Strip wall type underground diaphragm wall composite anchorage foundation and construction method thereof
By adopting a combination structure of wellbore and strip-wall ground connection walls in the underground continuous wall anchoring foundation, the lateral resistance of strip-wall ground connection walls and the arch effect of the wellbore ground connection walls is solved in the existing technology anchors The problem of the deeper design of the anchor foundation has achieved a safer and more economical construction method.
Patent Information
- Application Number
- CN202411386538.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-09-30
AI Technical Summary
The existing underground continuous wall anchor foundation did not consider the bearing function of the wall side soil resistance above the base plate and the embedded holding layer during design, resulting in a large foundation weight and burial depth, increasing construction safety risks and costs.
The composite anchor foundation of strip-wall underground continuous wall is adopted, including wellbore ground connection wall, lining, main body and strip-wall ground connection wall. The overall stress of the wellbore ground connection wall and strip-wall ground connection wall is used. The side area of the strip-wall ground connection wall provides side resistance, reduces excavation depth and self-weight, and sets an inner lining as an inner support under the arch effect of the wellbore ground connection wall to reduce the inner support structure.
It effectively reduces the excavation depth and construction risks, reduces the project cost, improves construction safety and anti-slip capacity of the foundation, and is suitable for various geological conditions.
Smart Images

Figure CN118997210A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge foundations, and in particular to a strip-wall type underground continuous wall composite anchor foundation and a construction method thereof. Background Art
[0002] Underground continuous walls are widely used in anchor foundations of large-span suspension bridges due to their high bearing capacity, high rigidity, good anti-seepage and water-stopping effects, quick construction, and applicability to various geological conditions. However, the current design of underground continuous wall anchor foundations is mainly based on the stability requirements of gravity-type anti-slip and anti-overturning, which neither considers the resistance of the wall side soil above the bottom plate nor the bearing effect of the underground continuous wall embedded in the bearing layer, and has high requirements for the base bearing layer.
[0003] In order to meet the requirements of anti-slip, anti-overturning and base bearing capacity, a sufficiently large foundation weight and scale, as well as a sufficiently large burial depth, are often required. This directly leads to problems such as the safety of ultra-large and ultra-deep foundation pit construction and the use of large volumes of concrete, which not only increases the safety risk of construction, but also causes great cost waste.
[0004] For example, the traditional underground continuous wall anchor foundation commonly used at present is a closed circular, ∞-shaped, rectangular and other closed types. The bottom of the wall needs to enter the rock layer or enter a good bearing layer in combination with deep foundation reinforcement, resulting in a large excavation depth of the ground-connected wall. In the entire design process, the ground-connected wall is only used as a temporary retaining structure and is not considered as a main load-bearing structure. Summary of the invention
[0005] The purpose of the present invention is to overcome the problem in the prior art that the bottom of the ground-connected wall anchor foundation enters the rock layer or, in combination with deep foundation reinforcement, enters a better bearing layer, resulting in a large excavation depth of the ground-connected wall. In the entire design process, the ground-connected wall is only used as a temporary retaining structure without considering the shortcomings of being a main load-bearing structure. A strip-wall type underground continuous wall composite anchor foundation and a construction method thereof are provided.
[0006] In a first aspect, the present invention provides a strip wall type underground continuous wall composite anchor foundation, comprising
[0007] The shaft-type ground-connecting wall is in the shape of a circular ring, the shaft-type ground-connecting wall has a vertical axis, is located underground, and the top surface of the shaft-type ground-connecting wall is connected to the ground;
[0008] The inner lining is fixedly arranged along the circumference of the inner wall of the shaft-type ground-connected wall, and the bottom depth of the inner lining is less than the depth of the shaft-type ground-connected wall;
[0009] The main body is located inside the lining and is fixedly connected to the inner wall of the lining;
[0010] An anchor body, which is fixedly connected to the upper part of the main body;
[0011] Strip-wall type ground dummy wall, the strip-wall type ground dummy wall is arranged along the longitudinal direction of the bridge, the strip-wall type ground dummy wall is distributed at intervals along the transverse direction of the bridge, the strip-wall type ground dummy wall is arranged on the inner side of the lining, the strip-wall type ground dummy wall is fixed to the lower part of the main body, the bottom of the strip-wall type ground dummy wall enters the bearing layer, the bottom depth of the strip-wall type ground dummy wall is greater than the bottom depth of the shaft type ground dummy wall, and the top depth of the strip-wall type ground dummy wall is less than the bottom depth of the shaft type ground dummy wall.
[0012] In this scheme, the force is mainly borne by the shaft type ground diaphragm wall, lining, main body and strip wall type ground diaphragm wall as a whole. The load is transferred to the surrounding soil through the shaft type ground diaphragm wall, lining, main body and strip wall type ground diaphragm wall. The bottom of the strip wall type ground diaphragm wall enters the bearing layer, which gives full play to the favorable bearing contribution of the strip wall type ground diaphragm wall. The larger side area of the strip wall type ground diaphragm wall can be used to provide the advantage of lateral resistance. The safety factor of the horizontal cable force will be very high, so there is no need to dig deeper to construct a larger main body to increase the deadweight to improve the horizontal bearing capacity and reduce the entire anchorage volume and deadweight. In addition, the arch effect self-stabilization effect of the shaft type ground diaphragm wall is fully utilized. Under the arch effect self-stabilization effect of the shaft type ground diaphragm wall, the inner side of the shaft type ground diaphragm wall An inner lining is set as the internal support of the foundation pit where the main body is located to avoid traditional internal support measures (such as traditional concrete and steel support internal support beams, etc.). There is no need to set up too many internal support structures. The buried depth of the shaft type ground-connected wall only needs to meet the safety and stability requirements of the main foundation pit construction, that is, the strip-wall type ground-connected wall is fixed to the lower part of the main body, the top depth of the strip-wall type ground-connected wall is less than the bottom depth of the shaft type ground-connected wall, and the bottom depth of the strip-wall type ground-connected wall is greater than the bottom depth of the shaft type ground-connected wall. The buried depth of the shaft type ground-connected wall does not need to be embedded in the rock layer or have a large buried depth, and it is sufficient to achieve the enclosure of the main foundation pit excavation. This greatly reduces the excavation depth and construction risks, saves project costs, and effectively solves the problems of foundation pit support safety and anchor foundation construction.
[0013] Preferably, the main body comprises a top plate and a bottom plate;
[0014] The top plate is fixed above the bottom plate, and the anchor body is fixedly connected above the top plate;
[0015] The bottom plate includes a first bottom plate and a second bottom plate. The first bottom plate is cast earlier than the second bottom plate. The tops of the first and second bottom plates are connected to the top plate. The second bottom plate is a horn section. The upper part of the horn section is larger than the lower part. The lower part of the horn section is connected to the upper part of the wall in a strip wall style.
[0016] The bottom plate includes a first bottom plate and a second bottom plate. The first bottom plate is cast before the second bottom plate. The purpose is to prevent the bottom plate from being connected to the strip-wall ground diaphragm wall. After the first bottom plate is cast, it settles under its own weight and is in full contact with the bottom soil. The base soil generates a reaction force, which can share part of the upper load by using the reaction force generated by the base soil. However, the load above the main body is large, and the soil reaction force of the base alone cannot meet the requirements. By casting the trumpet-shaped area concrete before the anchor body is constructed, the strip-wall ground diaphragm wall is rigidly connected to the bottom plate. At this time, the strip-wall ground diaphragm wall plays a role, and the upper structure load can be directly transferred to the strip-wall ground diaphragm wall. Finally, the base soil reaction force and the strip-wall ground diaphragm wall jointly bear the upper load. Even if the foundation soil below the bottom plate is fully consolidated and compacted under the action of the first bottom plate, the bearing function of the foundation soil below the bottom plate can be fully utilized, and the load required to be borne by the strip-wall ground diaphragm wall can be reduced, which can also indirectly reduce the scale of the ground diaphragm wall and reduce the amount of excavation. The trumpet section is used, and a trumpet-shaped steel cage is used inside, which is not easy to slip; and can make the first part of the bottom plate and the second part of the bottom plate form a better shear support, thereby improving the vertical bearing capacity of the bottom plate after forming.
[0017] Preferably, the lower part of the top plate has a groove and a tenon, which is arranged on the side of the lower part of the first part of the top plate above the first part of the bottom plate, and the lower part of the first part of the top plate is cast earlier than the second part of the bottom plate.
[0018] The vertical shear bearing capacity of the top plate can be increased by setting the concave and convex tenons. The connection construction of the strip wall type ground-connected wall and the bottom plate can be carried out after the construction of the first part of the bottom plate and the lower part of the first part of the top plate, so that the foundation soil below the bottom plate is fully consolidated and compacted under the self-weight of the first part of the bottom plate and the lower part of the first part of the top plate, and the bearing capacity of the foundation soil below the bottom plate can be fully utilized to reduce the force of the ground-connected wall, which can also indirectly reduce the scale of the ground-connected wall.
[0019] Preferably, the net distance between the edge of the strip-wall type ground connection wall and the inner edge line of the lining is not less than 1 m, which is convenient for setting the horn section and avoids interference with the shaft type ground connection wall.
[0020] Preferably, the lining is arranged in a stepped manner along the depth, with the lower part of the lining being larger than the upper part. When excavating the main foundation pit, the deeper the depth, the greater the soil pressure. Setting the lower part of the lining to be larger than the upper part in a stepped shape can ensure the bearing capacity, and after the main construction is completed in the later stage, it can better form vertical support for the main body.
[0021] Preferably, the shaft-type ground-connected wall includes a vertical joint, and the vertical joint of the shaft-type ground-connected wall is a milling joint. The depth of the bottom of the shaft-type ground-connected wall is lower than the depth of the bearing layer. The shaft-type ground-connected wall is mainly used for the protection of foundation pit construction. The use of milling joints can reduce construction costs while ensuring the bearing capacity.
[0022] Preferably, the strip-wall type ground connection walls are arranged in parallel with equal spacing, which effectively reduces the group wall effect.
[0023] Preferably, the wall spacing of the strip-wall type ground-connected wall is 6d to 10d, d is the wall thickness of the strip-wall type ground-connected wall, the group wall effect is significantly reduced, and the scale of the top plate of the foundation is relatively appropriate, which can reduce costs.
[0024] Preferably, the strip-wall type ground-connecting wall has vertical joints, and the vertical joints of the strip-wall type ground-connecting wall are rigid joints, which can better achieve vertical bearing.
[0025] In a second aspect, the present invention provides a construction method for a strip-wall type underground continuous wall composite anchor foundation, which is used to construct the strip-wall type underground continuous wall composite anchor foundation, comprising the following steps:
[0026] S1: Construction of shaft-type ground connection wall;
[0027] S2: Construction of strip-wall ground-connected wall;
[0028] S3: excavate the foundation pit inside the shaft-type ground-connected wall and construct the inner lining so that the inner lining and the inner wall of the shaft-type ground-connected wall form an integral structure;
[0029] S4: construct the main body layer by layer upwards on the top of the strip-wall type ground-connected wall and the inner side of the inner lining, so that the main body, the inner lining and the strip-wall type ground-connected wall form a whole;
[0030] S5: Anchor body is constructed on the top of the main body and the construction is completed.
[0031] In this scheme, the construction of the shaft type ground diaphragm wall provides safety conditions for the construction of the strip wall type ground diaphragm wall. The shaft type ground diaphragm wall construction and the strip wall type ground diaphragm wall construction provide safety conditions for the excavation of the foundation pit in the shaft type ground diaphragm wall and the construction of the inner lining. The inner lining construction ensures the safety after the excavation of the foundation pit. After the excavation of the foundation pit is completed, the main body is constructed layer by layer on the top of the strip wall type ground diaphragm wall and the inner side of the inner lining, so that the main body, the inner lining and the strip wall type ground diaphragm wall form a whole and form an overall force. The anchor body is constructed on the top of the main body for connecting the cable. This construction method can ensure the safety of the entire construction process and can reduce the excavation scale of the shaft type ground diaphragm wall and the foundation pit and the casting scale of the main structure. If the strip wall type ground diaphragm wall is constructed at the bottom of the foundation pit, the water head pressure is large, the safety risk of the trench construction is large, and the collapse hole is easy to occur; the strip wall type ground diaphragm wall of this method is constructed before the excavation of the foundation pit, the ground construction is convenient, the mud treatment is also convenient, and the groundwater level has little effect on the stability of the trench wall, and the construction is safer and more reliable.
[0032] Preferably, before step S1, the steps include: leveling the site, and then constructing guide walls of the shaft-type ground-connected wall and the strip-wall-type ground-connected wall;
[0033] In step S1, the first phase trench section and the second phase trench section trench section of the shaft type ground diaphragm wall are constructed to form a closed annular shaft type ground diaphragm wall enclosure structure;
[0034] In step S2, the first phase trench section and the second phase trench section ground diaphragm wall of the strip wall type ground diaphragm wall are constructed to form a parallel strip wall type ground diaphragm wall structure;
[0035] In step S3, the soil in the foundation pit inside the shaft-type ground-connected wall is excavated in layers, and the inner lining is constructed by reverse construction method, so that the inner lining and the shaft-type ground-connected wall form a whole;
[0036] In step S4, the following steps are included:
[0037] S4.1. After excavating to the top of the strip-wall ground diaphragm to form the pit bottom, remove the plain concrete in the top area of the strip-wall ground diaphragm and install trumpet-shaped steel bars at the top of the strip-wall ground diaphragm;
[0038] S4.2, pour the cushion layer and bottom sealing concrete, and then pour the bottom plate part other than the trumpet-shaped steel bars to form the first bottom plate, so that the first bottom plate and the inner lining form a whole;
[0039] S4.3, pour the top plate portion above the first part of the bottom plate to 4m-6m below the top surface of the top plate to form the lower part of the first part of the top plate, and make the lower part of the first part of the top plate and the lining form a whole;
[0040] S4.4. Cast the trumpet-shaped steel bars at the top of the strip-wall ground-connected wall corresponding to the bottom plate to form a second bottom plate, so as to form a complete bottom plate;
[0041] S4.5, pour the top plate portion above the second part bottom plate to 4m-6m below the top plate top surface to form the second part top plate lower portion, so as to form the top plate lower portion;
[0042] S4.6. Cast the remaining top plate portion to form the upper portion of the top plate, so as to form a complete top plate, and to form a whole with the strip-wall type ground connecting wall, bottom plate, top plate and inner lining;
[0043] In step S5, the anchor blocks and loose cable saddle piers are cast in layers and blocks.
[0044] In the above construction method, the second part of the bottom plate is the part that connects the bottom plate and the strip-wall type ground-connected wall. The first part of the bottom plate and the lower part of the first part of the top plate are cast earlier than the second part of the bottom plate. The deadweight of the first part of the bottom plate and the lower part of the first part of the top plate can be fully utilized to fully consolidate and compact the foundation soil below the bottom plate, and the bearing capacity of the foundation soil below the bottom plate can be fully utilized to reduce the stress on the ground-connected wall. This can also indirectly reduce the scale of the ground-connected wall, making the scale of the strip-wall type ground-connected wall in step S2 smaller and reducing the construction difficulty.
[0045] Preferably, in step S4.4, a concave and convex tenon is provided on one side of the lower part of the top plate of the first part which is horizontally facing the strip-wall type floor connecting wall.
[0046] The concave and convex tenons can effectively combine the lower part of the first part of the top plate and the lower part of the second part of the top plate to form a vertical shear load, form an overall lower structure of the top plate, and improve the overall force bearing capacity of the top plate.
[0047] Preferably, when constructing the top plate, the construction is carried out in layers from bottom to top, cooling pipes in each layer of the top plate are arranged layer by layer, and anchor reinforcements are pre-embedded.
[0048] Can ensure the construction quality of the roof.
[0049] Preferably, in step S2, the strip-wall type ground ties in the middle are constructed first, and then the strip-wall type ground ties on both sides are constructed.
[0050] The length of the strip-wall type ground dummy wall in the middle part is greater than that of the strip-wall type ground dummy walls on both sides. Constructing the longer strip-wall type ground dummy wall first can reduce the disturbance to the subsequent strip-wall type ground dummy wall construction, thus improving the quality after construction.
[0051] Preferably, in step S1, before excavating the guide walls on both sides of the shaft type ground ditch wall and the strip wall type ground ditch wall, trench wall reinforcement is first constructed on both sides of the shaft type ground ditch wall and the strip wall type ground ditch wall, which can improve the safety and construction quality of the shaft type ground ditch wall and the strip wall type ground ditch wall.
[0052] Compared with the prior art, the present invention has the following beneficial effects:
[0053] 1. The present invention provides a strip-wall underground continuous wall composite anchor foundation, which transmits load to the surrounding soil through the shaft-type ground-connecting wall, the inner lining, the main body and the strip-wall ground-connecting wall. The bottom of the strip-wall ground-connecting wall enters the bearing layer, which gives full play to the favorable bearing contribution of the strip-wall ground-connecting wall, and can use the larger side area of the strip-wall ground-connecting wall to provide the side resistance advantage. The safety factor of the horizontal cable force will be very high, so there is no need to dig deeper to construct a larger main body to increase the deadweight to improve the horizontal bearing capacity, reduce the volume and deadweight of the entire anchor, and make full use of the shaft-type The arch effect self-stabilizing effect of the shaft-type ground-anchored wall. Under the self-stabilizing effect of the arch effect of the shaft-type ground-anchored wall, an inner lining is set on the inner side of the shaft-type ground-anchored wall as the internal support of the foundation pit where the main body is located. There is no need to set up too many internal support structures. The buried depth of the shaft-type ground-anchored wall only needs to meet the safety and stability requirements of the main foundation pit construction. The buried depth of the shaft-type ground-anchored wall does not need to be embedded in the rock layer or have a large buried depth. It is sufficient to achieve the enclosure of the main foundation pit excavation. This greatly reduces the excavation depth and construction risks, saves project costs, and effectively solves the problems of foundation pit support safety and anchor foundation construction.
[0054] 2. The present invention provides a construction method for a strip-wall type underground continuous wall composite anchor foundation. Through the shaft type ground connecting wall construction, safety conditions are provided for the strip-wall type ground connecting wall construction. The shaft type ground connecting wall construction and the strip-wall type ground connecting wall construction provide safety conditions for the excavation of the foundation pit in the shaft type ground connecting wall and the construction of the inner lining. The inner lining construction ensures the safety after the foundation pit excavation. After the foundation pit excavation is completed, the main body is constructed layer by layer on the top of the strip-wall type ground connecting wall and the inner side of the inner lining, so that the main body, the inner lining and the strip-wall type ground connecting wall form a whole and form an overall force. An anchor body is constructed on the top of the main body for connecting cables. This construction method can ensure the safety of the entire construction process and can reduce the excavation scale of the shaft type ground connecting wall and the foundation pit and the casting scale of the main structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] Figure 1 It is a side view schematic diagram of the composite anchor foundation of the strip-wall underground continuous wall;
[0056] Figure 2 for Figure 1 Schematic diagram of the viewing angle at the middle AA;
[0057] Figure 3 for Figure 1 Schematic diagram of the viewing angle at the middle BB;
[0058] Figure 4 It is a side view schematic diagram of underground continuous wall;
[0059] Figure 5 for Figure 4 Schematic diagram of the view from CC in the middle;
[0060] Figure 6 for Figure 4 Schematic diagram of the viewing angle at DD in the middle;
[0061] Figure 7 A schematic diagram of the arrangement of the first part bottom plate and the second part bottom plate;
[0062] Figure 8 It is a schematic diagram of the arrangement of the lower part of the first part top plate and the lower part of the second part top plate;
[0063] Fig. 9 This is a schematic diagram of excavating the foundation pit to the bottom of the pit;
[0064] Fig.10 This is a schematic diagram of the first part of the base plate after pouring;
[0065] Fig.11 A schematic diagram of the arrangement of concave and convex tenons on the lower side of the top plate of the first part;
[0066] Fig.12 A schematic diagram of the bottom plate of the second part, the lower part of the top plate of the second part and the upper part of the top plate;
[0067] Fig.13 It is a side view diagram of reinforcement by mixing piles;
[0068] Fig.14 It is a schematic diagram of the plan reinforcement by mixing piles;
[0069] Fig.15 This is a side view diagram of the construction guide wall;
[0070] Fig.16 This is a plan view of the construction guide wall;
[0071] Fig.17 It is a side schematic diagram of the excavated trench section;
[0072] Fig.18 It is a plan view of the trench excavation section;
[0073] Fig.19 This is a side view of the construction of the first unit wall;
[0074] Fig. 20 This is a plan view of the construction of the first unit wall;
[0075] Fig.21 This is a side view diagram after the construction of the shaft-type ground-connected wall;
[0076] Fig. 22 This is a plan view of the shaft-type ground-connected wall after construction;
[0077] Fig.23 This is a side view diagram after the construction of the first strip-type ground-connected wall;
[0078] Fig.24 This is a plan view after the construction of the first strip-type ground-connected wall;
[0079] Fig.25 This is a side view diagram after the construction of all strip-type ground-connected walls;
[0080] Fig.26 This is a plan view of the construction of all strip-type ground-connected walls;
[0081] Fig. 27 A side view of the excavation of the foundation pit and the construction of the beam cap on the top of the lining;
[0082] Fig.28 A schematic plan view of excavating the foundation pit and constructing the beam cap on the top of the lining;
[0083] Fig.29 This is a side view diagram after excavation of the foundation pit and construction of the lining;
[0084] Fig.30 This is a plan view of the excavation of the foundation pit and the construction of the lining;
[0085] Fig.31 This is a side view diagram after the base plate is constructed;
[0086] Fig.32 This is a plan view after the base plate is constructed;
[0087] Fig.33 This is a side view diagram after the top slab is constructed;
[0088] Fig.34 This is a plan view after the top slab is constructed;
[0089] Fig.35 This is a side view of the anchor body after construction;
[0090] Fig.36 This is a plan view of the anchor body after construction.
[0091] Markings in the figure:
[0092] 1. Shaft-type ground-connected wall; 2. Inner lining; 21. Foundation pit; 3. Anchor body; 4. Strip-wall ground-connected wall; 5. Bottom plate; 51. First part of bottom plate; 52. Second part of bottom plate; 6. Top plate; 61. Lower part of first part of top plate; 611. Tenon and groove; 62. Lower part of second part of top plate; 63. Upper part of top plate; 7. Mixing pile; 71. Rear anchor surface; 72. Loose cable saddle; 8. Side ditch; 91. Guide wall; 92. Slot wall; 93. First unit slot section; 94. Guide ditch; 95. First unit wall; 96. First strip-wall ground-connected wall; 97. Beam cap. DETAILED DESCRIPTION
[0093] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0094] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all based on the expression of the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.
[0095] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.
[0096] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.
[0097] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.
[0098] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "installed", "connected", "connected", "provided with", "laid" and "arranged" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threaded connection and other commonly used connection means in the field.
[0099] Example 1
[0100] like Figure 1-6 As shown, a strip-wall underground continuous wall composite anchor foundation includes a shaft-type ground-connecting wall 1, an inner lining 2, a main body, an anchor body 3 and a strip-wall underground-connecting wall 4.
[0101] like Figure 3 and Figure 6 As shown, the shaft-type ground connection wall 1 is in the shape of a circular ring. Figure 1 As shown, the shaft-type ground-connecting wall 1 is axially vertical, the shaft-type ground-connecting wall 1 is located underground, and the top surface of the shaft-type ground-connecting wall 1 is connected to the ground;
[0102] In some embodiments, the shaft-type ground-connected wall 1 includes a vertical joint, and the vertical joint of the shaft-type ground-connected wall 1 is a milling joint. The depth of the bottom of the shaft-type ground-connected wall 1 is lower than the depth of the bearing layer. The shaft-type ground-connected wall 1 is mainly used for the protection of the foundation pit 21. The use of milling joints can reduce the construction cost while ensuring the bearing capacity. Of course, the shaft-type ground-connected wall 1 can also use vertical rigid joints.
[0103] like Figure 3 and Figure 6 As shown, the lining 2 is fixedly arranged along the inner wall circumference of the shaft-type ground-connected wall 1. Figure 1 As shown, the bottom depth of the lining 2 is less than the depth of the shaft-type ground-connected wall 1; the lining 2 serves as the inner support of the foundation pit 21, and is subjected to force together with the main structure after the main structure is constructed;
[0104] like Figure 1-Figure 3 As shown, the main body is located inside the liner 2, and the main body is fixedly connected to the inner wall of the liner 2;
[0105] like Figure 1-Figure 3 As shown, the anchor body 3 is fixedly connected to the upper part of the main body, and the anchor body 3 is used to connect the cable;
[0106] The strip-wall type ground connection wall 4 is arranged along the bridge direction. Figure 1 The left and right directions are along the bridge direction; the strip-wall type ground connecting walls 4 are distributed at intervals along the transverse direction of the bridge. Figure 2 The left and right directions are the transverse direction of the bridge; the strip-wall type ground connecting wall 4 is arranged on the inner side of the lining 2, the strip-wall type ground connecting wall 4 is fixed to the lower part of the main body, and the bottom of the strip-wall type ground connecting wall 4 enters the bearing layer, the bearing layer can be a stable stratum or rock stratum that can provide a larger anchoring force, the bottom depth of the strip-wall type ground connecting wall 4 is greater than the bottom depth of the shaft type ground connecting wall 1, and the top depth of the strip-wall type ground connecting wall 4 is less than the bottom depth of the shaft type ground connecting wall 1.
[0107] The above-mentioned strip-wall underground continuous wall composite anchor foundation structure is mainly subjected to the force by the shaft-type ground-connected wall 1, the lining 2, the main body and the strip-wall ground-connected wall 4 as a whole. The load of the anchor body 3 acts on the top plate 6, the top plate 6 is transferred to the bottom plate 5, the bottom plate 5 is transferred to the strip-wall ground-connected wall 4 and the foundation soil below the bottom plate 5, and then transferred to the bearing layer by the strip-wall ground-connected wall 4, that is, the strip-wall ground-connected wall 4 and the foundation soil below the bottom plate 5 jointly bear the vertical load; the anchor body 3 is pulled by the anchor cable, A horizontal load is generated, which acts on the top plate 6, which is then transferred to the bottom plate 5 and the lining 2. The bottom plate 5 acts on the strip-wall type ground dummy wall 4 and the lining 2, which is then transferred to the shaft type ground dummy wall 1 by the lining 2. The shaft type ground dummy wall 1 and the strip-wall type ground dummy wall 4 jointly bear the horizontal load, but the main horizontal load is borne by the strip-wall type ground dummy wall 4. The strip-wall type ground dummy wall 4 has a large area in the longitudinal direction of the bridge, which can rub against the foundation soil, thereby forming a frictional resistance to resist the tension of the anchor cable.
[0108] This method transfers the load to the surrounding soil through the shaft-type ground-connecting wall 1, the inner lining 2, the main body and the strip-wall ground-connecting wall 4. The bottom of the strip-wall ground-connecting wall 4 enters the bearing layer, giving full play to the favorable bearing contribution of the strip-wall ground-connecting wall 4, and being able to use the larger side area of the strip-wall ground-connecting wall 4 to provide the advantage of side resistance. The safety factor of the horizontal cable force will be very high, so there is no need to dig deeper to construct a larger main body to increase the deadweight to improve the horizontal bearing capacity, reduce the entire anchor volume and deadweight, and also fully utilize the arch effect self-stabilizing effect of the shaft-type ground-connecting wall 1. Under the arch effect self-stabilizing effect of the shaft-type ground-connecting wall 1, the inner lining 2 is arranged on the inner side of the shaft-type ground-connecting wall 1 as the inner support of the foundation pit 21 where the main body is located. , avoiding traditional internal support measures (such as traditional concrete and steel support internal support beams, etc.), and there is no need to set up too many internal support structures. The buried depth of the shaft type ground diaphragm wall 1 only needs to meet the safety and stability requirements of the main foundation pit 21 construction, that is, the strip wall type ground diaphragm wall 4 is fixed to the lower part of the main body, the top depth of the strip wall type ground diaphragm wall 4 is less than the bottom depth of the shaft type ground diaphragm wall 1, and the bottom depth of the strip wall type ground diaphragm wall 4 is greater than the bottom depth of the shaft type ground diaphragm wall 1. The buried depth of the shaft type ground diaphragm wall 1 does not need to be embedded in the rock layer and has a large buried depth, and it can achieve the enclosure of the main foundation pit 21 excavation. This greatly reduces the excavation depth and construction risks, saves engineering costs, and effectively solves the problems of foundation pit 21 support safety and anchor foundation construction.
[0109] In some embodiments, Figure 7 As shown, the main body includes a top plate 6 and a bottom plate 5;
[0110] The top plate 6 is fixed above the bottom plate 5, and the anchor body 3 is fixedly connected above the top plate 6;
[0111] The bottom plate 5 includes a first bottom plate 51 and a second bottom plate 52. The first bottom plate 51 is cast earlier than the second bottom plate 52. The tops of the first bottom plate 51 and the second bottom plate 52 are connected to the top plate 6. The second bottom plate 52 is a horn section. The upper part of the horn section is larger than the lower part. The lower part of the horn section is connected to the upper part of the strip wall type ground connecting wall 4.
[0112] The bottom plate 5 includes a first bottom plate 51 and a second bottom plate 52. Fig.10 and Fig.12As shown, the first part of the bottom plate 51 is cast before the second part of the bottom plate 52, the purpose is to make the bottom plate 5 and the strip-wall type ground diaphragm wall 4 not connected first, and the first part of the bottom plate 51 settles by its own weight after casting, and fully contacts with the soil below the bottom plate 5, and the base soil generates a reaction force, which can share part of the upper load by using the reaction force generated by the base soil, but the load above the main body is large, and the soil reaction force of the base alone cannot meet the requirements. By casting the trumpet-shaped area concrete before the construction of the anchor body 3, the strip-wall type ground diaphragm wall 4 is rigidly connected to the bottom plate 5. At this time, the strip-wall type ground diaphragm wall 4 plays a role, and the upper structure load can be directly transferred to the strip-wall type ground diaphragm wall 4. Finally, the base soil reaction force and the strip-wall type ground diaphragm wall 4 jointly bear the upper load. Even if the foundation soil below the bottom plate 5 is fully consolidated and compacted under the action of the first part of the bottom plate 51, the bearing function of the foundation soil below the bottom plate 5 can be fully utilized, and the load required to be borne by the strip-wall type ground diaphragm wall 4 can be reduced, which can also indirectly reduce the scale of the ground diaphragm wall and reduce the amount of excavation.
[0113] Further, such as Figure 8 As shown, the top plate 6 includes a top plate upper portion 63 and a top plate lower portion 6 , and the top plate 6 lower portion includes a first portion top plate lower portion 61 and a second portion top plate lower portion 62 . The first portion top plate lower portion 61 is located above the first portion bottom plate 51 , and the second portion top plate lower portion 62 is located above the second portion bottom plate 52 .
[0114] like Figure 10-12 As shown, the connection construction of the strip-wall type ground-connected wall 4 and the bottom plate 5 (i.e., the construction of the second part of the bottom plate 52) can be carried out after the construction of the first part of the bottom plate 51 and the lower part of the first part of the top plate 61, so that the foundation soil below the bottom plate 5 is fully consolidated and compacted under the self-weight of the first part of the bottom plate 51 and the lower part of the first part of the top plate 61, and the bearing function of the foundation soil below the bottom plate 5 can be fully utilized to reduce the force of the ground-connected wall and further reduce the scale of the ground-connected wall. Assuming that according to conventional practices, the load-sharing ratio of the base soil reaction force is 10%, and the strip-wall type ground-connected wall 4 shares 90% of the load; through this construction method, the base reaction force can reach about 30%, and the strip-wall type ground-connected wall 4 shares 70% of the load. Therefore, it is not necessary to design such a large-scale ground-connected wall (such as reducing the depth of the ground-connected wall by a few meters or reducing the length along the bridge by a few meters) to meet the design requirements.
[0115] Furthermore, a concave-convex tenon 611 is provided on the side of the first part top plate lower part 61, and when the second part top plate lower part 62 is cast, a concave-convex fit can be formed, thereby forming a vertical shear load, which can ensure the bearing capacity of the lower part of the top plate 6. And the concave-convex tenon 611 of the second part top plate lower part 62 and the first part top plate lower part 61 are connected and fixed by longitudinal and transverse steel bars.
[0116] Furthermore, a trumpet section with a larger top and a smaller bottom is set. Before constructing the first part of the bottom plate 51, the trumpet steel cage of the trumpet section will be set first. In order to avoid interference between the trumpet steel cage and the shaft-type ground-connected wall 1, the net distance between the edge of the strip-wall-type ground-connected wall 4 and the inner edge of the lining 2 is not less than 1m, which is convenient for setting the trumpet section. Figure 6 As shown, from the side to the middle, the lengths of the strip-wall type ground connecting wall 4 are 40m, 67m, 70m, 78m and 81m respectively, and the end of the 81m strip-wall type ground connecting wall 4 is about 3m away from the shaft type ground connecting wall 1.
[0117] In some embodiments, Figure 1 As shown, when excavating the main foundation pit 21, the deeper the depth, the greater the soil pressure. The lower part of the lining 2 is set to be larger than the upper part. That is, the lining 2 is arranged in a stepped manner along the depth, and the lower part of the lining 2 is larger than the upper part. This can ensure the bearing capacity, and after the main construction is completed in the later stage, it can better form vertical support for the main body.
[0118] In some embodiments, Figure 3 and Figure 6 As shown, the strip-wall type ground connection walls 4 are arranged in parallel with equal spacing. Figure 6 As shown, the spacing is a, which effectively reduces the group wall effect. Furthermore, the wall spacing of the strip-wall type ground-connecting wall 4 is 6d to 10d, d is the wall thickness of the strip-wall type ground-connecting wall 4, the group wall effect is significantly reduced, and the scale of the top plate 6 of the foundation is relatively appropriate, which can reduce costs. In this embodiment, when the strip-wall type ground-connecting wall 4 is long, it needs to be divided into a first-phase trough section and a second-phase trough section for construction, so the strip-wall type ground-connecting wall 4 has a vertical joint, and the vertical joint of the strip-wall type ground-connecting wall 4 is a rigid joint. The rigid joint is set between the first-phase trough section and the second-phase trough section, which can better realize vertical bearing.
[0119] A large number of calculations and studies have shown that during the normal operation of the anchor foundation, the enclosing ground-connected wall shares a large proportion of the load. In order to make full use of the bearing function of the ground-connected wall, this embodiment proposes a strip-wall underground continuous wall composite anchor foundation. The strip-wall underground continuous wall composite anchor foundation is mainly subjected to the force of the shaft-type ground-connected wall 1, the top plate 6, the bottom plate 5, the lining 2 and the lower sheet-like strip-wall ground-connected wall 4. The load is transferred to the surrounding soil through the shaft-type ground-connected wall 1, the lining 2, the top plate 6, the bottom plate 5 and the strip-wall ground-connected wall 4, which fully utilizes the favorable bearing contribution of the strip-wall ground-connected wall 4, and also fully utilizes the arch effect self-stabilizing effect of the shaft-type ground-connected wall 1. The buried depth of the shaft-type ground-connected wall 1 only needs to meet the safety and stability requirements of the construction of the foundation pit 21 of the bottom plate 5 and the top plate 6, and does not need to be embedded in the rock layer or have a large buried depth. In addition, the connection construction of the strip-wall type ground-connected wall 4 and the bottom plate 5 can be carried out after the bottom plate 5 and a part of the top plate 6 are constructed, so that the foundation soil below the bottom plate 5 is fully consolidated and compacted under the self-weight of the bottom plate 5 and the top plate 6 that have been constructed, and the bearing function of the foundation soil below the bottom plate 5 can be fully utilized to reduce the force of the ground-connected wall, which can also indirectly reduce the scale of the ground-connected wall. Therefore, the strip-wall type underground continuous wall composite anchor foundation of the embodiment of the present invention can greatly reduce the foundation excavation depth and construction risks, and can also shorten the construction period and reduce the impact on the environment. It is suitable for various geological conditions, has significant economic and environmental protection effects, and has broad application prospects.
[0120] Example 2
[0121] A construction method for a strip-wall type underground continuous wall composite anchor foundation, used for constructing any of the strip-wall type underground continuous wall composite anchor foundations described in Example 1, comprising the following steps:
[0122] S1: Fig.21 As shown, the shaft type ground-connected wall 1 is constructed; the shaft type ground-connected wall 1 can be constructed in the same manner as a conventional ground-connected wall;
[0123] Further, such as Figure 13-Figure 16 As shown, before step S1, the steps include: leveling the site, and then constructing the guide wall 91 of the shaft type ground connecting wall 1 and the strip wall type ground connecting wall 4;
[0124] Further, in step S1, if Fig.13 and Fig.14 As shown, before excavating the guide walls 91 on both sides of the shaft type ground diaphragm wall 1 and the strip wall type ground diaphragm wall 4, the groove walls 92 are first constructed on both sides of the shaft type ground diaphragm wall 1 and the strip wall type ground diaphragm wall 4 for reinforcement, which can improve the safety and construction quality of the shaft type ground diaphragm wall 1 and the strip wall type ground diaphragm wall 4.
[0125] Further, such as Fig.21As shown, in step S1, the first-phase trench section and the second-phase trench section ground ditch wall of the shaft type ground ditch wall 1 are constructed to form a closed annular shaft type ground ditch wall 1 enclosure structure; milling joints are used between the first-phase trench section and the second-phase trench section ground ditch wall.
[0126] S2: Fig.25 and Fig.26 As shown, the strip-wall type ground-connecting wall 4 is constructed; the strip-wall type ground-connecting wall 4 can be constructed in the same manner as a conventional ground-connecting wall;
[0127] Furthermore, in step S2, the first-phase trench section and the second-phase trench section ground connecting wall of the strip-wall type ground connecting wall 4 are constructed to form a parallel strip-wall type ground connecting wall 4 structure;
[0128] Further, in step S2, if Fig.24 and Fig.26 As shown, the strip-wall type ground connecting wall 4 in the middle is constructed first, and then the strip-wall type ground connecting walls 4 on both sides are constructed.
[0129] The length of the strip-wall type ground ties 4 in the middle is greater than that of the strip-wall type ground ties 4 on both sides. Constructing the longer strip-wall type ground ties 4 first can reduce the disturbance to the subsequent construction of the strip-wall type ground ties 4, thereby improving the quality after construction.
[0130] Post-grouting measures are taken on both the wall side and the wall bottom to increase the wall side friction resistance and wall bottom end resistance.
[0131] The first and second phase slot wall connection parts of the strip wall type diaphragm wall adopt the rigid joint method, and the slot length should be appropriately increased to reduce the number of vertical joints. For example, a 50m long strip wall type diaphragm wall is a 50m long slot. The actual construction is to divide 50m into many sections for construction, and the construction is segmented and casted. Vertical joints are left between adjacent sections. If it is 5m per section, there are 10 slots and 9 vertical joints; if it is 10m per section, there are 5 slots and 4 vertical joints. The first and second phase slots are in the length direction of the strip wall type diaphragm wall.
[0132] S3: Fig.29 and Fig.30 As shown, a foundation pit 21 is excavated in the shaft-type ground-connected wall 1 and an inner lining 2 is constructed, so that the inner lining 2 and the inner wall of the shaft-type ground-connected wall 1 form an integral structure; wherein, the inner lining 2 is constructed synchronously during the excavation of the foundation pit 21, and the inner lining 2 adopts a reinforced concrete structure.
[0133] Furthermore, in step S3, the soil in the foundation pit 21 inside the shaft-type ground-connected wall 1 is excavated in layers, and the inner lining 2 is constructed by reverse construction method, so that the inner lining 2 and the shaft-type ground-connected wall 1 form a whole;
[0134] S4: Figure 31-Figure 34As shown, the main body is constructed layer by layer on the top of the strip-wall type ground-connecting wall 4 and the inner side of the lining 2, so that the main body, the lining 2 and the strip-wall type ground-connecting wall 4 form a whole;
[0135] S5: Figure 35-Figure 36 As shown, the anchor body 3 is constructed on the top of the main body, and the construction is completed. In step S5, the anchor blocks and the loose cable saddle 72 are cast in layers and blocks.
[0136] In this scheme, the construction of the shaft-type ground-connecting wall 1 provides safety conditions for the construction of the strip-wall ground-connecting wall 4. The construction of the shaft-type ground-connecting wall 1 and the construction of the strip-wall ground-connecting wall 4 provide safety conditions for the excavation of the foundation pit 21 in the shaft-type ground-connecting wall 1 and the construction of the lining 2. The construction of the lining 2 ensures the safety after the excavation of the foundation pit 21. After the excavation of the foundation pit 21 is completed, the main body is constructed layer by layer on the top of the strip-wall ground-connecting wall 4 and the inner side of the lining 2, so that the main body, the lining 2 and the strip-wall ground-connecting wall 4 form a whole and form an overall force. Anchor body 3 is constructed on the top of the main body for connecting cables. This construction method can ensure the safety of the entire construction process and can reduce the excavation scale of the shaft-type ground-connecting wall 1 and the foundation pit 21 and the casting scale of the main structure.
[0137] In some embodiments, in step S4, the following steps are included:
[0138] S4.1. After excavation to the top of the strip-wall ground connection wall 4 to form the pit bottom, Fig. 9 As shown, at this time, the lining 2 has been poured; the plain concrete in the top area of the strip-wall type ground-connected wall 4 is chiseled out, and a trumpet-shaped steel bar is set on the top of the strip-wall type ground-connected wall 4, such as Fig.10 As shown, the trumpet-shaped reinforcement corresponds to the second portion of the bottom plate 52 to be cast;
[0139] S4.2, pouring the cushion layer and the bottom concrete, and then pouring the bottom plate 5 other than the trumpet-shaped steel bars to form the first bottom plate 51, such as Fig.10 As shown, the first part of the bottom plate 51 and the inner lining 2 form a whole; the cushion layer can be a crushed stone layer, etc., by setting the crushed stone layer and then constructing the bottom sealing concrete, it is avoided that the base soil below the bottom plate 5 is turned up by directly pouring the bottom plate 5, thereby reducing the impact on the pouring quality of the bottom plate 5; after pouring the first part of the bottom plate 51, the first part of the bottom plate 51 is not connected to the strip wall type ground connection wall 4, and there is a base soil below, so that the base soil below the bottom plate 5 can be squeezed, so that the base soil forms a reaction force;
[0140] S4.3, pour the top plate 6 part above the first part of the bottom plate 51 to 4m-6m below the top surface of the top plate 6 to form the first part of the top plate lower part 61, such as the top 5m as the top plate upper part, such as Fig.11As shown, the lower portion 61 of the first top plate is integrated with the inner lining 2; at this time, the first bottom plate 51 is still not connected to the strip-wall type ground connection wall 4, so the lower portion 61 of the first top plate and the first bottom plate 51 can squeeze the base soil below the bottom plate 5 together, so that the base soil forms a greater reaction force;
[0141] S4.4, pour the trumpet-shaped steel bars on the top of the strip-wall type ground-connected wall 4 corresponding to the bottom plate 5 to form the second bottom plate 52, such as Fig.12 As shown, a complete bottom plate 5 is formed;
[0142] Further, in step S4.4, a concave-convex tenon 611 is provided on one side of the first part top plate lower portion 61 horizontally facing the strip wall type ground connecting wall 4. The concave-convex tenon 611 can effectively combine the first part top plate lower portion 61 and the second part top plate lower portion 62 to form a vertical shear bearing, forming an integral top plate 6 lower structure, and improving the overall force bearing capacity of the top plate 6.
[0143] S4.5, pour the top plate 6 portion above the second part bottom plate 52 to 4m-6m below the top surface of the top plate 6 to form the second part top plate lower portion 62, such as Fig.12 As shown, so that the lower part of the top plate 6 is formed;
[0144] S4.6, pour the remaining top plate 6 to form the top plate upper portion 63, such as Fig.12 As shown, a complete top plate 6 is formed, and the strip-walled ground wall 4, the bottom plate 5, the top plate 6 and the lining 2 are integrated;
[0145] In the above construction method, the second part bottom plate 52 is the part where the bottom plate 5 is connected to the strip-wall type ground-connected wall 4. The first part bottom plate 51 and the lower part 61 of the first part top plate are cast earlier than the second part bottom plate 52, which can make full use of the deadweight of the first part bottom plate 51 and the lower part 61 of the first part top plate to fully consolidate and compact the foundation soil below the bottom plate 5, and can make full use of the bearing effect of the foundation soil below the bottom plate 5 to reduce the force on the ground-connected wall. This can also indirectly reduce the scale of the ground-connected wall, making the scale of the strip-wall type ground-connected wall 4 in step S2 smaller, reducing the construction difficulty. Among them, the bottom plate and the strip-wall type ground-connected wall 4 are connected by rigid connection. The inner lining is a cast-in-place lining structure, which is a part of the anchor foundation structure and serves as an internal support during excavation. The top plate of the present invention is a cast-in-place solid structure, which is bonded to the inner lining during casting, and together they are part of the anchor foundation.
[0146] In the above scheme, when constructing the top plate 6, the top plate 6 is constructed layer by layer from bottom to top, and each layer of cooling pipes in the top plate 6 is arranged layer by layer, and the anchor body 3 steel bars are pre-embedded, so that the construction quality of the top plate 6 can be guaranteed.
[0147] With respect to the possible construction methods mentioned above, this embodiment provides a specific implementation method as a reference:
[0148] 1. Level the site, 1. Level the site to make the surface bumps and potholes level to the designed ground elevation. 2. Tamp the surface soil of the work site.
[0149] 2. Build the side ditch 8 and the construction platform, and construct the mixing pile 7. Fig.13 and Fig.14 As shown, 1. Construction layout, masonry ditch 8 and construction platform plane (not shown in the figure). 2. Both sides of the ground-connected wall (well-type ground-connected wall 1 and well-wall type ground-connected wall) are reinforced with mixing piles (or rotary jet piles).
[0150] 3. Digging a guide ditch 94 and building a guide wall 91 Fig.15 and Fig.16 As shown, 1. Underground continuous walls (shaft-type ground-connected wall 1 and shaft-type ground-connected wall) are measured and laid out, and trenches for the shaft-type ground-connected wall 1 and shaft-type ground-connected wall 91 are excavated (mixing piles are not shown). 2. Steel bars for the guide wall 91 are tied and formwork is erected, concrete is poured and cured. 3. Formwork is removed, and wooden supports are set between the two guide walls 91.
[0151] 4. Construction of trenching of shaft-type ground-connected wall 1 Fig.17 and Fig.18 As shown, 1. According to the division of unit trench sections, the first unit trench section 93 is constructed. 2. The construction is continued and the mud is continuously supplied until the excavation reaches the designed elevation.
[0152] 5. Clean the bottom, lower the steel cage, and pour the concrete. Fig.19 and Fig. 20 As shown, 1. The trench is mechanically shifted to remove the sediment at the base. 2. The steel cage is hoisted into place in the trench. 3. The underwater concrete of the ground-connected wall is poured to form the first unit wall 95 of the shaft-type ground-connected wall 1.
[0153] 6. Carry out the construction of the shaft-type ground-connected wall 1 of the remaining units in sequence. Fig.21 and Fig. 22 As shown, 1. Repeat the fourth and fifth steps until the shaft continuous wall is completed. 2. The shaft continuous wall 1 is constructed in stages according to the phase I and phase II trench sections. 3. After the strength of the two phase I trench sections reaches 80%, the middle phase II trench section is constructed. 4. Milling joints are used between the phase I and phase II trench sections.
[0154] 7. Construction of strip-type ground-connected wall 4 Fig.23 and Fig.24 As shown, 1. The first strip wall type ground connecting wall 96 in the middle is constructed, and the elevation of the top of the wall is slightly higher than the elevation of the bottom surface of the bottom plate 5. 2. The cavity section from the top of the wall to the ground surface is backfilled with soil.
[0155] 8. Carry out the construction of the strip wall type ground connecting wall 4 of the remaining units in sequence. Fig.25 and Fig.26As shown, 1. The other strip-wall type ground-connecting walls 4 are constructed from the middle to both sides. 2. The strip-wall type ground-connecting walls 4 are constructed in sections according to the phase I and phase II trench sections. 3. Rigid joints are used between the phase I and phase II trench sections.
[0156] IX. Excavation of foundation pit 21 and construction of lining 2 Fig. 27 and Fig.28 As shown, 1. Excavate the soil in the foundation pit 21 in layers according to the design requirements, and use the reverse construction method to construct the continuous wall lining 2. 2. After the cast lining 2 reaches the specified strength, continue excavation and construct the next lining 2 until it reaches 0.5m above the design elevation. The excavation of the foundation pit 21 needs to be carried out in different areas, and the lining 2 is cast within 36 hours after the excavation of each area. Fig. 27 , first construct the top of the lining 2 to form the beam cap 97.
[0157] 10. Construction of the top of the strip-type ground-connected wall 4 Fig.29 and Fig.30 As shown, 1. chisel out the top concrete of the strip wall type ground tie wall 4 which is higher than the bottom elevation of the bottom plate 5. 2. cut off the redundant steel cage at the top. 3. set the steel cage at the top of the wall into a trumpet shape.
[0158] 11. Pour the cushion concrete and construct the bottom plate 5. Fig.31 and Fig.32 As shown, 1. Continue excavation by manual assault until the designed elevation is reached. 2. Base treatment. 3. Pour cushion layer and bottom sealing concrete. 4. Construct the base plate 5.
[0159] 12. Construction of roof 6 Fig.33 and Fig.34 As shown, 1. Arrange cooling pipes in each layer of the top plate 6 and pre-embed the anchor body 3 steel bars. 2. Cast the foundation top plate 6 in blocks and layers.
[0160] The bottom plate 5 and the top plate 6 may be constructed in the manner of steps S4.1 to S4.6.
[0161] 13. Construction of anchor body 3 structure Fig.35 and Fig.36 As shown, 1. Layered and block cast anchor blocks and loose cable saddles 72 support piers to form the rear anchor surface 71. 2. Construction of the front anchor room floor and side walls. 3. Prestressing of anchor blocks, installation of main cable strand anchoring connection components, erection of loose cable saddles 72, and installation of main cable strands. 4. Construction of the front anchor room and removal of the brackets.
[0162] The present invention has a large overall rigidity of the anchor foundation and good stability. It can give full play to the self-stabilizing ability of the arch effect of the shaft-type ground-connected wall, reduce internal support measures, and realize large-area dry operation foundation pit construction. At the same time, it can also fully utilize the bearing function of the strip-wall type ground-connected wall. It is better suitable for geological conditions with deep rock strata, overcomes the high cost disadvantage of excavating the traditional ground-connected wall anchor foundation to the rock surface, has the advantages of small excavation volume, safe and convenient construction, short construction period, low cost, etc. It is a new foundation type that integrates safety, economy, green and environmental protection, and has a good engineering application prospect.
[0163] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A strip wall type underground continuous wall composite anchor foundation, characterized in that: include The shaft-type ground-connecting wall is in the shape of a circular ring, the shaft-type ground-connecting wall has a vertical axis, is located underground, and the top surface of the shaft-type ground-connecting wall is connected to the ground; The inner lining is fixedly arranged along the circumference of the inner wall of the shaft-type ground-connected wall, and the bottom depth of the inner lining is less than the depth of the shaft-type ground-connected wall; The main body is located inside the lining and is fixedly connected to the inner wall of the lining; An anchor body, which is fixedly connected to the upper part of the main body; Strip-wall type ground dummy wall, the strip-wall type ground dummy wall is arranged along the longitudinal direction of the bridge, the strip-wall type ground dummy wall is distributed at intervals along the transverse direction of the bridge, the strip-wall type ground dummy wall is arranged on the inner side of the lining, the strip-wall type ground dummy wall is fixed to the lower part of the main body, the bottom of the strip-wall type ground dummy wall enters the bearing layer, the bottom depth of the strip-wall type ground dummy wall is greater than the bottom depth of the shaft type ground dummy wall, and the top depth of the strip-wall type ground dummy wall is less than the bottom depth of the shaft type ground dummy wall.
2. The strip wall type underground continuous wall composite anchor foundation according to claim 1, characterized in that: The main body includes a top plate and a bottom plate; The top plate is fixed above the bottom plate, and the anchor body is fixedly connected above the top plate; The bottom plate includes a first bottom plate and a second bottom plate. The first bottom plate is cast earlier than the second bottom plate. The tops of the first and second bottom plates are connected to the top plate. The second bottom plate is a horn section. The upper part of the horn section is larger than the lower part. The lower part of the horn section is connected to the upper part of the wall in a strip wall style.
3. The strip wall type underground continuous wall composite anchor foundation according to claim 2, characterized in that: The lower part of the top plate is provided with a concave and convex tenon, which is arranged on the side of the lower part of the first part top plate above the first part bottom plate, and the lower part of the first part top plate is cast earlier than the second part bottom plate.
4. The strip wall type underground continuous wall composite anchor foundation according to claim 2, characterized in that: The net distance between the edge of the strip-wall type ground connection wall and the inner edge of the lining shall not be less than 1m.
5. A strip wall type underground continuous wall composite anchor foundation according to any one of claims 1 to 4, characterized in that: The shaft-type ground-connected wall includes a vertical joint, the vertical joint of the shaft-type ground-connected wall is a milling joint, and the depth of the bottom of the shaft-type ground-connected wall is lower than the depth of the bearing stratum; and / or, The lining is arranged in steps along the depth, with the lower part of the lining being larger than the upper part; and / or, The strip-wall type ground-connected walls are arranged in parallel with equal spacing.
6. The strip wall type underground continuous wall composite anchor foundation according to claim 5, characterized in that: The wall spacing of the strip-wall type ground-connected wall is 6d~10d, and d is the wall thickness of the strip-wall type ground-connected wall.
7. The strip wall type underground continuous wall composite anchor foundation according to claim 6, characterized in that: The strip-wall type ground-connecting wall has vertical joints, and the vertical joints of the strip-wall type ground-connecting wall are rigid joints.
8. A construction method for a strip-wall underground continuous wall composite anchor foundation, characterized in that: Used for constructing the strip-wall underground continuous wall composite anchor foundation described in any one of claims 1 to 7, The following steps are involved: S1: Construction of shaft-type ground connection wall; S2: Construction of strip-wall ground-connected wall; S3: excavate the foundation pit inside the shaft-type ground-connected wall and construct the inner lining so that the inner lining and the inner wall of the shaft-type ground-connected wall form an integral structure; S4: construct the main body layer by layer upwards on the top of the strip-wall type ground-connected wall and the inner side of the inner lining, so that the main body, the inner lining and the strip-wall type ground-connected wall form a whole; S5: Anchor body is constructed on the top of the main body and the construction is completed.
9. The construction method of a strip-wall underground continuous wall composite anchor foundation according to claim 8, characterized in that: The method includes the following steps before step S1: leveling the site, and then constructing guide walls of shaft-type ground-connected walls and strip-wall-type ground-connected walls; In step S1, the first phase trench section and the second phase trench section trench section of the shaft type ground diaphragm wall are constructed to form a closed annular shaft type ground diaphragm wall enclosure structure; In step S2, the first phase trench section and the second phase trench section ground diaphragm wall of the strip wall type ground diaphragm wall are constructed to form a parallel strip wall type ground diaphragm wall structure; In step S3, the soil in the foundation pit inside the shaft-type ground-connected wall is excavated in layers, and the inner lining is constructed by reverse construction method, so that the inner lining and the shaft-type ground-connected wall form a whole; In step S4, the following steps are included: S4.
1. After excavating to the top of the strip-wall ground diaphragm to form the pit bottom, remove the plain concrete in the top area of the strip-wall ground diaphragm and install trumpet-shaped steel bars at the top of the strip-wall ground diaphragm; S4.2, pour the cushion layer and bottom sealing concrete, and then pour the bottom plate part other than the trumpet-shaped steel bars to form the first bottom plate, so that the first bottom plate and the inner lining form a whole; S4.3, pour the top plate portion above the first part of the bottom plate to 4m-6m below the top plate top surface to form the first part of the top plate lower portion, and make the first part of the top plate lower portion and the lining form a whole; S4.
4. Cast the trumpet-shaped steel bars at the top of the strip-wall ground-connected wall corresponding to the bottom plate to form a second bottom plate, so as to form a complete bottom plate; S4.5, pour the top plate portion above the second part bottom plate to 4m-6m below the top plate top surface to form the second part top plate lower portion, so as to form the top plate lower portion; S4.
6. Cast the remaining top plate portion to form the upper portion of the top plate, so as to form a complete top plate, and to form a whole with the strip-wall type ground connecting wall, bottom plate, top plate and inner lining; In step S5, anchor blocks and loose cable saddle buttresses are cast in layers and blocks.
10. The construction method of a strip wall type underground continuous wall composite anchor foundation according to claim 9, characterized in that: In step S4.4, a concave and convex tenon is provided on one side of the lower part of the first part of the top plate which is horizontally facing the strip-wall type floor connecting wall.
11. The construction method of a strip wall type underground continuous wall composite anchor foundation according to claim 9, characterized in that: When constructing the top slab, it is constructed in layers from bottom to top, cooling pipes are arranged layer by layer in the top slab, and anchor reinforcement is embedded in advance.
12. A construction method for a strip-wall type underground continuous wall composite anchor foundation according to any one of claims 8 to 11, characterized in that: In step S2, the strip-wall type ground ties in the middle are constructed first, and then the strip-wall type ground ties on both sides are constructed; and / or, In step S1, before excavating the guide walls on both sides of the shaft type ground diaphragm wall and the strip wall type ground diaphragm wall, the trench wall reinforcement is first constructed on both sides of the shaft type ground diaphragm wall and the strip wall type ground diaphragm wall.
Citation Information
Patent Citations
Complex anchorage foundation with mixed diaphragm wall and gravity type anchorage which are weighted commonly
CN104196048A
Construction method for super-large-diameter hollow pile-group anchorage
CN107642040A
Sheet pile type anchorage structure and construction method thereof
CN111794102A
Double-layer concentric-square-shaped composite concrete diaphragm wall anchorage foundation and construction method thereof
CN112376599A
Composite anchorage foundation of underground diaphragm wall enlarged-diameter steel pipe pile and construction method of composite anchorage foundation
CN113006113A