Gas explosion simulation experiment analysis system for A-type structure pipe network

By designing the gas explosion simulation experimental analysis system of A-type structural pipeline network, the problem that the existing technology cannot simulate the overpressure propagation characteristics of gas explosion in the A-type structural pipeline network in the coal mine is solved, and high accuracy is achieved under the conditions of complex pipeline networks in the coal mine underground Simulation and safety experiments provide data support for gas explosion propagation laws.

CN118980717APending Publication Date: 2024-11-19CHONGQING UNIVERSITY OF SCIENCE AND TECHNOLOGY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411102756.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The existing gas explosion simulation device cannot effectively simulate the overpressure propagation characteristics of gas explosion in the A-structure pipeline tunnel of coal mine underground, and cannot achieve accurate overpressure data collection at various locations during the explosion process, and cannot meet the complex conditions of coal mine underground simulation requirements.

Method used

A gas explosion simulation experimental analysis system of A-type structural pipeline network is designed, including A-type structural pipeline network and straight pipeline network, with uniform pressure sensors and flame sensors. Overpressure data is collected in real time through high-frequency pressure acquisition device, and The gas-air mixed gas filling section is used to achieve sealing and cleaning of the experimental environment, the bracket is fixed to the pipeline network, and the system host analyzes the collected data to simulate the gas explosion propagation law.

Benefits of technology

It realizes complete simulation of complex pipeline networks under coal mines, provides high-precision gas explosion overpressure propagation data, ensures experiment safety, is suitable for pipeline networks of different cross-sectional sizes, and improves the adaptability and practicality of simulation experiments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980717A_ABST
    Figure CN118980717A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of mine gas explosion simulation, in particular to an A-type structure pipe network gas explosion simulation experiment analysis system which comprises an A-type structure pipe network and a straight pipe network communicated with the closed end of the A-type structure pipe network, and a plurality of pressure sensors and flame sensors are evenly distributed on the A-type structure pipe network and the straight pipe network respectively. Overpressure data collected by the multiple pressure sensors are transmitted to the pressure dynamic data high-frequency collecting device, the straight pipe network is divided into a gas-air mixed gas filling section and a mixed gas transmission section, a thin film is arranged between the gas-air mixed gas filling section and the mixed gas transmission section, an ignition device is arranged at the end of the gas-air mixed gas filling section, and the ignition device is connected with the straight pipe network. The gas and air mixed gas filling section can be communicated with a gas cylinder, a pipeline where an air compressor is located and a pipeline where a vacuum pump is located respectively. The A-type pipe network provided by the invention comprises almost all pipe network combination forms such as straight pipes, turning, forking and the like, and can more completely meet the simulation requirements under the complex pipe network condition of the underground coal mine roadway.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mine gas explosion simulation, and in particular to an A-type structure pipe network gas explosion simulation experimental analysis system. Background Art

[0002] Gas explosion accidents are prone to occur during the production process of coal mining enterprises, and the shock wave overpressure generated by them usually causes casualties and equipment and property losses. At present, the explosion simulation devices used to explore the overpressure propagation characteristics of gas explosions mainly include the internationally used 20L spherical explosion device, cylindrical Hartmann tube, linear pipeline test device, bend pipeline test device, bifurcated pipeline test device, etc. However, the technical problems are as follows: most of these devices are single closed or semi-closed independent spaces, and do not form an interlaced interconnected structure. The actual coal mine underground tunnels are complex and changeable, with various angle-connected passages, and one of the special tunnels is the A-type structural pipe network tunnel, which has pipeline characteristics such as bends, bifurcations and angle-connected structures. Therefore, the above test devices cannot simulate the impact of the A-type pipeline network on the overpressure propagation of gas explosions, nor can they realize the accurate overpressure data collection of each position of the A-type pipeline during the explosion, and cannot meet the simulation requirements under the conditions of complex pipe networks in coal mine underground tunnels. Summary of the invention

[0003] The present invention aims to provide an A-type structure pipe network gas explosion simulation experiment analysis system, which is used to carry out simulation experiments under complex pipe network conditions in coal mine underground tunnels.

[0004] A gas explosion simulation experiment and analysis system for an A-type structural pipe network comprises an A-type structural pipe network and a straight pipe network connected to the closed end of the A-type structural pipe network, wherein a plurality of pressure sensors and flame sensors are evenly distributed on the A-type structural pipe network and the straight pipe network respectively, overpressure data collected by the plurality of pressure sensors are transmitted to a high-frequency acquisition device for pressure dynamic data, the straight pipe network is divided into a gas-air mixed gas filling section and a mixed gas propagation section, a film is provided between the gas-air mixed gas filling section and the mixed gas propagation section, an ignition device is provided at the end of the gas-air mixed gas filling section, and the gas-air mixed gas filling section can be respectively connected to a gas cylinder, a pipeline where an air compressor is located, and a pipeline where a vacuum pump is located.

[0005] The beneficial effects of the present invention are as follows: 1. The A-type pipe network provided by the present invention includes almost all pipe network combinations such as straight pipes, bends, and forks, which can more completely meet the simulation requirements under the complex pipe network conditions of coal mine underground tunnels. 2. The pressure sensor, high-speed data acquisition device and other high-precision equipment provided by the present invention can provide real-time feedback on the propagation changes of gas explosion overpressure in the pipeline, and the data feedback is accurate. 3. The gas-air mixed gas filling section can be connected to the gas cylinder, the pipeline where the air compressor is located, and the pipeline where the vacuum pump is located, respectively, and since a thin film is provided between the gas-air mixed gas filling section and the mixed gas propagation section, it can be ensured that the gas-air mixed gas filling section is in a sealed state before the explosion experiment. Before the explosion experiment, the air in the gas-air mixed gas filling section can be extracted by a vacuum pump to achieve a near-vacuum environment. After the experiment, the residue in the pipeline can be discharged by the air compressor to keep the pipeline clean and the experimental site safe, safe and environmentally friendly.

[0006] The preferred embodiment of the present invention is that the gas-air mixed gas filling section is also connected to a circulation pipeline, and a circulation pump is provided on the circulation pipeline. The present invention can fully premix the air and gas in the gas-air mixed gas filling section by providing a circulation pump.

[0007] The preferred embodiment of the present invention is that a vacuum meter is provided on the gas-air mixed gas filling section. By providing a vacuum meter, the present invention can use the vacuum meter to accurately control the gas and air intake and perform gas distribution operations.

[0008] The preferred embodiment of the present invention is that it also includes a bracket, which is used to fix the A-type structure pipe network and the straight pipe network. The present invention fixes the A-type structure pipe network and the straight pipe network by setting a bracket to avoid the explosion impact causing the A-type structure pipe network and the straight pipe network to move and affect the experimental results.

[0009] The preferred implementation of the present invention is that: the A-type structural pipe network includes a first straight pipe, two second straight pipes located at both ends of the first straight pipe and vertically connected to the first straight pipe, and a third straight pipe located between the two second straight pipes and parallel to the first straight pipe, and the pressure sensors are respectively arranged on the pipe on the first straight pipe close to one of the second straight pipes, and the second straight pipe is located on the pipes on both sides of the third straight pipe and on the third straight pipe. The present invention arranges the pressure sensors respectively on the pipe on the first straight pipe close to one of the second straight pipes, and the second straight pipe is located on the pipes on both sides of the third straight pipe and on the third straight pipe, so as to realize the collection of overpressure values ​​on both sides of the corner of the first straight pipe and the second straight pipe, and the pipe network on both sides of the third straight pipe and the third straight pipe, that is, the bifurcation formed by the third straight pipe and the second straight pipe, so as to simulate and reflect the overpressure propagation on both sides of the corner and the bifurcation.

[0010] The preferred embodiment of the present invention is to conduct a gas explosion simulation experiment on A-type structure pipe networks and straight pipe networks with various cross-sectional sizes and collect the overpressure value and temperature value of each experiment. By conducting a gas explosion simulation experiment on A-type structure pipe networks and straight pipe networks with various cross-sectional sizes, the overpressure situation of gas explosion in A-type structure pipe networks with different cross-sectional sizes can be reflected, and the data collection is more comprehensive.

[0011] A preferred implementation of the present invention is that in order to prevent data loss and facilitate subsequent analysis of the collected overpressure data, the overpressure values ​​and temperature values ​​collected by each pressure sensor and temperature sensor in each experiment are remotely transmitted to the system host, and stored and analyzed by the system host.

[0012] The preferred implementation of the present invention is that the system host analyzes the propagation law of gas explosion in the A-type pipe network by comparing the overpressure peak values ​​collected by each pressure sensor. The pressure sensors at each measuring point can monitor the explosion overpressure data of each measuring point in real time, thereby obtaining the spatiotemporal evolution law of the explosion overpressure, on which the explosion overpressure peak value of each measuring point can be obtained. By analyzing and comparing the overpressure peak values ​​of each measuring point, the propagation law of gas explosion overpressure in the A-type tunnel can be simulated, providing theoretical guidance for the prevention and control of coal mine gas explosions.

[0013] A preferred implementation of the present invention is that the system host analyzes the relationship between the overpressure values ​​at various locations of the A-type structure pipeline network and the cross-sectional dimensions of the A-type structure pipeline network and the straight pipeline network during a gas explosion based on the overpressure values ​​collected by each pressure sensor in the A-type structure pipeline network and the straight pipeline network with different cross-sectional dimensions, thereby predicting the estimated overpressure values ​​at various locations of the A-type structure pipeline network with a real structure under the same explosion volume.

[0014] In real situations, the cross-sectional area of ​​the tunnel network under the mine is relatively large, and the longitudinal cross-sectional sizes of each tunnel section under the same mine may be different, and the sizes of the tunnel network in different mines may also be different, that is, the sizes of the tunnel network in the actual coal mine are diverse. Therefore, on the one hand, due to experimental limitations, the pipeline network in the experiment is usually not made very large, and on the other hand, it is impossible to simulate the gas explosion experiment for the pipeline network of each cross-sectional size. Therefore, in order to analyze the gas explosion overpressure of the real pipeline network through experiments, the system host is based on the A-type structure pipeline network with different cross-sectional sizes and the straight pipeline network. The overpressure value collected by each pressure sensor is analyzed, and the relationship between the overpressure value at each location of the A-type structure pipeline network and the cross-sectional dimensions of the A-type structure pipeline network and the straight pipeline network is analyzed, so as to predict the estimated overpressure value at each location of the A-type structure pipeline network of the actual structure under the same explosion volume. Since the system host analyzes the relationship between the overpressure value at each location of the A-type structure pipeline network and the cross-sectional dimensions of the A-type structure pipeline network and the straight pipeline network, no matter what the cross-sectional dimensions of the A-type structure pipeline network in the mine tunnel are in actual conditions, the present invention can predict the overpressure value at each location of the pipeline network if an explosion occurs, thereby increasing the practicality of the simulation experiment analysis system of the present invention and making it more adaptable. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The schematic diagram of the gas explosion simulation experimental analysis system of the A-type structure pipe network of the present invention is shown in FIG.

[0016] Figure 2 It is a schematic diagram of Example 1 of the A-type structure pipeline gas explosion simulation experimental analysis system of the present invention.

[0017] Figure 3 It is a schematic diagram of Example 2 of the A-type structure pipe network gas explosion simulation experimental analysis system of the present invention.

[0018] Figure 4 This is a diagram of overpressure and optical signals at various measuring points of the A-type pipe network of the A-type structure pipe network gas explosion simulation experiment analysis system of the present invention.

[0019] Figure 5 This is a graph showing the changes in overpressure peak and flame speed attenuation rate of the gas explosion simulation experiment analysis system of the A-type structure pipe network of the present invention.

[0020] Figure 6 It is a schematic diagram of the structure of the bracket in the gas explosion simulation experimental analysis system of the A-type structure pipe network of the present invention. DETAILED DESCRIPTION

[0021] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described below are only used to explain the present invention and will not limit the protection scope of the present invention.

[0022] The terms "first", "second" and the like in the specification, claims and embodiments of the present application are used to distinguish similar objects rather than to describe a specific order or sequential sequence.

[0023] The present invention is further described in detail below through preferred specific embodiments:

[0024] The figure marks in the drawings of the specification include: straight pipe network 1, A-type structural pipe network 2, gas cylinder 3, ignition device 4, vacuum pump 5, circulation pump 6, vacuum gauge 7, plastic film 8, air compressor 9, combustible gas deflagration / detonation test device controller 10, pressure data collector 11, system host 12, pressure sensor 13, vertical beam 14, support beam 15, first support section 1501, second support section 1502, connecting beam 16, limit plate 17, end plate 18, tension spring 19, reinforcement rib 20.

[0025] As attached Figure 1 As shown: the A-type structure pipe network gas explosion simulation experiment analysis system disclosed in this embodiment includes an A-type structure pipe network 2 and a straight pipe network 1 connected to the closed end of the A-type structure pipe network 2. The A-type structure pipe network 2 and the straight pipe network 1 used in this embodiment are made of high-quality steel that is heat-resistant and pressure-resistant, and a rubber gasket or asbestos gasket is set at the flange where the pipes are spliced, which has good sealing, high temperature and high pressure resistance and corrosion resistance. A plurality of small holes are set on the pipe to install the pressure sensor 13 and the flame sensor during the experiment. The A-type structure pipe network 2 and the straight pipe network 1 have a total length of 18m and a total width of 7m. The outer diameter of the pipe is 200mm and the wall thickness is 20mm. In other embodiments, the outer diameter of the pipe can also be 250mm, 300mm or 350mm. The straight pipe network 1 described in this embodiment is divided into two parts: a 9.5m long gas-air mixed gas filling section and a mixed gas propagation section, and the two sections are separated by a plastic film 8.

[0026] In this embodiment, in order to stabilize the experimental pipeline, the system is equipped with a bracket, which is used to support and fix the A-type structure pipe network 2 and the straight pipe network 1. Figure 6As shown, in this embodiment, the bracket includes a vertical beam 14 and two support beams 15 arranged opposite to each other at the upper part of the vertical beam 14, each support beam 15 includes a horizontal first support section 1501 and an outwardly inclined second support section 1502, and the support space enclosed between the two support beams 15 can be adaptively adjusted based on pipes of different cross-sectional sizes, specifically: the vertical beam 14 adopts a square steel pipe, and two mounting holes are respectively opened on the opposite sides of the upper part of the vertical beam 14, and the horizontal support section of each support beam 15 passes through the mounting hole and extends into the interior of the vertical beam 14, and the inner end of the horizontal support section of each support beam 15 has an end plate 18, and a connecting beam 16 is provided between the two first support sections 1501, and a through hole is opened on each end plate 18, and the two ends of the connecting beam 16 pass through the through hole respectively, and limit plates 17 are respectively provided at the two ends of the connecting beam 16, and a plurality of tension springs 19 are circumferentially provided between the two end plates 18 of the two first support sections 1501. In this embodiment, a reinforcing rib 20 is further provided between the side of the vertical beam 14 and the bottom of the first supporting section 1501. The bottom of the reinforcing rib 20 is hinged to the side of the vertical beam 14. A strip groove with an opening facing downward is opened at the bottom of the first supporting section 1501. A plurality of slots are evenly spaced at the bottom of the strip groove. The slot walls on both sides of each slot are inclined. When the space enclosed by the two supporting beams 15 changes, the top of the reinforcing rib 20 can be inserted into different slots. When the supporting beam 15 moves outward, the top of the reinforcing rib 20 can slide out from the inclined side wall of the current slot and slide into the corresponding other slots for auxiliary support.

[0027] When no pipeline is placed (the pipeline described in this embodiment includes the pipeline of the A-type structure pipeline network 2 and the pipeline of the straight pipeline network 1, and each pipeline is assembled by flanges), the two support beams 15 are close to each other under the tension of the tension spring 19, and the enclosed space is the smallest at this time. When the pipeline is placed, under the action of the side wall of the pipeline, the two support beams 15 will overcome the tension of the tension spring 19 and pull outward under the guidance of the connecting beam 16 in order to adapt to the outer diameter of the pipeline, thereby increasing the enclosed space between the two support beams 15 for installing the pipeline, and under the action of the restoring force of the tension spring 19, the second support sections 1502 of the two support beams 15 will be tightly against the side wall of the pipeline, and further through the action of the reinforcing ribs 20, the support is stable and firm. The connecting beam 16 not only plays the role of adjusting and guiding, but also the limiting plates 17 at both ends of the connecting beam 16 and the end plate 18 of the first support section 1501 cooperate to limit the two support beams 15. The bracket of this scheme can be adaptively adjusted according to the outer diameter of different pipes, and the reinforcing rib 20 can also automatically adjust the auxiliary support position. Through the above design, it is avoided that when conducting pipe experiments with different cross-sectional sizes (that is, outer diameter sizes), different specifications of brackets need to be separately equipped each time, thereby reducing the experimental cost. Usually, the bracket has a certain height, which is generally higher than the human body height, and manual adjustment is extremely inconvenient. Through the above design, no manual adjustment is required, and the operation is more convenient and labor-saving.

[0028] In this embodiment, a plurality of pressure sensors 13 and flame sensors are evenly distributed on the A-type structure pipe network 2 and the straight pipe network 1, respectively. Specifically, the A-type structure pipe network 2 includes a first straight pipe, two second straight pipes located at both ends of the first straight pipe and vertically connected to the first straight pipe, and a third straight pipe located between the two second straight pipes and parallel to the first straight pipe. The pressure sensors 13 are respectively arranged on the pipes on one side of the first straight pipe close to one of the second straight pipes, and the second straight pipes are located on the pipes on both sides of the third straight pipe and on the third straight pipe.

[0029] The gas-air mixed gas filling section can be connected to the gas cylinder 3, the pipeline where the air compressor 9 is located, and the pipeline where the vacuum pump 5 is located. The gas cylinder 3, the air compressor 9 and the vacuum pump 5 form the gas distribution device of the present invention, and valves are provided at the connection points with the gas cylinder 3, the pipeline where the air compressor 9 is located, and the pipeline where the vacuum pump 5 is located. The gas-air mixed gas filling section is also connected to a circulation pipeline, and a circulation pump 6 is provided on the circulation pipeline. By setting the circulation pipeline and the circulation pump 6, the air and gas can be fully pre-mixed. A vacuum gauge 7 is provided on the gas-air mixed gas filling section. In this embodiment, the air compressor 9 is equipped to extract the residues in each pipeline after the experiment is over, so as to facilitate the next test. Furthermore, since the residues are mainly located in the gas-air mixed gas filling section, coal powder will be filled in the gas-air mixed gas filling section during the experiment. Therefore, in order to discharge the residues from the pipeline more thoroughly, after the experiment is over, the circulation pump 6 is turned on for a period of time to allow the residual gas and solid powder in the pipeline to float and circulate, and then the air compressor 9 is turned on together. Compared with the solid secretion and deposition at the bottom of the pipeline, the solid powder residue is mixed with the residual gas and flowed, and then extracted by the air compressor 9, so that the residual gas and solid powder residue in the pipeline can be removed more thoroughly.

[0030] An ignition device 4 is provided at the end of the gas-air mixed gas filling section, and the ignition device 4 includes an ignition electrode, an electric fuse, a wire and a DC regulated power supply. Under the premise of ensuring safety and ease of operation, two electrodes that are close to each other are connected by a fuse and installed at the end of the closed end of the straight pipe network 1. The maximum voltage on the electrode can reach 36V. After the ignition button on the high-speed data acquisition device is triggered, the electric spark will generate ignition energy, ignite the methane-air premixed gas and explode. After ignition, the fuse will be disconnected, so a new fuse needs to be replaced before each experiment.

[0031] The gas explosion simulation experiment and analysis system of the A-type structure pipe network in this embodiment also includes a dynamic data acquisition device, which includes a high-speed data acquisition device and a pressure transmitter. The overpressure information collected by each pressure sensor 13 and the flame information collected by the flame sensor are transmitted to the high-speed data acquisition device, and A / D conversion is performed. The pressure transmitter can convert the pressure signal into a pneumatic or electric signal, and control and transmit it to the system host 12. In this embodiment, the high-speed data acquisition device is mainly composed of a data acquisition circuit, data processing, data storage, power supply module, etc. This embodiment also includes a combustible gas deflagration / detonation test device controller, which can be integrated on the dynamic data acquisition device. The main function of the combustible gas deflagration / detonation test device controller in this experiment is to control the ignition device 4.

[0032] A gas explosion simulation experiment is conducted on the A-type structure pipe network 2 and the straight pipe network 1 of various cross-sectional sizes, and the overpressure value and temperature value of each experiment are collected. The overpressure value and temperature value collected by each pressure sensor 13 and temperature sensor in each experiment are remotely transmitted to the system host 12, and stored and analyzed by the system host 12. The system host 12 analyzes the propagation law of the gas explosion in the A-type pipe network by comparing the overpressure peak values ​​collected by each pressure sensor 13.

[0033] After the present invention utilizes the gas distribution device and the ignition device 4 for ignition, the pressure sensors 13 installed at each measuring point of the assembled A-type structure pipe network 2 and the straight pipe network 1 can monitor the explosion overpressure data of each measuring point in real time, thereby obtaining the spatiotemporal evolution law of the explosion overpressure. On this basis, the explosion overpressure peak value of each measuring point can be obtained. Through the analysis and comparison of the overpressure peak values ​​of each measuring point, the propagation law of the gas explosion overpressure in the A-type structure pipe network 2 is simulated, providing theoretical guidance for the prevention and control of coal mine gas explosions.

[0034] In the present invention, when the system host analyzes the gas explosion of the A-type structure pipe network, a two-dimensional model is established, and the model is meshed, and numerical simulation is used for calculation. The propagation process of the gas explosion can be assumed to be an ideal gas accelerated expansion process due to heat, following the conservation of mass, momentum and energy. This scheme selects the Standardk-epsilon model that is effective for turbulent flow with high Reynolds numbers to describe the turbulent process. The Standardk-epsilon model can well match the turbulent flow with high Reynolds numbers, and can simulate and verify the required results. Therefore, the turbulent kinetic energy equation (k equation) and the dissipation rate transport equation (equation) required to be solved by using this model to describe the flow field characteristics are as shown below:

[0035] k equation:

[0036]

[0037] Epsilon equation:

[0038]

[0039] in:

[0040]

[0041] In this embodiment, the system host analyzes the explosion overpressure as follows:

[0042] (1) The explosion overpressure appears before the flame front, and two peaks appear in the overpressure and flame waveforms. The gas explosion produces the first peak, but the duration is relatively short, while the overpressure generated by coal dust participating in the explosion is greater.

[0043] (2) In the corner-connected branch, as the distance from the explosion source increases, the overpressure peak and the flame propagation speed both show a trend of gradually decreasing, and the flame duration shows a trend of first increasing and then decreasing. In addition, a high-pressure superposition area is formed in the middle of the corner-connected branch, which has a strong destructive force on this area. However, regardless of whether coal dust is added or not, the flame signal in the middle of the corner-connected branch is very weak, and the high-temperature flame damage is relatively light.

[0044] (3) The laying of coal dust of different masses and particle sizes has a significant impact on the propagation characteristics of gas-coal dust mixed explosions. As the mass of coal dust increases, the overpressure peak value, flame propagation velocity, and flame duration at each measuring point increase first and then decrease; as the coal dust particle size range increases, the overpressure peak value and flame propagation velocity at each measuring point increase first and then decrease, but the change in flame duration is not much different.

[0045] More specifically, in this scheme, the A-type pipe network has five groups of measuring points. In the gas filling area, the gas premix is ​​continuously ignited, and the propagation of the flame front causes the gas to heat and expand rapidly, producing high-temperature and high-pressure gas, forming a pressure wave that breaks through the film. At the same time, the flame generated by the explosion follows the shock wave and forms a flame front. Both enter the complex pipeline to form a two-wave three-zone structure. The propagation direction of the flame front is affected by the overpressure peak, propagating from the high-pressure area to the low-pressure area. The shock wave speed is greater than the flame speed. In the A-type pipe network, since the shock wave reaches the branch first, the pressure at both ends of the branch is basically equal, and the pressure in the middle of the pipeline is greater than the pressure at both ends, forming a high-pressure area. The flame basically propagates backward along the branch, and very few flames enter the branch.

[0046] The middle part of the A-type pipe network forms a complex pipe network, where a T-shaped structure is formed. The shock wave forms turbulence here. The change of the overpressure gas flow affects the stability and propagation speed of the flame. Part of the flame propagates to the rear end of the pipeline with the overpressure gas and enters the parallel branch. Part of the flame stays here under the action of the turbulent vortex and gradually extinguishes. The corner of the tunnel has a significant impact on the overpressure peak and flame propagation. Due to the sudden change of the propagation path, the reflection of the shock wave, the compression of the gas flow, the geometric characteristics of the corner, etc., the local overpressure will be enhanced, and the turbulence effect will be caused. As shown in the attached figure Figure 4 Shown are the overpressure and light signals at various measuring points in the Type A pipeline network.

[0047] The degree of attenuation of the shock wave overpressure passing through different measuring points in the A-type pipe network is expressed by the overpressure attenuation rate K1. The overpressure P passing through the previous measuring point is X Overpressure at the next measuring point Px+1 The difference between the overpressure peak value of the previous measuring point is used to determine the overpressure attenuation characteristics of the shock wave in the A-type pipe network, as shown in calculation formula 2:

[0048]

[0049] Similarly, the attenuation degree of flame propagation velocity can be obtained, V X is the flame propagation speed between the first two measuring points, V X+1 is the flame propagation speed between the last two measuring points, as shown in calculation formula 3:

[0050]

[0051] The attenuation rates of overpressure and flame propagation velocity obtained from formulas 2 and 3 are shown in the following table. The experimental path is symmetrical and the propagation law is approximate.

[0052]

[0053] As the distance increases, the overpressure decay rate and flame decay rate show an overall increasing trend. The faster the overpressure peak and flame speed decay, the faster the overpressure peak and flame speed decay. This is in line with the propagation law of overpressure peak, flame speed and distance. At a certain distance from the explosion source, the shock wave meets here after passing through two propagation paths. The superposition of shock waves in two directions leads to an increase in the overpressure peak and a decrease in the overpressure decay rate. The changes in the overpressure peak and flame speed decay rate are shown in Figure 2. Figure 5 shown.

[0054] Furthermore, the system host 12 of the present invention analyzes the relationship between the overpressure value at each location of the A-type structure pipe network 2 and the cross-sectional dimensions of the A-type structure pipe network 2 and the straight pipe network 1 in the gas explosion based on the overpressure value collected by each pressure sensor 13 in the A-type structure pipe network 2 and the straight pipe network 1 of different cross-sectional dimensions, thereby predicting the estimated overpressure value at each location of the A-type structure pipe network 2 of the actual structure under the same explosion amount. In the present invention, since the system host 12 analyzes the relationship between the overpressure value at each location of the A-type structure pipe network 2 and the cross-sectional dimensions of the A-type structure pipe network 2 and the straight pipe network 1, no matter what the cross-sectional dimensions of the A-type structure pipe network 2 in the mine tunnel are in actual conditions, the present invention can predict the overpressure value at each location of the pipe network if an explosion occurs.

[0055] The following are two specific experimental cases:

[0056] Example 1

[0057] like Figure 2 As shown, a total of 8 pressure sensors are installed, numbered from PI to PVIII, and the system shows the distribution of each pressure sensor. The head end of the straight pipe network is closed and the end is open. This example aims to prove that the change characteristics of gas explosion in the symmetrical part of the A-type structure pipe network are the same.

[0058] ① Splice the explosion pipe, close the first end of the pipe and open the last end, and check its air tightness. The outer diameter of the pipe used in this embodiment is 200mm. Arrange the measuring points, install the pressure sensor, debug the explosion signal test system, and check the integrity of the dynamic data collector;

[0059] ② Install an electric spark ignition device at the closed end of the pipeline, connect both ends of the electrode with an electric fuse, and check whether the ignition button on the dynamic data collector is sensitive;

[0060] ③ The gas-air mixed gas filling section and the mixed gas propagation section of the explosion pipeline are separated by plastic film, and their air tightness is checked, and fire extinguishing equipment is placed near the section;

[0061] ④ Drive the vacuum pump to extract the air in the mixed gas propagation section to make the mixed gas propagation section close to vacuum;

[0062] ⑤Open the charging and exhaust valves and gas storage cylinders, and inflate the pipeline filling area according to the gas concentration required for the experiment. Use the vacuum gauge to accurately control the amount of gas and air entering and perform gas distribution operations;

[0063] ⑤ Start the circulation pump to fully stir and circulate the mixed gas of gas and air in the mixed gas propagation section to make it uniform. After circulation, let it stand for 15 minutes to ensure that the raised coal dust is deposited at the bottom of the pipeline;

[0064] ⑥ Press the ignition button on the dynamic data collector to ignite the gas at the closed end;

[0065] ⑦ Collect the explosion overpressure signal on the high-frequency data collector and transmit it to the system host. After the experiment, immediately disconnect the power supply of the ignition device, turn on the air compressor to discharge the reaction residue, and then analyze the data.

[0066] Example 2

[0067] like Figure 3 As shown, a total of 8 pressure sensors are installed, numbered P1 to P8, and the system shows the distribution of each pressure sensor. The first end of the pipeline is closed and the end is open. This example aims to study the change law of gas explosion overpressure at each distribution point on one side of the A-type structure pipeline network.

[0068] ① Splice the explosion pipe, close the first end of the pipe and open the last end, and check its air tightness. The outer diameter of the pipe used in this embodiment is 400mm. Arrange the measuring points, install the pressure sensor, debug the explosion signal test system, and check the integrity of the dynamic data collector;

[0069] ② Install the electric spark ignition system at the closed end of the mixture propagation section, and connect the two ends of the electrode with an electric fuse, and check whether the ignition button on the dynamic data collector is sensitive;

[0070] ③ The gas-air mixed gas filling section and the mixed gas propagation section of the explosion pipeline are separated by plastic film, and their air tightness is checked, and fire extinguishing equipment is placed near the section;

[0071] ④ Drive the vacuum pump to extract the air in the gas-air mixed gas filling section at the closed end of the pipeline, so that the gas-air mixed gas filling section is close to vacuum;

[0072] ⑤Open the charging and exhaust valves and gas storage cylinders, and inflate the gas-air mixed gas filling section according to the gas concentration required for the experiment. Use the vacuum meter to accurately control the amount of gas and air entering and perform gas distribution operations;

[0073] ⑥ Turn on the circulation pump to fully stir and circulate the mixture of gas and air in the explosion pipeline to make it uniform. After circulation, let it stand for 15 minutes to ensure that the raised coal dust is deposited at the bottom of the pipeline;

[0074] ⑥ Press the ignition button on the dynamic data collector to ignite the gas at the closed end;

[0075] ⑦ Observe and collect the explosion overpressure signal on the dynamic data collector. After the experiment, immediately disconnect the power supply of the ignition device, turn on the air compressor to discharge the reaction residue, and then analyze the data.

[0076] The preferred implementation modes of the present application are described in detail above in conjunction with the accompanying drawings. Typical known structures and common knowledge technologies in the preferred implementation modes are not described in detail here. Ordinary technicians in the relevant field can improve and implement the technical solutions of the present invention based on their own abilities under the inspiration given by the present implementation modes. Some typical known structures, known methods or common knowledge technologies should not become obstacles for ordinary technicians in the relevant field to implement the present application.

[0077] The scope of protection required by this application shall be based on the contents of its claims, and the contents recorded in the invention content, specific implementation methods and drawings of the specification shall be used to interpret the claims.

[0078] Within the technical concept of the present application, several modifications may be made to the specific implementation methods of the present application, and these modified specific implementation methods should also be regarded as within the protection scope of the present application.

Claims

1. A gas explosion simulation experimental analysis system for a type A structure pipe network, characterized by: It includes an A-type structural pipe network and a straight pipe network connected to the closed end of the A-type structural pipe network, a plurality of pressure sensors and flame sensors are evenly distributed on the A-type structural pipe network and the straight pipe network respectively, the straight pipe network is divided into a gas-air mixed gas filling section and a mixed gas propagation section, a thin film is provided between the gas-air mixed gas filling section and the mixed gas propagation section, an ignition device is provided at the end of the gas-air mixed gas filling section, and the gas-air mixed gas filling section can be respectively connected to the gas cylinder, the air compressor pipeline and the vacuum pump pipeline.

2. The A-type structure pipe network gas explosion simulation experiment analysis system according to claim 1 is characterized by: The gas-air mixed gas filling section is also connected to a circulation pipeline, and a circulation pump is arranged on the circulation pipeline.

3. The A-type structure pipe network gas explosion simulation experiment analysis system according to claim 1 is characterized by: A vacuum gauge is provided on the gas-air mixed gas filling section.

4. The A-type structure pipe network gas explosion simulation experiment analysis system according to claim 1 is characterized by: It also includes a bracket, which is used to fix the A-type structure pipe network and the straight pipe network.

5. The A-type structure pipe network gas explosion simulation experiment analysis system according to claim 1 is characterized by: The A-type structural pipe network includes a first straight pipe, two second straight pipes located at both ends of the first straight pipe and vertically connected to the first straight pipe, and a third straight pipe located between the two second straight pipes and parallel to the first straight pipe. The pressure sensors are respectively arranged on the pipes on one side of the first straight pipe close to one of the second straight pipes, and the second straight pipes are located on the pipes on both sides of the third straight pipe and on the third straight pipe.

6. The A-type structure pipe network gas explosion simulation experiment analysis system according to claim 1 is characterized by: Gas explosion simulation experiments were carried out on A-type structural pipe networks and straight pipe networks with various cross-sectional sizes, and the overpressure and temperature values ​​of each experiment were collected.

7. The A-type structure pipe network gas explosion simulation experiment analysis system according to claim 6 is characterized by: In each experiment, the overpressure value and temperature value collected by each pressure sensor and temperature sensor are remotely transmitted to the system host, and stored and analyzed by the system host.

8. The A-type structure pipe network gas explosion simulation experiment analysis system according to claim 7 is characterized by: The system host analyzes the propagation law of the gas explosion in the A-type pipe network by comparing the overpressure peak values ​​collected by the received pressure sensors.

9. The A-type structure pipe network gas explosion simulation experiment analysis system according to claim 7, characterized in that: The system host analyzes the relationship between the overpressure values ​​at various locations in the A-type structure pipeline network and the cross-sectional dimensions of the A-type structure pipeline network and the straight pipeline network during a gas explosion based on the overpressure values ​​collected by each pressure sensor in the A-type structure pipeline network and the straight pipeline network with different cross-sectional dimensions, thereby predicting the estimated overpressure values ​​at various locations in the A-type structure pipeline network of the actual structure under the same explosion volume.