Construction method for improving permeability coefficient of filler in dam backfill area
By dividing the dam backfill area into multiple construction units and laying geotextiles between and around each unit, the problem of high permeability coefficient soil layer being blocked by low permeability coefficient soil is solved, and the permeability and stability are improved. It reduces seepage disturbances and environmental pollution and meets engineering safety requirements.
Patent Information
- Application Number
- CN202411160060.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-19
AI Technical Summary
In the existing dam backfill project, the soil layer with high permeability coefficient is easily blocked by the soil with low permeability coefficient, resulting in a decrease in the permeability. The soil layer is disturbed greatly during the seepage process, which poses a safety hazard to the project.
The dam backfill area is divided into multiple construction units, backfill the high permeability coefficient soil layer and soil pile layer in turn, and geotextile is laid between and around each unit to prevent the low permeability coefficient soil from entering the high permeability coefficient soil layer. Reduce seepage path length.
It effectively improves the permeability coefficient and permeability of the backfill area, prevents the blockage of the soil layer with high permeability coefficient, reduces soil layer disturbance during the seepage process, ensures soil stability, and reduces costs and environmental pollution.
Smart Images

Figure CN118979506A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of dam backfilling, and in particular to a construction method for improving the permeability coefficient of filler in a dam backfilling area. Background Art
[0002] The statements herein merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] In existing dam backfill projects, the engineering plan usually sets specific standards for the permeability coefficient of the backfill area. However, the soil piles generated during the excavation process often cannot meet the strict permeability coefficient requirements in the standards. The solution generally adopted by construction units is to purchase high permeability coefficient soil that meets the standards to achieve overall backfill. Although this method can achieve the permeability coefficient required by the project, its implementation is accompanied by multiple problems such as high cost, environmental pollution and soil pile disposal.
[0004] The traditional layered backfill method, which is to simply stack a high permeability soil layer with a low permeability soil layer, can theoretically meet the overall permeability requirements of the cross section, but it faces many challenges in practical applications. Its limitations are particularly obvious when facing complex seepage problems during the dam backfill process. Specifically, under the action of long-term seepage, the low permeability soil may invade the high permeability soil layer, causing the latter to become blocked, thereby significantly reducing the permeability of the backfill area. In addition, when a single seepage soil layer is too long, its disturbance during the seepage process may also cause engineering safety hazards. Summary of the invention
[0005] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a construction method for improving the permeability coefficient of the filler in the dam backfill area, which can effectively prevent the low permeability coefficient soil from blocking the high permeability coefficient soil layer and reduce the disturbance of the soil layer during the seepage process, thereby solving the limitations of the current layered backfill method and meeting the safety requirements of engineering construction.
[0006] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0007] The embodiment of the present invention provides a construction method for improving the permeability coefficient of filler in a dam backfill area, wherein the dam backfill area is divided into a plurality of construction units; backfill construction of the plurality of construction units is performed in sequence, and a soil layer with a high permeability coefficient is constructed between adjacent construction units;
[0008] The backfill construction method of a single construction unit is: first, lay a geotextile on the bottom layer of the backfill area, and then alternately carry out backfill construction of the high permeability soil layer and the pile soil layer until the set backfill height is reached. After the high permeability soil layer is backfilled, lay a geotextile on top of it, and after the pile soil layer is backfilled, lay a geotextile on top of it and on the outside of the sides.
[0009] Optionally, the soil pile layer is paved with mudstone.
[0010] Optionally, the high permeability coefficient soil layer is paved with sand and pebbles.
[0011] Optionally, before laying the geotextile on the bottom layer of the backfill area, the backfill area is leveled.
[0012] Optionally, the thickness of the high permeability soil layer between adjacent construction units is 45 cm-55 cm in the horizontal direction.
[0013] Optionally, during backfill construction of a single construction unit, the thickness of multiple high permeability soil layers is the same, which is 18cm-22cm.
[0014] Optionally, the thickness of the geotextile is 0.6mm-1mm.
[0015] Optionally, in adjacent construction units, the bottommost high permeability coefficient soil layer is arranged flush, and the remaining high permeability coefficient soil layers are arranged staggered.
[0016] Optionally, the high permeability soil layer is compacted after being laid, and a geotextile is laid on top of it after compaction. After the soil pile layer is laid, the geotextile is laid on its outer side, the soil pile layer is compacted, and then a geotextile is laid on top of the soil pile layer.
[0017] Optionally, during backfill construction by a single construction unit, the cross-sectional area of the high permeability soil layer is obtained based on the permeability coefficient of the high permeability soil layer, the permeability coefficient of the pile soil layer, the required comprehensive cross-sectional permeability coefficient and the overall cross-sectional area of the backfill area of the construction unit, and the volume of high permeability soil required for the high permeability soil layer is obtained through the cross-sectional area of the high permeability soil layer.
[0018] The beneficial effects of the present invention are as follows:
[0019] 1. The construction method of the present invention, for a single construction unit, is provided with a geotextile between the high permeability coefficient soil layer and the pile soil layer. The pile soil layer is surrounded by the geotextile, which can effectively prevent the soil of the low permeability coefficient pile soil layer from entering into the high permeability coefficient soil layer and blocking the high permeability coefficient soil layer, and can better improve the permeability coefficient and permeability performance of the backfill area.
[0020] 2. In the construction method of the present invention, a high permeability soil layer is provided between adjacent construction units, and the high permeability soil layers of adjacent construction units are staggered, thereby avoiding that the water seepage path is too long and reducing the disturbance of the soil layer during the seepage process, thereby ensuring the stability of the soil and preventing moisture from accumulating between adjacent construction units, thereby avoiding soil softening and stability degradation caused by moisture.
[0021] 3. In the construction method of the present invention, when a single construction unit is constructing, geotextile is first laid on the bottom layer of the backfill area, and then the high permeability coefficient soil layer and the piled soil layer are alternately constructed to prevent the lower soil from entering the high permeability coefficient soil layer during the seepage process and causing blockage. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0023] Figure 1 is a flow chart of the construction method of embodiment 1 of the present invention;
[0024] Figure 2 This is a flow chart of a construction method for a single construction unit according to Embodiment 1 of the present invention;
[0025] Figure 3 This is a front view of a cross section of a backfilled soil body according to Embodiment 1 of the present invention;
[0026] Figure 4 is a side view of a backfill soil section of Example 1 of the present invention;
[0027] Among them, 1. Geotextile, 2. Soil layer, 3. High permeability coefficient soil layer. DETAILED DESCRIPTION
[0028] Example 1
[0029] This embodiment provides a construction method for improving the permeability coefficient of the filler in the dam backfill area, such as Figure 1-Figure 4 As shown, the following steps are included:
[0030] Step 1: Divide the overall dam backfill area into multiple construction units.
[0031] The number of construction units is determined according to construction adjustment and soil properties, which will not be described in detail here. In this embodiment, the overall dam backfill area is a rectangular area of 120m×10m×10m, and the overall dam backfill area is divided into two construction units, each of which has a backfill size of 60m×10m×10m, and the two construction units are respectively the first construction unit and the second construction unit.
[0032] Step 2: Backfill construction is performed on multiple construction units in sequence until all construction units have completed backfill construction, and a high permeability coefficient soil layer 3 is provided between adjacent construction units.
[0033] In this embodiment, after the construction of one construction unit is completed, a vertically laid high permeability coefficient soil layer 3 is constructed on one side thereof, and then the construction of the second construction unit adjacent thereto is carried out.
[0034] The thickness of the vertically laid high permeability soil layer 3 between two adjacent construction units along the horizontal direction is determined according to actual engineering conditions, and is 45 cm-55 cm, preferably 50 cm.
[0035] The backfill construction method of a single construction unit is as follows: first, a layer of geotextile 1 is laid on the bottom layer of the backfill area, and then the backfill construction of the high permeability coefficient soil layer 3 and the pile soil layer 2 is alternately carried out until the set backfill height is reached. After the backfill of the high permeability coefficient soil layer 3 is completed, a layer of geotextile 1 is laid on top of it, and after the backfill of the pile soil layer 2 is completed, a layer of geotextile 1 is laid on top of it and on the periphery.
[0036] In this embodiment, the high permeability coefficient soil layer 3 is paved with sand and gravel, and the piled soil layer 2 is paved with mudstone. The vertical thickness of the high permeability coefficient soil layer 3 is 18 cm-22 cm, preferably 20 cm.
[0037] The "high" in high permeability coefficient soil layer only means that its permeability coefficient is higher than that of the pile soil layer, and does not limit the specific value of its permeability coefficient.
[0038] Before construction, the volume of sand and gravel to be purchased is obtained in advance. Specifically, the permeability coefficients of the high permeability coefficient soil layer 3 and the pile soil layer 2 are measured first.
[0039] In this embodiment, according to Darcy's law, the permeability coefficients of the pile soil layer and the high permeability coefficient soil layer are measured using a constant water head indoor experiment.
[0040] The calculation formula of Darcy's law is:
[0041] Q=KAI
[0042]
[0043] Where Q is the infiltration outlet flow rate of the cross section; K is the permeability coefficient of the soil; A is the cross-sectional area; I is the hydraulic gradient; h is the head difference between the upstream and downstream, and L is the infiltration distance.
[0044] The existing technology can be used for the constant head indoor experiment, which will not be described in detail here.
[0045] In this embodiment, the permeability coefficient of sand and gravel is measured to be 0.1 cm / s, and the permeability coefficient of mudstone is measured to be 10-4 cm / s.
[0046] The permeability coefficient specified for dam backfill is not less than 3×10- 3 cm / s.
[0047] The cross-sectional area of the high permeability soil layer is obtained according to the permeability coefficient of the high permeability soil layer 3, the permeability coefficient of the pile soil layer 2, the required comprehensive cross-sectional permeability coefficient and the overall cross-sectional area of the backfill area. The volume of high permeability soil required for the high permeability soil layer 3 is obtained through the cross-sectional area of the high permeability soil layer 3.
[0048] Specifically,
[0049]
[0050] A=A+A2
[0051] Among them, k is the required comprehensive permeability coefficient of the cross section, which is a known quantity determined according to the dam backfill plan; k1 is the permeability coefficient of the soil layer, measured by the constant head indoor experiment; k2 is the permeability coefficient of the high permeability coefficient soil, measured by the constant head indoor experiment; A is the overall cross-sectional area; A1 is the cross-sectional area of the soil layer; A2 is the cross-sectional area of the high permeability coefficient soil layer.
[0052] Through the above formula, the cross-sectional area of the high permeability soil layer can be obtained, and then the volume of the high permeability soil layer can be obtained according to the size of the backfill area.
[0053] In this embodiment, the cross-sectional comprehensive permeability coefficient required to be achieved is 6×10- 3 cm / s, to meet the safety requirements of the project, the volume of sand and gravel required is 740m 3 .
[0054] Step 2 of this embodiment includes the following specific steps:
[0055] Step 2.1: Level the new construction unit backfill site, prepare construction personnel and machinery, and equip compaction machinery and excavators. Start the construction of the construction unit according to the plan. First, level the backfill area and clean up the debris that may damage the geotextile so that the geotextile can be laid and the soil can be backfilled.
[0056] Step 2.2: Lay a layer of geotextile 1 on the bottom of the backfill area to prevent the lower soil from entering the high permeability coefficient soil layer and causing blockage during seepage. The geotextile needs to be laid in the predetermined area according to the design requirements. The laying of geotextile 1 should be flat and wrinkle-free to ensure maximum contact between it and the soil, so as to play its reinforcing and protective role. After the geotextile is laid, the construction of the new construction unit begins.
[0057] Step 2.3: Lay the high permeability coefficient soil layer 3 on the geotextile 1. The thickness of the soil layer needs to be controlled to ensure the uniformity and compaction of the soil. The soil layer is compacted. During the compaction process, local overpressure or underpressure needs to be avoided. Lay another layer of geotextile 1 on top of the compacted high permeability coefficient soil layer.
[0058] Step 2.4: Lay the pile soil layer 2 on the geotextile 1 above the high permeability coefficient soil layer 3, and lay a layer of geotextile 1 around the side periphery of the pile soil layer 2, and then compact the pile soil layer 2. After the compaction is completed, lay another layer of geotextile 1 on the top of the pile soil layer 2.
[0059] Future settlement and uneven settlement can be prevented by compaction.
[0060] Step 2.5: Repeat steps 2.3-2.4 to complete the alternating laying of high permeability coefficient soil layer 3 and pile soil layer 2. After each layer of high permeability coefficient soil layer 3 and pile soil layer 2 is laid, measure the backfill height. If the measurement results show that the backfill height has reached or exceeded the required backfill height required by the design, the construction unit is considered to be completed. In this case, the construction team can proceed with the next construction plan or start quality inspection and acceptance of the completed construction unit. If the measurement results show that the backfill height has not yet reached the design requirements, it is necessary to continue to perform steps 2.3 and 2.4 in sequence. After laying, the construction team needs to carefully check the quality of the soil layer to ensure that it meets the construction requirements. After meeting the requirements, the construction of the next construction unit can be started.
[0061] In this embodiment, the thickness of the high permeability soil layer 3 and the thickness of the pile soil layer 2 are determined according to the specific project and construction. The thickness of the high permeability soil layer 3 is 18cm-22cm, preferably 20cm. The first construction unit has four layers of high permeability soil layers 3 and four layers of pile soil layers 2. The thickness of the bottom three pile soil layers 2 is 300cm, and the thickness of the top layer of pile soil layer 2 is 40cm.
[0062] Step 2.6: Level the backfill site area of the second construction unit, and vertically lay a high permeability coefficient soil layer 3 with a set thickness in the horizontal direction on one side of the first construction unit. The high permeability coefficient soil layer 3 is vertically laid with sand and gravel. The volume of sand and gravel required for the high permeability coefficient soil layer between the first construction unit and the second construction unit is determined according to its thickness and the size of the backfill site area.
[0063] The thickness of the high permeability soil layer 3 along the horizontal direction is determined according to actual engineering conditions, and is 45 cm-55 cm, preferably 50 cm.
[0064] Step 2.7: Repeat steps 2.3 to 2.5 to complete the construction of the second construction unit. In the second construction unit, the thickness of the high permeability soil layer 3 is 18cm-22cm, preferably 20cm, the thickness of the bottom soil layer 2 is 100cm, the thickness of the two middle soil layers 2 is 300cm, and the thickness of the top soil layer 2 is 240cm.
[0065] After the construction of the second construction unit is completed, check whether there is a new construction unit to be constructed. If not, the backfilling is completed. If there is a new construction unit, level the new construction unit and backfill the site, and repeat steps 2.6-2.7 until the construction of all construction units is completed. In this embodiment, there are only two construction units, so the entire backfilling construction is completed after the construction of the second construction unit is completed.
[0066] With this arrangement, the high permeability coefficient soil layers 3 of the first construction unit and the second construction unit are staggered, and are both connected to the high permeability coefficient soil layer between the first construction unit and the second construction unit. An excessively long seepage path may lead to uneven distribution of water in the soil, thereby causing disturbance of the soil layer. Therefore, in this embodiment, the high permeability coefficient soil layers 3 of the first construction unit and the second construction unit are staggered, which avoids the excessively long seepage path of water, thereby reducing the disturbance of the soil layer during the seepage process, ensuring the stability of the soil, and preventing water from accumulating between adjacent construction units, thereby avoiding soil softening and stability reduction caused by water.
[0067] In this embodiment, the thickness of the geotextile 1 is selected according to the construction requirements, ranging from 0.6 mm to 1 mm, preferably 0.8 mm.
[0068] The construction method of this embodiment, after fully considering the influencing factors such as soil stability, engineering economy, construction convenience, and environmental friendliness, can better improve the permeability coefficient, permeability performance, and stability of the backfill area, effectively prevent the blockage of the high permeability coefficient soil layer by the low permeability coefficient soil body such as the soil layer, and reduce the disturbance of the soil layer during the seepage process. The method of this embodiment not only reduces costs and environmental pollution, but also improves the utilization rate of the soil pile. In addition, the method of this embodiment has wide applicability and can be implemented and tested in a variety of regions.
[0069] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A construction method for improving the permeability coefficient of filler in the dam backfill area, It is characterized in that Divide the dam backfill area into multiple construction units; carry out backfill construction of multiple construction units in sequence, and construct high permeability coefficient soil layers between adjacent construction units; The backfill construction method of a single construction unit is: first, lay a geotextile on the bottom layer of the backfill area, and then alternately carry out backfill construction of the high permeability soil layer and the pile soil layer until the set backfill height is reached. After the high permeability soil layer is backfilled, lay a geotextile on top of it, and after the pile soil layer is backfilled, lay a geotextile on top of it and on the outside of the sides.
2. A construction method for improving the permeability coefficient of filler in the dam backfill area as claimed in claim 1, It is characterized in that The soil pile layer is paved with mudstone.
3. A construction method for improving the permeability coefficient of filler in the dam backfill area as claimed in claim 1, It is characterized in that The high permeability coefficient soil layer is paved with sand and pebbles.
4. A construction method for improving the permeability coefficient of filler in a dam backfill area as claimed in claim 1, It is characterized in that Before laying the geotextile on the bottom layer of the backfill area, the backfill area should be leveled.
5. A construction method for improving the permeability coefficient of filler in the dam backfill area as claimed in claim 1, It is characterized in that The horizontal thickness of the high permeability soil layer between adjacent construction units is 45cm-55cm.
6. A construction method for improving the permeability coefficient of filler in a dam backfill area as claimed in claim 1, It is characterized in that During backfill construction of a single construction unit, the thickness of multiple layers of high permeability soil layers is the same, which is 18cm-22cm.
7. A construction method for improving the permeability coefficient of filler in a dam backfill area as claimed in claim 1, It is characterized in that The thickness of the geotextile is 0.6mm-1mm.
8. A construction method for improving the permeability coefficient of filler in a dam backfill area as claimed in claim 1, It is characterized in that In adjacent construction units, the lowest high permeability coefficient soil layer is set flush, and the remaining high permeability coefficient soil layers are staggered.
9. A construction method for improving the permeability coefficient of filler in a dam backfill area as claimed in claim 1, It is characterized in that After the high permeability coefficient soil layer is laid, it is compacted, and after compaction, a geotextile is laid on it. After the soil pile layer is laid, the geotextile is laid on the outer side of the side, the soil pile layer is compacted, and then the geotextile is laid on the soil pile layer.
10. A construction method for improving the permeability coefficient of filler in a dam backfill area as claimed in claim 1, It is characterized in that During backfill construction of a single construction unit, the cross-sectional area of the high permeability soil layer is obtained based on the permeability coefficient of the high permeability soil layer, the permeability coefficient of the pile soil layer, the required comprehensive cross-sectional permeability coefficient and the overall cross-sectional area of the backfill area of the construction unit. The volume of high permeability soil required for the high permeability soil layer is obtained through the cross-sectional area of the high permeability soil layer.