Mountain embedding design structure and method for LNG storage tank
By designing an embedded structure on the mountain where the LNG storage tank is located, using slope protection reinforcement mesh and anti-seepage concrete reinforcement to fill gravel and water barriers, the problems of high cost and long construction period of traditional mountain opening solutions are solved, and storage is improved The stability and ecological restoration effect of the tank.
Patent Information
- Application Number
- CN202411213893.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-31
- Publication Date
- 2024-11-19
AI Technical Summary
When selecting liquefied natural gas (LNG) storage tanks, the traditional mountain-opening and leveling plan has high cost, long construction period, and has an impact on the ecological environment.
The design structure of the mountain embedding of the LNG storage tank is adopted, including the placement of the LNG concrete storage tank in the foundation pit, the mountain slope protection is set up on the slope protection slope, the slope protection steel mesh and C30 anti-seepage concrete are laid, gravel is filled, and water barrier is set on the top of the foundation pit and carry out ecological restoration.
It reduces the cost of starting a mountain, shortens the construction period, avoids the impact of landslides on the storage tank, and improves structural stability through anti-seepage concrete and gravel filling, reducing the dangers caused by rainwater and earthquakes.
Smart Images

Figure CN118979503A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of LNG storage tanks, and in particular relates to a mountain embedding design structure and method for LNG storage tanks. Background Art
[0002] In the liquefied natural gas (LNG) receiving station industry, when a large LNG storage tank is located in a mountainous area, it is necessary to excavate the mountain to form an area that meets the requirements of tank construction and production. The traditional method is to excavate the mountain in a large area around the tank to the designed floor elevation to form an open construction and production area, so that the remaining mountain after the excavation is kept at a sufficient safe distance from the tank to avoid affecting the safety of the tank structure when landslides or collapses occur around the tank.
[0003] Although the traditional mountain excavation and leveling scheme has opened up the production area and prevented landslides and collapses from damaging the tank structure, the cost of mountain excavation required for the vast space is relatively high. Large-scale mountain excavation consumes a lot of manpower and a long construction period. The transportation of waste rocks will also incur high transportation costs, and will also have a certain impact on the ecological environment.
[0004] Therefore, it is urgent to design a design structure and method for embedding LNG storage tanks in the mountain to solve the problems of high cost and long construction period of the mountain excavation and leveling solutions in the above-mentioned prior art. Summary of the invention
[0005] In order to solve the technical problems of high cost and long construction period of the existing mountain excavation and leveling scheme mentioned in the background technology, a LNG storage tank mountain embedding design structure and method are provided to solve the above problems.
[0006] To achieve the above-mentioned purpose, the specific technical scheme of the LNG storage tank mountain embedding design structure and method of the present invention is as follows: An LNG storage tank mountain embedded design structure comprises a foundation pit, an LNG concrete storage tank is placed in the foundation pit, a mountain slope protection is arranged on the inclined slope of the foundation pit, the mountain slope protection is provided with drill holes in the horizontal direction, bolts are connected in the drill holes, a slope protection steel mesh is laid on the mountain slope protection, the slope protection steel mesh is connected to the bolts by binding, C30 impermeable concrete is poured between the slope protection steel mesh and the mountain slope protection, crushed stone is filled between the LNG concrete storage tank and the mountain slope protection, a waterproof layer is arranged on the top of the foundation pit, and the surface ecology of the top of the foundation pit is restored.
[0007] Furthermore, the bolt is connected in the drill hole, and one end of the bolt is exposed from the mountain slope protection by a length of 250 mm.
[0008] Furthermore, the diameter of the steel bars of the slope protection steel mesh is greater than 12 mm, the spacing between adjacent steel bars is 200 mm, and the steel bars are tied and connected to one end of the bolts exposed on the mountain slope protection.
[0009] Furthermore, a drainage ditch is provided at the bottom of the foundation pit to drain the accumulated water in the foundation pit.
[0010] Furthermore, the crushed stone is the waste crushed stone generated after the foundation pit is excavated. The waste crushed stone is crushed and graded to become graded mountain-blasting crushed stone. The graded mountain-blasting crushed stone is filled between the LNG concrete storage tank and the mountain slope protection.
[0011] Furthermore, the grading compaction coefficient of the graded mountain crushed stone is greater than 0.95.
[0012] Furthermore, the calculation formula for mountain slope protection is: N=Gh / Fk Fy=As·τ in, N-the number of bolts implanted on the slope protection within a unit area; Gh-the weight of sliding soil on the slope sliding surface; FK - tensile bearing capacity of the stud after drilling, inserting and grouting; Fy-stud tensile strength, it must be ensured that Fy ≥ FK; As-cross-sectional area of stud; τ - tensile strength of the stud material.
[0013] Furthermore, the equivalent thermal insulation calculation of graded crushed stone is △H=H3·λ2 / λ1 in, △H-the thickness of the cold insulation material 82 in the tank that is expected to be reduced under the insulation effect of graded mountain crushed stone; λ1- is the thermal conductivity of graded mountain crushed stone; λ2- is the thermal conductivity of the cold insulation material in the tank; H3-The thickness of graded crushed stone at the bottom of the foundation pit.
[0014] A method for designing an LNG storage tank embedded in a mountain includes the following steps: S1. Excavate the mountain to form a foundation pit according to the size of the LNG concrete storage tank; S2. Level the slope of the foundation pit to form an inclined mountain slope protection; S3, drilling holes in the horizontal direction on the mountain slope protection, and inserting bolts into the holes; S4. Lay the slope protection steel mesh on the mountain slope protection, and tie the slope protection steel mesh to the bolts; S5. Use C30 impermeable concrete to spray pour between the mountain slope protection and the slope protection steel mesh; S6. Place the LNG concrete storage tank into the foundation pit; S7. Fill gravel between the LNG concrete storage tank and the mountain slope protection; S7. A waterproof layer is set on the top of the foundation pit; S8. Restore the body surface ecology.
[0015] Furthermore, before backfilling the space between the LNG concrete storage tank and the mountain slope, the waste gravel generated by mountain excavation is crushed and graded, and the graded mountain excavation gravel is backfilled between the storage tank and the mountain slope, and compacted.
[0016] The LNG storage tank mountain embedding design structure and method of the present invention have the following advantages: A mountain slope protection is set up at the slope of the foundation pit, and holes are drilled in the horizontal direction of the mountain slope protection. Bolts are connected in the drill holes, and a slope protection steel mesh is laid on the mountain slope protection. The slope protection steel mesh is tied and connected with the bolts. C30 anti-seepage concrete is poured between the slope protection steel mesh and the mountain slope protection. A slope protection reinforcement body is formed by the bolts, steel mesh, and C30 anti-seepage concrete to avoid the impact of landslides on LNG concrete storage tanks. Gravel is filled between the LNG concrete storage tank and the mountain slope protection. Through the backfilling of gravel, the foundation pit and the LNG concrete storage tank are condensed into one, eliminating the occurrence of dangerous situations such as landslides and mudslides caused by earthquakes and rain erosion during the use stage, and reducing costs and shortening construction period.
[0017] During the service life of the LNG concrete storage tank, the impermeable concrete used can effectively eliminate the impact of rainwater and atmospheric water in the gravel backfill area on the slope reinforcement body. The drainage ditch reserved at the bottom of the foundation pit can effectively drain the accumulated water. A waterproof layer is set on the top of the filling area, and ecological restoration is carried out on the surface to further avoid rainwater infiltration and accumulation. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a structural schematic diagram of the mountain embedded design structure of the LNG storage tank of the present invention; Figure 2 It is a partial structural schematic diagram of the mountain embedded design structure of the LNG storage tank of the present invention.
[0019] Description of the markings in the figure: 1. Mountain; 2. Mountain slope protection; 3. Bolts; 4. Slope protection steel mesh; 5. C30 anti-seepage concrete; 6. Graded mountain crushed stone; 7. Drainage ditch; 8. LNG concrete storage tank; 81. Outer wall of storage tank; 82. Cold insulation material inside the tank; 9. Waterproof layer; 10. Surface ecological restoration; 11. Slope sliding surface. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0021] Those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and form different embodiments. For example, in the claims, any one of the claimed embodiments may be used in any combination.
[0022] Please refer to the attached Figure 1 To Attachment Figure 2 The present invention describes the LNG storage tank mountain embedding design structure and method.
[0023] like Figure 1 and Figure 2 As shown, the LNG storage tank mountain embedded design structure in the present invention includes a foundation pit, an LNG concrete storage tank 8 is placed in the foundation pit, a mountain slope protection 2 is arranged on the slope of the foundation pit, a drill hole is opened in the horizontal direction of the mountain slope protection 2, a bolt 3 is connected in the drill hole, a slope protection steel mesh 4 is laid on the mountain slope protection 2, the slope protection steel mesh 4 is tied and connected with the bolt 3, C30 impermeable concrete 5 is poured between the slope protection steel mesh 4 and the mountain slope protection 2, crushed stones are filled between the LNG concrete storage tank 8 and the mountain slope protection 2, a waterproof layer 9 is arranged on the top of the foundation pit, and the surface ecology of the top of the foundation pit is restored 10. In this embodiment, the space size of the foundation pit is designed according to the construction requirements.
[0024] A mountain slope protection 2 is arranged at the slope of the foundation pit, and a drill hole is opened in the horizontal direction on the mountain slope protection 2, and bolts 3 are connected in the drill holes. A slope protection steel mesh 4 is laid on the mountain slope protection 2, and the slope protection steel mesh 4 is tied and connected with the bolts 3. C30 anti-seepage concrete 5 is poured between the slope protection steel mesh 4 and the mountain slope protection 2. A slope protection reinforcement body is formed by the bolts 3, the steel mesh, and the C30 anti-seepage concrete 5 to avoid the influence of landslides on the LNG concrete storage tank 8. Gravel is filled between the LNG concrete storage tank 8 and the mountain slope protection 2. Through the backfilling of gravel, the foundation pit and the LNG concrete storage tank 8 are condensed into one, eliminating the occurrence of dangerous situations such as landslides and mudslides caused by earthquakes and rain erosion of the mountain 1 during the use stage, and reducing costs and shortening construction period.
[0025] Further, if Figure 1 and Figure 2As shown, the bolt 3 is connected in the drilled hole, and one end of the bolt 3 is exposed from the mountain slope 2 for a length of 250mm. The diameter of the steel bars of the slope protection steel mesh 4 is greater than 12mm, and the spacing between adjacent steel bars is 200mm. The steel bars are tied and connected to one end of the bolt 3 exposed from the mountain slope 2. After the steel bars are tied, C30 impermeable concrete 5 is sprayed and poured, with an impermeability grade of P8 and a pouring thickness of 250mm, covering all the exposed bolts 3. After pouring, the C30 impermeable concrete 5 forms a slope reinforcement body with the bolts 3 and the steel mesh to prevent the impact of the landslide of the mountain 1 on the LNG concrete storage tank 8. When using C30 impermeable concrete 5 grouting material for hole grouting, it is necessary to ensure that the grouting material is dense and uniform, and the over-pouring coefficient is not less than 1.1.
[0026] Further, if Figure 1 and Figure 2 As shown, the crushed stone is the waste crushed stone generated after the foundation pit is excavated. The waste crushed stone is crushed and graded to be graded mountain-opening crushed stone 6. The graded mountain-opening crushed stone 6 is filled between the LNG concrete storage tank 8 and the mountain slope protection 2 and compacted. The gradation compaction coefficient of the graded mountain-opening crushed stone 6 is greater than 0.95. Before backfilling, a drainage ditch 7 must be reserved at the bottom of the foundation pit to remove the water at the bottom of the pit during construction and use. During the service period of the LNG concrete storage tank 8, the impermeable concrete used can effectively eliminate the impact of rainwater and atmospheric water in the gravel backfill area on the slope reinforcement body. The drainage ditch 7 reserved at the bottom of the foundation pit can effectively remove the accumulated water. A waterproof layer 9 is set at the top of the filling area, and ecological restoration is performed on the surface to further avoid rainwater infiltration and accumulation. During backfilling, a waterproof layer 9 is set at the top of the backfill area, and surface ecological restoration 10 is performed after backfilling is completed.
[0027] Further, if Figure 1 and Figure 2 As shown in the figure, the calculation formula of mountain slope protection 2 is: N=Gh / Fk Fy=As·τ in, N-the number of bolts 3 implanted on the slope protection 2 within a unit area; Gh-the weight of the sliding soil on the slope sliding surface 11; assuming that the foundation pit depth is H1, the horizontal theoretical projection length of the sliding surface H2=0.3H1, and the weight of the sliding soil per unit area Gh=H2•ρ, ρ is the weight of the sliding soil, unit KN / m³; FK - tensile bearing capacity of bolt 3 after drilling and grouting; unit KN, determined by on-site pull-out test, and the final hole depth and bolt 3 implantation length are set in combination with on-site construction conditions and test results; Fy-tensile strength of stud 3, it is necessary to ensure that Fy ≥ FK; As-cross-sectional area of stud 3; τ- tensile strength of the bolt 3 material, determined according to the selected material; The above formula is a formula for calculating the stability of the mountain slope protection 2, which requires that the deadweight of the sliding soil above the theoretical sliding surface is entirely borne by the drilled and implanted bolts 3; the material of the bolts 3 can be freely selected, and the final arrangement and length of the bolts 3 need to be confirmed after repeated calculations based on economic efficiency, construction operation space, and pull-out test results.
[0028] Further, if Figure 1 and Figure 2 As shown in the figure, the equivalent thermal insulation calculation of graded mountain crushed stone 6 △H=H3·λ2 / λ1 in, △H-the thickness of the cold insulation material 82 in the LNG concrete storage tank 8 is expected to be reduced under the heat preservation effect of the graded mountain crushed stone 6; λ1- is the thermal conductivity of graded mountain crushed stone 6; λ2- is the thermal conductivity of the cold insulation material 82 in the tank; H3 - the thickness of graded crushed stone 6 at the bottom of the foundation pit; the equivalent insulation calculation is carried out according to this thickness of graded crushed stone 6 after filling and compaction.
[0029] The above formula is an equivalent insulation calculation for graded mountain crushed stone 6. The thermal insulation effect of the crushed stone is equivalent to the cold insulation material 82 in the LNG concrete storage tank 8 with a thickness of △H, so that the amount of cold insulation material 82 in the LNG concrete storage tank 8 is reduced accordingly, the inner tank space is increased, and the economic benefits are improved.
[0030] The present invention also provides a LNG storage tank mountain embedding design method, comprising the following steps: S1. Excavate the mountain 1 to form a foundation pit according to the size of the LNG concrete storage tank 8; S2, leveling the slope of the foundation pit to form an inclined mountain slope protection 2; S3, drilling holes in the mountain slope protection 2 in the horizontal direction, and implanting bolts 3 in the holes; S4, laying the slope protection steel mesh 4 on the mountain slope protection 2, and tying and connecting the slope protection steel mesh 4 with the bolts 3; S5, spray pouring C30 impermeable concrete 5 between the mountain slope protection 2 and the slope protection steel mesh 4; S6, placing the LNG concrete storage tank 8 into the foundation pit; S7, filling gravel between the LNG concrete storage tank 8 and the mountain slope protection 2; S7, a waterproof layer 9 is set on the top of the foundation pit; S8. Perform body surface ecological restoration 10.
[0031] Further, if Figure 1and Figure 2 As shown, before backfilling the LNG concrete storage tank 8 and the mountain slope protection 2 with gravel, the waste gravel generated by the mountain excavation is crushed and graded, and the graded mountain excavation gravel 6 after the treatment is backfilled and compacted between the storage tank and the mountain slope protection 2. After the graded mountain excavation gravel 6 is backfilled and compacted, part of the internal pressure of the LNG concrete storage tank 8 can be transferred to the excavated mountain 1. The outer wall 81 of the LNG concrete storage tank is equivalently constrained by using finite element software, and the overall model is created. By solving, the structural internal force results of the LNG concrete storage tank 8 in the state of filling and compacting the graded mountain excavation gravel 6 can be obtained.
[0032] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A LNG storage tank mountain embedded design structure, characterized in that: It includes a foundation pit with an LNG concrete storage tank placed in it. A mountain slope protection is arranged on the inclined side of the foundation pit. The mountain slope protection is provided with drill holes in the horizontal direction, and bolts are connected in the drill holes. A slope protection steel mesh is laid on the mountain slope protection, and the slope protection steel mesh is connected to the bolts by binding. C30 anti-seepage concrete is poured between the slope protection steel mesh and the mountain slope protection, and gravel is filled between the LNG concrete storage tank and the mountain slope protection. A waterproof layer is arranged on the top of the foundation pit, and the surface ecology of the top of the foundation pit is restored.
2. The LNG storage tank mountain embedded design structure according to claim 1 is characterized in that: The bolt is connected in the drilled hole, and one end of the bolt is exposed to the slope protection for a length of 250mm.
3. The LNG storage tank mountain embedded design structure according to claim 1 is characterized in that: The diameter of the steel bars of the slope protection steel mesh is greater than 12mm, the spacing between adjacent steel bars is 200mm, and the steel bars are tied and connected to one end of the bolts exposed on the mountain slope protection.
4. The LNG storage tank mountain embedded design structure according to claim 1 is characterized in that: A drainage ditch is set at the bottom of the foundation pit to drain the accumulated water in the foundation pit.
5. The LNG storage tank mountain embedded design structure according to claim 1 is characterized in that: The crushed stone is the waste crushed stone generated after the foundation pit is excavated. The waste crushed stone is crushed and graded to become graded mountain-blasting crushed stone. The graded mountain-blasting crushed stone is filled between the LNG concrete storage tank and the mountain slope protection.
6. The LNG storage tank mountain embedded design structure according to claim 5 is characterized in that: The grading compaction coefficient of graded mountain crushed stone is greater than 0.
95.
7. The LNG storage tank mountain embedded design structure according to claim 1 is characterized in that: The calculation formula for mountain slope protection is: N=Gh / Fk Fy=As·τ in, N-the number of bolts implanted on the slope protection within a unit area; Gh-the weight of sliding soil on the slope sliding surface; FK - tensile bearing capacity of the stud after drilling, inserting and grouting; Fy-stud tensile strength, it must be ensured that Fy ≥ FK; As-cross-sectional area of stud; τ - tensile strength of the stud material.
8. The LNG storage tank mountain embedded design structure according to claim 5 is characterized in that: Equivalent thermal insulation calculation of graded crushed stone △H=H3·λ2 / λ1 in, △H-the thickness of the cold insulation material in the tank is expected to be reduced under the insulation effect of graded mountain crushed stone; λ1- is the thermal conductivity of graded mountain crushed stone; λ2- is the thermal conductivity of the cold insulation material in the tank; H3-The thickness of graded crushed stone at the bottom of the foundation pit.
9. A design method for embedding an LNG storage tank into a mountain, characterized in that: The steps include: S1. Excavate the mountain to form a foundation pit according to the size of the LNG concrete storage tank; S2. Level the slope of the foundation pit to form an inclined mountain slope protection; S3, drilling holes in the horizontal direction on the mountain slope protection, and inserting bolts into the holes; S4. Lay the slope protection steel mesh on the mountain slope protection, and tie the slope protection steel mesh to the bolts; S5. Use C30 impermeable concrete to spray pour between the mountain slope protection and the slope protection steel mesh; S6. Place the LNG concrete storage tank into the foundation pit; S7. Fill gravel between the LNG concrete storage tank and the mountain slope protection; S7. A waterproof layer is set on the top of the foundation pit; S8. Restore the body surface ecology.
10. The LNG storage tank mountain embedding design method according to claim 9 is characterized in that: Before backfilling the space between the LNG concrete storage tank and the mountain slope protection with crushed stone, the waste crushed stone generated by mountain excavation is also crushed and graded, and the graded mountain excavation crushed stone is backfilled between the storage tank and the mountain slope protection and compacted.