Grounding construction method
The grounding construction method in which the spiral copper tube forms a ring grounding body and the soil is closely in contact with the soil, the problem of high ground resistance is solved, lower resistance and higher anti-interference ability are achieved, and the safety of power construction is improved.
Patent Information
- Application Number
- CN202411107774.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-19
AI Technical Summary
In power construction, high ground resistance may cause abnormal increase in ground potential, threatening the safety of operating personnel, and may cause damage to electrical equipment. The existing grounding construction methods are difficult to effectively reduce resistance and improve safety.
A grounding construction method is adopted, including material inspection and positioning, on-site layout, trench excavation and drilling, grounding net laying and connection, backfilling and other steps. The annular grounding body is formed through a spiral-shaped copper tube to closely contact the soil, and the annular shape is used to form a ring grounding body. The mutual cooperation with the spiral shape reduces the grounding resistance, and ensures the safety of the grounding grid through exothermic welding connection and resistance detection.
It achieves a lower ground resistance, improves construction safety, reduces safety hazards, enhances anti-interference ability, and ensures optimization of grounding effect.
Smart Images

Figure CN118983671A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of grounding construction, in particular to a grounding construction method. Background Art
[0002] When conducting power construction, it is necessary to use grounding wires to achieve grounding operations. When encountering dangers such as leakage, the grounding wire can directly transfer the high voltage to the ground, effectively ensuring the safety of construction workers. Usually, grounding wires are required in parts such as the casing of electrical equipment to conduct unsafe charges or leakage currents generated by various reasons to the ground, achieving the effect of safe grounding.
[0003] The grounding network of the substation is connected to the grounding wires of the high and low voltage electrical equipment of the entire station. It is the fundamental guarantee and important measure to maintain the safety of the substation and ensure the safe operation of the operators and electrical equipment. If the grounding resistance is large, the ground potential may rise abnormally when a grounding fault occurs in the power system or other large current enters the ground. This will threaten the safety of the operators, and may also damage the low voltage or secondary equipment and cable insulation due to counterattack, causing the high voltage to enter the control and protection system, and the substation monitoring and protection equipment to malfunction or refuse to operate. Therefore, it is urgent to set up a new grounding construction method to effectively reduce the resistance, thereby reducing safety hazards. Summary of the invention
[0004] The purpose of the present invention is to provide a grounding construction method to solve the problems raised in the above background technology.
[0005] In order to achieve the above-mentioned invention object, the present invention adopts the following technical scheme:
[0006] The present invention provides a grounding construction method, comprising the following steps:
[0007] S1: Material inspection and positioning: Before construction, measure and locate the materials required for the vertical grounding body and the horizontal grounding body. After the measurement is correct, keep them ready for use and record the quantity;
[0008] S2: On-site layout: Prepare drainage work around the foundation pit in advance, then conduct on-site investigation to determine the coordinate position and calibrate the fixed points; then securely fix the tools and equipment, connect the power supply and measure the coordinate point position to prepare for construction;
[0009] S3: Trench excavation and drilling: Construction personnel shall excavate according to the construction documents, remove obstacles such as stones and tree roots before excavation, and store the excavated earth and stone in advance for subsequent backfilling; after the earth and stone excavation reaches the bottom, the cushion layer shall be sealed in time, and then the trench excavation and vertical grounding body drilling shall be carried out; in sites with relatively good geological conditions, the foundation pit monitoring measurement data is still within the normal range, and the change rate does not exceed the standard, the cushion layer can be constructed after the base construction is completed;
[0010] The horizontal grounding groove is dug by manual labor and mechanical excavation. The groove is an isosceles trapezoid with a cross-section of 800mm width on the upper side, 600mm width on the lower side, and 900mm height. The bottom of the groove is at the same elevation as the bottom of the cushion layer.
[0011] After trench excavation, drill a hole of φ700-750mm and 3000mm deep at the vertical grounding body position in the center of the trench, and drain the water inside; draw a φ666mm line at the center of the bottom of the hole, and then divide the circle into six equal parts, and draw six φ60mm small circles with each equal point as the center;
[0012] S4: Grounding grid laying: first lay the vertical grounding body, then lay the horizontal grounding body;
[0013] Laying the vertical grounding body: first prepare a first copper tube and five second copper tubes, where the first copper tube is 3.2m long and the second copper tube is 0.5m long; the first copper tube and the second copper tube are both φ50mm and 5mm thick; then the six copper tubes are matched to the six small circles drawn in S2 one by one, and the copper wires are used to wrap and fix every two copper tubes in an up-and-down spiral manner; after the six copper tubes are wrapped and fixed with each other, they form the entire vertical grounding body, and then clay or powdered soil is filled in the gaps. In order to ensure the density of the backfill material, the water tamping method is used for treatment;
[0014] Laying horizontal grounding electrodes: The horizontal grounding electrodes are made of 50mm*5mm copper bars, which are cut mechanically and placed vertically in horizontal grooves with a burial depth of no less than 800mm and a bending radius of no less than 5m.
[0015] S5: Grounding grid connection: After the grounding grid is laid, each connection point is connected by exothermic welding, and desoldering and cold welding are strictly prevented;
[0016] S6: Grounding device lead wire: After welding is completed, install the grounding device lead wire on the grounding grid; the lead wire and the grounding grid are connected by exothermic welding; the grounding lead wire passes through the structural bottom plate;
[0017] S7: Backfill: The grounding grid trench is backfilled with clay or powdered highly differentiated rock with low soil resistivity; each filling should not exceed 30cm, and it should be properly watered and compacted, and the operation should be repeated until it is flush with the ground surface;
[0018] S8: Resistance detection: After the construction of each section of the grounding grid is completed, the grounding resistance is measured, and the grounding resistance of the entire grounding grid is calculated and the data is recorded.
[0019] Preferably, in step S2, after the coordinate point of the vertical grounding electrode is marked, the marked point is led to the side wall of the enclosure structure using a horizontal marking line to facilitate the later review of the vertical grounding electrode and reduce the measurement workload.
[0020] Preferably, in step S3, the moisture change and stability of the excavated earth and stone will be continuously detected during the entire construction process, and photos and records will be taken in time, and the recorded data will be transmitted to the cloud by an external computer.
[0021] Preferably, in step S4, to ensure that the copper busbar is completely in the backfill soil, high-strength mortar pads can be used to support different parts so that the bottom is about 50 mm higher than the bottom of the ditch, and the backfill soil is moved to fill the lower part of the copper busbar densely.
[0022] Preferably, in step S5, the exothermic welding connection of the grounding grid is divided into: horizontal connection of horizontal grounding bodies, vertical cross connection of horizontal grounding bodies, and connection of horizontal and vertical grounding bodies according to the form of welding points.
[0023] Preferably, before welding, the oxides on the inner surface of 200mm on both sides of the copper busbar should be cleaned to expose the metallic luster completely; at the same time, the welding points, welding slag and welding flux should be cleaned after welding, and the welding quality should be checked as required; the welding points should be treated with anti-corrosion.
[0024] Preferably, in step S6, after welding is completed, a hidden inspection is carried out in a timely manner and the inspection is reported to the supervisor for acceptance; after the material, position and welding quality of the grounding body are accepted, the backfilling operation of step S7 is carried out.
[0025] Compared with the prior art, one or more of the above technical solutions have the following beneficial effects:
[0026] By arranging five second copper tubes in a spiral distribution around the first copper tube, the entire vertical grounding body has a spiral state. At the same time, the cross-section of the overall vertical grounding body constitutes a ring state. The mutual cooperation of the ring and spiral shapes makes its direct contact with the soil closer. Since the annular vertical grounding body forms a closed loop through the copper wire, it has a better grounding effect; and the spiral vertical grounding body can maximize the grounding effect, has a higher anti-interference ability and a lower grounding resistance, and has a better use effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0028] Figure 1 It is a schematic diagram of the three-dimensional structure of the vertical grounding body of the present invention;
[0029] Figure 2 It is a schematic diagram of the top view of the vertical grounding body of the present invention;
[0030] Figure 3 It is a schematic diagram of the system structure of the present invention;
[0031] In the figure:
[0032] 1. First copper tube; 2. Second copper tube; 3. Copper wire. DETAILED DESCRIPTION
[0033] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0034] See also Figure 1-Figure 3 , a grounding construction method, comprising the following steps:
[0035] S1: Material inspection and positioning: Before construction, measure and locate the materials required for the vertical grounding body and the horizontal grounding body. After the measurement is correct, keep them ready for use and record the quantity;
[0036] S2: On-site layout: Prepare drainage work around the foundation pit in advance, then conduct on-site investigation to determine the coordinate position and calibrate the fixed points; then securely fix the tools and equipment, connect the power supply and measure the coordinate point position to prepare for construction;
[0037] S3: Trench excavation and drilling: Construction personnel shall excavate according to the construction documents, remove obstacles such as stones and tree roots before excavation, and store the excavated earth and stone in advance for subsequent backfilling; after the earth and stone excavation reaches the bottom, the cushion layer shall be sealed in time, and then the trench excavation and vertical grounding body drilling shall be carried out; in sites with relatively good geological conditions, the foundation pit monitoring measurement data is still within the normal range, and the change rate does not exceed the standard, the cushion layer can be constructed after the base construction is completed;
[0038] The horizontal grounding groove is dug by manual labor and mechanical excavation. The groove is an isosceles trapezoid with a cross-section of 800mm width on the upper side, 600mm width on the lower side, and 900mm height. The bottom of the groove is at the same elevation as the bottom of the cushion layer.
[0039] After trench excavation, drill a hole of φ700-750mm and 3000mm deep at the vertical grounding body position in the center of the trench, and drain the water inside; draw a φ666mm line at the center of the bottom of the hole, and then divide the circle into six equal parts, and draw six φ60mm small circles with each equal point as the center;
[0040] S4: Grounding grid laying: first lay the vertical grounding body, then lay the horizontal grounding body;
[0041] Laying the vertical grounding body: first prepare a first copper tube 1 and five second copper tubes 2, wherein the first copper tube 1 is 3.2m long and the second copper tube 2 is 0.5m long; the first copper tube 1 and the second copper tube 2 are both φ50mm and 5mm thick; then the six copper tubes are corresponding to the six small circles drawn in S2 one by one, and the copper wire 3 is used to wrap and fix every two copper tubes in an upward and downward spiral manner, as shown in the following figure. Figure 1 and Figure 2 As shown, by winding six copper tubes in this way, five second copper tubes 2 are arranged in a spiral around the first copper tube 1, and the entire vertical grounding body has a spiral state. At the same time, the cross section of the overall vertical grounding body forms a ring state. The cooperation between the ring and the spiral shape makes it more closely in direct contact with the soil. Since the ring-shaped vertical grounding body forms a closed loop through the copper wire 3, it has a better grounding effect; and the spiral vertical grounding body can maximize the grounding effect, has a higher anti-interference ability and a lower grounding resistance, and has a better use effect; after the six copper tubes are wound and fixed with each other, they form the entire vertical grounding body, and then clay or powdered soil is filled in the gap. In order to ensure that the backfill material is dense, a water tamping method is used for processing;
[0042] Laying horizontal grounding electrodes: The horizontal grounding electrodes are made of 50mm*5mm copper bars, which are cut mechanically and placed vertically in horizontal grooves with a burial depth of no less than 800mm and a bending radius of no less than 5m.
[0043] S5: Grounding grid connection: After the grounding grid is laid, each connection point is connected by exothermic welding, and desoldering and cold welding are strictly prevented;
[0044] S6: Grounding device lead wire: After welding is completed, install the grounding device lead wire on the grounding grid; the lead wire and the grounding grid are connected by exothermic welding; the grounding lead wire passes through the structural bottom plate;
[0045] S7: Backfill: The grounding grid trench is backfilled with clay or powdered highly differentiated rock with low soil resistivity; each filling should not exceed 30cm, and it should be properly watered and compacted, and the operation should be repeated until it is flush with the ground surface;
[0046] S8: Resistance detection: After the construction of each section of the grounding grid is completed, the grounding resistance is measured, and the grounding resistance of the entire grounding grid is calculated and the data is recorded.
[0047] Furthermore, in step S2, after the coordinate point of the vertical grounding electrode is marked, the marked point is led to the side wall of the enclosure structure using a horizontal marking line to facilitate the later review of the vertical grounding electrode and reduce the measurement workload.
[0048] Furthermore, in step S3, the moisture change and stability of the excavated earth and stone will be continuously detected during the entire construction process, and photos and records will be taken in time, and the recorded data will be transmitted to the cloud by an external computer.
[0049] Furthermore, in step S4, to ensure that the copper busbar is completely in the backfill soil, high-strength mortar pads can be used to support different parts so that the bottom is about 50 mm higher than the bottom of the ditch, and the backfill soil is moved to fill the lower part of the copper busbar densely.
[0050] Furthermore, in step S5, the grounding grid exothermic welding connection is divided into: horizontal connection of horizontal grounding bodies, vertical cross connection of horizontal grounding bodies, and connection of horizontal and vertical grounding bodies according to the form of welding points.
[0051] Furthermore, in step S5, the oxides on the inner surface of 200 mm on both sides of the copper busbar are cleaned before welding to fully expose the metallic luster; at the same time, the welding points, welding slag and welding flux should be cleaned after welding, and the welding quality should be checked as required; the welding points are treated with anti-corrosion.
[0052] Furthermore, in step S6, after the welding is completed, a hidden inspection is carried out in a timely manner and the inspection is reported to the supervisor for acceptance; after the material, position and welding quality of the grounding body are accepted, the backfilling operation of step S7 is carried out.
[0053] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A grounding construction method, It is characterized in that The following steps are involved: S1: Material inspection and positioning: Before construction, measure and locate the materials required for the vertical grounding body and the horizontal grounding body. After the measurement is correct, keep them ready for use and record the quantity; S2: On-site layout: Prepare drainage work around the foundation pit in advance, then conduct on-site investigation to determine the coordinate position and calibrate the fixed points; then securely fix the tools and equipment, connect the power supply and measure the coordinate point position to prepare for construction; S3: Trench excavation and drilling: Construction personnel shall excavate according to the construction documents, remove obstacles such as stones and tree roots before excavation, and store the excavated earth and stone in advance for subsequent backfilling; after the earth and stone excavation reaches the bottom, the cushion layer shall be sealed in time, and then trench excavation and vertical grounding body drilling shall be carried out; The horizontal grounding groove is dug by manual labor and mechanical excavation. The groove is an isosceles trapezoid with a cross-section of 800mm width on the upper side, 600mm width on the lower side, and 900mm height. The bottom of the groove is at the same elevation as the bottom of the cushion layer. After trench excavation, drill a hole of φ700-750mm and 3000mm deep at the vertical grounding body position in the center of the trench, and drain the water inside; draw a φ666mm line at the center of the bottom of the hole, and then divide the circle into six equal parts, and draw six φ60mm small circles with each equal point as the center; S4: Grounding grid laying: first lay the vertical grounding body, then lay the horizontal grounding body; Laying the vertical grounding body: first prepare a first copper tube and five second copper tubes, where the first copper tube is 3.2m long and the second copper tube is 0.5m long; the first copper tube and the second copper tube are both φ50mm and 5mm thick; then the six copper tubes are matched to the six small circles drawn in S2 one by one, and the copper wires are used to wrap and fix every two copper tubes in an up-and-down spiral manner; after the six copper tubes are wrapped and fixed with each other, they form the entire vertical grounding body, and then clay or powdered soil is filled in the gaps. In order to ensure the density of the backfill material, the water tamping method is used for treatment; Laying horizontal grounding electrodes: The horizontal grounding electrodes are made of 50mm*5mm copper bars, which are cut mechanically and placed vertically in horizontal grooves with a burial depth of no less than 800mm and a bending radius of no less than 5m. S5: Grounding grid connection: After the grounding grid is laid, each connection point is connected by exothermic welding, and desoldering and cold welding are strictly prevented; S6: Grounding device lead wire: After welding is completed, install the grounding device lead wire on the grounding grid; the lead wire and the grounding grid are connected by exothermic welding; the grounding lead wire passes through the structural bottom plate; S7: Backfill: The grounding grid trench is backfilled with clay or powdered highly differentiated rock with low soil resistivity; Each filling should not exceed 30cm, and should be properly watered and compacted, and the operation should be repeated until it is flush with the ground surface; S8: Resistance detection: After the construction of each section of the grounding grid is completed, the grounding resistance is measured, and the grounding resistance of the entire grounding grid is calculated and the data is recorded.
2. The grounding construction method according to claim 1, Features: In step S2, after the coordinate point of the vertical grounding electrode is marked, the marked point is led to the side wall of the enclosure structure using a horizontal marking line to facilitate the later review of the vertical grounding electrode and reduce the measurement workload.
3. The grounding construction method according to claim 1, Features: In step S3, the moisture change and stability of the excavated earth and stone will be continuously detected during the entire construction process, and photos and records will be taken in time, and the recorded data will be transmitted to the cloud by an external computer.
4. The grounding construction method according to claim 1, Features: In step S4, to ensure that the copper busbar is completely in the backfill soil, high-strength mortar pads can be used to support different parts so that the bottom is about 50 mm higher than the bottom of the ditch, and the backfill soil is moved to fill the lower part of the copper busbar densely.
5. The grounding construction method according to claim 1, Features: In step S5, the exothermic welding connection of the grounding grid is divided into the following types according to the form of welding points: horizontal connection of horizontal grounding bodies, vertical cross connection of horizontal grounding bodies, and connection of horizontal and vertical grounding bodies.
6. The grounding construction method according to claim 1, Features: In step S5, the oxides on the inner surface of 200 mm on both sides of the copper busbar are cleaned before welding to expose the metallic luster completely; at the same time, the welding points, welding slag and welding flux should be cleaned after welding, and the welding quality should be checked as required; the welding points are treated with anti-corrosion.
7. The grounding construction method according to claim 1, Features: In step S6, after welding is completed, a hidden inspection is carried out in a timely manner and the inspection is reported to the supervisor for acceptance; after the material, position and welding quality of the grounding body are accepted, the backfilling operation of step S7 is carried out.