Code storage method, system and equipment for common equipment and medium

By encoding and linking equipment and projects item by item according to the engineering design drawings in engineering equipment management, statistical errors caused by manual operations are solved, efficient and precise management of equipment storage is achieved, and the accuracy and economicality of project completion acceptance is ensured. sex.

CN118967004APending Publication Date: 2024-11-15CHINA THREE GORGES CORPORATION
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202410927737.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing technology relies on manual operation of EXCEL software in engineering equipment management, resulting in large statistical errors, insufficient comprehensive and accurate management, and lack of automated and efficient equipment storage process.

Method used

By encoding common equipment item by item according to the engineering design drawings and associated with sub-projects in the project, obtaining the project nodes and contract status, setting assessment nodes and acceptance processes, ensuring the accuracy and relevance of equipment storage, generating acceptance results and Send to the database.

Benefits of technology

It improves the efficiency and accuracy of equipment management, reduces contract settlement errors, avoids adverse effects in fund management, and ensures economical and accuracy during project completion acceptance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118967004A_ABST
    Figure CN118967004A_ABST
Patent Text Reader

Abstract

The invention discloses a code storage method and system for common equipment, equipment and a medium, and belongs to the technical field of engineering equipment storage. Coding is executed on multiple common equipment item by item according to an engineering design drawing; associating the plurality of common devices with sub-projects in the engineering project; obtaining project nodes, setting common equipment according to the project nodes, and setting assessment nodes and assessment contents corresponding to each sub-project according to a storage time sequence of the common equipment; obtaining the reorganization state of the engineering contract, and determining that the state of the engineering contract is not reorganized; under the condition that the project contract state is not modified, the setting of the common equipment is accepted to generate the acceptance result, and the acceptance result is sent to the database, so that the information of the actual generation cost of the project can be accurately and timely reflected to overcome the error of contract settlement and avoid the adverse effect on fund management; economic problems which are difficult to deal with are left during project completion acceptance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of engineering equipment storage, and in particular relates to a coding storage method, system, equipment and medium for commonly used equipment. Background Art

[0002] Common equipment refers to the engineering machinery equipment frequently used in engineering construction. It is consumable. The management system of common equipment is an important subsystem in engineering management. It involves the management process of equipment introduction, consumption, maintenance and scrapping, including equipment registration, equipment consumption, equipment depreciation and overhaul, regular inventory of equipment assets, etc. Only relying on manual use of EXCEL office software for statistics and manual evaluation will cause large errors, and manual processing is not comprehensive and accurate enough. Summary of the invention

[0003] In view of the above problems, the present application proposes a coding warehousing method, system, device and medium for commonly used equipment, which is conducive to improving equipment management efficiency and improving the breadth and accuracy of equipment warehousing.

[0004] The present application provides a method for storing codes of commonly used devices, including:

[0005] S101: Encoding a plurality of commonly used equipment item by item according to the engineering design drawing; and associating the plurality of commonly used equipment with sub-items in the engineering project;

[0006] S102: Acquire a project node, and set common equipment according to the project node, wherein the setting of the common equipment is set according to the sub-project process in the project;

[0007] S103: According to the time sequence of the common equipment entering the warehouse, set the corresponding assessment nodes and assessment contents for each sub-project;

[0008] S104: Obtaining the modification status of the engineering contract. If the engineering contract status is modified, repeating steps 101 to 103 according to the modified engineering contract to ensure that there is no error in the association of the equipment;

[0009] S105: When the engineering contract status is not modified, acceptance is performed on the settings of common equipment to generate acceptance results, and the acceptance results are sent to the database.

[0010] Furthermore, the step S101 of performing coding on a plurality of commonly used equipment item by item according to the engineering design drawing includes:

[0011] According to the engineering design plan, code all commonly used equipment;

[0012] Enter data from commonly used equipment through data entry and image entry;

[0013] The input contents of the commonly used equipment include: storage time, storage time, depreciation of commonly used equipment, cost of commonly used equipment and life cycle.

[0014] Furthermore, associating the plurality of commonly used equipment with the sub-projects in the engineering project in step S101 includes:

[0015] In the engineering project, common codes for commonly used equipment are shared among multiple sub-projects;

[0016] Further, the method further comprises: matching the design budget of the sub-project with the purchased common equipment, wherein the common equipment code is associated with the sub-project;

[0017] The purchase of commonly used equipment is carried out according to the sub-projects divided into the engineering design plan and in a scheduled time period.

[0018] Furthermore, in step S102, setting common equipment according to the engineering nodes includes:

[0019] Mark the associated ordering contracts according to the project nodes and evaluate the ordered equipment in the ordering contracts;

[0020] Among them, an assessment is performed according to the length of equipment delay time and the loss status, an equipment assessment result is generated, and commonly used equipment is set based on the equipment assessment result.

[0021] Furthermore, in step S103, the order of the storage time of the commonly used equipment is determined according to the accumulated daily report;

[0022] Perform node assessment of engineering sub-projects according to the cumulative daily report, and conduct assessment and evaluation of sub-projects.

[0023] Furthermore, in step S104, whether to perform the common equipment acceptance is determined by obtaining the engineering contract adaptation status;

[0024] If the commonly used equipment code in the engineering contract changes, execute steps S101 to S103 to reset the storage and assessment of the commonly used equipment until the commonly used equipment code does not change.

[0025] Based on the same inventive concept, the embodiment of the present application also discloses a coding storage system for commonly used equipment, including:

[0026] A coding unit is used to perform coding on a plurality of commonly used equipment item by item according to the engineering design drawing; and to associate the plurality of commonly used equipment with sub-items in the engineering project;

[0027] A setting unit, used to obtain a project node and set common equipment according to the project node, wherein the setting of the common equipment is set according to the sub-project process in the project;

[0028] The assessment unit is used to set the assessment nodes and assessment contents of each sub-project according to the time sequence of the common equipment entering the warehouse;

[0029] A determination unit, used for obtaining the modification status of the engineering contract, and if the engineering contract status is modified, repeating steps 101 to 103 according to the modified engineering contract to ensure that there is no error in the association of the equipment;

[0030] The warehousing unit is used to perform acceptance on the settings of common equipment when the contract status is not modified, generate acceptance results, and send the acceptance results to the database.

[0031] Based on the same inventive concept, the embodiment of the present application further discloses an electronic device, characterized in that it includes: a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other through the communication bus;

[0032] a memory storing a computer program;

[0033] The processor implements the coding storage method of the commonly used devices when executing the program stored in the memory.

[0034] Based on the same inventive concept, the embodiment of the present application further discloses a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the coding storage method of the commonly used devices.

[0035] This application has at least the following beneficial effects:

[0036] This application performs coding on multiple commonly used equipment item by item according to the engineering design drawings; and associates multiple commonly used equipment with sub-projects in the engineering project; obtains engineering nodes, sets commonly used equipment according to engineering nodes, and sets corresponding assessment nodes and assessment contents for each sub-project according to the time sequence of commonly used equipment entering the warehouse; obtains the modification status of the engineering contract, and determines that the engineering contract status has not been modified; when the engineering contract status has not been modified, performs acceptance on the settings of commonly used equipment to generate acceptance results, and sends the acceptance results to the database. It can be seen that the information on the actual cost of the project can be accurately and timely reflected to overcome the mistakes in contract settlement, avoid adverse effects on fund management, and leave difficult economic problems at the completion acceptance of the project. It can improve the efficiency of equipment management and the breadth and accuracy of equipment entry.

[0037] Other features and advantages of the present application will be described in the following description, and partly become apparent from the description, or understood by practicing the present application. The purpose and other advantages of the present application can be realized and obtained by the structures indicated in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0039] Figure 1 This is a schematic diagram of a method for encoding storage of a commonly used device in an embodiment of the present application;

[0040] Figure 2 This is a schematic diagram of a method for encoding storage of a commonly used device in an embodiment of the present application;

[0041] Figure 3 This is a flow chart of material definition for the embodiment of this application;

[0042] Figure 4 This is a flow chart of the device code for the embodiment of the present application;

[0043] Figure 5 A schematic diagram of an electronic device serving as an engineering management platform according to an embodiment of the present application. DETAILED DESCRIPTION

[0044] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0045] It should be noted that the terms "first", "second" etc. in the present application are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged in appropriate circumstances, so that the embodiments of the present application described here. In the present application, the orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inside", "outside", "middle", "vertical", "horizontal", "lateral", "longitudinal" etc. are based on the orientation or positional relationship shown in the accompanying drawings.

[0046] The present application embodiment provides a method for storing codes of commonly used devices. Figure 1 ,include:

[0047] S101: Encoding a plurality of commonly used equipment item by item according to the engineering design drawing; and associating the plurality of commonly used equipment with sub-items in the engineering project;

[0048] S102: Acquire a project node, and set common equipment according to the project node, wherein the setting of the common equipment is set according to the sub-project process in the project;

[0049] S103: According to the time sequence of the common equipment entering the warehouse, set the corresponding assessment nodes and assessment contents for each sub-project;

[0050] S104: Obtaining the modification status of the engineering contract. If the engineering contract status is modified, repeating steps 101 to 103 according to the modified engineering contract to ensure that there is no error in the association of the equipment;

[0051] S105: When the engineering contract status is not modified, acceptance is performed on the settings of common equipment to generate acceptance results, and the acceptance results are sent to the database.

[0052] It should be noted that the coding storage method for commonly used equipment disclosed in this application is applied to the engineering management platform, including the management system for commonly used equipment in the project. The engineering management platform can be a computer, tablet computer, mobile phone and other devices, and the coding storage method for commonly used equipment of this application is executed based on hardware devices. The commonly used equipment includes permanent electromechanical products that need to be installed in the project, and the commonly used equipment management system includes: a central computer, a database, an input device & a display device.

[0053] All parties involved in the project construction can analyze, process and monitor various data in real time, so as to achieve better management of the project. In cost control, the information on the actual cost of the project can be accurately and timely reflected to overcome the mistakes in contract settlement, such as over-settlement, under-settlement, delayed settlement, etc., to avoid adverse effects on fund management and difficult economic problems left at the completion and acceptance of the project. Each item in the contract has a predicted value, and all the information that needs to be paid must be entered into the system and verified before settlement. Once the system finds that the predicted value is exceeded, the system will alarm and prompt, so that the manager can focus on these items, complete the corresponding processing or problem tracing in time, and finally achieve the purpose of control.

[0054] Specifically, the step S101 of performing coding on a plurality of commonly used equipment item by item according to the engineering design drawing includes:

[0055] According to the engineering design plan, code all commonly used equipment;

[0056] Enter data from commonly used equipment through data entry and image entry;

[0057] The input contents of the commonly used equipment include: storage time, storage time, depreciation of commonly used equipment, cost of commonly used equipment and life cycle.

[0058] The step S101 of associating a plurality of commonly used equipment with sub-projects in the engineering project includes:

[0059] In the engineering project, common codes of commonly used equipment are shared among multiple sub-projects.

[0060] Match the design budget of the sub-project with the commonly used equipment purchased, and associate the commonly used equipment code with the sub-project;

[0061] The purchase of commonly used equipment is carried out according to the sub-projects divided into the engineering design plan and in a scheduled time period.

[0062] Specifically, according to the engineering design plan, various commonly used equipment are coded, and the commonly used equipment is entered through data entry and image entry. The entry content of the commonly used equipment includes: storage time, storage time, depreciation and impairment of commonly used equipment, cost and life cycle of commonly used equipment;

[0063] The purchase of common equipment corresponds to the relevant content of the design budget and has the relevant code. The purchase of common equipment is carried out according to the sub-items divided by the engineering design plan and in a predetermined time period.

[0064] The use, loss or accidental damage of commonly used equipment should be reported according to the predetermined plan and re-recorded.

[0065] The following is a detailed explanation of the coding of commonly used devices using examples.

[0066] See also Figure 3 , encode the commonly used equipment item by item according to the engineering design drawings, and associate the commonly used equipment with each sub-project of the project one by one, and share the general equipment code in each sub-project;

[0067] Material codes provide a basic coding library for all bulk materials required by all projects, which can be used uniformly by all projects. Material coding information is entered into the system according to the pre-established coding rules.

[0068] The material coding matrix is ​​used to enter the components that make up the material code. Each part of the code has a certain meaning, and when they are combined together, they form a complete description of the material. This matrix can ensure the uniformity of the material code, and the code has logical and practical meaning.

[0069] Create material codes according to the general list of materials. These codes can provide the basic data framework for the procurement of bulk materials and equipment required for the project and the allocation of materials and equipment to contractors.

[0070] See also Figure 4 , equipment code and equipment related information definition. The equipment master list is used to establish an equipment database for a project, through the equipment code and related material code and shortcut code; equipment specification definition, to write a specification master list for each type of equipment, which is only used to define and establish the specification attributes of the equipment,

[0071] All necessary information for equipment specifications, such as operating temperatures, equipment size and weight, metallurgy and calibrating requirements, etc.

[0072] Equipment requirement date is used to describe the various requirement dates of specific equipment and establish the association between the construction schedule and the equipment purchase plan. Large electromechanical equipment is decomposed and coded according to the level.

[0073] In some embodiments, setting common equipment according to the engineering nodes in step S102 includes:

[0074] Mark the associated ordering contracts according to the project nodes and evaluate the ordered equipment in the ordering contracts;

[0075] Among them, an assessment is performed according to the length of equipment delay time and the loss status, an equipment assessment result is generated, and commonly used equipment is set based on the equipment assessment result.

[0076] Specifically, the system's management module marks the associated ordering contracts while issuing expected warnings, evaluates the engineering contracts associated with the ordered equipment based on the length of equipment delay and loss status, and submits the evaluation results to the system for use as a basis for modifying the general contract and related unit contracts.

[0077] In step S103, the order of the commonly used equipment entering the warehouse is determined based on the accumulated daily report;

[0078] Perform node assessment of engineering sub-projects according to the cumulative daily report, and conduct assessment and evaluation of sub-projects.

[0079] Specifically, according to the time sequence from the storage to the installation of commonly used equipment, multiple assessment nodes and assessment contents corresponding to each sub-project are set; the assessment of the engineering sub-project nodes is carried out according to the cumulative daily report, and the sub-projects are evaluated and assessed.

[0080] In some embodiments, in step S104, whether to perform common equipment acceptance is determined by obtaining the engineering contract adaptation status;

[0081] If the commonly used equipment code in the engineering contract changes, execute steps S101 to S103 to reset the storage and assessment of the commonly used equipment until the commonly used equipment code does not change.

[0082] The present invention is based on the principles and ideas of the supply chain, takes the demand for construction materials (quantity, quality, time) as the main line, connects suppliers, demanders (owners), and users (construction units), and focuses on the project schedule. It takes design details, sub-items, engineering quantities, and quota consumption as the basis for demand compilation, and implements comprehensive management and control of all logistics links in the entire process of construction, such as material demand (such as: monthly material application supply plan), procurement, allocation, acceptance, urging scheduling, and consumption control. The dynamic management of material supply is achieved through total quantity control and resource balance, and a direct decision-making basis is provided for the preparation and arrangement of capital budgets and capital scheduling; the vouchers for the two income and expenditure links of allocation and acceptance are automatically generated, and the corresponding contract engineering projects and procurement contracts are automatically associated to form a detailed material and financial detailed ledger for the supply of engineering materials, so as to achieve the correspondence between logistics and funds.

[0083] At the same time, in order to further improve the system's control over the logistics process, a material transportation model is designed to support the optimization and organization of logistics.

[0084] Add a flow chart for the assessment of equipment purchase and depreciation. For example, an excavator cannot be used all the time. After one or two sub-projects are completed, the cost of repairing the equipment will exceed the cost of purchasing a new one. In this case, it is more reasonable to purchase new equipment, so there must be an equipment update project. Use depreciation assessment to determine the update time node.

[0085] For device management content:

[0086] Bulk materials: In hydropower projects, generally refers to steel, cement, fly ash, wood, fuel, civil explosives, oil, etc. In environmental protection municipal projects, generally refers to pipes and inspection wells.

[0087] General equipment: Compared with complete sets of equipment, general equipment usually refers to equipment that does not require assembly or only requires simple assembly, such as office equipment, automobiles, air conditioners, etc. Provide a basic coding library for all bulk materials (usually supplied by Party A) required by all projects for unified use by all projects. Define the material coding matrix to input the components that make up the material code. Each part of the code has a certain meaning, and when combined together, it constitutes a complete description of the material.

[0088] The present application provides a coding storage method, system, equipment and medium for commonly used equipment, which belongs to the technical field of engineering equipment storage. The method performs coding on multiple commonly used equipment item by item according to the engineering design drawing; and associates multiple commonly used equipment with sub-projects in the engineering project; obtains the engineering node, sets the commonly used equipment according to the engineering node, and sets the corresponding assessment nodes and assessment contents of each sub-project according to the time sequence of the commonly used equipment storage; obtains the modification status of the engineering contract, and determines that the engineering contract status has not been modified; when the engineering contract status has not been modified, performs acceptance on the settings of the commonly used equipment to generate acceptance results, and sends the acceptance results to the database. It can be seen that the information on the actual cost of the project can be accurately and timely reflected, so as to overcome the mistakes in contract settlement, avoid adverse effects on fund management, and leave difficult economic problems at the time of completion acceptance of the project.

[0089] Based on the same inventive concept, the present application also discloses a coding storage system for commonly used equipment. Figure 2 ,include:

[0090] The coding unit 201 is used to code the multiple common equipments one by one according to the engineering design drawing; and associate the multiple common equipments with the sub-items in the engineering project;

[0091] A setting unit 202 is used to obtain a project node and set common equipment according to the project node, wherein the setting of the common equipment is set according to the sub-project process in the project;

[0092] Assessment unit 203, used to set assessment nodes and assessment contents corresponding to each sub-item according to the time sequence of the common equipment entering the warehouse;

[0093] The determination unit 204 is used to obtain the modification status of the engineering contract. If the engineering contract status is modified, steps 101 to 103 are repeatedly executed according to the modified engineering contract to ensure that there is no error in the association of the equipment;

[0094] The storage unit 205 is used to perform acceptance on the settings of the common equipment when the contract status is not modified, generate acceptance results, and send the acceptance results to the database.

[0095] Based on the same inventive concept, the present application embodiment also provides an electronic device 161, see Figure 5 , including a processor 164, a communication interface 165, a memory 162 and a communication bus, wherein the processor 164, the communication interface 165 and the memory 162 communicate with each other through the communication bus;

[0096] A memory 162 storing a computer program 163;

[0097] When the processor 164 executes the program stored in the memory 162, the coding storage method of the commonly used devices is implemented.

[0098] The above communication bus may be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The communication bus may be divided into an address bus, a data bus, a control bus, etc.

[0099] The communication interface 165 is used for communication between the electronic device 161 and other devices.

[0100] The memory 162 may include a random access memory 162 (RAM), or may include a non-volatile memory 162 (non-volatile memory), such as at least one disk memory 162. Optionally, the memory 162 may also be at least one storage device located away from the processor 164.

[0101] The above-mentioned processor 164 can be a general-purpose processor 164, including a central processing unit 164 (CPU), a network processor 164 (NP), etc.; it can also be a digital signal processor 164 (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components.

[0102] Based on the same inventive concept, the embodiment of the present application further provides a computer-readable storage medium on the other hand, storing a computer program 163, which implements the coding warehousing method of the commonly used devices when executed by the processor 164.

[0103] The computer-readable storage medium may be included in the device / apparatus described in the above embodiment; or it may exist independently without being assembled into the device / apparatus. The above computer-readable storage medium carries one or more programs, and when the above one or more programs are executed, the coding storage method of the commonly used device according to the embodiment of the present application is implemented.

[0104] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A coding storage method for commonly used equipment, characterized in that: include: S101: Encoding multiple commonly used equipment item by item according to the engineering design drawing; And associate multiple commonly used equipment with sub-projects in engineering projects; S102: Acquire a project node, and set common equipment according to the project node, wherein the setting of the common equipment is set according to the sub-project process in the project; S103: According to the time sequence of the common equipment entering the warehouse, set the corresponding assessment nodes and assessment contents for each sub-project; S104: Obtaining the modification status of the engineering contract. If the engineering contract status is modified, repeating steps 101 to 103 according to the modified engineering contract to ensure that there is no error in the association of the equipment; S105: When the engineering contract status is not modified, acceptance is performed on the settings of common equipment to generate acceptance results, and the acceptance results are sent to the database.

2. The method according to claim 1, characterized in that: The step S101 of performing coding on a plurality of commonly used equipments item by item according to the engineering design drawing includes: According to the engineering design plan, code all commonly used equipment; Enter data from commonly used equipment through data entry and image entry; The input contents of the commonly used equipment include: storage time, storage time, depreciation of commonly used equipment, cost of commonly used equipment and life cycle.

3. The method according to claim 2, characterized in that The step S101 of associating a plurality of commonly used equipment with sub-projects in the engineering project includes: In the engineering project, common codes of commonly used equipment are shared among multiple sub-projects.

4. The method according to claim 3, characterized in that The method further comprises: Match the design budget of the sub-project with the commonly used equipment purchased, where the commonly used equipment code is associated with the sub-project; The purchase of commonly used equipment is carried out according to the sub-projects divided into the engineering design plan and in a scheduled time period.

5. The method according to claim 1, characterized in that In step S102, commonly used equipment is set according to the engineering nodes, including: Mark the associated ordering contracts according to the project nodes and evaluate the ordered equipment in the ordering contracts; Among them, an assessment is performed according to the length of equipment delay time and the loss status, an equipment assessment result is generated, and commonly used equipment is set based on the equipment assessment result.

6. The method according to claim 1, characterized in that In step S103, the order of the commonly used equipment entering the warehouse is determined based on the accumulated daily report; Perform node assessment of engineering sub-projects according to the cumulative daily report, and conduct assessment and evaluation of sub-projects.

7. The method according to claim 1, characterized in that In step S104, whether to perform the common equipment acceptance is determined by obtaining the engineering contract modification status; If the commonly used equipment code in the engineering contract changes, execute steps S101 to S103 to reset the storage and assessment of the commonly used equipment until the commonly used equipment code does not change.

8. A coding storage system for commonly used equipment, characterized in that: include: A coding unit, used to perform coding on a plurality of commonly used equipments item by item according to an engineering design drawing; And associate multiple commonly used equipment with sub-projects in engineering projects; A setting unit, used to obtain a project node and set common equipment according to the project node, wherein the setting of the common equipment is set according to the sub-project process in the project; The assessment unit is used to set the assessment nodes and assessment contents of each sub-project according to the time sequence of the common equipment entering the warehouse; A determination unit, used for obtaining the modification status of the engineering contract, and if the engineering contract status is modified, repeating steps 101 to 103 according to the modified engineering contract to ensure that there is no error in the association of the equipment; The warehousing unit is used to perform acceptance on the settings of common equipment when the contract status is not modified, generate acceptance results, and send the acceptance results to the database.

9. An electronic device, characterized in that: include: A processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus; a memory storing a computer program; The processor, when executing the program stored in the memory, implements the coding warehousing method for commonly used devices as described in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: A computer program is stored, and when the computer program is executed by a processor, the coding storage method of the commonly used equipment described in any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Engineering project information management system and method

    CN107944665A

  • Project completion settlement method and terminal device

    CN108154314A

  • EPC project purchase management method, system and device, and storage medium

    CN108288148A

  • Engineering project material management system

    CN111738695A

  • Substation whole station tagging control method based on real object ID

    CN115062972A