Material management method and system based on intelligent manufacturing

Through RFID technology, the materials are identified and traced, combined with intelligent algorithm analysis, the problems of inaccurate material tracking and incoordinated supply in traditional material management are solved, the accuracy and efficiency of material management are achieved, and the production efficiency and overall supply chain efficiency are improved. .

CN118982102AInactive Publication Date: 2024-11-19SHANDONG HUAYU UNIV OF TECH
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411006021.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional material management methods face problems such as inaccurate material tracking and incoordinated flow scheduling and supply, resulting in low production efficiency and high cost.

Method used

RFID technology is used to identify and process materials and trace materials, and the production loss data and real-time inventory status are obtained through material flow information and data analysis, intelligent demand adjustment and intelligent scheduling management are carried out, and scheduling solutions are optimized in combination with fault detection.

Benefits of technology

It improves the accuracy of material tracking and transparency of the production process, optimizes inventory management and production processes, reduces inventory costs and production stagnation, and improves supply chain efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982102A_ABST
    Figure CN118982102A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of material management, in particular to a material management method and system based on intelligent manufacturing. The method comprises the following steps: performing RFID tag identification processing on a material to obtain an RFID identification material; performing material tracing processing on the RFID identification material to obtain identification material flow direction information data; identification material production loss data and identification material real-time inventory condition data are obtained, intelligent demand adjustment analysis is carried out on the RFID identification material, and identification material real-time production demand data are obtained; performing intelligent material scheduling management on the real-time production demand data of the identification material, and generating an intelligent scheduling management scheme of the identification material; carrying out material fault detection and dispatching transportation influence analysis on the RFID identification material to obtain identification material dispatching transportation influence factor data; and adjusting and optimizing the identification material intelligent scheduling management scheme to obtain an identification material scheduling management optimization scheme. The efficiency of material management can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of material management, and in particular to a material management method and system based on intelligent manufacturing. Background Art

[0002] The rapid development of intelligent manufacturing has promoted innovation in the field of material management, providing great opportunities for improving production efficiency and reducing costs. At the same time, the application of intelligent algorithms enables production plans to be intelligently adjusted based on real-time data, which can improve production efficiency and material supply flexibility. However, traditional material management methods face many challenges, such as inaccurate material tracking and uncoordinated flow scheduling and supply. Summary of the invention

[0003] Based on this, it is necessary for the present invention to provide a material management method and system based on intelligent manufacturing to solve at least one of the above technical problems.

[0004] To achieve the above purpose, a material management method based on intelligent manufacturing includes the following steps:

[0005] Step S1: Perform RFID tag identification processing on materials through RFID technology to obtain RFID-identified materials; perform material traceability processing on RFID-identified materials to obtain flow information data of identified materials; perform material production loss analysis on RFID-identified materials based on the flow information data of identified materials to obtain production loss data of identified materials; obtain real-time inventory status data of identified materials based on the production loss data of identified materials;

[0006] Step S2: Based on the production loss data of the identification materials and the real-time inventory status data of the identification materials, intelligent demand adjustment analysis is performed on the RFID identification materials to obtain the real-time production demand data of the identification materials;

[0007] Step S3: performing material production stagnation analysis on the identification material flow information data to obtain the identification material production supply stagnation factor; performing intelligent material scheduling management on the identification material real-time production demand data based on the identification material production supply stagnation factor and the identification material real-time inventory status data to generate an identification material intelligent scheduling management plan;

[0008] Step S4: perform material fault detection on RFID-identified materials to obtain RFID-identified faulty materials; obtain material average fault probability data through RFID-identified faulty materials, and perform scheduling and transportation impact analysis on the identified material intelligent scheduling management plan based on the material average fault probability data to obtain data on scheduling and transportation impact factors of the identified materials; adjust and optimize the identified material intelligent scheduling management plan based on the data on scheduling and transportation impact factors of the identified materials to obtain an optimized scheduling management plan for the identified materials.

[0009] The present invention firstly uses RFID technology to perform RFID tag identification processing on materials, which can realize accurate identification and tracking of materials. The introduction of RFID tags enables each material to have a unique identification code, providing a reliable basis for subsequent material management and tracing. Such an identification processing process can effectively reduce the complexity of material management, thereby improving the accuracy of material tracking. By performing material tracing processing on RFID-identified materials, this step enables full traceability of materials, including various links such as material production, transportation, and warehousing, so as to deeply understand the flow of materials at various stages in the product production process, which helps to improve the transparency of the material product production process, reduce information asymmetry, and thus improve the overall supply chain efficiency, providing comprehensive data support for subsequent production management. At the same time, further analyzing the identification material flow information data to obtain the identification material production loss data helps to identify potential problems and material loss in the production process, and provides a useful reference for optimizing the production process and reducing production costs. By deeply understanding the causes of loss, effective measures can be taken to improve the production efficiency of material products. In addition, by updating the actual inventory of materials in real time through the production loss data of marked materials, timely feedback and adjustment of inventory data can be achieved, so that the subsequent processing process can flexibly adjust the inventory strategy according to the actual situation, ensure that the inventory level matches the actual demand, reduce the inventory holding cost, and thus improve the utilization efficiency of material inventory. Secondly, by conducting intelligent demand adjustment analysis based on the production loss data of marked materials and the real-time inventory status data, the key to this step is to analyze the real-time data through intelligent algorithms to achieve more accurate production demand forecasts. By comprehensively considering multiple factors such as loss and inventory, the real-time production demand data can be determined more accurately, which helps to flexibly adjust the material production demand plan according to the actual situation, improve production efficiency, and reduce inventory costs, so that it can better respond to market changes and customer demand fluctuations. Then, the material production stagnation analysis is performed on the flow information data of marked materials to obtain the production supply stagnation factor. By combining the stagnation factor and the real-time inventory status data, intelligent material scheduling management is realized, thereby generating the corresponding intelligent scheduling management plan for marked materials. This plan is based on the actual situation and can effectively avoid stagnation and waste in the production process of material products and improve the utilization efficiency of production resources. Through intelligent scheduling management, we can more flexibly respond to changes in the production environment, optimize the production process, and maximize the overall supply chain efficiency. Finally, by performing material fault detection on RFID-marked materials, we can identify faulty materials in a timely manner, thereby obtaining data on the average failure probability of materials, which can better understand the quality of materials and provide guarantees for the stability of the production process.Furthermore, by analyzing the data of factors affecting dispatching and transportation, it is possible to fine-tune the intelligent dispatching management plan. This step provides a dispatching management optimization plan based on the actual material quality status for material management, which helps to improve the stability and reliability of the overall production operation. By comprehensively considering multiple factors such as material production, dispatching and fault management, it is possible to optimize dispatching management more comprehensively, thereby improving the coordination of material flow to dispatching supply.

[0010] Preferably, the present invention further provides a material management system based on intelligent manufacturing, which is used to execute the material management method based on intelligent manufacturing as described above, and the material management system based on intelligent manufacturing includes:

[0011] The material identification data analysis module is used to perform RFID tag identification processing on materials through RFID technology to obtain RFID identified materials; perform material traceability processing on RFID identified materials to obtain identified material flow information data; perform material production loss analysis on RFID identified materials based on identified material flow information data to obtain identified material production loss data; obtain identified material real-time inventory status data based on identified material production loss data;

[0012] The material real-time production demand analysis module is used to perform intelligent demand adjustment analysis on RFID-marked materials based on the production loss data of marked materials and the real-time inventory status data of marked materials, so as to obtain the real-time production demand data of marked materials;

[0013] The material production and supply intelligent scheduling module is used to analyze the material production stagnation of the identification material flow information data to obtain the identification material production and supply stagnation factor; based on the identification material production and supply stagnation factor and the identification material real-time inventory status data, the identification material real-time production demand data is intelligently scheduled and managed to generate an identification material intelligent scheduling management plan;

[0014] The material fault scheduling adjustment and optimization module is used to perform material fault detection on RFID-identified materials to obtain RFID-identified faulty materials; obtain material average fault probability data through RFID-identified faulty materials, and perform scheduling and transportation impact analysis on the identified material intelligent scheduling management plan based on the material average fault probability data to obtain the identified material scheduling and transportation impact factor data; adjust and optimize the identified material intelligent scheduling management plan based on the identified material scheduling and transportation impact factor data to obtain the identified material scheduling management optimization plan.

[0015] In summary, the present invention provides a material management system based on intelligent manufacturing, which is composed of a material identification data analysis module, a material real-time production demand analysis module, a material production and supply intelligent scheduling module, and a material fault scheduling adjustment and optimization module. It can realize any one of the material management methods based on intelligent manufacturing described in the present invention, and is used to combine the operations between computer programs running on various modules to realize a material management method based on intelligent manufacturing. The internal structures of the system cooperate with each other, and the intelligent identification of materials is realized through RFID technology. Each material can be accurately tracked and identified, which helps to improve the traceability of the material product production process, ensure the accuracy and consistency of the materials, and at the same time gain insight into and analyze the loss of materials in the production process and the real-time inventory status of the materials, and implement intelligent demand adjustment on them. Through the overall analysis, it can accurately predict and adjust real-time production needs, ensure that the production plan matches the market demand, thereby improving production efficiency and customer satisfaction. At the same time, by detecting material production stagnation and combining real-time inventory status data, it systematically implements intelligent material scheduling management, thereby generating a material scheduling management plan to ensure the continuity of production supply, thereby avoiding production interruptions caused by material stagnation. Through the above modules, a comprehensive material management system is jointly constructed. By using RFID technology, intelligent identification, traceability, analysis and scheduling management optimization of materials are realized, thereby providing accurate and efficient material management solutions, which can greatly reduce duplication of work and manpower investment, and can quickly and effectively provide a more accurate and efficient material management process, thereby simplifying the operating procedures of the material management system based on intelligent manufacturing. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments thereof made with reference to the following drawings:

[0017] Figure 1 It is a schematic diagram of the steps of the material management method based on intelligent manufacturing of the present invention;

[0018] Figure 2 for Figure 1 Detailed step flow diagram of step S1;

[0019] Figure 3 for Figure 2 Detailed step flow chart of step S14 in FIG. DETAILED DESCRIPTION

[0020] The following is a clear and complete description of the technical method of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by technicians in this field without creative work are within the scope of protection of the present invention.

[0021] In addition, the accompanying drawings are only schematic illustrations of the present invention and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. The functional entities can be implemented in software form, or implemented in one or more hardware modules or integrated circuits, or implemented in different networks and / or processor methods and / or microcontroller methods.

[0022] It should be understood that, although the terms "first", "second", etc. may be used herein to describe various units, these units should not be limited by these terms. These terms are used only to distinguish one unit from another unit. For example, without departing from the scope of the exemplary embodiments, the first unit may be referred to as the second unit, and similarly the second unit may be referred to as the first unit. The term "and / or" used herein includes any and all combinations of one or more of the listed associated items.

[0023] To achieve this, please refer to Figures 1 to 3 The present invention provides a material management method based on intelligent manufacturing, the method comprising the following steps:

[0024] Step S1: Perform RFID tag identification processing on materials through RFID technology to obtain RFID-identified materials; perform material traceability processing on RFID-identified materials to obtain flow information data of identified materials; perform material production loss analysis on RFID-identified materials based on the flow information data of identified materials to obtain production loss data of identified materials; obtain real-time inventory status data of identified materials based on the production loss data of identified materials;

[0025] Step S2: Based on the production loss data of the identification materials and the real-time inventory status data of the identification materials, intelligent demand adjustment analysis is performed on the RFID identification materials to obtain the real-time production demand data of the identification materials;

[0026] Step S3: performing material production stagnation analysis on the identification material flow information data to obtain the identification material production supply stagnation factor; performing intelligent material scheduling management on the identification material real-time production demand data based on the identification material production supply stagnation factor and the identification material real-time inventory status data to generate an identification material intelligent scheduling management plan;

[0027] Step S4: perform material fault detection on RFID-identified materials to obtain RFID-identified faulty materials; obtain material average fault probability data through RFID-identified faulty materials, and perform scheduling and transportation impact analysis on the identified material intelligent scheduling management plan based on the material average fault probability data to obtain data on scheduling and transportation impact factors of the identified materials; adjust and optimize the identified material intelligent scheduling management plan based on the data on scheduling and transportation impact factors of the identified materials to obtain an optimized scheduling management plan for the identified materials.

[0028] In the embodiment of the present invention, please refer to Figure 1 FIG. 1 is a schematic diagram of a process flow of a material management method based on intelligent manufacturing of the present invention. In this example, the steps of the material management method based on intelligent manufacturing include:

[0029] Step S1: Perform RFID tag identification processing on materials through RFID technology to obtain RFID-identified materials; perform material traceability processing on RFID-identified materials to obtain flow information data of identified materials; perform material production loss analysis on RFID-identified materials based on the flow information data of identified materials to obtain production loss data of identified materials; obtain real-time inventory status data of identified materials based on the production loss data of identified materials;

[0030] The embodiment of the present invention uses RFID technology to perform labeling processing on each material to ensure that each material has a unique identification code, thereby obtaining RFID-marked materials. Secondly, by using an RFID reader to read the information of the RFID tag on the RFID-marked material, the flow information such as the key nodes and transportation routes of the material in the production process is recorded, and the whole process of material traceability is realized, including the production, transportation, warehousing and other links of the material, thereby obtaining the flow information data of the marked material. Then, by combining the flow information data of the marked material, a mathematical statistical method is used to perform statistical calculations on the RFID-marked material to calculate the average frequency of use and loss probability of each RFID-marked material, and by using a flow loss algorithm for statistical calculations, the corresponding RFID-marked material is analyzed to better predict the flow loss of the material, so as to comprehensively consider the impact of material flow loss and other conditions on the material production loss, thereby obtaining the production loss data of the marked material. Finally, by collecting and obtaining the original inventory information of the identification materials, including the initial inventory quantity, storage location and other information, and updating the original inventory information of the identification materials in real time according to the production loss data of the identification materials (that is, the loss of the identification materials during the production process), it is ensured that the inventory information is synchronized with the actual production loss situation to reflect the current status of the material inventory, and finally the real-time inventory status data of the identification materials is obtained.

[0031] Step S2: Based on the production loss data of the identification materials and the real-time inventory status data of the identification materials, intelligent demand adjustment analysis is performed on the RFID identification materials to obtain the real-time production demand data of the identification materials;

[0032] The embodiment of the present invention collects the corresponding amount of identification material loss and related production link information through identification material production loss data, and performs probability calculation on RFID identification materials by using mathematical statistical methods to quantify the possibility of material loss in the production process of material products. At the same time, the product production plan of RFID identification materials is analyzed in combination with the real-time inventory status data of the identification materials to make accurate material production demand analysis based on the real-time inventory data, and ensure the matching of material supply and demand in the production process of material products to avoid losses caused by insufficient or excessive inventory. Then, the real-time production demand quantity of the identification material products is adjusted by using the identification material loss situation calculated previously to more accurately reflect the actual production demand of the material, and ensure that the loss is minimized while ensuring production efficiency, and finally obtain the real-time production demand data of the identification material.

[0033] Step S3: performing material production stagnation analysis on the identification material flow information data to obtain the identification material production supply stagnation factor; performing intelligent material scheduling management on the identification material real-time production demand data based on the identification material production supply stagnation factor and the identification material real-time inventory status data to generate an identification material intelligent scheduling management plan;

[0034] The embodiment of the present invention collects the key nodes and positions of the flow direction of materials in the production process by identifying the material flow direction information data, and obtains the total time required for the material from the start of production to the completion of production on the product production line by using a time monitoring device, thereby obtaining the material production waiting time. At the same time, by combining the material production waiting time, the identification material flow direction information data is calculated using a mathematical statistical method to fully consider the waiting time of the material in the production process to estimate the production delay of the material production flow direction, and analyze the actual impact of the delay on the production efficiency to quantify the stagnation impact index of the production efficiency, and also by using an evaluation and analysis method to identify the specific factors that cause the stagnation of production efficiency (that is, the stagnation impact factors of the material flow supply on the production line), thereby obtaining the identification material production supply stagnation factor. Then, by combining the identification material production supply stagnation factor and the real-time inventory status data of the current identification material, the identification material real-time production demand data is dispatched using tools such as intelligent manufacturing and transportation equipment, so as to achieve the real-time dispatch of the identification material of the corresponding inventory to the location of the material production demand, so that it can reasonably dispatch and allocate materials and reduce the stagnation and interruption of materials in the production and transportation process, and finally generate an identification material intelligent dispatch management plan.

[0035] Step S4: perform material fault detection on RFID-identified materials to obtain RFID-identified faulty materials; obtain material average fault probability data through RFID-identified faulty materials, and perform scheduling and transportation impact analysis on the identified material intelligent scheduling management plan based on the material average fault probability data to obtain data on scheduling and transportation impact factors of the identified materials; adjust and optimize the identified material intelligent scheduling management plan based on the data on scheduling and transportation impact factors of the identified materials to obtain an optimized scheduling management plan for the identified materials.

[0036] The embodiment of the present invention detects RFID-marked materials by using a fault identification method based on an RFID identifier to identify and record RFID-marked materials with faults in real time, thereby obtaining RFID-marked faulty materials. At the same time, the identified RFID-marked faulty materials are statistically analyzed by using a mathematical statistical method to statistically understand the average material failure probability data of the faulty materials, and analyze the potential impact of risks on the material scheduling and transportation routes. Then, by combining the average failure probability of the materials and the potential impact of risks on the material scheduling and transportation routes, the material scheduling and transportation process in the intelligent scheduling and management scheme for marked materials is analyzed to determine the key influencing factors in the scheduling and transportation process of marked materials. Finally, by using the key influencing factors obtained by the analysis, the material scheduling and transportation process in the intelligent scheduling and management scheme for marked materials is reasonably scheduled and optimized, so as to fully consider the material failure, route risk and other influencing factors to optimize the material scheduling strategy, reduce the material transportation risk and improve the material scheduling efficiency, and finally obtain the optimized scheduling and management scheme for marked materials.

[0037] The present invention firstly uses RFID technology to perform RFID tag identification processing on materials, which can realize accurate identification and tracking of materials. The introduction of RFID tags enables each material to have a unique identification code, providing a reliable basis for subsequent material management and tracing. Such an identification processing process can effectively reduce the complexity of material management, thereby improving the accuracy of material tracking. By performing material tracing processing on RFID-identified materials, this step enables full traceability of materials, including various links such as material production, transportation, and warehousing, so as to deeply understand the flow of materials at various stages in the product production process, which helps to improve the transparency of the material product production process, reduce information asymmetry, and thus improve the overall supply chain efficiency, providing comprehensive data support for subsequent production management. At the same time, further analyzing the identification material flow information data to obtain the identification material production loss data helps to identify potential problems and material loss in the production process, and provides a useful reference for optimizing the production process and reducing production costs. By deeply understanding the causes of loss, effective measures can be taken to improve the production efficiency of material products. In addition, by updating the actual inventory of materials in real time through the production loss data of marked materials, timely feedback and adjustment of inventory data can be achieved, so that the subsequent processing process can flexibly adjust the inventory strategy according to the actual situation, ensure that the inventory level matches the actual demand, reduce the inventory holding cost, and thus improve the utilization efficiency of material inventory. Secondly, by conducting intelligent demand adjustment analysis based on the production loss data of marked materials and the real-time inventory status data, the key to this step is to analyze the real-time data through intelligent algorithms to achieve more accurate production demand forecasts. By comprehensively considering multiple factors such as loss and inventory, the real-time production demand data can be determined more accurately, which helps to flexibly adjust the material production demand plan according to the actual situation, improve production efficiency, and reduce inventory costs, so that it can better respond to market changes and customer demand fluctuations. Then, the material production stagnation analysis is performed on the flow information data of marked materials to obtain the production supply stagnation factor. By combining the stagnation factor and the real-time inventory status data, intelligent material scheduling management is realized, thereby generating the corresponding intelligent scheduling management plan for marked materials. This plan is based on the actual situation and can effectively avoid stagnation and waste in the production process of material products and improve the utilization efficiency of production resources. Through intelligent scheduling management, we can more flexibly respond to changes in the production environment, optimize the production process, and maximize the overall supply chain efficiency. Finally, by performing material fault detection on RFID-marked materials, we can identify faulty materials in a timely manner, thereby obtaining data on the average failure probability of materials, which can better understand the quality of materials and provide guarantees for the stability of the production process.Furthermore, by analyzing the data of factors affecting dispatching and transportation, it is possible to fine-tune the intelligent dispatching management plan. This step provides a dispatching management optimization plan based on the actual material quality status for material management, which helps to improve the stability and reliability of the overall production operation. By comprehensively considering multiple factors such as material production, dispatching and fault management, it is possible to optimize dispatching management more comprehensively, thereby improving the coordination of material flow to dispatching supply.

[0038] Preferably, step S1 comprises the following steps:

[0039] Step S11: Perform RFID tag identification processing on the material through RFID technology to obtain RFID-labeled material;

[0040] Step S12: Perform material tracing processing on the RFID-marked material to obtain the flow information data of the marked material;

[0041] Step S13: obtaining average usage frequency data and material loss probability data of RFID-marked materials through the marked material flow information data; calculating the flow loss of the marked material flow information data according to the average usage frequency data and the material loss probability data to obtain the marked material flow loss probability;

[0042] Step S14: performing material production loss analysis on the RFID-marked material based on the marked material flow loss probability and the marked material flow information data to obtain the marked material production loss data;

[0043] Step S15: Acquire the original inventory status data of the identification material, and update the original inventory status data of the identification material in real time according to the production loss data of the identification material to obtain the real-time inventory status data of the identification material.

[0044] As an embodiment of the present invention, refer to Figure 2 As shown, Figure 1 Detailed step flow diagram of step S1 in FIG. 1 , in this embodiment, step S1 includes the following steps:

[0045] Step S11: Perform RFID tag identification processing on the material through RFID technology to obtain RFID-labeled material;

[0046] The embodiment of the present invention uses RFID technology to perform label identification processing on each material to ensure that each material has a unique identification code, and finally obtains RFID-identified materials.

[0047] Step S12: Perform material tracing processing on the RFID-marked material to obtain the flow information data of the marked material;

[0048] The embodiment of the present invention uses an RFID reader to read the information of the RFID tag on the RFID-identified material to record the key nodes, transportation routes and other flow information of the material in the production process, thereby realizing the full traceability of the material, including the production, transportation, warehousing and other links of the material, and finally obtaining the flow information data of the identified material.

[0049] Step S13: obtaining average usage frequency data and material loss probability data of RFID-marked materials through the marked material flow information data; calculating the flow loss of the marked material flow information data according to the average usage frequency data and the material loss probability data to obtain the marked material flow loss probability;

[0050] The embodiment of the present invention uses a mathematical statistical method to perform statistical calculations on RFID-marked materials by combining the marked material flow information data to calculate the average usage frequency and loss probability of each RFID-marked material, thereby obtaining the average usage frequency data of the RFID-marked material and the material loss probability data. Then, by combining the average usage frequency data and the material loss probability data, a flow loss algorithm is used to perform statistical calculations on the marked material flow information data to better predict the material flow loss situation, and finally obtain the marked material flow loss probability.

[0051] Step S14: performing material production loss analysis on the RFID-marked material based on the marked material flow loss probability and the marked material flow information data to obtain the marked material production loss data;

[0052] The embodiment of the present invention analyzes the corresponding RFID-marked materials by combining the calculated probability of flow loss of marked materials and flow information data of marked materials (including flow information such as key nodes and transportation routes of materials in the production process), so as to comprehensively consider the impact of material flow loss and other situations on material production loss, and finally obtain the production loss data of marked materials.

[0053] Step S15: Acquire the original inventory status data of the identification material, and update the original inventory status data of the identification material in real time according to the production loss data of the identification material to obtain the real-time inventory status data of the identification material.

[0054] The embodiment of the present invention obtains the original inventory information of the identification material by collecting and acquiring the original inventory information, including the initial inventory quantity, storage location and other information. Then, the original inventory status data of the identification material is updated in real time according to the production loss data of the identification material (i.e., the loss of the identification material during the production process) to ensure that the inventory information is synchronized with the actual production loss situation, so as to reflect the current status of the material inventory, and finally obtain the real-time inventory status data of the identification material.

[0055] The present invention firstly uses RFID technology to carry out RFID tag identification processing on materials, which can realize accurate identification and tracking of materials. The introduction of RFID tags enables each material to have a unique identification code, which provides a reliable basis for subsequent material management and tracing. Such an identification processing process can effectively reduce the complexity of material management, thereby improving the accuracy of operation. Secondly, by carrying out material tracing processing on RFID-identified materials, detailed identification material flow information data is obtained. This step enables the whole process of material tracing to be realized, including the production, transportation, warehousing and other links of materials. Such a tracing processing process helps to improve the transparency of the material product production process, reduce information asymmetry, and thus improve the overall supply chain efficiency. Then, the average frequency of use data and material loss probability data of RFID-identified materials are obtained through the identification material flow information data, and then the flow loss calculation is performed. The key to this step is that it can realize an in-depth analysis of the material usage and provide important data support for the subsequent processing process. Through the calculation of the flow loss probability, the demand and loss of materials can be better predicted. Next, by analyzing the material production loss based on the loss probability and flow information data of the identified materials, this analysis and processing process helps to identify potential problems and material losses in the production process, and provides a useful reference for optimizing the production process and reducing production costs. By deeply understanding the causes of loss, effective measures can be taken to improve the production efficiency of material products. Finally, by obtaining the original inventory status data of the identified materials and updating the original inventory status data of the identified materials in real time with the production loss data of the identified materials, this step can achieve timely feedback and adjustment of inventory data, so that the subsequent processing process can flexibly adjust the inventory strategy according to the actual situation, ensure that the inventory level matches the actual demand, reduce inventory holding costs, and thus improve the utilization efficiency of material inventory.

[0056] Preferably, step S14 comprises the following steps:

[0057] Step S141: based on the loss probability of the marked material flow, using the material production loss impact calculation formula to calculate the loss impact of the marked material flow information data, to obtain the marked material flow production loss impact coefficient;

[0058] Step S142: performing impact assessment analysis on the marked material flow direction information data according to the marked material flow direction production loss impact coefficient to obtain the marked material production loss impact factor;

[0059] Step S143: performing material expiration statistics analysis on the RFID-marked materials to obtain expiration probability data of the marked materials;

[0060] Step S144: performing loss assessment analysis on the RFID identification material according to the identification material expiration probability data to obtain the identification material loss potential factor;

[0061] Step S145: performing material production loss analysis on the RFID identification material according to the identification material production loss influencing factors and identification material loss potential factors to obtain identification material production loss data.

[0062] As an embodiment of the present invention, refer to Figure 3 As shown, Figure 2 Detailed step flow diagram of step S14 in the embodiment, step S14 includes the following steps:

[0063] Step S141: based on the loss probability of the marked material flow, using the material production loss impact calculation formula to calculate the loss impact of the marked material flow information data, to obtain the marked material flow production loss impact coefficient;

[0064] The embodiment of the present invention combines the number of RFID-marked materials, index item parameters, the probability of loss of the marked material flow, material flow attribute parameters, material flow attribute influence attenuation parameters, production process loss influence parameters, environmental factor loss influence parameters, production association influence parameters, material flow association parameters, time loss attenuation factors, time variable parameters for loss influence calculation, time-varying loss influence function, time-varying loss influence adjustment parameters and related parameters to form a suitable material production loss influence calculation formula for calculating the loss influence of the marked material flow information data, so as to quantify the degree of loss that may occur in the material during its product production process, and finally obtain the production loss influence coefficient of the marked material flow. In addition, the material production loss influence calculation formula can also use any loss influence algorithm in the field to replace the loss influence calculation process, and is not limited to the material production loss influence calculation formula.

[0065] Step S142: performing impact assessment analysis on the marked material flow direction information data according to the marked material flow direction production loss impact coefficient to obtain the marked material production loss impact factor;

[0066] The embodiment of the present invention uses an impact assessment algorithm to analyze the marked material flow information data by combining the calculated marked material flow production loss influence coefficient, so as to deeply understand the actual influence of material flow on production loss, and finally obtain the marked material production loss influence factor, which reflects the influence of flow information on production loss.

[0067] Step S143: performing material expiration statistics analysis on the RFID-marked materials to obtain expiration probability data of the marked materials;

[0068] The embodiment of the present invention first collects the number of expired materials of RFID-marked materials, and then analyzes the collected number of expired materials by using a mathematical statistical analysis method to analyze the probability of the marked materials being expired, and finally obtains the marked materials expiration probability data.

[0069] Step S144: performing loss assessment analysis on the RFID identification material according to the identification material expiration probability data to obtain the identification material loss potential factor;

[0070] The embodiment of the present invention uses the analyzed identification material expiration probability data to calculate the possibility of identification material expiration, and then uses the loss assessment method to analyze the RFID identification material in combination with the possibility of identification material expiration, so as to gain an in-depth understanding of the potential risk impact of material expiration on loss, and finally obtain the potential factor of identification material loss.

[0071] Step S145: performing material production loss analysis on the RFID identification material according to the identification material production loss influencing factors and identification material loss potential factors to obtain identification material production loss data.

[0072] The embodiment of the present invention analyzes RFID identification materials by combining the factors affecting the production loss of identification materials and the degree of influence of potential factors of identification material loss, so as to comprehensively consider the impact of flow information and material expiration on material production loss, thereby providing a more comprehensive loss analysis result and finally obtaining the production loss data of identification materials.

[0073] The present invention firstly calculates the loss impact of the identified material flow direction information data by using a suitable material production loss impact calculation formula based on the loss probability of the identified material flow direction, and can accurately calculate the production loss impact coefficient of the identified material flow direction. This coefficient reflects the degree of loss that may occur in the material during its product production process, and provides an important indicator for subsequent processing steps, so that it can more effectively manage and optimize the production process. Through the loss impact calculation, it is possible to achieve a quantitative assessment of the potential losses in the production link, thereby providing data support for the formulation of improvement strategies. Secondly, by performing an impact assessment analysis on the identified material flow direction information data based on the calculated identification material flow direction production loss impact coefficient, the key to this step is to be able to deeply understand the actual impact of the material flow direction on the production loss, and provide more accurate data support for subsequent processing decisions. By analyzing the influencing factors, targeted measures can be taken to reduce production losses, thereby improving production efficiency. Then, by performing material expiration statistical analysis on RFID identified materials, the probability data of the identified material expiration is obtained. This step is beneficial to identifying the shelf life of the material and provides key information for inventory management and production planning. By using the probability data of material expiration, the inventory can be adjusted in time to avoid losses caused by material expiration, thereby improving inventory turnover and overall production efficiency. Next, by using the probability data of material expiration to conduct a loss assessment analysis on RFID-labeled materials, the key to this step is to be able to deeply understand the potential risk of material expiration to loss, which provides a basis for taking prevention and control measures. By analyzing the potential factors of loss, an effective shelf life management strategy can be formulated to reduce losses caused by material expiration. Finally, by analyzing the material production loss influencing factors and potential factors of material loss obtained by analysis, the material production loss of RFID-labeled materials can be analyzed, and various material loss influencing factors in the production process can be comprehensively considered, thereby providing comprehensive production loss data. With these data, more refined production plans and management strategies can be formulated, production processes can be optimized, loss costs can be reduced, and overall economic benefits can be improved.

[0074] Preferably, the material production loss impact calculation formula in step S141 is specifically:

[0075]

[0076] G(t)=a0+a1t+a2t 2 +…+a n t n ;

[0077] In the formula, H iis the production loss influence coefficient of the RFID-marked material flow of the i-th RFID-marked material, N is the number of RFID-marked materials, i is the index item parameter of the RFID-marked material, j is the index item parameter of the adjacent RFID-marked material, α is the loss probability of the RFID-marked material flow, A i is the material flow attribute parameter of the i-th RFID-tagged material, m is the material flow attribute attenuation parameter, B i is the production process loss influencing parameter of the i-th RFID-labeled material, C i is the environmental factor loss impact parameter of the i-th RFID tag material, D ij is the production correlation influencing parameter between the i-th RFID-marked material and the j-th adjacent RFID-marked material, E i is the material flow direction association parameter of the i-th RFID-tagged material, F i is the time loss attenuation factor of the i-th RFID-tagged material, t1 is the initial time of the loss impact calculation, t2 is the termination time of the loss impact calculation, t is the time variable parameter of the loss impact calculation, G(t) is the time-varying loss impact function at time t, a0, a1, a2, …, a n are all adjustment parameters for the impact of time-varying losses, n is the index parameter of the time-varying loss impact item, and ε is the correction value of the production loss impact coefficient that identifies the material flow.

[0078] The present invention obtains a material production loss impact calculation formula by using a specific mathematical model and verifying it, which is used to calculate the loss impact of the identified material flow information data. The material production loss impact calculation formula comprehensively considers a variety of factors that may affect material production loss, including material flow attributes, production processes, environmental factors, and production-related effects. Such comprehensive consideration can more comprehensively evaluate the loss situation, help identify potential loss sources, and take corresponding improvement measures. Secondly, G(t) in the formula represents the time-varying loss impact function, which is expressed in the form of a polynomial function a0+a1t+a2t 2 +…+a n t nTo describe the changing trend of material production loss over time, this allows the calculation formula to take into account the change of loss over time, and to model and analyze the time trend of loss. By introducing correction values ​​to take into account possible abnormal situations or other correction requirements for the calculation process, this improves the flexibility of the calculation formula and makes it closer to the actual situation. In addition, the calculated identification material flow production loss influence coefficient, which integrates the impact of different factors on the loss, can help evaluate the loss of each material in the production process, thereby providing a reference for improving the production process. Therefore, the material production loss impact calculation formula can comprehensively consider the impact of multiple factors on the loss, and obtain the loss impact coefficient by calculation, which provides a useful reference for the analysis and improvement of material production loss. In summary, this formula fully considers the identification material flow production loss influence coefficient H of the i-th RFID identification material. i , the number of RFID-marked materials N, the index item parameter i of the RFID-marked materials, the index item parameter j of the adjacent RFID-marked materials, the probability of loss of the marked material flow α, the material flow attribute parameter A of the i-th RFID-marked material i , the material flow attribute affects the attenuation parameter m, and the production process loss of the i-th RFID-tagged material affects the parameter B i , the environmental factor loss impact parameter C of the i-th RFID identification material i , the production correlation effect parameter D between the i-th RFID-marked material and the j-th adjacent RFID-marked material ij , the material flow direction association parameter E of the i-th RFID identified material i , the time loss attenuation factor F of the i-th RFID-marked material i , the initial time t1 of the loss impact calculation, the termination time t2 of the loss impact calculation, the time variable parameter t of the loss impact calculation, the time-varying loss impact function G(t) at time t, the time-varying loss impact adjustment parameters a0, a1, a2, ..., a n , the index parameter n of the time-varying loss influence item, the correction value ε of the material flow production loss influence coefficient, where the time variable parameter t calculated by using the loss influence, the time-varying loss influence adjustment parameters a0, a1, a2, ..., a n And the index item parameter n of the time-varying loss influence item constitutes a time-varying loss influence function relationship a0+a1t+a2t at time t 2 +…+a n t n , according to the production loss influence coefficient H of the material flow direction of the i-th RFID-marked material i The correlation between the above parameters forms a functional relationship:

[0079]

[0080] This formula can realize the loss impact calculation process of the identified material flow information data. At the same time, by introducing the correction value ε of the production loss impact coefficient of the identified material flow, it can be adjusted according to the errors occurring in the calculation process, thereby improving the accuracy and applicability of the material production loss impact calculation formula.

[0081] Preferably, step S2 comprises the following steps:

[0082] Step S21: Calculate the loss probability of the RFID identification material according to the identification material production loss data to obtain the identification material loss probability value;

[0083] The embodiment of the present invention collects the corresponding number of identified material losses and related production link information through the identification material production loss data, and then uses mathematical statistical methods in combination with the collected specific data to perform probability calculation on the RFID identified materials to quantify the possibility of material loss in the material product production process, and finally obtains the identification material loss probability value.

[0084] Step S22: dividing the product production plan for the RFID-marked material to obtain the product production plan for the marked material at different production stages;

[0085] The embodiment of the present invention first analyzes the characteristics of the RFID identification material, and analyzes the production stage of the RFID identification material in the product production process and factors such as process requirements based on the characteristics of the RFID identification material, and then reasonably allocates the RFID identification material to the product production plan of the corresponding production stage, and finally obtains the identification material product production plan for different production stages.

[0086] Step S23: performing material demand analysis on the production plan of the identification material products at different production stages according to the real-time inventory status data of the identification material, so as to generate a real-time production demand plan for the identification material products;

[0087] The embodiment of the present invention analyzes the production plans of identification material products at different production stages in combination with the real-time inventory status data of the identification materials, so as to make accurate material production demand analysis based on the real-time inventory data, and ensure the matching of material supply and demand in the material product production process, avoid losses caused by insufficient or excessive inventory, thereby achieving more accurate material production resource allocation, and finally generating a real-time production demand plan for identification material products.

[0088] Step S24: intelligently adjust the real-time production demand plan of the identification material product according to the probability value of the identification material loss to obtain the real-time production demand data of the identification material.

[0089] The embodiment of the present invention uses the previously calculated probability value of identification material loss to adjust the required quantity of identification materials in the real-time production demand plan of identification material products, so as to more accurately reflect the actual production demand of the materials and ensure that the loss is minimized while ensuring the production efficiency, and finally obtain the real-time production demand data of the identification materials.

[0090] The present invention firstly calculates the loss probability of RFID identification materials according to the production loss data of identification materials, and can accurately obtain the loss probability value of RFID identification materials. This value reflects the possibility of material loss in the production process of material products, thereby providing key information for subsequent processing steps, so that it can better predict and plan the material loss situation in the production process. Through the loss probability calculation, production strategies can be effectively formulated, unnecessary losses can be reduced, and production efficiency can be improved. Secondly, by dividing the product production plan of RFID identification materials, the production plan of identification materials products in different production stages can be obtained. The key of this step is to obtain the production plan of material products so that it is more in line with actual production needs. By dividing the production plan, market changes and production demand fluctuations can be more flexibly responded to, thereby improving the adaptability and efficiency of the production line. Then, by analyzing the material demand of the identification material product production plan at different production stages according to the real-time inventory status data of the identification materials, a real-time production demand plan of the identification material products is systematically generated. The key of this step is to make accurate material demand analysis based on real-time inventory data, which can help to better adjust the production plan and material inventory management. Through real-time demand planning, losses caused by insufficient or excessive inventory can be avoided, and more accurate production resource allocation can be achieved. Finally, the real-time production demand plan of the identification material products is adjusted intelligently according to the probability of loss of the identification material. The key to this step is that through intelligent adjustment, the risks brought by the loss probability can be better dealt with, making the real-time production demand more reasonable and controllable. Through intelligent adjustment, the loss can be minimized while ensuring production efficiency, thereby improving the economic benefits of the overall operation.

[0091] Preferably, step S3 comprises the following steps:

[0092] Step S31: performing material production efficiency prediction analysis on the marked material flow information data to obtain marked material production prediction efficiency data;

[0093] The embodiment of the present invention collects key flow nodes and positions of materials in the production process by identifying material flow information data, and then analyzes the collected data by using statistical methods, machine learning models or other production efficiency prediction methods to better predict the production efficiency of the identified materials, and finally obtain the identified material production prediction efficiency data.

[0094] Step S32: obtaining the material production waiting time, and performing material production delay calculation on the marked material flow information data according to the material production waiting time, so as to obtain the marked material production estimated delay data;

[0095] The embodiment of the present invention obtains the total time required for the material on the product production line from the start to the completion by using a time monitoring device, thereby obtaining the material production waiting time. Then, by combining the material production waiting time, a mathematical statistical method is used to calculate the information data of the marked material flow direction, so as to fully consider the waiting time of the material in the production process to estimate and calculate the production delay of the material production flow direction, and finally obtain the marked material production estimated delay data.

[0096] Step S33: Correct and analyze the predicted efficiency data of the marking material production according to the estimated delay data of the marking material production to obtain the actual estimated efficiency data of the marking material production;

[0097] The embodiment of the present invention uses the calculated estimated delay data of identification material production to analyze the predicted efficiency data of identification material production, so as to analyze the actual impact of the delay on the production efficiency, and analyzes the impact factor based on its actual impact to correct the predicted production efficiency of each identification material, so as to obtain the estimated production efficiency within the production cycle corresponding to the current production task, and finally obtain the actual estimated efficiency data of identification material production.

[0098] Step S34: using the production efficiency stagnation impact index calculation formula to calculate the impact index of the actual estimated efficiency data of the marking material production, to obtain the marking material production efficiency stagnation impact index;

[0099] The embodiment of the present invention forms a suitable production efficiency stagnation impact index calculation formula by combining the time variable parameter of the impact index calculation, the overall impact complexity parameter of production efficiency, the production efficiency integral weight parameter, the production efficiency time impact attenuation parameter, the production efficiency stagnation impact weight parameter, the production efficiency time dependence adjustment parameter, the production efficiency stagnation correlation parameter, the production efficiency recovery speed adjustment parameter, the production efficiency attenuation speed adjustment parameter and related parameters to calculate the impact index of the actual estimated efficiency data of the marking material production, so as to quantify the stagnation impact index of the production efficiency, and finally obtain the marking material production efficiency stagnation impact index. In addition, the production efficiency stagnation impact index calculation formula can also use any stagnation impact algorithm in the field to replace the process of impact index calculation, and is not limited to the production efficiency stagnation impact index calculation formula.

[0100] Step S35: performing production stagnation evaluation and analysis on the marking material flow information data according to the marking material production efficiency stagnation impact index to obtain the marking material production supply stagnation factor;

[0101] The embodiment of the present invention evaluates and analyzes the identification material flow information data according to the specific size of the calculated identification material production efficiency stagnation impact index, so as to evaluate and identify the specific factors that cause production efficiency stagnation (that is, the stagnation factors affecting the flow of materials on the production line), and finally obtain the identification material production and supply stagnation factor.

[0102] Step S36: Based on the identification material production and supply stagnation factor and the identification material real-time inventory status data, intelligent material scheduling management is performed on the identification material real-time production demand data to generate an identification material intelligent scheduling management plan.

[0103] The embodiment of the present invention combines the production and supply stagnation factor of the identification material and the real-time inventory status data of the current identification material to use tools such as intelligent manufacturing and transportation equipment to perform material scheduling on the real-time production demand data of the identification material, so as to realize the real-time scheduling and allocation of the identification materials in the corresponding inventory to the location of the material production demand, so that it can reasonably schedule and allocate materials and reduce stagnation and interruption of materials in the production and transportation process, and finally generate an intelligent scheduling management plan for identification materials.

[0104] The present invention firstly performs material production efficiency prediction analysis on the identification material flow information data, and can accurately obtain the production prediction efficiency data of the identification material. This analysis process is based on the relevant information of the material flow, so as to consider various factors in the production link, thereby providing predictive data on the material production efficiency for the subsequent processing steps. Through this step, the trend and potential impact of production efficiency can be better understood, and optimization strategies can be formulated in a targeted manner to improve the overall production efficiency. At the same time, by obtaining the material production waiting time and calculating the material production delay for the identification material flow information data according to the material production waiting time, this step can calculate the corresponding production delay data by considering the waiting time of the material in the production process, thereby providing more comprehensive production estimation information for the subsequent processing steps. By considering the production delay, the production process can be better planned, the waiting time can be reduced, and the production efficiency can be improved. Secondly, by performing a correction analysis on the identification material production prediction efficiency data according to the identification material production estimation delay data, this correction analysis process takes into account the actual impact of the delay on the production efficiency, and provides a more accurate and practical production efficiency estimation for the material product production process. Through this step, the production efficiency can be evaluated more accurately, the accuracy of the prediction can be improved, and the production plan can be adjusted in a targeted manner. Then, by using the appropriate production efficiency stagnation impact index calculation formula to calculate the impact index of the actual estimated efficiency data, the stagnation impact of the production efficiency can be quantified, thereby providing specific evaluation indicators for the subsequent stagnation evaluation and analysis. Through this index, the problem of production efficiency stagnation can be better identified and solved, so that corresponding measures can be taken to improve production efficiency. Next, by evaluating and analyzing the production stagnation of the identification material flow information data according to the production efficiency stagnation impact index, this step can systematically identify the specific factors that cause the production efficiency stagnation through evaluation and analysis, and provide in-depth problem diagnosis for the subsequent intelligent material scheduling. By understanding the stagnation factor, improvement strategies can be formulated in a targeted manner to improve production efficiency and reduce the impact of stagnation. Finally, by performing intelligent material scheduling management on the real-time production demand data of the identification material based on the stagnation factor of the identification material production supply and the real-time inventory status data, an intelligent scheduling management plan for the material is generated. The key to this step is that through intelligent scheduling management, material scheduling can be optimized on the basis of considering the stagnation factor and real-time inventory, and the overall efficiency of the supply chain can be improved. Through intelligent scheduling, we can better cope with complex production environments, achieve rational allocation of materials, reduce production interruptions, and improve production flexibility and resilience.

[0105] Preferably, the calculation formula of the production efficiency stagnation impact index in step S34 is specifically:

[0106]

[0107] In the formula, is the impact index of stagnation of production efficiency of marked materials, T is the integral time range parameter of the impact index calculation, τ is the time variable parameter of the impact index calculation, P(τ) is the actual estimated efficiency data of the production of marked materials at time τ, β is the overall impact complexity parameter of production efficiency, ρ1 is the integral weight parameter of production efficiency, ρ2 is the time impact attenuation parameter of production efficiency, ρ3 is the weight parameter of production efficiency stagnation, ∈ is the time dependence adjustment parameter of production efficiency, ζ is the correlation parameter of production efficiency stagnation, η is the production efficiency recovery speed adjustment parameter, θ is the production efficiency attenuation speed adjustment parameter, and ξ is the correction value of the impact index of stagnation of production efficiency of marked materials.

[0108] The present invention uses a specific mathematical model and verifies that a production efficiency stagnation impact index calculation formula is used to calculate the impact index of the actual estimated efficiency data of the marking material production. The production efficiency stagnation impact index calculation formula is obtained by using the integral term The changes in production efficiency within the time τ are taken into account. By weighting the actual estimated efficiency data P(τ) of the identification material production, the influence of different time points can be integrated, which helps to more comprehensively evaluate the overall change trend of production efficiency. The overall stagnation influence complexity is adjusted by using the complexity parameter. This parameter allows the degree of complexity to be adjusted according to the actual situation, so that the calculation formula is more suitable for the real production environment. Secondly, adjustments to different aspects are provided by using corresponding influencing factors and adjustment parameters, making the calculation formula more flexible and adaptable. In addition, by introducing correction values ​​to consider possible abnormal situations or other correction requirements for the calculation process, the flexibility of the calculation formula is improved, making it closer to the actual situation. Therefore, by considering multiple aspects of time changes and efficiency, this formula provides a quantitative assessment of the impact of production efficiency stagnation, which helps to better understand the reasons for efficiency fluctuations in the production process, and formulate scheduling management strategies based on this to maximize material production efficiency. In summary, this formula fully considers the stagnation impact index of identification material production efficiency. The integral time range parameter T for the impact index calculation, the time variable parameter τ for the impact index calculation, the actual estimated efficiency data P(τ) of the marked material production at time τ, the overall impact complexity parameter β of the production efficiency, the integral weight parameter ρ1 of the production efficiency, the attenuation parameter ρ2 of the production efficiency time impact, the weight parameter ρ3 of the production efficiency stagnation impact, the time dependence adjustment parameter ∈ of the production efficiency, the correlation parameter ζ of the production efficiency stagnation, the adjustment parameter η of the production efficiency recovery speed, the adjustment parameter θ of the production efficiency attenuation speed, the correction value ξ of the marked material production efficiency stagnation impact index, according to the marked material production efficiency stagnation impact index The correlation between the above parameters constitutes a functional relationship The formula can realize the calculation process of the influence index of the actual estimated efficiency data of the marked material production. At the same time, by introducing the correction value ξ of the influence index of the stagnation of the marked material production efficiency, it can be adjusted according to the error situation occurring in the calculation process, thereby improving the accuracy and applicability of the calculation formula of the production efficiency stagnation influence index.

[0109] Preferably, step S36 includes the following steps:

[0110] Step S361: Based on the real-time inventory status data of the identified materials, the intelligent manufacturing and transportation equipment is used to perform intelligent scheduling route planning on the real-time production demand data of the identified materials, so as to obtain the scheduling and transportation route of the identified materials demand;

[0111] The embodiment of the present invention first obtains the real-time inventory status data of the identified materials, including information such as inventory quantity and storage location, and at the same time, matches the materials with the real-time production demand data of the identified materials to obtain the inventory information of the corresponding demand materials. Then, by using intelligent manufacturing transportation equipment (such as automatic guided vehicles), the identified materials in the corresponding inventory are dispatched and allocated to the material production demand locations in real time, and the transportation route is planned for the material scheduling and allocation process by using a route planning algorithm, and finally the identified material demand scheduling transportation route is obtained.

[0112] Step S362: Calculate the route stagnation probability of the identified material demand scheduling transportation route according to the identified material production and supply stagnation factor to obtain the identified material scheduling route stagnation probability value;

[0113] The embodiment of the present invention uses mathematical statistical methods to calculate the stagnation probability of the identification material demand scheduling transportation route by combining the identification material production supply stagnation factors (including material supply delays, the impact of production efficiency stagnation, etc.), so as to comprehensively consider the stagnation factors of material supply on the production line to quantify the transportation stagnation risk of the identification material demand scheduling transportation route, thereby reflecting the probability of stagnation in the identification material demand scheduling transportation route, and finally obtaining the stagnation probability value of the identification material scheduling route.

[0114] Step S363: comparing and judging the stagnation probability value of the identified material scheduling route according to the preset stagnation probability standard value; when the stagnation probability value of the identified material scheduling route is greater than or equal to the preset stagnation probability standard value, the identified material demand scheduling transportation route corresponding to the stagnation probability value of the identified material scheduling route is marked as a stagnant transportation route; when the stagnation probability value of the identified material scheduling route is less than the preset stagnation probability standard value, the identified material demand scheduling transportation route corresponding to the stagnation probability value of the identified material scheduling route is marked as a waiting transportation route;

[0115] The embodiment of the present invention compares and judges the calculated stagnation probability value of the identification material scheduling route by using a preset stagnation probability standard value. If the stagnation probability value of the identification material scheduling route is greater than or equal to the preset stagnation probability standard value, it means that the identification material demand scheduling transportation route corresponding to the stagnation probability value of the identification material scheduling route is in a transportation stagnation state, and the identification material demand scheduling transportation route corresponding to the stagnation probability value of the identification material scheduling route is marked as a stagnation transportation route; if the stagnation probability value of the identification material scheduling route is less than the preset stagnation probability standard value, it means that the identification material demand scheduling transportation route corresponding to the stagnation probability value of the identification material scheduling route is in a transportation waiting state, and the identification material demand scheduling transportation route corresponding to the stagnation probability value of the identification material scheduling route is marked as a waiting transportation route.

[0116] Step S364: Eliminate the identified material demand scheduling transportation routes marked as stagnant transportation routes, and perform path optimization processing on the identified material demand scheduling transportation routes marked as waiting transportation routes through a path optimization algorithm to obtain the identified material scheduling transportation optimization routes;

[0117] The embodiment of the present invention removes the identified material demand scheduling transportation routes marked as stagnant transportation routes from the entire material scheduling transportation route set of the automatic guided vehicle, and at the same time, optimizes the identified material demand scheduling transportation routes marked as waiting transportation routes by using a path optimization algorithm to find a more suitable scheduling transportation route, and while ensuring the punctuality of material transportation, minimizes the transportation cost, and finally obtains the identified material scheduling transportation optimized route.

[0118] Step S365: Based on the optimized transportation route for the identified materials, intelligent manufacturing and transportation equipment is used to perform intelligent scheduling strategy management on the real-time production demand data of the identified materials to generate an intelligent scheduling management plan for the identified materials.

[0119] The embodiment of the present invention uses intelligent manufacturing and transportation equipment to dispatch the corresponding inventory of identified materials in real time to the locations required by material production needs based on the optimized identified material scheduling and transportation optimization route, and generates corresponding intelligent scheduling strategies through intelligent manufacturing and transportation equipment to allocate and manage corresponding intelligent scheduling strategies at reasonable transportation opportunities, thereby optimizing scheduling efficiency to the greatest extent, and recording the corresponding scheduling management process at the same time, and finally generating an intelligent scheduling management plan for identified materials.

[0120] The present invention firstly realizes efficient material scheduling management of real-time production demand of identification materials by intelligently scheduling route planning based on real-time inventory status data of identification materials and using intelligent manufacturing and transportation equipment. This step uses intelligent manufacturing technology and real-time inventory information to obtain the transportation route planning of material scheduling and allocation, thereby improving transportation efficiency, reducing waiting time in material product production, making the production and material transportation process more coordinated and smooth, and providing efficient production scheduling and transportation route planning for subsequent processing steps. Secondly, by calculating the route stagnation probability of the identification material demand scheduling and transportation route with the help of the identification material production supply stagnation factor, the stagnation risk of the route can be quantified. Through this calculation, the stagnation factor of production supply can be considered more comprehensively, providing data support for the risk assessment of the scheduling route, which is helpful to predict potential production stagnation risks, take measures in time to reduce possible production interruptions, and improve overall production reliability. Then, in the process of comparing and judging according to the stagnation probability standard value, the identification material demand scheduling and transportation route can be intelligently divided into a stagnation transportation route and a waiting transportation route. This judgment is set based on the stagnation probability, so that the standard value can be adjusted according to the specific situation, and the transportation route can be managed more flexibly. By clearly defining the stagnant and waiting routes, it is possible to formulate subsequent processing strategies in a targeted manner and improve the stability and controllability of material product production. Next, by eliminating the identified material demand scheduling transportation routes marked as stagnant transportation routes and optimizing the waiting transportation routes, the intelligent management of transportation routes can be achieved. This step takes into account the exclusion of stagnant routes and the optimization of waiting routes, which can further improve the transportation efficiency. Through the path optimization algorithm, while ensuring the punctuality of material transportation, the transportation cost can be minimized to achieve effective utilization of resources. Finally, by scheduling the transportation optimization route based on the identified materials and using intelligent manufacturing transportation equipment to manage the real-time production demand data, the intelligent scheduling strategy is generated by the intelligent manufacturing transportation equipment, so that the transportation plan can be dynamically adjusted according to the actual situation, responding to emergencies, and improving the flexibility of material scheduling. This provides a more intelligent and responsive scheduling solution for the subsequent processing steps, which helps to improve the overall supply chain operation efficiency and production adaptability.

[0121] Preferably, step S4 comprises the following steps:

[0122] Step S41: Perform material fault detection on the RFID-marked material to obtain the RFID-marked faulty material;

[0123] The embodiment of the present invention detects RFID-marked materials using a fault identification method based on an RFID identifier to identify and record faulty RFID-marked materials in real time, including material reading errors, fault damage, etc., and finally screens out RFID-marked faulty materials.

[0124] Step S42: Statistically analyzing the RFID-marked faulty materials to obtain data on the average failure probability of the materials;

[0125] The embodiment of the present invention uses a mathematical statistical method to count the identified RFID-marked faulty materials to statistically understand the failure probability of each faulty material, and then uses a mathematical averaging method to average the statistically obtained failure probabilities to finally obtain the material average failure probability data.

[0126] Step S43: monitoring the transportation status risk of the material scheduling and transportation process in the intelligent scheduling management solution for the identified material, and obtaining the risk data of the scheduling and transportation route of the identified material;

[0127] The embodiment of the present invention monitors the material scheduling and transportation process in the intelligent scheduling management solution for identified materials by using a risk monitoring method, so as to evaluate the safety and stability of the material scheduling and transportation route in real time, and monitor unexpected situations of materials on the scheduling and transportation route in real time, including risk information such as transportation tool failure and stagnation, route abnormality, etc., and finally obtain the risk data of the scheduling and transportation route for identified materials.

[0128] Step S44: performing potential assessment analysis on the risk data of the identified material scheduling and transportation route to obtain the potential factors of the identified material scheduling and transportation risk;

[0129] The embodiment of the present invention uses a potential factor assessment method to analyze the route risk situation in the monitored material scheduling and transportation route risk data, so as to gain an in-depth understanding of the potential risk factors of the scheduling and transportation routes, that is, potential risk factors such as traffic conditions, weather conditions, route anomalies, etc., and finally obtain the potential factors for identifying material scheduling and transportation risks.

[0130] Step S45: performing a scheduling and transportation impact analysis on the material scheduling and transportation process in the identified material intelligent scheduling and transportation management solution according to the material average failure probability data and the identified material scheduling and transportation risk potential factors, so as to obtain the identified material scheduling and transportation impact factor data;

[0131] The embodiment of the present invention performs an impact analysis on the material scheduling and transportation process in the intelligent scheduling management solution for identified materials by combining the average failure probability of the material and the potential risk factors on the material scheduling and transportation routes, so as to determine the key influencing factors in the scheduling and transportation process of identified materials, such as materials with high failure probability, high-risk route conditions, and other potential influencing factors on the material scheduling process, and finally obtains the data on the influencing factors of the scheduling and transportation of identified materials.

[0132] Step S46: adjusting and optimizing the intelligent scheduling management plan for marked materials according to the data of factors influencing the scheduling and transportation of marked materials, so as to obtain an optimized scheduling management plan for marked materials.

[0133] The embodiment of the present invention uses the analyzed data of the influencing factors of the scheduling and transportation of identified materials to reasonably optimize the scheduling of the material scheduling and transportation process in the intelligent scheduling management plan for identified materials, so as to fully consider various influencing factors such as material failures and route risks to optimize the material scheduling strategy, reduce material transportation risks and improve material scheduling efficiency, and finally obtain an optimized scheduling management plan for identified materials.

[0134] The present invention firstly detects material failures on RFID-marked materials, and can identify and record RFID-marked materials with faults in real time. The key to this step is that it can improve the monitorability of the production process, so that material failures can be understood in a timely manner, which helps to reduce production interruptions and losses caused by faulty materials in production, thereby effectively improving the accuracy and efficiency of material management. At the same time, by statistically analyzing RFID-marked faulty materials, this analysis process can not only help understand the distribution of faulty materials, but also provide basic data for subsequent risk assessment and scheduling and transportation impact analysis. By obtaining the average material failure probability data, maintenance plans can be formulated in a targeted manner to improve the reliability and life of material use. Secondly, by monitoring the transportation status risk of the material scheduling and transportation process in the intelligent scheduling management solution for marked materials, the safety and stability of the scheduling and transportation route can be evaluated in real time, which provides an early warning of potential risk issues for subsequent processing processes, helps to avoid unexpected situations in transportation, and improves the controllability of overall scheduling and transportation. Then, by conducting a potential assessment analysis on the risk data of the identified material scheduling and transportation routes, we can gain an in-depth understanding of the potential risk factors of the scheduling and transportation routes, and provide detailed information for the subsequent analysis of influencing factors. This step helps to formulate risk prevention measures in a targeted manner, thereby improving the safety and stability of scheduling and transportation. Next, by conducting a scheduling and transportation impact analysis on the material scheduling and transportation process in the intelligent scheduling management solution based on the average material failure probability data and the potential factors of the identified material scheduling and transportation risks, this step can comprehensively consider the material failure probability and route risk factors, thereby providing comprehensive scheduling and transportation influencing factor data for the subsequent processing process. Through this analysis, we can more accurately understand the potential impact of material scheduling and provide decision support for subsequent adjustments and optimizations. Finally, by adjusting and optimizing the intelligent scheduling management solution based on the data of the influencing factors of the identified material scheduling and transportation, we can intelligently improve the adaptability and flexibility of the scheduling management solution, thereby providing an intelligent scheduling optimization strategy based on actual conditions, which helps to improve the efficiency and reliability of scheduling management. The entire process can take into account factors such as material failure and route risks, making the optimization solution more comprehensive and practical.

[0135] Preferably, the present invention further provides a material management system based on intelligent manufacturing, which is used to execute the material management method based on intelligent manufacturing as described above, and the material management system based on intelligent manufacturing includes:

[0136] The material identification data analysis module is used to perform RFID tag identification processing on materials through RFID technology to obtain RFID identified materials; perform material traceability processing on RFID identified materials to obtain identified material flow information data; perform material production loss analysis on RFID identified materials based on identified material flow information data to obtain identified material production loss data; obtain identified material real-time inventory status data based on identified material production loss data;

[0137] The material real-time production demand analysis module is used to perform intelligent demand adjustment analysis on RFID-marked materials based on the production loss data of marked materials and the real-time inventory status data of marked materials, so as to obtain the real-time production demand data of marked materials;

[0138] The material production and supply intelligent scheduling module is used to analyze the material production stagnation of the identification material flow information data to obtain the identification material production and supply stagnation factor; based on the identification material production and supply stagnation factor and the identification material real-time inventory status data, the identification material real-time production demand data is intelligently scheduled and managed to generate an identification material intelligent scheduling management plan;

[0139] The material fault scheduling adjustment and optimization module is used to perform material fault detection on RFID-identified materials to obtain RFID-identified faulty materials; obtain material average fault probability data through RFID-identified faulty materials, and perform scheduling and transportation impact analysis on the identified material intelligent scheduling management plan based on the material average fault probability data to obtain the identified material scheduling and transportation impact factor data; adjust and optimize the identified material intelligent scheduling management plan based on the identified material scheduling and transportation impact factor data to obtain the identified material scheduling management optimization plan.

[0140] In summary, the present invention provides a material management system based on intelligent manufacturing, which is composed of a material identification data analysis module, a material real-time production demand analysis module, a material production and supply intelligent scheduling module, and a material fault scheduling adjustment and optimization module. It can realize any one of the material management methods based on intelligent manufacturing described in the present invention, and is used to combine the operations between computer programs running on various modules to realize a material management method based on intelligent manufacturing. The internal structures of the system cooperate with each other, and the intelligent identification of materials is realized through RFID technology. Each material can be accurately tracked and identified, which helps to improve the traceability of the material product production process, ensure the accuracy and consistency of the materials, and at the same time gain insight into and analyze the loss of materials in the production process and the real-time inventory status of the materials, and implement intelligent demand adjustment on them. Through the overall analysis, it can accurately predict and adjust real-time production needs, ensure that the production plan matches the market demand, thereby improving production efficiency and customer satisfaction. At the same time, by detecting material production stagnation and combining real-time inventory status data, it systematically implements intelligent material scheduling management, thereby generating a material scheduling management plan to ensure the continuity of production supply, thereby avoiding production interruptions caused by material stagnation. Through the above modules, a comprehensive material management system is jointly constructed. By using RFID technology, intelligent identification, traceability, analysis and scheduling management optimization of materials are realized, thereby providing accurate and efficient material management solutions, which can greatly reduce duplication of work and manpower investment, and can quickly and effectively provide a more accurate and efficient material management process, thereby simplifying the operating procedures of the material management system based on intelligent manufacturing.

[0141] Therefore, the embodiments should be regarded as illustrative and non-restrictive from all points, and the scope of the present invention is limited by the appended claims rather than the above description, and it is therefore intended that all changes falling within the meaning and range of equivalent elements of the application documents are included in the present invention.

[0142] The above description is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features invented herein.

Claims

1. A material management method based on intelligent manufacturing, characterized in that: The following steps are involved: Step S1: Perform RFID tag identification processing on materials through RFID technology to obtain RFID-identified materials; perform material traceability processing on RFID-identified materials to obtain flow information data of identified materials; perform material production loss analysis on RFID-identified materials based on the flow information data of identified materials to obtain production loss data of identified materials; obtain real-time inventory status data of identified materials based on the production loss data of identified materials; Step S2: Based on the production loss data of the identification materials and the real-time inventory status data of the identification materials, intelligent demand adjustment analysis is performed on the RFID identification materials to obtain the real-time production demand data of the identification materials; Step S3: performing material production stagnation analysis on the identification material flow information data to obtain the identification material production supply stagnation factor; performing intelligent material scheduling management on the identification material real-time production demand data based on the identification material production supply stagnation factor and the identification material real-time inventory status data to generate an identification material intelligent scheduling management plan; Step S4: perform material fault detection on RFID-identified materials to obtain RFID-identified faulty materials; obtain material average fault probability data through RFID-identified faulty materials, and perform scheduling and transportation impact analysis on the identified material intelligent scheduling management plan based on the material average fault probability data to obtain data on scheduling and transportation impact factors of the identified materials; adjust and optimize the identified material intelligent scheduling management plan based on the data on scheduling and transportation impact factors of the identified materials to obtain an optimized scheduling management plan for the identified materials.

2. The material management method based on intelligent manufacturing according to claim 1 is characterized in that: Step S1 includes the following steps: Step S11: Perform RFID tag identification processing on the material through RFID technology to obtain RFID-labeled material; Step S12: Perform material tracing processing on the RFID-marked material to obtain the flow information data of the marked material; Step S13: obtaining average usage frequency data and material loss probability data of RFID-marked materials through the marked material flow information data; calculating the flow loss of the marked material flow information data according to the average usage frequency data and the material loss probability data to obtain the marked material flow loss probability; Step S14: performing material production loss analysis on the RFID-marked material based on the marked material flow loss probability and the marked material flow information data to obtain the marked material production loss data; Step S15: Acquire the original inventory status data of the identification material, and update the original inventory status data of the identification material in real time according to the production loss data of the identification material to obtain the real-time inventory status data of the identification material.

3. The material management method based on intelligent manufacturing according to claim 2 is characterized in that: Step S14 includes the following steps: Step S141: based on the loss probability of the marked material flow, using the material production loss impact calculation formula to calculate the loss impact of the marked material flow information data, to obtain the marked material flow production loss impact coefficient; Step S142: performing impact assessment analysis on the marked material flow direction information data according to the marked material flow direction production loss impact coefficient to obtain the marked material production loss impact factor; Step S143: performing material expiration statistics analysis on the RFID-marked materials to obtain expiration probability data of the marked materials; Step S144: performing loss assessment analysis on the RFID identification material according to the identification material expiration probability data to obtain the identification material loss potential factor; Step S145: performing material production loss analysis on the RFID identification material according to the identification material production loss influencing factors and identification material loss potential factors to obtain identification material production loss data.

4. The material management method based on intelligent manufacturing according to claim 3 is characterized in that: The specific calculation formula for the material production loss impact in step S141 is: G(t)=a0+a1t+a2t 2 +…+a n t n ; In the formula, H i is the production loss influence coefficient of the RFID-marked material flow of the i-th RFID-marked material, N is the number of RFID-marked materials, i is the index item parameter of the RFID-marked material, j is the index item parameter of the adjacent RFID-marked material, α is the loss probability of the RFID-marked material flow, A i is the material flow attribute parameter of the i-th RFID-tagged material, m is the material flow attribute attenuation parameter, B i is the production process loss influencing parameter of the i-th RFID-labeled material, C i is the environmental factor loss impact parameter of the i-th RFID tag material, D ij is the production correlation influencing parameter between the i-th RFID-marked material and the j-th adjacent RFID-marked material, E i is the material flow association parameter of the i-th RFID-tagged material, F i is the time loss attenuation factor of the i-th RFID-tagged material, t1 is the initial time of the loss impact calculation, t2 is the termination time of the loss impact calculation, t is the time variable parameter of the loss impact calculation, G(t) is the time-varying loss impact function at time t, a0, a1, a2, …, a n are all adjustment parameters for the impact of time-varying losses, n is the index parameter of the time-varying loss impact item, and ε is the correction value of the production loss impact coefficient that identifies the material flow.

5. The material management method based on intelligent manufacturing according to claim 1 is characterized in that: Step S2 includes the following steps: Step S21: Calculate the loss probability of the RFID identification material according to the identification material production loss data to obtain the identification material loss probability value; Step S22: dividing the product production plan for the RFID-marked material to obtain the product production plan for the marked material at different production stages; Step S23: performing material demand analysis on the production plan of the identification material products at different production stages according to the real-time inventory status data of the identification material, so as to generate a real-time production demand plan for the identification material products; Step S24: intelligently adjust the real-time production demand plan of the identification material product according to the probability value of the identification material loss to obtain the real-time production demand data of the identification material.

6. The material management method based on intelligent manufacturing according to claim 1 is characterized in that: Step S3 includes the following steps: Step S31: performing material production efficiency prediction analysis on the marked material flow information data to obtain marked material production prediction efficiency data; Step S32: obtaining the material production waiting time, and performing material production delay calculation on the marked material flow information data according to the material production waiting time, so as to obtain the marked material production estimated delay data; Step S33: Correct and analyze the predicted efficiency data of the marking material production according to the estimated delay data of the marking material production to obtain the actual estimated efficiency data of the marking material production; Step S34: using the production efficiency stagnation impact index calculation formula to calculate the impact index of the actual estimated efficiency data of the marking material production, to obtain the marking material production efficiency stagnation impact index; Step S35: performing production stagnation evaluation and analysis on the marking material flow information data according to the marking material production efficiency stagnation impact index to obtain the marking material production supply stagnation factor; Step S36: Based on the identification material production and supply stagnation factor and the identification material real-time inventory status data, intelligent material scheduling management is performed on the identification material real-time production demand data to generate an identification material intelligent scheduling management plan.

7. The material management method based on intelligent manufacturing according to claim 6 is characterized in that: The calculation formula of the production efficiency stagnation impact index in step S34 is specifically: In the formula, is the impact index of stagnation of production efficiency of marked materials, T is the integral time range parameter of the impact index calculation, τ is the time variable parameter of the impact index calculation, P(τ) is the actual estimated efficiency data of the marked material production at time τ, β is the overall impact complexity parameter of production efficiency, ρ1 is the integral weight parameter of production efficiency, ρ2 is the attenuation parameter of production efficiency time impact, ρ3 is the weight parameter of production efficiency stagnation impact, ∈ is the time-dependent adjustment parameter of production efficiency, is the correlation parameter of production efficiency stagnation, η is the production efficiency recovery speed adjustment parameter, θ is the production efficiency attenuation speed adjustment parameter, and ξ is the correction value of the production efficiency stagnation impact index of the identified material.

8. The material management method based on intelligent manufacturing according to claim 6 is characterized in that: Step S36 includes the following steps: Step S361: Based on the real-time inventory status data of the identified materials, the intelligent manufacturing and transportation equipment is used to perform intelligent scheduling route planning on the real-time production demand data of the identified materials, so as to obtain the scheduling and transportation route of the identified materials demand; Step S362: Calculate the route stagnation probability of the identified material demand scheduling transportation route according to the identified material production and supply stagnation factor to obtain the identified material scheduling route stagnation probability value; Step S363: comparing and judging the stagnation probability value of the identified material scheduling route according to the preset stagnation probability standard value; when the stagnation probability value of the identified material scheduling route is greater than or equal to the preset stagnation probability standard value, the identified material demand scheduling transportation route corresponding to the stagnation probability value of the identified material scheduling route is marked as a stagnant transportation route; when the stagnation probability value of the identified material scheduling route is less than the preset stagnation probability standard value, the identified material demand scheduling transportation route corresponding to the stagnation probability value of the identified material scheduling route is marked as a waiting transportation route; Step S364: Eliminate the identified material demand scheduling transportation routes marked as stagnant transportation routes, and perform path optimization processing on the identified material demand scheduling transportation routes marked as waiting transportation routes through a path optimization algorithm to obtain the identified material scheduling transportation optimization routes; Step S365: Based on the optimized transportation route for the identified materials, intelligent manufacturing and transportation equipment is used to perform intelligent scheduling strategy management on the real-time production demand data of the identified materials to generate an intelligent scheduling management plan for the identified materials.

9. The material management method based on intelligent manufacturing according to claim 1, characterized in that: Step S4 includes the following steps: Step S41: Perform material fault detection on the RFID-marked material to obtain the RFID-marked faulty material; Step S42: Statistically analyzing the RFID-marked faulty materials to obtain data on the average failure probability of the materials; Step S43: monitoring the transportation status risk of the material scheduling and transportation process in the intelligent scheduling management solution for the identified material, and obtaining the risk data of the scheduling and transportation route of the identified material; Step S44: performing potential assessment analysis on the risk data of the identified material scheduling and transportation route to obtain the potential factors of the identified material scheduling and transportation risk; Step S45: performing a scheduling and transportation impact analysis on the material scheduling and transportation process in the identified material intelligent scheduling and transportation management solution according to the material average failure probability data and the identified material scheduling and transportation risk potential factors, so as to obtain the identified material scheduling and transportation impact factor data; Step S46: adjusting and optimizing the intelligent scheduling management plan for marked materials according to the data of factors influencing the scheduling and transportation of marked materials, so as to obtain an optimized scheduling management plan for marked materials.

10. A material management system based on intelligent manufacturing, characterized in that: Used to execute the material management method based on intelligent manufacturing as claimed in claim 1, the material management system based on intelligent manufacturing comprises: The material identification data analysis module is used to perform RFID tag identification processing on materials through RFID technology to obtain RFID identified materials; perform material traceability processing on RFID identified materials to obtain identified material flow information data; perform material production loss analysis on RFID identified materials based on identified material flow information data to obtain identified material production loss data; obtain identified material real-time inventory status data based on identified material production loss data; The material real-time production demand analysis module is used to perform intelligent demand adjustment analysis on RFID-marked materials based on the production loss data of marked materials and the real-time inventory status data of marked materials, so as to obtain the real-time production demand data of marked materials; The material production and supply intelligent scheduling module is used to analyze the material production stagnation of the identification material flow information data to obtain the identification material production and supply stagnation factor; based on the identification material production and supply stagnation factor and the identification material real-time inventory status data, the identification material real-time production demand data is intelligently scheduled and managed to generate an identification material intelligent scheduling management plan; The material fault scheduling adjustment and optimization module is used to perform material fault detection on RFID-identified materials to obtain RFID-identified faulty materials; obtain material average fault probability data through RFID-identified faulty materials, and perform scheduling and transportation impact analysis on the identified material intelligent scheduling management plan based on the material average fault probability data to obtain the identified material scheduling and transportation impact factor data; adjust and optimize the identified material intelligent scheduling management plan based on the identified material scheduling and transportation impact factor data to obtain the identified material scheduling management optimization plan.

Citation Information

Cited By

  • AI-based experimental consumable management system and method

    CN121148625A