Source-network collaborative planning method, system and equipment based on short-circuit ratio constraint and medium

By building a collaborative planning model for source network, the short-circuit ratio under UHV DC topology and control mode is calculated, and the constraints are adjusted, the problem of incomplete factors affecting short-circuit ratio constraints in the existing technology is solved, and the receiver AC system is improved to DC System support capability.

CN118983853AInactive Publication Date: 2024-11-19EAST CHINA BRANCH OF STATE GRID CORP
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202410952165.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing source network planning model does not consider the influencing factors of short-circuit ratio constraints, resulting in limitations in the support capacity of the DC system on the receiving AC system.

Method used

By building a collaborative planning model for source network based on investment and operation costs, the short-circuit ratio under different UHV DC topology and its control methods are calculated, and the model constraints are adjusted until the short-circuit ratio constraints are met, so as to ensure the receiving AC system Support capability for DC system.

Benefits of technology

Effectively improve the support capacity of the receiving AC system for the DC system. By considering the short-circuit ratio indicators under different UHV DC topology and control methods and setting the short-circuit ratio constraints, the line planning is optimized to ensure that the system short-circuit ratio is within the allowable range. Inside.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118983853A_ABST
    Figure CN118983853A_ABST
Patent Text Reader

Abstract

The invention discloses a source-network collaborative planning method, system and device based on short-circuit ratio constraint and a medium, and relates to the technical field of power planning, and the method comprises the steps: setting a model objective function according to investment cost and operation cost, and building a source-network collaborative planning model based on the model objective function; according to a current output result of the source-network collaborative planning model, calculating short-circuit ratios of different extra-high-voltage direct-current topologies and control modes of the different extra-high-voltage direct-current topologies; if the short-circuit ratio does not meet the short-circuit ratio constraint condition, adjusting the constraint condition of the source network collaborative planning model until the short-circuit ratio calculated based on the current output result of the source network collaborative planning model meets the short-circuit ratio constraint condition; and if the short-circuit ratio satisfies a short-circuit ratio constraint condition, obtaining a source network planning result of the source network collaborative planning model, and the method and the device are suitable for source network line planning.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power planning, and in particular to a source-network collaborative planning method, system, device and medium based on short-circuit ratio constraints. Background Art

[0002] The highly inverse distribution characteristics of my country's energy resources and load centers determine the necessity of building large-scale long-distance power transmission channels. With the continuous increase in the capacity of ultra-high voltage direct current fed into the receiving power grid, the supporting capacity of the receiving AC system for the DC system is gradually weakened. Therefore, the short-circuit ratio is an important indicator to measure the supporting strength of the receiving AC system for the DC system.

[0003] At present, there is still a lack of research on the influence of UHV DC topology and control mode on short-circuit ratio constraints in source network planning models. In the existing technology, Technical Solution 1: By solving the minimum characteristic root of the extended Jacobian matrix, the generalized short-circuit ratio index is obtained, and it is matched with the single-feed short-circuit ratio. In the process, only the line-commutated converter high-voltage DC feeding mode is considered; Technical Solution 2: Based on the superposition theorem, short-circuit ratio indicators based on capacity calculation and voltage calculation are proposed respectively, and a critical short-circuit ratio calculation model based on maximum power is given. The research content does not consider the external characteristics of the DC system.

[0004] It can be seen that the current research mainly focuses on improving the short-circuit ratio indicator. The existing source network planning model does not fully consider the influencing factors of the short-circuit ratio constraint, which leads to certain limitations in improving the supporting capacity of the receiving-end AC system for the DC system in the existing technology. Summary of the invention

[0005] In view of this, the present application provides a source network collaborative planning method, system, equipment and medium based on short-circuit ratio constraints. The main purpose is to solve the technical problem that the existing source network planning model does not comprehensively consider the influencing factors of the short-circuit ratio constraint and cannot ensure the supporting capacity of the receiving end AC system for the DC system.

[0006] According to one aspect of the present application, a source network collaborative planning method based on short circuit ratio constraint is provided, the method comprising:

[0007] A model objective function is set according to the investment and construction cost and the operation cost, and a source network collaborative planning model is constructed based on the model objective function;

[0008] According to the current output result of the source-network collaborative planning model, the short-circuit ratio under different UHV DC topologies and control modes is calculated;

[0009] If the short circuit ratio does not satisfy the short circuit ratio constraint condition, adjusting the constraint condition of the source network collaborative planning model until the short circuit ratio calculated based on the current output result of the source network collaborative planning model satisfies the short circuit ratio constraint condition;

[0010] If the short circuit ratio satisfies the short circuit ratio constraint condition, the source network planning result of the source network collaborative planning model is obtained.

[0011] According to another aspect of the present application, a source network collaborative planning system based on short circuit ratio constraint is provided, the system comprising:

[0012] A construction module is used to set a model objective function according to the investment and construction cost and the operation cost, and to construct a source network collaborative planning model based on the model objective function;

[0013] A short circuit ratio calculation module, used to calculate the short circuit ratios under different UHV DC topologies and control modes according to the current output results of the source-network collaborative planning model;

[0014] A short circuit ratio comparison module, configured to adjust the constraint conditions of the source network collaborative planning model if the short circuit ratio does not satisfy the short circuit ratio constraint conditions, until the short circuit ratio calculated based on the current output result of the source network collaborative planning model satisfies the short circuit ratio constraint conditions;

[0015] The result output module is used to obtain the source network planning result of the source network collaborative planning model if the short circuit ratio meets the short circuit ratio constraint condition.

[0016] According to another aspect of the present application, a computer storage medium is provided, on which a computer program is stored, and when the program is executed by a processor, the above-mentioned source network collaborative planning method based on short circuit ratio constraint is implemented.

[0017] According to another aspect of the present application, a computer device is provided, including a storage medium, a processor, and a computer program stored on the storage medium and executable on the processor, wherein the processor implements the above-mentioned source network collaborative planning method based on short-circuit ratio constraint when executing the program.

[0018] By means of the above technical scheme, the source network collaborative planning method, system, equipment and medium based on short-circuit ratio constraint provided by the present application, compared with the technical scheme that the existing source network planning model does not consider the influencing factors of short-circuit ratio constraint comprehensively, the present application sets the model objective function according to the investment and construction cost and the operation cost, and constructs the source network collaborative planning model based on the model objective function; according to the current output result of the source network collaborative planning model, the short-circuit ratio under different UHV DC topologies and their control modes is calculated; if the short-circuit ratio does not meet the short-circuit ratio constraint condition, the constraint condition of the source network collaborative planning model is adjusted until the short-circuit ratio calculated based on the current output result of the source network collaborative planning model meets the short-circuit ratio constraint condition; if the short-circuit ratio meets the short-circuit ratio constraint condition, the source network planning result of the source network collaborative planning model is obtained. It can be seen that by considering the short-circuit ratio index under different UHV DC topologies and control modes, and setting the short-circuit ratio constraint condition, the supporting capacity of the receiving end AC system to the DC system is guaranteed.

[0019] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0021] Figure 1 A schematic diagram of a flow chart of a source network collaborative planning method based on short circuit ratio constraint provided in an embodiment of the present application is shown;

[0022] Figure 2 A schematic diagram of a process flow of another source network collaborative planning system based on short circuit ratio constraints provided in an embodiment of the present application is shown;

[0023] Figure 3 A schematic flow chart of another source network collaborative planning method based on short circuit ratio constraint provided in an embodiment of the present application is shown;

[0024] Figure 4 A conventional voltage source converter high voltage direct current transmission system grid-following control block diagram provided in an embodiment of the present application is shown;

[0025] Figure 5 A control block diagram of a voltage source converter high voltage direct current transmission system based on a droop control method provided in an embodiment of the present application is shown;

[0026] Figure 6A schematic diagram of a transmission network test structure of a source-network collaborative planning method based on short-circuit ratio constraints provided in an embodiment of the present application is shown;

[0027] Figure 7 A schematic diagram of the structure of a source network collaborative planning system based on short circuit ratio constraints provided in an embodiment of the present application is shown;

[0028] Figure 8 A structural schematic diagram of another source network collaborative planning system based on short circuit ratio constraints provided in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0029] The present application will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0030] The existing source network planning model does not fully consider the factors affecting the short-circuit ratio constraint, and cannot guarantee the technical problem that the receiving-end AC system cannot support the DC system. This embodiment provides a source network collaborative planning method based on the short-circuit ratio constraint, which ensures the supporting capacity of the receiving-end AC system for the DC system by considering the short-circuit ratio index under different UHV DC topologies and control modes, and setting the short-circuit ratio constraint conditions. Figure 1 As shown, the above method comprises the following steps:

[0031] Step 101: set a model objective function according to the investment and construction cost and the operation cost, and build a source network collaborative planning model based on the model objective function.

[0032] In this embodiment, if Figure 2 As shown, the source network collaborative planning system based on short circuit ratio constraint includes a data module, an input module, a source network collaborative planning model construction module, a source network collaborative planning model solving module, a short circuit ratio calculation module, a short circuit ratio comparison module, a short circuit ratio constraint supplement module and a result output module. The data module is used to store load data, wind and solar output data, power supply data, transmission network data, high voltage direct current, etc. The input module is used to obtain relevant data from the data module and convert it into a standard format that can be called by the corresponding program in the source network collaborative planning system to facilitate data calculation.

[0033] Step 102: Calculate short-circuit ratios under different UHV DC topologies and control modes according to the current output results of the source-network collaborative planning model.

[0034] In this embodiment, different UHV DC topologies and their control methods include: for line-commutated converter HVDC transmission system, the control method is constant current / fixed arc extinction angle, constant power / fixed arc extinction angle, constant current / fixed DC voltage, and for voltage source converter HVDC transmission system, the control method can be a grid-following droop control method. According to the needs of actual application scenarios, the source-network collaborative planning model is solved using the YALMIP toolkit and Gurobi solver, and the solution accuracy is set to 0.5%. According to the needs of actual application scenarios, the solution results may include: the capacity of new thermal power units, the capacity of new wind power units, the capacity of new photovoltaic units, the proportion of new energy installed capacity, the new energy consumption rate, the planned line, the over-limit short-circuit ratio and the total cost. If the over-limit short-circuit ratio is 1.9 / 2, it means that the short-circuit ratio is 1.9 and the lower limit of the short-circuit ratio is 2. At this time, the line needs to be replanned.

[0035] Step 103: If the short circuit ratio does not satisfy the short circuit ratio constraint, adjust the constraint of the source network collaborative planning model until the short circuit ratio calculated based on the current output result of the source network collaborative planning model satisfies the short circuit ratio constraint.

[0036] Step 104: If the short circuit ratio satisfies the short circuit ratio constraint condition, a source network planning result of the source network collaborative planning model is obtained.

[0037] In this embodiment, the short circuit ratio calculated based on the current output result of the source network collaborative planning model is compared with a preset value of the short circuit ratio (lower limit of the short circuit ratio). If the short circuit ratio calculated based on the current output result of the source network collaborative planning model is less than the lower limit of the short circuit ratio, the constraint conditions of the source network collaborative planning model are adjusted, that is, the line planning constraints are added to the constraint conditions of the source network collaborative planning model until the short circuit ratio calculated based on the current output result of the source network collaborative planning model is greater than the calculated lower limit of the short circuit ratio, and then the result output module is entered; if the short circuit ratio satisfies the short circuit ratio constraint, that is, the short circuit ratio calculated based on the current output result of the source network collaborative planning model is greater than the preset lower limit of the short circuit ratio, then the result output module is directly entered to obtain the source network planning result of the source network collaborative planning model.

[0038] For this embodiment, the model objective function can be set according to the above scheme according to the investment and construction cost and the operating cost, and a source network collaborative planning model can be constructed based on the model objective function; according to the current output result of the source network collaborative planning model, the short circuit ratio under different ultra-high voltage DC topologies and their control modes is calculated; if the short circuit ratio does not meet the short circuit ratio constraint condition, the constraint condition of the source network collaborative planning model is adjusted until the short circuit ratio calculated based on the current output result of the source network collaborative planning model meets the short circuit ratio constraint condition; if the short circuit ratio meets the short circuit ratio constraint condition, the source network planning result of the source network collaborative planning model is obtained. Compared with the existing technical scheme in which the influencing factors of the short circuit ratio constraint are not considered comprehensively, this embodiment can ensure the supporting capacity of the receiving end AC system to the DC system by considering the short circuit ratio indicators under different ultra-high voltage DC topologies and control modes, and setting the short circuit ratio constraint condition.

[0039] Furthermore, as a refinement and extension of the specific implementation methods of the above-mentioned embodiment, in order to fully illustrate the specific implementation process of this embodiment, another source-network collaborative planning method based on short-circuit ratio constraints is provided. This embodiment can be applicable to high-voltage direct current transmission systems with different ultra-high voltage direct current topologies and corresponding control methods. This embodiment can ensure the supporting capacity of the receiving-end AC system for the DC system by considering the short-circuit ratio indicators under different ultra-high voltage direct current topologies and control methods, and setting the short-circuit ratio constraint conditions.

[0040] The data module of this embodiment is used to store load data, wind and solar output data, power supply data, transmission network data, and high-voltage direct current data, so that the input module can obtain relevant data from the data module and perform data calculations. Among them, the load data is the load size of each node in the system; the wind and solar output data is the active power of the wind turbine generator set and the photovoltaic generator set at each moment; the power supply data includes the installed capacity of the unit, the upper and lower limits of the output, the unit status, etc.; the transmission network data includes the transmission network topology, line length, line admittance, line capacity, etc.; the high-voltage direct current data includes the high-voltage direct current topology, control method, etc. Further, as Figure 3 As shown, the method includes:

[0041] Step 201: Set constraints of the source network collaborative planning model.

[0042] During implementation, the constraints include short-circuit ratio constraints, and the constraints also include at least one of node power balance constraints, thermal power unit output constraints, thermal power unit start-up and shutdown logic constraints, thermal power unit climbing constraints, load shedding constraints, energy abandonment constraints, system rotating reserve constraints, system total reserve constraints, and line flow constraints.

[0043] Step 202: set a model objective function according to the investment and construction costs and the operation costs, and build a source network collaborative planning model based on the model objective function.

[0044] In implementation, the investment and construction costs include the investment and construction costs of thermal power units, wind and solar units, and lines; the operating costs include fuel costs, abandoned energy costs, load shedding costs, and unit start-up and shutdown costs. Specifically, the source-network collaborative planning model construction module needs to consider economic needs and static safety needs, so as to realize the construction of a source-network collaborative planning model that takes into account short-circuit ratio constraints. In order to consider static safety and economic goals, the model objective function is set to minimize the total value of investment and construction costs (investment costs) and operating costs, as shown in formula (1):

[0045] minC overall =C coal +C wind +C pv +C l +C ope (1)

[0046] In the formula, C overall is the total cost, C coal The construction cost of thermal power units, C wind is the construction cost of wind turbines, C pv is the construction cost of the photovoltaic unit, C l is the line construction cost, C ope For running costs.

[0047] The specific investment and construction costs are shown in formula (2) to formula (5):

[0048]

[0049] In the formula, C c is the unit capacity investment and construction cost of thermal power units, is the capacity of the thermal power unit to be built, is the decision variable for construction of thermal power units, C is the collection of thermal power units to be built; w is the unit capacity investment and construction cost of wind turbines, is the capacity of the wind turbine to be built, is the decision variable for wind turbine construction.

[0050] is the set of wind turbines to be built; C pv is the unit capacity investment and construction cost of the photovoltaic unit, is the capacity of the photovoltaic unit to be built, is the decision variable for the construction of photovoltaic units, C is the collection of photovoltaic units to be built; l is the construction cost per unit length of the line, Ll is the length of the line to be built, λ l is the line construction decision variable, A collection of lines to be built.

[0051] The operating cost is shown in equations (6) to (11):

[0052] C ope =C fuel +C w_cut +C pv_cut +C load_cut +C start (6)

[0053]

[0054]

[0055] In the formula, C fuel is the fuel cost, C w_cut is the wind curtailment cost, C pv_cut is the cost of abandoned light, C load_cut is the load shedding cost, C start is the unit start-up and shutdown cost. f is the unit fuel cost, p g,ρ,t is the active power output of the unit, C wc is the unit wind curtailment cost, is the unit's abandoned energy size, C pvc is the unit abandoned light cost, is the load shedding size, is the decision variable for the thermal power unit startup action, It is the startup cost of thermal power unit. For wind turbines, For photovoltaic units, is the busbar set, is a set of scenes, and T is a set of moments in each scene.

[0056] The source-grid collaborative planning model taking into account the short-circuit ratio constraint includes conventional constraints such as node power balance constraint, thermal power unit output constraint, thermal power unit start-up and shutdown logic constraint, thermal power unit ramp constraint, load shedding constraint, energy abandonment constraint, system spinning reserve constraint, system total reserve constraint, and line flow constraint, as shown below:

[0057]

[0058] For the node power balance constraint, is the set of units at busbar b, is the wind turbine set at busbar b, is the photovoltaic unit collection at busbar b, is a collection of lines, is the bus-line correlation matrix element, f l,ρ,t is the line flow, d b,ρ,t is the load size at busbar b.

[0059]

[0060] For the output constraint of thermal power units, where p g,min is the minimum output of the unit, p g,max The maximum output of the unit.

[0061]

[0062] For the start-up and shutdown logic constraints of thermal power units, is the decision variable for the shutdown action of the thermal power unit, UT g is the minimum startup time, DT g is the minimum downtime, T g,u is the duration of unit startup at the initial moment, T g,d is the duration of unit shutdown at the initial moment, T N The total time.

[0063]

[0064] For the thermal power unit climbing constraint, where ξ g,up is the maximum climbing power of the thermal power unit, ξ g,down It is the maximum downhill power of the thermal power unit.

[0065] For load shedding constraints,

[0066]

[0067] For the energy abandonment constraint, where β w is the maximum wind power abandonment, β pv is the maximum abandoned optical power.

[0068]

[0069] For the system spinning reserve constraint, where γ is the spinning reserve coefficient.

[0070]

[0071] For the system total reserve constraint, where δ is the system total reserve coefficient, τ = 10%.

[0072]

[0073] For line power flow constraints, where B lis the line admittance, θ fr(l),ρ,t is the line starting phase, θ to(l),ρ,t is the line end phase, F l max The upper limit of the line capacity.

[0074] Step 203: According to the current output result of the source-network collaborative planning model, a multi-infeed short-circuit ratio algorithm is used to calculate the short-circuit ratios under different UHV DC topologies and control modes.

[0075] During implementation, the UHV DC topology includes the DC topology of a line-commutated converter HVDC transmission system and the DC topology of a voltage source converter HVDC transmission system; the control mode of the line-commutated converter HVDC transmission system at least includes a constant current / fixed arc extinction angle, a constant power / fixed arc extinction angle, and a constant current / constant voltage control mode, and the control mode of the voltage source converter HVDC transmission system at least includes a grid-following droop control mode.

[0076] During implementation, in order to illustrate the specific implementation method of step 203, as a preferred embodiment, step 203 includes: determining the corresponding UHV DC topology and its control method according to the input data received by the source network collaborative planning model; according to the current output result of the source network collaborative planning model, using the multi-input short-circuit ratio algorithm corresponding to different UHV DC topologies and their control methods, respectively calculating the short-circuit ratios under different UHV DC topologies and their control methods.

[0077] During implementation, the solution module is based on the YALMIP toolkit and Gurobi solver to obtain the current output results of the source-network collaborative planning model, and the short-circuit ratio calculation module is based on the UHV DC topology and control method corresponding to the bus, that is, the impact of different UHV DC topologies and control methods on the short-circuit ratio is comprehensively considered, and the short-circuit ratio of the source-network collaborative planning model is calculated according to the current output results.

[0078] Specifically:

[0079] According to the definition of the multi-infeed short-circuit ratio algorithm, the short-circuit ratios under different UHV DC topologies and control modes are calculated. In formula (21), F MIIFij is the multi-input impact factor, is the short-circuit capacity of the AC system, P i re is the rated capacity of the DC system.

[0080]

[0081] The steady-state power flow equation of the AC system is:

[0082]

[0083] Where: ΔP and ΔQ are the correction vectors of the AC bus active power and reactive power respectively; Δδ and ΔU are the correction vectors of the AC bus voltage phase angle and amplitude respectively; J Pδ , J PU , J Qδ , J QU The Jacobian matrix J is divided into 4 corresponding sub-matrices.

[0084] When the DC system delivers power to the AC system, its Jacobian matrix J needs to be modified. Since the power delivered by the DC system has nothing to do with the phase angle of the AC system, J Pδ and J Qδ Keep it the same, J PU and J QU After correction, it becomes J' PU and J' QU The steady-state power flow equation of the multi-infeed system is:

[0085]

[0086] Since the power of the converter station is only affected by the voltage amplitude of the converter bus, the impact of DC connection on the Jacobian matrix J is manifested in J PU and J QU If there is an inverter station feeding into bus i, then J PU and J QU The corresponding diagonal elements in (J PU ) i,i and (J QU ) i,i Modified to:

[0087]

[0088] Where: Q dci The reactive power fed into the AC system by the inverter station connected to bus i; U i is the voltage amplitude of bus i.

[0089] Assuming ΔP = 0, the relationship between ΔU and ΔQ is:

[0090] Where:

[0091] Based on the definition of multi-feed impact factor, after a reactive load is connected to the commutation bus j, ΔQ j The change causes the voltage of bus j to change, and at the same time causes the voltage of commutation bus i to change. According to formula (26), the multi-feed impact factor F MIIFij It is expressed as:

[0092]

[0093] Based on the definition of multi-feed influencing factors, only the reactive power of bus j is changed to change its voltage. At this time, the reactive power on other buses remains basically unchanged, that is, ΔQ m =0(m=1,2,…,n; m≠j).

[0094] At this time, formula (28) can be simplified as:

[0095]

[0096] Formula (29) gives the calculation method of the multi-input impact factor based on the reduced-order Jacobian matrix. It can be seen that the reduced-order Jacobian matrix Elements and It is the factor that determines the intensity of the mutual influence of voltage between converter stations, and its magnitude is determined by both the AC system and the DC system.

[0097] For the line-commutated converter HVDC transmission system, since the constant current and constant power under the constant DC voltage control mode are consistent, according to the needs of the actual application scenario, the DC system models under three control modes are mainly considered: constant current / fixed arc extinction angle, constant power / fixed arc extinction angle, and constant current / constant voltage. According to the port external characteristic equations of the high-voltage DC system under each control mode, the corresponding active-voltage and reactive-voltage sensitivity equations are obtained. Specifically:

[0098] In the constant current / fixed arc extinction angle control mode,

[0099]

[0100] In the constant power / constant arc extinction angle control mode,

[0101]

[0102]

[0103] In constant current / constant voltage control mode,

[0104]

[0105] In the formula, γ i is the arc extinction angle of the inverter station, U d0i is the no-load voltage on the DC side of the inverter station, U di is the DC voltage of the inverter station, T i is the transformation ratio of the converter transformer, and m is the corresponding coefficient.

[0106] For voltage source converter HVDC transmission systems, traditional control methods include grid-following and grid-forming types of grid connection, such as Figure 4-5 As shown, this embodiment takes the grid-following control mode as an example. When the system is in static stability, the port external characteristic satisfies formula (36), where P ref , Q ref They are active reference value and reactive reference value respectively. It can be seen that when the system is in static stability, the port external characteristic Jacobian matrix of the voltage source converter high voltage direct current transmission system under the traditional control mode is zero, that is, under this control mode, the UHV DC grid connection has no effect on the short circuit ratio calculation.

[0107]

[0108] In order to improve the UHV DC's ability to support the frequency and voltage of the receiving grid, the UHV DC grid-connected system is optimized by taking the droop control method as an example. When the system is in static stability, the port external characteristic satisfies equation (37), where D m , D n They are active power droop control coefficient and reactive power droop control coefficient respectively.

[0109]

[0110] Therefore, when the system is in static stability, the port external characteristic Jacobian matrix of the grid-connected system based on the droop control method is shown in formula (38):

[0111]

[0112] Step 204: If the short circuit ratio does not satisfy the short circuit ratio constraint, a line planning constraint is added to the constraint of the source network collaborative planning model.

[0113] During implementation, in order to illustrate the specific implementation method of step 204, as a preferred embodiment, step 204 includes: if the short circuit ratio is less than the short circuit ratio preset value, the short circuit ratio does not meet the short circuit ratio constraint condition; continue to perform iterative calculations using the source network collaborative planning model, and when calling the constraint condition, add the line planning constraint condition to the constraint condition.

[0114] Step 205: recalculate the short circuit ratio based on the current output result obtained by continuing the iterative calculation.

[0115] Step 206: If the recalculated short circuit ratio is greater than the preset short circuit ratio value, determine whether the short circuit ratio calculated based on the current output result of the source network collaborative planning model satisfies the short circuit ratio constraint condition.

[0116] Step 207: If the short circuit ratio satisfies the short circuit ratio constraint condition, the source network planning result of the source network collaborative planning model is obtained.

[0117] During implementation, the short circuit ratio is one or more, and the short circuit ratio comparison module is used to compare the calculated short circuit ratio with the short circuit ratio preset value. If the short circuit ratio is less than the short circuit ratio preset value (short circuit ratio lower limit), the short circuit ratio does not meet the short circuit ratio constraint condition, and enters the short circuit ratio constraint supplement module. The source network collaborative planning model is used to continue iterative calculation, and when the constraint condition is called, the line planning constraint condition of the short circuit ratio constraint supplement module is added to the constraint condition, and then the short circuit ratio is fed back to the source network collaborative planning model construction module taking into account the short circuit ratio constraint, and the solution module is used to re-solve, recalculate the current output result, and recalculate the short circuit ratio until the short circuit ratio calculated based on the current output result of the source network collaborative planning model is greater than the short circuit ratio preset value, then step 207 is entered, and the result output module is entered to output the source network planning line, short circuit ratio, total cost and other results.

[0118] Specifically, if the short circuit ratio comparison module determines that the short circuit ratio calculated based on the current output result of the source network collaborative planning model is small, the line planning constraint of the short circuit ratio constraint supplement module is added to the constraint condition, as shown in formula (39):

[0119]

[0120] In the formula, is the number of planned lines for the i-th loop iteration, The number of planned lines at the i-1th iteration.

[0121] This embodiment takes a specific scenario as an example to describe the present application in detail. Figure 6 As shown, the installed capacity of thermal power units is 3405MW, the installed capacity of wind turbines is 600MW, the installed capacity of photovoltaic units is 600MW, the maximum load is 3000MW, the number of nodes is 24, the number of lines is 38, the planned annual maximum load is 3500MW, the capacity of thermal power units to be built is 3405MW, the capacity of wind turbines to be built is 1200MW, the capacity of photovoltaic units to be built is 1200MW, and busbars 3 and 4 are each connected to 100MW VSC-HVDC , bus 8 is connected to 200MW LCC-HVDC, the unit capacity investment cost of thermal power units is 5,000,000 yuan / MW, the unit capacity investment cost of wind turbine units is 8,000,000 yuan / MW, the unit capacity investment cost of photovoltaic units is 6,000,000 yuan / MW, the unit length investment cost of the line is 6,000,000 yuan / km, the fuel cost is 300 yuan / MWh, the load shedding cost is 25,000 yuan / MWh, and the energy abandonment cost is 300 yuan / MWh. Among them, the normalized values ​​of wind and solar output and load on a typical day are shown in Table 1:

[0122] Table 1. Typical day wind and solar output and load normalized values

[0123]

[0124] In this embodiment, the solution results of whether the short circuit ratio constraint is taken into account are compared. Scheme 1 does not include the short circuit ratio constraint, and Scheme 2 includes the short circuit ratio constraint. The source network collaborative planning model is solved using the YALMIP toolkit and the Gurobi solver, and the solution accuracy is set to 0.5%. The solution results are shown in Table 2. From the solution results, it can be seen that Scheme 2 taking the short circuit ratio constraint into account ensures that the system short circuit ratio is within the allowable range by reasonably increasing the planned lines while ensuring economy. Among them, the over-limit short circuit ratio of 1.9 / 2 means that the short circuit ratio is 1.9, and the lower limit of the short circuit ratio is 2, and the rest is similar.

[0125] Table 2 Model solution results

[0126]

[0127] By applying the technical solution of this embodiment, the model objective function can be set according to the investment and construction cost and the operation cost, and the source network collaborative planning model can be constructed based on the model objective function; according to the current output result of the source network collaborative planning model, the short circuit ratio under different UHV DC topologies and their control modes is calculated; if the short circuit ratio does not meet the short circuit ratio constraint condition, the constraint condition of the source network collaborative planning model is adjusted until the short circuit ratio calculated based on the current output result of the source network collaborative planning model meets the short circuit ratio constraint condition; if the short circuit ratio meets the short circuit ratio constraint condition, the source network planning result of the source network collaborative planning model is obtained. Compared with the technical solution that the existing source network planning model does not consider the influencing factors of the short circuit ratio constraint comprehensively, the short circuit ratio index is combined with the source network collaborative planning model, and the short circuit ratio index under different UHV DC grid connection modes and control modes is calculated by considering the influence of different types of UHV DC on the short circuit ratio, and the short circuit ratio constraint condition is set to optimize the line planning so that the system short circuit ratio meets the short circuit ratio constraint condition, thereby ensuring the supporting capacity of the receiving end AC system to the DC system.

[0128] Further, as Figure 1 The specific implementation of the method, the embodiment of the present application provides a source network collaborative planning system based on short circuit ratio constraints, such as Figure 7 As shown, the system includes: a construction module 73 , a short circuit ratio calculation module 75 , a short circuit ratio comparison module 76 , and a result output module 78 .

[0129] The construction module 73 is used to set the model objective function according to the investment and construction cost and the operation cost, and to construct the source network collaborative planning model based on the model objective function.

[0130] The short circuit ratio calculation module 75 is used to calculate the short circuit ratios under different UHV DC topologies and control modes according to the current output results of the source network collaborative planning model.

[0131] The short circuit ratio comparison module 76 is used to adjust the constraint conditions of the source network collaborative planning model if the short circuit ratio does not meet the short circuit ratio constraint conditions, until the short circuit ratio calculated based on the current output result of the source network collaborative planning model meets the short circuit ratio constraint conditions.

[0132] The result output module 78 is used to obtain the source network planning result of the source network collaborative planning model if the short circuit ratio meets the short circuit ratio constraint condition.

[0133] In specific application scenarios, such as Figure 7 As shown, the construction module 73 includes a setting submodule 731 .

[0134] The setting submodule 731 is used to set the constraints of the source-network collaborative planning model; and the constraints include short-circuit ratio constraints, and the constraints also include node power balance constraints, thermal power unit output constraints, thermal power unit start-up and shutdown logic constraints, thermal power unit climbing constraints, load shedding constraints, energy abandonment constraints, system rotating reserve constraints, system total reserve constraints, and at least one of line flow constraints.

[0135] In specific application scenarios, the investment and construction costs include the investment and construction costs of thermal power units, wind and solar units, and lines; the operating costs include fuel costs, energy abandonment costs, load shedding costs, and unit start and stop costs.

[0136] In a specific application scenario, the short-circuit ratio calculation module 75 includes a determination submodule 751 .

[0137] The determination submodule 751 is used to determine the corresponding UHV DC topology and its control method according to the input data received by the source network collaborative planning model; and, according to the current output result of the source network collaborative planning model, use the multi-input short-circuit ratio algorithm corresponding to different UHV DC topologies and their control methods to calculate the short-circuit ratios under different UHV DC topologies and their control methods.

[0138] In a specific application scenario, the short-circuit ratio calculation module 75 includes a calculation submodule 752 .

[0139] The calculation submodule 752 is used to calculate the short-circuit ratios under different UHV DC topologies and their control modes according to the current output results of the source-grid collaborative planning model by using a multi-infeed short-circuit ratio algorithm; wherein the UHV DC topology includes the DC topology of a line-commutated converter high-voltage DC transmission system and the DC topology of a voltage source converter high-voltage DC transmission system; the control mode of the line-commutated converter high-voltage DC transmission system includes at least a constant current / fixed arc extinction angle, a constant power / fixed arc extinction angle, and a constant current / constant voltage control mode, and the control mode of the voltage source converter high-voltage DC transmission system includes at least a grid-following droop control mode.

[0140] In a specific application scenario, the short-circuit ratio is one or more, and the short-circuit ratio comparison module 76 includes a first judgment submodule 761 and a second judgment submodule 762 .

[0141] The first judgment submodule 761 is configured to add a line planning constraint condition to the constraint conditions of the source network collaborative planning model if the short circuit ratio does not satisfy the short circuit ratio constraint condition.

[0142] The short circuit ratio calculation module 75 is further used to recalculate the short circuit ratio based on the current output result obtained by continuing the iterative calculation.

[0143] The second judgment submodule 762 is used to determine whether the short circuit ratio calculated based on the current output result of the source network collaborative planning model satisfies the short circuit ratio constraint condition if the recalculated short circuit ratio is greater than the preset short circuit ratio value.

[0144] In a specific application scenario, the first judgment submodule 761 includes: if the short circuit ratio is less than a preset short circuit ratio value, the short circuit ratio does not meet the short circuit ratio constraint; and, continuing to perform iterative calculations using the source network collaborative planning model, and adding line planning constraints to the constraints when calling the constraints.

[0145] The system also includes: a data module 71, an input module 72, a source network collaborative planning model solving module 74, a short circuit ratio constraint supplementing module 77 and a result output module 78, wherein the data module 71 is used to store load data, wind and solar output data, power supply data, transmission network data, high voltage DC parameters, etc.; the input module 72 is used to obtain relevant data from the data module; the source network collaborative planning model solving module 74 is used to solve the source network collaborative planning model; the short circuit ratio constraint supplementing module 77 is used to add a short circuit ratio constraint when the system short circuit ratio does not meet the short circuit ratio constraint; the result output module 78 is used to output the source network planning, short circuit ratio and other results.

[0146] It should be noted that for other corresponding descriptions of the functional units involved in the source network collaborative planning system based on short circuit ratio constraint provided in the embodiment of the present application, reference can be made to Figure 1 and Figure 3 The corresponding description in will not be repeated here.

[0147] Based on the above Figure 1 and Figure 3 The method shown in the embodiment of the present application accordingly provides a computer storage medium on which a computer program is stored, and when the program is executed by a processor, the above-mentioned Figure 1 and Figure 3 The source network collaborative planning method based on short-circuit ratio constraint is shown.

[0148] Based on this understanding, the technical solution of the present application can be embodied in the form of a software product, which can be stored in a storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.), and includes a number of instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each implementation scenario of the present application.

[0149] Based on the above Figure 1 , Figure 3 The method shown, and Figure 7 , Figure 8 In order to achieve the above-mentioned purpose, the embodiment of the present application further provides a computer device, which can be a personal computer, a server, a network device, etc. The physical device includes a storage medium and a processor; the storage medium is used to store a computer program; the processor is used to execute the computer program to achieve the above-mentioned Figure 1 and Figure 3 The source network collaborative planning method based on short-circuit ratio constraint is shown.

[0150] Optionally, the computer device may further include a user interface, a network interface, a camera, a radio frequency (RF) circuit, a sensor, an audio circuit, a WI-FI module, etc. The user interface may include a display, an input unit such as a keyboard, etc., and the optional user interface may also include a USB interface, a card reader interface, etc. The network interface may optionally include a standard wired interface, a wireless interface (such as a Bluetooth interface, a WI-FI interface), etc.

[0151] Those skilled in the art will appreciate that the computer device structure provided in this embodiment does not constitute a limitation on the physical device, and may include more or fewer components, or a combination of certain components, or different component arrangements.

[0152] The storage medium may also include an operating system and a network communication module. The operating system is a program that manages the hardware and software resources of a computer device and supports the operation of information processing programs and other software and / or programs. The network communication module is used to achieve communication between components within the storage medium and with other hardware and software in the physical device.

[0153] Through the description of the above implementation methods, those skilled in the art can clearly understand that the present application can be implemented by means of software plus a necessary general hardware platform, or by hardware. By applying the technical solution of the present application, compared with the technical solution that does not fully consider the influencing factors of the short-circuit ratio constraint in the existing source network planning model, the present embodiment combines the short-circuit ratio index with the source network collaborative planning model, considers the influence of different types of ultra-high voltage direct current on the short-circuit ratio, calculates the short-circuit ratio index under different ultra-high voltage direct current grid connection modes and control modes, and sets the short-circuit ratio constraint condition, so as to optimize the line planning in a way that the system short-circuit ratio satisfies the short-circuit ratio constraint condition, thereby ensuring the supporting capacity of the receiving end AC system to the DC system.

[0154] Those skilled in the art will appreciate that the accompanying drawings are only schematic diagrams of a preferred implementation scenario, and the modules or processes in the accompanying drawings are not necessarily necessary for implementing the present application. Those skilled in the art will appreciate that the modules in the system in the implementation scenario can be distributed in the system of the implementation scenario according to the implementation scenario description, or can be changed accordingly and located in one or more systems different from the present implementation scenario. The modules of the above-mentioned implementation scenario can be combined into one module, or can be further split into multiple submodules.

[0155] The above serial numbers of this application are only for description and do not represent the advantages and disadvantages of the implementation scenarios. The above disclosure is only a few specific implementation scenarios of this application, but this application is not limited to them, and any changes that can be thought of by technicians in this field should fall within the scope of protection of this application.

Claims

1. A source network collaborative planning method based on short circuit ratio constraint, characterized in that: include: A model objective function is set according to the investment and construction cost and the operation cost, and a source network collaborative planning model is constructed based on the model objective function; According to the current output result of the source-network collaborative planning model, the short-circuit ratios under different UHV DC topologies and control modes are calculated; If the short circuit ratio does not satisfy the short circuit ratio constraint condition, adjusting the constraint condition of the source network collaborative planning model until the short circuit ratio calculated based on the current output result of the source network collaborative planning model satisfies the short circuit ratio constraint condition; If the short circuit ratio satisfies the short circuit ratio constraint condition, the source network planning result of the source network collaborative planning model is obtained.

2. The method according to claim 1, characterized in that The step of setting a model objective function according to the investment and construction cost and the operation cost, and constructing a source network collaborative planning model based on the model objective function, further includes: Setting constraints of the source network collaborative planning model; The constraints include short-circuit ratio constraints, and the constraints also include at least one of node power balance constraints, thermal power unit output constraints, thermal power unit start-up and shutdown logic constraints, thermal power unit climbing constraints, load shedding constraints, energy abandonment constraints, system rotating reserve constraints, system total reserve constraints, and line flow constraints.

3. The method according to claim 1 or 2, characterized in that: The investment and construction costs include the investment and construction costs of thermal power units, wind and solar units, and line construction costs; the operating costs include fuel costs, energy abandonment costs, load shedding costs, and unit start-up and shutdown costs.

4. The method according to claim 1, characterized in that: The step of calculating the short-circuit ratios under different UHV DC topologies and control modes according to the current output results of the source-network collaborative planning model comprises: According to the current output result of the source-network collaborative planning model, the short-circuit ratio under different UHV DC topologies and control modes is calculated by using a multi-infeed short-circuit ratio algorithm; The UHV DC topology includes the DC topology of the line-commutated converter HVDC transmission system and the DC topology of the voltage source converter HVDC transmission system. The control mode of the line-commutated converter high-voltage direct current power transmission system at least includes constant current / fixed arc extinction angle, constant power / fixed arc extinction angle, and constant current / constant voltage control modes, and the control mode of the voltage source converter high-voltage direct current power transmission system at least includes a grid-following droop control mode.

5. The method according to claim 1 or 4, characterized in that: The step of calculating the short-circuit ratios under different UHV DC topologies and control modes according to the current output results of the source-network collaborative planning model comprises: Determine a corresponding UHV DC topology and its control method according to the input data received by the source-network collaborative planning model; According to the current output result of the source-network collaborative planning model, the short-circuit ratios under different UHV DC topologies and their control modes are calculated by using the multi-infeed short-circuit ratio algorithms corresponding to different UHV DC topologies and their control modes.

6. The method according to claim 1, characterized in that The short circuit ratio is one or more, and if the short circuit ratio does not satisfy the short circuit ratio constraint condition, the step of adjusting the constraint condition of the source network collaborative planning model until the short circuit ratio calculated based on the current output result of the source network collaborative planning model satisfies the short circuit ratio constraint condition includes: If the short circuit ratio does not satisfy the short circuit ratio constraint, adding a line planning constraint to the constraint of the source network collaborative planning model; Recalculate the short-circuit ratio based on the current output result obtained by continuing iterative calculation; If the recalculated short circuit ratio is greater than the preset short circuit ratio value, it is determined that the short circuit ratio calculated based on the current output result of the source network collaborative planning model satisfies the short circuit ratio constraint condition.

7. The method according to claim 6, characterized in that If the short circuit ratio does not satisfy the short circuit ratio constraint condition, the step of adding a line planning constraint condition to the constraint condition of the source network collaborative planning model comprises: If the short circuit ratio is less than the short circuit ratio preset value, the short circuit ratio does not meet the short circuit ratio constraint condition; The source network collaborative planning model is used to continue iterative calculation, and when the constraint condition is called, the line planning constraint condition is added to the constraint condition.

8. A source network collaborative planning system based on short circuit ratio constraint, characterized in that: include: A construction module is used to set a model objective function according to the investment and construction cost and the operation cost, and to construct a source network collaborative planning model based on the model objective function; A short circuit ratio calculation module, used to calculate the short circuit ratios under different UHV DC topologies and control modes according to the current output results of the source-network collaborative planning model; A short circuit ratio comparison module, configured to adjust the constraint conditions of the source network collaborative planning model if the short circuit ratio does not satisfy the short circuit ratio constraint conditions, until the short circuit ratio calculated based on the current output result of the source network collaborative planning model satisfies the short circuit ratio constraint conditions; The result output module is used to obtain the source network planning result of the source network collaborative planning model if the short circuit ratio meets the short circuit ratio constraint condition.

9. A computer storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the source network collaborative planning method based on short circuit ratio constraints as described in any one of claims 1 to 7 is implemented.

10. A computer device comprising a storage medium, a processor, and a computer program stored in the storage medium and executable on the processor, characterized in that: When the processor executes the program, the source network collaborative planning method based on short circuit ratio constraint according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Receiving end power grid planning scheme optimization method based on multi-infeed short-circuit ratio check

    CN114021845A

  • Virtual power plant collaborative power grid planning method and system

    CN115358479A

  • Source network coordination planning method and system considering demand response substitution benefit

    CN115603308A

  • New energy station position and net rack coordinated planning method considering short-circuit ratio

    CN117458463A

  • Network source collaborative planning method and system considering new energy multi-station short circuit ratio

    CN117713245A