Sea spring cable-stayed sinking and floating tunnel

By setting up ventilation ducts and symmetrically installing tension spring tunnel support devices in the underwater tunnel, the stability problem of the tunnel under natural disasters such as sea level fluctuations and earthquakes has been solved, thereby improving the stability and service life of the tunnel.

CN118979520APending Publication Date: 2024-11-19谢建华
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411369422.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

Existing underwater tunnels are easily damaged by rising sea levels, frequent earthquakes, and natural disasters such as typhoons. Furthermore, they lack effective shock absorption facilities, resulting in poor tunnel stability and short service life.

Method used

The tunnel adopts a sea-spring inclined cable-stayed floating tunnel design. By setting up ventilation ducts at the bottom of the tunnel and symmetrically installing multiple tension spring tunnel support devices on the tunnel, the compression and tension of the springs provide support and buffer, ensuring the stability of the tunnel and the space for movement.

Benefits of technology

It improves the stability and service life of the tunnel, reduces the risk of damage from seawater impact and earthquakes, and enhances the safety and comfort of the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979520A_ABST
    Figure CN118979520A_ABST
Patent Text Reader

Abstract

The invention discloses an in-sea spring cable-stayed sinking and floating type tunnel which comprises an in-sea tunnel fixedly built on the seabed, a ventilation duct is arranged at the bottom end of the in-sea tunnel and used for internal ventilation of the in-sea tunnel, and a plurality of tension spring tunnel supporting devices are symmetrically arranged on the in-sea tunnel. During use, when many trains or automobiles pass through the tunnel in the sea, the weight in the tunnel in the sea is increased to tend to move downwards, the tunnel in the sea moves downwards to compress a first connecting spring through a first piston rod, and a second connecting spring is compressed through a second piston rod; a plurality of tension springs are arranged in the tunnel supporting device, so that the tunnel in the sea has a certain activity space in the using process, the tunnel supporting device can support and protect the tunnel in the sea, the impact force on the tunnel can be reduced when a vehicle passes through the tunnel, the tunnel can be prevented from being damaged, and the tunnel supporting device has good practicability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underwater tunnels, and in particular to an underwater spring cable-stayed floating tunnel. Background Art

[0002] The Qiongzhou Strait is an irregular V-shaped trench. As a strait connecting Hainan and the inland, its maximum north-south width is about 39.5 kilometers, and its average width is about 29.5 kilometers. According to relevant data, the average water depth of the Qiongzhou Strait is about 44 meters, the water depth of the deep sea area in the middle of the strait is between 80-100 meters, and the deepest waters of the entire strait can reach about 114 meters. In other words, there is a deep trench of about 114 meters in the middle of the strait. The key issue is still the Qiongzhou Strait. The maximum north-south width is about 39.5 kilometers, and the narrowest part is 19.4 kilometers. According to this situation, if the total height of the piers of the cross-sea bridge is built, it will need to reach about 120 to 150 meters. This difficulty is undoubtedly a huge challenge, and the Qiongzhou Strait is located in the earthquake fault zone of the two plates.

[0003] In addition, the seabed topography of the Qiongzhou Strait is a typical tidal current, and the slope of the trench is very undulating. Therefore, when building a cross-sea bridge, it is very difficult to find a stable fulcrum on the seabed. Moreover, the Qiongzhou Strait is a high-incidence area of ​​natural disasters. First of all, there will be typhoons of level 8 or above for about 12 days, especially from May to November is the frequent season of tropical storms and typhoons. The Qiongzhou Strait is located between the Leizhou Peninsula and Hainan Island, which is exactly the coastal earthquake zone of my country, with frequent earthquake activities. The middle of the strait is the Qiongzhou Strait fault zone, and the fault zone in the north of Hainan Island is intertwined here. In addition, the Qiongzhou Strait is a sea passage in the middle and eastern part of the South China Sea, and it is also an important channel for exchanges between my country and neighboring countries such as Vietnam. This also adds difficulty to the construction of the Qiongzhou Strait Cross-sea Bridge. Due to the terrain, it is impossible to build an undersea tunnel, and only a spring-cable-stayed sinking and floating sea tunnel can be built by relying on the buoyancy of seawater. This spring-cable-stayed sinking and floating sea tunnel can be used to solve the problem of crossing the strait.

[0004] The seabed pipelines currently in use do not have corresponding shock-absorbing facilities. When vehicles pass through, they will cause certain vibrations to the tunnel. Not only that, the ups and downs of the sea water and frequent seismic activities on the seabed will also cause vibrations in the tunnel. Long-term use will inevitably lead to damage to the seabed pipelines.

[0005] In order to solve the above technical problems, it is urgent to provide a spring cable-stayed floating tunnel in the sea. Summary of the invention

[0006] In order to solve the above technical problems, the technical solution provided by the present invention is: a sea spring inclined-stayed floating tunnel, comprising a sea tunnel fixedly built on the seabed, a ventilation duct is arranged at the bottom end of the sea tunnel for internal ventilation of the sea tunnel, and a plurality of tension spring tunnel support devices are symmetrically arranged on the sea tunnel, the tension spring tunnel support device comprises a spring tube housing, a first connecting spring, a second connecting spring, a first piston rod and a second piston rod, a first spring chamber and a second spring chamber are arranged inside the spring tube housing, the first spring chamber is used to place the first connecting spring, the second spring chamber is used to place the second connecting spring, the first piston rod is connected to the top end of the first connecting spring, the second piston rod is connected to the bottom end of the second connecting spring, a first through hole is opened at the top end of the spring tube housing, and a second through hole is opened at the bottom end thereof, the top end of the first piston rod extends out of the spring tube housing from the first through hole, and its extended end is used to be connected and fixed on the sea tunnel, the bottom end of the second piston rod extends out of the spring tube housing from the second through hole, and its extended end is used to be connected and fixed on a foundation on the seabed.

[0007] Furthermore, the underwater tunnel is arranged in a water drop-shaped structure, which is wider at the top and narrower at the bottom.

[0008] Furthermore, the tension spring tunnel support device is obliquely distributed on both sides of the underwater tunnel.

[0009] The advantages of the invention compared with the prior art are:

[0010] When the present invention is in use, when there are many trains or cars passing through the sea tunnel, the weight in the sea tunnel increases and tends to move downward. The downward movement of the sea tunnel compresses the first connecting spring through the first piston rod, and compresses the second connecting spring through the second piston rod, so that the sea tunnel can have a certain activity space during use. The multiple tension spring tunnel support devices can support and protect the sea tunnel, so that when vehicles pass through the tunnel, the impact force on the tunnel can be reduced, the stability of the tunnel can be improved, and it has good practicality. The inclination angle of the symmetrical spring tube shell during installation ensures the stability of the sea tunnel shell under the premise of ensuring the maximum support force of the sea tunnel.

[0011] The present invention adopts a symmetrically arranged tension spring tunnel support device, wherein the tension spring tunnel support device is distributed at a certain distance, and the symmetrical springs are inclined and suspended in a floating and sinking type support. When one of the symmetrical springs is subjected to lateral pressure, the other one acts as a tension force, so that the tunnel is always kept in a balanced state.

[0012] The present invention can reduce the impact force of seawater on the sea tunnel through the above-mentioned multiple tension spring tunnel support devices, and can reduce the seabed buffer through the above-mentioned spring support components, thereby improving the service life of the sea tunnel. In the present invention, the extended end of the first piston rod is used to connect and fix on the sea tunnel, and the second piston rod is used to connect and fix on the foundation of the seabed. The sea tunnel is fixed by the above-mentioned structure, so that the sea tunnel can only move up and down along the direction of the first piston rod and the second piston rod, thereby improving the stability of the sea tunnel.

[0013] The present invention provides a ventilation duct at the bottom end of the underwater tunnel, which can increase the ventilation effect of the underwater tunnel and improve the overall safety of the tunnel and the comfort of driving in the lane. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic cross-sectional diagram of the submarine installation of a spring cable-stayed floating tunnel in the sea according to the present invention;

[0015] Figure 2 It is a cross-sectional schematic diagram of a spring cable-stayed floating tunnel in the sea according to the present invention;

[0016] Figure 3 It is a structural schematic diagram of a tension spring tunnel support device;

[0017] Figure 4 It is a top view of the tension spring tunnel support device;

[0018] Figure 5 Schematic diagram of piston rod connection Figure 1 ;

[0019] Figure 6 Schematic diagram of piston rod connection Figure 2 ;

[0020] Figure 7 Schematic diagram of piston rod connection Figure 3 .

[0021] Among them, 1. underwater tunnel, 2. ventilation duct, 3. spring tube housing, 4. first connecting spring, 5. second connecting spring, 6. first piston rod, 7. second piston rod, 8. first spring chamber, 9. second spring chamber, 10. first through hole, 11. second through hole, 12. spring tube housing fixing hinge, 13. car passage, 14. train passage, 15. rotating shaft bolt live link. DETAILED DESCRIPTION

[0022] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0023] The present invention is described in detail with reference to the accompanying drawings.

[0024] The present invention provides a submerged spring inclined-stayed floating tunnel in a sea, comprising a submerged tunnel 1 fixedly built on the seabed, a ventilation duct 2 is arranged at the bottom of the submerged tunnel 1 for internal ventilation of the submerged tunnel 1, a plurality of tension spring tunnel support devices are symmetrically arranged on the submerged tunnel 1, the tension spring tunnel support device comprises a spring tube housing 3, a first connecting spring 4, a second connecting spring 5, a first piston rod 6 and a second piston rod 7, a first spring chamber 8 and a second spring chamber 9 are arranged inside the spring tube housing 3, the first spring chamber 8 is used to place a first The spring tube housing 3 is provided with a first through hole 10, and a second through hole 11 is provided at its bottom end. The top end of the first piston rod 6 extends out of the spring tube housing 3 from the first through hole 10, and its extended end is used to be connected and fixed to the underwater tunnel 1. The bottom end of the second piston rod 7 extends out of the spring tube housing 3 from the second through hole 11, and its extended end is used to be connected and fixed to the foundation on the seabed.

[0025] Embodiment 1:

[0026] When the present invention is in use, two sets of automobile passages 13 are arranged above the sea tunnel 1 for automobiles to travel in the sea tunnel, and two sets of train passages 14 are arranged below the sea tunnel 1 for trains to travel in the sea tunnel.

[0027] The automobile passage is made of existing road material, and its two ends are connected to the inner wall of the sea tunnel 1 through steel bars and concrete pouring. The interior is filled with steel bars, and a steel structure combination is used at the bottom to provide auxiliary support for the road. The bottom of the steel structure combination is connected to the steel structure supporting the train passage, and the two sides of the steel structure combination are welded to the shell of the sea tunnel to resist the pressure of seawater on the shell of the sea tunnel.

[0028] The train passage 14 is made of road material at the bottom, and its two ends are connected to the inner wall of the sea tunnel 1 by steel bars and concrete pouring. Gravel and train tracks are laid on the road, and a steel structure combination is used at the bottom of the road material to provide auxiliary support for the train passage. The steel structure combination and the sea tunnel shell are fixed and welded.

[0029] A ventilation duct 2 is provided at the bottom end of the sea tunnel 1 for internal ventilation of the sea tunnel 1, which can increase the ventilation effect of the sea tunnel, improve the overall safety of the tunnel and the comfort of driving in the lane.

[0030] When there are many trains or cars passing through the sea tunnel, the weight in the sea tunnel increases and there is a tendency to move downward. A plurality of tension spring tunnel support devices are symmetrically arranged on the sea tunnel 1. The sea tunnel can be supported and protected by the plurality of tension spring tunnel support devices, so that when vehicles pass through the tunnel, the impact force on the tunnel can be reduced, thereby avoiding damage to the tunnel, and having good practicality.

[0031] The purpose of symmetrical installation of multiple tension spring tunnel support devices is: (1) when the passing vehicles on one side generate pressure, the gravity spring plays a supporting role, and the spring on the other side plays a tensioning role. (2) when the sea tunnel is impacted by the lateral force of seawater backflow, the spring on the impacting side plays a tensioning role. The spring on the back impacting side plays a supporting role. This can keep the sea tunnel in a balanced state at all times.

[0032] The installation position of the symmetrical cable-stayed spring is determined by the distance from the shore.

[0033] When the underwater tunnel moves downward, the first piston rod 6 connected to the underwater tunnel 1 pushes the first connecting spring 4 to be compressed in the first spring chamber 8, and the second piston rod 7 pushes the second connecting spring 5 to be compressed in the second spring chamber 9, so that the underwater tunnel can have a certain activity space during use. The first connecting spring 4 and the second connecting spring 5 are deformed and are in a stressed state, which can provide good primary support protection when the vehicle passes, reduce the impact damage to the underwater tunnel, and improve the service life of the underwater tunnel.

[0034] When the sea water floats or the seabed vibrates, the sea tunnel will shake. At this time, multiple tension spring tunnel support devices can support and protect the sea tunnel as it shakes up and down, preventing the sea tunnel from shaking too much.

[0035] In order to increase the stability of the underwater tunnel in the sea, the underwater tunnel 1 is configured in a water drop-shaped structure, which is wider at the top and narrower at the bottom.

[0036] In order to facilitate the support and protection of the underwater tunnel, the tension spring tunnel support device is obliquely distributed on both sides of the underwater tunnel 1.

[0037] Among them, the top end of the first piston rod 6 extends out of the spring tube housing 3 from the first through hole 10, and the extended end is fixed to the sea tunnel 1 by a rotating shaft bolt 15, and the bottom end of the second piston rod 7 extends out of the spring tube housing 3 from the second through hole 11, and the extended end is fixed to the foundation on the seabed by a rotating shaft bolt 15.

[0038] Embodiment 2:

[0039] The outer circumferential surface of the spring tube housing 3 is provided with a plurality of evenly distributed spring tube housing fixed hinges 12. The spring tube housing fixed hinges 12 are provided in four groups.

[0040] In the present invention, the spring tube housing 3 is assembled and fixed by a plurality of spring tube housing fixing hinges 12, and the spring tube housing 3 can also be disassembled as needed, which is convenient for assembly and disassembly, convenient for maintenance, and has strong practicality.

[0041] As a further explanation of the present invention, the spring tube housing 3 is arranged in a circular tubular structure.

[0042] As a further elaboration of the present invention, the interior height of the first spring chamber 8 is greater than the maximum stretched height of the first connecting spring 4. The spring length is determined according to the seawater depth at the device to avoid excessive springs causing fatigue.

[0043] The length of the first piston rod 6 for connecting the underwater tunnel housing or the second piston rod 7 for connecting the seabed foundation protruding from the spring tube housing 3 is greater than the length of the outdoor space when the spring is compressed to the maximum, that is, the reserved space in the spring chamber is greater than the maximum stretched length of the spring. The length of the first piston rod or the second piston rod in the spring chamber is greater than the length of the reserved space when the spring is stretched to the maximum.

[0044] The length of the spring is determined according to the seawater depth at the installation location to avoid excessive springs causing fatigue.

[0045] Moreover, the length of the spring chamber is greater than the space when the spring is stretched to its maximum extent, and the piston rod portion exposed outside the spring tube housing is greater than the space when the spring is compressed to its maximum extent.

[0046] Embodiment three:

[0047] A plurality of vehicle passages 13 and a plurality of train passages 14 are arranged inside the underwater tunnel 1 . The plurality of vehicle passages 13 are distributed above the train passages 14 , and the ventilation ducts 2 are arranged below the train passages 14 .

[0048] The automobile passage 13 in the sea tunnel 1 of the present invention can be used for the travel of a large number of automobiles at the same time, and can also be used for the passage of trains in opposite directions at the same time, because the plurality of automobile passages 13 are distributed above the train passage 14, and the ventilation duct 2 is arranged below the train passage 14. Automobiles and trains travel separately and independently in the sea tunnel 1, and the two do not affect each other, and can be used for the simultaneous travel of automobiles and trains.

[0049] The shell of the sea tunnel is made of steel structure and welded with specially made reinforced steel plates. Seawater-proof expansion devices are installed at the connection between the two ends of the sea tunnel and the underground tunnel to prevent damage to the sea tunnel due to variations in the strait or slight drift of Hainan Island.

[0050] The present invention and its embodiments are described above, and such description is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. In short, if ordinary technicians in the field are inspired by it, without departing from the purpose of the invention, they can design a structure and embodiment similar to the technical solution without creativity, which should belong to the protection scope of the present invention.

Claims

1. A submerged spring cable-stayed floating tunnel, comprising a submerged tunnel (1) fixedly built on the seabed, a ventilation duct (2) being arranged at the bottom end of the submerged tunnel (1) for internal ventilation of the submerged tunnel (1), characterized in that: A plurality of tension spring tunnel support devices are symmetrically arranged on the underwater tunnel (1), the tension spring tunnel support device comprising a spring tube housing (3), a first connecting spring (4), a second connecting spring (5), a first piston rod (6) and a second piston rod (7), a first spring chamber (8) and a second spring chamber (9) are arranged inside the spring tube housing (3), the first spring chamber (8) is used to place the first connecting spring (4), the second spring chamber (9) is used to place the second connecting spring (5), the first piston rod (6) is connected to the first connecting spring (4), the second connecting spring (5) is connected to the first connecting spring (4), the first connecting spring (5) is connected to the second connecting spring (5), the first connecting spring (6) is connected to the first connecting spring (4), the second connecting spring (5) is connected to the first connecting spring (5), the first connecting spring (6) is connected to the first connecting spring (4), the second connecting spring (5) is connected to the first connecting spring (5), the first connecting spring (6) is connected to the first connecting spring (4), the second connecting spring (5) is connected to the first connecting spring (5), the first connecting spring (6) is connected to the first connecting spring (4), the first connecting spring (5) is connected to the first connecting spring (5 ... The second piston rod (7) is connected to the bottom end of the second connecting spring (5) at the top end of the first connecting spring (4). A first through hole (10) is provided at the top end of the spring tube housing (3), and a second through hole (11) is provided at the bottom end. The top end of the first piston rod (6) extends out of the spring tube housing (3) from the first through hole (10), and the extended end is used to be connected and fixed to the underwater tunnel (1). The bottom end of the second piston rod (7) extends out of the spring tube housing (3) from the second through hole (11), and the extended end is used to be connected and fixed to a foundation on the seabed.

2. The underwater spring cable-stayed floating tunnel according to claim 1, characterized in that: The underwater tunnel (1) is arranged in a water drop-shaped structure, which is wide at the top and narrow at the bottom.

3. The underwater spring cable-stayed floating tunnel according to claim 1, characterized in that: The tension spring tunnel support device is distributed obliquely on both sides of the underwater tunnel (1), and the inclination angle ensures the stability of the underwater tunnel shell while ensuring that the spring shell supports the underwater tunnel with the maximum supporting force.

4. The underwater spring cable-stayed floating tunnel according to claim 1, characterized in that: The outer peripheral surface of the spring tube housing (3) is provided with a plurality of evenly distributed spring tube housing fixing hinges (12); the spring tube housing (3) is divided into four equal parts, comprising four groups of circular arc combination pieces of the same structure and size; the spring tube housing fixing hinges (12) are arranged at the edges of the circular arc combination pieces to enhance the bending strength of the spring tube housing and facilitate construction.

5. The underwater spring cable-stayed floating tunnel according to claim 4, characterized in that: The spring tube housing fixed hinges (12) are provided in four groups and are distributed on the edges of both sides of the arc combination sheet to enhance the bending strength of the spring tube housing.

6. The underwater spring cable-stayed floating tunnel according to claim 4 or 5, characterized in that: The spring tube housing (3) is arranged in a circular tube structure.

7. The underwater spring cable-stayed floating tunnel according to claim 1, characterized in that: The length of the first piston rod (6) for connecting the underwater tunnel housing protruding from the spring tube housing (3) is greater than the length of the outdoor space when the spring is maximally compressed.

8. The underwater spring cable-stayed floating tunnel according to claim 1, characterized in that: The length of the second piston rod (7) for connecting to the seabed foundation that is exposed from the spring tube housing (3) is greater than the length of the outdoor space when the spring is compressed to the maximum.

9. The underwater spring cable-stayed floating tunnel according to claim 1, characterized in that: The interior of the sea tunnel (1) is provided with a plurality of automobile passages (13) and two train passages (14), the plurality of automobile passages (13) being distributed above the train passages (14), and the ventilation duct (2) being arranged below the train passages (14), and seawater-proof telescopic devices being arranged at the connection points between the two ends of the sea tunnel and the underground tunnel to prevent damage to the sea tunnel caused by variations in the strait or slight variations and drifts of Hainan Island.