Pre-burying machine for protection type slope treatment
By using the design of the vehicle-mounted chassis and rotary base in the slope anchor embedded machine, combined with the hydraulic pump station and the lift controller, the precise control of the drilling angle and position is achieved, and the problem of insufficient drilling accuracy is solved. Improve the stability and construction efficiency of anchor bolt pre-embedding.
Patent Information
- Application Number
- CN202411069746.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-19
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the current pre-embedding process of slope anchors, the drilling accuracy is insufficient, resulting in unstable anchor buried solids, and excessive mechanical vibrations lead to additional material waste and environmental pollution.
A protective slope treatment embedded machine is designed, using a vehicle-mounted chassis and rotating base, combined with a hydraulic pump station and a lifting controller, and precisely controls the drilling angle and position through synchronous stabilizer and telescopic guide rails, thereby enhancing drilling. Stability of the organization.
It improves drilling accuracy, improves the quality of anchor bolt embedding, reduces material waste and environmental pollution, and improves construction efficiency.
Smart Images

Figure CN118979696A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pre-embedding of slope anchor rods, in particular to a pre-embedding machine for protective slope management. Background Art
[0002] In the process of modern river or highway management, it is sometimes necessary to reinforce the slopes on both sides of the river or road. The mainstream reinforcement methods at this stage are mostly anchor rods and anchor cables. In this reinforcement method, pre-buried anchor rods or anchor cables are required. Therefore, how to pre-bury anchor rods into the slope matrix is a common construction problem.
[0003] At present, the construction methods for pre-buried anchor rods or anchor cables are mainly divided into the following types: first, manually drilling holes in the slope body with a pneumatic drill, and then burying the anchor rods; and second, drilling holes with a slope anchor drilling rig, and then burying the anchor rods. The former has the problems of inconvenient construction operation and low construction efficiency. Therefore, at this stage, slope anchor drilling rigs are mostly used for pre-buried anchor rods.
[0004] However, during the use of the current slope anchor drilling rig, the angle of the embedded drilling rig is often required to be changed due to the uncertainty of the height and angle of the slope. The hole position and drilling angle of the embedded anchor drilling rig need to be positioned and drilled according to the designed position. However, during the use of the embedded anchor drilling rig, the hydraulic lifting and adjustment system used for positioning the direction and height is not in sufficient contact with the slope, and is only supported and stabilized by its own frame weight. It is easy to cause mechanical vibration during the drilling process, resulting in inaccurate drilling and serious damage to the drill rod.
[0005] Based on the above problems, when burying anchor rods after drilling is completed, due to insufficient drilling accuracy, not only the filling grouting amount increases, resulting in additional material waste, but also the anchor rod burial is unstable due to poor drilling accuracy. In addition, due to excessive mechanical vibration, additional smoke and dust will be generated, affecting the surrounding environment. Summary of the invention
[0006] In view of the shortcomings of the prior art, the present invention only provides a pre-embedded machine for protective slope management to solve the problem of insufficient drilling accuracy when burying anchor rods after drilling is completed.
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: a protective slope management embedded machine, including a vehicle-mounted chassis, the vehicle-mounted chassis is a crawler or wheeled vehicle, a rotating base is provided on the vehicle-mounted chassis, a hydraulic pump station is installed on the rotating base, a lifting controller is provided on the rotating base, and a drilling mechanism is provided on the lifting controller;
[0008] The drilling mechanism comprises a guide seat, the guide seat is assembled and connected with the lifting controller, a drilling rig guide rail is assembled on the guide seat, a drilling power machine is arranged on the drilling rig guide rail, and an anchor guide device is connected to the drilling rig guide rail to correspond to the drilling power machine;
[0009] The lifting controller is composed of a multi-section foldable telescopic guide rail and a hydraulic control cylinder, wherein the hydraulic control cylinder is mounted on a rotating base, the telescopic end of the hydraulic control cylinder is movably connected to the telescopic guide rail, and the hydraulic control cylinder is connected to a hydraulic pump station;
[0010] A pair of synchronous stabilizers are also provided on the rotating base, and the pair of synchronous stabilizers are connected to the guide seat;
[0011] The top end of the telescopic guide rail is movably connected to the bottom surface of the guide seat through a pin shaft, and the telescopic guide rail cooperates with a pair of synchronous stabilizers to adjust the direction of the guide seat;
[0012] A pair of guide controllers are arranged on both sides of the guide seat, and the pair of guide controllers are connected to the drilling rig guide rails for adjusting the positions of the drilling rig guide rails;
[0013] A docking seat is arranged at the end of the drilling rig guide rail, and the docking seat is used to contact the working surface of the slope. At least two pairs of stabilizing nails are arranged in a circular array on the docking seat.
[0014] Preferably, the docking seat is a plate with a semicircle, and a central axis hole is opened in the center of the semicircle.
[0015] Preferably, the rotating base is linked by a motor and a gear set.
[0016] Preferably, a pair of the synchronous stabilizers and the telescopic guide rail are arranged in a herringbone shape;
[0017] The synchronous stabilizer comprises a stabilizing telescopic rod, which is a multi-stage hydraulic telescopic rod. The bottom end of the stabilizing telescopic rod is movably connected to a rotating base, and the telescopic end of the stabilizing telescopic rod is movably connected to the bottom of a guide seat through a spherical movable joint.
[0018] Preferably, the anchor rod guiding device comprises a guide bracket, the end of the drilling rig guide rail is provided with a guide bracket, the top of the guide bracket is provided with a guide hole, the guide hole is provided with a guide sleeve, and the guide sleeve is used to guide the drill rod and the anchor rod.
[0019] Preferably, the drilling rig guide rail is a plate of a rectangular structure, a pair of tracks are symmetrically arranged on the top of the drilling rig guide rail, a pair of sliding grooves are symmetrically opened on both sides of the guide seat, and a hydraulic propulsion rod is arranged between the pair of tracks.
[0020] Preferably, the guide controller includes a guide adjustment hydraulic cylinder, a pair of shaft seat grooves are opened on both sides of the guide seat, and a guide adjustment cylinder is installed in the shaft seat groove. The telescopic end of the guide adjustment cylinder is connected to the bottom surface of the drilling rig guide rail through a connecting block.
[0021] Preferably, the drilling power machine includes a drilling rig base, the drilling rig base is assembled on the drilling rig guide rail and is provided with a pair of guide blocks matching a pair of rails, a hydraulic motor is provided on the drilling rig base, a drill rod connecting seat is connected to the driving end of the hydraulic motor, and the drilling rig base is connected to the telescopic end of the hydraulic propulsion rod;
[0022] The axial direction of the drill rod connecting seat corresponds to the guide sleeve on the docking seat;
[0023] The guide sleeve corresponds to the central axis hole in the center of the docking seat.
[0024] The beneficial effects of the present invention are as follows: the embedded machine for protective slope management is transported by a vehicle-mounted chassis, and the horizontal orientation of the drilling mechanism is adjusted by a large-structure rotating base. A pair of synchronous stabilizers cooperate with telescopic guide rails to act as a triangular support to improve stability. The drilling angle is accurately controlled by controlling the synchronous stabilizers, and the stabilizing device at the front of the drilling rig is used to further enhance the stability of the drilling mechanism, thereby improving the drilling accuracy and the embedded quality of the anchor rods. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a top view of the present invention.
[0026] Figure 2 It is the front view of the present invention.
[0027] Figure 3 It is a side view of the present invention.
[0028] Figure 4 Schematic diagram of the docking seat of the present invention.
[0029] Figure 5 for Figure 2 A partial enlarged view of .
[0030] In the figure: 1. vehicle chassis; 2. rotating base; 3. hydraulic pump station; 4. lifting controller; 5. drilling mechanism; 6. synchronous stabilizer; 7. docking seat; 41. telescopic guide rail; 42. hydraulic control cylinder; 51. guide seat; 52. drilling rig guide rail; 53. drilling power machine; 54. anchor rod guide device; 61. stable telescopic rod; 62. spherical movable joint; 71. stabilizing nail; 72. central axis hole; 511. guide adjustment cylinder; 512. connecting block; 521. track; 522. sliding groove; 523. hydraulic propulsion rod; 531. drilling rig base; 532. guide block; 533. hydraulic motor; 534. drill rod connecting seat; 541. guide bracket; 542. guide bushing. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] like Figure 1-5 As shown, a protective slope management embedded machine is supported by a vehicle-mounted chassis 1, which is a crawler or wheeled vehicle. A suitable vehicle-mounted chassis 1 is selected according to the road conditions at the construction site, and the vehicle-mounted chassis 1 needs to have a certain traction and load-bearing capacity; a rotating base 2 is arranged on the vehicle-mounted chassis 1, and the rotating base 2 is a support for the drilling equipment, and the rotating base 2 is linked by a motor and a gear set.
[0033] A lifting controller 4 is provided on the rotating base 2, and a drilling mechanism 5 is provided on the lifting controller 4. The lifting controller 4 is used to adjust the height and angle of the drilling mechanism 5. A hydraulic pump station 3 is installed on the rotating base 2, and hydraulic power is provided to power equipment such as the lifting controller 4 and the drilling mechanism 5 through the hydraulic pump station 3.
[0034] The lifting controller 4 is composed of a multi-section foldable telescopic guide rail 41 and a hydraulic control cylinder 42. The hydraulic control cylinder 42 is installed on the rotating base 2. The telescopic end of the hydraulic control cylinder 42 is movably connected to the telescopic guide rail 41. The hydraulic control cylinder 42 is connected to the hydraulic pump station 3.
[0035] During the specific implementation process, the hydraulic control cylinder 42 is used to adjust the horizontal angle of the telescopic guide rail 41 and at the same time supports the telescopic guide rail 41. The height of the guide seat 51 can be controlled by the telescopic guide rail 41. The power of the hydraulic cylinder and the telescopic guide rail 41 is provided by the hydraulic pump station 3. The telescopic guide rail 41 is used in conjunction with the hydraulic control cylinder 42 to lift the guide seat 51 to the working height and then adjust the angle posture.
[0036] The top end of the telescopic guide rail 41 is movably connected to the bottom surface of the guide seat 51 through a pin shaft, and the adjustment of the angle posture is controlled by a pair of synchronous stabilizers 6. A pair of synchronous stabilizers 6 is also provided on the rotating base 2, and the pair of synchronous stabilizers 6 is connected to the guide seat 51.
[0037] A pair of synchronous stabilizers 6 and the telescopic guide rail 41 are arranged in a herringbone shape and are connected to the bottom surface of the guide seat 51 at the same time. By controlling the extension and retraction of the pair of synchronous stabilizers 6, the guide seat 51 is driven to rotate with the end of the telescopic guide rail 41 as the axis. Therefore, the telescopic guide rail 41 and the pair of synchronous stabilizers 6 are used to cooperate to adjust the direction of the guide seat 51, thereby changing the direction of the drilling mechanism 5 on the guide seat 51 and realizing the adjustment of the drilling angle.
[0038] The synchronous stabilizer 6 includes a stabilizing telescopic rod 61, which is a multi-stage hydraulic telescopic rod. The bottom end of the stabilizing telescopic rod 61 is movably connected to the rotating base 2, and the telescopic end of the stabilizing telescopic rod 61 is movably connected to the bottom of the guide seat 51 through a spherical movable joint 62. The stabilizing telescopic rod 61 can move with the guide seat 51 under the action of hydraulic pressure. When the guide seat 51 moves to the working position, the spherical movable joint 62 is driven to move by adjusting the length of the stabilizing telescopic rod 61. Since both ends of the stabilizing telescopic rod 61 are movably connected, the stabilizing telescopic rod 61 can drive the guide seat 51 to rotate around the pin shaft, thereby changing the posture and drilling angle of the guide seat 51.
[0039] The drilling mechanism 5 includes a guide seat 51, which is assembled and connected with the lifting controller 4. A drilling rig guide rail 52 is assembled on the guide seat 51, and a drilling power machine 53 is arranged on the drilling rig guide rail 52. An anchor guide device 54 is connected to the drilling rig guide rail 52 to correspond to the drilling power machine 53.
[0040] In the specific implementation process, the guide seat 51 plays the role of supporting and limiting the drilling rig guide rail 52. At the same time, the drilling rig guide rail 52 can move on the guide seat 51 to adjust the feed amount, and the drilling rig power machine can move on the drilling rig guide rail 52 to play the role of advancing the drill rod and the anchor rod. The drilling power machine 53 is a hydraulic linear drive and is equipped with a hydraulic motor 533. The hydraulic motor 533 is pushed by the drilling power machine 53, so that the hydraulic motor 533 is pushed forward while rotating the anchor rod. The anchor rod guide device 54 plays the role of auxiliary positioning of the anchor rod and the drilling rod. The specific drilling construction is to adjust the drilling angle through the synchronous stabilizer 6, and then choose to fix or pre-install the drill rod on the drilling power machine 53. The guide seat 51 adjusts the drilling rig guide rail 52 close to the working slope, and then starts the drilling power machine 53. The drilling of the drill rod is controlled by the drilling power machine 53. After the drilling is completed, the drill rod is pulled out and the anchor rod is replaced. The anchor rod is inserted into the borehole along the original path to complete the pre-embedding of the anchor rod.
[0041] A pair of guide controllers are provided on both sides of the guide seat 51, and the pair of guide controllers are connected to the drilling rig guide rail 52 for adjusting the position of the drilling rig guide rail 52. The guide controller includes a guide adjustment hydraulic cylinder, and a pair of shaft seat grooves are provided on both sides of the guide seat 51, and a guide adjustment cylinder 511 is installed in the shaft seat groove. The telescopic end of the guide adjustment cylinder 511 is connected to the bottom surface of the drilling rig guide rail 52 through the connecting block 512. The pair of shaft seat grooves provide installation space for the guide adjustment cylinder 511 and assist in stabilizing the guide adjustment cylinder 511. The telescopic movement of the guide adjustment cylinder 511 drives the movement of the connecting block 512, which can drive the drilling rig guide rail 52 to move linearly, thereby adjusting the drilling rig head end close to the working position, and achieving the purpose of adjusting the working feed amount in a small range.
[0042] The drilling rig guide rail 52 is a rectangular structure plate, a pair of rails 521 are symmetrically arranged on the top of the drilling rig guide rail 52, a pair of sliding grooves 522 are symmetrically opened on both sides of the guide seat 51, a hydraulic propulsion rod 523 is arranged between the pair of rails 521, and is connected to the drilling rig base 531 through the hydraulic propulsion rod 523, so as to propel the drilling power machine 53, and the pair of sliding grooves 522 on the guide seat 51 and the two sides of the drilling rig guide rail 52 are limited to prevent the drilling rig guide rail 52 from detaching from the guide seat 51, thereby playing a stabilizing role.
[0043] The anchor rod guide device 54 includes a guide bracket 541. The end of the drilling rig guide rail 52 is provided with a guide bracket 541. A guide hole is provided at the top of the guide bracket 541. A guide sleeve 542 is provided in the guide hole. The guide sleeve 542 is used to guide the drill rod and the anchor rod. The guide bracket 541 is used to support the guide sleeve 542. The guide hole and the guide sleeve 542 are both semi-annular structures, which play a supporting role to avoid the problem of the drill rod or the anchor rod falling due to gravity and other reasons when it is used, resulting in poor drilling accuracy. The height of the guide bracket 541 is adjustable, which is used to finely control the direction of the anchor rod. The above-mentioned guide sleeve 542 corresponds to the central axis hole 72 in the center of the docking seat 7, and the central axis hole 72 is for the drill rod and the anchor rod to pass through.
[0044] The drilling power machine 53 includes a drilling rig base 531, which is assembled on the drilling rig guide rail 52 and is provided with a pair of guide blocks 532 matching a pair of rails 521. A hydraulic motor 533 is provided on the drilling rig base, and a drill rod connecting base 534 is connected to the driving end of the hydraulic motor 533. The drilling rig base 531 is connected to the telescopic end of the hydraulic propulsion rod 523.
[0045] In the specific implementation process, the hydraulic propulsion rod 523 controls the drilling rig base 531 to move linearly on the drilling rig guide rail 52 to complete the feeding of the drill rod or anchor rod. The mutual limitation of a pair of guide blocks 532 and a pair of rails 521 plays a guiding role on the drilling rig base 531. The drill rod connecting seat 534 is used to mount the drill rod or anchor rod, and then the axial direction of the drill rod connecting seat 534 corresponds to the axial direction of the guide sleeve 542 on the docking seat 7 to keep the drilling direction of the drill rod straight. While the hydraulic propulsion rod 523 pushes the drilling rig base 531 forward, the hydraulic motor 533 synchronously drives the drill rod connecting seat 534 to rotate, thereby driving the drill rod to rotate, and completing the drilling pre-embedding of the slope.
[0046] The end of the drilling rig guide rail 52 is provided with a docking seat 7, which is used to contact the working surface of the slope. At least two pairs of stabilizing nails 71 are arranged in a ring array on the docking seat 7. The docking seat 7 contacts the wall of the slope, and at least two pairs of stabilizing nails 71 on the docking seat 7 are aligned with the working surface and inserted into the rock mass, so as to stabilize the docking seat 7 and thus the posture of the entire drilling rig. At the same time, during the operation of the drilling rig, the stones and slag generated by drilling are discharged through the discharge channel on the docking seat 7; the docking seat 7 is a plate with a semicircle, and a central axis hole 72 is opened in the center of the semicircle, which corresponds to the drilling axis of the drilling rig through the central axis hole 72, which plays a role in stabilizing the guide.
[0047] In summary, the embedded machine for protective slope management is transported by a vehicle-mounted chassis 1, and the horizontal orientation of the drilling mechanism is adjusted by a large-structure rotating base 2. A pair of synchronous stabilizers 6 cooperate with the telescopic guide rail 41 to act as a triangular support to improve stability. The drilling angle is precisely controlled by controlling the synchronous stabilizer 6, and the stabilizing device at the front of the drilling rig is used to further enhance the stability of the drilling mechanism 5, thereby improving the drilling accuracy and the embedded quality of the anchor rod.
[0048] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A protective slope management embedded machine, comprising a vehicle-mounted chassis (1), the vehicle-mounted chassis (1) being a crawler-type or wheeled vehicle, the vehicle-mounted chassis (1) being provided with a rotating base (2), the rotating base (2) being equipped with a hydraulic pump station (3), It is characterized in that The rotating base (2) is provided with a lifting controller (4), and the lifting controller (4) is provided with a drilling mechanism (5); The drilling mechanism (5) comprises a guide seat (51), the guide seat (51) is assembled and connected with the lifting controller (4), a drilling rig guide rail (52) is assembled on the guide seat (51), a drilling power machine (53) is arranged on the drilling rig guide rail (52), and an anchor guide device (54) is connected to the drilling rig guide rail (52) to correspond to the drilling power machine (53); The lifting controller (4) is composed of a multi-section foldable telescopic guide rail (41) and a hydraulic control cylinder (42), wherein the hydraulic control cylinder (42) is mounted on a rotating base (2), the telescopic end of the hydraulic control cylinder (42) is movably connected to the telescopic guide rail (41), and the hydraulic control cylinder (42) is connected to a hydraulic pump station (3); A pair of synchronous stabilizers (6) is also provided on the rotating base (2), and the pair of synchronous stabilizers (6) is connected to the guide seat (51); The top end of the telescopic guide rail (41) is movably connected to the bottom surface of the guide seat (51) via a pin shaft, and the telescopic guide rail (41) cooperates with a pair of synchronous stabilizers (6) to adjust the orientation of the guide seat (51); A pair of guide controllers are arranged on both sides of the guide seat (51), and the pair of guide controllers are connected to the drilling rig guide rail (52) for adjusting the position of the drilling rig guide rail (52); A docking seat (7) is provided at the end of the drilling rig guide rail (52), and the docking seat (7) is used to contact the working surface of the slope. At least two pairs of stabilizing nails (71) are arranged in a circular array on the docking seat (7).
2. A protective slope management embedded machine according to claim 1, It is characterized in that The docking seat (7) is a plate with a semicircle, and a central axis hole (72) is opened at the center of the semicircle.
3. A protective slope management embedded machine according to claim 1, It is characterized in that The rotating base (2) is linked by a motor and a gear set.
4. A protective slope management embedded machine according to claim 1, It is characterized in that A pair of synchronous stabilizers (6) and the telescopic guide rail (41) are arranged in a herringbone shape.
5. A protective slope management embedded machine according to claim 1, It is characterized in that The synchronous stabilizer (6) comprises a stabilizing telescopic rod (61), which is a multi-stage hydraulic telescopic rod. The bottom end of the stabilizing telescopic rod (61) is movably connected to the rotating base (2), and the telescopic end of the stabilizing telescopic rod (61) is movably connected to the bottom of the guide seat (51) via a spherical movable joint (62).
6. A protective slope management embedded machine according to claim 1, It is characterized in that The anchor rod guiding device (54) comprises a guiding bracket (541), the end of the drilling rig guide rail (52) is provided with the guiding bracket (541), the top end of the guiding bracket (541) is provided with a guiding hole, a guiding sleeve (542) is provided in the guiding hole, and the guiding sleeve (542) is used to guide the drill rod and the anchor rod.
7. A protective slope management embedded machine according to claim 1, It is characterized in that The drilling rig guide rail (52) is a rectangular plate. A pair of rails (521) are symmetrically arranged on the top of the drilling rig guide rail (52). A pair of sliding grooves (522) are symmetrically opened on both sides of the guide seat (51). A hydraulic propulsion rod (523) is arranged between the pair of rails (521).
8. A protective slope management embedded machine according to claim 1, It is characterized in that The guide controller comprises a guide adjustment hydraulic cylinder. A pair of shaft seat grooves are provided on both sides of the guide seat (51). A guide adjustment cylinder (511) is installed in the shaft seat groove. The telescopic end of the guide adjustment cylinder (511) is connected to the bottom surface of the drilling rig guide rail (52) through a connecting block (512).
9. A protective slope management embedded machine according to claim 6, It is characterized in that The drilling power machine (53) comprises a drilling rig base (531), which is mounted on a drilling rig guide rail (52) and is provided with a pair of guide blocks (532) matching a pair of rails (521); a hydraulic motor (533) is provided on the drilling rig base, a drill rod connecting seat (534) is connected to the driving end of the hydraulic motor (533), and the drilling rig base (531) is connected to the telescopic end of the hydraulic propulsion rod (523); The axial direction of the drill rod connecting seat (534) corresponds to the guide sleeve (542) on the docking seat (7); The guide sleeve (542) corresponds to the central axis hole (72) at the center of the docking seat (7).
Citation Information
Patent Citations
Adjustable natural gas pipeline supporting frame
CN110701386A
Intelligent construction method and device for high slope and large cavern support
CN114575903A
Anchoring drilling device and system for slope reinforcement construction
CN115898267A
High steep boring construction equipment of side slope anchor
CN207377491U
Double-crawler-belt adjustable high slope jumbolter
CN210598817U