Magnetic type sedimentation monitoring device and use method thereof

Through the magnetic suction settlement monitoring device, the magnetic adsorption and screw-in structure is used to solve the cumbersomeness and insufficient accuracy of surface settlement monitoring in the prior art, and realizes intuitive and accurate settlement monitoring, which is suitable for tunnel construction and other Scene.

CN118980350AActive Publication Date: 2024-11-19XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY +1
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202411010309.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-19
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

The existing surface settlement monitoring methods are cumbersome, costly and insufficiently accurate, so it is impossible to intuitively monitor the settlement of rock and soil, especially in tunnel construction, which is difficult to meet safety monitoring needs.

Method used

A magnetic suction settlement monitoring device is designed, including connectors, monitoring mechanisms, settlement monitoring points and folding brackets. It is installed and disassembled through magnetic adsorption and screw-in, and the settlement amount is intuitively monitored by the scale changes of the rubber piston. .

Benefits of technology

It realizes settlement monitoring with simple structure, convenient installation and disassembly and intuitive detection effect, and can accurately monitor the settlement amount of rock and soil, and is suitable for tunnel construction and other scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980350A_ABST
    Figure CN118980350A_ABST
Patent Text Reader

Abstract

The invention discloses a magnetic type settlement monitoring device and a use method thereof, relates to the technical field of foundation settlement monitoring, and particularly aims to solve the problems of tedious installation and measurement steps during leveling instrument measurement and total station measurement of land settlement and large positioning precision error during GPS positioning measurement of the land settlement in the background technology. Through the arrangement of the connecting piece, the monitoring mechanism, the settlement monitoring points and the folding bracket in the magnetic settlement monitoring device, the settlement amount of the corresponding settlement monitoring points can be visually monitored by observing the downward moving scale number of the rubber piston, the installation and measurement are simple and convenient, the monitoring is more visual, the detection precision is high, and the detection efficiency is high. The device has the advantages of being simple in structure, convenient to assemble and disassemble and visual in detection effect, and effectively solves the problems existing in the background technology.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of foundation settlement monitoring, and in particular to a magnetic settlement monitoring device and a use method thereof. Background Art

[0002] While subways play an irreplaceable role in people's lives, their construction is also prone to cause a series of geotechnical engineering problems, especially surface subsidence. Surface subsidence caused by tunnel construction is common in construction. Due to the limitations of construction technology and the influence of geological conditions, tunnel construction will inevitably have an impact on the surface and its ground buildings.

[0003] In order to ensure the safety of tunnel construction and the normal use of ground buildings, it is necessary to monitor the surface settlement and deformation caused by tunnel construction. The current monitoring methods of surface settlement mainly include: (1) Level measurement, GPS positioning and total station measurement. When measuring with a level or total station, it is necessary to set a reference point in advance, and then use the position change of the reference point to judge the foundation settlement during the later measurement process. However, the level or total station needs to be centered and leveled each time a measurement is made, which makes the installation and measurement steps cumbersome. In addition, each measuring point needs to be recalibrated during the actual measurement. In addition, the level or total station equipment is expensive. Considering the cost of measurement, it is impossible to set up a level or total station at each measuring station. In addition, considering the accuracy error of GPS positioning, it is difficult to accurately capture the subtle settlement of landmarks. (2) At the same time, when measuring foundation settlement, traditional monitoring devices must rely on leveling instruments or total stations. Due to the limitations of construction space and surrounding environment, their actual use scenarios are greatly limited, and they cannot intuitively reflect the magnitude of the settlement of the rock and soil body, thus failing to intuitively and conveniently achieve the purpose of foundation settlement monitoring; In view of the above problems, it is urgent to design a new type of magnetic sedimentation monitoring device and its use method to solve the problems existing in the above-mentioned prior art. Summary of the invention

[0004] In view of the above-mentioned problems, the present invention aims to provide a magnetic settlement monitoring device and a method of using the same. The detection device, through the setting of connecting parts, monitoring mechanisms, settlement monitoring points and foldable brackets, can intuitively monitor the settlement amount at the corresponding settlement monitoring point by observing the scale number of downward movement of the rubber piston. It has the characteristics of simple structure, easy installation and disassembly and intuitive detection effect.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is as follows: A magnetic suction type settlement monitoring device, comprising a connecting piece, a monitoring mechanism, a settlement monitoring point and a foldable bracket; The connecting piece is a magnetic structure that is detachably arranged on the upper end of the monitoring mechanism and is used in conjunction with the foldable bracket; The monitoring mechanism is arranged between the connecting piece and the settlement monitoring point; The settlement monitoring point is arranged at the lower end of the monitoring mechanism; The foldable bracket is installed on the upper side of the settlement observation point and is used in conjunction with the connecting piece.

[0006] Preferably, the connecting piece comprises a square cover plate and a threaded sleeve; The square cover is a magnetic cover arranged on the top of the threaded sleeve and is used in conjunction with the foldable bracket; The threaded sleeve is a hollow sleeve, and an internal thread is arranged on the inner wall of the threaded sleeve for use in conjunction with the monitoring mechanism.

[0007] Preferably, the foldable bracket includes a magnetic crossbar and an insertion rod; The insertion rods are symmetrically arranged at both ends of the magnetic cross bar and connected to the magnetic cross bar through mechanical hinges; The magnetic cross bar is a magnetic rod and is used in conjunction with a square cover plate.

[0008] Preferably, the monitoring mechanism comprises a universal rotating assembly, a monitoring cylinder and a spring magnetic attraction assembly; The universal rotating assembly is arranged at the upper end of the monitoring cylinder and is detachably connected to the connecting piece; The monitoring cylinder body comprises a glass cylinder, and a top cover plate and a bottom cover plate arranged at the upper and lower ends of the glass cylinder; The spring magnetic attraction type component is movably arranged in the glass cylinder and is used in conjunction with the settlement monitoring point.

[0009] Preferably, the universal rotation assembly comprises a stud and a universal transmission member; The stud is arranged at the top of the universal transmission member and is used in conjunction with the connecting member; The universal transmission member is arranged at the lower end of the stud and is connected to the top cover plate.

[0010] Preferably, the glass tube is installed in the grooves of the top cover plate of the monitoring tube and the bottom cover plate of the monitoring tube; and scales for reading are evenly arranged from top to bottom on the surface of the glass tube.

[0011] Preferably, the spring magnetic suction type assembly comprises a rubber piston, a spring, a connecting rod and a magnetic disc; The rubber piston is bonded to the top of the connecting rod and has a diameter smaller than that of the glass cylinder; The spring movable sleeve is arranged on the connecting rod and is connected to the rubber piston; The connecting rod is arranged longitudinally and passes through the central circular hole of the bottom cover plate; The magnetic disc is fixedly arranged at the bottom of the connecting rod.

[0012] Preferably, the magnetic suction type settlement monitoring point comprises a magnetic monitoring plate and a pointed slender rod; The magnetic monitoring disc is arranged at the upper end of the slender rod and is used in conjunction with the magnetic disc; The slender rod is arranged at the bottom center of the magnetic monitoring plate, and the lower end of the slender rod is a pointed structure.

[0013] A method for using a magnetic suction type settlement monitoring device, comprising: Steps: Assembly Install and monitor Insert the slender rod into the surface rock and soil of the settlement observation point to fix the magnetic settlement monitoring point; adsorb the monitoring tube to the lower surface of the foldable bracket through the connecting piece, let the spring overcome the settlement of the magnetic settlement monitoring point caused by its own gravity, and compensate the height of the settlement monitoring device by adjusting the degree of screw connection between the threaded sleeve and the stud, so that when the magnetic disc is adsorbed on the surface of the magnetic monitoring disc, the spring is not in a compressed state, and the settlement scale is zero at this time, and the lower end tip of the magnetic monitoring disc points to the settlement monitoring point; When sedimentation occurs, the amount of sedimentation can be obtained by observing the number of scales that the rubber piston moves downward.

[0014] Preferably, the assembly process described in step includes First, the foldable bracket is opened by mechanical hinges, and the tip of the plug rod end of the foldable bracket is inserted into the rock and soil around the monitoring settlement observation point to fix the foldable bracket; Then, screw the connector onto the stud through a threaded sleeve, and the universal rotating assembly will keep the monitoring mechanism in a vertical state; bond the top of the spring to the bottom of the rubber piston, open the bottom cover, place the rubber piston and spring inside the monitoring cylinder, and install the bottom cover; Then pass the connecting rod through the circular hole of the bottom cover plate, and bond the upper end of the connecting rod to the rubber piston; Finally, through the interaction between the magnetic disc and the magnetic monitoring disc, the magnetic suction type settlement monitoring point is installed at the lower end of the monitoring mechanism.

[0015] The beneficial effects of the present invention are as follows: the present invention discloses a magnetic suction type settlement monitoring device and a method for using the same. Compared with the prior art, the present invention has the following improvements: 1. The present invention designs a magnetic suction type settlement monitoring device, including a connecting piece, a monitoring mechanism, a settlement monitoring point and a folding bracket. When in use: insert a pointed slender rod into the surface rock and soil to fix the magnetic suction type settlement monitoring point; adsorb the monitoring tube to the lower surface of the folding bracket through the connecting piece, so that the spring overcomes the settlement of the magnetic suction type settlement monitoring point caused by its own gravity, and compensates for the height of the settlement monitoring device by adjusting the degree of screw connection between the threaded sleeve and the stud, so that when the magnetic disc is adsorbed on the surface of the magnetic monitoring disc, the spring is not in a compressed state, and the settlement scale is 0 at this time, and the lower end tip of the magnetic monitoring disc points to the settlement monitoring point; the magnetic suction type settlement monitoring device settles with the settlement of the rock and soil body, and the magnetic suction type settlement monitoring device drives the magnetic disc adsorbed with the magnetic monitoring disc to settle, thereby causing the rubber piston to squeeze downward, and then the settlement change amplitude can be judged by observing the scale change of the monitoring tube body, so as to intuitively obtain the settlement amount; 2. All structures of this magnetic settlement monitoring device are connected by magnetic adsorption or screw connection, which is convenient for installation and disassembly. It has the advantages of simple structure, easy installation and disassembly, and intuitive detection effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the magnetic suction type settlement monitoring device of the present invention.

[0017] Figure 2 It is an exploded view of the magnetic suction type settlement monitoring device of the present invention.

[0018] Figure 3 It is a schematic diagram of the structure of the foldable bracket of the present invention after being unfolded.

[0019] Figure 4 It is a schematic diagram of the structure of the foldable bracket of the present invention after being folded.

[0020] Figure 5 It is a partial enlarged view of the connection of the foldable bracket of the present invention.

[0021] Figure 6 It is a schematic structural diagram of the connecting piece of the present invention.

[0022] Figure 7 It is a schematic diagram of the structure of the monitoring mechanism of the present invention.

[0023] Figure 8 It is a structural schematic diagram of the universal rotating assembly of the present invention.

[0024] Fig. 9 It is a schematic structural diagram of the monitoring cylinder body of the present invention.

[0025] Fig.10 It is a structural schematic diagram of the spring magnetic attraction component of the present invention.

[0026] Fig.11 It is a structural schematic diagram of the settlement monitoring point of the present invention.

[0027] Among them: 1. Connector, 2. Monitoring mechanism, 3. Settlement monitoring point, 4. Folding bracket, 5. Square cover, 6. Threaded sleeve, 7. Universal rotating assembly, 8. Monitoring cylinder body, 9. Spring magnetic assembly, 10. Stud, 11. Universal transmission part, 12. Top cover, 13. Glass cylinder, 14. Bottom cover, 15. Rubber piston, 16. Spring, 17. Connecting rod, 18. Magnetic disc, 19. Magnetic monitoring disc, 20. Slender rod, 21. Mechanical hinge. DETAILED DESCRIPTION

[0028] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0029] Embodiment 1: refer to the attached Figure 1-11 The magnetic suction type settlement monitoring device shown in the figure comprises a connecting member 1, a monitoring mechanism 2, a settlement monitoring point 3 and a foldable bracket 4; wherein The connecting member 1 is a magnetic structure that is detachably arranged on the upper end of the monitoring mechanism 2 and is used in conjunction with the foldable bracket 4; The monitoring mechanism 2 is arranged between the connecting member 1 and the settlement monitoring point 3, and is used to monitor the foundation settlement; The settlement monitoring point 3 is arranged at the lower side of the monitoring mechanism 2, and is used to locate the position of the settlement observation point, so that the monitoring mechanism 2 can accurately monitor the settlement amount of the settlement observation point; The foldable bracket 4 is fixedly installed on the upper side of the settlement observation point and is used in conjunction with the connecting piece 1. That is, when in use, the monitoring mechanism 2 and the settlement monitoring point 3 are suspended at the settlement observation point by utilizing the interaction between the foldable bracket 4 and the connecting piece 1 to monitor the settlement amount of the settlement observation point.

[0030] Preferably, in order to quickly connect the connector 1 to the foldable bracket 4 during use, the connector 1 is designed to include a magnetic square cover plate 5 and a threaded sleeve 6; wherein, The magnetic square cover plate 5 is welded to the top of the threaded sleeve 6 and is used in conjunction with the foldable bracket 4; The threaded sleeve 6 is a hollow sleeve, and an internal thread is provided on the inner wall of the threaded sleeve 6 for use in conjunction with the monitoring mechanism 2 .

[0031] Preferably, in order to monitor the settlement amount at the settlement observation point during use, the monitoring mechanism 2 is designed to include a universal rotating component 7, a monitoring cylinder 8 and a spring magnetic suction component 9; The universal rotating assembly 7 is arranged at the upper end of the monitoring cylinder body 8 and plays a connecting role, and is used to connect the monitoring cylinder body 8 with the connecting member 1; The monitoring tube body 8 includes a glass tube 13 with scales, and a monitoring tube top cover 12 and a monitoring tube bottom cover 14 arranged at the upper and lower ends of the glass tube 13 with scales; The spring magnetic component 9 is movably arranged in the glass cylinder 13 and is used in conjunction with the settlement monitoring point 3 to monitor the lifting amount of the settlement observation point.

[0032] Preferably, in order to connect the monitoring cylinder 8 with the connecting member 1, the universal rotation assembly 7 is designed to include a stud 10 and a universal transmission member 11; The stud 10 is arranged at the top of the universal transmission member 11 and is used in conjunction with the threaded sleeve 6, that is, when in use, the connection member 1 is connected to the monitoring mechanism 2 through the screw connection between the stud 10 and the threaded sleeve 6; The universal transmission member 11 is arranged at the lower end of the stud 10 and is welded to the top of the top cover plate 12 of the monitoring tube.

[0033] Preferably, the glass tube 13 is installed in the grooves of the top cover plate 12 of the monitoring tube and the bottom cover plate 14 of the monitoring tube; and scales are evenly arranged from top to bottom on the surface of the glass tube 13 to facilitate observation of surface settlement during use.

[0034] Preferably, the lifting amount of the settlement observation point is monitored, and the spring magnetic suction assembly 9 is designed to include a rubber piston 15, a spring 16, a connecting rod 17 and a magnetic disc 18; wherein The rubber piston 15 is disposed on the top of the connecting rod 17 and is bonded to the connecting rod 17; The spring 16 is sleeved on the outside of the connecting rod 17 and bonded to the bottom of the rubber piston 15; The connecting rod 17 is arranged longitudinally and passes through the central circular hole of the bottom cover plate 14 of the monitoring tube; The magnetic disc 18 is disposed at the bottom of the connecting rod 17 and is welded to the connecting rod 17 .

[0035] Preferably, in order to facilitate the downward movement of the connecting rod 17 with the rubber piston 15 when sedimentation occurs, the diameter of the rubber piston 15 is designed to be slightly smaller than the diameter of the glass cylinder 13 .

[0036] Preferably, in order to facilitate installation at the lower end of the monitoring mechanism 2 and positioning of the settlement observation point, the magnetic settlement monitoring point 3 is designed to include a magnetic monitoring plate 19 and a pointed slender rod 20; The magnetic monitoring disk 19 is arranged at the upper end of the pointed slender rod 20 and is used in conjunction with the magnetic disc 18, that is, when in use, the monitoring mechanism 2 is connected to the magnetic suction type sedimentation monitoring point 3 through the mutual adsorption between the magnetic monitoring disk 19 and the magnetic disc 18; The pointed slender rod 20 is arranged at the bottom center of the magnetic monitoring plate 19, and its lower end is a pointed structure, which is used to directly point out and locate the position of the settlement observation point when in use.

[0037] Preferably, in order to facilitate the suspension of the device on the upper side of the settlement observation point when in use, the foldable bracket 4 is designed to include a magnetic cross bar and an insertion rod, the insertion rods are symmetrically arranged at both ends of the magnetic cross bar, and are connected to the magnetic cross bar through a mechanical hinge 21. When in use, the insertion rods are inserted into the rock and soil around the settlement monitoring point to install and fix the foldable bracket. The magnetic cross bar is used in conjunction with the square cover plate 5, that is, when in use, the connector 1 is installed on the lower side of the foldable bracket 4 through the magnetic attraction between the magnetic cross bar and the threaded sleeve 6.

[0038] The method for using the magnetic suction type settlement monitoring device in this embodiment includes: Step 1: Assembly First, the foldable bracket 4 is opened by means of the mechanical hinge 21, and the tip of the end of the insertion rod of the foldable bracket 4 is inserted into the rock and soil around the desired monitoring settlement observation point to fix the foldable bracket; Secondly, the connector 1 is screwed onto the stud 10 at the top of the universal rotating assembly 7 through the threaded sleeve 6, and the universal rotating assembly 7 will keep the monitoring mechanism 2 in a vertical state; the top of the spring 16 is bonded to the bottom of the rubber piston 15, the bottom cover plate 14 of the monitoring tube is opened, the rubber piston 15 and the spring 16 are placed inside the monitoring tube body 8, and the bottom cover plate 14 of the monitoring tube is installed; then the connecting rod 17 is passed through the round hole of the bottom cover plate 14 of the monitoring tube and bonded to the bottom of the rubber piston 15; Step 2: Install and monitor Finally, insert the pointed slender rod 20 into the surface rock and soil to fix the magnetic settlement monitoring point 3; adsorb the monitoring tube 2 to the lower surface of the foldable bracket 4 through the connecting piece 1, so that the spring 16 can overcome the settlement of the magnetic settlement monitoring point 3 caused by its own gravity, and compensate for the height of the settlement monitoring device by adjusting the degree of screw connection between the threaded sleeve 6 and the stud 10, so that when the magnetic disc 18 is adsorbed on the surface of the magnetic monitoring disc 19, the spring 16 is not in a compressed state, and the settlement scale is zero at this time, and the lower end tip of the magnetic monitoring disc 19 points to the settlement monitoring point; when settlement occurs, the settlement amount can be obtained by observing the number of scales moved downward by the rubber piston 15.

[0039] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A magnetic sedimentation monitoring device, characterized in that: It comprises a connecting piece (1), a monitoring mechanism (2), a settlement monitoring point (3) and a foldable bracket (4); The connecting piece (1) is a magnetic structure that is detachably arranged on the upper end of the monitoring mechanism (2) and is used in conjunction with the foldable bracket (4); The monitoring mechanism (2) is arranged between the connecting piece (1) and the settlement monitoring point (3); The settlement monitoring point (3) is arranged at the lower end of the monitoring mechanism (2); The foldable bracket (4) is installed on the upper side of the settlement observation point and is used in conjunction with the connecting piece (1).

2. A magnetic suction type settlement monitoring device according to claim 1, characterized in that: The connecting piece comprises a square cover plate (5) and a threaded sleeve (6); The square cover plate (5) is a magnetic cover plate arranged on the top of the threaded sleeve (6) and is used in conjunction with the foldable bracket (4); The threaded sleeve (6) is a hollow sleeve, and an internal thread is provided on the inner wall of the threaded sleeve (6) for use in conjunction with the monitoring mechanism (2).

3. A magnetic suction type settlement monitoring device according to claim 2, characterized in that: The foldable bracket (4) comprises a magnetic crossbar and an insertion rod; The insertion rods are symmetrically arranged at both ends of the magnetic cross bar and are connected to the magnetic cross bar via a mechanical hinge (21); The magnetic cross bar is a magnetic rod and is used in conjunction with the square cover plate (5).

4. A magnetic suction type settlement monitoring device according to claim 1, characterized in that: The monitoring mechanism (2) comprises a universal rotating assembly (7), a monitoring cylinder (8) and a spring magnetic attraction assembly (9); The universal rotating assembly (7) is arranged at the upper end of the monitoring barrel (8) and is detachably connected to the connecting piece (1); The monitoring cylinder body (8) comprises a glass cylinder (13), and a top cover plate (12) and a bottom cover plate (14) arranged at the upper and lower ends of the glass cylinder (13); The spring magnetic attraction component (9) is movably arranged in the glass cylinder (13) and is used in conjunction with the settlement monitoring point (3).

5. A magnetic suction type settlement monitoring device according to claim 4, characterized in that: The universal rotating assembly (7) comprises a stud (10) and a universal transmission member (11); The stud (10) is arranged at the top end of the universal transmission member (11) and is used in conjunction with the connecting member (1); The universal transmission member (11) is arranged at the lower end of the stud (10) and is connected to the top cover plate (12).

6. A magnetic suction type settlement monitoring device according to claim 4, characterized in that: The glass tube (13) is installed in the grooves of the top cover plate (12) of the monitoring tube and the bottom cover plate (14) of the monitoring tube; and scales for reading are evenly arranged from top to bottom on the surface of the glass tube (13).

7. A magnetic suction type settlement monitoring device according to claim 4, characterized in that: The spring magnetic attraction assembly (9) comprises a rubber piston (15), a spring (16), a connecting rod (17) and a magnetic disc (18); The rubber piston (15) is bonded to the top of the connecting rod (17) and has a diameter smaller than that of the glass cylinder (13); The spring (16) is movably sleeved on the connecting rod (17) and connected to the rubber piston (15); The connecting rod (17) is arranged longitudinally and passes through the central circular hole of the bottom cover plate (14); The magnetic disc (18) is fixedly arranged at the bottom of the connecting rod (17).

8. A magnetic suction type settlement monitoring device according to claim 7, characterized in that: The magnetic suction type sedimentation monitoring point (3) comprises a magnetic monitoring plate (19) and a pointed slender rod (20); The magnetic monitoring disk (19) is arranged at the upper end of the slender rod (20) and is used in conjunction with the magnetic disc (18); The slender rod (20) is arranged at the bottom center of the magnetic monitoring plate (19), and the lower end thereof is a pointed structure.

9. A method for using the magnetic suction type settlement monitoring device according to claim 1, characterized in that: include Step 1: Assembly Install and monitor Inserting the slender rod (20) into the surface rock and soil of the settlement observation point to fix the magnetic settlement monitoring point (3); adsorbing the monitoring tube (2) to the lower surface of the foldable bracket (4) through the connecting piece (1), allowing the spring (16) to overcome the settlement of the magnetic settlement monitoring point (3) caused by its own gravity, and compensating the height of the settlement monitoring device by adjusting the degree of screw connection between the threaded sleeve (6) and the stud (10), so that when the magnetic disc (18) is adsorbed on the surface of the magnetic monitoring disc (19), the spring (16) is not in a compressed state, the settlement scale is zero, and the lower end tip of the magnetic monitoring disc (19) points to the settlement monitoring point; When sedimentation occurs, the amount of sedimentation can be obtained by observing the number of scales that the rubber piston (15) moves downward.

10. The method for using the magnetic suction type settlement monitoring device according to claim 9, characterized in that: The assembly process described in step 1 includes First, the foldable support (4) is opened by means of a mechanical hinge (21), and the tip of the end of the insertion rod of the foldable support (4) is inserted into the rock and soil around the monitoring settlement observation point, so as to fix the foldable support (4); Then, the connecting piece (1) is screwed onto the stud (10) through the threaded sleeve (6), and the universal rotating assembly (7) keeps the monitoring mechanism (2) in a vertical state. The top of the spring (16) is bonded to the bottom of the rubber piston (15), the bottom cover (14) is opened, the rubber piston (15) and the spring (16) are placed inside the monitoring cylinder (8), and the bottom cover (14) is installed. Then, the connecting rod (17) is passed through the circular hole of the bottom cover plate (14), and the upper end of the connecting rod (17) is bonded to the rubber piston (15); Finally, through the interaction between the magnetic disc (18) and the magnetic monitoring disc (19), the magnetic suction type sedimentation monitoring point (3) is installed at the lower end of the monitoring mechanism (2).

Citation Information

Patent Citations

  • Self-leveling surveying and mapping device suitable for soft land and used for construction engineering costs

    CN112797274A

  • Deep sea bottom floating sediment resettlement measuring device

    CN115979140A

  • Ground subsidence monitoring device

    CN209783579U

  • Portable multifunctional box staff for tunnel monitoring

    CN211121180U

  • Ground monitoring device for rail transit interval shield construction

    CN211576055U