset by the knowledge management module.

[0027] In one possible implementation, in step 6, if a new situation arises during the execution process, the information of the new situation is processed successively by the nuclear power plant knowledge management layer, the nuclear power plant knowledge configuration layer, the overhaul plan management layer, and the overhaul activity management layer to obtain deviation control information, and the deviation control information is issued to the associated execution team and scenario management team of the corresponding execution work order.

[0028] The beneficial effects of the present disclosure are as follows: the nuclear power plant overhaul performance management system disclosed in the present disclosure, through the close cooperation among the nuclear power plant knowledge management layer, the nuclear power plant knowledge configuration layer, the overhaul plan management layer, and the overhaul activity management layer, realizes the prediction and management of overhaul special activity execution deviation, overhaul execution deviation, overhaul planning deviation, and unit overhaul distribution; realizes unit factor prediction and optimization. It realizes the digitization of overhaul performance, provides a handle for overhaul performance management, and effectively improves overhaul performance.

[0029] Overhaul status information is shared and reliable, and overhaul participants participate in overhaul activities at the same frequency and resonance; and the power plant defects are further linked to the overhaul plan in real time, and the overhaul plan is dynamically optimized according to various aspects of power plant information, so that the overhaul plan can be carefully formulated; in addition, the system disclosed in the present invention also realizes dynamic management of technical personnel, and undertakes key path maintenance activities in real time; realizes real-time display of the status of equipment spare parts and special tools, and dynamically configures them to the key path to promote timely planning; realizes systematic management of power plant files, archives, and records, and intelligently configures them to work packages; realizes intuitive display of power plant overhaul status, and selects the best window period for special activities based on the real-time status of the power plant; realizes real-time display of partner overhaul related information, and shares it among overhaul participants; realizes information sharing of overhaul activity risks and good experiences. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of a nuclear power plant overhaul performance management system shown in an embodiment of the present disclosure.

[0031] Figure 2 It is a flow chart of a nuclear power plant overhaul performance management method shown in an embodiment of the present disclosure. DETAILED DESCRIPTION

[0032] The present disclosure is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0033] Unless otherwise defined, the technical and scientific terms used in the present disclosure have the same meanings as those generally understood by those skilled in the art to which the present disclosure belongs; the terms used in the present disclosure are only for the purpose of describing specific embodiments and are not intended to limit the present disclosure; the term "including" and any variations thereof in the present disclosure are intended to cover non-exclusive inclusions. Obviously, the embodiments described in the present disclosure are only part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in the field without making creative efforts are within the scope of protection of the present disclosure.

[0034] Reference to "embodiments" in this disclosure means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the disclosure. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0035] Figure 1 is a schematic diagram of a nuclear power plant overhaul performance management system shown in an embodiment of the present disclosure, such as Figure 1 As shown, the system includes: a nuclear power plant knowledge management layer, a nuclear power plant knowledge configuration layer, an overhaul plan management layer, and an overhaul activity management layer.

[0036] The knowledge management layer of a nuclear power plant is used for inputting, storing, integrating and eliminating ambiguity of various types of information in the nuclear power plant. The knowledge management layer of a nuclear power plant includes the first module, the second module and the third module.

[0037] The first module is used to obtain nuclear power plant information from other systems of the nuclear power plant according to preset rules. It is the management level of nuclear power plant information. Nuclear power plant information includes more than 60 basic information and change information such as human resources, equipment status, system status, file records, spare parts, tools, periodic activity cycle changes, nuclear power plant environment and experience feedback.

[0038] The second module presets a data standard dictionary and a fusion layer. The data standard dictionary collects the information specification results of nuclear power plants and is a normative standard; the fusion layer is used to compare, transform, fuse and unify the nuclear power plant data information entering the fusion layer and the standard dictionary to obtain nuclear power plant information data with clear concepts and no ambiguity.

[0039] The third module presets the encoding rules and machine learning models for nuclear power plant information data. The third module can encode regular nuclear power plant information data according to the preset encoding rules. The third module can also classify and encode irregular nuclear power plant information data through machine learning models, so that the data information input into the knowledge management layer of the nuclear power plant can be intelligently identified to form digital portraits of key information such as people, equipment, facilities, documents, tools, etc., which are included in the calculation process as calculation parameters.

[0040] The knowledge configuration layer of the nuclear power plant is used to configure the operation and maintenance information of each single device in the nuclear power plant according to the data of the knowledge management layer of the nuclear power plant, taking the single device of the nuclear power plant as the unit. The operation and maintenance information includes, for example, maintenance, preventive maintenance, testing, and inspection activities for the single device, and configure the resource information of each single device. The resource information includes, for example, information on manpower, documents, spare parts, tools, and environmental conditions. The operation and maintenance information and resource information of each single device serve as the basic information for single plans and overall overhaul plans; the knowledge configuration layer of the nuclear power plant sets activity performance indicators and activity role indicators to reflect the performance data of activities and activity roles, which are displayed in the data display layer of the nuclear power plant; the knowledge configuration layer of the nuclear power plant can analyze overhaul risks, plan maintenance distribution scenarios, design modules for key maintenance activities of nuclear power plants, and predict the status and factors of nuclear power plants based on the configuration data.

[0041] The overhaul planning management layer is used for planning and planning management of nuclear power plant maintenance activities. Based on the knowledge configured by the knowledge configuration layer, the overhaul planning management layer coordinates and coordinates the knowledge resources, equipment, and systems of the nuclear power plant, plans key maintenance activities and forecast scenarios, and forms maintenance plans, professional maintenance plans, test and inspection plans, comprehensive plans, and key indicator management for individual equipment. The overhaul planning management layer dynamically adjusts various plans and critical paths based on the output information of the nuclear power plant knowledge configuration layer; formulates overhaul performance goals through plan formulation and deviation management.

[0042] The overhaul activity management layer is used to coordinate data to form execution work orders including information related to manpower, documents, tools, and spare parts according to the plan formed by the planning management layer, and to send each execution work order to the associated execution team and scenario management team. The tasks can be, for example, radiation protection, fire management, industrial safety management, isolation management, etc.

[0043] In one possible implementation, if a new situation arises during the execution process, the information of the new situation is processed in turn through the nuclear power plant knowledge management layer, nuclear power plant knowledge configuration layer, overhaul plan management layer, and overhaul activity management layer to obtain deviation control information, and the deviation control information is issued to the associated execution team and scenario management team of the corresponding execution work order. The overhaul activity management layer is a performance execution layer with the functions of intelligent planning and correction of overhaul deviation control and execution deviation management.

[0044] Nuclear power plant data display layer. This layer is used to display the data of key elements of nuclear power plant overhaul. For example, the nuclear power plant data display layer can display the overhaul key project planning, key path video, internal and external supervision and evaluation, cost performance evaluation, overhaul life cycle planning, overhaul project forecast, maintenance activity execution, plan execution display and forecast, performance in units of people, etc. The nuclear power plant data display layer has performance appraisal and evaluation functions.

[0045] The system also includes a nuclear power plant data search engine layer, which is used to realize the retrieval function of various types of information in the nuclear power plant overhaul performance management system. The retrieval function includes, for example, simple retrieval, advanced retrieval and semantic retrieval, and can perform intelligent data push based on the user portrait of each user.

[0046] The system also includes a basic capability layer for user information management, organizational structure management, user authority management, log management, audit management, and security management.

[0047] The disclosed nuclear power plant overhaul performance management system realizes the prediction and management of overhaul special activity execution deviation, overhaul execution deviation, overhaul planning deviation, and unit overhaul distribution through close cooperation among the nuclear power plant knowledge management layer, nuclear power plant knowledge configuration layer, overhaul plan management layer, and overhaul activity management layer; realizes unit factor prediction and optimization. It realizes the digitization of overhaul performance, provides a handle for overhaul performance management, and effectively improves overhaul performance.

[0048] Overhaul status information is shared and reliable, and overhaul participants participate in overhaul activities at the same frequency and resonance; and the power plant defects are further linked to the overhaul plan in real time, and the overhaul plan is dynamically optimized according to various aspects of power plant information, so that the overhaul plan can be carefully formulated; in addition, the system disclosed in the present invention also realizes dynamic management of technical personnel, and undertakes key path maintenance activities in real time; realizes real-time display of the status of equipment spare parts and special tools, and dynamically configures them to the key path to promote timely planning; realizes systematic management of power plant files, archives, and records, and intelligently configures them to work packages; realizes intuitive display of power plant overhaul status, and selects the best window period for special activities based on the real-time status of the power plant; realizes real-time display of partner overhaul related information, and shares it among overhaul participants; realizes information sharing of overhaul activity risks and good experiences.

[0049] Figure 2 is a flow chart of a nuclear power plant overhaul performance management method shown in an embodiment of the present disclosure, such as Figure 2 As shown, the method includes

[0050] Step 1, nuclear power plant knowledge input, input the key information of the nuclear power plant into the nuclear power plant knowledge management layer, where the key information includes nuclear power plant human resources, equipment status, system status, file records, spare parts, tools, periodic activity cycle changes, power plant environment and experience feedback.

[0051] Step 2, knowledge fusion. The knowledge management layer of the nuclear power plant has set up a data standard dictionary and data information fusion function, which can compare, transform and fuse the input information data to form a unified and conceptually clear and unambiguous multiple data information, and give each data information a systematic code (for example, for irregular data information, the data information is given a systematic code through machine learning and manual intervention preset by the knowledge management layer of the nuclear power plant), so that the input data information becomes data that can be recognized and calculated by the computer, and portraits of personnel, equipment, documents, facilities, tools, activities, etc. are included in the calculation process as parameters.

[0052] Step 3, assigning points to knowledge and performance indicators, assigning standardized scores to each element of the overhaul activity based on its contribution to the overhaul performance. The elements of the overhaul activity include personnel, equipment, facilities, documents, tools, activities, and nuclear power plant environment. Standardized data can be used as performance indicator statistics; this data is used to analyze overhaul risks, plan maintenance scenarios, design overhaul progress management, and predict nuclear power plant status factors based on the configuration of step 4.

[0053] Step 4, knowledge configuration, knowledge configuration is the core step of nuclear power plant knowledge data management. Taking the single equipment of the nuclear power plant as the unit, the human resources, documents, spare parts, tools, and environmental conditions information configured for the equipment's maintenance, preventive maintenance, testing, and inspection activities are used as the basic information for single plans and overhaul overall plans, forming a knowledge map with the single equipment as the core, which serves as the data basis for the statistics of overhaul comprehensive performance, single work performance, and personnel (team and individual) performance.

[0054] Step 5, plan management, configure the relevant knowledge according to the knowledge configuration layer of the nuclear power plant, coordinate and coordinate the knowledge resources and equipment and system conditions of the nuclear power plant, intelligently plan key maintenance activities and prediction scenarios, and form maintenance plans, professional maintenance plans, test inspection plans, comprehensive plans and key indicator management for single equipment. The planning management layer dynamically adjusts various plans and key paths according to the output information of the knowledge configuration layer of the nuclear power plant; through plan formulation and deviation management, it formulates overhaul performance goals.

[0055] Step 6, plan implementation and management. The implementation and management of the overhaul plan is a key step in performance implementation. It is used to form an execution work order including manpower, documents, tools, and spare parts information based on the plan formed in step 5, according to the data of the configuration layer coordinated by the plan management layer, and assign tasks to the execution team and the scenario management team. The tasks may include radiation protection, fire management, industrial safety management, isolation management, etc. If new situations arise during the execution process, the nuclear power plant information will be passed through the nuclear power plant knowledge management layer, and the tool will start a new round of intelligent management process. The overhaul activity management layer is the performance execution layer, which has the functions of intelligent planning and correction of overhaul deviation control and execution deviation management.

[0056] Step 7, display of plan implementation results. Display of plan implementation results is a step to reflect the status of the unit and the status of key elements of the unit in real time. This step displays the status of the nuclear power plant unit elements and real-time audio-visual scenes of key activities. It also displays the overhaul key project planning, overhaul life cycle planning, overhaul project forecasts, maintenance activity execution (overhaul performance management), plan execution display and forecast, performance status in units of people, etc.

[0057] In addition to the above-mentioned process steps, when the data in a certain step is updated, if it affects the overhaul plan, it can be used as a reconfiguration element to automatically configure the data, update the plan, and execute the plan, and display the latest data in the above-mentioned step 7.

[0058] In this way, the method disclosed in the present invention can realize the closed-loop cycle process of nuclear power plant knowledge input → knowledge fusion → knowledge and performance indicator scoring → data configuration → plan formation → plan implementation and management → plan implementation results display → nuclear power plant knowledge input.

[0059] The description of the above method has been explained in detail in the description of the above system and will not be repeated here.

[0060] The embodiments of the present disclosure have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.

Claims

1. A nuclear power plant overhaul performance management system, characterized in that: The system includes: a nuclear power plant knowledge management layer, a nuclear power plant knowledge configuration layer, an overhaul plan management layer, and an overhaul activity management layer; The knowledge management layer of nuclear power plants is used for inputting, storing, integrating and disambiguating various types of information in nuclear power plants; The knowledge configuration layer of a nuclear power plant is used to configure the operation and maintenance information and resource information of each single device based on the data of the knowledge management layer of the nuclear power plant, taking the single device of the nuclear power plant as the unit. The operation and maintenance information includes maintenance, preventive maintenance, testing, and inspection activities for the single device. The resource information includes the manpower, documents, spare parts, tools, and environmental condition information corresponding to the single device. The operation and maintenance information and resource information of each single device serve as the basic information for the single plan and the overall overhaul plan; the knowledge configuration layer of the nuclear power plant sets activity performance indicators and activity role indicators to reflect the performance data of activities and activity roles, which are displayed in the data display layer of the nuclear power plant; the knowledge configuration layer of the nuclear power plant can analyze the overhaul risk, plan the maintenance distribution scenario, design modules for key maintenance activities of the nuclear power plant, and predict the status and factors of the nuclear power plant based on the configuration data; The overhaul plan management layer is used to coordinate and coordinate the knowledge resources, equipment and systems of the nuclear power plant according to the knowledge configured in the knowledge configuration layer, plan key maintenance activities and forecast scenarios, and form maintenance plans, professional maintenance plans, test and inspection plans, comprehensive plans and key indicator management for individual equipment; the overhaul plan management layer dynamically adjusts various plans and key paths according to the output information of the nuclear power plant knowledge configuration layer; and formulates overhaul performance goals through plan formulation and deviation management; The overhaul activity management layer is used to coordinate data to form execution work orders including information related to manpower, documents, tools, and spare parts according to the plan formed by the planning management layer, and to send each execution work order to the associated execution team and scenario management team; Nuclear power plant data display layer: This layer is used to display the data of key elements of nuclear power plant overhaul.

2. The system according to claim 1, characterized in that The knowledge management layer of nuclear power plants includes the first module, the second module and the third module; The first module is used to obtain nuclear power plant information from other systems of the nuclear power plant according to preset rules. It is the management layer of nuclear power plant information. Nuclear power plant information includes more than 60 basic information and change information of elements such as human resources, equipment status, system status, file records, spare parts, tools, periodic activity cycle changes, nuclear power plant environment and experience feedback; The second module presets the data standard dictionary and fusion layer. The data standard dictionary collects the standard results of nuclear power plant information and is a normative standard; the fusion layer is used to compare, transform, fuse and unify the nuclear power plant data information entering the fusion layer and the standard dictionary to obtain clear concepts and unambiguous nuclear power plant information data; The third module presets the encoding rules and machine learning models for nuclear power plant information data. The third module can encode regular nuclear power plant information data according to the preset encoding rules. The third module can also classify and encode irregular nuclear power plant information data through machine learning models, so that the data information input into the knowledge management layer of the nuclear power plant can be intelligently identified to form digital portraits of key information such as people, equipment, facilities, documents, and tools, which are included in the calculation process as calculation parameters.

3. The system according to claim 1, characterized in that If a new situation arises during the execution process, the information of the new situation will be processed in sequence through the nuclear power plant knowledge management layer, nuclear power plant knowledge configuration layer, overhaul plan management layer, and overhaul activity management layer to obtain deviation control information, and the deviation control information will be issued to the associated execution team and scenario management team of the corresponding execution work order; the overhaul activity management layer is the performance execution layer, which has the functions of intelligent planning and correction of overhaul deviation control and execution deviation management.

4. The system according to claim 1, characterized in that The data display layer of a nuclear power plant can display the planning of key overhaul projects, critical path videos, internal and external supervision and evaluation, cost performance evaluation, overhaul life cycle planning, overhaul project forecasts, maintenance activity execution, plan execution display and forecasts, and performance in units of people. The data display layer of a nuclear power plant has performance appraisal and evaluation functions.

5. The system according to claim 1, characterized in that The system also includes: a nuclear power plant data search engine layer, which is used to realize the retrieval function of various types of information in the nuclear power plant overhaul performance management system, the retrieval function includes simple retrieval, advanced retrieval and semantic retrieval, and intelligent data push is performed according to the user portrait of each user.

6. The system according to claim 1, characterized in that The system also includes: a basic capability layer for user information management, organizational structure management, user authority management, log management, audit management, and security management.

7. A nuclear power plant overhaul performance management method, characterized in that: Step 1: Nuclear power plant knowledge input, inputting the key information of the nuclear power plant into the nuclear power plant knowledge management layer, where the key information includes nuclear power plant human resources, equipment status, system status, document records, spare parts, tools, periodic activity cycle changes, power plant environment and experience feedback; Step 2: Knowledge fusion. The knowledge management layer of the nuclear power plant has set up a data standard dictionary and data information fusion function, which can compare, transform and fuse the input information data to form a unified and conceptually clear and unambiguous multiple data information, and give each data information a systematic code so that the input data information can be recognized and calculated by the computer, and the personnel, equipment, documents, facilities, tools, and activities are portrayed and included in the calculation process as parameters; Step 3: Assign points to knowledge and performance indicators. According to the contribution of each element of the overhaul activity to the overhaul performance, assign standardized scores to each element. The elements of the overhaul activity include personnel, equipment, facilities, documents, tools, activities, and nuclear power plant environment. Standardized data is used as performance indicator statistics. In addition, overhaul risks are analyzed, maintenance scenarios are planned, overhaul progress management is designed, and nuclear power plant status factors are predicted. Step 4, knowledge configuration, taking the single equipment of the nuclear power plant as the unit, configure the manpower, documents, spare parts, tools, and environmental conditions information configured for the equipment's maintenance, preventive maintenance, testing, and inspection activities as the basic information for the single plan and the overall overhaul plan, forming a knowledge map with the single equipment as the core, as the data basis for the statistics of the comprehensive overhaul performance, single work performance, and personnel performance; Step 5, plan management, configure relevant knowledge according to the knowledge configuration layer, coordinate and coordinate the knowledge resources and equipment and system conditions of the nuclear power plant, intelligently plan key maintenance activities and prediction scenarios, and form maintenance plans for single equipment, professional maintenance plans, test and inspection plans, comprehensive plans and key indicator management; the overhaul plan management layer dynamically adjusts various plans and key paths according to the output information of the nuclear power plant knowledge configuration layer; through plan formulation and deviation management, the overhaul performance goals are formulated; Step 6: Plan implementation and management. The implementation and management of the overhaul plan is a key step in performance implementation. It is used to form execution work orders including manpower, documents, tools, and spare parts information based on the plan formed in step 5, according to the data of the configuration layer coordinated by the plan management layer, and issue tasks to the execution team and scenario management team. Step 7, display of plan implementation results. Display of plan implementation results is a step to reflect the status of the unit and the status of key elements of the unit in real time. This step displays the status of the nuclear power plant unit elements and real-time audio-visual scenes of key activities. It also displays the overhaul key project planning, overhaul life cycle planning, overhaul project forecasts, maintenance activity execution (overhaul performance management), plan execution display and forecast, and performance in units of people.

8. The method according to claim 7, characterized in that In step 3, for irregular data information, systematic coding is given to the data information through machine learning and manual intervention preset by the knowledge management module.

9. The method according to claim 7, characterized in that: In step 6, if a new situation arises during the execution process, the information of the new situation will be processed successively by the nuclear power plant knowledge management layer, the nuclear power plant knowledge configuration layer, the overhaul plan management layer, and the overhaul activity management layer to obtain deviation control information, and the deviation control information will be issued to the associated execution team and scenario management team of the corresponding execution work order.