Extraction tower structure of acetic anhydride workshop
By introducing a material distributor and increasing the filler layer into the extraction tower of the acetic anhydride workshop, the problems of insufficient filler and uneven feeding in the prior art are solved, the extraction efficiency and stability are improved, and the uniform extraction of acetic acid and Equipment security.
Patent Information
- Application Number
- CN202410963510.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-22
AI Technical Summary
The extraction tower design of the existing acetic anhydride II device has insufficient filler quantity and uneven distribution of ethyl acetate feed, resulting in low extraction efficiency and potential environmental threats.
An extraction tower structure consisting of a material distributor and an elevated filler layer is designed. The material distributor ensures uniform distribution through a central fixation and a bulk hopper, the height of the filler layer is increased to increase the contact area, and provides solid support through the support frame and fixing components. , set up safety facilities and thermometers to improve equipment stability and safety.
It improves the extraction efficiency and effect, enhances the stability and ease of use of the equipment, and ensures a uniform distribution of materials and a safe and controllable extraction process.
Smart Images

Figure CN118987685A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of extraction towers, and in particular to an extraction tower structure of an acetic anhydride workshop. Background Art
[0002] In the dilute acetic acid recovery system of the acetic anhydride II unit, the extraction tower is the core equipment, and its function is to extract acetic acid through the reverse contact of dilute acetic acid and ethyl acetate. In this process, an ester acid phase is formed in the upper part of the tower, while an ester water phase is formed in the lower part. However, due to certain limitations in the current extraction tower design, especially the insufficient amount of fillers and the uneven distribution of ethyl acetate feed, these problems seriously affect the extraction efficiency. Specifically, the uneven feed causes the acetic acid to be unable to be fully extracted, resulting in excessive acetic acid in the ester water phase at the bottom of the tower, which not only reduces the recovery efficiency, but also poses a potential threat to the environment, especially affecting the chemical oxygen demand (COD) value of the external wastewater.
[0003] In order to improve the stability and efficiency of the acetic anhydride II dilute acetic acid recovery system, a method for recovering dilute acetic acid by extracting cyclohexyl acetate is disclosed in Chinese patent CN106866409A. Although this method adopts reverse contact between dilute acetic acid and cycloethyl acetate, cycloethyl acetate is directly injected through a feed pipe located below the extraction tower. In actual application, this method still has the problem of uneven feed distribution, which affects the extraction effect. Summary of the invention
[0004] The purpose of the present invention is to solve the problems raised in the above background technology, and then proposes an extraction tower structure for an acetic anhydride workshop.
[0005] The technical solution adopted by the present invention to solve the technical problem is:
[0006] An extraction tower structure of an acetic anhydride workshop comprises an extraction tower body, an ester feed pipe is arranged at the bottom of the extraction tower body, the ester feed pipe is connected to a material distributor, the material distributor is located inside the extraction tower body, the inner wall of the extraction tower body and the material distributor are fixedly connected, the material distributor is located at the center of the extraction tower body, the material distributor comprises a feed pipe, one end of the feed pipe is connected to the ester feed pipe, the other end of the feed pipe is connected to a distribution pipe, and a plurality of bulk hoppers are arranged on the distribution pipe.
[0007] Furthermore, a plurality of manholes are provided on one side of the extraction tower body.
[0008] Furthermore, the first and second packing layers in the extraction tower increase the packing height by 550 mm.
[0009] Furthermore, the distribution pipe includes a central pipe, the central bottom of the central pipe is connected to a feed pipe, the two sides of the central pipe are respectively connected to a first tee and a second tee, the first tee is connected to a third tee and a fourth tee, the second tee is connected to a fifth tee and a sixth tee, the third tee, the fourth tee, the fifth tee and the sixth tee are all provided with plug holes, vertical pipes are plugged into the plug holes, and a bulk hopper is installed on the vertical pipe.
[0010] Furthermore, the inner wall of the extraction tower body and the material distributor are fixedly connected via a connecting rod.
[0011] Furthermore, the ends of the third three-way pipe, the fourth three-way pipe, the fifth three-way pipe and the sixth three-way pipe are provided with blocking plates.
[0012] Furthermore, a support frame is provided in the extraction tower body, and a material distributor is installed on the support frame.
[0013] Furthermore, the support frame includes a first horizontal plate, a first vertical plate and a second vertical plate, the first vertical plate and the second vertical plate are vertically arranged with the first horizontal plate, a central groove for accommodating the insertion of a central tube is provided in the middle of the first horizontal plate, a left slot for accommodating the insertion of a first tee, a third tee and a fourth tee is provided in the middle of the first vertical plate, and a right slot for accommodating the insertion of a second tee, a fifth tee and a sixth tee is provided in the middle of the second vertical plate.
[0014] Furthermore, the first vertical plate and the second vertical plate are provided with a fixing assembly, and the fixing assembly can enable the material distributor to be clamped in the support frame.
[0015] Furthermore, the fixing assembly includes an arc-shaped clamping plate, connecting plates are provided on both sides of the arc-shaped clamping plate, through holes are provided on the connecting plates, bolts are installed in the through holes, and the bolts pass through the through holes and are threadedly connected to the threaded holes of the first vertical plate or the second vertical plate.
[0016] Furthermore, the bottom of the extraction tower body is also provided with a drain port and a tower bottom discharge port.
[0017] Furthermore, a vent, a safety valve and a pressure gauge are provided on the top of the extraction tower body.
[0018] Furthermore, a top discharge port is provided on one side of the top of the extraction tower body.
[0019] Furthermore, a dilute acid feed port is provided on one side of the upper portion of the extraction tower body.
[0020] Furthermore, thermometers are provided at different heights of the extraction tower body.
[0021] Compared with the prior art, the beneficial effects of the present invention are: the central fixation and bulk hopper design of the material distributor of the present invention ensure the uniform distribution of the material and improve the extraction efficiency; the increased filler height increases the contact area and further improves the extraction effect; the support frame and fixing components provide a stable support for the material distributor, enhancing the stability and ease of use of the equipment; and the setting of safety facilities, feed ports and thermometers makes the extraction process safer, more flexible and controllable. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of the present invention;
[0023] Figure 2 It is a structural schematic diagram of a material distributor;
[0024] Figure 3 is a schematic diagram of the structure of the distribution pipe;
[0025] Figure 4 This is a structural schematic diagram of a material distributor installed in an extraction tower body;
[0026] Figure 5 It is a structural schematic diagram when the support frame is installed in the extraction tower body;
[0027] Figure 6 for Figure 5 A partial enlarged view of the middle A;
[0028] Wherein: 1 extraction tower body, 12 thermometer, 13 drain port, 14 bottom discharge port, 15 ester feed pipe, 17 dilute acid feed port, 18 top discharge port, 19 vent port, 110 safety valve, 2 manholes, 3 material distributor, 31 distribution pipe, 311 center pipe, 312 first tee pipe, 313 second tee pipe, 314 third tee pipe, 315 fourth tee pipe, 316 fifth tee pipe, 317 sixth tee pipe, 32 feed pipe, 33 plug hole, 34 blocking plate, 35 vertical pipe, 36 bulk hopper, 4 support frame, 41 first horizontal plate, 411 center slot, 42 first vertical plate, 421 left slot, 43 second vertical plate, 431 right slot, 44 arc-shaped clamping plate, 441 bolt. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. The present invention is further described in combination with the drawings and embodiments:
[0030] like Figure 1-Figure 6As shown, an extraction tower structure of an acetic anhydride workshop includes an extraction tower body 1, an ester feed pipe 15 is provided at the bottom of the extraction tower body, and the ester feed pipe is connected to a material distributor 3, the material distributor is located inside the extraction tower body, and the inner wall of the extraction tower body is fixedly connected to the material distributor, the material distributor is located at the center of the extraction tower body, and the material distributor includes a feed pipe 32, one end of the feed pipe is connected to the ester feed pipe, and the other end of the feed pipe is connected to a distribution pipe 31, and a plurality of bulk hoppers 36 are provided on the distribution pipe. By arranging the material distributor at the center of the extraction tower and fixing it to the inner wall of the tower body through a connecting rod, it is ensured that the material can be evenly and stably distributed in the extraction tower, thereby improving the extraction efficiency.
[0031] Furthermore, a plurality of manholes 2 are provided on one side of the extraction tower body. The design of the manholes facilitates the staff to enter the extraction tower for maintenance, inspection and cleaning, thereby improving the maintainability and service life of the equipment.
[0032] Furthermore, the first and second packing layers in the extraction tower have increased packing heights, with each packing height increasing by 550 mm. By increasing the packing height, the contact area between the material and the extractant is increased, thereby improving the extraction effect and efficiency.
[0033] Specifically, the distribution pipe includes a central pipe 311, the central bottom of the central pipe is connected to a feed pipe 32, the two sides of the central pipe are respectively connected to a first tee 312 and a second tee 313, the first tee is connected to a third tee 314 and a fourth tee 315, the second tee is connected to a fifth tee 316 and a sixth tee 317, the third tee 314, the fourth tee 315, the fifth tee 316 and the sixth tee 317 are all provided with a plug hole 33, a vertical pipe 35 is plugged into the plug hole, and a bulk hopper 36 is installed on the vertical pipe. This multi-branch material distribution pipe design ensures that the material can be more evenly distributed in the extraction tower, thereby improving the extraction effect.
[0034] Furthermore, the inner wall of the extraction tower body and the material distributor are fixedly connected via a connecting rod.
[0035] Furthermore, blocking plates 34 are provided at the ends of the third three-way pipe 314 , the fourth three-way pipe, the fifth three-way pipe 316 and the sixth three-way pipe 317 .
[0036] In some embodiments, a support frame 4 is provided in the extraction tower body, and a material distributor is installed on the support frame.
[0037] Specifically, the support frame includes a first horizontal plate 41, a first vertical plate 42 and a second vertical plate 43, the first vertical plate 42 and the second vertical plate 43 are arranged perpendicular to the first horizontal plate, the first horizontal plate is provided with a central groove 411 for accommodating the insertion of the central tube in the middle, the first vertical plate is provided with a left slot 421 for accommodating the insertion of the first three-way pipe, the third three-way pipe and the fourth three-way pipe in the middle, and the second vertical plate is provided with a right slot 431 for accommodating the insertion of the second three-way pipe, the fifth three-way pipe 316 and the sixth three-way pipe 317 in the middle. The design of the support frame not only provides a stable support for the material distributor, but also facilitates the installation and disassembly of the material distributor, and improves the usability and maintainability of the equipment.
[0038] Furthermore, the first vertical plate and the second vertical plate are provided with a fixing assembly, and the fixing assembly can enable the material distributor to be clamped in the support frame to limit the relative movement of the two.
[0039] Specifically, the fixing assembly includes an arc-shaped card plate 44, connecting plates are provided on both sides of the arc-shaped card plate, through holes are provided on the connecting plates, bolts 441 are installed in the through holes, and the bolts are threadedly connected to the threaded holes of the first vertical plate or the second vertical plate after passing through the through holes. The fixing assembly ensures the stability of the material distributor on the support frame through the tight combination of the arc-shaped card plate and the bolts, and prevents displacement or falling off due to equipment vibration or material impact.
[0040] In at least one embodiment, the bottom of the extraction tower body is further provided with a drain port 13 and a bottom discharge port 14. The design of the drain port and the bottom discharge port facilitates the discharge of residual materials and the collection of materials after extraction, and improves the operating convenience of the equipment.
[0041] In at least one embodiment, the top of the extraction tower body is provided with a vent 19, a safety valve 110 and a pressure gauge. The provision of these safety facilities ensures the safety and stability of the extraction tower during operation and prevents safety accidents caused by excessive pressure.
[0042] Furthermore, a top discharge port 18 is provided on one side of the top of the extraction tower body.
[0043] Furthermore, a dilute acid feed port 17 is provided on one side of the upper portion of the extraction tower body.
[0044] Furthermore, the extraction tower body is provided with thermometers 12 at different heights. The provision of the thermometers enables the operator to monitor the temperature at different heights in the extraction tower in real time, providing an important basis for adjusting the extraction parameters.
[0045] Working mode, ensure that the extraction tower body and material distributor are correctly installed and fixed in the extraction tower. Check all connection points and fixing devices to ensure stability and reliability. Deliver the material to be extracted to the material distributor through the ester feed pipe. Ensure that the connection between the feed pipe and the material distributor is well sealed to prevent material leakage. The material enters the distribution pipe through the feed pipe and is evenly distributed into the extraction tower body through the bulk hopper. Ensure that the material can be evenly distributed throughout the extraction tower body to improve the extraction efficiency. In the extraction tower body, the material and the extractant are fully contacted and mixed to achieve extraction and separation. According to the specific process requirements, control the flow rate and temperature of the extractant and other parameters. After the extraction is completed, collect the extracted material through the bottom outlet of the tower. At the same time, collect the extractant or other substances that need to be recovered through the top outlet of the tower. Clean and maintain the extraction tower regularly to ensure its normal operation and extend its service life.
[0046] Before use, be sure to check whether all parts of the extraction tower are intact, especially key parts such as material distributors and connecting pipes. According to specific process requirements, adjust the operating parameters of the extraction tower, such as temperature, pressure, flow, etc., to ensure the efficient extraction process. During the extraction process, pay close attention to the operating status of the extraction tower. If any abnormal situation occurs, stop the tower immediately for inspection and treatment. Regularly maintain and service the extraction tower, including cleaning, checking the sealing performance, replacing worn parts, etc., to ensure its long-term stable operation.
[0047] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. An extraction tower structure for an acetic anhydride workshop, characterized in that: It comprises an extraction tower body, an ester feed pipe is arranged at the bottom of the extraction tower body, the ester feed pipe is connected to a material distributor, the material distributor is located inside the extraction tower body, the inner wall of the extraction tower body and the material distributor are fixedly connected, the material distributor is located at the center of the extraction tower body, the material distributor comprises a feed pipe, one end of the feed pipe is connected to the ester feed pipe, the other end of the feed pipe is connected to a distribution pipe, and a plurality of bulk hoppers are arranged on the distribution pipe.
2. The extraction tower structure of the acetic anhydride plant according to claim 1, characterized in that: A plurality of manholes are provided on one side of the extraction tower body.
3. The extraction tower structure of the acetic anhydride plant according to claim 1 or 2, characterized in that: The first and second packing layers in the extraction tower increase the packing height by 550 mm.
4. The extraction tower structure of the acetic anhydride plant according to claim 1, characterized in that: The distribution pipe includes a central pipe, the central bottom of the central pipe is connected to a feed pipe, the two sides of the central pipe are respectively connected to the first tee and the second tee, the first tee is connected to the third tee and the fourth tee, the second tee is connected to the fifth tee and the sixth tee, the third tee, the fourth tee, the fifth tee and the sixth tee are all provided with plug holes, vertical pipes are plugged into the plug holes, and a bulk hopper is installed on the vertical pipe.
5. The extraction tower structure of the acetic anhydride plant according to claim 4, characterized in that: The inner wall of the extraction tower body and the material distributor are fixedly connected via a connecting rod.
6. The extraction tower structure of the acetic anhydride plant according to claim 4, characterized in that: The ends of the third three-way pipe, the fourth three-way pipe, the fifth three-way pipe and the sixth three-way pipe are provided with blocking plates.
7. The extraction tower structure of the acetic anhydride plant according to claim 4, characterized in that: A support frame is provided in the extraction tower body, and a material distributor is installed on the support frame.
8. The extraction tower structure of the acetic anhydride plant according to claim 7, characterized in that: The support frame includes a first horizontal plate, a first vertical plate and a second vertical plate. The first vertical plate and the second vertical plate are vertically arranged with the first horizontal plate. A central groove for accommodating the insertion of a central tube is provided in the middle of the first horizontal plate. A left slot for accommodating the insertion of a first tee, a third tee and a fourth tee is provided in the middle of the first vertical plate. A right slot for accommodating the insertion of a second tee, a fifth tee and a sixth tee is provided in the middle of the second vertical plate.
9. The extraction tower structure of the acetic anhydride plant according to claim 8, characterized in that: The first vertical plate and the second vertical plate are provided with fixing components, and the fixing components can enable the material distributor to be clamped in the support frame.
10. The extraction tower structure of the acetic anhydride plant according to claim 9, characterized in that: The fixing assembly includes an arc-shaped clamping plate, connecting plates are provided on both sides of the arc-shaped clamping plate, through holes are provided on the connecting plates, bolts are installed in the through holes, and the bolts pass through the through holes and are threadedly connected to the threaded holes of the first vertical plate or the second vertical plate.
Citation Information
Patent Citations
Composite filler tower for extracting oil-water system
CN101073713A
Extractive agent for recycling acetic acid in dilute acetic acid
CN101172940A
Method for recovering dilute acetic acid through extraction by cyclohexyl acetate
CN106866409A
Energy-storing water tank
CN202255004U
Catalytic ozonation device for treating tail water of industrial wastewater
CN216711701U