Monitoring system and method for project quality management

Through the full process monitoring and data analysis of the construction area under construction, a BIM three-dimensional model is constructed, the stress distribution and vibration deviation of the building structure are evaluated, and the structural quality and risks are predicted, the efficiency and accuracy of traditional quality management methods are solved, and the efficiency and accuracy of traditional quality management methods are achieved. Efficient project quality management.

CN118966908AInactive Publication Date: 2024-11-15SHENZHEN DOCTOR MA NETWORK TECH CO LTD
View PDF 0 Cites 6 Cited by

Patent Information

Application Number
CN202411192875.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional engineering quality management methods are limited by manual observation and manual testing, and there are problems of inaccurate analysis and inefficient efficiency, which cannot meet the needs of modern engineering quality management.

Method used

A monitoring system and method are adopted to monitor the construction area of ​​the under-construction building, obtain concrete pouring parameters, component data and multi-directional images, match feature points of multi-frame images, calculate the matrix between images, and build a spatial coordinate system , carry out point cloud three-dimensional reconstruction, establish concrete-component correlation data, build BIM three-dimensional model, conduct stress excitation simulation and temperature difference change simulation, evaluate the stress distribution and vibration deviation of the building structure, predict structural quality and risks, and optimize the casting process.

Benefits of technology

It realizes accurate monitoring and optimization decisions for project quality management, improves the accuracy and efficiency of quality management, provides comprehensive data support and building information modeling, and ensures construction quality and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118966908A_ABST
    Figure CN118966908A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of project quality management, in particular to a monitoring system and method for project quality management. The method comprises the following steps of performing whole-process monitoring on a construction area of a building under construction, and obtaining concrete pouring parameters, component data of the building under construction and multidirectional images of the building under construction; performing multi-frame image feature point matching on the multi-azimuth image of the building under construction to obtain matched feature point data; performing inter-image matrix calculation based on the matched feature point data to obtain an image global internal and external parameter matrix; constructing a building under construction space coordinate system based on the image global internal and external parameter matrix; performing point cloud three-dimensional reconstruction on the matched feature points based on a space coordinate system of the building under construction to construct a three-dimensional point cloud model of the building; and obtaining concrete-component associated data based on the concrete pouring parameters and the data of the building component under construction. According to the invention, efficient engineering quality management monitoring is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering quality management, and in particular to a monitoring system and method for engineering quality management. Background Art

[0002] In the engineering field, quality management is one of the key factors to ensure the smooth progress of projects and achieve the expected results. However, traditional quality management methods are often limited to manual observation and manual testing, and there are problems such as inaccurate analysis and low efficiency. In order to meet the needs of modern engineering quality management, an intelligent monitoring system and method is needed to improve the accuracy and efficiency of quality management. Summary of the invention

[0003] In order to solve the above technical problems, the present invention proposes a monitoring system and method for engineering quality management to solve at least one of the above technical problems.

[0004] To achieve the above object, the present invention provides a monitoring method for engineering quality management, comprising the following steps: Step S1: monitoring the entire process of the construction area of ​​the building under construction, obtaining concrete pouring parameters, component data of the building under construction, and multi-directional images of the building under construction; matching multi-frame image feature points of the multi-directional images of the building under construction to obtain matching feature point data; Step S2: performing inter-image matrix calculation based on the matching feature point data to obtain the global internal and external parameter matrix of the image; constructing the spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image; performing point cloud stereo reconstruction on the matching feature points based on the spatial coordinate system of the building under construction to construct a three-dimensional point cloud model of the building; Step S3: obtaining concrete-component association data based on concrete pouring parameters and data of building components under construction; performing attribute mapping on the building three-dimensional point cloud model based on the concrete-component association data to construct a building BIM three-dimensional model; Step S4: obtaining building BIM unit data based on the building BIM three-dimensional model; performing stress excitation simulation on the building BIM unit data to generate a building stress distribution field; Step S5: Based on the preset anti-frost standard, the temperature difference change simulation is performed on the building stress distribution field to generate temperature difference fluctuation prestress data; based on the temperature difference fluctuation prestress data, the building unit deformation analysis is performed on the building temperature difference change stress data to obtain the building unit deformation data; based on the building unit deformation data, the building structure vibration deviation data is obtained; Step S6: Obtain building structure quality data based on building structure vibration deviation data; predict the structural stiffness trend based on the building structure quality data to obtain building risk trend data; make casting process optimization decisions based on the building risk trend data, generate building quality optimization decisions, and perform monitoring operations for engineering quality management.

[0005] The present invention monitors the entire process of the construction area of ​​the building under construction, obtains concrete pouring parameters, component data of the building under construction and multi-directional images of the building under construction in real time, provides a comprehensive data source, provides a basis for subsequent analysis and decision-making, calculates the matrix between images based on the matching of feature points of multiple frames of images, thereby obtaining the global internal and external parameter matrix of the image, and constructs the spatial coordinate system of the building under construction by using these internal and external parameter matrices, provides accurate coordinate reference for subsequent point cloud stereo reconstruction, and constructs a three-dimensional point cloud model of the building through point cloud stereo reconstruction, accurately presents the spatial form and structure of the building under construction, establishes concrete-component association data based on concrete pouring parameters and component data of the building under construction, associates concrete information with components, and uses the concrete-component association data to perform attribute mapping on the three-dimensional point cloud model of the building, thereby constructing a three-dimensional BIM model of the building, which provides accurate structural information and attribute data, and provides a basis for subsequent analysis and decision-making, and obtains building BIM unit data based on the three-dimensional BIM model of the building, and through the three-dimensional reconstruction of the building BIM M unit data is used to perform stress excitation simulation to generate a building stress distribution field. The building stress distribution field helps evaluate the stress condition of the building structure and provides a basis for subsequent analysis and decision-making. Based on the preset frost protection standard, the temperature difference change of the building stress distribution field is simulated to generate temperature difference fluctuation prestress data. The temperature difference fluctuation prestress data is used to analyze the building temperature difference change stress data to obtain the building unit deformation data. Through the building unit deformation analysis, the deformation of the building structure under temperature difference change is evaluated to provide a basis for subsequent analysis and decision-making. Based on the building unit deformation data, the building structure vibration deviation data is obtained to evaluate the vibration condition of the building structure. Based on the building structure vibration deviation data, the building structure quality data is obtained to evaluate the quality status of the building structure. The building structure quality data is used to predict the structural stiffness trend to obtain the building risk trend data to evaluate the risk condition of the building structure. Based on the building risk trend data, the pouring process optimization decision is made to generate the building quality optimization decision, thereby guiding the monitoring work of the project quality management.

[0006] Preferably, step S1 comprises the following steps: Step S11: monitoring the entire process of the construction area of ​​the building under construction, obtaining concrete pouring parameters, component data of the building under construction, and multi-directional images of the building under construction; Step S12: performing characteristic structure point recognition on the multi-directional image of the building under construction to obtain characteristic structure point data; Step S13: Calculate the regional pixel value of the characteristic structure point data to obtain the characteristic point pixel vector; Step S14: performing multi-frame image feature point matching on the multi-directional image of the building under construction based on the feature point pixel vector to obtain matching feature point data. The present invention monitors the entire process of the construction area of ​​the building under construction, obtains concrete pouring parameters, component data of the building under construction and multi-directional images of the building under construction in real time, identifies characteristic structure points of the multi-directional images of the building under construction, and identifies key structure points in the image. The characteristic structure points are usually important components, nodes or special features of the building, which are representative and distinctive. By identifying the characteristic structure points, important building information is extracted, and regional pixel values ​​are calculated for the characteristic structure point data to obtain pixel values ​​of the areas around the characteristic points. The regional pixel values ​​provide image information of the surrounding environment of the characteristic points, including color, texture, etc. This information is helpful to further analyze the characteristics of the characteristic points and the state of the surrounding environment. Based on the characteristic point pixel vector, multi-frame image feature point matching is performed to obtain matching feature point data. The feature point matching finds and matches corresponding feature points between different images. By matching the feature points, a corresponding relationship between images is established to achieve image registration and alignment.

[0007] Preferably, the specific steps of step S2 are: Step S21: performing inter-image matrix calculation based on the matching feature point data to obtain an inter-image basic matrix; Step S22: performing matrix inverse projection on the basic matrix between images to obtain the global internal and external parameter matrix of the image; Step S23: constructing a spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image; Step S24: performing a three-dimensional structural analysis of the building on the matching feature points based on the spatial coordinate system of the building under construction to obtain three-dimensional structural data of the building; Step S25: Perform point cloud stereoscopic reconstruction on the building three-dimensional structure data to construct a three-dimensional point cloud model of the building.

[0008] The present invention obtains a basic matrix between images by performing matrix calculation between images based on matching feature point data. The basic matrix between images describes the geometric relationship between images and is used for image registration and alignment. The basic matrix provides a mapping relationship between images and is used for subsequent image processing and analysis. The basic matrix between images is subjected to matrix inverse projection to obtain a global internal and external parameter matrix of the image. The global internal and external parameter matrix of the image describes the internal parameters (such as focal length, distortion, etc.) and external parameters (such as camera position, posture, etc.) of the camera. The global internal and external parameter matrix of the image provides a mapping relationship between the camera and the world coordinate system and is used to establish a geometric relationship between the image and the actual object. A spatial coordinate system of a building under construction is constructed based on the global internal and external parameter matrix of the image. The spatial coordinate system of the building under construction is a three-dimensional coordinate system used to represent the three-dimensional spatial position and posture of the building. The establishment of the building space coordinate system is based on the position and posture information of the camera, and the points in the image are mapped to the three-dimensional coordinates in the real world. Based on the spatial coordinate system of the building under construction, the matching feature points are analyzed for the building three-dimensional structure to obtain the building three-dimensional structure data. The building three-dimensional structure analysis infers the three-dimensional shape, size and layout of the building, such as the position, shape and relationship of components such as walls, beams and columns. The building three-dimensional structure data provides a comprehensive understanding of the building, which helps to evaluate the construction quality and discover potential problems. The building three-dimensional structure data is reconstructed by point cloud stereo to construct a building three-dimensional point cloud model. The point cloud model is a three-dimensional model composed of a large number of discrete points, which accurately represents the shape and spatial distribution of the building. The building three-dimensional point cloud model is the basis of digital architecture and is used for visualization, measurement, analysis and simulation applications.

[0009] Preferably, the specific steps of step S3 are: Step S31: performing topological association analysis on concrete pouring parameters and building component data under construction based on a preset building pouring sequence to obtain concrete-component association data; Step S32: performing casting strength analysis based on concrete-component association data to obtain component casting attribute data; Step S33: performing position association on the matching feature point data based on the component data of the building under construction to obtain component position data; Step S34: Mapping the component casting attribute data to the building three-dimensional point cloud model based on the component position data to construct a building BIM three-dimensional model. The present invention performs topological association analysis on concrete pouring parameters and data of building components under construction based on a preset building pouring sequence to obtain concrete-component association data. The concrete-component association data describes the relationship between each concrete pouring and the corresponding building component. Through the concrete-component association data, the components involved in each concrete pouring are accurately determined, providing an accurate data basis for subsequent pouring strength analysis and building BIM model construction. Based on the concrete-component association data, pouring strength analysis is performed to obtain component pouring attribute data. The pouring strength analysis evaluates the concrete pouring quality and strength characteristics of each component. The component pouring attribute data provides relevant information such as the pouring quality and strength of each component, which is helpful to discover potential pouring defects and quality problems. Based on the building component data under construction, the matching feature point data is positionally associated to obtain component position data. The component position association The matching feature point data is associated with the position of the building components to ensure the accurate position of each component in the building model. The component position data provides the spatial coordinates and posture information of each component in the building model, providing an accurate spatial reference for subsequent attribute mapping and BIM model construction. Based on the component position data, the component casting attribute data is attribute-mapped to the building 3D point cloud model to build the building BIM 3D model. The attribute mapping associates the component casting attribute data with the spatial position of the corresponding component in the building 3D point cloud model, assigns the attribute information to the corresponding component, and builds the building BIM 3D model. The attribute-mapped data is integrated into the 3D model to achieve a comprehensive description of the building, including geometric shape, material properties, construction information, etc. The BIM model is used for monitoring and analysis of engineering quality management, providing comprehensive building information, and supporting visualization, coordination and conflict detection of the construction process.

[0010] Preferably, the specific steps of step S4 are: Step S41: dividing the building BIM three-dimensional model into units to obtain building BIM unit data; Step S42: performing stress excitation simulation on the building BIM unit data to obtain building stress excitation simulation data; Step S43: performing stress distribution analysis on the building stress excitation simulation data to obtain building unit stress distribution data; Step S44: performing unit stress response analysis on the building unit stress distribution data to generate dynamic stress response data; Step S45: performing stress field fitting on the dynamic stress response data to generate a building stress distribution field. The present invention divides the building model into discrete units by performing unit division on the building BIM three-dimensional model. The building BIM unit data describes the geometric shape and attribute information of each unit in the building model. Through unit division, the complex building structure is decomposed into smaller units, providing a refined modeling basis for subsequent stress excitation simulation and stress analysis. Stress excitation simulation is performed on the building BIM unit data to simulate the force and stress applied to the building structure under different loads and working conditions. The stress excitation simulation evaluates the stress condition of the building structure under different working conditions, including the influence of static and dynamic loads. The building stress excitation simulation data provides stress excitation information of each unit under different working conditions, which is helpful to understand the stress condition and working state of the structure. Stress distribution analysis is performed on the building stress excitation simulation data to evaluate the distribution of stress in each unit. The stress distribution analysis reveals the distribution characteristics of stress inside the building structure. , including maximum stress points, stress concentration areas, etc. The building unit stress distribution data provides the specific value and distribution of stress in each unit, providing an accurate data basis for subsequent stress response analysis. Unit stress response analysis is performed on the building unit stress distribution data to analyze the response behavior of the unit under stress excitation. The unit stress response analysis evaluates the stress response characteristics of each unit, including deformation, deflection, cracks, etc. Through unit stress response analysis, the deformation and damage of the building structure under stress excitation can be understood, providing early warning and decision support for engineering quality management. The dynamic stress response data is fitted with stress field to generate the building stress distribution field. The stress field fitting fits the dynamic stress response data into a continuous stress field to describe the spatial distribution of stress in the building structure. The building stress distribution field provides the global distribution of stress in the building structure, which is helpful to discover problems such as stress concentration areas and abnormal stress distribution.

[0011] Preferably, the specific steps of step S5 are: Step S51: simulating the temperature difference change of the building stress distribution field based on the preset frost protection standard to obtain the building temperature difference change stress data; Step S52: performing prestress analysis on the building temperature difference change stress data under temperature change to generate temperature difference fluctuation prestress data; Step S53: calculating the prestress change rate of the temperature difference fluctuation prestress data to obtain the prestress change rate; Step S54: performing building unit deformation analysis on the building temperature difference change stress data based on the prestress change rate to obtain building unit deformation data; Step S55: Perform structural vibration deviation analysis on the building BIM three-dimensional model based on the building unit deformation data to obtain building structure vibration deviation data. The present invention simulates the temperature difference change of the building stress distribution field based on the preset anti-frost standard, simulates the stress response of the building structure under temperature change, and evaluates the stress distribution of the building structure under temperature change by temperature difference change stress simulation, especially considering the influence of the anti-frost standard on stress. The building temperature difference change stress data provides stress information of the building structure under different temperature conditions, which is helpful to understand the influence of temperature change on the structure. The building temperature difference change stress data is subjected to prestress analysis under temperature change to evaluate the influence of temperature change on the prestressed system. The prestress analysis under temperature change reveals the stress change of the prestressed system in the building structure, especially the prestress change caused by temperature change. The temperature difference fluctuation prestress data provides stress information of the prestressed system under temperature change, which is helpful to understand the prestressed behavior under the influence of temperature. The prestress change rate is calculated for the temperature difference fluctuation prestress data to obtain the change rate of the prestress under temperature change. The prestress change rate calculation evaluates the effect of the prestressed system on the temperature change The dynamic performance of the prestressed system is judged by the response speed of the prestressing system. The prestressing change rate provides the stress change rate information of the prestressing system under temperature changes, which is helpful to understand the dynamic characteristics of the prestressed system. Based on the prestressing change rate, the building unit deformation analysis is performed on the building temperature difference stress data to evaluate the deformation of the building unit under temperature changes. The building unit deformation analysis reveals the deformation characteristics of the building structure under temperature changes, including deflection, deformation, etc. The building unit deformation data provides the deformation information of each unit under temperature changes, which is helpful to understand the deformation of the building structure and its ability to cope with temperature changes. Based on the building unit deformation data, the structural vibration deviation analysis is performed on the building BIM three-dimensional model to evaluate the vibration characteristics of the building structure. The structural vibration deviation analysis reveals the vibration mode and vibration shape of the building structure, including the resonance frequency, resonance amplitude, etc. The building structure vibration deviation data provides the specific numerical value and characteristic information of the structural vibration, which is helpful to understand the vibration stability and dynamic response characteristics of the structure.

[0012] Preferably, the specific steps of step S51 are: Step S511: setting a temperature difference simulation range based on a preset anti-frost standard; Step S512: dividing the temperature difference simulation range into time windows to obtain time window temperature difference range data; Step S513: using the temperature difference range data of the time window to simulate the temperature difference change of the building stress distribution field to obtain the temperature difference simulation data of the stress distribution field; Step S514: performing thermal effect change analysis on the stress distribution field temperature difference simulation data to generate stress distribution field thermal effect data; Step S515: Calculate the temperature difference stress change rate for the stress distribution field thermal effect data to obtain the building temperature difference stress data.

[0013] The present invention sets the range of building temperature difference simulation based on a preset anti-frost standard. The setting of the temperature difference simulation range ensures that the simulated temperature change range meets the anti-frost requirements, effectively simulates the temperature difference conditions in the actual environment, divides the temperature difference simulation range into time windows, and divides the entire simulation process into multiple time windows. The time window division helps to simulate the temperature change more precisely, especially for long-term temperature changes. The time window temperature difference range data provides the temperature difference range information in each time window, and provides accurate input for subsequent temperature difference simulations. The time window temperature difference range data is used to simulate the temperature difference change of the building stress distribution field. The stress distribution field temperature difference simulation evaluates the stress distribution of the building structure under temperature changes in different time windows. The stress distribution field temperature difference simulation data It provides the temperature difference simulation results of the stress distribution field in each time window, provides accurate stress data for subsequent analysis and calculation, performs thermal effect change analysis on the temperature difference simulation data of the stress distribution field, evaluates the thermal effect of temperature change on the structure, and reveals the changes in thermal effects such as thermal expansion and contraction of the building structure under temperature change. The thermal effect data of the stress distribution field provides specific information on the thermal effect change, which helps to understand the impact of temperature change on structural stress. The temperature difference stress change rate is calculated for the thermal effect data of the stress distribution field to obtain the building temperature difference change stress data. The temperature difference stress change rate calculation evaluates the rate of change of structural stress due to temperature change. The building temperature difference change stress data provides stress change information under temperature change, which helps to understand the stress response of the structure under different temperature conditions.

[0014] Preferably, the specific steps of step S6 are: Step S61: performing regular structural stiffness quantitative evaluation on the building structure vibration deviation data based on a preset building pouring sequence to generate building structure quality data; Step S62: performing structural stiffness trend prediction based on the building structure quality data to generate quality trend prediction data; Step S63: performing future risk analysis on the quality trend prediction data to obtain building risk trend data; Step S64: Make a pouring process optimization decision based on the building risk trend data, generate a building quality optimization decision, and perform monitoring operations for project quality management.

[0015] The present invention periodically evaluates the vibration deviation data of the building structure based on a preset building casting sequence. The structural stiffness quantification evaluation quantitatively evaluates the stiffness performance of the structure, that is, the resistance of the structure to external forces. By periodically evaluating the stiffness of the building structure, the building structure quality data is generated, and key information on stiffness is provided. Based on the building structure quality data, the structural stiffness trend is predicted. The structural stiffness trend prediction analyzes the change trend of the structural stiffness and predicts the stiffness change of the structure during future use. The structural stiffness trend prediction data provides prediction information on the structural quality, which is helpful to understand the evolution and change of the structure. The quality trend prediction data is subjected to future risk analysis to evaluate the risks faced by the building structure during future use. The future risk analysis identifies potential problems and challenges, and takes measures in advance to prevent or respond to them. The building risk trend data provides prediction and evaluation results of future risks, which is helpful to formulate a reasonable risk management strategy. Based on the building risk trend data, a casting process optimization decision is made. The casting process optimization decision is adjusted and improved according to potential risks to improve the building quality and reduce risks. The generated building quality optimization decision provides a specific action plan for the monitoring of engineering quality management to ensure the controllable and continuous improvement of building quality.

[0016] In this specification, a monitoring system for project quality management is provided, which is used to execute the monitoring method for project quality management as described above, including: The feature point matching module monitors the entire process of the construction area of ​​the building under construction, obtains concrete pouring parameters, component data of the building under construction, and multi-directional images of the building under construction; performs multi-frame image feature point matching on the multi-directional images of the building under construction to obtain matching feature point data; The point cloud reconstruction module calculates the matrix between images based on the matching feature point data to obtain the global internal and external parameter matrix of the image; constructs the spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image; and performs point cloud stereo reconstruction on the matching feature points based on the spatial coordinate system of the building under construction to construct a three-dimensional point cloud model of the building; The 3D model module obtains concrete-component association data based on concrete pouring parameters and data of building components under construction; maps the attributes of the building 3D point cloud model based on the concrete-component association data to construct a building BIM 3D model; The stress distribution module obtains the building BIM unit data based on the building BIM three-dimensional model; performs stress excitation simulation on the building BIM unit data to generate the building stress distribution field; The vibration deviation module simulates the temperature difference change of the building stress distribution field based on the preset anti-frost standard to generate temperature difference fluctuation prestress data; performs building unit deformation analysis on the building temperature difference change stress data based on the temperature difference fluctuation prestress data to obtain building unit deformation data; obtains building structure vibration deviation data based on the building unit deformation data; The trend prediction module obtains the building structure quality data based on the building structure vibration deviation data; predicts the structural stiffness trend based on the building structure quality data to obtain the building risk trend data; makes casting process optimization decisions based on the building risk trend data, generates building quality optimization decisions, and performs monitoring operations for engineering quality management.

[0017] The present invention monitors the construction area of ​​the building under construction throughout the entire process through a feature point matching module, obtains concrete pouring parameters, component data of the building under construction, and multi-directional images of the building under construction, obtains matching feature point data by matching multi-frame image feature points of the multi-directional images of the building under construction, and the matching feature point data provides a correspondence between images, and provides accurate spatial information for point cloud reconstruction and three-dimensional model construction in subsequent steps. The point cloud reconstruction module calculates the matrix between images based on the matching feature point data to obtain a global internal and external parameter matrix of the image, and constructs a spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image, and uses the spatial coordinate system of the building under construction to perform point cloud stereoscopic reconstruction on the matching feature points to generate a three-dimensional point cloud model of the building. The three-dimensional point cloud model of the building provides an accurate representation of the building in three-dimensional space, and provides basic data for three-dimensional model construction and stress distribution analysis in subsequent steps. The three-dimensional model module obtains concrete-component association data based on concrete pouring parameters and component data of the building under construction, and uses the concrete-component association data to perform attribute mapping on the three-dimensional point cloud model of the building to construct a three-dimensional BIM model of the building. The three-dimensional BIM model of the building associates the building structure with concrete information, and provides a comprehensive building The building information model is used for stress distribution and vibration deviation analysis in subsequent steps. The stress distribution module obtains the building BIM unit data based on the building BIM three-dimensional model, performs stress excitation simulation on the building BIM unit data, and generates the building stress distribution field. The building stress distribution field provides the stress distribution of the building structure under force, which is used for vibration deviation analysis and trend prediction in subsequent steps. The vibration deviation module simulates the temperature difference change of the building stress distribution field based on the preset anti-frost standard, generates temperature difference fluctuation prestress data, and performs building unit deformation analysis on the building temperature difference change stress data based on the temperature difference fluctuation prestress data to obtain the building unit deformation data. The building structure vibration deviation data is obtained based on the building unit deformation data. The building structure vibration deviation data provides the vibration of the building structure under the influence of temperature changes, which is used for trend prediction and quality optimization decision in subsequent steps. The trend prediction module obtains the building structure quality data based on the building structure vibration deviation data, predicts the structural stiffness trend based on the building structure quality data, obtains the building risk trend data, makes casting process optimization decisions based on the building risk trend data, and generates building quality optimization decisions to perform monitoring operations for engineering quality management. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A schematic diagram of the steps of a monitoring method for engineering quality management according to the present invention; Figure 2 Detailed implementation flow chart of step S1; Figure 3 Detailed implementation flow chart of step S2; Figure 4 Detailed implementation flow chart of step S3. DETAILED DESCRIPTION

[0019] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0020] This application example provides a monitoring system and method for engineering quality management. The execution subject of the monitoring system and method for engineering quality management includes but is not limited to: mechanical equipment, data processing platform, cloud server node, network upload device, etc. equipped with the system can be regarded as the general computing node of this application, and the data processing platform includes but is not limited to: audio image management system, information management system, cloud data management system at least one.

[0021] See also Figures 1 to 4 The present invention provides a monitoring method for engineering quality management, the monitoring method for engineering quality management comprising the following steps: Step S1: monitoring the entire process of the construction area of ​​the building under construction, obtaining concrete pouring parameters, component data of the building under construction, and multi-directional images of the building under construction; matching multi-frame image feature points of the multi-directional images of the building under construction to obtain matching feature point data; Step S2: performing inter-image matrix calculation based on the matching feature point data to obtain the global internal and external parameter matrix of the image; constructing the spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image; performing point cloud stereo reconstruction on the matching feature points based on the spatial coordinate system of the building under construction to construct a three-dimensional point cloud model of the building; Step S3: obtaining concrete-component association data based on concrete pouring parameters and data of building components under construction; performing attribute mapping on the building three-dimensional point cloud model based on the concrete-component association data to construct a building BIM three-dimensional model; Step S4: obtaining building BIM unit data based on the building BIM three-dimensional model; performing stress excitation simulation on the building BIM unit data to generate a building stress distribution field; Step S5: Based on the preset anti-frost standard, the temperature difference change simulation is performed on the building stress distribution field to generate temperature difference fluctuation prestress data; based on the temperature difference fluctuation prestress data, the building unit deformation analysis is performed on the building temperature difference change stress data to obtain the building unit deformation data; based on the building unit deformation data, the building structure vibration deviation data is obtained; Step S6: Obtain building structure quality data based on building structure vibration deviation data; predict the structural stiffness trend based on the building structure quality data to obtain building risk trend data; make casting process optimization decisions based on the building risk trend data, generate building quality optimization decisions, and perform monitoring operations for engineering quality management.

[0022] The present invention monitors the entire process of the construction area of ​​the building under construction, obtains concrete pouring parameters, component data of the building under construction and multi-directional images of the building under construction in real time, provides a comprehensive data source, provides a basis for subsequent analysis and decision-making, calculates the matrix between images based on the matching of feature points of multiple frames of images, thereby obtaining the global internal and external parameter matrix of the image, and constructs the spatial coordinate system of the building under construction by using these internal and external parameter matrices, provides accurate coordinate reference for subsequent point cloud stereo reconstruction, and constructs a three-dimensional point cloud model of the building through point cloud stereo reconstruction, accurately presents the spatial form and structure of the building under construction, establishes concrete-component association data based on concrete pouring parameters and component data of the building under construction, associates concrete information with components, and uses the concrete-component association data to perform attribute mapping on the three-dimensional point cloud model of the building, thereby constructing a three-dimensional BIM model of the building, which provides accurate structural information and attribute data, and provides a basis for subsequent analysis and decision-making, and obtains building BIM unit data based on the three-dimensional BIM model of the building, and through the three-dimensional reconstruction of the building BIM M unit data is used to perform stress excitation simulation to generate a building stress distribution field. The building stress distribution field helps evaluate the stress condition of the building structure and provides a basis for subsequent analysis and decision-making. Based on the preset frost protection standard, the temperature difference change of the building stress distribution field is simulated to generate temperature difference fluctuation prestress data. The temperature difference fluctuation prestress data is used to analyze the building temperature difference change stress data to obtain the building unit deformation data. Through the building unit deformation analysis, the deformation of the building structure under temperature difference change is evaluated to provide a basis for subsequent analysis and decision-making. Based on the building unit deformation data, the building structure vibration deviation data is obtained to evaluate the vibration condition of the building structure. Based on the building structure vibration deviation data, the building structure quality data is obtained to evaluate the quality status of the building structure. The building structure quality data is used to predict the structural stiffness trend to obtain the building risk trend data to evaluate the risk condition of the building structure. Based on the building risk trend data, the pouring process optimization decision is made to generate the building quality optimization decision, thereby guiding the monitoring work of the project quality management.

[0023] In the embodiment of the present invention, refer to Figure 1 , is a schematic diagram of a step flow of a monitoring system for project quality management of the present invention. In this example, the steps of the monitoring method for project quality management include: Step S1: monitoring the entire process of the construction area of ​​the building under construction, obtaining concrete pouring parameters, component data of the building under construction, and multi-directional images of the building under construction; matching multi-frame image feature points of the multi-directional images of the building under construction to obtain matching feature point data; In this embodiment, after obtaining authorization, cameras or other monitoring equipment are arranged in the construction area to fully cover the construction area, ensure that the equipment is reasonably located and can capture key construction processes, and the monitoring equipment captures images and video data of the construction area of ​​the building under construction in real time. These data include parameters in the concrete pouring process (such as pouring time, pouring speed, pouring thickness, etc.), relevant data of the components of the building under construction (such as size, material, location, etc.) and multi-directional images of the construction site. The collected multi-directional images of the building under construction are pre-processed, including image denoising, image enhancement, image correction and other operations to improve image quality and accuracy. , extract feature points from the preprocessed image. Common feature point extraction algorithms include SIFT, SURF, ORB, etc. These feature points should have good robustness and discrimination, and can be accurately detected in different images. Match the feature points extracted from multiple frames to establish the correspondence between images. Common feature point matching algorithms include RANSAC, FLANN, etc. The matching algorithm selects the appropriate algorithm according to the actual situation. According to the results of feature point matching, the matching feature point data is extracted. These data include the coordinates of the feature points, descriptors and other information, which are used for point cloud reconstruction and 3D model construction in subsequent steps.

[0024] Step S2: performing inter-image matrix calculation based on the matching feature point data to obtain the global internal and external parameter matrix of the image; constructing the spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image; performing point cloud stereo reconstruction on the matching feature points based on the spatial coordinate system of the building under construction to construct a three-dimensional point cloud model of the building; In this embodiment, based on matching feature point data, a feature point correspondence relationship between images is established, that is, the corresponding points of each feature point in different images. Using the feature point correspondence relationship, a multi-view geometry method, such as triangulation or a method based on an essential matrix, is used to solve the internal and external parameter matrices of the camera. These matrices describe the projection relationship of the image and the position and posture of the camera. According to the internal and external parameter matrices of the camera, the image coordinates are converted into three-dimensional points in the world coordinate system. The internal parameter matrix includes the camera's focal length, the principal point position and other camera internal parameters, and the external parameter matrix includes the camera's rotation matrix and translation vector and other camera external parameters. According to the converted three-dimensional points, the three-dimensional point coordinates in the spatial coordinate system of the building under construction are determined using the established coordinate system. These points correspond to the actual position of the building. Using the three-dimensional points in the spatial coordinate system of the building under construction, these points are combined into point cloud data. The coordinate information of each point corresponds to a specific position in the building. The generated point cloud is filtered to remove abnormal points or noise to improve the quality and accuracy of the point cloud data. Using the filtered point cloud data, a surface reconstruction algorithm (such as Poisson reconstruction, triangulation, etc.) or a voxel meshing method is used to construct a three-dimensional point cloud model of the building. This model provides the building's geometry and surface details.

[0025] Step S3: obtaining concrete-component association data based on concrete pouring parameters and data of building components under construction; performing attribute mapping on the building three-dimensional point cloud model based on the concrete-component association data to construct a building BIM three-dimensional model; In this embodiment, an association relationship between concrete and components is established based on concrete pouring parameters and component data of the building under construction, and components involved in each concrete pouring are determined by matching through timestamps, location information, etc., and the associated component information is matched with the building three-dimensional point cloud model based on the concrete-component association data to ensure that each point cloud data point can be associated with a specific component, and the attributes in the concrete pouring parameters (such as pouring time, pouring thickness, etc.) and the attributes in the component data of the building under construction (such as component type, material, etc.) are mapped to corresponding points in the building three-dimensional point cloud model. In this way, each point has attribute information related to concrete pouring and components. According to the three-dimensional point cloud model of the building after attribute mapping, these point cloud data are converted into a building model with geometric shape and attribute information using building information modeling (BIM) software or algorithm. This BIM model can provide more comprehensive and detailed building information, including component type, material properties, size, etc.

[0026] Step S4: obtaining building BIM unit data based on the building BIM three-dimensional model; performing stress excitation simulation on the building BIM unit data to generate a building stress distribution field; In this embodiment, the building BIM three-dimensional model is divided into smaller units, such as grid units or finite element units, for stress excitation simulation. The size and accuracy of the units are determined according to the requirements and the accuracy of the simulation. The geometry, material properties, boundary conditions and other related information of each unit are extracted from the building BIM three-dimensional model. These properties will be used for subsequent stress simulation analysis. According to the simulation requirements, appropriate stress simulation methods and algorithms are selected, including finite element analysis, computational fluid dynamics, multi-body dynamics and other methods. At the same time, boundary conditions, loading conditions and material parameters are set. The selected stress simulation method and algorithm are used to perform stress analysis and calculation on the building BIM unit data, and the stress distribution in each unit is calculated according to the unit's geometry, material properties and loading conditions.

[0027] Step S5: Based on the preset anti-frost standard, the temperature difference change simulation is performed on the building stress distribution field to generate temperature difference fluctuation prestress data; based on the temperature difference fluctuation prestress data, the building unit deformation analysis is performed on the building temperature difference change stress data to obtain the building unit deformation data; based on the building unit deformation data, the building structure vibration deviation data is obtained; In this embodiment, according to the preset anti-frost standard, the anti-frost measures and parameters required for the building under different temperature conditions are determined, and these parameters include the temperature change range, time period, temperature gradient, etc. According to the anti-frost standard setting, the building stress distribution field is coupled with the temperature change for simulation, the temperature change range and time period are set, and factors such as external environmental conditions and internal heat conduction are considered. The selected simulation method and algorithm are used to simulate the temperature difference change of the building stress distribution field, and the temperature difference fluctuation prestress data in each unit is calculated according to the temperature change and material properties. The stress distribution field generated by the building under temperature change is calculated using the temperature difference fluctuation prestress data and parameters such as the thermal expansion coefficient of the material. The temperature difference stress is applied to each unit in the building BIM unit data to perform deformation analysis. The deformation of each unit is calculated according to the elastic modulus and geometric shape of the material. Based on the building unit deformation data, a structural vibration analysis is performed, and the deviation of the building structure under vibration is calculated considering factors such as the stiffness of the material, the geometric shape of the building structure, and the support conditions. According to the results of the structural vibration analysis, the vibration deviation data of each position of the building structure are obtained, and these data include information such as vibration amplitude, frequency, and displacement.

[0028] Step S6: Obtain building structure quality data based on building structure vibration deviation data; predict the structural stiffness trend based on the building structure quality data to obtain building risk trend data; make casting process optimization decisions based on the building risk trend data, generate building quality optimization decisions, and perform monitoring operations for engineering quality management.

[0029] In this embodiment, according to the vibration deviation data, the quality indicators of the building structure are calculated using appropriate algorithms or models. These indicators include the stiffness, stability, vibration characteristics, etc. of the structure. According to the characteristics and requirements of the building structure quality data, an appropriate trend prediction model is selected. Commonly used models include linear regression, time series analysis, machine learning, etc. The building structure quality data is preprocessed, including data smoothing, missing value processing, feature extraction, etc., to facilitate subsequent trend prediction analysis. The selected trend prediction model is used to analyze and model the building structure quality data to predict the trend change of the structural stiffness and provide trend information on the change of the building structure quality over time. According to the building risk trend data, the risk level of the building structure quality is evaluated. By comparing with the preset quality standard or threshold, it is determined whether there is a quality risk. Based on the risk assessment results, appropriate casting process optimization decisions are made, which include adjusting the material ratio, construction sequence, support structure, etc. to reduce quality risks and improve the stability and safety of the building structure. The process optimization decisions are implemented in the actual engineering quality management monitoring operations. The monitoring work includes real-time monitoring, detection records, quality control, etc. to ensure the effective implementation of the building quality optimization decisions.

[0030] In this embodiment, refer to Figure 2 , is a flowchart of detailed implementation steps of step S1. In this embodiment, the detailed implementation steps of step S1 include: Step S11: monitoring the entire process of the construction area of ​​the building under construction, obtaining concrete pouring parameters, component data of the building under construction, and multi-directional images of the building under construction; Step S12: performing characteristic structure point recognition on the multi-directional image of the building under construction to obtain characteristic structure point data; Step S13: Calculate the regional pixel value of the characteristic structure point data to obtain the characteristic point pixel vector; Step S14: performing multi-frame image feature point matching on the multi-directional image of the building under construction based on the feature point pixel vector to obtain matching feature point data. In this embodiment, a monitoring system is set up in the construction area, including cameras, sensors and other equipment to realize the whole process monitoring of the construction area. The monitoring system collects concrete pouring parameters (such as pouring time, temperature, humidity, etc.), component data of the building under construction (such as component type, size, position, etc.) and multi-directional images of the building under construction in real time, and pre-processes the acquired multi-directional images of the building under construction, including image denoising, grayscale processing, edge detection, etc., to improve the recognition accuracy of feature structure points. Computer vision technology, such as feature detection algorithms (such as SIFT, SURF, ORB, etc.) are used to extract feature points from the pre-processed images. These feature points are unique and repeatable positions in the image. According to the position of the feature structure point and the surrounding pixels, the area of ​​each feature point is set. For the area of ​​each feature point, the numerical representation of the pixels in the area is calculated, including grayscale value, color value or other specific pixel attributes. The pixel vectors of feature points in different frames are matched to find the corresponding feature points in different images. By applying matching algorithms and geometric constraints, reliable feature point matching pairs are screened out. This is achieved by eliminating false matches or using consistency checks.

[0031] In this embodiment, refer to Figure 3 , is a flowchart of detailed implementation steps of step S2. In this embodiment, the detailed implementation steps of step S2 include: Step S21: performing inter-image matrix calculation based on the matching feature point data to obtain an inter-image basic matrix; Step S22: performing matrix inverse projection on the basic matrix between images to obtain the global internal and external parameter matrix of the image; Step S23: constructing a spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image; Step S24: performing a three-dimensional structural analysis of the building on the matching feature points based on the spatial coordinate system of the building under construction to obtain three-dimensional structural data of the building; Step S25: Perform point cloud stereoscopic reconstruction on the building three-dimensional structure data to construct a three-dimensional point cloud model of the building.

[0032] In this embodiment, the basic matrix between the images is calculated by using the matching feature point data and a basic matrix calculation algorithm (such as the eight-point method, the random sampling consistency algorithm, etc.). The basic matrix describes the basic geometric relationship between the two images and is used for subsequent camera posture estimation and three-dimensional reconstruction. The basic matrix between the images is inversely projected to obtain the global internal and external parameter matrix of the image. These matrices include the internal parameter matrix and the external parameter matrix of the camera, which describe the internal parameters of the camera (such as focal length, principal point position, etc.) and external parameters (such as the position and posture of the camera), define the spatial coordinate system of the building under construction, determine the origin and coordinate axis direction of the coordinate system, and convert the coordinate transformation relationship between the spatial coordinate system of the building under construction and the global internal and external parameter matrix of the image. The feature points in the image are converted from the image coordinate system to the three-dimensional space coordinate system. The feature point data in the spatial coordinate system of the building under construction are used to analyze the three-dimensional structure of the building, which includes spatial position calculation of the feature points, point cloud data processing, point cloud registration, etc. According to the results of the three-dimensional structure analysis, the three-dimensional structure data of the building is generated. These data include the point cloud data, three-dimensional model, component information, etc. of the building. The point cloud data in the three-dimensional structure data of the building is used to perform stereoscopic reconstruction of the point cloud. This is achieved through point cloud registration, triangular mesh generation, surface reconstruction and other technologies. According to the results of the point cloud stereoscopic reconstruction, a three-dimensional point cloud model of the building is generated. The model provides three-dimensional information of the building for subsequent visualization, analysis and design work.

[0033] In this embodiment, refer to Figure 4 , is a flowchart of detailed implementation steps of step S3. In this embodiment, the detailed implementation steps of step S3 include: Step S31: performing topological association analysis on concrete pouring parameters and building component data under construction based on a preset building pouring sequence to obtain concrete-component association data; Step S32: performing pouring strength analysis based on concrete-component association data to obtain component pouring attribute data; Step S33: performing position association on the matching feature point data based on the component data of the building under construction to obtain component position data; Step S34: Mapping the component casting attribute data to the building three-dimensional point cloud model based on the component position data to construct a building BIM three-dimensional model. In this embodiment, the pouring order of each component is determined according to a preset building pouring sequence, and topological association analysis is performed on concrete pouring parameters and component data of the building under construction. By analyzing parameters such as time and position of concrete pouring, as well as data such as type, size, and position of components, the association relationship between concrete and corresponding components is determined to obtain concrete-component association data. Based on the concrete-component association data, the concrete pouring strength of each component is analyzed, which is achieved through concrete pouring parameters (such as pouring time, temperature, etc.) and related concrete strength models. Based on the results of the pouring strength analysis, pouring attribute data of each component is generated. These data include information such as pouring time and strength of the component, which is used for subsequent component management and quality control. Component data and matching feature point data are used to associate component positions. According to the type, size, position and other information of the component, the feature points related to the component in the matching feature point data are positionally associated to determine the position of the component in the building 3D point cloud model. Using the component position data, the component casting attribute data is mapped to the corresponding position in the building 3D point cloud model. According to the component position information, the casting attribute data of the component is associated with the corresponding point or area of ​​the building 3D point cloud model. According to the result of the attribute mapping, the point or area in the building 3D point cloud model is associated with the casting attribute data of the component to construct a BIM 3D model of the building. The model includes the geometric shape, attribute information, casting time, etc. of the component, providing detailed information and visual representation for building management and design.

[0034] In this embodiment, step S4 includes the following steps: Step S41: dividing the building BIM three-dimensional model into units to obtain building BIM unit data; Step S42: performing stress excitation simulation on the building BIM unit data to obtain building stress excitation simulation data; Step S43: performing stress distribution analysis on the building stress excitation simulation data to obtain building unit stress distribution data; Step S44: performing unit stress response analysis on the building unit stress distribution data to generate dynamic stress response data; Step S45: performing stress field fitting on the dynamic stress response data to generate a building stress distribution field. In this embodiment, the building is divided into discrete units according to the geometric shape of the building BIM three-dimensional model. The units are voxels, grids or other appropriate division forms for subsequent stress excitation simulation and analysis. For each unit, its geometric shape and attribute information are recorded to generate building BIM unit data. These data will be used for subsequent stress excitation simulation and analysis. According to the characteristics of the building and the load conditions it is subjected to, the parameters and conditions of the stress excitation simulation are set, which include information such as the type, size, and direction of the load applied to the building. Using appropriate numerical simulation methods (such as finite element analysis), the building BIM unit data is subjected to stress excitation simulation calculation. According to the geometric shape, material properties and applied load of the unit, the stress condition of each unit under a given excitation is calculated, and the results of the stress excitation simulation calculation are recorded to generate building stress excitation simulation data. These data include the stress condition of each unit under different excitation conditions. The stress value, strain value and other information under the components are used to analyze the stress distribution of the building stress excitation simulation data. According to the stress excitation simulation data of each unit, the stress distribution inside the unit is determined, and the results of the stress distribution analysis are recorded to generate the building unit stress distribution data. These data include the stress distribution diagram inside each unit, the stress concentration area and other information. According to the building unit stress distribution data, the stress response of each unit is analyzed, including the analysis of the unit's stress response time history, spectrum characteristics and other analysis. The dynamic stress response data is used to fit the building's stress field. The unit-level stress data is converted into a continuous stress field distribution using a suitable interpolation or fitting method. According to the results of the stress field fitting, the building's stress distribution field data is generated. These data represent the stress level and distribution of each position of the building, and are used to evaluate the stability and safety of the structure and to optimize the structural design.

[0035] In this embodiment, the specific steps of step S5 are: Step S51: simulating the temperature difference change of the building stress distribution field based on the preset frost protection standard to obtain the building temperature difference change stress data; Step S52: performing prestress analysis on the building temperature difference change stress data under temperature change to generate temperature difference fluctuation prestress data; Step S53: calculating the prestress change rate of the temperature difference fluctuation prestress data to obtain the prestress change rate; Step S54: performing building unit deformation analysis on the building temperature difference change stress data based on the prestress change rate to obtain building unit deformation data; Step S55: Performing structural vibration deviation analysis on the building BIM three-dimensional model based on the building unit deformation data to obtain building structure vibration deviation data. In this embodiment, preset anti-frost standards applicable to the building are determined. These standards usually take into account the climate conditions and seasonal changes in the area where the building is located, and stipulate the temperature difference range that the building needs to meet under anti-frost protection. According to the preset anti-frost standards, the parameters and conditions for simulating the temperature difference change are set, which include information such as the temperature change range and change rate to which the building is subjected. An appropriate numerical simulation method (such as finite element analysis) is used to simulate and calculate the temperature difference change of the stress distribution field of the building. According to the preset temperature change range and change rate, the stress of the building under different temperature differences is calculated. According to the material characteristics of the building and the design of the prestressed system, the parameters and conditions for prestress analysis are set, which include information such as the properties of the prestressed material, the prestressed force value, and the prestressed arrangement method. According to an appropriate prestress calculation method, the prestress analysis of the temperature difference change stress data of the building under temperature changes is performed. Considering the influence of temperature, the stress change of the prestressed system under different temperature conditions is calculated. Based on the temperature difference fluctuation prestress data, the change rate of prestress is calculated. According to the characteristics of the prestressed system and the temperature change conditions, the prestress is determined. The rate of change of stress, record the results of the calculation of the prestress change rate, and obtain the rate of change of prestress under different temperature changes. According to the preset prestress change rate and the properties of the building unit, set the parameters and conditions of the building unit deformation analysis, which includes the geometric shape, material properties and other information of the building unit. Use appropriate deformation analysis methods to perform building unit deformation analysis on the building temperature difference stress data. Considering the rate of change of prestress and the characteristics of the building unit, calculate the deformation of the building unit under prestress change. According to the structural characteristics and deformation data of the building, set the parameters and conditions of the structural vibration deviation analysis, which includes the frequency range, boundary conditions and other information of the vibration analysis. Use appropriate structural analysis methods or vibration analysis methods to perform structural vibration deviation analysis on the building BIM three-dimensional model. Considering the deformation data and vibration characteristics of the building unit, calculate the vibration deviation of the building structure at different frequencies. Record the results of the structural vibration deviation analysis to generate building structure vibration deviation data. These data represent the structural vibration of the building under temperature changes and prestress changes.

[0036] In this embodiment, the specific steps of step S51 are: Step S511: setting a temperature difference simulation range based on a preset anti-frost standard; Step S512: dividing the temperature difference simulation range into time windows to obtain time window temperature difference range data; Step S513: using the temperature difference range data of the time window to simulate the temperature difference change of the building stress distribution field to obtain the temperature difference simulation data of the stress distribution field; Step S514: performing thermal effect change analysis on the stress distribution field temperature difference simulation data to generate stress distribution field thermal effect data; Step S515: Calculate the temperature difference stress change rate for the stress distribution field thermal effect data to obtain the building temperature difference stress data.

[0037] In this embodiment, the applicable frost protection standard is determined according to the climatic conditions and seasonal changes in the area where the building is located. The frost protection standard stipulates the temperature difference range that the building needs to meet under frost protection. According to the frost protection standard, the range of the building temperature difference simulation is set, which includes the upper and lower limits of the temperature difference to ensure that the simulation covers the temperature changes that occur. The temperature difference simulation range is divided into multiple time windows. The size of the time window is selected according to needs and actual conditions, and is usually determined according to the periodicity of seasonal temperature changes. For each time window, the corresponding temperature difference range data is recorded. These data represent the temperature difference range experienced by the building in each time window. According to the time window temperature difference range data, the parameters and conditions of the temperature difference change simulation are set, which include information such as the temperature change range and change rate to which the building is subjected. The temperature difference change simulation calculation is performed on the building stress distribution field using an appropriate numerical simulation method (such as finite element analysis). According to the time window temperature difference range data, the temperature of the building in different time windows is simulated. According to the thermal properties of building materials and the temperature difference simulation data of the stress distribution field, the parameters and conditions for the thermal effect change analysis are set, which include information such as the thermal expansion coefficient and thermal conductivity of the material. Appropriate thermal effect analysis methods are used to analyze the thermal effect change of the stress distribution field temperature difference simulation data. Considering factors such as heat conduction and thermal expansion of materials, the thermal effect change of the building under temperature difference changes is calculated. According to the thermal effect data of the stress distribution field and the mechanical properties of building materials, the parameters and conditions for the calculation of the temperature difference stress change rate are set, which include information such as the elastic modulus and linear expansion coefficient of the material. Appropriate mechanical analysis methods are used to calculate the temperature difference stress change rate for the thermal effect data of the stress distribution field. Considering the thermal expansion and mechanical properties of the material, the stress change rate of the building under temperature difference changes is calculated. The calculation results of the temperature difference stress change rate are recorded to generate the building temperature difference stress data. These data represent the stress distribution of the building under temperature difference changes and are used to evaluate the stability and safety of the building structure.

[0038] In this embodiment, the specific steps of step S6 are: Step S61: performing regular structural stiffness quantitative evaluation on the building structure vibration deviation data based on a preset building pouring sequence to generate building structure quality data; Step S62: performing structural stiffness trend prediction based on the building structure quality data to generate quality trend prediction data; Step S63: performing future risk analysis on the quality trend prediction data to obtain building risk trend data; Step S64: Make a pouring process optimization decision based on the building risk trend data, generate a building quality optimization decision, and perform monitoring operations for project quality management.

[0039] In this embodiment, based on the collected vibration deviation data, the stiffness of the building structure is evaluated by using appropriate analysis methods (such as modal analysis, frequency analysis, etc.). Stiffness is the ability of a structure to resist deformation and is an important indicator for measuring structural quality. A structural stiffness trend prediction model is established using historical building structure quality data. Statistical analysis, machine learning or other prediction methods are used to establish the model. The established prediction model is used to predict the future quality of the building structure. The stiffness change trend of the building structure at different stages is predicted based on the casting sequence and time schedule. Based on the construction environment and structural characteristics, future risk factors that affect the building quality are determined, including material quality, construction technology, natural disasters and other factors. Based on known risk factors and quality trend prediction data, a risk analysis model is established. The model is established using probability statistics and risk assessment methods. The established risk analysis model is used to conduct future risk analysis on the quality trend prediction data to assess the degree and probability of risk faced by the building structure in various stages in the future. According to the building risk trend data and quality requirements, the optimization needs of the casting process are determined, which include adjusting the casting sequence, improving the construction process, strengthening quality control, etc. Based on the casting process optimization needs, a specific process optimization plan is formulated, which involves specific construction methods, quality control measures, resource allocation, etc. According to the formulated casting process optimization plan, building quality optimization decisions are generated, which involve adjusting the construction sequence, strengthening quality inspections, optimizing material selection, etc. The building quality optimization decisions are implemented in engineering practice, and the monitoring of engineering quality management is performed.

[0040] In this embodiment, a monitoring system for project quality management is provided, which is used to execute the monitoring method for project quality management as described above, including: The feature point matching module monitors the entire process of the construction area of ​​the building under construction, obtains concrete pouring parameters, component data of the building under construction, and multi-directional images of the building under construction; performs multi-frame image feature point matching on the multi-directional images of the building under construction to obtain matching feature point data; The point cloud reconstruction module calculates the matrix between images based on the matching feature point data to obtain the global internal and external parameter matrix of the image; constructs the spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image; and performs point cloud stereo reconstruction on the matching feature points based on the spatial coordinate system of the building under construction to construct a three-dimensional point cloud model of the building; The 3D model module obtains concrete-component association data based on concrete pouring parameters and data of building components under construction; maps the attributes of the building 3D point cloud model based on the concrete-component association data to construct a building BIM 3D model; The stress distribution module obtains the building BIM unit data based on the building BIM three-dimensional model; performs stress excitation simulation on the building BIM unit data to generate the building stress distribution field; The vibration deviation module simulates the temperature difference change of the building stress distribution field based on the preset anti-frost standard to generate temperature difference fluctuation prestress data; performs building unit deformation analysis on the building temperature difference change stress data based on the temperature difference fluctuation prestress data to obtain building unit deformation data; obtains building structure vibration deviation data based on the building unit deformation data; The trend prediction module obtains the building structure quality data based on the building structure vibration deviation data; predicts the structural stiffness trend based on the building structure quality data to obtain the building risk trend data; makes casting process optimization decisions based on the building risk trend data, generates building quality optimization decisions, and performs monitoring operations for engineering quality management.

[0041] The present invention monitors the construction area of ​​the building under construction throughout the entire process through a feature point matching module, obtains concrete pouring parameters, component data of the building under construction, and multi-directional images of the building under construction, obtains matching feature point data by matching multi-frame image feature points of the multi-directional images of the building under construction, and the matching feature point data provides a correspondence between images, and provides accurate spatial information for point cloud reconstruction and three-dimensional model construction in subsequent steps. The point cloud reconstruction module calculates the matrix between images based on the matching feature point data to obtain a global internal and external parameter matrix of the image, and constructs a spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image, and uses the spatial coordinate system of the building under construction to perform point cloud stereoscopic reconstruction on the matching feature points to generate a three-dimensional point cloud model of the building. The three-dimensional point cloud model of the building provides an accurate representation of the building in three-dimensional space, and provides basic data for three-dimensional model construction and stress distribution analysis in subsequent steps. The three-dimensional model module obtains concrete-component association data based on concrete pouring parameters and component data of the building under construction, and uses the concrete-component association data to perform attribute mapping on the three-dimensional point cloud model of the building to construct a three-dimensional BIM model of the building. The three-dimensional BIM model of the building associates the building structure with concrete information, and provides a comprehensive building The building information model is used for stress distribution and vibration deviation analysis in subsequent steps. The stress distribution module obtains the building BIM unit data based on the building BIM three-dimensional model, performs stress excitation simulation on the building BIM unit data, and generates the building stress distribution field. The building stress distribution field provides the stress distribution of the building structure under force, which is used for vibration deviation analysis and trend prediction in subsequent steps. The vibration deviation module simulates the temperature difference change of the building stress distribution field based on the preset anti-frost standard, generates temperature difference fluctuation prestress data, and performs building unit deformation analysis on the building temperature difference change stress data based on the temperature difference fluctuation prestress data to obtain the building unit deformation data. The building structure vibration deviation data is obtained based on the building unit deformation data. The building structure vibration deviation data provides the vibration of the building structure under the influence of temperature changes, which is used for trend prediction and quality optimization decision in subsequent steps. The trend prediction module obtains the building structure quality data based on the building structure vibration deviation data, predicts the structural stiffness trend based on the building structure quality data, obtains the building risk trend data, makes casting process optimization decisions based on the building risk trend data, and generates building quality optimization decisions to perform monitoring operations for engineering quality management.

[0042] Therefore, the embodiments should be regarded as illustrative and non-restrictive from all points, and the scope of the present invention is limited by the appended claims rather than the above description, and it is therefore intended that all changes falling within the meaning and range of equivalent elements of the application documents are included in the present invention.

[0043] The above is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features invented herein.

Claims

1. A monitoring method for engineering quality management, characterized in that: The following steps are involved: Step S1: Monitor the entire process of the construction area of ​​the building under construction to obtain concrete pouring parameters, building component data and multi-directional images of the building under construction; Perform multi-frame image feature point matching on multi-directional images of the building under construction to obtain matching feature point data; Step S2: performing inter-image matrix calculation based on the matching feature point data to obtain the global internal and external parameter matrix of the image; Construct the spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image; Based on the spatial coordinate system of the building under construction, point cloud stereo reconstruction is performed on the matching feature points to construct a three-dimensional point cloud model of the building; Step S3: obtaining concrete-component association data based on concrete pouring parameters and building component data under construction; Map the attributes of the building 3D point cloud model based on the concrete-component association data to construct the building BIM 3D model; Step S4: Obtaining building BIM unit data based on the building BIM three-dimensional model; Conduct stress excitation simulation on building BIM unit data to generate building stress distribution field; Step S5: simulating the temperature difference change of the building stress distribution field based on the preset anti-frost standard to generate temperature difference fluctuation prestress data; Based on the temperature difference fluctuation prestress data, the building unit deformation analysis is performed on the building temperature difference change stress data to obtain the building unit deformation data; Obtain building structure vibration deviation data based on building unit deformation data; Step S6: Obtaining building structure quality data based on the building structure vibration deviation data; Predict the structural stiffness trend based on the building structure quality data to obtain the building risk trend data; Based on the construction risk trend data, the pouring process optimization decision is made to generate the construction quality optimization decision to perform the monitoring work of project quality management.

2. The method according to claim 1, characterized in that The specific steps of step S1 are: Step S11: monitoring the entire process of the construction area of ​​the building under construction, obtaining concrete pouring parameters, component data of the building under construction, and multi-directional images of the building under construction; Step S12: performing characteristic structure point recognition on the multi-directional image of the building under construction to obtain characteristic structure point data; Step S13: Calculate the regional pixel value of the characteristic structure point data to obtain the characteristic point pixel vector; Step S14: performing multi-frame image feature point matching on the multi-directional image of the building under construction based on the feature point pixel vector to obtain matching feature point data.

3. The method according to claim 1, characterized in that The specific steps of step S2 are: Step S21: performing inter-image matrix calculation based on the matching feature point data to obtain an inter-image basic matrix; Step S22: performing matrix inverse projection on the basic matrix between images to obtain the global internal and external parameter matrix of the image; Step S23: constructing a spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image; Step S24: performing a three-dimensional structural analysis of the building on the matching feature points based on the spatial coordinate system of the building under construction to obtain three-dimensional structural data of the building; Step S25: Perform point cloud stereoscopic reconstruction on the building three-dimensional structure data to construct a three-dimensional point cloud model of the building.

4. The method according to claim 1, characterized in that: The specific steps of step S3 are: Step S31: performing topological association analysis on concrete pouring parameters and building component data under construction based on a preset building pouring sequence to obtain concrete-component association data; Step S32: performing pouring strength analysis based on concrete-component association data to obtain component pouring attribute data; Step S33: performing position association on the matching feature point data based on the component data of the building under construction to obtain component position data; Step S34: Mapping the component casting attribute data to the building three-dimensional point cloud model based on the component position data to construct a building BIM three-dimensional model.

5. The method according to claim 1, characterized in that The specific steps of step S4 are: Step S41: dividing the building BIM three-dimensional model into units to obtain building BIM unit data; Step S42: performing stress excitation simulation on the building BIM unit data to obtain building stress excitation simulation data; Step S43: performing stress distribution analysis on the building stress excitation simulation data to obtain building unit stress distribution data; Step S44: performing unit stress response analysis on the building unit stress distribution data to generate dynamic stress response data; Step S45: performing stress field fitting on the dynamic stress response data to generate a building stress distribution field.

6. The method according to claim 1, characterized in that The specific steps of step S5 are: Step S51: simulating the temperature difference change of the building stress distribution field based on the preset frost protection standard to obtain the building temperature difference change stress data; Step S52: performing prestress analysis on the building temperature difference change stress data under temperature change to generate temperature difference fluctuation prestress data; Step S53: calculating the prestress change rate of the temperature difference fluctuation prestress data to obtain the prestress change rate; Step S54: performing building unit deformation analysis on the building temperature difference change stress data based on the prestress change rate to obtain building unit deformation data; Step S55: Performing structural vibration deviation analysis on the building BIM three-dimensional model based on the building unit deformation data to obtain building structure vibration deviation data.

7. The method according to claim 6, characterized in that The specific steps of step S51 are: Step S511: setting a temperature difference simulation range based on a preset anti-frost standard; Step S512: dividing the temperature difference simulation range into time windows to obtain time window temperature difference range data; Step S513: using the temperature difference range data of the time window to simulate the temperature difference change of the building stress distribution field to obtain the temperature difference simulation data of the stress distribution field; Step S514: performing thermal effect change analysis on the stress distribution field temperature difference simulation data to generate stress distribution field thermal effect data; Step S515: Calculate the temperature difference stress change rate for the stress distribution field thermal effect data to obtain the building temperature difference stress data.

8. The method according to claim 1, characterized in that The specific steps of step S6 are: Step S61: performing regular structural stiffness quantitative evaluation on the building structure vibration deviation data based on a preset building casting sequence to generate building structure quality data; Step S62: performing structural stiffness trend prediction based on the building structure quality data to generate quality trend prediction data; Step S63: performing future risk analysis on the quality trend prediction data to obtain building risk trend data; Step S64: Make a pouring process optimization decision based on the construction risk trend data, generate a building quality optimization decision, and perform monitoring operations for project quality management.

9. A monitoring system for engineering quality management, characterized in that: include: The feature point matching module monitors the entire process of the construction area of ​​the building under construction, obtains concrete pouring parameters, data of building components under construction, and multi-directional images of the building under construction; Perform multi-frame image feature point matching on multi-directional images of the building under construction to obtain matching feature point data; Point cloud reconstruction module, which performs inter-image matrix calculation based on matching feature point data to obtain the global internal and external parameter matrix of the image; Construct the spatial coordinate system of the building under construction based on the global internal and external parameter matrix of the image; Based on the spatial coordinate system of the building under construction, point cloud stereo reconstruction is performed on the matching feature points to construct a three-dimensional point cloud model of the building; The 3D model module obtains concrete-component correlation data based on concrete pouring parameters and building component data under construction; Map the attributes of the building 3D point cloud model based on the concrete-component association data to construct the building BIM 3D model; Stress distribution module, which obtains building BIM unit data based on the building BIM three-dimensional model; Conduct stress excitation simulation on building BIM unit data to generate building stress distribution field; The vibration deviation module simulates the temperature difference change of the building stress distribution field based on the preset anti-frost standard and generates temperature difference fluctuation prestress data; Based on the temperature difference fluctuation prestress data, the building unit deformation analysis is performed on the building temperature difference change stress data to obtain the building unit deformation data; Obtain building structure vibration deviation data based on building unit deformation data; Trend prediction module, which obtains building structure quality data based on building structure vibration deviation data; Predict the structural stiffness trend based on the building structure quality data to obtain the building risk trend data; Based on the construction risk trend data, the pouring process optimization decision is made to generate the construction quality optimization decision to perform the monitoring work of project quality management.

Citation Information

Cited By

  • Engineering project construction quality management method and system

    CN119359170A

  • Engineering quality detection system and method for highway construction supervision based on cloud data

    CN119624122A

  • Intelligent monitoring method and system for concrete pouring quality, product and medium

    CN119758941A

  • Intelligent building engineering three-dimensional modeling system and method

    CN119903578A

  • Short line segment prefabricated line shape intelligent control and acceptance system, method and medium

    CN120008511A