Large-gradient roof pouring construction method

By dividing the roof into small areas and intercepting concrete with intercepting nets and baffle steel bars, the difficulty and quality problems of pouring concrete on slope roofs are solved, and the effective retention and quality control of concrete are achieved, which significantly improves the roof's emissivity and waterproofing effect.

CN118979581APending Publication Date: 2024-11-19SHANXI CONSTR ENG CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410910111.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

When pouring concrete on slope roof, the concrete is prone to flow to the bottom of the slope due to the large slope, making it difficult to form at one time. It is prone to slip, looseness and separation during vibration, resulting in mass defects such as exposed tendons, exposed stones, holes, honeycombs, and lints. , cracks and other problems.

Method used

Divide the roof into multiple small pouring areas, and tie the intercepting net between the upper and lower rows of steel bars, set up baffle steel bars to intercept the concrete, reduce the concrete slippage, ensure that the concrete stays in each intercepting zone, and reduce the occurrence of quality problems.

Benefits of technology

It significantly reduces the occurrence of quality problems such as exposed tendons, exposed stones, holes, honeycombs, numb surfaces, and cracks, and does not require secondary repair, which improves the roof's anti-seepage and waterproofing effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979581A_ABST
    Figure CN118979581A_ABST
Patent Text Reader

Abstract

The invention discloses a large-gradient roof pouring construction method, which belongs to the technical field of constructional engineering, and comprises the following steps: S1, dividing a roof template into a plurality of pouring areas along the ridge extension direction; s2, intercepting nets are bound between the upper row of reinforcing meshes and the lower row of reinforcing meshes, the intercepting nets are arranged at intervals in the slope direction, baffle steel bars are bound on the intercepting nets, and the baffle steel bars are welded to the upper row of reinforcing meshes and the lower row of reinforcing meshes and extend out of the preset concrete face; s3, a baffle is additionally arranged on the upper-row reinforcing mesh, and the baffle is bound and lapped on baffle steel bars; and S4, the pouring area is poured, and the baffle is taken away after the concrete loses liquidity and before initial setting of the concrete. The roof with a large area is divided into small-range pouring areas, operation and quality control of concrete construction are facilitated, concrete gliding can be reduced under closure of the intercepting nets and blocking of the baffles, the quality problems of rib exposure, stone exposure, holes, honeycombs, pitted surfaces, cracks and the like can be greatly reduced, secondary repairing is not needed, and the effects in the aspects of impermeability, water resistance and the like of the roof are remarkable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building engineering, in particular to a large-slope roof pouring construction method. Background Art

[0002] When pouring concrete for a sloping roof, the slope is too large and the slump cannot be too large. Therefore, the concrete is easily poured to the bottom of the slope, which makes it very difficult to pour the concrete. It is difficult to pour it in one go, and the concrete is prone to slipping, loosening, and segregation during the vibration process. The density of the concrete cannot be controlled, resulting in quality defects such as exposed reinforcement, exposed stones, holes, honeycombs, rough surfaces, cracks, and other quality problems, leaving hidden dangers of leakage. Summary of the invention

[0003] The purpose of the present invention is to solve the above-mentioned technical problems and provide a large-slope roof pouring construction method, which divides a roof with a larger area into several small pouring areas, facilitates the operation and quality control of concrete construction, and can intercept concrete in each interception partition under the interception of the interception net and the blocking of the baffle, thereby reducing the sliding of concrete and greatly reducing the occurrence of quality problems such as exposed reinforcement, exposed stone, holes, honeycombs, rough surfaces, cracks, etc., without the need for secondary repair, and has significant effects on the roof's anti-seepage and waterproofing.

[0004] To achieve the above object, the present invention provides the following solution: The present invention discloses a large slope roof pouring construction method, comprising the following steps:

[0005] S1. Divide the roof formwork into multiple pouring areas along the ridge extension direction of the slope roof;

[0006] S2. Tie a plurality of interception nets between the upper and lower rows of steel meshes in the pouring area, wherein the interception nets are parallel to the extension direction of the roof ridge, and have meshes capable of intercepting coarse aggregate of concrete. The plurality of interception nets are arranged at intervals along the slope direction of the sloping roof to divide the pouring area into a plurality of interception partitions, and baffle steel bars perpendicular to the sloping roof are tied to the interception nets, wherein the baffle steel bars are welded to the upper and lower rows of steel meshes and extend out of a preset concrete surface;

[0007] S3, a baffle that can be submerged by the preset concrete surface is added to the upper row of steel bars, the baffle is tied and overlapped on the baffle steel bars parallel to the extension direction of the roof ridge, the length of the baffle is consistent with the length of the interception net, and the thickness of the preset concrete surface submerged by the baffle is the thickness of the steel bar protective layer;

[0008] S4, pouring the pouring area, and removing the baffle after the concrete loses fluidity and before the concrete begins to set.

[0009] Preferably, before step S1, the method further includes step S0: setting up roof formwork and steel mesh.

[0010] Preferably, in step S1, the length of the pouring area along the extension direction of the roof ridge is not greater than 2 m.

[0011] Preferably, in step S2, the spacing between the interception nets is 1.5 to 3 m.

[0012] Preferably, in step S2, the size of the mesh is 5 mm×5 mm to 25 mm×25 mm.

[0013] Preferably, in step S2, the intercepting net is a wire mesh or a steel plate mesh.

[0014] Preferably, in step S2, the length of the baffle steel bars extending out of the preset concrete surface is 50 mm to 200 mm.

[0015] Preferably, in step S2, two baffle steel bars are provided on each of the interception nets, and the two baffle steel bars are respectively provided at both ends of the interception net.

[0016] Preferably, in step S2, the baffle steel bars are Φ12 steel bars.

[0017] Preferably, in step S2, the preset thickness of the concrete surface is 20-25 mm.

[0018] Compared with the prior art, the present invention has achieved the following technical effects:

[0019] In the present invention, a roof with a larger area is divided into several casting areas, which is equivalent to carrying out concrete construction in a small range, which is convenient for operation and quality control. An interception net is added between the upper and lower rows of steel meshes to intercept the concrete, and the baffle can stop the mortar on the concrete surface from falling, thereby intercepting the concrete in each interception partition, which can greatly reduce the degree of concrete flowing to the bottom of the slope, greatly reduce the occurrence of quality problems such as exposed steel bars, exposed stones, holes, honeycombs, rough surfaces, cracks, etc., and no secondary repair is required, thereby having a significant effect on the roof's anti-seepage and waterproofing effects. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0021] Figure 1 This is a top-down stereoscopic diagram of the pouring construction process of a steep slope roof;

[0022] Figure 2 This is a side view of the pouring construction process of a steep slope roof.

[0023] Explanation of the accompanying reference numerals: 1. Intercepting net; 2. Baffle steel bars; 3. Baffle; 4. Roof formwork; 5. Ridge; 6. Upper row of steel mesh; 7. Lower row of steel mesh. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] This invention provides a large slope roof pouring construction method. Figure 1 to Figure 2 As shown, the following steps are included:

[0026] S1, dividing the roof formwork 4 into a plurality of pouring areas along the extension direction of the ridge 5 of the sloping roof;

[0027] S2. A plurality of interception nets 1 are tied between the upper row of steel meshes 6 and the lower row of steel meshes 7 in the casting area. The interception nets 1 are parallel to the extension direction of the ridge 5. The plurality of interception nets 1 are arranged at intervals along the slope direction of the sloping roof to divide the casting area into a plurality of interception partitions. The interception nets 1 have meshes capable of intercepting concrete coarse aggregates, that is, the size of the meshes is related to the particle size of the concrete coarse aggregate particles. The concrete coarse aggregate particles that can be intercepted are required to intercept the concrete and ensure that the concrete is retained in the interception partitions. The baffle steel bars 2 are tied to the interception nets 1. The baffle steel bars 2 are perpendicular to the sloping roof and are welded to the upper row of steel meshes 6 and the lower row of steel meshes 7. The length of the baffle steel bars 2 needs to extend out of the preset concrete surface.

[0028] S3, add a baffle 3 on the upper row of steel mesh 6 to intercept concrete, the baffle 3 is tied parallel to the extension direction of the roof ridge and overlapped on the baffle steel bar 2, the length of the baffle 3 is consistent with the length of the interception mesh 1, the width of the baffle 3 needs to be able to be submerged by the preset concrete surface, and the thickness of the preset concrete surface that submerges the baffle 3 is the thickness of the steel bar protective layer;

[0029] S4. In the pouring area, after the concrete loses fluidity and before the concrete begins to set, remove all baffles 3.

[0030] By adopting this method, a roof with a larger area can be divided into several pouring areas, which is equivalent to carrying out concrete construction in a small range, which is convenient for operation and quality control. The interception at the interception net 1 can reduce the sliding of coarse aggregate in the concrete, and the fine aggregate is lighter in weight and is not easy to slide down under the action of viscosity. The baffle 3 can stop the mortar on the surface of the concrete from falling, thereby intercepting the concrete in each interception zone, which can greatly reduce the degree of concrete flowing to the bottom of the slope, greatly reducing the occurrence of quality problems such as exposed reinforcement, exposed stone, holes, honeycombs, rough surfaces, cracks, etc., and no secondary repair is required, thereby having a significant effect on the roof's anti-seepage and waterproofing.

[0031] In this embodiment, Figure 1 to Figure 2 As shown, before step S1, step S0 is also included: setting up the roof formwork 4 and the steel mesh, the steel mesh including the upper row steel mesh 6 and the lower row steel mesh 7.

[0032] In this embodiment, Figure 1 to Figure 2 As shown, in step S1, the length of the pouring area along the extension direction of the roof ridge is not greater than 2 m. Usually, the length of the pouring area along the extension direction of the roof ridge is 2 m.

[0033] Further, in this embodiment, if Figure 1 to Figure 2 As shown, in step S2, the spacing of the interception nets 1 is 1.5 to 3m. Specifically, when the slope of the sloping roof is ≤30°, the spacing of the interception nets 1 is 2m to 3m, and when the slope of the sloping roof is >30°, the spacing of the interception nets 1 is 1.5m to 2m. The spacing of the interception nets 1 is usually selected to be 2m, which is generally applicable to the above two situations, except for extreme slope values. When the length of the pouring area along the ridge extension direction is selected to be 2m, the spacing of the interception nets 1 is selected to be 2m, so that the pouring area forms a 2m×2m square pouring area, which is more convenient for concrete construction operations and quality control.

[0034] Further, in this embodiment, if Figure 1 to Figure 2 As shown, in step S2, the mesh size of the intercepting net 1 is determined according to the diameter of the concrete coarse aggregate, and the mesh size is usually 5mm×5mm~25mm×25mm, and 15mm×15mm can be selected as a preferred size.

[0035] In this embodiment, Figure 1 to Figure 2 As shown, the interception net 1 can be made of steel wire mesh or steel plate mesh, which has high strength and good corrosion resistance. Steel wire mesh is preferred, as it is cheaper than steel plate mesh, and is easy to use and simple to make.

[0036] In this embodiment, Figure 1 to Figure 2 As shown, in step S2, the length of the baffle steel bar 2 extending out of the preset concrete surface is 50 mm to 200 mm, that is, the length of the upper part of the baffle steel bar 2 exposed from the preset concrete surface is 50 mm to 200 mm, preferably 50 mm.

[0037] Further, in this embodiment, if Figure 1 to Figure 2 As shown, in step S2, two baffle steel bars 2 are provided on each interception net 1, and the two baffle steel bars 2 are respectively provided at two ends of the interception net 1.

[0038] Further, in this embodiment, if Figure 1 to Figure 2 As shown, in step S2, the baffle reinforcement 2 uses Φ12 reinforcement, which can of course be adjusted according to actual construction.

[0039] In this embodiment, Figure 1 to Figure 2 As shown, in step S2, the thickness of the concrete surface is preset to be 20 to 25 mm.

[0040] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A method for pouring a large slope roof, characterized in that: The following steps are involved: S1. Divide the roof formwork into multiple pouring areas along the ridge extension direction of the slope roof; S2. Tie a plurality of interception nets between the upper and lower rows of steel meshes in the pouring area, wherein the interception nets are parallel to the extension direction of the roof ridge, and have meshes capable of intercepting coarse aggregate of concrete. The plurality of interception nets are arranged at intervals along the slope direction of the sloping roof to divide the pouring area into a plurality of interception partitions, and baffle steel bars perpendicular to the sloping roof are tied to the interception nets, wherein the baffle steel bars are welded to the upper and lower rows of steel meshes and extend out of a preset concrete surface; S3, a baffle that can be submerged by the preset concrete surface is added to the upper row of steel bars, the baffle is tied and overlapped on the baffle steel bars parallel to the extension direction of the roof ridge, the length of the baffle is consistent with the length of the interception net, and the thickness of the preset concrete surface submerged by the baffle is the thickness of the steel bar protective layer; S4, pouring the pouring area, and removing the baffle after the concrete loses fluidity and before the concrete begins to set.

2. A method for pouring a large slope roof according to claim 1, characterized in that: Before step S1, the method further includes step S0: setting up roof formwork and steel mesh.

3. A method for pouring a steep roof according to claim 1, characterized in that: In step S1, the length of the pouring area along the extension direction of the roof ridge is not greater than 2m.

4. A method for pouring a steep roof according to claim 1 or 3, characterized in that: In step S2, the spacing between the interception nets is 1.5 to 3 meters.

5. A method for pouring a steep slope roof according to claim 4, characterized in that: In step S2, the size of the mesh is 5 mm×5 mm to 25 mm×25 mm.

6. A method for pouring a steep slope roof according to claim 1, characterized in that: In step S2, the intercepting net is a wire mesh or a steel plate mesh.

7. A method for pouring a steep roof according to claim 1, characterized in that: In step S2, the length of the baffle reinforcement extending out of the preset concrete surface is 50 mm to 200 mm.

8. A method for pouring a steep slope roof according to claim 1 or 7, characterized in that: In step S2, two baffle steel bars are arranged on each of the interception nets, and the two baffle steel bars are arranged at both ends of the interception net.

9. A method for pouring a steep slope roof according to claim 8, characterized in that: In step S2, the baffle steel bars are Φ12 steel bars.

10. A method for pouring a steep slope roof according to claim 1, characterized in that: In step S2, the thickness of the concrete surface is preset to be 20 to 25 mm.

Citation Information

Cited By

  • Construction method of inclined arc roof foundation layer

    CN121429127A

  • Cast-in-place formwork support system of large-span vault structure and construction method

    CN121429172A