Digitalized generation method and system for side station information
Through communication between electronic devices and the on-site information generation device, historical information is automatically obtained and log templates are adjusted, which solves the time-consuming problem of generation of on-site information caused by traditional manual filling, and realizes efficient and low-cost information generation.
Patent Information
- Application Number
- CN202411456010.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-10-18
AI Technical Summary
Traditional on-site information generation requires the project manager or relevant personnel to manually fill in a large amount of information, which makes the information generation time-consuming and labor-intensive and inefficient.
Through the communication connection between electronic devices and the on-site information generation device, the automatic acquisition of historical on-site information and the adjustment of log templates is realized, the need to manually fill in and process information is reduced, and the adjustment of non-standard generation periods and task periods is adopted to optimize information generation process.
It reduces the time and labor cost of generating information on the side station, improves the efficiency and flexibility of information generation, and reduces the need for manual recording and processing of information.
Smart Images

Figure CN118981269A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of construction information processing, and in particular, relates to a method and system for digitally generating on-site monitoring information. Background Art
[0002] On-site supervision usually refers to the supervision and inspection of technicians or supervisors on site during the construction process to ensure the construction quality and project progress. On-site supervision information refers to the various information recorded by special inspectors or supervisors on site during the construction process.
[0003] Traditional generation of on-site monitoring information requires manual filling by the project leader or relevant personnel, and a large amount of information needs to be re-filled each time, which makes the generation of on-site monitoring information time-consuming and labor-intensive. Summary of the invention
[0004] The embodiments of the present application provide a method and system for digitally generating on-site monitoring information, which can solve the problem that traditional on-site monitoring information generation requires project leaders or relevant personnel to fill in the information manually, and a large amount of information needs to be filled in again each time, which makes the generation of on-site monitoring information time-consuming and labor-intensive.
[0005] In a first aspect, an embodiment of the present application provides a method for digitally generating side station information, which is applied to an electronic device, wherein the electronic device is communicatively connected to a side station information generating device, and the method includes: The electronic device sends a historical side station information request to the side station information generating device in response to the first operation; wherein the second operation is used to instruct the generation of a side station information log; Receiving historical monitoring information sent by the monitoring information generating device; wherein the historical monitoring information is used to reflect the information in the historical monitoring pouring construction process; The electronic device generates an original side station information log template based on the historical side station information; The electronic device adjusts the on-site monitoring problem information and the processing measure information in the original on-site monitoring information log template in response to the second operation to obtain an adjusted on-site monitoring information log template; wherein the first operation is used to adjust the content of the historical on-site monitoring information, the on-site monitoring problem information is used to reflect the problems in the historical on-site monitoring process, the processing measure information is used to reflect the processing measures corresponding to the on-site monitoring problem information in the historical on-site monitoring process, and the adjusted on-site monitoring information log template is used to reflect the problems in the actual on-site monitoring process and the processing measures corresponding to the problems in the actual on-site monitoring process; The electronic device generates actual station information based on the adjusted station information log template, and sends the actual station information and a first request to the station information generating device; wherein the first request is used to request the station information generating device to generate the station information log according to the actual station information; Receive the by-station information log sent by the by-station information generating device.
[0006] The above technical solutions in the embodiments of the present application have at least the following technical effects: The digital generation method of the on-site monitoring information provided by the present application, through the electronic device responding to the first operation, sends a historical on-site monitoring information request to the on-site monitoring information generating device, can quickly obtain the historical on-site monitoring information when needed, without the need for the project leader or relevant personnel to manually fill in a large amount of information, for example, in a large pouring time period, the on-site monitoring information of each day is roughly the same, while the number of mechanical equipment may be different, so only the number of mechanical equipment needs to be adjusted, without re-filling a large amount of information, so as to help reduce the time and labor cost of subsequent on-site monitoring information generation. Secondly, receiving the historical on-site monitoring information sent by the on-site monitoring information generating device can provide a data basis for the generation of subsequent on-site monitoring information logs. Then, the electronic device generates the original on-site monitoring information log template based on the historical on-site monitoring information, can quickly load the pouring records of the project history, without the need for the project leader or relevant personnel to manually fill in a large amount of information, which helps to make flexible adjustments according to the actual operating environment in the future, and then quickly obtain the actual information, for example, the loading content can be adjusted according to the needs and the setting button can be used to adjust the loading content (i.e., adjust the historical on-site monitoring information), which helps to reduce the time and labor cost of subsequent on-site monitoring information generation. Secondly, in response to the second operation, the electronic device adjusts the on-site station problem information and treatment measure information in the original on-site station information log template to obtain an adjusted on-site station information log template, which can be flexibly adjusted according to the actual operating environment without having to re-fill in a large amount of information, which helps to reduce the time and labor costs of subsequent on-site station information generation. Then, the electronic device generates actual on-site station information based on the adjusted on-site station information log template, and sends the actual on-site station information and the first request to the on-site station information generation device to receive the on-site station information log sent by the on-site station information generation device. The on-site station information generation device can perform log generation activities, thereby reducing the need for manual recording and processing of information, thereby helping to reduce the time and labor costs of on-site station information generation.
[0007] In a possible implementation manner of the first aspect, the electronic device adjusts, in response to the second operation, the on-site station problem information and the processing measure information in the original on-site station information log template to obtain an adjusted on-site station information log template, including: The electronic device obtains the on-site station problem information and the processing measure information in the original on-site station information log template in response to the second operation; In response to the adjustment operation on the on-site problem information and the processing measure information, the contents of the on-site problem information and the processing measure information in the original on-site information log template are adjusted to obtain the adjusted on-site information log template.
[0008] In a possible implementation manner of the first aspect, before the electronic device generates actual side station information based on the adjusted side station information log template and sends the actual side station information and the first request to the side station information generating device, the method further includes: The generation period recorded by the electronic device for requesting the side station information generating device to generate side station information is adjusted to a non-standard generation period; wherein the non-standard generation period is a period during which the side station information generating device generates the side station information based on the actual side station information sent by the electronic device and the first request in the side station state, and a period that does not overlap with the task period of the side station information generating device; the non-standard generation period is generated by the task period and the variation of the side station information generating device; The electronic device sends the information corresponding to the non-standard generation period to the side station information generation device, so that the side station information generation device performs the side station information digital generation task based on the information corresponding to the non-standard generation period.
[0009] In a possible implementation manner of the first aspect, before the electronic device sends the information corresponding to the non-standard generation period to the side station information generating device so that the side station information generating device performs the side station information digital generation task based on the information corresponding to the non-standard generation period, the method further includes: Sending task period acquisition data to the side station information generating device; wherein the task period acquisition data is used to obtain the task period of the side station information generating device; When feedback data corresponding to the task period acquisition data is obtained, and the feedback data reflects the data of the task period, information is obtained that the current generation state does not meet the requirements of the execution standard generation period; wherein the requirements of the execution standard generation period are the requirements of the task period when the electronic device does not obtain the side station information generation device; When the feedback data corresponding to the data acquired during the task period is not obtained, or when the feedback data corresponding to the data acquired during the task period is obtained and the feedback data is not reflected as the data of the task period, information is obtained that the current generation status meets the requirements of the execution standard generation period.
[0010] In a possible implementation manner of the first aspect, after sending the task period acquisition data to the side station information generating device, the method further includes: When the current generation state does not meet the requirements for executing the standard generation period, adjusting the generation period recorded by the electronic device for requesting the side station information generating device to generate the side station information to a non-standard generation period; If the current build status meets the requirements for executing the standard build period, no adjustments are made.
[0011] In a possible implementation manner of the first aspect, after the electronic device sends the information corresponding to the non-standard generation period to the side station information generation device so that the side station information generation device performs the side station information digital generation task based on the information corresponding to the non-standard generation period, the method further includes: If the on-site information generating device does not perform the on-site information digital generation task based on the information corresponding to the non-standard generation period in the on-site state, a new non-standard generation period is generated based on the non-standard generation period; Based on the information corresponding to the new non-standard generation period, the side station information generation device is requested to perform the side station information digital generation task.
[0012] In a possible implementation manner of the first aspect, after the electronic device sends the information corresponding to the non-standard generation period to the side station information generation device so that the side station information generation device performs the side station information digital generation task based on the information corresponding to the non-standard generation period, the method further includes: When a digital generation service of side station information is detected, the service stage information is acquired; wherein the digital generation service of side station information is generated when the side station information generating device meets the side station information generating conditions, and the service stage information is used to reflect the stage information of the side station information generating device currently running the digital generation service of side station information, and the service stage information is one of configuration stage information, generation stage information and completion stage information; In the case where the business phase information is configuration phase information, a side station information digital generation task is implemented, and the business phase information is adjusted to generation phase information; When the service phase information is not configuration information, the active phase information is adjusted to the phase information to be generated; wherein the active phase information is used to reflect the phase information of the service to be generated by the side station information generating device this time, and the active phase information is one of the configuration phase information and the phase information to be generated.
[0013] In a possible implementation manner of the first aspect, when the service stage information is configuration stage information, after performing a side station information digital generation task and adjusting the service stage information to generation stage information, the method further includes: Analyze whether the digital generation service of the side station information is completed; When it is parsed that the digital generation service of the side station information is completed, the service phase information is adjusted to configuration phase information.
[0014] In a possible implementation manner of the first aspect, when the service phase information is not configuration information, after adjusting the activity phase information to phase information to be generated, the method further includes: Analyze whether the activity stage information is stage information to be generated; In the case that the activity phase information is the phase information to be generated, the completion generation task of the side station information is implemented, and the activity phase information is adjusted to the configuration phase information.
[0015] In a possible implementation manner of the first aspect, the method further includes: The side station information generating device is requested to generate the actual side station information according to the timestamp to obtain the side station information log.
[0016] In a second aspect, an embodiment of the present application provides a system for digitally generating side station information, which is used to implement the method for digitally generating side station information described in any one of the first aspects above, and is applied to an electronic device, wherein the electronic device is communicatively connected to a side station information generating device, and the system for digitally generating side station information includes: A response unit, configured for the electronic device to send a historical station information request to the station information generating device in response to a first operation; wherein the first operation is used to instruct the generation of a station information log; A receiving unit, used to receive the historical monitoring information sent by the monitoring information generating device; wherein the historical monitoring information is used to reflect the information in the historical monitoring pouring construction process; A generating unit, configured for the electronic device to generate an original side station information log template based on the historical side station information; An adjusting unit, configured for the electronic device to adjust the on-site station problem information and the processing measure information in the original on-site station information log template in response to a second operation, so as to obtain an adjusted on-site station information log template; A sending unit, configured for the electronic device to generate actual side station information based on the adjusted side station information log template, and send the actual side station information and the first request to the side station information generating device; A receiving unit is used to receive the side station information log sent by the side station information generating device.
[0017] In a third aspect, an embodiment of the present application provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the method for digitally generating side station information described in any one of the first aspects above is implemented.
[0018] It can be understood that the beneficial effects of the second to third aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0020] Figure 1 It is a flowchart of a method for digitally generating side station information provided by an embodiment of the present application; Figure 2 This is a schematic diagram for assisting understanding of analyzing whether there is an intersection in the method for digitally generating side station information provided in an embodiment of the present application; Figure 3 It is a schematic diagram of the implementation process of adjusting the generation period in the method for digitally generating the side station information provided in an embodiment of the present application; Figure 4 It is a structural diagram of a system for digitally generating side station information provided by an embodiment of the present application; Figure 5 It is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0021] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0022] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.
[0023] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0024] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting" depending on the context. Similarly, the phrase "if it is determined" or "if the described condition or event is detected" can be interpreted as meaning "uponce determined" or "in response to determining" or "uponce the described condition or event is detected" or "in response to detecting the described condition or event" depending on the context.
[0025] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0026] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0027] In related technologies, on-site supervision usually refers to the supervision and inspection of technicians or supervisors on site during the construction process to ensure the construction quality and project progress. On-site supervision information refers to the various information supervised and recorded by special inspectors or supervisors on site during the construction process.
[0028] Traditional on-site monitoring information generation requires project leaders or relevant personnel to fill in manually, and on-site monitoring information requires filling in a large amount of information, which makes the generation of on-site monitoring information time-consuming and labor-intensive.
[0029] In order to solve the above problems, the embodiments of the present application provide a method and system for digitally generating side station information.
[0030] In the method, the electronic device can respond to the first operation and send a historical side station information request to the side station information generating device, so that the historical side station information can be quickly obtained when needed, without the need for the project leader or relevant personnel to manually fill in a large amount of information. For example, in a large pouring time period, the side station information of each day is roughly the same, while the number of mechanical equipment may be different, so only the number of mechanical equipment needs to be adjusted, without re-filling a large amount of information, which helps to reduce the time and labor cost of subsequent side station information generation. Secondly, receiving the historical side station information sent by the side station information generating device can provide a data basis for the generation of subsequent side station information logs. Then, the electronic device generates an original side station information log template based on the historical side station information, which can quickly load the pouring records of the project history, without the need for the project leader or relevant personnel to manually fill in a large amount of information, which helps to make flexible adjustments according to the actual operating environment in the future, and then quickly obtain the actual information. For example, the loaded content can be adjusted according to the needs and the setting button can be used to adjust the historical side station information, which helps to reduce the time and labor cost of subsequent side station information generation. Secondly, in response to the second operation, the electronic device adjusts the on-site station problem information and treatment measure information in the original on-site station information log template to obtain an adjusted on-site station information log template, which can be flexibly adjusted according to the actual operating environment without having to re-fill in a large amount of information, which helps to reduce the time and labor costs of subsequent on-site station information generation. Then, the electronic device generates actual on-site station information based on the adjusted on-site station information log template, and sends the actual on-site station information and the first request to the on-site station information generation device to receive the on-site station information log sent by the on-site station information generation device. The on-site station information generation device can perform log generation activities, thereby reducing the need for manual recording and processing of information, thereby helping to reduce the time and labor costs of on-site station information generation.
[0031] The method for digitally generating side station information provided in the embodiment of the present application can be applied to an electronic device. In this case, the electronic device is the executor of the method for digitally generating side station information provided in the embodiment of the present application. The embodiment of the present application does not impose any restrictions on the specific type of the electronic device.
[0032] For example, the electronic device may be a cell phone, a tablet computer, a notebook computer, an ultra-mobile personal computer (UMPC), a netbook, a desktop computer, a computing device or a computer connected to a wireless modem, a laptop computer, a handheld communication device, a handheld computing device, etc.
[0033] For example, the station information generating device may include a data storage device (e.g., a hard drive, cloud storage, etc.), a data processing device (e.g., a device installed with data processing and analysis software), a log generating device (e.g., a device that automatically converts data into a structured log format), etc. The electronic device may send the actual station information and the first request to the station information generating device, so that the station information generating device generates a station information log according to the actual station information, thereby obtaining the required station information log. The station information generating device may be a server, a mobile phone, a tablet computer, a laptop computer, an ultra-mobile personal computer (UMPC), a netbook, a desktop computer, a computing device, or a computer connected to a wireless modem, a laptop computer, a handheld communication device, a handheld computing device, etc.
[0034] In order to better understand the method for digitally generating side station information provided in the embodiment of the present application, the specific implementation process of the method for digitally generating side station information provided in the embodiment of the present application is exemplarily introduced below.
[0035] Figure 1 A schematic flow chart of a method for digitally generating side station information provided in an embodiment of the present application is shown. The method for digitally generating side station information includes: S100, the electronic device sends a historical station information request to the station information generating device in response to a first operation, wherein the first operation is used to instruct the generation of a station information log.
[0036] It can be understood that the user performs the first operation on the electronic device, which may be pressing a button or selecting a menu option. After the electronic device recognizes this operation, it automatically generates a signal to request to obtain historical side station information from the side station information generating device. The electronic device can send the signal for obtaining historical side station information to the side station information generating device through an appropriate communication protocol (such as HTTP, MQTT, etc.), and at the same time, the electronic device enters a waiting state to prepare to receive the historical side station information returned by the side station information generating device.
[0037] With such arrangement, the electronic device responds to the first operation and sends a request for historical monitoring information to the monitoring information generating device, so that the historical monitoring information can be quickly obtained when needed, without the need for the project manager or relevant personnel to manually fill in a large amount of information. For example, within a large pouring time period, the daily monitoring information is roughly the same, while the number of mechanical equipment may be different, so only the number of mechanical equipment needs to be adjusted without re-filling in a large amount of information. This helps to reduce the time and labor costs for subsequent generation of monitoring information.
[0038] S200, receiving historical monitoring information sent by the monitoring information generating device, wherein the historical monitoring information is used to reflect the information in the historical monitoring pouring construction process.
[0039] It can be understood that the historical on-site supervision information can be the information recorded during the historical pouring of the project. For example, the historical on-site supervision information can be the information reflecting the before and after status of the pouring site, the number of on-site personnel and mechanical equipment, the problems found during the on-site supervision process and the information on the treatment measures, etc.
[0040] For example, information management software can be used to organize and archive historical monitoring information in a structured manner, and then the monitoring information generation device queries and retrieves (for example, by date, process type or other conditions) according to the signal sent by the electronic device to obtain historical monitoring information to obtain the required historical monitoring information, and sends the acquired historical monitoring information to the electronic device. The historical monitoring information can also be stored in a cloud server, and the monitoring information generation device accesses the cloud server through a preset query interface according to the signal sent by the electronic device to obtain historical monitoring information, and then can enter conditions (such as time range, construction stage, specific project, etc.) through the query function to obtain historical monitoring information, and send the acquired historical monitoring information to the electronic device.
[0041] With such configuration, by receiving the historical on-site monitoring information sent by the on-site monitoring information generating device, a data basis can be provided for the generation of subsequent on-site monitoring information logs.
[0042] S300, the electronic device generates an original side monitoring information log template based on historical side monitoring information.
[0043] It is understood that the electronic device can parse the received historical monitoring information and extract key data fields, such as monitoring time, location, monitoring problem, treatment measures, etc. Design a log template structure, including various necessary fields. For example, project name, monitoring time, monitoring location, monitoring problem description, treatment measures and remarks, etc. Fill the parsed historical monitoring information into the corresponding fields of the template to form an original monitoring information log template, and store the generated original monitoring information log template in the electronic device, or display it to the user for further review or modification as needed.
[0044] With this configuration, the electronic device generates an original on-site supervision information log template based on the historical on-site supervision information, which can quickly load the project's historical pouring records without the need for the project manager or relevant personnel to manually fill in a large amount of information. This helps to make flexible adjustments based on the actual operating environment in the future, and thus quickly obtain actual information. For example, the loading content can be adjusted as needed and using the setting button (i.e., adjusting the historical on-site supervision information), which helps to reduce the time and labor costs of generating subsequent on-site supervision information.
[0045] S400, the electronic device adjusts the on-site monitoring problem information and the processing measure information in the original on-site monitoring information log template in response to the second operation to obtain an adjusted on-site monitoring information log template. The second operation is used to adjust the content of the historical on-site monitoring information, the on-site monitoring problem information is used to reflect the problems in the historical on-site monitoring process, the processing measure information is used to reflect the processing measures corresponding to the on-site monitoring problem information in the historical on-site monitoring process, and the adjusted on-site monitoring information log template is used to reflect the problems in the actual on-site monitoring process and the processing measures corresponding to the problems in the actual on-site monitoring process.
[0046] It can be understood that the second operation can be an operation of adjusting the content of the historical side station information, for example, by clicking, touching or using a keyboard and mouse on the operation interface of the electronic device to adjust the content of the historical side station information. The side station information adjustment log template can include information on actually discovered problems or abnormal conditions (such as concrete segregation, pipe blockage, etc.), as well as information on treatment measures corresponding to the problems or abnormal conditions.
[0047] For example, the second operation issued by the operator can be received through the graphical user interface (GUI), command line interface (CLI) or dedicated control panel of the electronic device, and then the content of the historical side station information in the original side station information log template can be adjusted according to the needs and using the setting button to obtain the adjusted side station information log template. For example, the problems in the historical side station information are concrete segregation and pipe blocking, and the problem in the current actual side station process is concrete segregation, so the pipe blocking information in the historical side station information and the treatment measures information corresponding to the pipe blocking information in the historical side station information can be deleted through the second operation, and then the deleted template is obtained, that is, the adjusted side station information log template. For another example, the problems in the historical side station information are concrete segregation and pipe blocking, and the problems in the current actual side station process are concrete segregation, pipe blocking and hollowing problems, so the hollowing problem can be added to the historical side station information through the second operation, and the treatment measures corresponding to the hollowing problem can be added to the historical side station information, and then the added template is obtained, that is, the adjusted side station information log template.
[0048] With such a configuration, the electronic device adjusts the on-site problem information and processing measure information in the original on-site information log template in response to the second operation to obtain an adjusted on-site information log template. It can be flexibly adjusted according to the actual operating environment without re-filling in a large amount of data, which helps to reduce the time and labor costs of subsequent on-site information generation.
[0049] In a possible implementation, S400, the electronic device adjusts the on-site station problem information and the processing measure information in the original on-site station information log template in response to the second operation to obtain an adjusted on-site station information log template, including: S410, the electronic device obtains the on-site station problem information and processing measure information in the original on-site station information log template in response to the second operation.
[0050] It can be understood that the second operation issued by the operator can be received through the graphical user interface (GUI), command line interface (CLI) or dedicated control panel of the electronic device. After receiving the second operation, the side station problem information and processing measure information in the original side station information log template can be extracted through SQL query or written query statement.
[0051] With such a configuration, the electronic device responds to the second operation, obtains the on-site supervision problem information and treatment measure information in the original on-site supervision information log template, and can quickly load the project's historical pouring records without the need for the project leader or relevant personnel to manually fill in a large amount of additional information, which helps to reduce the time and labor costs of generating subsequent on-site supervision information.
[0052] S420, in response to the adjustment operation on the on-site station problem information and the processing measure information, adjust the contents of the on-site station problem information and the processing measure information in the original on-site station information log template to obtain an adjusted on-site station information log template.
[0053] It can be understood that the adjustment operation can be an operation to adjust the text box where the side station problem information and the treatment measure information are located in the original side station information log template. For example, the side station problem information is concrete segregation and pipe blockage, and the problem in the current actual side station process is concrete segregation, so the pipe blockage information in the text box where the side station problem information is located, and the treatment measure information corresponding to the pipe blockage information in the text box where the side station problem information is located can be deleted through the adjustment operation, and then the deleted template is obtained, that is, the adjustment side station information log template. For another example, the side station problem information is concrete segregation and pipe blockage, and the problems in the current actual side station process are concrete segregation, pipe blockage and hollowing problems, so the hollowing problem can be added to the text box where the side station problem information is located, and the treatment measure information corresponding to the hollowing problem can be added, and then the added template is obtained, that is, the adjustment side station information log template.
[0054] With such a configuration, by adjusting the content of the on-site monitoring problem information and the treatment measure information in response to the first operation to obtain the actual on-site monitoring information, it can be flexibly adjusted according to the actual operating environment to quickly obtain the actual data. For example, the loading content can be adjusted as needed and using the setting button (i.e., adjusting the historical on-site monitoring information), which helps to reduce the time and labor costs of generating subsequent on-site monitoring information.
[0055] S500, the electronic device generates actual station information based on the adjusted station information log template, and sends the actual station information and a first request to the station information generating device, wherein the first request is used to request the station information generating device to generate a station information log according to the actual station information.
[0056] It can be understood that the first request can be a digital signal, a request instruction, etc. The actual on-site monitoring information can be the problem information in the actual on-site monitoring process after the historical on-site monitoring information is adjusted, and the treatment measure information corresponding to the problem in the actual on-site monitoring process. The electronic device can parse the adjusted on-site monitoring information log template, extract key data fields, such as on-site monitoring time, location, on-site monitoring problem, treatment measures, etc., to generate actual on-site monitoring information, and send the actual on-site monitoring information and the first request to the on-site monitoring information generating device to request the on-site monitoring information generating device to generate an on-site monitoring information log according to the actual on-site monitoring information.
[0057] With such a configuration, the electronic device generates actual side station information based on the adjusted side station information log template, and sends the actual side station information and the first request to the side station information generating device. The side station information generating device can perform log generation activities, thereby reducing the need for manual recording and processing of information, thereby helping to reduce the time and labor costs of side station information generation.
[0058] In a possible implementation, in step S500, before the electronic device generates actual side station information based on the adjusted side station information log template and sends the actual side station information and the first request to the side station information generating device, the side station information digital generation method further includes: S501, adjusting the generation period recorded by the electronic device for requesting the side station information generating device to generate side station information to a non-standard generation period. The non-standard generation period is a period in which the side station information generating device generates information based on the actual side station information sent by the electronic device and the first request in the side station state, and a period that does not intersect with the task period of the side station information generating device. The non-standard generation period is generated by the task period and the variation of the side station information generating device.
[0059] For example, when the electronic device senses that there is no digital generation task of the by-station information at present, it will request the by-station information generating device to adjust to the by-station state. For example, the by-station process is usually a long period of time, such as 6 hours, 8 hours, etc., that is, the actual by-station information may take 6 hours or 8 hours to obtain. Therefore, in order to avoid the by-station information generating device waiting for the generation of the actual by-station information, the by-station information generating device can be requested to rest in a certain time period, and the electronic device can send the actual by-station information that has been obtained to the by-station information generating device during the standard generation period (that is, not the time period when the by-station information generating device rests), and the by-station information generating device can perform the by-station information digital generation task for the actual by-station information within the standard generation period, that is, the electronic device can request the by-station information generating device to perform the by-station information digital generation task in the by-station state according to the standard generation period.
[0060] For example, Figure 2 As shown, the side monitoring information generating device detects whether the actual side monitoring information is obtained at the start time of the standard generation period. If the actual side monitoring information is obtained, it indicates that the side monitoring information digital generation activity is to be performed on the actual side monitoring information. For example, the standard generation period can be a plurality of time periods distributed according to a certain time period. The side monitoring information generating device detects whether the actual side monitoring information is obtained at the start time of each standard generation period. If the actual side monitoring information is obtained within the a period, the side monitoring information digital generation activity is performed on the actual side monitoring information.
[0061] For example, when the task period of the suspended service (such as data calibration service and system maintenance service) arrives, the side station information generating device will first run the suspended service. The task period of the suspended service (such as time period b) can be multiple time periods distributed according to a certain time period, or it can be a time period. For example, multiple time periods can be used to execute different suspended services respectively. For example, when performing system maintenance or data calibration, the side station information generating device will give priority to the suspended service. When the task period of the suspended service is the same as or overlaps with the standard generation period, the side station information generating device has both the suspended service and the side station information digital generation service at the start time of the standard generation period, but because the suspended service must be run first, the side station information generating device will first run the suspended service instead of the side station information digital generation service, which will cause the electronic device to be unable to request the side station information generating device to perform the side station information digital generation service.
[0062] For example, Figure 2As shown, when multiple standard generation time periods are the same as or overlap with the task time period of the suspended service, the electronic device will not be able to request the side station information generation device to perform the side station information digitization generation service. For example, the standard generation time period may include 1:00-3:00, 7:00-9:00, 13:00-15:00, and the task time period of the suspended service may include 1:00-3:00, 7:00-9:00, 13:00-15:00. At this time, multiple standard generation time periods are the same as the task time period of the suspended service. For another example, the standard generation time period may include 1:00-3:00, 7:00-9:00, 13:00-15:00, and the task time period of the suspended service may include 0:00-4:00, 6:00-10:00, 12:00-16:00. At this time, multiple standard generation time periods also overlap with the task time period of the suspended service.
[0063] It can be understood that when the task period of suspending business contains only one time period, for example, when the task period of suspending business is 1:00-3:00, a non-standard generation period can be generated by the task period and the variation, such as A=X+C, B=Y+C, A is the start time of the non-standard generation period, X is the start time of the task period, C is the variation, Y is the end time of the task period, and B is the end time of the non-standard generation period. After calculating A and B through the formula, the time period composed of A and B can be compared with the task period to determine whether they are the same or have an intersection. If not, it means that the time period composed of A and B is a non-standard generation period, such as A=1+4=5, B=3+4=7, and the non-standard generation period is 5:00-7:00, which is not the same as or has no intersection with the task period. Then, the generation period recorded by the electronic device for requesting the side station information generation device to generate side station information is adjusted to the non-standard generation period.
[0064] It can be understood that when the task period of suspending business contains multiple time periods, for example, when the task period of suspending business can include 0:00-4:00, 6:00-10:00, and 12:00-16:00, a non-standard generation period can also be generated through the task period and the variation, such as A=X+C, B=Y+C, A is the start time of the non-standard generation period, X is the start time of the task period, C is the variation, Y is the end time of the task period, and B is the end time of the non-standard generation period. After A and B are calculated through the formula, the time period composed of A and B can be combined with the task period. A comparison is performed to determine whether they are the same or have an intersection. If not, it means that the time period composed of A and B is a non-standard generation period, such as A=0+4=4, B=4+2=6, A=6+4=10, B=10+2=12, that is, the non-standard generation period is 4:00-6:00, 10:00-12:00, which is different from or has no intersection with the task period. Then, the generation period recorded by the electronic device for requesting the side station information generation device is adjusted from the original generation period to the non-standard generation period, that is, the generation period recorded by the electronic device for requesting the side station information generation device to generate side station information is adjusted to the non-standard generation period.
[0065] For example, in a scenario where the standard generation period is different from or has no intersection with the task period of the suspended service, the problem may arise that the electronic device cannot request the side station information generating device to perform the side station information digital generation service. For example, the duration of the standard generation period is limited and is insufficient to support the side station information generating device to perform the side station information digital generation service. For example, the standard generation period may end just when the side station information digital generation service has just started or has not yet started, resulting in the electronic device being unable to request the side station information generating device to perform the side station information digital generation service. Therefore, the standard generation period can be extended, but it should not be the same as or have no intersection with the task period of the suspended service.
[0066] With such a setting, by adjusting the generation period recorded by the electronic device for requesting the side station information generating device to generate side station information to a non-standard generation period, it is possible to more flexibly adapt to different task requirements and operating conditions to avoid task conflicts, thereby avoiding the problem that the electronic device has been unable to request the side station information generating device to perform the side station information digital generation service, which helps to reduce the time and labor costs of side station information generation.
[0067] S502, the electronic device sends information corresponding to the non-standard generation period to the side station information generation device, so that the side station information generation device performs the side station information digital generation task based on the information corresponding to the non-standard generation period.
[0068] It is understandable that the information corresponding to the non-standard generation period is formatted into a format suitable for transmission. For example, JSON, XML or other standard formats can be used to encapsulate data, and the information corresponding to the non-standard generation period is sent from the electronic device to the side station information generation device through a transmission protocol (for example, TCP / IP, UDP, HTTP, MQTT or other communication protocols). In this case, there will be no problem that the electronic device cannot always request the side station information generation device to perform the side station information digital generation service.
[0069] With such a setting, the electronic device sends the information corresponding to the non-standard generation period to the side station information generating device, so that the side station information generating device performs the side station information digital generation task based on the information corresponding to the non-standard generation period. This can avoid the problem that the electronic device cannot always request the side station information generating device to perform the side station information digital generation service, and helps to reduce the time and labor cost of side station information generation.
[0070] In a possible implementation, in step S502, before the electronic device sends the information corresponding to the non-standard generation period to the side station information generation device so that the side station information generation device performs the side station information digital generation task based on the information corresponding to the non-standard generation period, the side station information digital generation method further includes: S5021, sending task period acquisition data to the side station information generating device, wherein the task period acquisition data is used to acquire the task period of the side station information generating device.
[0071] It can be understood that the task period acquisition data is used to obtain the task period during which the station information generating device performs the suspended service. The electronic device can call the task period data interface of the station information generating device through the API to send the task period acquisition data to the station information generating device.
[0072] With such a setting, by sending task period acquisition data to the side station information generating device, the task period of the side station device (such as the time period for executing suspended business) can be understood, which can help avoid performing side station information digitization generation tasks during these time periods, thereby avoiding delays in generation time caused by failure of side station information digitization generation tasks due to the side station information generating device being in a state of suspended business operation, and helping to reduce the time and labor costs of side station information generation.
[0073] In a possible implementation, after sending the task period acquisition data to the side station information generating device in step S5021, the side station information digital generation method further includes: S5121, when the current generation state does not meet the requirements of executing the standard generation period, the generation period recorded by the electronic device for requesting the side station information generating device to generate the side station information is adjusted to a non-standard generation period.
[0074] It can be understood that when the current generation state does not meet the requirements for executing the standard generation period, it means that the electronic device cannot currently request the side station information generation device to perform the side station information digital generation task in the side station state according to the standard generation period. Therefore, the generation period recorded by the electronic device for requesting the side station information generation device to generate side station information is adjusted to a non-standard generation period.
[0075] With such a setting, when the current generation status does not meet the requirements for executing the standard generation period, the generation period recorded by the electronic device for requesting the side station information generation device to generate side station information is adjusted to a non-standard generation period. This can help avoid performing generation tasks when the side station information generation device is in an unsuitable state, and reduce the risk of erroneous generation operations.
[0076] S5221: If the current generation status meets the requirements of executing the standard generation period, no adjustment is made.
[0077] It can be understood that when the current generation state meets the requirements of executing the standard generation period, the description control device can request the side station information generation equipment to perform the side station information digital generation task in the side station state according to the standard generation period, so no adjustment is made.
[0078] With such a configuration, when the current generation status meets the requirements of executing the standard generation period, no adjustment is performed, thereby avoiding an invalid and complicated adjustment process, thereby simplifying the operation process and reducing the workload of operators.
[0079] S5022, when feedback data corresponding to the task period acquisition data is obtained, and the feedback data reflects the data of the task period, information is obtained that the current generation state does not meet the requirements of the execution standard generation period. The requirements of the execution standard generation period are the requirements of the task period when the electronic device does not obtain the side station information generation device.
[0080] It can be understood that when feedback data corresponding to the data obtained during the task period is obtained, and the feedback data is reflected as data for the task period, it means that the side station information generating device has suspended its business, and the period of suspended business may be the same as or overlap with the standard generation period. Therefore, the electronic device cannot request the side station information generating device to perform the side station information digitization generation task in the side station state according to the standard generation period, that is, the current generation state does not meet the requirements for executing the standard generation period.
[0081] With such a setting, when feedback data corresponding to the data obtained during the task period is obtained and the feedback data is reflected as data for the task period, information is obtained that the current generation status does not meet the requirements of the execution standard generation period. It can be determined whether the generation task can be performed without adjusting the generation period. This can avoid delays in generation time caused by invalid adjustments to the generation period, help improve subsequent generation efficiency, and further help reduce the time and labor costs of generating on-site information.
[0082] S5023, when the feedback data corresponding to the data acquired during the task period is not obtained, or when the feedback data corresponding to the data acquired during the task period is obtained and the feedback data is not reflected as the data of the task period, information is obtained that the current generation status meets the requirements of the execution standard generation period.
[0083] It can be understood that when the feedback data corresponding to the data acquired during the task period is not obtained, or when the feedback data corresponding to the data acquired during the task period is obtained and the feedback data is not reflected as the data of the task period, it means that the side station information generating device has not suspended the business. At this time, the period of suspended business will not be the same as or intersect with the standard generation period. Therefore, the electronic device can request the side station information generating device to perform the side station information digitization generation task in the side station state according to the standard generation period, that is, the current generation state meets the requirements for executing the standard generation period.
[0084] With such a setting, when the feedback data corresponding to the data acquired during the task period is not obtained, or when the feedback data corresponding to the data acquired during the task period is obtained and the feedback data is not reflected as the data of the task period, information is obtained that the current generation status does not meet the requirements of the execution standard generation period. It can be determined whether the generation task can be generated without adjusting the generation period. This can avoid delays in generation time caused by invalid adjustments to the generation period, help improve subsequent generation efficiency, and further help reduce the time and labor costs of generating on-site information.
[0085] In a possible implementation, in step S502, the electronic device sends the information corresponding to the non-standard generation period to the side station information generation device, so that the side station information generation device performs the side station information digital generation task based on the information corresponding to the non-standard generation period, and the side station information digital generation method further includes: S512: If the on-site information generating device does not perform the on-site information digital generation task based on the information corresponding to the non-standard generation period in the on-site state, a new non-standard generation period is generated based on the non-standard generation period.
[0086] For example, in a scenario where the non-standard generation period is different from or has no intersection with the task period of the suspended service, the problem may arise that the electronic device cannot request the side station information generating device to perform the side station information digital generation service. For example, the duration of the non-standard generation period is limited and is insufficient to support the side station information generating device to perform the side station information digital generation service. For example, the non-standard generation period may end just when the side station information digital generation service has just started or has not yet started, resulting in the problem that the electronic device cannot request the side station information generating device to perform the side station information digital generation service. Therefore, the non-standard generation period can be extended, but it can be the same as or have an intersection with the task period of the suspended service. For example, the non-standard generation time periods include 1:00-1:10, 2:00-2:10, and 4:00-4:10, and the task time periods for suspended services include: 0:00-1:00 and 3:00-4:00. At this time, the non-standard generation time period is not the same as or has no intersection with the task time period for suspended services, but the generation time required for the current digital generation service of station information is 1 hour, so the current non-standard generation time period cannot meet the generation time requirement required for the current digital generation service of station information, so the non-standard generation time period needs to be adjusted, that is, a new non-standard generation time period is generated based on the non-standard generation time period, and the new non-standard generation time period includes 1:00-2:00, 2:00-3:00, and 4:00-5:00. At this time, the non-standard generation time period is neither different from or has no intersection with the task time period for suspended services, and can also meet the generation time requirement required for the current digital generation service of station information.
[0087] With such a setting, if the side-by-side information generating device does not perform the side-by-side information digital generation task based on the information corresponding to the non-standard generation period in the side-by-side state, a new non-standard generation period is generated based on the non-standard generation period, which helps to improve the adaptability to different tasks and time requirements, and thus facilitates the smooth progress of the side-by-side information digital generation task.
[0088] S522: Based on the information corresponding to the new non-standard generation period, request the nearby station information generation device to perform the nearby station information digital generation task.
[0089] It is understandable that the information corresponding to the new non-standard generation period is formatted into a format suitable for transmission. For example, JSON, XML or other standard formats can be used to encapsulate data, and the information corresponding to the new non-standard generation period is sent from the electronic device to the side station information generation device through a transmission protocol (for example, TCP / IP, UDP, HTTP, MQTT or other communication protocols). At this time, there will be no problem that the electronic device cannot request the side station information generation device to perform the side station information digital generation service.
[0090] With such a setting, based on the information corresponding to the new non-standard generation period, requesting the side station information generating device to perform the side station information digital generation task can avoid the problem that the electronic device cannot request the side station information generating device to perform the side station information digital generation service, which helps to reduce the time and labor cost of side station information generation.
[0091] In a possible implementation, in step S502, the electronic device sends the information corresponding to the non-standard generation period to the side station information generation device, so that the side station information generation device performs the side station information digital generation task based on the information corresponding to the non-standard generation period, and the side station information digital generation method further includes: S700, when a digital generation service of side station information is detected, obtain service stage information. The digital generation service of side station information is generated when the side station information generating device meets the side station information generating conditions, and the service stage information is used to reflect the stage information of the side station information generating device currently running the digital generation service of side station information, and the service stage information is one of configuration stage information, generation stage information and completion stage information.
[0092] For example, during the process of the station information generating device performing the station information digital generation service, if it is found that the current actual station information is wrong, the station information log corresponding to the wrong actual station information will be deleted through the communication connection between the electronic device and the station information generating device (for example, the electronic device sends a deletion instruction to the station information generating device). However, since the station information generating device is still in the process of the station information digital generation service at this time, there is no station information log corresponding to the wrong actual station information that has been generated in the station information generating device, so the deletion will fail. At the same time, although the instruction to delete the station information log corresponding to the wrong actual station information has been generated, since the station information log corresponding to the wrong actual station information has not been generated at this time, the instruction to delete the station information log corresponding to the wrong actual station information will not be responded to.
[0093] For example, in a scenario where an electronic device requests a station information generating device to perform a station information digital generation service again (for example, after the erroneous actual station information is adjusted to the non-erroneous actual station information, the non-erroneous actual station information is subjected to a station information digital generation service), if there is no response to an instruction to delete the station information log corresponding to the erroneous actual station information, the station information log corresponding to the erroneous actual station information still exists, which leads to the problem that the non-erroneous actual station information cannot perform the station information digital generation service. For example, the station information log corresponding to the erroneous actual station information (such as the A log) still exists, and it may be mistakenly believed that the generation of the A log has been completed (that is, the currently completed service of generating the erroneous A log is mistakenly believed to have completed the generation of the A log), so the A log is not generated again (that is, the service of generating the non-erroneous A log is not performed).
[0094] It can be understood that the generation condition of the side station information is that the non-standard generation period is not the same as or does not intersect with the task period of the suspended service, or the standard generation period is not the same as or does not intersect with the task period of the suspended service, and the non-standard generation period or the standard generation period can meet the generation time requirements of the current side station information digital generation service. The service stage information is used to reflect the generation stage of the side station information generation device. For example, the configuration stage information is the information that the current actual side station information has no errors, that is, there will be no situation where the side station information digital generation service cannot be performed. The configuration stage information can also be the current actual side station information has no errors and there are no other side station information digital generation services. The generation stage information is the information that the current actual side station information has errors and is in the generation stage, or the information that the current actual side station information has no errors and is in the generation stage. The completion stage information is the information that the current actual side station information has errors and is in the completion generation stage, or the information that the current actual side station information has no errors and is in the completion generation stage.
[0095] For example, the service detection component can be used to detect whether there is a service for digital generation of on-site information, and the detection program or detection mechanism can be used to identify and track the service for digital generation of on-site information. When the service for digital generation of on-site information is detected, the current service stage information can be queried through the API interface or component.
[0096] With such a setting, when the digital generation service of the side station information is detected, the service stage information can be obtained, the current stage information can be understood, and a data foundation can be built for the subsequent generation process, thereby providing a reliable generation strategy.
[0097] S800, when the business phase information is configuration phase information, implement the side station information digital generation task, and adjust the business phase information to generation phase information.
[0098] It can be understood that when the business stage information is the configuration stage information, it means that no business is being processed at present and it is in idle mode, and there is no error in the current actual side station information, so there will be no problem of being unable to perform the side station information digital generation business. Therefore, the side station information digital generation task can be implemented. At the same time, the current business stage information can be adjusted to the generation stage information to indicate that the side station information digital generation task is currently running and is in busy mode.
[0099] With such a setting, when the business stage information is the configuration stage information, the digital generation task of the side monitoring information is implemented, and the business stage information is adjusted to the generation stage information. This can avoid generation conflicts or errors caused by other business operations or incorrect current actual side monitoring information, help to clearly understand the current status of the business, improve the effect of subsequent side monitoring information log generation, and reduce failures in the generation process.
[0100] In a possible implementation, in step S800, when the service stage information is configuration stage information, after the side station information digital generation task is implemented and the service stage information is adjusted to generation stage information, the side station information digital generation method further includes: S810, analyzing whether the digital generation service of the side station information is completed.
[0101] It is understood that the files or records related to the generated service can be checked to check whether the digital generation service of the station information is completed. The status of the service can also be queried regularly or in real time through the service management program to determine whether the digital generation service of the station information is completed.
[0102] With this configuration, by analyzing whether the digital generation service of the side station information is completed, data support can be provided for subsequent generation strategies, thereby facilitating subsequent data processing and analysis capabilities.
[0103] S820: When it is found that the service of digital generation of the side station information is completed, the service phase information is adjusted to the configuration phase information.
[0104] It can be understood that when it is parsed that the digital generation of side station information is completed, it means that the digital generation of side station information has been completed, no business is being processed, and it is in idle mode. There is no error in the actual side station information currently obtained, so the business stage information can be adjusted to the configuration stage information to indicate that there will be no problem of being unable to perform the digital generation of side station information business, and the digital generation task of the side station information can be implemented again.
[0105] With such a setting, when it is parsed that the digital generation service of the side station information is completed, the service stage information is adjusted to the configuration stage information, which can clearly identify the stage of the current generation process and avoid confusion and misoperation.
[0106] S900, when the service phase information is not configuration information, adjust the active phase information to the phase information to be generated. The active phase information is used to reflect the phase information of the service to be generated by the side station information generating device, and the active phase information is one of the configuration phase information and the phase information to be generated.
[0107] It can be understood that the information in the to-be-generated stage is information that the current actual side station information has errors and is in the to-be-generated stage, or information that the current actual side station information has no errors and is in the to-be-generated stage.
[0108] For example, when the service stage information is not configuration information, it may indicate that a certain service is currently running and is in a busy mode, that is, the service of digital generation of station information cannot be run again, or it may indicate that the current actual station information has errors, and the corresponding station information log is to be generated using the wrong actual station information, that is, the service of digital generation of station information cannot be run again. Therefore, the active stage information is adjusted to the stage information to be generated, to indicate that a certain service is currently running and is in a busy state, and the service of digital generation of station information cannot be run again, or it indicates that the current actual station information has errors, and the corresponding station information log is to be generated using the wrong actual station information, and the corresponding station information log is generated by the wrong actual station information, and the service of digital generation of station information can be performed normally again only after the wrong actual station information generates the corresponding station information log and deletes the corresponding station information log.
[0109] With such a setting, when the business stage information is not configuration information, the active stage information is adjusted to the stage information to be generated. This can avoid generation conflicts or errors caused by other business operations or errors in the current actual side-station information. It can also help avoid the problem that subsequent non-erroneous actual side-station information cannot perform the side-station information digital generation business.
[0110] In a possible implementation, in step S900, when the service stage information is not configuration information, after the activity stage information is adjusted to the stage information to be generated, the method for digitally generating the station information further includes: S910, analyzing whether the activity stage information is stage information to be generated.
[0111] It is understood that files or records related to the activity stage can be viewed to check whether the activity stage information is the stage information to be generated. It is also possible to query through a special management tool or interface to determine whether the activity stage information is the stage information to be generated.
[0112] With such a setting, by analyzing whether the activity stage information is the stage information to be generated, data support can be provided for subsequent generation strategies, thereby facilitating subsequent data processing and analysis capabilities.
[0113] S920: When the active stage information is the stage information to be generated, the task of completing the generation of the side station information is performed, and the active stage information is adjusted to the configuration stage information.
[0114] It can be understood that when the active stage information is the to-be-generated stage information, it means that a certain service is currently being prepared for operation and is in busy mode, i.e., the service of digital generation of station information cannot be run again, or it may mean that the current actual station information is erroneous, and the erroneous actual station information is to be used to generate the corresponding station information log, i.e., the service of digital generation of station information cannot be run again. Therefore, the current service of digital generation of station information can be run, i.e., the current task of generating station information can be completed. At this time, the corresponding station information log will be generated regardless of whether the actual station information is erroneous or not. In the case where the corresponding station information log is generated for the erroneous actual station information, the response can be The instruction of the side station information log corresponding to the erroneous actual side station information should be deleted. After deleting the side station information log corresponding to the erroneous actual side station information generation, the side station information digital generation service can be carried out again using the actual side station information without errors. Therefore, the activity stage information can be adjusted to the configuration stage information to indicate that no service is being processed at present and it is in idle mode, or the side station information digital generation service can be carried out when there is no error in the current actual side station information. That is, after the current side station information generation task is implemented, there will be no problem of being unable to carry out the side station information digital generation service. That is, the next generation task can be carried out only after the current side station information generation task is completed.
[0115] With such a setting, when the active stage information is the stage information to be generated, the completion generation task of the side-station information is implemented, and the active stage information is adjusted to the configuration stage information. This can avoid generation conflicts or errors caused by other business operations or errors in the current actual side-station information. It can also help avoid the problem that subsequent non-erroneous actual side-station information cannot perform the side-station information digital generation business.
[0116] S600: Receive a side station information log sent by a side station information generating device.
[0117] It can be understood that a monitoring or receiving function is set on the electronic device to wait for the message sent by the side station information generating device. A server interface can be set or a specific topic can be subscribed (such as using MQTT) to receive the side station information log sent by the side station information generating device.
[0118] For example, the on-site supervision information log may be a log reflecting problems and treatment measures in the pouring process, for example, a log recording the content of on-site supervision activities, the specific time and date of occurrence, or a log of construction conditions and construction results.
[0119] For example, as shown in Table 1, a log format can be defined for the monitoring information log, such as timestamp, geographic location, operator information, problem description, and treatment measures. The actual monitoring information is organized into a structured data format, such as JSON, XML, or CSV, and the problem description, treatment measures, timestamp, and other information can be summarized as standard fields. According to the set log format and template (such as including timestamp, operator, operation content, and other fields), the actual monitoring information is inserted into the log to generate a complete monitoring information log.
[0120] Table 1 With such a setting, by receiving the side station information log sent by the side station information generating device, the side station information generating device can automatically perform log generation activities, thereby reducing the need for manual recording and processing of information, thereby helping to reduce the time and labor cost of side station information generation.
[0121] In a possible implementation, the method for digitally generating the side station information further includes: The side station information generating device is requested to generate the actual side station information according to the timestamp to obtain the side station information log.
[0122] It can be understood that the timestamp can be the time when the actual side station information is obtained, or it can be the time mark corresponding to the actual side station information, and one actual side station information corresponds to one time mark. The actual side station information is sorted according to the timestamp, so that the side station information generating device generates according to the time sequence of the actual side station information, thereby obtaining the side station information log.
[0123] With such a setting, the request side station information generation device generates the actual side station information according to the timestamp to obtain the side station information log, which can ensure that the generated log is arranged in the actual occurrence order of the actual side station information, avoid log recording errors caused by confusion in the information processing order, and improve the accuracy of the log.
[0124] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0125] Corresponding to the method for digitally generating by-station information described in the above embodiment, the embodiment of the present application further provides a system for digitally generating by-station information, and each unit of the system can implement each step of the method for digitally generating by-station information. Figure 4 A structural block diagram of a system for digitally generating side station information provided in an embodiment of the present application is shown. For ease of explanation, only the parts related to the embodiment of the present application are shown.
[0126] Reference Figure 4 , the digital generation system of the station information includes: The response unit is used for the electronic device to send a historical side station information request to the side station information generating device in response to a first operation, wherein the first operation is used to instruct the generation of a side station information log.
[0127] The receiving unit is used to receive the historical monitoring information sent by the monitoring information generating device, wherein the historical monitoring information is used to reflect the information in the historical monitoring pouring construction process.
[0128] The generating unit is used for the electronic device to generate an original side station information log template based on the historical side station information.
[0129] The adjusting unit is used for the electronic device to adjust the on-site station problem information and the processing measure information in the original on-site station information log template in response to the second operation to obtain an adjusted on-site station information log template.
[0130] The sending unit is used for the electronic device to generate actual side station information based on the adjusted side station information log template, and send the actual side station information and the first request to the side station information generating device.
[0131] The receiving unit is used to receive the side station information log sent by the side station information generating device.
[0132] It should be noted that the information interaction, execution process, etc. between the above-mentioned systems / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0133] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the division of the above-mentioned functional units is used as an example for illustration. In practical applications, the above-mentioned functions can be assigned to different functional units as needed, that is, the internal structure of the system can be divided into different functional units to complete all or part of the functions described above. The functional units in the embodiment can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0134] The embodiment of the present application also provides an electronic device, Figure 5 This is a schematic diagram of the structure of an electronic device provided by an embodiment of the present application. Figure 5 As shown, the electronic device 6 of this embodiment includes: at least one processor 60 ( Figure 5 Only one is shown), at least one memory 61 ( Figure 5 Only one is shown in the figure) and a computer program 62 stored in the at least one memory 61 and executable on the at least one processor 60. When the processor 60 executes the computer program 62, the electronic device 6 implements the steps in any of the above-mentioned embodiments of the method for digitally generating side station information, or implements the functions of the units in the above-mentioned system embodiments.
[0135] Exemplarily, the computer program 62 may be divided into one or more units, which are stored in the memory 61 and executed by the processor 60 to complete the present application. The one or more units may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program 62 in the electronic device 6.
[0136] The electronic device may be a mobile phone, a tablet computer, a laptop computer, an ultra-mobile personal computer (UMPC), a netbook, a desktop computer, a computing device or a computer connected to a wireless modem, a laptop computer, a handheld communication device, a handheld computing device, etc. The electronic device 6 may include, but is not limited to, a processor 60 and a memory 61. Those skilled in the art will appreciate that Figure 5It is only an example of the electronic device 6 and does not constitute a limitation on the electronic device 6. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, buses, etc.
[0137] The processor 60 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0138] In some embodiments, the memory 61 may be an internal storage unit of the electronic device 6, such as a hard disk or memory of the electronic device 6. In other embodiments, the memory 61 may also be an external storage device of the electronic device 6, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the electronic device 6. Further, the memory 61 may also include both an internal storage unit and an external storage device of the electronic device 6. The memory 61 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program. The memory 61 may also be used to temporarily store data that has been output or is to be output.
[0139] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.
[0140] An embodiment of the present application provides a computer program product. When the computer program product is executed on an electronic device, the electronic device implements the steps in any of the above method embodiments.
[0141] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to an electronic device, a recording medium, a computer memory, a read-only memory (ROM, Read-Only Memory), a random access memory (RAM, Random Access Memory), an electrical carrier signal, a telecommunication signal, and a software distribution medium. For example, a USB flash drive, a mobile hard disk, a disk or an optical disk.
[0142] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0143] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0144] In the embodiments provided in the present application, it should be understood that the disclosed electronic device, the digital generation system of the side station information and the digital generation method of the side station information can be implemented in other ways. For example, the electronic device / side station information digital generation system embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.
[0145] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0146] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A method for digitally generating side station information, characterized in that: Applied to an electronic device, the electronic device is communicatively connected with a side station information generating device, and the method comprises: The electronic device sends a historical station information request to the station information generating device in response to a first operation; wherein the first operation is used to instruct the generation of a station information log; Receiving historical monitoring information sent by the monitoring information generating device; wherein the historical monitoring information is used to reflect the information in the historical monitoring pouring construction process; The electronic device generates an original side station information log template based on the historical side station information; The electronic device adjusts the on-site monitoring problem information and the processing measure information in the original on-site monitoring information log template in response to the second operation to obtain an adjusted on-site monitoring information log template; wherein the second operation is used to adjust the content of the historical on-site monitoring information, the on-site monitoring problem information is used to reflect the problems in the historical on-site monitoring process, the processing measure information is used to reflect the processing measures corresponding to the on-site monitoring problem information in the historical on-site monitoring process, and the adjusted on-site monitoring information log template is used to reflect the problems in the actual on-site monitoring process and the processing measures corresponding to the problems in the actual on-site monitoring process; The electronic device generates actual station information based on the adjusted station information log template, and sends the actual station information and a first request to the station information generating device; wherein the first request is used to request the station information generating device to generate the station information log according to the actual station information; Receive the by-station information log sent by the by-station information generating device.
2. The method for digitally generating the side station information according to claim 1, characterized in that: The electronic device adjusts the on-site station problem information and the processing measure information in the original on-site station information log template in response to the second operation to obtain an adjusted on-site station information log template, including: The electronic device obtains the on-site station problem information and the processing measure information in the original on-site station information log template in response to the second operation; In response to the adjustment operation on the on-site problem information and the processing measure information, the contents of the on-site problem information and the processing measure information in the original on-site information log template are adjusted to obtain the adjusted on-site information log template.
3. The method for digitally generating the side station information according to claim 1, characterized in that: Before the electronic device generates actual side station information based on the adjusted side station information log template and sends the actual side station information and the first request to the side station information generating device, the method further includes: The generation period recorded by the electronic device for requesting the side station information generating device to generate side station information is adjusted to a non-standard generation period; wherein the non-standard generation period is a period during which the side station information generating device generates the side station information based on the actual side station information sent by the electronic device and the first request in the side station state, and a period that does not overlap with the task period of the side station information generating device; the non-standard generation period is generated by the task period and the variation of the side station information generating device; The electronic device sends the information corresponding to the non-standard generation period to the side station information generation device, so that the side station information generation device performs the side station information digital generation task based on the information corresponding to the non-standard generation period.
4. The method for digitally generating the side station information according to claim 3, characterized in that: Before the electronic device sends the information corresponding to the non-standard generation period to the side station information generation device so that the side station information generation device performs the side station information digital generation task based on the information corresponding to the non-standard generation period, the method further includes: Sending task period acquisition data to the side station information generating device; wherein the task period acquisition data is used to obtain the task period of the side station information generating device; When feedback data corresponding to the task period acquisition data is obtained, and the feedback data reflects the data of the task period, information is obtained that the current generation state does not meet the requirements of the execution standard generation period; wherein the requirements of the execution standard generation period are the requirements of the task period when the electronic device does not obtain the side station information generation device; When the feedback data corresponding to the data acquired during the task period is not obtained, or when the feedback data corresponding to the data acquired during the task period is obtained and the feedback data is not reflected as the data of the task period, information is obtained that the current generation status meets the requirements of the execution standard generation period.
5. The method for digitally generating the side station information according to claim 4, characterized in that: After sending the task period acquisition data to the side station information generating device, the method further includes: When the current generation state does not meet the requirements for executing the standard generation period, adjusting the generation period recorded by the electronic device for requesting the side station information generating device to generate the side station information to a non-standard generation period; If the current build status meets the requirements for executing the standard build period, no adjustments are made.
6. The method for digitally generating the side station information according to claim 3, characterized in that: After the electronic device sends the information corresponding to the non-standard generation period to the side station information generation device so that the side station information generation device performs the side station information digital generation task based on the information corresponding to the non-standard generation period, the method further includes: If the on-site information generating device does not perform the on-site information digital generation task based on the information corresponding to the non-standard generation period in the on-site state, a new non-standard generation period is generated based on the non-standard generation period; Based on the information corresponding to the new non-standard generation period, the side station information generation device is requested to perform the side station information digital generation task.
7. The method for digitally generating the side station information according to claim 3, characterized in that: After the electronic device sends the information corresponding to the non-standard generation period to the side station information generation device so that the side station information generation device performs the side station information digital generation task based on the information corresponding to the non-standard generation period, the method further includes: When a digital generation service of side station information is detected, the service stage information is acquired; wherein the digital generation service of side station information is generated when the side station information generating device meets the side station information generating conditions, and the service stage information is used to reflect the stage information of the side station information generating device currently running the digital generation service of side station information, and the service stage information is one of configuration stage information, generation stage information and completion stage information; In the case where the business phase information is configuration phase information, a side station information digital generation task is implemented, and the business phase information is adjusted to generation phase information; When the service phase information is not configuration information, the active phase information is adjusted to the phase information to be generated; wherein the active phase information is used to reflect the phase information of the service to be generated by the side station information generating device this time, and the active phase information is one of the configuration phase information and the phase information to be generated.
8. The method for digitally generating the side station information according to claim 7, characterized in that: In the case where the service stage information is configuration stage information, after the side station information digital generation task is implemented and the service stage information is adjusted to generation stage information, the method further includes: Analyze whether the digital generation service of the side station information is completed; When it is parsed that the digital generation service of the side station information is completed, the service phase information is adjusted to configuration phase information.
9. The method for digitally generating the side station information according to claim 7, characterized in that: In the case where the service stage information is not configuration information, after adjusting the activity stage information to the stage information to be generated, the method further includes: Analyze whether the activity stage information is stage information to be generated; In the case that the activity phase information is the phase information to be generated, the completion generation task of the side station information is implemented, and the activity phase information is adjusted to the configuration phase information.
10. A digital generation system for side station information, characterized in that: Applied to electronic equipment, the electronic equipment is communicatively connected with a side station information generating device, and the side station information digital generating system comprises: A response unit, configured for the electronic device to send a historical station information request to the station information generating device in response to a first operation; wherein the first operation is used to instruct the generation of a station information log; A receiving unit, used to receive the historical monitoring information sent by the monitoring information generating device; wherein the historical monitoring information is used to reflect the information in the historical monitoring pouring construction process; A generating unit, configured for the electronic device to generate an original side station information log template based on the historical side station information; An adjusting unit, configured for the electronic device to adjust the on-site station problem information and the processing measure information in the original on-site station information log template in response to a second operation, so as to obtain an adjusted on-site station information log template; A sending unit, configured for the electronic device to generate actual side station information based on the adjusted side station information log template, and send the actual side station information and the first request to the side station information generating device; A receiving unit is used to receive the side station information log sent by the side station information generating device.
Citation Information
Patent Citations
Intelligent side station supervision method and system
CN113850562A
Case generation method and device, equipment and medium
CN115981602A
System and method for quickly adjusting and generating plan scheduling scheme
CN116011696A
Project supervision log automatic generation method and system
CN116738080A
Log analysis method and device, electronic equipment and storage medium
CN118132711A