Abnormal prediction method and device, computer equipment and storage medium
By obtaining the operating parameters and trend change cycles of the baling parts of the Dafang baler in the preset period, combined with the abnormal prediction model, the problem of difficulty in predicting the abnormal prediction of the Dafang baler is solved, and accurate abnormal prediction and continuous of the baling parts are achieved. Run stably.
Patent Information
- Application Number
- CN202411070528.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-19
AI Technical Summary
Because the Dafang baler contains a large number of baling parts, it is difficult to predict abnormalities, and it is impossible to accurately realize abnormal prediction for Dafang baler.
By obtaining the component operation parameters of any baling component in the preset period during the baling machine operation, determine the time period of the upward trend change and the downward trend change, and based on these parameters and cycles, it is determined that the baling component is in the preset period. Whether there are any abnormalities in the future period after the cycle is made by combining the trained anomaly prediction model.
Accurate abnormal prediction of the baling parts of the Dafang baler is achieved, ensuring the continuous and stable operation of the baler, and improving the accuracy and efficiency of abnormal detection.
Smart Images

Figure CN118981732A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of fault monitoring, and in particular to an abnormality prediction method, apparatus, computer equipment and storage medium. Background Art
[0002] At present, with the development of straw collection and storage system, traditional small square balers and round balers can no longer meet the demand. Large square balers have the advantages of high operating efficiency, high bale density, regular bale shape and easy transportation, and are deeply loved by users of straw and forage harvesting operations.
[0003] However, since a large square baler contains a large number of baling components, it is difficult to accurately predict abnormalities for the large square baler. Summary of the invention
[0004] Based on this, it is necessary to provide an abnormality prediction method, device, computer equipment and storage medium that can accurately realize abnormality prediction for large square balers in response to the above technical problems.
[0005] In a first aspect, the present application provides an abnormality prediction method. The method comprises:
[0006] Obtaining component operation parameters corresponding to any baling component within a preset period during the baler operation process;
[0007] Determine at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend, from the preset periods;
[0008] It is determined whether the baling component has an abnormality in a future time period after the preset period according to the component operation parameters, each of the first time periods and each of the second time periods.
[0009] In one embodiment, determining whether the baling component has an abnormality in a future time period after the preset period according to the component operation parameter, each of the first time periods and each of the second time periods includes:
[0010] Performing period screening on each of the first time periods and each of the second time periods respectively to obtain at least one first target period after screening of each of the first time periods, and at least one second target period after screening of each of the second time periods;
[0011] It is determined whether the baling component has an abnormality in a future time period after the preset period according to the component operation parameters, each of the first target cycles and each of the second target cycles.
[0012] In one embodiment, determining whether the bundling component has an abnormality in a future period after the preset period according to the component operation parameter, each of the first target cycles and each of the second target cycles includes:
[0013] Selecting component operation parameters at the start and end times corresponding to the first target period as first start and end parameters;
[0014] Selecting component operation parameters at the start and end times corresponding to the second target period as second start and end parameters;
[0015] Based on the trained abnormality prediction model, it is determined whether the baling component has an abnormality in a future period after the preset period according to the first start and end parameters and the second start and end parameters.
[0016] In one embodiment, the period screening of each of the first time periods and each of the second time periods to obtain at least one first target period after screening of each of the first time periods and at least one second target period after screening of each of the second time periods comprises:
[0017] Remove the first time periods whose period length is less than a preset length threshold from the first time periods to obtain at least one first reference period;
[0018] Remove the second time periods whose period length is less than a preset length threshold from the second time periods to obtain at least one second reference period;
[0019] At least one first target period is determined according to each of the first reference periods, and at least one second target period is determined according to each of the second reference periods.
[0020] In one embodiment, determining at least one first target period according to each of the first reference periods, and determining at least one second target period according to each of the second reference periods, comprises:
[0021] Determine a first parameter difference corresponding to each of the first reference cycles, and a second parameter difference corresponding to each of the second reference cycles; wherein the first parameter difference refers to a difference between a maximum component operating parameter and a corresponding minimum component operating parameter in the first reference cycle; and the second parameter difference refers to a difference between a maximum component operating parameter and a corresponding minimum component operating parameter in the second reference cycle;
[0022] Remove the first reference cycles whose first parameter difference values in the first reference cycles are less than a difference threshold value, to obtain at least one first target cycle;
[0023] The first reference periods whose second parameter difference in each of the second reference periods is less than a difference threshold are removed to obtain at least one second target period.
[0024] In one embodiment, the method further comprises:
[0025] Determine the current device status of each of the bundling components according to the component operation parameters corresponding to each of the devices to be detected within a preset period;
[0026] According to the current device status, an abnormal baling component is determined, and an abnormal alarm is issued for the abnormal baling component.
[0027] In a second aspect, the present application also provides an abnormality prediction device. The device comprises:
[0028] An acquisition module, used for acquiring component operation parameters corresponding to any baling component within a preset period during the operation of the baler;
[0029] A first determining module, configured to determine, from the preset periods, at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend;
[0030] The second determining module is used to determine whether the bundling component has an abnormality in a future time period after the preset period according to the component operation parameters, each of the first time periods and each of the second time periods.
[0031] In a third aspect, the present application further provides a computer device. The computer device includes a memory and a processor, the memory stores a computer program, and the processor implements the following steps when executing the computer program:
[0032] Obtaining component operation parameters corresponding to any baling component within a preset period during the baler operation process;
[0033] Determine at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend, from the preset periods;
[0034] It is determined whether the baling component has an abnormality in a future time period after the preset period according to the component operation parameters, each of the first time periods and each of the second time periods.
[0035] In a fourth aspect, the present application further provides a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the following steps are implemented:
[0036] Obtaining component operation parameters corresponding to any baling component within a preset period during the baler operation process;
[0037] Determine at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend, from the preset periods;
[0038] It is determined whether the baling component has an abnormality in a future time period after the preset period according to the component operation parameters, each of the first time periods and each of the second time periods.
[0039] In a fifth aspect, the present application further provides a computer program product. The computer program product includes a computer program, and when the computer program is executed by a processor, the following steps are implemented:
[0040] Obtaining component operation parameters corresponding to any baling component within a preset period during the baler operation process;
[0041] Determine at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend, from the preset periods;
[0042] It is determined whether the baling component has an abnormality in a future time period after the preset period according to the component operation parameters, each of the first time periods and each of the second time periods.
[0043] The above-mentioned abnormality prediction method, device, computer equipment and storage medium obtain the component operation parameters corresponding to any baling component in the preset period during the operation of the baler, and then determine whether the baling component has an abnormality in the future time period after the preset period according to the component operation parameters, each first time period and each second time period. According to the above content, the present application obtains the status of each baling component through the component operation parameters corresponding to any baling component in the preset period, and provides a data basis for the subsequent determination of whether the baling component has an abnormality in the future time period after the preset period, and obtains the parameter trend change of the component operation parameters of each baling component in the preset period from the first time period and the second time period in the preset period, and then ensures that when determining whether the baling component has an abnormality in the future time period after the preset period, it can be combined with the trend change of the component operation parameters of each baling component in the preset period to ensure the accuracy of the subsequent abnormality prediction of each baling component, and ensure the continuous and stable operation of the baler. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 An application environment diagram of an abnormality prediction method provided in an embodiment of the present application;
[0045] Figure 2 A schematic diagram of a first abnormality prediction method provided in an embodiment of the present application;
[0046] Figure 3 A schematic diagram of a second abnormality prediction method provided in an embodiment of the present application;
[0047] Figure 4 A schematic diagram of a third abnormality prediction method provided in an embodiment of the present application;
[0048] Figure 5 A schematic diagram of a main controller and a sensor provided in an embodiment of the present application;
[0049] Figure 6 A schematic diagram of a fourth abnormality prediction method provided in an embodiment of the present application;
[0050] Figure 7 A structural block diagram of a first abnormality prediction device provided in an embodiment of the present application;
[0051] Figure 8 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0052] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0053] It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. In the description of the present application, the description of the reference terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms is not necessarily for the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art can combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples without contradicting each other.
[0054] The abnormality prediction method provided in the embodiment of the present application can be applied to Figure 1In the application environment shown. Among them, the terminal 102 communicates with the server 104 through the network. The data storage system can store data that the server 104 needs to process. The data storage system can be integrated on the server 104, or it can be placed on the cloud or other network servers. By obtaining the component operation parameters corresponding to any baling component in the preset period during the operation of the baler, from the first time period and the second time period in the preset period, and then, according to the component operation parameters, each first time period and each second time period, determine whether the baling component has an abnormality in the future time period after the preset period. Among them, the terminal 102 can be but is not limited to various personal computers, laptops, smart phones, tablets, Internet of Things devices and portable wearable devices. The Internet of Things devices can be smart speakers, smart TVs, smart air conditioners, smart car-mounted devices, etc. Portable wearable devices can be smart watches, smart bracelets, head-mounted devices, etc. The server 104 can be implemented by an independent server or a server cluster consisting of multiple servers.
[0055] In one embodiment, Figure 2 As shown, an abnormal prediction method is provided, which is applied to Figure 1 The terminal 102 in the example is used as an example to illustrate, and the following steps are included:
[0056] S201, obtaining component operation parameters corresponding to any baling component within a preset period during the operation of the baler.
[0057] The baling components may include but are not limited to: a pick-up clutch, a feed clutch, a flywheel clutch, a flywheel shear bolt, a filling drive shear bolt, a bale weight sensor and other components.
[0058] It should be noted that when it is necessary to obtain the component operating parameters corresponding to each baling component within a preset period, a collection sensor for the corresponding baling component can be set in advance at each baling component. Through each collection sensor, the operation of obtaining the component operating parameters corresponding to any baling component within a preset period during the operation of the baler can be realized.
[0059] In one embodiment of the present application, for a certain bundling component, when it is necessary to obtain the component operating parameters corresponding to the bundling component within a preset period, the data collection function of the collection sensor can be triggered when the current time reaches the start time of the preset period, and when the current time reaches the end time of the preset period, the data collection function of the collection sensor is turned off, and the component operating parameters collected by the collection sensor within the preset period are received.
[0060] Further explanation: in order to ensure the smooth progress of subsequent operation processes and to ensure the accuracy of predicting whether there are abnormalities in the bundling components in the future time period after the preset cycle, after receiving the parameters collected by the collection sensor in the preset period, it is necessary to preprocess the parameters to obtain the preprocessed component operation parameters.
[0061] In one embodiment of the present application, when it is necessary to perform data preprocessing on the parameters collected by the acquisition sensor, the parameters can be cleaned in advance, wherein the data cleaning includes deduplication operations, missing value processing, outlier processing, etc. on the parameters; further, the parameters that have completed data cleaning are normalized to obtain the preprocessed component operation parameters.
[0062] S202: Determine, from preset periods, at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend.
[0063] The first time period refers to a period during which the component operating parameter shows an upward trend within a preset period; the second time period refers to a period during which the component operating parameter shows a downward trend within the preset period.
[0064] In one embodiment set of the present application, when it is necessary to determine the first time period and the second time period from a preset period, a data line graph corresponding to the component operation parameters within the preset period can be determined based on the component operation parameters within the preset period; then, based on the rising and falling trends of the line in the data line graph corresponding to the component operation parameters, the operation of determining at least one first time period corresponding to the component operation parameters that change with an upward trend and at least one second time period corresponding to the component operation parameters that change with a downward trend from the preset period is implemented.
[0065] In another embodiment of the present application, in order to ensure the timeliness of the subsequent judgment of whether there is an abnormality in the baling component in a future time period after a preset period based on each first time period and each second time period, the period lengths of the first time period and the second time period may be limited to achieve the removal of periods in the first time period and the second time period whose period lengths are less than a preset length threshold, thereby reducing the time required to determine whether there is an abnormality in the baling component in a future time period after the preset period while ensuring the accuracy of the judgment.
[0066] S203: Determine whether there is an abnormality in the bundling component in a future time period after a preset period according to the component operation parameters, each first time period and each second time period.
[0067] It should be noted that the abnormality prediction model may be pre-trained, and then, the abnormality prediction model may be used to determine whether the bundling component has an abnormality in a future period after a preset period according to the component operation parameters, each first time period and each second time period.
[0068] Specifically, by inputting component operation parameters, each first time period and each second time period into a pre-trained abnormality prediction model, an output result of the abnormality prediction model is obtained, and the output result is used to characterize whether there is an abnormality in the bundling component in a future time period after a preset period.
[0069] In one embodiment of the present application, when it is necessary to train an abnormality prediction model, the following contents may be included: obtaining sample operation parameters corresponding to at least one sample component within a preset period; determining, based on the sample operation parameters, a first sample period in which the sample operation parameters show an upward trend, and a second sample period in which the sample operation parameters show a downward trend from the preset period; marking the sample operation parameters, the first sample period, and the second sample period based on the historical experience of the staff to determine whether the sample component has an abnormality in a future time period after the preset period, and then, training the abnormality prediction model based on the labeled sample operation parameters, the first sample period, and the second sample period to obtain a trained abnormality prediction model.
[0070] Furthermore, the output result of the abnormality prediction model may be a prediction parameter, which pre-sets a first value range of the prediction parameter corresponding to the presence of an abnormality in the baling component in a future time period after a preset cycle, and pre-sets a second value range of the prediction parameter corresponding to the presence of an abnormality in the baling component in a future time period after a preset cycle; after determining the prediction parameter output by the abnormality prediction model, determine the relationship between the prediction parameter and the first value range and the second value range, and then, based on the relationship, determine whether the baling component has an abnormality in the future time period after the preset cycle.
[0071] The above-mentioned abnormality prediction method obtains the component operation parameters corresponding to any baling component in the preset period during the operation of the baler, and then determines whether the baling component has an abnormality in the future time period after the preset period based on the component operation parameters, each first time period and each second time period. According to the above content, the present application obtains the status of each baling component through the component operation parameters corresponding to any baling component in the preset period, and provides a data basis for the subsequent determination of whether the baling component has an abnormality in the future time period after the preset period, and obtains the parameter trend change of the component operation parameters of each baling component in the preset period from the first time period and the second time period in the preset period, and then ensures that when determining whether the baling component has an abnormality in the future time period after the preset period, the trend change of the component operation parameters of each baling component in the preset period can be combined to ensure the accuracy of the subsequent abnormality prediction of each baling component, and ensure the continuous and stable operation of the baler.
[0072] In one embodiment, if Figure 3 As shown, when it is necessary to determine whether there is an abnormality in the future time period after the preset period of the baling component according to the component operation parameters, each first time period and each second time period, the following contents may be specifically included:
[0073] S301, periodically screening each first time period and each second time period to obtain at least one first target period after screening of each first time period and at least one second target period after screening of each second time period.
[0074] It should be noted that when it is necessary to perform period screening on each first time period and each second time period, the following contents may be included: removing the first time periods in each first time period whose period length is less than a preset length threshold, and obtaining at least one first reference period; removing the second time periods in each second time period whose period length is less than the preset length threshold, and obtaining at least one second reference period; determining at least one first target period based on each first reference period, and determining at least one second target period based on each second reference period.
[0075] Among them, the preset length threshold can be set or adjusted according to the actual situation and the historical experience of the staff, and the value range of the preset length threshold is not limited here.
[0076] It is further explained that in order to further improve the efficiency of subsequent determination of whether there is an abnormality in the future time period after the preset cycle, it is necessary to remove the cycles with less influence on the determination of whether there is an abnormality in the future time period after the preset cycle, and retain the cycles with greater influence; to this end, determining at least one first target cycle according to each first reference cycle, and determining at least one second target cycle according to each second reference cycle, may include the following contents: determining a first parameter difference corresponding to each first reference cycle, and a second parameter difference corresponding to each second reference cycle; wherein the first parameter difference refers to the difference between the maximum component operating parameter and the corresponding minimum component operating parameter in the first reference cycle; the second parameter difference refers to the difference between the maximum component operating parameter and the corresponding minimum component operating parameter in the second reference cycle; removing the first reference cycle in each first reference cycle where the first parameter difference is less than the difference threshold, and obtaining at least one first target cycle; removing the first reference cycle in each second reference cycle where the second parameter difference is less than the difference threshold, and obtaining at least one second target cycle.
[0077] The difference threshold may be set or adjusted according to actual conditions and historical experience of staff, and the value range of the difference threshold is not limited here.
[0078] S302: Determine whether there is an abnormality in the bundling component in a future period after a preset period according to the component operation parameters, each first target period and each second target period.
[0079] It should be noted that, when it is necessary to determine whether there is an abnormality in the future time period after a preset cycle for the baling components, the following contents may be specifically included: selecting component operation parameters at the start and end times corresponding to the first target cycle as the first start and end parameters; selecting component operation parameters at the start and end times corresponding to the second target cycle as the second start and end parameters; based on the trained abnormality prediction model, determine whether there is an abnormality in the future time period after the preset cycle according to the first start and end parameters and the second start and end parameters.
[0080] Among them, the first start and end parameters include parameters corresponding to the starting time of the component operation parameters in the first target cycle, and parameters corresponding to the end time of the component operation parameters in the first target cycle; the second start and end parameters include parameters corresponding to the starting time of the component operation parameters in the second target cycle, and parameters corresponding to the end time of the component operation parameters in the second target cycle.
[0081] Specifically, by inputting the first start and end parameters and the second start and end parameters into a pre-trained abnormality prediction model, an output result of the abnormality prediction model is obtained, and the output result can be used to characterize whether there is an abnormality in the bundling component in a future period after a preset period.
[0082] Further explanation, in order to further improve the accuracy of determining whether there is an abnormality in the baling component in a future time period after a preset period, after determining the first start-end parameter and the second start-end parameter, the start time and end time corresponding to each of the first start-end parameter and the second start-end parameter are respectively marked as timestamps on the response parameters, and then, the first start-end parameter and the second start-end parameter marked with timestamps are input into a pre-trained abnormality prediction model to obtain the output result of the abnormality prediction model, which can be used to characterize whether there is an abnormality in the baling component in a future time period after the preset period.
[0083] The above-mentioned abnormality prediction method, by determining each first target period and each second target period, realizes the subsequent determination of whether there is an abnormality in the baling component in a future time period after a preset period, and ensures that when subsequently determining whether there is an abnormality in the baling component in a future time period after a preset period, the trend change of the component operation parameters of each baling component in the preset period can be combined to ensure the accuracy of the subsequent abnormality prediction of each baling component, thereby ensuring the continuous and stable operation of the baler.
[0084] In one embodiment, if Figure 4 As shown, this application may also include the following contents:
[0085] S401, determining the current device status of each bundling component according to the component operation parameters corresponding to each device to be detected within a preset period.
[0086] It should be noted that when the current equipment status of the baling component needs to be determined, the parameter value range corresponding to the component operation parameter can be pre-set, and then the current equipment status of each baling component can be determined based on the inclusion relationship between the parameter value range and the component operation parameter.
[0087] Among them, the current equipment state of the baling component may include but is not limited to: normal working state and abnormal working state; specifically, if the component operating parameters of a baling component within a preset period all belong to the parameter value range, then the current equipment state of the baling component is determined to be a normal working state; if the component operating parameters of a baling component within the preset period include component operating parameters that do not belong to the parameter value range, then the current equipment state of the baling component is determined to be an abnormal working state.
[0088] In one embodiment of the application, since each bale of grass is compressed piece by piece by a piston, that is, a bale of grass is composed of multiple pieces of grass, the connecting rod pushes the piston to perform compression movement, and the force sensor on the connecting rod will collect pressure every time it is compressed. When the pressure is too large or too small, it will be calculated by the controller and then send an instruction to the bale chamber pre-compression cylinder valve group. After receiving the instruction, the valve group will control the cylinder to extend and retract to adjust the pre-tightening force of the bale chamber, thereby intervening in the compression force of the piston to achieve relative stability of the compression force, and at the same time control the weight of the grass bale. The successfully harvested square bale will be pushed out of the bale chamber and then arrive at the bracket located in the bale chamber. There will be a weighing sensor on the bracket. When the grass bale completely arrives on the bracket, the controller will immediately collect the corresponding component operation parameters transmitted by the weighing sensor within the preset period, and then, according to the component operation parameters and the inclusive relationship between the component operation parameters, determine the current equipment status of each baling component.
[0089] Further explanation: after determining the component operation parameters corresponding to each device to be detected within the preset period, ratio operation can be performed on each component operation parameter, and then, based on the inclusion relationship between the parameter value range and the ratio operation result, the current device status of each bundling component can be determined.
[0090] In one embodiment of the present application, if the baling component is a clutch (for example, a picking clutch, a feeding clutch, a flywheel clutch), the speed sensors provided before and after the clutch are used to determine the component operating parameters within a preset period before and after the clutch. For each moment within the preset period, a ratio operation is performed on the component operating parameters corresponding to the front of the clutch and the component operating parameters corresponding to the back of the clutch to verify whether the ratio operation result falls within the parameter value range. If so, the current device state of the clutch is determined to be a normal working state; if not, the current device state of the clutch is determined to be an abnormal working state.
[0091] In one embodiment of the present application, if the bundling component is an overload bolt (for example, a flywheel shear bolt, a filling drive shear bolt), the component operating parameters within a preset period before and after the overload bolt are determined by using rotation sensors provided before and after the overload bolt. For each moment in the preset period, a ratio operation is performed on the component operating parameters corresponding to the component before the overload bolt and the component operating parameters corresponding to the overload bolt after the overload bolt to verify whether the ratio operation result belongs to the parameter value range. If so, it is determined that the current device state of the overload bolt is a normal working state; if not, it is determined that the overload bolt is broken due to overload, and therefore, the current device state of the overload bolt is determined to be an abnormal working state.
[0092] S402, determining abnormal bundling components according to the current status of each device, and issuing an abnormal alarm for the abnormal bundling components.
[0093] It should be noted that after determining the current equipment status of each bundling component, the bundling component whose current equipment status is an abnormal working state is regarded as an abnormal bundling component, and then, an abnormal alarm is issued for the abnormal bundling component so that the equipment operation and maintenance personnel can perform component inspection and repair on the abnormal bundling component.
[0094] In an embodiment of the present application, a human-machine interaction interface may be pre-set, and the main controller may be used to determine abnormal baling components according to the current device status of each baling component, and issue an abnormal alarm for the abnormal baling component.
[0095] Specifically, Figure 5 As shown, the main controller is connected to the sensors corresponding to each baling component. Specifically, the sensors connected to the main controller may include but are not limited to: rotation speed sensor, connecting rod force sensor, bundle detection sensor, position sensor, hydraulic sensor, lighting equipment sensor, etc. The sensors connected to the main controller are not limited here. In addition, the main controller is also connected to the buzzer alarm. When an abnormal baling component is determined, the main controller can control the buzzer alarm to perform an abnormal alarm operation for the abnormal baling component, and display the abnormal baling component and the component operation parameters corresponding to the abnormal baling component on the human-computer interaction interface.
[0096] The above-mentioned abnormality prediction method, by determining the current equipment status of each baling component, determines the abnormal baling component according to each current equipment status, and issues an abnormal alarm for the abnormal baling component, thereby realizing safety detection of any baling component during the operation of the baler and ensuring the continuous and stable operation of the baler.
[0097] In one embodiment, if Figure 6 As shown, when it is necessary to determine whether there is an abnormality in the bundling component in the future period after the preset period, the following contents may be specifically included:
[0098] S601, obtaining component operation parameters corresponding to any baling component within a preset period during the operation of the baler.
[0099] S602: Determine, from preset periods, at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend.
[0100] S603: Remove the first time periods whose period length is less than a preset length threshold from the first time periods to obtain at least one first reference period.
[0101] S604: Remove the second time periods whose period lengths are less than a preset length threshold from the second time periods to obtain at least one second reference period.
[0102] S605, determining a first parameter difference corresponding to each first reference period and a second parameter difference corresponding to each second reference period.
[0103] S606: Remove the first reference periods whose first parameter difference is less than the difference threshold in each first reference period to obtain at least one first target period.
[0104] S607, removing the first reference periods whose second parameter difference is less than the difference threshold in each second reference period, to obtain at least one second target period.
[0105] S608: Select component operation parameters at the start and end times corresponding to the first target period as first start and end parameters.
[0106] S609: Select component operation parameters at the start and end times corresponding to the second target period as second start and end parameters.
[0107] S610, based on the trained abnormality prediction model, according to the first start and end parameters and the second start and end parameters, determine whether the baling component has an abnormality in a future period after a preset period.
[0108] The above-mentioned abnormality prediction method obtains the component operation parameters corresponding to any baling component in the preset period during the operation of the baler, and then determines whether the baling component has an abnormality in the future time period after the preset period based on the component operation parameters, each first time period and each second time period. According to the above content, the present application obtains the status of each baling component through the component operation parameters corresponding to any baling component in the preset period, and provides a data basis for the subsequent determination of whether the baling component has an abnormality in the future time period after the preset period, and obtains the parameter trend change of the component operation parameters of each baling component in the preset period from the first time period and the second time period in the preset period, and then ensures that when determining whether the baling component has an abnormality in the future time period after the preset period, the trend change of the component operation parameters of each baling component in the preset period can be combined to ensure the accuracy of the subsequent abnormality prediction of each baling component, and ensure the continuous and stable operation of the baler.
[0109] It should be understood that, although the steps in the flowcharts involved in the above embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above embodiments may include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0110] Based on the same inventive concept, the embodiment of the present application also provides an abnormality prediction device for implementing the abnormality prediction method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more abnormality prediction device embodiments provided below can refer to the limitations of the abnormality prediction method above, and will not be repeated here.
[0111] In one embodiment, Figure 7 As shown, an abnormality prediction device is provided, comprising: an acquisition module 10, a first determination module 20 and a second determination module 30, wherein:
[0112] The acquisition module 10 is used to acquire component operation parameters corresponding to any baling component within a preset period during the operation of the baler.
[0113] The first determination module 20 is used to determine at least one first time period corresponding to the component operation parameter changing in an upward trend and at least one second time period corresponding to the component operation parameter changing in a downward trend from the preset period.
[0114] The second determining module 30 is used to determine whether there is an abnormality in the bundling component in a future time period after a preset period according to the component operation parameters, each first time period and each second time period.
[0115] In one embodiment, period screening is performed on each first time period and each second time period respectively to obtain at least one first target period after screening of each first time period and at least one second target period after screening of each second time period; and it is determined whether there is an abnormality in the bundling component in a future time period after a preset period based on component operation parameters, each first target period and each second target period.
[0116] In one embodiment, component operation parameters at the start and end times corresponding to the first target cycle are selected as first start and end parameters; component operation parameters at the start and end times corresponding to the second target cycle are selected as second start and end parameters; based on the trained abnormality prediction model, it is determined whether there is an abnormality in the bundling component in a future time period after a preset cycle according to the first start and end parameters and the second start and end parameters.
[0117] In one embodiment, first time periods whose cycle lengths are less than a preset length threshold are removed from each first time period to obtain at least one first reference cycle; second time periods whose cycle lengths are less than a preset length threshold are removed from each second time period to obtain at least one second reference cycle; at least one first target cycle is determined based on each first reference cycle, and at least one second target cycle is determined based on each second reference cycle.
[0118] In one embodiment, a first parameter difference corresponding to each first reference cycle and a second parameter difference corresponding to each second reference cycle are determined; wherein the first parameter difference refers to the difference between the maximum component operating parameter and the corresponding minimum component operating parameter in the first reference cycle; the second parameter difference refers to the difference between the maximum component operating parameter and the corresponding minimum component operating parameter in the second reference cycle; the first reference cycle in which the first parameter difference in each first reference cycle is less than the difference threshold is removed to obtain at least one first target cycle; the first reference cycle in which the second parameter difference in each second reference cycle is less than the difference threshold is removed to obtain at least one second target cycle.
[0119] In one embodiment, the current device status of each baling component is determined according to the component operation parameters corresponding to each device to be detected within a preset period; abnormal baling components are determined according to each current device status, and abnormal alarms are issued for the abnormal baling components.
[0120] The above-mentioned abnormality prediction device obtains the component operation parameters corresponding to any baling component in the preset period during the operation of the baler, and then determines whether the baling component has an abnormality in the future time period after the preset period according to the component operation parameters, each first time period and each second time period. According to the above content, the present application obtains the status of each baling component through the component operation parameters corresponding to any baling component in the preset period, and provides a data basis for the subsequent determination of whether the baling component has an abnormality in the future time period after the preset period, and obtains the parameter trend change of the component operation parameters of each baling component in the preset period from the first time period and the second time period in the preset period, and then ensures that when determining whether the baling component has an abnormality in the future time period after the preset period, it can be combined with the trend change of the component operation parameters of each baling component in the preset period to ensure the accuracy of the subsequent abnormality prediction of each baling component, and ensure the continuous and stable operation of the baler.
[0121] Each module in the above-mentioned abnormal prediction device can be implemented in whole or in part by software, hardware and a combination thereof. Each of the above-mentioned modules can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.
[0122] In one embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as follows: Figure 8As shown. The computer device includes a processor, a memory, an input / output interface, a communication interface, a display unit and an input device. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface, the display unit and the input device are connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and the external device. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be implemented through WIFI, a mobile cellular network, NFC (near field communication) or other technologies. When the computer program is executed by the processor, an abnormality prediction method is implemented. The display unit of the computer device is used to form a visually visible picture, which can be a display screen, a projection device or a virtual reality imaging device. The display screen can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covering the display screen, or a button, trackball or touchpad set on the computer device shell, or an external keyboard, touchpad or mouse.
[0123] Those skilled in the art will understand that Figure 8 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0124] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:
[0125] Obtaining component operation parameters corresponding to any baling component within a preset period during the baler operation process;
[0126] Determine at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend, from the preset periods;
[0127] According to the component operation parameters, each first time period and each second time period, it is determined whether there is an abnormality in the baling component within a future time period after a preset period.
[0128] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0129] Performing period screening on each first time period and each second time period respectively to obtain at least one first target period after screening of each first time period, and at least one second target period after screening of each second time period;
[0130] It is determined whether there is an abnormality in the baling component in a future time period after a preset period according to the component operation parameters, each first target period and each second target period.
[0131] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0132] Selecting component operation parameters at the start and end times corresponding to the first target cycle as first start and end parameters;
[0133] Selecting the component operation parameters at the start and end times corresponding to the second target cycle as the second start and end parameters;
[0134] Based on the trained abnormality prediction model, it is determined whether there is an abnormality in the baling component in a future time period after a preset period according to the first start and end parameters and the second start and end parameters.
[0135] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0136] Remove the first time periods whose period length is less than a preset length threshold from the first time periods to obtain at least one first reference period;
[0137] Remove the second time periods whose period length is less than a preset length threshold from the second time periods to obtain at least one second reference period;
[0138] At least one first target period is determined according to each first reference period, and at least one second target period is determined according to each second reference period.
[0139] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0140] Determine a first parameter difference corresponding to each first reference period, and a second parameter difference corresponding to each second reference period; wherein the first parameter difference refers to a difference between a maximum component operating parameter and a corresponding minimum component operating parameter in the first reference period; and the second parameter difference refers to a difference between a maximum component operating parameter and a corresponding minimum component operating parameter in the second reference period;
[0141] Remove the first reference period in each first reference period where the first parameter difference is less than the difference threshold, to obtain at least one first target period;
[0142] The first reference periods whose second parameter difference values in each second reference period are smaller than the difference threshold value are removed to obtain at least one second target period.
[0143] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0144] Determine the current equipment status of each bundling component according to the component operation parameters corresponding to each device to be detected within a preset period;
[0145] According to the current status of each device, the abnormal baling component is determined and an abnormal alarm is issued for the abnormal baling component.
[0146] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:
[0147] Obtaining component operation parameters corresponding to any baling component within a preset period during the baler operation process;
[0148] Determine at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend, from the preset periods;
[0149] According to the component operation parameters, each first time period and each second time period, it is determined whether there is an abnormality in the baling component within a future time period after a preset period.
[0150] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0151] Performing period screening on each first time period and each second time period respectively to obtain at least one first target period after screening of each first time period, and at least one second target period after screening of each second time period;
[0152] It is determined whether there is an abnormality in the baling component in a future time period after a preset period according to the component operation parameters, each first target period and each second target period.
[0153] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0154] Selecting component operation parameters at the start and end times corresponding to the first target cycle as first start and end parameters;
[0155] Selecting the component operation parameters at the start and end times corresponding to the second target cycle as the second start and end parameters;
[0156] Based on the trained abnormality prediction model, it is determined whether there is an abnormality in the baling component in a future time period after a preset period according to the first start and end parameters and the second start and end parameters.
[0157] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0158] Remove the first time periods whose period length is less than a preset length threshold from the first time periods to obtain at least one first reference period;
[0159] Remove the second time periods whose period length is less than a preset length threshold from the second time periods to obtain at least one second reference period;
[0160] At least one first target period is determined according to each first reference period, and at least one second target period is determined according to each second reference period.
[0161] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0162] Determine a first parameter difference corresponding to each first reference period, and a second parameter difference corresponding to each second reference period; wherein the first parameter difference refers to a difference between a maximum component operating parameter and a corresponding minimum component operating parameter in the first reference period; and the second parameter difference refers to a difference between a maximum component operating parameter and a corresponding minimum component operating parameter in the second reference period;
[0163] Remove the first reference period in each first reference period where the first parameter difference is less than the difference threshold, to obtain at least one first target period;
[0164] The first reference periods whose second parameter difference values in each second reference period are smaller than the difference threshold value are removed to obtain at least one second target period.
[0165] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0166] Determine the current equipment status of each bundling component according to the component operation parameters corresponding to each device to be detected within a preset period;
[0167] According to the current status of each device, the abnormal baling component is determined and an abnormal alarm is issued for the abnormal baling component.
[0168] In one embodiment, a computer program product is provided, comprising a computer program, which, when executed by a processor, implements the following steps:
[0169] Obtaining component operation parameters corresponding to any baling component within a preset period during the baler operation process;
[0170] Determine at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend, from the preset periods;
[0171] According to the component operation parameters, each first time period and each second time period, it is determined whether there is an abnormality in the baling component within a future time period after a preset period.
[0172] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0173] Performing period screening on each first time period and each second time period respectively to obtain at least one first target period after screening of each first time period, and at least one second target period after screening of each second time period;
[0174] It is determined whether there is an abnormality in the baling component in a future time period after a preset period according to the component operation parameters, each first target period and each second target period.
[0175] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0176] Selecting component operation parameters at the start and end times corresponding to the first target cycle as first start and end parameters;
[0177] Selecting the component operation parameters at the start and end times corresponding to the second target cycle as the second start and end parameters;
[0178] Based on the trained abnormality prediction model, it is determined whether there is an abnormality in the baling component in a future time period after a preset period according to the first start and end parameters and the second start and end parameters.
[0179] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0180] Remove the first time periods whose period length is less than a preset length threshold from the first time periods to obtain at least one first reference period;
[0181] Remove the second time periods whose period length is less than a preset length threshold from the second time periods to obtain at least one second reference period;
[0182] At least one first target period is determined according to each first reference period, and at least one second target period is determined according to each second reference period.
[0183] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0184] Determine a first parameter difference corresponding to each first reference period, and a second parameter difference corresponding to each second reference period; wherein the first parameter difference refers to a difference between a maximum component operating parameter and a corresponding minimum component operating parameter in the first reference period; and the second parameter difference refers to a difference between a maximum component operating parameter and a corresponding minimum component operating parameter in the second reference period;
[0185] Remove the first reference period in each first reference period where the first parameter difference is less than the difference threshold, to obtain at least one first target period;
[0186] The first reference periods whose second parameter difference values in each second reference period are smaller than the difference threshold value are removed to obtain at least one second target period.
[0187] In one embodiment, when the computer program is executed by a processor, the following steps are also implemented:
[0188] Determine the current equipment status of each bundling component according to the component operation parameters corresponding to each device to be detected within a preset period;
[0189] According to the current status of each device, the abnormal baling component is determined and an abnormal alarm is issued for the abnormal baling component.
[0190] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant laws, regulations and standards of relevant countries and regions.
[0191] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0192] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0193] The above embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. An abnormality prediction method, characterized in that: The method comprises: Obtaining component operation parameters corresponding to any baling component within a preset period during the baler operation process; Determine at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend, from the preset periods; It is determined whether the baling component has an abnormality in a future time period after the preset period according to the component operation parameters, each of the first time periods and each of the second time periods.
2. The method according to claim 1, characterized in that: The determining, based on the component operation parameters, each of the first time periods and each of the second time periods, whether the bundling component is abnormal in a future time period after the preset period includes: Performing period screening on each of the first time periods and each of the second time periods respectively to obtain at least one first target period after screening of each of the first time periods, and at least one second target period after screening of each of the second time periods; It is determined whether the baling component has an abnormality in a future time period after the preset period according to the component operation parameters, each of the first target cycles and each of the second target cycles.
3. The method according to claim 2, characterized in that The determining, based on the component operation parameters, each of the first target cycles and each of the second target cycles, whether the bundling component has an abnormality in a future period after the preset cycle includes: Selecting component operation parameters at the start and end times corresponding to the first target period as first start and end parameters; Selecting component operation parameters at the start and end times corresponding to the second target period as second start and end parameters; Based on the trained abnormality prediction model, it is determined whether the baling component has an abnormality in a future period after the preset period according to the first start and end parameters and the second start and end parameters.
4. The method according to claim 2, characterized in that: The step of periodically screening each of the first time periods and each of the second time periods to obtain at least one first target period after screening each of the first time periods and at least one second target period after screening each of the second time periods comprises: Remove the first time periods whose period length is less than a preset length threshold from the first time periods to obtain at least one first reference period; Remove the second time periods whose period length is less than a preset length threshold from the second time periods to obtain at least one second reference period; At least one first target period is determined according to each of the first reference periods, and at least one second target period is determined according to each of the second reference periods.
5. The method according to claim 4, characterized in that The determining at least one first target period according to each of the first reference periods, and determining at least one second target period according to each of the second reference periods, comprises: Determine a first parameter difference corresponding to each of the first reference cycles, and a second parameter difference corresponding to each of the second reference cycles; wherein the first parameter difference refers to a difference between a maximum component operating parameter and a corresponding minimum component operating parameter in the first reference cycle; and the second parameter difference refers to a difference between a maximum component operating parameter and a corresponding minimum component operating parameter in the second reference cycle; Remove the first reference cycles whose first parameter difference values in the first reference cycles are less than a difference threshold value, to obtain at least one first target cycle; The first reference periods whose second parameter difference in each of the second reference periods is less than a difference threshold are removed to obtain at least one second target period.
6. The method according to any one of claims 1 to 5, characterized in that The method further comprises: Determine the current device status of each of the bundling components according to the component operation parameters corresponding to each of the devices to be detected within a preset period; According to the current device status, an abnormal baling component is determined, and an abnormal alarm is issued for the abnormal baling component.
7. An abnormality prediction device, characterized in that: The device comprises: An acquisition module, used for acquiring component operation parameters corresponding to any baling component within a preset period during the operation of the baler; A first determining module, configured to determine, from the preset periods, at least one first time period corresponding to a component operating parameter that changes in an upward trend, and at least one second time period corresponding to a component operating parameter that changes in a downward trend; The second determining module is used to determine whether the bundling component has an abnormality in a future time period after the preset period according to the component operation parameters, each of the first time periods and each of the second time periods.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
