Optimal configuration method for wind-solar matching system of hydrogen production park

By optimizing the use of wind and light resources and the operation of energy equipment, the problems of low energy conversion efficiency and lack of coordination in wind and light hydrogen production are solved, and efficient new energy utilization and economic planning strategies are realized, which are suitable for electric hydrogen in different application scenarios Energy storage configuration.

CN118983834AActive Publication Date: 2024-11-19POWERCHINA SEPCO1 ELECTRIC POWER CONSTR CO LTD

Patent Information

Application Number
CN202411136540.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-19
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

In the process of wind and light hydrogen production, there are problems such as low energy conversion efficiency, high hydrogen production cost, and lack of coordinated optimization of wind power and photovoltaic power generation planning. In addition, the differences in hydrogen load characteristics in different application scenarios lead to the electro-hydrogen storage configuration strategy. Sexual design.

Method used

Using an optimized configuration method for wind and light ratio system in hydrogen production park, by calculating the output time series of wind power and photovoltaic power generation, an equivalent equipment model of hydrogen energy storage unit and electrochemical energy storage unit is established to form an electrical busbar power balance and hydrogen Busbar power balance relationship, build a new energy hydrogen production park system planning and optimization configuration model that considers the wind and light ratio, and optimizes the utilization of wind and light resources and the operation of energy equipment.

Benefits of technology

The comprehensive optimization and utilization of scenery resources has been achieved, the efficiency of new energy utilization has been improved, the operation characteristics of energy equipment has been accurately simulated, economically feasible planning strategies have been provided, and the power purchase demand and new energy consumption capacity have been optimized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118983834A_ABST
    Figure CN118983834A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of new energy power generation, in particular to an optimal configuration method for a wind-solar matching system of a hydrogen production park, which comprises the following steps: S1) calculating output time sequences of local wind power and photovoltaic power generation, and analyzing wind power and photovoltaic output characteristics and wind-light correlation; s2) establishing equivalent equipment models of a hydrogen energy storage unit and an electrochemical energy storage unit, and operating characteristic models of related electricity and hydrogen equipment of the park; s3) obtaining a new energy hydrogen production park system planning optimization configuration scheme and a system configuration total cost by integrating the above objective function; and S4) further considering an electricity price factor and an energy storage operation characteristic constraint, carrying out annual wind-solar hydrogen production time sequence operation simulation, and analyzing a park electricity purchase demand and a new energy consumption capability under the planning optimization configuration scheme.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of renewable energy power generation, and in particular to a method for optimizing the configuration of a wind-solar ratio system in a hydrogen production park. Background Art

[0002] In recent years, the solar energy industry has become a hot spot for development. In industrial parks and ecological parks, the generation of "green hydrogen" can be achieved by configuring photovoltaic units or wind turbines. Obtaining clean and low-carbon hydrogen is an inevitable path for the future sustainable development of hydrogen energy.

[0003] Although wind and solar hydrogen production has great potential, there are still some shortcomings in its current utilization. First, from the perspective of conversion efficiency, the method of producing hydrogen by electrolysis of water has the problems of low energy conversion efficiency and high hydrogen production cost in the energy storage process; secondly, at present, various regions only make extensive plans for the development of wind power and photovoltaic power based on wind and solar energy resources, and do not fully consider the operating characteristics of wind power and photovoltaic power generation and the coordinated optimization of the optimal ratio capacity. In addition, due to the huge differences in hydrogen energy load characteristics in different application scenarios, the electric hydrogen energy storage configuration strategy and equipment planning scheme in each scenario need to be designed and optimized in a targeted manner. Summary of the invention

[0004] In order to solve the above problems, the present invention provides a method for optimizing the configuration of a wind-solar ratio system in a hydrogen production park, optimizes the comprehensive utilization of wind and solar resources, and realizes accurate simulation of the operation of energy equipment. The technical solution adopted by the present invention is as follows: A method for optimizing the configuration of a wind-solar ratio system in a hydrogen production park comprises the following steps: S1) Calculate the output time series of local wind power and photovoltaic power generation, analyze the output characteristics of wind power and photovoltaic power generation and the correlation between wind and light, where the power output model of wind turbine generator set is: Where P WT,t is the power generated by the wind turbine at time t; N is the number of wind power / photovoltaic units connected to the wind farm; P WT is the rated power of the wind turbine; v t is the actual wind speed at time t; v in is the cut-in wind speed of the wind turbine; v out is the cut-out wind speed of the wind turbine; v 0 is the rated wind speed of the wind turbine; The electric energy output by photovoltaic power generation is direct current, and its steady-state power output model can be expressed as: Where: P PV is the actual power generation of the photovoltaic unit (kW); P STC is the rated output power (kW) of the photovoltaic cell module under standard test conditions (STC); G ING (t) is the solar radiation intensity at time t (W / m 2 ); G STC is the solar radiation intensity under standard environment (1000W / m 2 ); η loss is the power loss of the photovoltaic cell due to the increase in temperature; To ensure the consumption of wind power and the economic benefits of the park, when the grid electricity price is low, the power generated by the wind turbines or the remaining power after offsetting the load demand of the park can be stored in the energy storage system; when the grid electricity price is peak, the power generated by the wind turbines is first directly consumed by the load side, or the energy storage system releases power to supply power to the load and the grid; S2) Establish equivalent equipment models for hydrogen energy storage units and electrochemical energy storage units, and form the relationship between the power balance of the electric bus and the power balance of the hydrogen bus according to the operating characteristic models of the relevant electric and hydrogen equipment in the park; take the lowest cost of the entire life cycle as the objective function, consider power balance and equipment operating characteristics constraints, land restrictions and other constraints, and build a new energy hydrogen production park system planning optimization configuration model that considers the ratio of wind and solar; S3) Combining the above objective functions, obtaining the optimal configuration scheme and total system configuration cost of the new energy hydrogen production park system planning; S4) Further consider the electricity price factors and energy storage operation characteristics constraints, conduct a year-round wind and solar hydrogen production timing operation simulation, and analyze the park's electricity purchase demand and new energy consumption capacity under this planning optimization configuration plan. In the above step S1, a clustering method is used to obtain a typical day situation, which includes the following steps: S1.1) Randomly select a sample in the data set x as the first center point; S1.2) Calculate the shortest distance between each sample and the current cluster center, represented by D(x); then calculate the probability P(x) of each sample point being selected as the next cluster center, and finally select the sample point corresponding to the maximum probability value (or probability distribution) as the next cluster center; S1.3) Repeat S1.2 until k cluster centers are found; S1.4) For each sample in the data set, calculate its distance to the k cluster centers and assign it to the class corresponding to the cluster center with the smallest distance; S1.5) Calculate the average for each category and recalculate the cluster center; S1.6) Repeat S1.4 and S1.5 until a certain termination condition is reached, which is usually when the objective function reaches the optimal value or the maximum number of iterations is reached. The objective function is often different for different distance metrics. When using Euclidean distance, the objective function is generally to minimize the sum of squares of the distances from the object to its cluster centroid; when using cosine similarity, the objective function is generally to maximize the sum of cosine similarities from the object to its cluster centroid.

[0005] In the above step S2, the following constraints are set for the multi-objective optimization configuration model: S2.1) Power balance constraints: Where: L E (t) is the power load demand of the park during period t; L H (t) is the hydrogen load demand of the park during period t; S2.2) Equipment output constraints Equipment output constraints include electrolyzer output power constraints, fuel cell output power constraints, battery output and capacity constraints, and hydrogen storage tank output and capacity constraints: Where: P EL_max , P FC_max They are the maximum outputs of the electrolyzer and fuel cell respectively; S E_max , S H_max They are the maximum capacities of the battery and hydrogen storage tank respectively; S2.3) Energy storage equipment constraints: Where: SOC(0) is the initial state of charge of the battery; SOC (24) is the state of charge of the battery at the end of the period; S H (0) is the initial capacity of the hydrogen storage tank; S H (24) is the capacity of the hydrogen storage tank at the end of the day; S2.4) Power purchase and sales constraints: Where: P grid_max and P grid_min They are the upper and lower limits of the power exchanged between the park and the upper power grid; S2.5) Floor space constraints: Where: P PV_max , P WT_max is the total installed capacity of photovoltaic units and wind turbine units; λ PV , WT The unit capacity area of ​​photovoltaic units and wind turbine units; S max It is the largest construction area of ​​new energy units in the park.

[0006] In the above step S2, the park optimization objective function is to minimize the total life cycle cost: Where: C cstr is the one-time investment cost, C buy is the energy purchase cost, C OM is the operation and maintenance cost, C loss is the loss cost, C Dis For scrapping costs; One-time investment cost C cstr Refers to the sum of the initial investment costs of each equipment during its entire life cycle: Where: y represents the service life of the equipment; r is the discount rate; μ i is the unit capacity investment cost of the i-th equipment; S i represents the maximum capacity of the i-th device; N represents the collection of equipment in the park, including wind turbines, electrolyzers, fuel cells, batteries and hydrogen storage tanks.

[0007] Energy purchase cost C buy Refers to the sum of the cost of purchasing electricity from the upper-level power grid and the income from selling electricity to the upper-level power grid in the park throughout the year: Where: c t is the electricity purchase / sale price in period t; P grid,t is the interactive power between the park and the upper power grid during period t. grid,t is positive, indicating that the park purchases electricity from the upper power grid; when P grid,t If it is negative, it means that the industrial park sells electricity to the superior power grid.

[0008] Operation and maintenance cost C OM Refers to the total operation and maintenance costs of each device in the system during each time period throughout the year: Where: i,t is the unit capacity operation and maintenance cost of the i-th equipment in period t, P i,t represents the output power of the i-th device in period t; N represents the collection of equipment in the park, including wind turbines, electrolyzers, fuel cells, batteries and hydrogen storage tanks.

[0009] In step S1, the selected source side equipment includes photovoltaic units and wind turbine units, and the selected energy conversion equipment includes electrolyzers and fuel cells, and the input-output relationship thereof is as follows: Where: P EL,in (t), P EL,out (t), η EL are the input power, output power and conversion efficiency of the electrolyzer in period t respectively; P FC,in (t), P FC,out (t), P FC,h (t), η FC,e , η FC,h are the input power, output electrical power, thermal power, and conversion efficiency of the fuel cell during period t, respectively; The selected energy storage equipment includes batteries and hydrogen storage tanks. The mathematical model and input-output relationship are as follows: Where: S E_max is the maximum capacity of the battery; SOC(t) is the charge level of the battery at time t; , are the charging and discharging power of the battery at time t respectively; , are the charging and discharging efficiency of the battery respectively.

[0010] S Hy is the capacity of the hydrogen storage tank at time t; , They are the charging and discharging power of the hydrogen storage tank respectively; , They are the charging and discharging efficiency of the hydrogen storage tank respectively.

[0011] In the above step S1, n loss It can be expressed as: Where: k PVis the temperature coefficient; T c (t) is the surface temperature of the photovoltaic panel; T t is the reference temperature; The photovoltaic cell surface temperature T c (t) can be estimated from the ambient temperature and light intensity: Where: T a is the ambient temperature, G ING is the light intensity.

[0012] Beneficial effects of the present invention: 1) Optimized the comprehensive utilization of wind and solar resources: Not only accurately analyzed the characteristics of wind power and photovoltaic output and their relationship, but also fully utilized wind and solar resources and improved the utilization efficiency of new energy.

[0013] 2) Accurate simulation of the operating characteristics of energy equipment is achieved: By establishing equivalent equipment models of hydrogen energy storage units, electrochemical energy storage units, etc., and considering the power balance relationship between the electric bus and the hydrogen bus, this patent achieves accurate simulation of the operating characteristics of various energy equipment in the park.

[0014] 3) Provides an economically feasible planning strategy: By simulating the timing operation of wind and solar hydrogen production throughout the year and rationally configuring various equipment in the park, this patent not only optimizes the park's electricity purchase demand and new energy absorption capacity, but also provides an economically feasible planning strategy. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the overall layout of a hydrogen production park according to an embodiment of the present invention; Figure 2 It is a schematic diagram of a flow chart of an embodiment of the present invention; Figure 3 is a clustering image of an embodiment of the present invention; Figure 4 This is a typical daily energy balance diagram of a hydrogen production park according to an embodiment of the present invention; Figure 5 This is a typical daily hydrogen energy balance diagram of a hydrogen production park according to an embodiment of the present invention; Figure 6 A schematic diagram of a dual-typical daily energy balance of a hydrogen production park according to an embodiment of the present invention; Figure 7 This is a schematic diagram of the double typical day hydrogen energy balance of the hydrogen production park according to an embodiment of the present invention.

[0016] In the figure: 1 is a wind turbine, 2 is a photovoltaic unit, 3 is a battery, 4 is an electrolyzer, 5 is a hydrogen storage tank, and 6 is a fuel cell. DETAILED DESCRIPTION

[0017] The technical contents of the present invention are described in detail below with reference to the accompanying drawings.

[0018] This embodiment is a method for optimizing the configuration of a wind-solar ratio system in a hydrogen production park, and the method includes the following four steps.

[0019] Step 1 S1) By analyzing the key data such as historical wind speed and sunshine in the planned site area in detail, the output time series of local wind power and photovoltaic power generation are calculated, and the wind power and photovoltaic output characteristics and wind-photovoltaic correlation are analyzed.

[0020] The output of wind turbines is mainly affected by factors such as wind speed, and its power output model is: Where P WT,t is the power generated by the wind turbine at time t; N is the number of wind power / photovoltaic units connected to the wind farm; P WT is the rated power of the wind turbine; v t is the actual wind speed at time t; v in is the cut-in wind speed of the wind turbine; v out is the cut-out wind speed of the wind turbine; v 0 is the rated wind speed of the wind turbine.

[0021] To ensure the consumption of wind power and the economic benefits of the industrial park, when the power grid is at a low point in the off-peak period, the power generated by the wind turbines or the remaining power after offsetting the load demand of the industrial park can be stored in the energy storage system; when the power grid is at a peak point in the peak period, the power generated by the wind turbines will be directly consumed by the load side first, or the energy storage system will release power to supply power to the load and the grid.

[0022] The electric energy output by photovoltaic power generation is direct current. The output is mainly affected by the intensity of solar radiation, ambient temperature, etc. Its steady-state power output model can be expressed as: Where: P PV is the actual power generation of the photovoltaic unit (kW); P STC is the rated output power (kW) of the photovoltaic cell module under standard test conditions (STC); G ING (t) is the solar radiation intensity at time t (W / m 2 ); G STC is the solar radiation intensity under standard environment (1000W / m 2 ); η loss is the power loss of the photovoltaic cell due to the temperature increase, which can be expressed as: Where: k PV is the temperature coefficient (generally -0.00485 / ℃); T c (t) is the surface temperature of the photovoltaic panel; T t is the reference temperature (generally 25°C).

[0023] The photovoltaic cell surface temperature T c (t) can be estimated from the ambient temperature and light intensity: Where: T a is the ambient temperature (°C), G ING is the light intensity.

[0024] After obtaining the time series of photovoltaic unit output and wind turbine unit output, the clustering method is used to obtain the typical daily situation. In the process of clustering the wind and solar output, the following steps need to be performed: 1) Data preprocessing: Data needs to be processed and standardized, including steps such as handling missing values, removing outliers, and performing data standardization.

[0025] 2) Time series feature extraction: For time series data such as wind and solar power output, direct clustering may not be suitable because the original time series data is usually high-dimensional. Through feature extraction, the data dimension can be reduced and important information can be retained.

[0026] 3) Choose a clustering algorithm: There are many different clustering algorithms to choose from, including K-means, spectral clustering, DBSCAN, etc. Choose the most appropriate clustering algorithm based on your data and problem.

[0027] 4) Determine the number of clusters: If you choose an algorithm such as K-means that requires the number of clusters to be set in advance, you need to use some methods to determine the optimal number of clusters.

[0028] 5) Clustering: Use the selected clustering algorithm to cluster the wind and solar power output.

[0029] 6) Cluster analysis: Evaluate the clustering results and then analyze the characteristics of each cluster, such as the seasonal climate and weather conditions to which the cluster belongs.

[0030] 7) Practical application: Apply the clustering results to practical problems, model and simulate the clusters corresponding to different scenarios respectively, and output the equipment configuration and operation status of the integrated energy system with source, grid, load and storage under different scenarios.

[0031] Since the results of the K-means method depend on the selection of the initial cluster centers, the number of clusters obtained each time the code is run may be unstable. Therefore, in order to improve the stability of the clustering results, the K-means++ initialization method is used. The K-means++ algorithm selects the initial cluster centers in an intelligent way so that they are as far away from each other as possible. This can significantly reduce the instability of the K-means clustering results. The specific implementation steps are as follows: S1.1) Randomly select a sample in the data set x as the first center point; S1.2) Calculate the shortest distance between each sample and the current cluster center, represented by D(x); then calculate the probability P(x) of each sample point being selected as the next cluster center, and finally select the sample point corresponding to the maximum probability value (or probability distribution) as the next cluster center; S1.3) Repeat S1.2 until k cluster centers are found; S1.4) For each sample in the data set, calculate its distance to the k cluster centers and assign it to the class corresponding to the cluster center with the smallest distance; S1.5) Calculate the average for each category and recalculate the cluster center; S1.6) Repeat S1.4 and S1.5 until a certain termination condition is reached, which is usually when the objective function reaches the optimal value or the maximum number of iterations is reached. The objective function is often different for different distance metrics. When using Euclidean distance, the objective function is generally to minimize the sum of squares of the distances from the object to its cluster centroid; when using cosine similarity, the objective function is generally to maximize the sum of cosine similarities from the object to its cluster centroid.

[0032] Step 2 S2) Establish equivalent equipment models for hydrogen energy storage units and electrochemical energy storage units, and form the relationship between the power balance of the electric bus and the power balance of the hydrogen bus according to the operating characteristic models of the relevant electric and hydrogen equipment in the park; take the lowest cost over the entire life cycle as the objective function, consider power balance and equipment operating characteristics constraints, land restrictions and other constraints, and build a new energy hydrogen production park system planning optimization configuration model that considers the ratio of wind and solar.

[0033] In step 2 S2, the park optimization objective function is to minimize the total life cycle cost: Where: Ccstr is the one-time investment cost, C buy is the energy purchase cost, C OM is the operation and maintenance cost, C loss is the loss cost, C Dis For scrapping costs.

[0034] One-time investment cost C cstr Refers to the sum of the initial investment costs of each equipment during the entire life cycle, expressed as: Where: y represents the service life of the equipment; r is the discount rate; μ i is the unit capacity investment cost of the i-th equipment; S i represents the maximum capacity of the i-th device; N represents the collection of equipment in the park, including wind turbines, electrolyzers, fuel cells, batteries and hydrogen storage tanks.

[0035] Energy purchase cost C buy It refers to the sum of the cost of purchasing electricity from the upper-level power grid and the income from selling electricity to the upper-level power grid in the whole year. The expression is: Where: c t is the electricity purchase / sale price in period t; P grid,t is the interactive power between the park and the upper power grid during period t. grid,t is positive, indicating that the park purchases electricity from the upper power grid; when P grid,t If it is negative, it means that the industrial park sells electricity to the superior power grid.

[0036] Operation and maintenance cost C OM Refers to the total operation and maintenance costs of each device in the system during each time period throughout the year, expressed as: Where: i,t is the unit capacity operation and maintenance cost of the i-th equipment in period t, P i,t represents the output power of the i-th device in period t; N represents the collection of equipment in the park, including wind turbines, electrolyzers, fuel cells, batteries and hydrogen storage tanks.

[0037] Loss cost C loss It refers to the cost of electric energy loss during the transmission process, usually expressed as the energy purchase cost C buy Scrap cost C DisIt refers to the sum of the dismantling cost and the residual value of the equipment after it is abandoned, usually expressed as a one-time investment cost C cstr Calculated at about 3%.

[0038] In step 2 S2, the following constraints are set for the multi-objective optimization configuration model: S2.1) Power balance constraints The capacity configuration of the wind and solar hydrogen production park system needs to meet the power balance constraints of the electric bus and the hydrogen bus. The power balance of each day of the year or the power balance relationship under the typical day set are expressed as follows: Where: L E (t) is the power load demand of the park during period t; L H (t) is the hydrogen load demand of the park during period t.

[0039] S2.2) Equipment output constraints Equipment output constraints include electrolyzer output power constraints, fuel cell output power constraints, battery output and capacity constraints, hydrogen storage tank output and capacity constraints, etc. The specific expressions are as follows: Where: P EL_max , P FC_max They are the maximum outputs of the electrolyzer and fuel cell respectively; S E_max , S H_max They are the maximum capacities of the battery and hydrogen storage tank respectively.

[0040] S2.3) Energy storage equipment constraints In order to achieve the sustainability of energy storage equipment, the constraint that the initial and final capacities of the energy storage equipment are equal must be met: Where: SOC(0) is the initial state of charge of the battery; SOC (24) is the state of charge of the battery at the end of the period; S H (0) is the initial capacity of the hydrogen storage tank; S H (24) is the capacity of the hydrogen storage tank at the final moment.

[0041] S2.4) Power Constraints for Purchase and Sale of Electricity Where: P grid_max and P grid_min They are the upper and lower limits of the power exchanged between the park and the upper power grid. S2.5) Floor space constraints Since the construction area of ​​new energy units in the wind and solar hydrogen production park is limited, the total construction area of ​​wind turbines and photovoltaic units is subject to the maximum construction area. Without considering the terrain restrictions, the area constraint is expressed as follows: Where: P PV_max , P WT_max is the total installed capacity of photovoltaic units and wind turbine units; λ PV , WT The unit capacity area of ​​photovoltaic units and wind turbine units; S max It is the largest construction area of ​​new energy units in the park.

[0042] Step 3 S3) Combining the above objective functions and constraints, the optimal configuration plan for the new energy hydrogen production park system planning and the total system configuration cost are obtained.

[0043] In the step 1 S1, the selected source-side equipment includes a photovoltaic unit and a wind turbine unit. The selected energy conversion equipment includes electrolyzers and fuel cells, and their mathematical models and input-output relationships are as follows: Where: P EL,in (t), P EL,out (t), η EL are the input power, output power and conversion efficiency of the electrolyzer in period t respectively; P FC,in (t), P FC,out (t), P FC,h (t), η FC,e , η FC,h They are the input power, output electrical power, thermal power and conversion efficiency of the fuel cell during period t respectively.

[0044] The selected energy storage equipment includes batteries and hydrogen storage tanks. The mathematical model and input-output relationship are as follows: Where: S E_max is the maximum capacity of the battery; SOC(t) is the charge level of the battery at time t; , are the charging and discharging power of the battery at time t respectively; , are the charging and discharging efficiency of the battery respectively.

[0045] SHy is the capacity of the hydrogen storage tank at time t; , They are the charging and discharging power of the hydrogen storage tank respectively; , They are the charging and discharging efficiency of the hydrogen storage tank respectively.

[0046] Step 4 S4) Further consider the electricity price factors and energy storage operation characteristics constraints, conduct a year-round wind and solar hydrogen production timing operation simulation, and analyze the park's electricity purchase demand and new energy consumption capacity under this planning optimization configuration plan. Embodiment 1 According to the established optimization planning model, the investment economics of wind turbines and photovoltaic units under different construction areas are shown in Table 1.

[0047] Table 1 Investment economics of wind turbines and photovoltaic units under different construction areas With a total construction area of ​​19 million m 2 Taking as an example, the following three energy storage coordination configuration constraints are considered: Collaborative constraint 1: There is no upper limit constraint on the capacity configuration of hydrogen energy storage equipment in the park, and the objective function is to minimize the cost over the entire life cycle.

[0048] Collaborative constraint 2: The capacity configuration of the park’s hydrogen energy storage equipment is subject to an upper limit constraint. The maximum design capacity of the hydrogen storage tank is 4000MWh, and the objective function is to minimize the full life cycle cost.

[0049] Collaborative constraint 3: The capacity configuration of the park's hydrogen energy storage equipment is subject to an upper limit constraint. The maximum design capacity of the hydrogen storage tank is 3000MWh, and the lowest life cycle cost is the objective function. Based on the above objective function and constraints, the mixed integer linear programming method is used to solve the optimization configuration model of this application, and the planned capacity, rated output and cost details of each part of the equipment in the park are obtained, as shown in Table 2 and Table 3.

[0050] Table 2 Optimal configuration results of wind-solar hydrogen production system planning Table 3 Cost of each part (unit: 100 million yuan) On the basis of the above equipment configuration scheme, the factors of electricity price and energy storage operation characteristics are further considered to simulate the operation sequence of wind and solar hydrogen production throughout the year, and the output of each equipment in the hydrogen production park and the power balance of electricity and hydrogen bus are obtained. The power balance diagram of the wind and solar hydrogen production park system for a single day and the power balance diagram are attached respectively. Figure 4 , Attachment Figure 5 shown.

[0051] From the optimization configuration results, we can see that: (1) As the configuration capacity of the hydrogen storage tank decreases, the output power and corresponding hours of the hydrogen storage tank configured by the corresponding optimization model will also decrease. At the same time, the output power, capacity and corresponding hours of the required battery will increase, and the configuration power of the electrolyzer will also increase.

[0052] (2) When the hydrogen storage tank is configured with sufficient capacity, the corresponding hours of the battery capacity power can be smaller, that is, the hydrogen storage tank can make up for the lack of battery regulation capacity. When the hydrogen storage tank configuration capacity decreases, the hydrogen storage tank regulation capacity decreases and cannot meet the hydrogen load demand of the park. Therefore, the configured battery capacity, output power and corresponding hours are increased to enhance the energy storage regulation capacity of PIES. At the same time, it is also necessary to speed up the rate at which the electrolyzer converts electrical energy into hydrogen energy, so the output power of the configured electrolyzer will also increase.

[0053] (3) In different scenarios, the capacity configuration result of the fuel cell is always 0. This is because the power load demand of the park is small, and the power generation of the wind turbine is sufficient to meet the power load demand of the park. At the same time, since the hydrogen-electricity conversion efficiency of fuel cells is only 60%, it is not recommended to configure fuel cells in the wind and solar hydrogen production park. Embodiment 2 Considering the equipment optimization configuration method of the electric hydrogen park under double typical days, the output curve of wind and solar units on double typical days is simulated. The objective function and constraints are the same as those in Example 1. The mixed integer linear programming method is used to solve the above optimization configuration model to obtain the planned capacity, rated output and cost details of each part of the equipment in the park, as shown in Tables 4 and 5.

[0054] Table 4 Optimal configuration results of wind-solar hydrogen production system planning Table 5 Cost of each part (unit: 100 million yuan) On the basis of the above equipment configuration scheme, the factors of electricity price and energy storage operation characteristics are further considered to simulate the operation sequence of wind and solar hydrogen production throughout the year, and the output of each equipment in the hydrogen production park and the power balance of electricity and hydrogen bus are obtained. The power balance diagram of the wind and solar hydrogen production park system for a single day and the power balance diagram are attached respectively. Figure 6 , Figure 7 shown.

[0055] From the optimization configuration results, we can see that: (1) Compared with the high utilization hours, the utilization hours of photovoltaic units and wind turbines are reduced at this time, so the park selects photovoltaic units with larger power generation per unit construction area to replace wind turbines. Therefore, the installed capacity of photovoltaic units increases and the installed capacity of wind turbines decreases. At the same time, the configuration power and configuration capacity of energy storage equipment in the park increase to enhance the flexible regulation of energy. The above-mentioned related measures have increased the configuration cost, operation cost and other costs of the wind-solar hydrogen production park system.

[0056] (2) When considering the high-load double typical day situation, the configuration optimization result of the wind-solar hydrogen production park is more in line with the actual situation. At this time, the system considers various typical day situations that may occur in a year. At this time, the output utilization hours of the wind and solar units in the system are close to the average level of the whole year. Therefore, the configuration capacity of the photovoltaic unit is low when the utilization hours are high, and high when the utilization hours are low. The configuration capacity of the wind turbine unit is the opposite.

Claims

1. A method for optimizing the configuration of a wind-solar ratio system in a hydrogen production park, characterized in that: The following steps are involved: S1) Calculate the output time series of local wind power and photovoltaic power generation, analyze the output characteristics of wind power and photovoltaic power generation and the correlation between wind and light, where the power output model of wind turbine generator set is: ; Where P WT,t is the power generated by the wind turbine at time t; N is the number of wind power / photovoltaic units connected to the wind farm; P WT is the rated power of the wind turbine; v t is the actual wind speed at time t; v in is the cut-in wind speed of the wind turbine; v out is the cut-out wind speed of the wind turbine; v 0 is the rated wind speed of the wind turbine; The electric energy output by photovoltaic power generation is direct current, and its steady-state power output model can be expressed as: ; Where: P PV is the actual power generation of the photovoltaic unit (kW); P STC is the rated output power (kW) of the photovoltaic cell module under standard test conditions (STC); G ING (t) is the solar radiation intensity at time t (W / m 2 ); G STC is the solar radiation intensity under standard environment (1000W / m 2 ); η loss is the power loss of the photovoltaic cell due to the increase in temperature; To ensure the consumption of wind power and the economic benefits of the park, when the grid electricity price is low, the power generated by the wind turbines or the remaining power after offsetting the load demand of the park can be stored in the energy storage system; when the grid electricity price is peak, the power generated by the wind turbines is first directly consumed by the load side, or the energy storage system releases power to supply power to the load and the grid; S2) Establish equivalent equipment models for hydrogen energy storage units and electrochemical energy storage units, and form the relationship between the power balance of the electric bus and the power balance of the hydrogen bus according to the operation characteristic models of the relevant electric and hydrogen equipment in the park; take the lowest cost of the entire life cycle as the objective function, consider power balance and constraints, and build a new energy hydrogen production park system planning optimization configuration model that considers the ratio of wind and solar; S3) Combining the above objective functions, obtaining the optimal configuration scheme and total system configuration cost of the new energy hydrogen production park system planning; S4) Further consider the factors of electricity price and the constraints of energy storage operation characteristics, conduct a simulation of the timing operation of wind and solar hydrogen production throughout the year, and analyze the power purchase demand and new energy consumption capacity of the park under the optimal configuration scheme of this plan.

2. The method for optimizing the configuration of the wind-solar ratio system of the hydrogen production park according to claim 1, characterized in that: In the above step S1, a clustering method is used to obtain a typical day situation, which includes the following steps: S1.1) Randomly select a sample in the data set x as the first center point; S1.2) Calculate the shortest distance between each sample and the current cluster center, represented by D(x); then calculate the probability P(x) of each sample point being selected as the next cluster center, and finally select the sample point corresponding to the maximum probability value (or probability distribution) as the next cluster center; ; S1.3) Repeat S1.2 until k cluster centers are found; S1.4) For each sample in the data set, calculate its distance to the k cluster centers and assign it to the class corresponding to the cluster center with the smallest distance; S1.5) Calculate the average for each category and recalculate the cluster center; S1.6) Repeat S1.4 and S1.5 until the termination condition is met.

3. The method for optimizing the configuration of the wind-solar ratio system of the hydrogen production park according to claim 1, characterized in that: In the above step S2, the following constraints are set for the multi-objective optimization configuration model: S2.1) Power balance constraints: ; Where: L E (t) is the power load demand of the park during period t; L H (t) is the hydrogen load demand of the park during period t; S2.2) Equipment output constraints: Equipment output constraints include electrolyzer output power constraints, fuel cell output power constraints, battery output and capacity constraints, and hydrogen storage tank output and capacity constraints: ; Where: P EL_max , P FC_max They are the maximum outputs of the electrolyzer and fuel cell respectively; S E_max , S H_max They are the maximum capacities of the battery and hydrogen storage tank respectively; S2.3) Energy storage equipment constraints: ; Where: SOC(0) is the initial state of charge of the battery; SOC (24) is the state of charge of the battery at the end of the period; S H (0) is the initial capacity of the hydrogen storage tank; S H (24) is the capacity of the hydrogen storage tank at the end of the period; S2.4) Power purchase and sales constraints: ; Where: P grid_max and P grid_min They are the upper and lower limits of the power exchanged between the park and the upper power grid; S2.5) Floor space constraints: ; Where: P PV_max , P WT_max is the total installed capacity of photovoltaic units and wind turbine units; λ PV , WT The unit capacity area of ​​photovoltaic units and wind turbine units; S max It is the largest construction area of ​​new energy units in the park.

4. The method for optimizing the configuration of the wind-solar ratio system of the hydrogen production park according to claim 3 is characterized in that: In the above step S2, the park optimization objective function is to minimize the full life cycle cost: ; Where: C cstr is the one-time investment cost, C buy is the energy purchase cost, C OM is the operation and maintenance cost, C loss is the loss cost, C Dis For scrapping costs; One-time investment cost C cstr Refers to the sum of the initial investment costs of each equipment during its entire life cycle: ; Where: y represents the service life of the equipment; r is the discount rate; μ i is the unit capacity investment cost of the i-th equipment; S i represents the maximum capacity of the i-th device; N represents the collection of equipment in the park, including wind turbines, electrolyzers, fuel cells, batteries, and hydrogen storage tanks; Energy purchase cost C buy Refers to the sum of the cost of purchasing electricity from the upper-level power grid and the income from selling electricity to the upper-level power grid in the park throughout the year: ; Where: c t is the electricity purchase / sale price in period t; P grid,t is the interactive power between the park and the upper power grid during period t. grid,t is positive, indicating that the park purchases electricity from the upper power grid; when P grid,t If it is negative, it means that the park sells electricity to the superior power grid; Operation and maintenance cost C OM Refers to the total operation and maintenance costs of each device in the system during each time period throughout the year: ; Where: i,t is the unit capacity operation and maintenance cost of the i-th equipment in period t, P i,t represents the output power of the i-th device in period t; N represents the collection of equipment in the park, including wind turbines, electrolyzers, fuel cells, batteries and hydrogen storage tanks.

5. The method for optimizing the configuration of the wind-solar ratio system of the hydrogen production park according to claim 1, characterized in that: In step S1, the selected source side equipment includes photovoltaic units and wind turbine units, and the selected energy conversion equipment includes electrolyzers and fuel cells, and the input-output relationship thereof is as follows: ; Where: P EL,in (t), P EL,out (t), η EL are the input power, output power and conversion efficiency of the electrolyzer in period t respectively; P FC,in (t), P FC,out (t), P FC,h (t), η FC,e , η FC,h are the input power, output electrical power, thermal power, and conversion efficiency of the fuel cell during period t, respectively; The selected energy storage equipment includes batteries and hydrogen storage tanks. The mathematical model and input-output relationship are as follows: ; Where: S E_max is the maximum capacity of the battery; SOC(t) is the charge level of the battery at time t; , are the charging and discharging power of the battery at time t respectively; , are the charging and discharging efficiency of the battery respectively; S Hy is the capacity of the hydrogen storage tank at time t; , They are the charging and discharging power of the hydrogen storage tank respectively; , They are the charging and discharging efficiency of the hydrogen storage tank respectively.

6. The method for optimizing the configuration of the wind-solar ratio system of the hydrogen production park according to claim 1, characterized in that: In the above step S1, n loss It can be expressed as: ; Where: k PV is the temperature coefficient; T c (t) is the surface temperature of the photovoltaic panel; T t is the reference temperature; The photovoltaic cell surface temperature T c (t) can be estimated from the ambient temperature and light intensity: ; Where: T a is the ambient temperature, G ING is the light intensity.

Citation Information

Patent Citations

  • Photo-thermal power generation capacity optimization method suitable for multiple scenes of all renewable energy base

    CN113673156A

  • Distribution network source-network load-storage coordinated operation method for distributed energy

    CN117543712A

  • Equipment flexible optimization configuration method for multi-type park integrated energy system

    CN118446457A

Cited By

  • Accounting method for cost budget cost electricity price of onshore wind power engineering project

    CN119722154A

  • Planning analysis method, system, storage medium and equipment for wind-solar-hydrogen-stored diesel energy system

    CN120146531A

  • Method, device and equipment for determining wind-light capacity matching strategy

    CN120728733A

  • Wind-photovoltaic ratio system optimization configuration method for hydrogen production park

    WO2026040250A1