Short-process combined nitrogen and phosphorus removal process for realizing capacity expansion of sewage plant in situ
By combining the side flow functional bacteria screening technology and AAO process, the efficient nitrogen removal and phosphorus removal of sewage plants during hydraulic load changes is achieved, and the problem of insufficient pollutant removal capacity of sewage treatment plants under the impact of rainy season is solved, ensuring that the system is different Stable operation and efficient treatment under load conditions.
Patent Information
- Application Number
- CN202411028010.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-07-30
AI Technical Summary
When urban sewage treatment plants face increased hydraulic loads and impacts in rainy seasons, it is difficult for the nitrogen removal and phosphorus removal system to effectively maintain pollutant removal capabilities, resulting in sewage overflow and black and odorous water problems. The existing AAO process shows insufficient under the impact of hydraulic loads.
A short-process combined nitrogen removal and phosphorus removal process is adopted to realize the capacity expansion of sewage plants in situ. Through the side flow functional bacteria screening technology combined with precipitation method and membrane separation technology, a compact system structure is designed, and the intelligent automatic control module is used to monitor and adjust functional bacteria in real time. The screening device is operated to ensure that the system maintains efficient nitrogen removal and phosphorus removal capabilities during in-situ expansion in the dry season and excessive capacity expansion in the rainy season.
Through the targeted enrichment and targeted reflux strategies of functional flora, the activity of nitrification and polyphosphate flora is strengthened, the system's denitrification and phosphorus removal capabilities are improved, the area is reduced, and the system can operate stably under different load conditions is avoided. Deterioration of sludge settlement performance and removal efficiency.
Smart Images

Figure CN118978258A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of sewage treatment, and in particular to a short-process combined denitrification and phosphorus removal process for in-situ expansion of a sewage treatment plant. Background Art
[0002] With the rapid economic development and the continuous expansion of urbanization, the amount of urban sewage discharge is increasing. At the same time, urban sewage treatment plants in coastal areas and Taihu Lake Basin are also facing the problems of heavy rainfall, long rainy season, and incomplete rainwater and sewage separation in the pipeline network. However, due to the limited design and treatment capacity of urban sewage treatment plants, they can only solve the increasing hydraulic load year by year by overloading operation, and cope with the excessive load in the rainy season. The gradually increasing hydraulic load makes the denitrification and phosphorus removal system of the sewage treatment plant extremely vulnerable to shocks, and it is difficult to effectively guarantee the overall pollutant removal capacity of the system, which will cause the denitrification and phosphorus removal system of the sewage treatment plant to be damaged in the rainy season, and lose the ability to cope with load shocks, forcing sewage to overflow into the river, causing black and smelly water bodies and other problems.
[0003] AAO and its improved variants are one of the mainstream processes for nitrogen and phosphorus removal in urban sewage treatment plants in my country. They have the advantages of high pollutant removal efficiency, strong resistance to shock loads, and low filamentous bacterial expansion. Among them, the solid-liquid separation process is the key step in determining the treatment load of sewage treatment plants. Commonly used methods include sedimentation tanks and membrane separation technology.
[0004] The sedimentation tank method maintains a lower biomass through a lower SRT, ensuring the enrichment of polyphosphate bacteria with stronger extracellular polymer (EPS) secretion ability, making it have better resistance to hydraulic load shock, so as to ensure the solid-liquid separation performance of the sedimentation tank. At the same time, in order to give the low biomass enough reaction time, the hydraulic retention time (HRT) of the system will be extended during the design process, resulting in a larger footprint. However, with the continuous increase in hydraulic load, the original design HRT is still insufficient to maintain the denitrification and phosphorus removal process, especially the impact of rainwater load, which will cause a significant reduction in the HRT of the biological stage, resulting in insufficient anaerobic / aerobic reaction time for polyphosphate bacteria, weakening its activity. At the same time, due to the shorter SRT and HRT, the nitrification process is hindered, which will cause the deterioration of sedimentation performance and pollutant removal performance.
[0005] Membrane bioreactor (MBR) technology based on membrane separation is conducive to the efficient interception capacity of the membrane, which can maintain a high concentration of biomass, ensure biological activity, cultivate and enrich nitrifying bacteria with a longer SRT, and can directly replace the secondary sedimentation tank to achieve mud-water separation, greatly reducing the floor space. However, the longer SRT makes the system's phosphorus removal capacity weaker, causing more bacteria to be in the decline stage. Once the impact of hydraulic load occurs, it will cause large-scale death of the bacteria, resulting in aggravated membrane pollution, making it unable to cope with higher hydraulic loads.
[0006] Side-stream functional bacteria screening technology is a technology that achieves biological screening based on density and viscosity differences. It consists of a hydrocyclone and its pump assembly. By setting the configuration parameters and operating parameters of the hydrocyclone, it can effectively achieve directional screening of functional bacteria, and can screen out polyphosphate-accumulating bacteria and denitrifying bacteria with stronger viscosity to enhance sludge settling performance, as well as loose and low-viscosity nitrifying bacteria to enhance nitrification performance. Summary of the invention
[0007] The purpose of the present invention is to solve the problem of insufficient hydraulic load in the design of existing urban sewage treatment plants, and propose a short-process combined denitrification and phosphorus removal process for in-situ expansion of sewage treatment plants. The process effectively combines the AAO process based on precipitation and membrane separation through the lateral flow functional bacteria screening technology. The process has a compact structure, simple operation, simple structure, flexible control, and small footprint. By taking advantage of each other's strengths and making up for each other's weaknesses, the advantages of the AAO process under the two solid-liquid separation technologies are magnified respectively, ensuring the in-situ expansion of the system in the dry season, while coping with excessive expansion in the rainy season, and maintaining the system's efficient simultaneous denitrification and phosphorus removal.
[0008] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a short-process combined denitrification and phosphorus removal process for in-situ expansion of a sewage treatment plant, wherein the system used in the process includes an inlet water diversion system, a denitrification and phosphorus removal system 1, a denitrification and phosphorus removal system 2, and an intelligent automatic control module;
[0009] The water inlet diversion system includes a water distribution well, a water distribution gate and a diversion pipeline;
[0010] The intelligent automatic control module includes a flow meter detector, a PLC control cabinet, a sludge concentration detector, and a nitrification performance detector;
[0011] The denitrification and phosphorus removal system comprises an anaerobic tank, an anoxic tank, an aerobic tank, a membrane separation component, an internal return pipeline, an external return pipeline, a functional bacteria sifter and a sludge storage tank, wherein the anaerobic tank, the anoxic tank and the aerobic tank are connected in sequence, the membrane separation component is installed at the tail of the aerobic tank, and comprises an outlet pump group and a membrane cleaning component, the sludge storage tank is connected to the aerobic tank and the functional bacteria sifter, the functional bacteria sifter comprises a US pipeline, an OS pipeline and an OSE pipeline, the US pipeline is directly connected to the sludge treatment unit, the OS pipeline is connected to the external return pipeline, and the OSE pipeline is connected to the external return pipeline;
[0012] The second denitrification and phosphorus removal system comprises a second anaerobic tank, a second anoxic tank, a second aerobic tank, a second sedimentation tank, a second internal return pipeline, a second external return pipeline, a first functional bacteria sifter and a first sludge storage tank. The second anaerobic tank, the second anoxic tank, the second aerobic tank and the second sedimentation tank are connected in sequence. The second sludge storage tank is connected to the second aerobic tank and the second functional bacteria sifter. The second functional bacteria sifter comprises a second US pipeline and a second OS pipeline. The second US pipeline is directly connected to the second external return pipeline, and the second OS pipeline is directly connected to the sludge treatment unit.
[0013] The process specifically comprises the following steps:
[0014] Step (1): The raw water enters the denitrification and phosphorus removal system 1 and the denitrification and phosphorus removal system 2 respectively at 40% and 60% through the water inlet diversion system;
[0015] Step (2): 40% of the raw water flow enters the anaerobic tank 1, the anoxic tank 1 and the aerobic tank 1 of the denitrification and phosphorus removal system 1 in sequence, and leaves the system through the membrane separation component. The sludge in the aerobic tank 1 is pumped into the sludge storage tank 1 according to 100% to 110% of the influent flow, wherein the sludge in the sludge storage tank 1 is pumped into the functional bacteria sifter 1 according to 1% to 10% of the influent flow, and the hydrocyclone produces underflow sludge (US) and overflow sludge (OS), wherein OS is enriched with nitrifying bacteria, and US is discharged from the system as residual sludge according to the SRT of 15 to 110%. 30d controls the operation time of the functional bacteria sifter 1, and monitors it in real time through the intelligent automatic control module. When the US sludge discharge volume meets the above SRT, the operation of the functional bacteria sifter 1 is stopped; the OS generated during normal operation all enters the external return pipeline 1 through the OS pipeline 1 to supplement the sludge concentration and nitrifying bacteria, and the US is discharged as residual sludge through the US pipeline 1; the OS pipeline 1 is directly connected to the OSE pipeline and the external return pipeline 2 at the same time, and the flow direction of the OS is selected according to the real-time monitoring of the dinitrification performance of the denitrification and phosphorus removal system by the intelligent automatic control module;
[0016] Step (3): 60% of the raw water flow enters the anaerobic tank 2, the anoxic tank 2 and the aerobic tank 2 of the denitrification and phosphorus removal system 2 in sequence, and leaves the system after solid-liquid separation in the second sedimentation tank. The sludge in the aerobic tank 2 is pumped into the sludge storage tank 2 according to 100% to 110% of the inlet flow, wherein the sludge in the sludge storage tank 2 is pumped into the functional bacteria sifter 2 according to 1% to 10% of the inlet flow, and passes through the hydrocyclone to generate underflow sludge (US) and overflow sludge (OS), wherein the US is enriched with phosphorus accumulation bacteria and denitrifying bacteria, and the OS is discharged as the residual sludge system, and the operating time of the functional bacteria sifter 2 is controlled according to the SRT of 8 to 12 days, and is monitored in real time by the intelligent automatic control module. After the OS sludge discharge volume meets the above SRT, the functional bacteria sifter 2 stops running, and all the US generated during the operation enters the external return pipeline 2 to supplement the sludge concentration and the phosphorus accumulation and denitrifying bacteria.
[0017] Furthermore, the denitrification and phosphorus removal system 1 has a designed HRT of 6 to 8 hours, an SRT of 15 to 30 days, and an MLSS of 8 to 12 g / L; the denitrification and phosphorus removal system 2 has a designed HRT of 8 to 12 hours, an SRT of 8 to 12 days, and an MLSS of 4 to 6 g / L.
[0018] Furthermore, the functional bacteria screener 1 and the functional bacteria screener 2 are assembled in an integrated container, which is convenient for transportation and management.
[0019] Furthermore, the hydrocyclone comprises a cylinder, a cone, a feed port, an overflow port and an underflow port, the cylinder diameter D is between 50 and 120 mm, the cylinder height-to-diameter ratio L1 / D is 1; the cone height-to-diameter ratio L2 / D is 2 to 6, and the cone angle is 8 to 16°; the feed port is a rectangular parallelepiped configuration, the ratio of the inlet area S to the square of the cylinder diameter D is 0.067, and the feed port enters the cylinder tangentially; the overflow port is partially embedded in the cylinder, and the length of the embedded part L v / The diameter of the cylinder D is 0.14, and the remaining part of the overflow port protrudes from the cylinder, and the protruding length is L o / The cylinder diameter D is 0.57, the overflow diameter D o / The cylinder diameter D is 0.4-0.6; the bottom flow port is connected to the cone port, and the bottom flow port length L u / The diameter of the cylinder D is 0.57, the bottom flow port diameter D u / The cylinder diameter D is 0.2~0.3.
[0020] Furthermore, the functional bacteria screener 1 and the functional bacteria screener 2 control the screening effect of the functional bacteria and the sludge discharge of the system by adjusting the operating parameters of the hydrocyclone, such as the processing flow, inlet flow rate and inlet pressure.
[0021] Furthermore, the specific operating parameters of the hydrocyclone are set according to the on-site operating conditions as follows: processing flow rate: 1% to 10% of the inlet flow rate; inlet flow rate: 5 to 12 m / s; inlet pressure: 50 to 200 kPa.
[0022] The operating principle of the functional bacteria sifter is as follows:
[0023] The sludge in the sludge storage tank is pumped into the hydrocyclone, and the sludge is driven into the hydrocyclone column through the lateral feed port. This part is the feed sludge (FS); the sludge is subjected to the effects of high-speed centrifugal force, shear force, etc. in the column, so that the functional bacteria (such as activated sludge agglomerates such as denitrifying bacteria and polyphosphate bacteria) that have been agglomerated and have a larger density (such as activated sludge agglomerates such as denitrifying bacteria and polyphosphate bacteria) and inert substances are thrown to the outer wall, and naturally settle to the bottom flow port under the action of gravity and flow out. At the same time, the sludge that has lost its activity and viscosity is broken by the high-speed centrifugal force and shear force and enters the bottom flow port together. The above part is US, which has good dewatering performance. Among them, the broken sludge is supplemented into the system as an internal carbon source to enhance denitrification and reduce the amount of in-situ sludge; the sludge with lower density and higher viscosity (such as nitrifying bacteria) flows upward from the overflow port under the action of the central vortex. This part is OS, which has poor dewatering performance.
[0024] The principle of the present invention is as follows:
[0025] The denitrification and phosphorus removal system 1 has a long design SRT, which is conducive to the enrichment and cultivation of nitrifying bacteria with a long generation time. Therefore, under the enhanced effect of the functional bacteria sifter 1, the OS rich in nitrifying bacteria is returned to the denitrification and phosphorus removal system 1, which can further increase the proportion of nitrifying bacteria in the system; the denitrification and phosphorus removal system 2 has a short design SRT, which is conducive to the enrichment and cultivation of denitrifying bacteria and polyphosphate bacteria. Under the enhanced effect of the functional bacteria sifter 2, the US rich in denitrification and polyphosphate bacteria is returned to the denitrification and phosphorus removal system 2, which further increases the proportion of denitrifying bacteria and polyphosphate bacteria in the system. At the same time, the sedimentation performance and denitrification and phosphorus removal capacity of activated sludge are improved. In the face of the in-situ expansion in the dry season and the over-expansion in the rainy season, 40% of the sewage is still maintained to enter the denitrification and phosphorus removal system 1 to ensure the activity of nitrifying bacteria, while the remaining water enters the denitrification and phosphorus removal system 2, which can accept 80% to 160% of the original design water volume of sewage by utilizing the characteristics of rapid sedimentation of rich denitrification and polyphosphate bacteria. In order to prevent a substantial increase in water volume, which would lead to a reduction in the HRT of the aerobic pool and weaken the nitrification performance of the system, the intelligent automatic control module is equipped to monitor the changes in the nitrification performance of the denitrification and phosphorus removal system in real time. Before the risk of nitrification occurs, the OS of the functional bacteria sifter 1 is added to the denitrification and phosphorus removal system 2 to supplement the nitrifying bacteria of the denitrification and phosphorus removal system 2, thereby improving the nitrification performance of the system and ensuring the overall denitrification and phosphorus removal capacity of the system. The process has a compact structure, is easy to operate, has a simple structure, is flexible to control, and occupies a small area. By taking advantage of each other's strengths and making up for each other's weaknesses, the advantages of the AAO process under the two solid-liquid separation technologies are magnified respectively, ensuring the system's in-situ expansion in the dry season, while coping with excessive expansion in the rainy season, and maintaining the system's efficient simultaneous denitrification and phosphorus removal.
[0026] Beneficial effects of the present invention:
[0027] 1. Use a combined nitrogen removal and phosphorus removal system to form a targeted enrichment screening and targeted reflux strategy for functional bacteria. Through SRT settings and the operating conditions of the functional bacteria sifter, the process advantages of AAO based on precipitation method and membrane separation technology are magnified, and the corresponding functional bacteria can be flexibly refluxed according to the actual different expansion needs;
[0028] 2. By controlling the inlet flow, inlet flow rate and inlet pressure of the hydrocyclone, on the basis of the general hydrocyclone, the sludge crushing and lysis are strengthened, which is conducive to improving the dewatering performance, achieving in-situ sludge reduction, and releasing soluble COD at the same time, and following the reflux to supplement the carbon source in the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the hydrocyclone of the present invention;
[0030] Figure 2 It is a schematic diagram of the principle of the process of the present invention;
[0031] Figure 3 It is a schematic diagram of the change of the settling speed of activated sludge under the application of the present invention;
[0032] Figure 4 This is a schematic diagram of the enrichment capability of the functional bacteria screening module for nitrifying bacteria in the present invention;
[0033] Figure 5 It is a schematic diagram of the enrichment ability of the functional bacteria screening module for denitrifying bacteria in the application of the present invention;
[0034] Figure 6 It is a schematic diagram of the enrichment ability of the functional bacteria screening module for polyphosphate bacteria in the application of the present invention;
[0035] Figure 7 It is a schematic diagram of the changes in the nitrification, denitrification and phosphorus release performance of activated sludge under the application of the present invention;
[0036] Figure 8 It is a schematic diagram of the capillary water absorption time and viscosity change of activated sludge under the application of the present invention;
[0037] Fig. 9 It is a schematic diagram of the release of soluble COD of activated sludge under the functional bacteria sieving module under the application of the present invention;
[0038] Fig.10 It is a schematic diagram of the change of the apparent yield of activated sludge under the application of the present invention;
[0039] Fig.11 It is a schematic diagram of the process operation mode of the process of the present invention in the rainy season. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] Example 1: Figure 2 As shown: a short-process combined denitrification and phosphorus removal process for in-situ expansion of a sewage treatment plant, the system used in the process includes an inlet water diversion system, a denitrification and phosphorus removal system 1, a denitrification and phosphorus removal system 2, and an intelligent automatic control module;
[0042] The water inlet diversion system includes a water distribution well, a water distribution gate and a diversion pipeline;
[0043] The intelligent automatic control module includes a flow meter detector, a PLC control cabinet, a sludge concentration detector, and a nitrification performance detector;
[0044] The denitrification and phosphorus removal system comprises an anaerobic tank, an anoxic tank, an aerobic tank, a membrane separation component, an internal return pipeline, an external return pipeline, a functional bacteria sifter and a sludge storage tank, wherein the anaerobic tank, the anoxic tank and the aerobic tank are connected in sequence, the membrane separation component is installed at the tail of the aerobic tank, and comprises an outlet pump group and a membrane cleaning component, the sludge storage tank is connected to the aerobic tank and the functional bacteria sifter, the functional bacteria sifter comprises a US pipeline, an OS pipeline and an OSE pipeline, the US pipeline is directly connected to the sludge treatment unit, the OS pipeline is connected to the external return pipeline, and the OSE pipeline is connected to the external return pipeline;
[0045] The second denitrification and phosphorus removal system comprises a second anaerobic tank, a second anoxic tank, a second aerobic tank, a second sedimentation tank, a second internal return pipeline, a second external return pipeline, a first functional bacteria sifter and a first sludge storage tank. The second anaerobic tank, the second anoxic tank, the second aerobic tank and the second sedimentation tank are connected in sequence. The second sludge storage tank is connected to the second aerobic tank and the second functional bacteria sifter. The second functional bacteria sifter comprises a second US pipeline and a second OS pipeline. The second US pipeline is directly connected to the second external return pipeline, and the second OS pipeline is directly connected to the sludge treatment unit.
[0046] The process specifically comprises the following steps:
[0047] Step (1): The raw water enters the denitrification and phosphorus removal system 1 and the denitrification and phosphorus removal system 2 respectively at 40% and 60% through the water inlet diversion system;
[0048] Step (2): 40% of the raw water flow enters the anaerobic tank 1, the anoxic tank 1 and the aerobic tank 1 of the denitrification and phosphorus removal system 1 in sequence, and leaves the system through the membrane separation component. The sludge in the aerobic tank 1 is pumped into the sludge storage tank 1 according to 100% to 110% of the influent flow, wherein the sludge in the sludge storage tank 1 is pumped into the functional bacteria sifter 1 according to 1% to 10% of the influent flow, and US and OS are generated through a specific hydrocyclone and its supporting components, wherein OS is enriched with nitrifying bacteria, and US is discharged from the system as residual sludge, and discharged according to the SRT of 15 to 30 d. Control the operation time of the functional bacteria sifter 1, and monitor it in real time through the intelligent automatic control module. When the sludge discharge volume of US meets the above SRT, stop the operation of the functional bacteria sifter 1; the OS generated during normal operation all enters the external return pipeline 1 through the OS pipeline 1 to supplement the sludge concentration and nitrifying bacteria, and the US is discharged as residual sludge through the US pipeline 1; the OS pipeline 1 is directly connected to the OSE pipeline and the external return pipeline 2 at the same time, and the flow direction of the OS is selected according to the real-time monitoring of the dinitrification performance of the denitrification and phosphorus removal system by the intelligent automatic control module;
[0049] Step (3): 60% of the raw water flow enters the anaerobic tank 2, the anoxic tank 2 and the aerobic tank 2 of the denitrification and phosphorus removal system 2 in sequence, and leaves the system after solid-liquid separation in the second sedimentation tank. The sludge in the aerobic tank 2 is pumped into the sludge storage tank 2 according to 100% to 110% of the inlet flow, wherein the sludge in the sludge storage tank 2 is pumped into the functional bacteria sifter 2 according to 1% to 10% of the inlet flow, and US and OS are generated through a specific hydrocyclone and its supporting components, wherein US is enriched with polyphosphate bacteria and denitrifying bacteria, and OS is discharged as residual sludge from the system, and the operating time of the functional bacteria sifter 2 is controlled according to the SRT of 8 to 12 days, and real-time monitoring is performed through the intelligent automatic control module. After the OS sludge discharge volume meets the above SRT, the functional bacteria sifter 2 stops running, and all the US generated during the operation enters the external return pipeline 2 to supplement the sludge concentration and the polyphosphate and denitrifying bacteria.
[0050] The design HRT of the denitrification and phosphorus removal system 1 is 6-8h, the SRT is 15-30d, and the MLSS is 8-12g / L; the design HRT of the denitrification and phosphorus removal system 2 is 8-12h, the SRT is 8-12d, and the MLSS is 4-6g / L. The functional bacteria sifter 1 and the functional bacteria sifter 2 are integrated container-type assemblies for easy transportation and management. The hydrocyclone includes a column, a cone, a feed port, an overflow port, and an underflow port, such as Figure 1 As shown, the cylinder diameter D is between 50 and 120 mm, and the cylinder height-to-diameter ratio L1 / D is 1; the cone height-to-diameter ratio L2 / D is 2 to 6, and the cone angle is 8 to 16°; the feed port is a rectangular parallelepiped configuration, the ratio of the inlet area S to the square of the cylinder diameter D is 0.067, and the feed port enters the cylinder tangentially; the overflow port is partially embedded in the cylinder, and the length of the embedded part is L v / The diameter of the cylinder D is 0.14, and the remaining part of the overflow port protrudes from the cylinder, and the protruding length is L o / The cylinder diameter D is 0.57, the overflow diameter D o / The cylinder diameter D is 0.4-0.6; the bottom flow port is connected to the cone port, and the bottom flow port length L u / The diameter of the cylinder D is 0.57, the bottom flow port diameter D u / The cylinder diameter D is 0.2-0.3. The functional bacteria sifter 1 and the functional bacteria sifter 2 control the screening effect of the functional bacteria and the amount of mud discharged by the system by adjusting the operating parameters of the hydrocyclone, such as the processing flow rate, inlet flow rate and inlet pressure. The specific operating parameters of the hydrocyclone are set according to the on-site operating conditions as follows: processing flow rate: 1%-10% of the inlet flow rate; inlet flow rate: 5-12m / s; inlet pressure: 50-200kPa.
[0051] After long-term cyclone treatment, the sedimentation rate of the second sludge in the nitrogen and phosphorus removal system can be gradually increased from 1m / h to a maximum of 4m / h. Figure 3 As shown, the sludge settling performance is greatly improved, the solid-liquid separation in the secondary sedimentation tank is strengthened, and the sewage treatment plant's ability to cope with high water loads is thereby improved.
[0052] The functional bacteria sifter can effectively sieve the microbial functional bacteria based on the difference in density and viscosity, and can effectively increase the biological activity of the nitrifying bacteria in the denitrification and phosphorus removal system by 29.1% (such as Figure 4 The biological activity of the denitrification bacteria group and the phosphate accumulation bacteria group in the denitrification and phosphorus removal system was effectively increased by 24.3% and 15.6% through the functional bacteria sifter 2 (as shown in Figure 5 , 6 shown).
[0053] After long-term cyclone treatment, the nitrification performance, denitrification and phosphorus release performance of the nitrogen removal and phosphorus removal system are gradually improved (such as Figure 7 shown).
[0054] After cyclone treatment, the capillary absorption time (CST) of US can be reduced by 17.8% and the viscosity can be reduced by 18.6% (e.g. Figure 8 As shown in the figure), the denitrification and phosphorus removal system uses US as residual sludge, which directly improves the dewatering performance of the system's residual sludge and reduces the cost of sludge treatment and disposal.
[0055] The hydraulic shearing and collision processes in the hydrocyclone will achieve the lysis and fragmentation of the activated sludge, releasing 25% of the soluble COD (such as Fig. 9 As shown in the figure), it is returned to the anaerobic tank as an internal carbon source to compensate for the lack of carbon source in the biological pool, while achieving a 50% in-situ sludge reduction in the system (as shown in the figure). Fig.10 shown).
[0056] Example 2: Fig.11 As shown: a short-process combined denitrification and phosphorus removal process for in-situ expansion of a sewage treatment plant, the characteristics of this process compared with Example 1 are:
[0057] The hydraulic load of the denitrification and phosphorus removal system 1 is maintained and the operation is still carried out in the manner of step (2) to maintain a high biomass and a high level of active nitrifying bacteria. In the denitrification and phosphorus removal system 2, the in-situ expansion water volume and the excess rainwater are directly discharged into the denitrification and phosphorus removal system 2. The rapid sedimentation characteristics of the cultured and enriched denitrification and polyphosphate bacteria can be used to increase the system's design processing flow by 20% to 100%. In order to prevent the impact of the reduction of the HRT of the aerobic pool on the nitrification performance, the changes in the nitrification performance of the denitrification and phosphorus removal system are monitored in real time through the intelligent automatic control module. Before the risk of nitrification occurs, the OS of the functional bacteria sifter 1 is directly discharged to the external return pipeline 2, that is, a large amount of nitrifying bacteria are added to the denitrification and phosphorus removal system 2, thereby improving the nitrification performance of the nitrification system and ensuring the overall denitrification and phosphorus removal capacity of the system.
[0058] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for a person skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A short-process combined denitrification and phosphorus removal process for in-situ expansion of sewage treatment plants. Features: The systems used in this process include water inlet diversion system, denitrification and phosphorus removal system 1, denitrification and phosphorus removal system 2, and intelligent automatic control module; The water inlet diversion system includes a water distribution well, a water distribution gate and a diversion pipeline; The intelligent automatic control module includes a flow meter detector, a PLC control cabinet, a sludge concentration detector, and a nitrification performance detector; The denitrification and phosphorus removal system comprises an anaerobic tank, an anoxic tank, an aerobic tank, a membrane separation component, an internal return pipeline, an external return pipeline, a functional bacteria sifter and a sludge storage tank, wherein the anaerobic tank, the anoxic tank and the aerobic tank are connected in sequence, the membrane separation component is installed at the tail of the aerobic tank, and comprises an outlet pump group and a membrane cleaning component, the sludge storage tank is connected to the aerobic tank and the functional bacteria sifter, the functional bacteria sifter comprises a US pipeline, an OS pipeline and an OSE pipeline, the US pipeline is directly connected to the sludge treatment unit, the OS pipeline is connected to the external return pipeline, and the OSE pipeline is connected to the external return pipeline; The second denitrification and phosphorus removal system comprises a second anaerobic tank, a second anoxic tank, a second aerobic tank, a second sedimentation tank, a second internal return pipeline, a second external return pipeline, a first functional bacteria sifter and a first sludge storage tank. The second anaerobic tank, the second anoxic tank, the second aerobic tank and the second sedimentation tank are connected in sequence. The second sludge storage tank is connected to the second aerobic tank and the second functional bacteria sifter. The second functional bacteria sifter comprises a second US pipeline and a second OS pipeline. The second US pipeline is directly connected to the second external return pipeline, and the second OS pipeline is directly connected to the sludge treatment unit. The process specifically comprises the following steps: Step (1): The raw water enters the denitrification and phosphorus removal system 1 and the denitrification and phosphorus removal system 2 respectively at 40% and 60% through the water inlet diversion system; Step (2): 40% of the raw water flow enters the anaerobic tank 1, the anoxic tank 1 and the aerobic tank 1 of the denitrification and phosphorus removal system 1 in sequence, and leaves the system through the membrane separation component. The sludge in the aerobic tank 1 is pumped into the sludge storage tank 1 according to 100% to 110% of the influent flow, wherein the sludge in the sludge storage tank 1 is pumped into the functional bacteria sifter 1 according to 1% to 10% of the influent flow, and the hydrocyclone produces US and OS, wherein OS is enriched with nitrifying bacteria, and US is discharged from the system as the residual sludge, and the functional bacteria are controlled according to the SRT of 15 to 30 days. The operation time of the functional bacteria screener 1 is monitored in real time through the intelligent automatic control module. When the sludge discharge volume of US meets the above SRT, the operation of the functional bacteria screener 1 is stopped; the OS generated during normal operation enters the external return pipeline 1 through the OS pipeline 1 to supplement the sludge concentration and nitrifying bacteria, and the US is discharged as residual sludge through the US pipeline 1; the OS pipeline 1 is directly connected to the OSE pipeline and the external return pipeline 2 at the same time, and the flow direction of the OS is selected according to the real-time monitoring of the dinitrification performance of the denitrification and phosphorus removal system by the intelligent automatic control module; Step (3): 60% of the raw water flow enters the anaerobic tank 2, the anoxic tank 2 and the aerobic tank 2 of the denitrification and phosphorus removal system 2 in sequence, and leaves the system after solid-liquid separation in the second sedimentation tank. The sludge in the aerobic tank 2 is pumped into the sludge storage tank 2 according to 100% to 110% of the inlet flow, wherein the sludge in the sludge storage tank 2 is pumped into the functional bacteria sifter 2 according to 1% to 10% of the inlet flow, and passes through the hydrocyclone to produce US and OS, wherein the US is enriched with polyphosphate bacteria and denitrifying bacteria, and the OS is discharged from the system as the residual sludge, and the operating time of the functional bacteria sifter 2 is controlled according to the SRT of 8 to 12 days, and is monitored in real time by the intelligent automatic control module. After the OS sludge discharge volume meets the above SRT, the functional bacteria sifter 2 stops running, and all the US generated during the operation enters the external return pipeline 2 to supplement the sludge concentration and the polyphosphate and denitrifying bacteria.
2. According to claim 1, a short-process combined denitrification and phosphorus removal process for in-situ expansion of a sewage treatment plant, Features: The design HRT of the denitrification and phosphorus removal system 1 is 6 to 8 hours, the SRT is 15 to 30 days, and the MLSS is 8 to 12 g / L; the design HRT of the denitrification and phosphorus removal system 2 is 8 to 12 hours, the SRT is 8 to 12 days, and the MLSS is 4 to 6 g / L.
3. According to claim 2, a short-process combined denitrification and phosphorus removal process for in-situ expansion of a sewage treatment plant, Features: The functional bacteria sifter 1 and the functional bacteria sifter 2 are integrated container-type assemblies.
4. According to claim 3, a short-process combined denitrification and phosphorus removal process for in-situ expansion of a sewage treatment plant is described. Features: The hydrocyclone comprises a column, a cone, a feed port, an overflow port and an underflow port. The column diameter D is between 50 and 120 mm, and the column height-to-diameter ratio L is 1 / D is 1; the cone height-to-diameter ratio L 2 / D is 2 to 6, and the cone angle is 8 to 16°; the feed port is a rectangular parallelepiped configuration, the ratio of the inlet area S to the square of the cylinder diameter D is 0.067, and the feed port enters the cylinder tangentially; the overflow port is partially embedded in the cylinder, and the length of the embedded part is L v / The diameter of the cylinder D is 0.14, and the remaining part of the overflow port protrudes from the cylinder, and the protruding length is L o / The cylinder diameter D is 0.57, the overflow diameter D o / The cylinder diameter D is 0.4-0.6; the bottom flow port is connected to the cone port, and the bottom flow port length L u / The diameter of the cylinder D is 0.57, the bottom flow port diameter D u / The cylinder diameter D is 0.2~0.
3.
5. According to claim 4, a short-process combined denitrification and phosphorus removal process for in-situ expansion of a sewage treatment plant is described. Features: The functional bacteria screener 1 and the functional bacteria screener 2 control the screening effect of the functional bacteria and the sludge discharge of the system by adjusting the operating parameters of the hydrocyclone, such as the processing flow, inlet flow rate and inlet pressure.
6. A short-process combined denitrification and phosphorus removal process for in-situ expansion of a sewage treatment plant according to claim 5, Features: The hydrocyclone is configured to process a flow rate of 1% to 10% of the inlet flow rate; an inlet flow rate of 5 to 12 m / s; and an inlet pressure of 50 to 200 kPa.
Citation Information
Patent Citations
Denitrification and dephosphorization technique
CN103121754A
Method for forcibly removing nitrogen and phosphorus by means of in-situ enrichment of nitrifying bacteria coupled with sludge hydrolysis
CN104150609A
Rapid short-process sewage advanced nitrogen removal and phosphorous removal system and process
CN108793605A
System and method for reduction treatment of excess sludge and reinforced nitrogen and phosphorus removal of urban domestic sewage
CN109205785A
Serial composite fixed biofilm and activated sludge autotrophic denitrification apparatus and method on basis of continuous flow AAO phosphorus removal and partial denitrification
CN110171904A
