Incremental launching construction method for steel box girder

By placing elastic components on the push-up equipment and using pilot beams, rear guide beams and inspection components, the problem of bolt damage during push-up construction of steel box beams is solved, and the effect of reducing local stress and improving construction safety is achieved.

CN118997020AInactive Publication Date: 2024-11-22CHONGQING JUNENG CONSTR GRP ROAD & BRIDGE ENG CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411236497.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the steel box beam top push construction, the contact area between the jack and the bottom plate bolt is small, resulting in excessive local stress and easily damage the bottom bolt.

Method used

Place elastic components on the pushing equipment. The elastic components are located under the bottom plate bolts. The elastic components are in contact with the bottom plate bolts through the elastic components, which increases the contact area, reduces local stress, and passes through pilot beams, rear guide beams and detection components (such as multiple sets of laser displacements). Sensor) corrects deviations to ensure structural stability and safety.

Benefits of technology

It effectively avoids damage to the bottom plate bolts, reduces structural stress abnormalities and adjustment workload, and improves construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997020A_ABST
    Figure CN118997020A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of bridge construction, and particularly relates to a steel box girder incremental launching construction method which comprises the steps that S1, a plurality of assembling buttresses and a plurality of incremental launching buttresses are erected; s2, a pilot beam, a plurality of steel box beams and a rear guide beam are sequentially assembled on the assembling buttresses to form a main beam, and pushing equipment is installed on each pushing buttress; s3, an elastic assembly is placed on each pushing device, and the elastic assemblies are located below the bottom plate bolts; s4, the total beam is jacked up by the jacking and pushing equipment and then pushed forwards by a preset distance; s5, the step S4 is repeated until the steel beam is pushed to the designated position; and S6, the pilot beam and the rear guide beam are dismantled, and pushing is completed. Compared with the prior art, the pushing device has the beneficial effects that the elastic assembly is placed on the pushing device, when the pushing device conducts pushing, the elastic assembly makes contact with the bottom plate bolt, after the elastic assembly deforms, the contact area between the elastic assembly and the bottom plate bolt is increased, and therefore local stress is reduced, and damage to the bottom bolt is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a steel box girder jacking construction method. Background Art

[0002] The steel box girder jacking method is a bridge construction technology, which is mainly used to install large steel box girder structures across obstacles (such as rivers, roads) without building supports underneath; steel box girders are generally composed of top plates, bottom plates, webs, transverse diaphragms, longitudinal diaphragms and stiffening ribs; the bottom plates and webs of steel box girders are connected by connecting steel plates and bolts. During construction, multiple walking jacking devices are used for jacking. The walking jacking devices can drive the steel box girder to move along the X, Y and Z axes. During jacking, the steel box girder is lifted up and then pushed in the corresponding direction.

[0003] During the pushing process, the top surface of the jack directly contacts the bottom plate bolts, but the contact area between the bolts and the jack is small, and the local stress is too large, which can easily cause damage to the bottom bolts. Summary of the invention

[0004] In order to overcome the deficiencies of the prior art, the object of the present invention is to provide a steel box girder jacking construction method that avoids damage to the bottom plate bolts.

[0005] The technical solution adopted by the present invention is as follows: A steel box girder top-pushing construction method, characterized by comprising the following steps: S1: Erect multiple assembly piers and top-pushing piers; S2: Assemble the leading beam, multiple steel box beams, and the rear leading beam on the assembly piers in sequence to form a total beam, and install the jacking equipment on each jacking pier; S3: placing an elastic component on each jacking device, the elastic component being located below the base plate bolt; S4: The jacking device lifts the main beam and pushes it forward by a preset distance; S5: Repeat step S4 until the steel beam is pushed to a specified position; S6: Remove the leading beam and the rear guide beam to complete the jacking.

[0006] Compared with the prior art, the present invention has the following beneficial effects: By placing an elastic component on the jacking device, when the jacking device is pushing, the elastic component contacts the bottom plate bolts. After the elastic component is deformed, the contact area with the bottom plate bolts is increased, thereby reducing local stress and avoiding damage to the bottom bolts.

[0007] As a preferred embodiment of the present invention, in step S2, the ratio of the length of the leading beam to the maximum span of the bridge is in the range of 0.68 to 0.7.

[0008] Beneficial effect: The length of the leading beam is set according to the above ratio, and the weight proportion of the leading beam is limited, so that the total beam has better stability and economy when being pushed.

[0009] As a preferred embodiment of the present invention, during the jacking process, when the detection component detects that the steel beam is offset, the jacking device lifts the steel beam, and the corresponding jacking device pushes the steel beam laterally to correct the deviation.

[0010] Beneficial effects: By correcting the deviation, we can avoid abnormal stress state of the beam caused by deviation, prevent local stress concentration, structural distortion and other problems, thereby protecting the safety of the bridge structure; correcting the deviation during each push can greatly reduce the adjustment workload after the main structure of the bridge is in place, saving time and cost.

[0011] As a preferred embodiment of the present invention, the detection component uses multiple groups of laser displacement sensors to detect the lateral and longitudinal displacements of each section of the total beam during the jacking process.

[0012] Beneficial effects: The laser displacement sensor has high measurement accuracy, fast response speed, and is easy to connect to computer equipment to achieve automated measurement and remote monitoring.

[0013] As a preferred embodiment of the present invention, the elastic component includes a fixed cylinder and a sliding cylinder, the sliding cylinder is slidably installed in the fixed cylinder, the outer wall of the sliding cylinder is provided with a plurality of upper connecting parts, the outer wall of the fixed cylinder is provided with a plurality of lower connecting parts, an elastic member is vertically arranged between each of the upper connecting parts and the corresponding lower connecting part, and the sliding cylinder is filled with a filler in contact with the bottom plate bolt; The filler is one of river sand, quartz sand and machine-made sand.

[0014] Working principle: when the pushing assembly is pushing, the sliding cylinder first contacts with the base plate, and then the sliding cylinder is forced to slide downward along the fixed cylinder, and the space inside the sliding cylinder is reduced until the internal filler contacts with the base plate bolts. Due to the characteristics of river sand, quartz sand and machine-made sand, the outer wall of the base plate bolts is fully in contact with the filler.

[0015] Beneficial effects: 1. The filler is in contact with the bottom plate and bottom plate bolts of the steel box girder. Compared with the way that the jacking equipment directly contacts the bottom plate bolts, the local stress on the bottom plate bolts is smaller, thus avoiding damage to the bottom plate bolts.

[0016] 2. When pushing, the internal space is reduced, the filling material is compacted, the structure is more stable, and base plate bolts of different specifications can be inserted into the filling sand, with a wide range of applications.

[0017] As a preferred embodiment of the present invention, a filling bag is provided in the sliding cylinder, and the filling material is filled in the filling bag.

[0018] Beneficial effect: By filling the filling bag with the filling material, it is convenient to separate the filling material from the sliding cylinder when disassembling the device.

[0019] As a preferred embodiment of the present invention, the opening of the filling bag is provided with a plurality of extensions, and the extensions pass through the outer wall of the sliding cylinder and are clamped between the sliding cylinder and the fixed cylinder.

[0020] Beneficial effects: 1. By setting the extension part, the gap between the sliding cylinder and the fixed cylinder is used to fix the extension part, so as to limit the storage belt.

[0021] 2. During the pushing process, when the sliding cylinder slides downward, the extension portion between the sliding cylinder and the fixed cylinder will gradually become longer, so that the filling bag as a whole rises relative to the sliding cylinder. The filling bag is in a tightened state, compacting the internal filling and providing a certain upward supporting force, making the device more stable.

[0022] 3. After completing the pushing work, you need to disassemble the elastic component. After removing the sliding cylinder, you can use the extension part to tighten and knot the filling bag to close the opening of the filling bag. When the filling material is river sand, it can avoid moisture and mold; the entire filling bag can be lifted by the extension part, which is convenient for storage and transportation.

[0023] As a preferred embodiment of the present invention, a rubber ring is fixedly connected to the upper portion of the fixed cylinder, and the rubber ring presses the plurality of extension portions against the inner wall of the sliding cylinder.

[0024] Beneficial effect: By setting a rubber ring, the end of the extension part is compressed, so that when the sliding cylinder moves, the compressed part is not easy to move compared with the sliding cylinder, thereby preventing the extension part from following the movement of the sliding cylinder and failing to tighten the filling bag.

[0025] As a preferred embodiment of the present invention, the pushing device lifts up the elastic component, so that the sliding cylinder moves downward along the fixed cylinder. Since the rubber ring presses the end of the extension part, the length of the extension part between the sliding cylinder and the fixed cylinder increases, and then the extension part tightens the filling bag, the space between the filling bag and the base plate is reduced, the internal filler is compacted, the filler is evenly in contact with the base plate bolts, and the base plate is in contact with the sliding cylinder and the filler.

[0026] Beneficial effect: the filler is in uniform contact with the bottom plate bolts, and the bottom plate is in uniform contact with the sliding cylinder and the filler, so that the overall force is more uniform. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a flow chart of the steps of an embodiment of the steel box girder top-pushing construction method of the present invention; Figure 22 is a schematic diagram of the structure of the elastic component in the embodiment of the steel box girder jacking construction method of the present invention; Figure 3 is a cross-sectional view of an elastic component in an embodiment of a steel box girder top-pushing construction method of the present invention; Figure 4 It is a cross-sectional view of a filling bag in an embodiment of the steel box girder jacking construction method of the present invention.

[0028] The reference numerals include: fixed cylinder 1, lower connecting part 11, rubber ring 12, sliding cylinder 2, upper connecting part 21, inner reinforcing ring 22, elastic member 3, guide rod 31, limit nut 32, upper ring body 33, lower ring body 34, spring 35, filling bag 4, and extension part 41. DETAILED DESCRIPTION

[0029] Typical embodiments that embody the features and advantages of the present invention will be described in detail in the following description. It should be understood that the present invention can have various changes in different embodiments without departing from the scope of the present invention, and the descriptions and illustrations therein are essentially used for illustration purposes rather than for limiting the present invention.

[0030] In the description of the present application, the terms "first", "second", etc. are only used to facilitate the description of the present application and simplify the description, and do not indicate or imply that the structure referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0031] See also Figure 1 As shown, the steel box girder top-pushing construction method of this embodiment comprises the following steps: S1: Erect multiple assembly piers and top-pushing piers; S2: Assemble the leading beam, multiple steel box beams, and the rear leading beam on the assembly piers in sequence to form a total beam, and install the jacking equipment on each jacking pier; S3: An elastic component is placed on each jacking device, and the elastic component is located below the bottom plate bolt; S4: The jacking device lifts the main beam and pushes it forward by a preset distance; S5: Repeat step S4 until the steel beam is pushed to a specified position; S6: Remove the leading beam and the rear guide beam to complete the jacking.

[0032] In step S2, the ratio of the length of the leading beam to the maximum span of the bridge is in the range of 0.68 to 0.7. In the present embodiment, the maximum span of the bridge is 35 m, and the length of the leading beam is 24 m. The length of the leading beam is set according to the above ratio, and the weight proportion of the leading beam is limited, so that the total beam has better stability and economy when being pushed.

[0033] In step S5, during the pushing process, when the steel beam of the detection component is offset, the pushing device lifts the steel beam, and the corresponding pushing device pushes the steel beam laterally to correct the deviation; the detection component uses multiple groups of laser displacement sensors to detect the lateral and longitudinal displacements of each section of the total beam during the pushing process; the laser displacement sensor has high measurement accuracy, fast response speed, and is easy to connect to computer equipment to achieve automated measurement and remote monitoring.

[0034] Among them, see Figure 2 As shown, the elastic component includes a fixed cylinder 1 and a sliding cylinder 2, the sliding cylinder 2 is slidably installed in the fixed cylinder 1, the outer wall of the sliding cylinder 2 is provided with a plurality of upper connecting parts 21, the outer wall of the fixed cylinder 1 is provided with a plurality of lower connecting parts 11, and an elastic member 3 is vertically arranged between each of the upper connecting parts 21 and the corresponding lower connecting part 11, and the sliding cylinder 2 is filled with a filler in contact with the bottom plate bolts; In this embodiment, the filler is machine-made sand, and in other embodiments, river sand or quartz sand may be used.

[0035] Among them, see Figure 2 As shown, a guide rod 31 is screwed on the lower connecting portion 11 , the guide rod 31 passes through the upper connecting portion 21 , and a limiting nut 32 is screwed on the upper end of the guide rod 31 .

[0036] Among them, the elastic member 3 includes an upper ring body 33, a lower ring body 34 and a spring 35. The upper ring body 33 is fixedly connected to the bottom surface of the upper connecting part 21, and the lower ring body 34 is fixedly connected to the upper end surface of the lower connecting part 11 and is located below the corresponding upper connecting part 21. The two ends of the spring 35 are respectively installed in the upper ring body 33 and the lower ring body 34; the spring 35 is used to elastically support the upper cylinder body. After the jacking equipment rises, the spring 35 is in the maximum compression state, and the sliding cylinder 2 descends, so that the filler contacts the bottom plate of the steel box girder. The spring 35 is limited by setting the upper ring body 33 and the lower ring body 34 to prevent the spring 35 from detaching from between the upper plate body and the lower plate body.

[0037] Among them, see Figure 3 As shown, a filling bag 4 is provided in the sliding cylinder 2, and the filler is filled in the filling bag 4; by filling the filler into the filling bag 4, it is convenient to separate the filler from the sliding cylinder 2 when disassembling the device.

[0038] Among them, see Figure 2 and Figure 3As shown, the opening of the filling bag 4 is provided with a plurality of extensions 41, which pass through the outer wall of the sliding cylinder 2 and are clamped between the sliding cylinder 2 and the fixed cylinder 1; by providing the extensions 41, the extensions 41 are fixed by utilizing the gap between the sliding cylinder 2 and the fixed cylinder 1, thereby limiting the position of the storage belt. During the pushing process, when the sliding cylinder 2 slides downward, the extensions 41 between the sliding cylinder 2 and the fixed cylinder 1 will gradually lengthen, so that the filling bag 4 as a whole rises relative to the sliding cylinder 2, and the filling bag 4 is in a tightened state, compacting the filling material inside and providing a certain upward support force, making the device more stable.

[0039] Among them, see Figure 2 , Figure 3 As shown, a rubber ring 12 is fixedly connected to the upper part of the fixed cylinder 1, and the rubber ring 12 presses multiple extensions 41 against the inner wall of the sliding cylinder 2; an inner reinforcement ring 22 is fixedly connected to the inner wall of the sliding cylinder 2; by setting the rubber ring 12, the end of the extension 41 is compressed, so that when the sliding cylinder 2 moves, the compressed part is not easy to be displaced compared with the sliding cylinder 2, so as to avoid the extension 41 following the movement of the sliding cylinder 2 and failing to tighten the filling bag 4; by setting the inner reinforcement ring 22, the fixed cylinder 1 is limited to avoid excessive deformation of the jack when it is pushed, and because the rubber ring 12 is set, the inner reinforcement ring 22 contacts the rubber ring 12 before contacting the fixed cylinder 1, so that the fixed cylinder 1 is not easy to be deformed.

[0040] The usage and operation principle of the elastic component are as follows: When assembling the elastic component, first place the filling bag 4 filled with the filling material in the fixed tube 1, then wrap the extension part 41 around the outer wall of the sliding tube 2 and inside the sliding tube 2, then sleeve the sliding tube 2 on the fixed tube 1, so that the end of the extension part 41 is pressed by the rubber ring 12, and after installing the guide rod 31 and the limit nut 32, the assembly of the elastic component is completed; The jacking device lifts the elastic component until the sliding cylinder 2 contacts the bottom plate of the steel box beam, and the bottom plate bolts are located inside the sliding cylinder 2. The elastic component continues to rise, the spring 35 is compressed, and the sliding cylinder 2 moves downward along the fixed cylinder 1. Since the rubber ring 12 presses the end of the extension 41, the length of the extension 41 between the sliding cylinder 2 and the fixed cylinder 1 increases, and the extension 41 tightens the filling bag 4, so that the space between the filling bag 4 and the bottom plate is reduced, and the filling inside is compacted. The filling is evenly in contact with the bottom plate bolts, and the bottom plate is also in contact with the sliding cylinder 2 and the filling, so that the bottom plate and the bottom plate bolts are evenly stressed; After the pushing is completed and the sliding tube 2 is removed, the plurality of extension portions 41 can be used to tie a knot to close the opening of the filling bag 4 for easy transfer and storage.

[0041] The above-mentioned embodiments are only preferred embodiments of the present invention and cannot be used to limit the scope of protection of the present invention. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present invention shall fall within the scope of protection required by the present invention.

Claims

1. A steel box girder top-pushing construction method, characterized in that: The steps include: S1: Erect multiple assembly piers and top-pushing piers; S2: Assemble the leading beam, multiple steel box beams, and the rear guide beam on the assembly piers in sequence to form a total beam, and install the jacking equipment on each jacking pier; S3: An elastic component is placed on each jacking device, and the elastic component is located below the bottom plate bolt; S4: The jacking device lifts the main beam and pushes it forward by a preset distance; S5: Repeat step S4 until the steel beam is pushed to a specified position; S6: Remove the leading beam and the rear guide beam to complete the jacking.

2. The steel box girder top-pushing construction method according to claim 1 is characterized in that: In step S2, The ratio of the length of the pilot beam to the maximum span of the bridge ranges from 0.68 to 0.

7.

3. The steel box girder top-pushing construction method according to claim 1 is characterized in that: In step S5, During the jacking process, when the steel beam of the detection component deviates, the jacking equipment will lift the steel beam, and the corresponding jacking equipment will push the steel beam sideways to correct the deviation.

4. The steel box girder top-pushing construction method according to claim 3 is characterized in that: The detection component uses multiple groups of laser displacement sensors to detect the lateral and longitudinal displacements of each section of the total beam during the jacking process.

5. The steel box girder top-pushing construction method according to claim 1 is characterized in that: The elastic component comprises a fixed cylinder and a sliding cylinder, the sliding cylinder is slidably installed in the fixed cylinder, the outer wall of the sliding cylinder is provided with a plurality of upper connecting parts, the outer wall of the fixed cylinder is provided with a plurality of lower connecting parts, an elastic member is vertically arranged between each of the upper connecting parts and the corresponding lower connecting part, and the sliding cylinder is filled with a filler in contact with the bottom plate bolt; The filler is one of river sand, quartz sand and machine-made sand.

6. The steel box girder top-pushing construction method according to claim 5 is characterized in that: A filling bag is arranged in the sliding cylinder, and the filling material is filled in the filling bag.

7. The steel box girder top-pushing construction method according to claim 6 is characterized in that: The opening of the filling bag is provided with a plurality of extension parts, and the extension parts pass through the outer wall of the sliding cylinder and are clamped between the sliding cylinder and the fixed cylinder.

8. The steel box girder top-pushing construction method according to claim 7 is characterized in that: The upper part of the fixed cylinder is fixedly connected with a rubber ring, and the rubber ring presses the multiple extension parts against the inner wall of the sliding cylinder.

9. The steel box girder top-pushing construction method according to claim 8, characterized in that: The pushing device lifts the elastic component, causing the sliding cylinder to move downward along the fixed cylinder. Since the rubber ring presses the end of the extension part, the length of the extension part between the sliding cylinder and the fixed cylinder increases, and the extension part tightens the filling bag. The space between the filling bag and the base plate is reduced, the internal filler is compacted, the filler is evenly in contact with the base plate bolts, and the base plate is in contact with the sliding cylinder and the filler.

Citation Information

Patent Citations

  • Single-hole large-span steel box girder metro-crossing walking type pushing construction method

    CN112359729A

  • Incremental launching construction method for super-long curve steel box composite beam

    CN115217040A

  • Steel box girder pushing bottom plate bolt protection device

    CN117926720A

  • Method for constructing temporary bearing

    JP2001262515A

  • Method for constructing temporary bridge using movable boxgirder

    KR1020120083781A