Construction dredging treatment equipment and method
By using conversion units and bevel gear systems in dredging equipment to achieve synchronous replacement of multiple sets of tools, combined with excavation heads and dredging guide channels, the problem of inconvenient tool replacement in traditional equipment is solved, efficiency and adaptability are improved, and maintenance costs are reduced and operational complexity.
Patent Information
- Application Number
- CN202411363687.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-28
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-09-28
AI Technical Summary
Traditional dredging equipment cannot flexibly replace tools or cannot replace multiple sets of tools at the same time, resulting in problems such as low operating efficiency, poor equipment adaptability, high maintenance costs and complex and cumbersome operations.
A construction dredging treatment equipment is designed to realize the synchronous rotation adjustment of multiple sets of wide-edge tools and spiral tools through the conversion unit and bevel gear system, and combine the excavation head and dredging guide channel to simplify tool replacement and operation process.
It realizes time savings in tool replacement, improves operating efficiency and equipment adaptability, reduces maintenance costs and operation difficulty, and ensures the accuracy of tool position and dredging effect accuracy.
Smart Images

Figure HDA0005065559950000011 
Figure HDA0005065559950000021 
Figure HDA0005065559950000031
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of dredging construction, and in particular relates to a construction dredging processing device and method. Background Art
[0002] Dredging is the process of clearing, widening or deepening rivers, lakes and other waters, and excavating underwater earth and stone using manpower or machinery. The main purposes of dredging projects are: excavating harbors, access channels, etc., filling land to build docks, port areas and port-side industrial areas, coastal urban land and recreational land, shore maintenance, water conservancy flood control and reservoir dredging, water environment improvement and ecological restoration of rivers, lakes and seas, and construction and landfill of various underwater pipeline trenches.
[0003] However, existing traditional dredging equipment has limitations in tool configuration, such as the inability to flexibly replace tools: previous dredging equipment usually adopts a fixed tool design, that is, the widening tool and the dredging tool are fixedly installed on the equipment. In the case of different operations (such as switching from widening operations to dredging operations), the equipment cannot flexibly replace multiple sets of tools set in the circumference; although some equipment has the function of tool replacement, it can only replace a single set in sequence, and it is impossible to replace multiple sets of tools at the same time, which brings many inconveniences to dredging construction:
[0004] 1. Low operating efficiency: Since multiple sets of cutters cannot be replaced at the same time, it takes a lot of time to change the cutters one by one from widening operation to dredging operation or vice versa. For example, in a large dredging project, if the operation mode needs to be switched frequently, each cutter replacement process will waste at least several hours or even longer, causing the progress of the entire dredging project to lag seriously.
[0005] 2. Poor equipment adaptability: The dredging environment is complex and changeable. Different areas require different operating methods. The inability to flexibly replace the cutter makes it difficult for the equipment to quickly adapt to different operating requirements. For example, when encountering a narrow area that needs to be dredged, if the spiral cutter cannot be replaced in time, the equipment cannot work effectively and may even be damaged.
[0006] 3. Increased maintenance costs: Because the tool cannot be replaced efficiently, the equipment will barely operate under an inappropriate tool configuration, which will cause excessive wear and damage to the tool and increase the tool loss rate; at the same time, due to uneven tool wear, it will affect the overall performance of the equipment, further increasing the maintenance cost and difficulty of the equipment.
[0007] 4. Complex and cumbersome operation: The operator needs to replace each set of tools separately, which not only increases the labor intensity of the operator, but also easily leads to operational errors. For example, in the process of replacing the tools one by one, problems such as the tools being installed loosely or the tools being installed in the wrong position may occur, affecting the normal operation of the equipment.
[0008] Based on the above-mentioned defects, the present invention is now proposed. Summary of the invention
[0009] In view of the problem that the conventional dredging equipment in the prior art cannot realize flexible replacement of cutting tools, or cannot realize simultaneous replacement of multiple sets of cutting tools, which brings many inconveniences to dredging construction, the present invention provides a construction dredging processing equipment and method, which can flexibly realize simultaneous replacement of cutting tools, save the time of cutting tool replacement in different working environments, improve working efficiency, and the equipment can adapt to the complex environment of different situations, reduce unnecessary cutting tool loss caused by failure to replace cutting tools in time, reduce maintenance costs, and realize simultaneous switching of multiple sets of cutting tools more simply, avoiding mistakes caused by cumbersome operating steps. Its specific technical scheme is as follows:
[0010] A construction dredging processing equipment, comprising a first chamber, a rotating seat is rotatably provided at the top of the first chamber, a cylinder is fixedly installed at the top of the cylinder, the cylinder is arranged in a hollow cylindrical shape, a top seat is communicated with the top of the cylinder, a conversion unit is arranged at the cylinder and the inner cavity of the top seat, a plurality of groups of tool assemblies are rotatably provided at the side wall of the top seat, each group of the tool assemblies comprises a wide blade tool and a spiral tool, and the synchronous transformation of the positions of the wide blade tool and the spiral tool in each group of the tool assembly is realized by the conversion unit;
[0011] The conversion unit includes a second rotating shaft rotatably arranged in the middle of the inner cavity of the top seat in the vertical direction, a second bevel gear is fixedly installed on the top end of the second rotating shaft, a plurality of first bevel gears are equidistantly arranged on the second bevel gear along the circumferential direction, and each of the first bevel gears is respectively meshed and connected with the second bevel gear, a first rotating shaft is passed through and fixedly installed at the center of each of the first bevel gears, and the first rotating shaft passes through the side wall of the top seat toward the outside, a connecting block is rotatably connected to the top end of the first rotating shaft, a first connecting seat is fixedly connected to the bottom end of the first rotating shaft, and the first connecting seat is connected to the top ends of the wide blade tool and the spiral tool;
[0012] Among them, a plurality of mounting seats are installed at equal intervals along the circumferential direction on the top end of the inner wall of the top seat, and the number of the mounting seats is the same as the number of the connecting blocks, and each of the connecting blocks is fixedly connected to the inner cavity of the mounting seat at a corresponding position.
[0013] In the above technical solution, each group of the wide-blade tools and the bottom end of the spiral tools are respectively installed with a second connecting seat, and each of the second connecting seats is rotatably connected to a connecting column on the side facing away from the first connecting seat, and a plurality of groups of support columns are equidistantly arranged on the side wall of the rotating seat along the circumferential direction, and each of the support columns corresponds to the position of each of the connecting columns, and the support columns are fixedly connected to the connecting columns.
[0014] In the above technical solution, the angle between the wide-blade tool and the support column is set to a range of 60 degrees to 90 degrees.
[0015] In the above technical solution, the inner cavity of the cylinder is provided with a power mechanism for driving the second rotating shaft to rotate;
[0016] The power mechanism includes a motor frame and a support arm respectively fixedly mounted on the top of the rotating seat, a first motor is arranged on the support arm, a third rotating shaft is connected to the output end of the first motor, and the third rotating shaft is rotatably connected to the side wall of the support arm, a turntable is fixedly mounted on the third rotating shaft, a plurality of second teeth are provided on the side wall of the turntable, an elastic paddle is vertically mounted on the inner wall of the turntable, and the elastic paddle corresponds to the second teeth in the inner and outer sides.
[0017] In the above technical solution, the second rotating shaft is vertically and rotatably arranged on the support arm from top to bottom, a disc is installed at the bottom end of the second rotating shaft, and six first teeth are arranged on the side wall of the disc, and each three first teeth form a group and are symmetrically arranged on the side wall of the disc, and each three first teeth are rotatably embedded in the first teeth, and two fixing pins are respectively vertically installed at the bottom end of the disc, and each fixing pin corresponds to the position of each group of the first teeth;
[0018] Wherein, the circumferential rotation of the elastic paddle can drive the fixing pin to be forced to rotate.
[0019] In the above technical solution, an excavating head is fixedly installed on the top of the top seat, a rotating column is fixedly installed in the middle of the bottom end of the rotating seat, and the bottom end of the rotating column is rotatably connected to the inner wall of the first chamber, a first gear is installed on the side wall of the rotating column, and a fourth rotating shaft is vertically and rotatably connected to the bottom end of the rotating seat, a second gear is fixedly installed on the fourth rotating shaft, the second gear is meshingly connected to the first gear, a second motor is provided in the inner cavity of the first chamber, and the output end of the second motor is connected to the fourth rotating shaft.
[0020] In the above technical solution, a fixing column is vertically and fixedly installed in the middle of the bottom end of the first chamber, a plurality of fixing arms are installed on the side walls of the fixing column, a second chamber is installed on the outer end of the fixing arm, the second chamber is a hollow cylinder, and the vertical center axis of the second chamber is colinear with the vertical center axis of the first chamber, four groups of first side panels are rotatably arranged on the top end of the second chamber, each side wall of the first side panel is respectively installed with a second side panel, and the second side panels are arranged in an inverted triangle shape.
[0021] In the above technical solution, the opening and closing angles of each group of the first side panels and the second side panels are adjusted by an adjustment unit. When the second side panel is in a tightly closed state with an adjacent group of the first side panels, the first side panel, the second side panel and the second chamber form a dredging guide channel. When the second side panel is in a separated state with an adjacent group of the first side panels, the second side panel and the first side panel extend outward to assist in dredging and hole expansion.
[0022] In the above technical solution, the adjustment unit includes a fixing seat fixedly mounted on the side wall of each first side plate, the fixing seat side wall is provided with a slide groove, a slider is slidably embedded in the slide groove, one end of a support rod is rotatably connected to the slider, a lifting frame is slidably sleeved on the second chamber, and the other end of the support rod is rotatably connected to the lifting frame, a cylinder is installed on the second chamber, and the output end of the cylinder is connected to the lifting frame;
[0023] Wherein, the cross-sectional shape of the slide groove is T-shaped.
[0024] The present invention also provides a construction dredging treatment method, comprising the following steps:
[0025] S1: Equipment pre-adjustment
[0026] According to the operation conditions of widening operation and dredging operation, adjust the corresponding tool to switch to the outside of the equipment:
[0027] Mode 1: During widening operation, multiple wide-blade cutters arranged in the circumferential direction are synchronously adjusted to the outside through the conversion unit;
[0028] Mode 2: During dredging operations, multiple spiral cutters arranged in the circumferential direction are synchronously adjusted to the outside through the conversion unit;
[0029] S2: Construction
[0030] The excavator head and multiple sets of wide-blade cutters and spiral cutters arranged in the circumference are rotated synchronously by the same driving force, so as to realize the joint action of pre-drilling and subsequent hole expansion operation;
[0031] S3: According to the two constructions of dredging hole expansion and dredging guidance, it is necessary to adjust the opening and closing angles of the first side plate and the second side plate
[0032] Scenario 1: During dredging and hole expansion, each set of first side plates and second side plates are adjusted to the maximum extension through the adjustment unit;
[0033] Scenario 2: During dredging guidance, each set of first side plates and second side plates are adjusted and retracted to a minimum through the adjustment unit, so that each set of first side plates and second side plates are closely fitted;
[0034] Among them, S1 and S3 can be used in combination as follows:
[0035] Method 1: S1 mode 1 + S3 scenario 1;
[0036] Method 2: S1 mode 1 + S3 scenario 2;
[0037] Method 3: S1 Mode 2 + S3 Scenario 1;
[0038] Method 4: S1 mode 2 + S3 scenario 2.
[0039] Compared with the prior art, the construction dredging equipment and method of the present invention have the following beneficial effects:
[0040] 1. In view of the problem that traditional dredging equipment cannot realize flexible replacement of tools, or cannot realize simultaneous replacement of multiple sets of tools, which brings many inconveniences to dredging construction, the present invention can realize the synchronous rotation and adjustment of the positions of multiple sets of wide-blade tools and spiral tools through the cooperation of the second bevel gear and multiple first bevel gears, and can flexibly realize the replacement of tools. Multiple sets of tools can be replaced at the same time, which saves the time of tool replacement in different working environments and improves working efficiency. The equipment can adapt to complex environments in different situations, reduce unnecessary tool loss caused by failure to replace tools in time, reduce maintenance costs, and realize simultaneous switching of multiple sets of tools more simply, avoiding mistakes caused by cumbersome operating steps;
[0041] Second, the present invention can realize synchronous rotation of all wide blade cutters and spiral cutters by rotating the second bevel gear, and ensure that each group of wide blade cutters and spiral cutters flip the same after rotation, thereby ensuring that each group of wide blade cutters and spiral cutters have the same angle after rotation, ensuring that each group of wide blade cutters or spiral cutters can play the same role in the circumference of the equipment when the subsequent equipment is working, avoiding the problem that the construction effect of a certain position of the circumference of the equipment is adversely affected due to uneven positions of each group of wide blade cutters or spiral cutters after a single adjustment position;
[0042] 3. The present invention promotes the intermittent rotation of the disc, the first teeth and the fixing pin through the first motor, the third rotating shaft, the rotating disc, the second teeth and the elastic paddle, thereby promoting the intermittent rotation of the second bevel gear, and can realize the automatic locking and stability after the second bevel gear rotates. By means of the intermittent rotation characteristics of the second bevel gear, multiple groups of first bevel gears are driven to perform intermittent rotation operations synchronously, and the self-locking function of the second bevel gear after the intermittent rotation is utilized, so that multiple groups of first bevel gears can also achieve self-locking after completing the intermittent rotation. Furthermore, through the coordinated cooperation between the disc, the first teeth and other related components, the rotation behavior of multiple groups of wide-blade tools and spiral tools and the self-locking state after rotation can be effectively controlled. The entire adjustment process is simple and easy, the positioning state after the adjustment is completed is stable and reliable, and the switching between the rotation mode and the positioning mode can be carried out smoothly.
[0043] Fourth, in the present invention, when the third rotating shaft, the rotating disk and the elastic paddle complete a 360-degree rotation, the disc, the first tooth, the fixing pin, the second rotating shaft and the second bevel gear will be driven to rotate 180 degrees, thereby driving multiple groups of first bevel gears to rotate 180 degrees synchronously, thereby realizing that each group of the first bevel gear, the first connecting seat, the wide blade tool and the spiral tool rotates 180 degrees; with the help of the intermittent rotation of the second bevel gear each time, the position of multiple groups of wide blade tools and spiral tools can be adjusted, and after the adjustment is completed, it can be ensured that the position of the wide blade tool and the spiral tool is facing the outside of the equipment, so that the tool is in the correct position, avoiding incomplete dredging caused by tool position deviation, and improving the accuracy of the dredging effect, thereby providing a guarantee for the subsequent smooth dredging operation;
[0044] 5. The present invention arranges an excavating head on the top of the top seat, so that when the equipment is in operation, the excavating head can first perform a rotary dredging operation on the construction position to form a prefabricated borehole, and then the wide-blade tool or spiral tool arranged circumferentially of the equipment can be used to further expand the prefabricated borehole. In this way, the jamming and adjustment time of the wide-blade tool and the spiral tool during the operation are reduced, and the efficiency of drilling and expanding the hole is improved. Compared with directly using the wide-blade tool and the spiral tool for drilling, this operation method effectively reduces the wear of the wide-blade tool and the spiral tool, and the step-by-step operation method of the excavating head performing rotary dredging to form a prefabricated borehole and the wide-blade tool or the spiral tool for expanding the hole makes the entire drilling and expanding process smoother and more efficient;
[0045] Sixth, the present invention can drive the rotating seat to rotate relative to the first chamber through the second motor, the second gear, the fourth shaft, the first gear, and the rotating column, so that the components above the rotating seat can rotate synchronously with the rotating seat, that is, the excavator head and multiple groups of wide-blade cutters and spiral cutters arranged circumferentially can rotate synchronously through the same driving force. The same driving force ensures that the movement rhythm of the excavator head, the wide-blade cutter and the spiral cutter is completely consistent during the rotation process. In the dredging operation, the connection between the prefabricated drilling and the subsequent hole expansion operation is smooth, and the jamming or operation interruption caused by asynchronous rotation is avoided. The mechanical structure of the equipment is simplified, which not only reduces the number of parts of the equipment, but also reduces the manufacturing cost and assembly difficulty of the equipment, and the control system is more concise and efficient.
[0046] 7. The materials generated in the existing dredging operation are easy to accumulate at the holes and affect the subsequent operations. To solve this problem, the present invention provides a dredging guide channel composed of multiple groups of first side plates, second side plates and second chambers under the first chamber. The dredged materials enter the second chamber under the guidance of the first side plates and the second side plates and are discharged. With the existing vibration motor, the materials can be discharged smoothly at the first side plates, the second side plates and the second chamber, avoiding the stagnation of the operation caused by the accumulation of materials at the holes, and providing guarantee for the continuous operation of the subsequent dredging project.
[0047] 8. In the present invention, the opening and closing angles of each group of first side plates and second side plates can be flexibly adjusted. In the excavation stage, the first side plates and second side plates are extended to the maximum, so that the free ends of each group of first side plates and second side plates are in contact with the inner wall of the hole, so as to realize further hole expansion construction of the hole excavation and realize the superposition effect of dredging and hole expansion construction; when the first side plates and second side plates are contracted and extended to the minimum, the first side plates and second side plates form a dredging guide channel around the bottom of the first chamber, and the first side plates and second side plates at this time are located on the relative inner sides of the bottom end of the wide blade tool, that is, when the wide blade tool or the spiral tool is expanding the hole, the second side plates and the first side plates in the contracted state will not contact the inner wall of the hole, so as to reduce the dredging resistance and ensure the normal guiding effect of materials in narrow environment operation;
[0048] IX. The present invention can achieve synchronous opening and closing angle adjustment of multiple groups of first side plates and second side plates arranged in the circumferential direction through the arrangement of the cylinder, the lifting frame and the support rod, thereby ensuring the coordination and consistency of each group of first side plates and second side plates after adjustment, thereby ensuring that each group of first side plates and second side plates can play the same hole expansion role in the circumference of the equipment in the extended state, and ensuring that the adjustment angles of two adjacent groups of first side plates and second side plates in the contracted state are the same, so as to ensure that the first side plates and second side plates in the subsequent contracted state are tightly connected to form a tight dredging guide channel;
[0049] 10. The present invention can flexibly meet the two construction requirements of dredging and expanding holes or material dredging and guiding by providing multiple groups of first side panels and second side panels that can be adjusted for opening and closing angles synchronously. The same component realizes multiple functions. Operators do not need to perform complicated component replacement operations. They only need to adjust the opening and closing angles of the first side panels and the second side panels to switch the construction functions. The construction requirements of different construction scenes and construction stages can be met without replacing equipment components, and there is no need to configure multiple independent components for different functions, which saves installation space inside the equipment.
[0050] 11. The first side plate and the second side plate of the present invention in the extended state have sharp ends, which can achieve better deep digging with the inner wall of the hole during hole expansion and enhance the hole expansion effect;
[0051] 12. By setting the angle between the wide blade tool and the support column to 60 to 90 degrees, it is ensured that the wide blade tool and the spiral tool can extend outward by a sufficient distance in this range to ensure a sufficient hole expansion radius, so that the hole expansion effect can meet the expected requirements;
[0052] In summary, the present invention can flexibly realize the simultaneous replacement of tools, save the time of tool replacement in different working environments, improve working efficiency, the equipment can adapt to the complex environment of different situations, reduce unnecessary tool loss caused by the failure to replace tools in time, reduce maintenance costs, and at the same time, the operation of synchronous switching of multiple groups of tools is simpler, avoiding mistakes caused by cumbersome operating steps, and the angles of each group of wide-blade tools and spiral tools after rotation are the same, ensuring that they play the same role in the circumference of the equipment. In addition, the positions of multiple groups of wide-blade tools and spiral tools can be adjusted, and after the adjustment is completed, it can be ensured that the positions of the wide-blade tools and spiral tools are facing the outside of the equipment, so that the tools are in the correct position, avoiding tool position errors. Incomplete dredging caused by deviation improves the accuracy of dredging effect, thereby providing guarantee for the smooth subsequent dredging operations. In addition, the same driving force is used to realize the synchronous rotation of the excavator head and multiple sets of wide-blade cutters and spiral cutters arranged circumferentially to ensure that their movement rhythm is completely consistent, which promotes the smooth connection between prefabricated drilling and subsequent hole expansion operations. A dredging guide channel composed of multiple sets of first side plates, second side plates and second chambers is also provided, which can flexibly meet the two construction needs of dredging hole expansion or material dredging guidance. The same component realizes multiple functions. The construction function can be switched by adjusting the opening and closing angles of the first side plate and the second side plate. The construction needs of different construction scenes and construction stages can be met without replacing equipment parts. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 It is a structural schematic diagram of the first chamber of the present invention;
[0054] Figure 2 It is a structural schematic diagram of the second chamber of the present invention;
[0055] Figure 3 for Figure 2 A magnified image of point A;
[0056] Figure 4 It is a schematic diagram of a partial cross-sectional structure of the top seat of the present invention;
[0057] Figure 5 A schematic diagram of the structure of the disc of the present invention viewed from one angle;
[0058] Figure 6 is a schematic diagram of the structure of the disc of the present invention viewed from another angle;
[0059] Figure 7 It is a schematic diagram of a partial cross-sectional structure of the first chamber of the present invention;
[0060] Figure 8 It is a bottom view structural schematic diagram of the fixed arm of the present invention;
[0061] Fig. 9 It is a structural schematic diagram of the first side plate of the present invention;
[0062] Fig.10 It is a structural schematic diagram of the second side panel of the present invention in an unfolded state;
[0063] Fig.11 It is a structural schematic diagram of the first side panel of the present invention in an unfolded state;
[0064] Figures 1 to 11 1. first chamber, 2. rotating seat, 3. cylinder, 4. top seat, 5. excavator head, 6. mounting seat, 7. connecting block, 8. first rotating shaft, 9. first bevel gear, 10. first connecting seat, 11. wide blade tool, 12. spiral tool, 13. second connecting seat, 14. connecting column, 15. supporting column, 16. motor frame, 17. supporting arm, 18. second rotating shaft, 19. second bevel gear, 20. disc, 21. first tooth, 22. fixed Pin, 23, first motor, 24, third rotating shaft, 25, turntable, 26, second tooth, 27, elastic paddle, 28, rotating column, 29, first gear, 30, fourth rotating shaft, 31, second gear, 32, second motor, 33, fixed column, 34, fixed arm, 35, second chamber, 36, first side plate, 37, second side plate, 38, fixed seat, 39, slide groove, 40, slider, 41, support rod, 42, lifting frame, 43, cylinder. DETAILED DESCRIPTION
[0065] The following is a combination of specific implementation cases and attached Figures 1 to 11 The present invention is further described below, but the present invention is not limited to these embodiments.
[0066] Main references Figures 1 to 9As shown, a construction dredging processing equipment comprises a first chamber 1, a rotating seat 2 is arranged at the top of the first chamber 1 through a bearing, the rotating seat 2 can rotate relative to the first chamber 1, a cylinder 3 is fixedly installed at the top of the cylinder 3, the cylinder 3 is arranged in a hollow cylindrical shape, a top seat 4 is connected to the top of the cylinder 3, a conversion unit is arranged in the inner cavity of the cylinder 3 and the top seat 4, a plurality of groups of tool assemblies are arranged on the side wall of the top seat 4 along the circumferential direction, specifically, six groups of tool assemblies are arranged, each group of tool assemblies comprises a wide blade tool 11 and a spiral tool 12, and the synchronous transformation of the positions of the wide blade tool 11 and the spiral tool 12 in each group of tool assemblies is realized through the conversion unit, when widening operation, the wide blade tool 11 is adjusted to face the outside of the equipment, and when dredging operation, the spiral tool 12 is adjusted to face the outside of the equipment;
[0067] Main references Figure 1 , Figure 3 and 4 As shown, the conversion unit includes a second rotating shaft 18 rotatably arranged in the middle of the inner cavity of the top seat 4 in the vertical direction, a second bevel gear 19 is fixedly installed on the top end of the second rotating shaft 18, and a plurality of first bevel gears 9 are equidistantly arranged on the second bevel gear 19 along the circumferential direction. Specifically, six first bevel gears 9 are arranged, and each first bevel gear 9 is respectively meshed and connected with the second bevel gear 19, a first rotating shaft 8 is passed through and fixedly installed at the center of each first bevel gear 9, and the first rotating shaft 8 passes through the side wall of the top seat 4 outwardly, the top end of the first rotating shaft 8 is rotatably connected to the connecting block 7 through a bearing, that is, the first rotating shaft 8 can rotate relative to the connecting block 7, and the bottom end of the first rotating shaft 8 is fixedly connected to the first connecting seat 10, through the first rotating shaft The rotation of the shaft 8 drives the first connecting seat 10 to rotate synchronously, and the first connecting seat 10 is connected to the top ends of the wide blade tool 11 and the spiral tool 12. The wide blade tool 11 and the spiral tool 12 are driven to rotate synchronously by the rotation of the first connecting seat 10, so as to realize the adjustment and conversion of the positions of the wide blade tool 11 and the spiral tool 12; wherein, a plurality of mounting seats 6 are equidistantly installed at the top end of the inner wall of the top seat 4 along the circumferential direction, specifically, six mounting seats 6 are provided, and the number of mounting seats 6 is the same as that of the connecting blocks 7, and each connecting block 7 is fixedly connected to the inner cavity of the mounting seat 6 at the corresponding position, and the rotation of the first rotating shaft 8 is supported by the connecting blocks 7 and the mounting seats 6, so as to ensure that the first rotating shaft 8 can rotate stably;
[0068] By rotating the second bevel gear 19, multiple groups of first bevel gears 9 arranged circumferentially are driven to rotate synchronously, thereby driving the first rotating shaft 8, the first connecting seat 10, the wide-blade tool 11, the spiral tool 12 and the second connecting seat 13 corresponding to each group of first bevel gears 9 to rotate synchronously, thereby realizing the adjustment of the positions of the wide-blade tool 11 and the spiral tool 12.
[0069] Main references Figure 4As shown, the bottom end of each group of wide blade tools 11 and spiral tools 12 is respectively installed with a second connecting seat 13, and each second connecting seat 13 is rotatably connected to a connecting column 14 on the side away from the first connecting seat 10. A plurality of supporting columns 15 are equidistantly arranged on the side wall of the rotating seat 2 along the circumferential direction, and each supporting column 15 corresponds to the position of each connecting column 14, and the supporting column 15 is fixedly connected to the connecting column 14. When the wide blade tool 11 and the spiral tool 12 rotate, the second connecting seat 13 can be driven to rotate relative to the connecting column 14, and the connecting column 14 can be stabilized by the supporting column 15. Fixed support ensures that the second connecting seat 13 can remain stable when rotating relative to the connecting column 14; specifically, the angle range between the wide blade tool 11 and the support column 15 is set to 60 degrees to 90 degrees. When the angle is 60 degrees, the wide blade tool 11 and the spiral tool 12 extend outward by the longest distance. When the angle is 90 degrees, the wide blade tool 11 and the spiral tool 12 extend outward by the shortest distance. Within this range, it can ensure that the wide blade tool 11 and the spiral tool 12 extend outward at a sufficient distance to ensure that there is a sufficient hole expansion radius, so that the hole expansion effect meets the expected requirements.
[0070] Main references Figures 3 to 6As shown, the inner cavity of the cylinder 3 is provided with a power mechanism for driving the second rotating shaft 18 to rotate; the power mechanism includes a motor frame 16 and a support arm 17 respectively fixedly mounted on the top of the rotating seat 2, a first motor 23 is arranged on the support arm 17, an output end of the first motor 23 is connected to a third rotating shaft 24, and the third rotating shaft 24 is rotatably connected to the side wall of the support arm 17 through a bearing, a rotating disk 25 is fixedly mounted on the third rotating shaft 24, a plurality of second teeth 26 are provided on the side wall of the rotating disk 25, and an elastic paddle 27 is vertically mounted on the inner wall of the rotating disk 25 , and the elastic paddle 27 corresponds to the second tooth 26 in the inside and outside positions, and the first motor 23 is turned on to drive the third shaft 24, the turntable 25, the second tooth 26, and the elastic paddle 27 to rotate clockwise; the second shaft 18 is vertically and rotatably arranged on the support arm 17 from top to bottom, and a disk 20 is installed at the bottom end of the second shaft 18. Six first teeth 21 are arranged on the side wall of the disk 20, and every three first teeth 21 are symmetrically arranged on the side wall of the disk 20 as a group, and every three first teeth 21 can be rotatably embedded in the second Two fixing pins 22 are respectively installed vertically at the bottom of the disc 20 in the teeth 26, and each fixing pin 22 corresponds to the position of each group of first teeth 21; wherein, the circumferential rotation of the elastic paddle 27 can drive the fixing pin 22 to be forced to rotate, specifically, the elastic paddle 27 corresponds to the end position of the second teeth 26 in the clockwise direction inside and outside, so as to ensure that after the rotating elastic paddle 27 drives the fixing pin 22 to rotate, the first teeth 21 then immediately meshes with the second teeth 26, so as to realize the clockwise engagement of the first teeth 21 and the second teeth 26. The first motor 23 is turned on to drive the third rotating shaft 24, the rotating disk 25, the second teeth 26, and the elastic paddle 27 to rotate clockwise. When the elastic paddle 27 rotates to touch the fixed pin 22 on the left, the fixed pin 22 on the left will be caused to rotate simultaneously with the elastic paddle 27. At this time, the three adjacent first teeth 21 of the fixed pin 22 on the left rotate and mesh with the second teeth 26, so that the disk 20 and the first teeth 21 rotate counterclockwise synchronously, so as to drive the second rotating shaft 18 and the second bevel gear 19 to rotate counterclockwise at the same time.
[0071] When the third rotating shaft 24, the rotating disk 25 and the elastic paddle 27 complete a 360-degree rotation, the disc 20, the first tooth 21, the fixing pin 22, the second rotating shaft 18 and the second bevel gear 19 will be driven to rotate 180 degrees, thereby driving multiple groups of first bevel gears 9 to rotate 180 degrees synchronously, thereby realizing that each group of the first bevel gear 9, the first connecting seat 10, the wide-blade tool 11 and the spiral tool 12 rotates 180 degrees; with the help of the intermittent rotation of the second bevel gear 19 each time, the position of the multiple groups of wide-blade tools 11 and the spiral tool 12 can be adjusted, and after the adjustment is completed, it can be ensured that the position of the wide-blade tool 11 and the spiral tool 12 is facing the outside of the equipment, so that the tool is in the correct position, avoiding incomplete dredging caused by tool position deviation, and improving the accuracy of the dredging effect, thereby providing a guarantee for the subsequent smooth dredging operation.
[0072] Other main references Figure 7 As shown, an excavating head 5 is fixedly installed on the top of the top seat 4, a rotating column 28 is fixedly installed in the middle of the bottom end of the rotating seat 2, and the bottom end of the rotating column 28 is rotatably connected to the inner wall of the first chamber 1 through a bearing, a first gear 29 is installed on the side wall of the rotating column 28, and a fourth rotating shaft 30 is vertically and rotatably connected to the bottom end of the rotating seat 2 through a bearing, a second gear 31 is fixedly installed on the fourth rotating shaft 30, and the second gear 31 is meshed and connected with the first gear 29, a second motor 32 is provided in the inner cavity of the first chamber 1, and the output end of the second motor 32 is connected to the fourth rotating shaft 30;
[0073] The turned-on second motor 32 drives the fourth rotating shaft 30 and the second gear 31 to rotate synchronously, thereby driving the first gear 29 and the rotating column 28 to rotate. The rotating column 28 rotates and drives the rotating seat 2 to rotate relative to the first chamber 1, so as to realize the synchronous circumferential rotation of the multiple sets of tools and the excavating head 5 arranged above the rotating seat 2. The rotating excavating head 5 first performs a rotational dredging operation on the construction position to form a prefabricated borehole, and then the prefabricated borehole is further expanded by the rotation action of the circumferentially arranged wide-blade tool 11 or spiral tool 12. In this way, the jamming and adjustment time of the wide-blade tool 11 and the spiral tool 12 during the operation are reduced, and the efficiency of the drilling and expanding operations is improved. Compared with directly using the wide-blade tool 11 and the spiral tool 12 for drilling operations, this operation method effectively reduces the wear degree of the wide-blade tool 11 and the spiral tool 12, and the excavating head 5 performs rotational dredging to form a prefabricated borehole and the wide-blade tool 11 or the spiral tool 12 performs expansion processing in a step-by-step operation mode, so that the entire drilling and expanding process is smoother and more efficient.
[0074] Main references Figures 7 to 9 As shown, a fixing column 33 is vertically and fixedly installed at the middle of the bottom end of the first chamber 1, and a plurality of fixing arms 34 are installed on the side wall of the fixing column 33. A second chamber 35 is installed on the outer end of the fixing arm 34. The second chamber 35 is a hollow column, and the vertical center axis of the second chamber 35 is arranged in line with the vertical center axis of the first chamber 1. Four groups of first side plates 36 are respectively arranged on the top of the second chamber 35 through the rotation of the pin shaft, and the side walls of each first side plate 36 are respectively installed with a second side plate 37, and the second side plate 37 is arranged in an inverted triangle. When dredging and guiding materials, the adjacent first side plates 36 and second side plates 37 are in a tightly connected state. The dredging guide channel composed of multiple circumferential groups of first side plates 36, second side plates 37 and second chamber 35 allows the dredged materials to enter the second chamber 35 and be discharged under the guidance of the first side plates 36 and the second side plates 37. The second side plates 37 and the first side plates 36 in the contracted state will not contact the inner wall of the hole, thereby reducing dredging resistance and ensuring the normal guiding effect of materials in narrow environment operations.
[0075] Main references Fig.10 and Fig.11 As shown, each group of first side panels 36 and second side panels 37 are adjusted in opening and closing angle by an adjusting unit. When the second side panel 37 is in a tightly closed state with an adjacent group of first side panels 36, the first side panel 36, the second side panel 37 and the second chamber 35 form a dredging guide channel. When the second side panel 37 is in a separated state with an adjacent group of first side panels 36, the second side panel 37 and the first side panel 36 extend outward to assist in dredging and expanding the hole. The adjusting unit includes a fixing seat 38 fixedly mounted on the side wall of each first side panel 36. A slide groove 39 is provided on the side wall of the fixing seat 38. A slider 40 is slidably embedded in the slide groove 39. One end of a support rod 41 is rotatably connected to the slider 40. A lifting frame 42 is slidably sleeved on the second chamber 35, and the other end of the support rod 41 is rotatably connected to the lifting frame 42. A cylinder 43 is installed on the chamber 35, and the output end of the cylinder 43 is connected to the lifting frame 42; before dredging and expanding the hole with the help of the first side plate 36 and the second side plate 37, the lifting frame 42 is driven to move by the opened cylinder 43. As the lifting frame 42 moves, the bottom ends of the plurality of groups of support rods 41 arranged in the circumferential direction are driven to move synchronously, thereby prompting the slider 40 connected to the top of the support rod 41 to move along the inner cavity of the slide groove 39, so as to realize that each group of the first side plate 36 and the second side plate 37 connected to each group of fixed seats 38 is synchronously opened and extended outward, so as to adjust the extension angle of the first side plate 36 and the second side plate 37 to the maximum limit, at this time, the sharp ends of the first side plate 36 and the second side plate 37 face outward, which can realize better deep digging with the inner wall of the hole during expansion and enhance the expansion effect. Among them, the cross-sectional shape of the slide groove 39 is T-shaped, and the slide groove 39 set in the T shape can ensure that the slider 40 slides along the slide groove 39 but does not leave the inner cavity of the slide groove 39.
[0076] The present invention also provides a construction dredging treatment method, comprising the following steps:
[0077] S1: Equipment pre-adjustment
[0078] According to the operation conditions of widening operation and dredging operation, adjust the corresponding tool to switch to the outside of the equipment:
[0079] Mode 1: During the widening operation, the multiple wide-blade cutters 11 arranged in the circumferential direction are synchronously adjusted to the outside through the conversion unit;
[0080] Mode 2: During the dredging operation, the multiple spiral cutters 12 arranged in the circumferential direction are synchronously adjusted to the outside through the conversion unit;
[0081] By turning on the first motor 23, the third rotating shaft 24, the rotating disk 25, the second teeth 26, and the elastic paddle 27 are driven to rotate clockwise. When the elastic paddle 27 rotates to touch the fixed pin 22 on the left, the fixed pin 22 on the left will be prompted to rotate simultaneously with the elastic paddle 27. At this time, the three adjacent first teeth 21 of the fixed pin 22 on the left rotate and mesh with the second teeth 26, so that the disk 20 and the first teeth 21 rotate counterclockwise synchronously, so as to drive the second rotating shaft 18 and the second bevel gear 19 to rotate counterclockwise at the same time; through the rotation of the second bevel gear 19, the multiple groups of first bevel gears 9 arranged circumferentially are driven to rotate synchronously, so as to drive the first rotating shaft 8, the first connecting seat 10, the wide blade tool 11, the spiral tool 12 and the second connecting seat 13 corresponding to each group of first bevel gears 9 to rotate synchronously, so as to adjust the positions of the wide blade tool 11 and the spiral tool 12, and adjust the appropriate tool to face the outside of the equipment for subsequent use.
[0082] S2: Construction
[0083] The excavating head 5 and the multiple groups of wide-blade cutters 11 and spiral cutters 12 arranged in the circumferential direction are rotated synchronously by the same driving force, so as to realize the joint action of pre-drilling and subsequent hole enlarging operation;
[0084] The turned-on second motor 32 drives the fourth rotating shaft 30 and the second gear 31 to rotate synchronously, thereby driving the first gear 29 and the rotating column 28 to rotate. The rotating column 28 rotates to drive the rotating seat 2 to rotate relative to the first chamber 1, so as to realize the synchronous circumferential rotation of multiple sets of tools and the excavating head 5 arranged above the rotating seat 2. The rotating excavating head 5 first performs a rotational dredging operation on the construction position to form a prefabricated borehole, and then the prefabricated borehole is further expanded by the rotation of the circumferentially arranged wide-blade tool 11 or spiral tool 12.
[0085] S3: According to the two constructions of dredging and dredging, the opening and closing angles of the first side plate 36 and the second side plate 37 need to be adjusted
[0086] Scenario 1: During dredging and hole expansion, each set of first side plates 36 and second side plates 37 are adjusted to the maximum extension through the adjustment unit;
[0087] Scenario 2: During dredging and guiding, each set of first side plates 36 and second side plates 37 are adjusted and retracted to a minimum through the adjustment unit, so that each set of first side plates 36 and second side plates 37 are closely fitted together;
[0088] Among them, S1 and S3 can be used in combination as follows:
[0089] Mode 1: S1 mode 1 + S3 scenario 1. In this mode, the widening operation is performed by the wide blade cutter 11, and the dredging and hole enlarging operation is achieved in cooperation with the first side plate 36 and the second side plate 37;
[0090] Mode 2: S1 mode 1 + S3 scenario 2. In this mode, the widening operation is performed by the wide blade cutter 11, and the dredging guide channel formed by the first side plate 36, the second side plate 37 and the second chamber 35 is used to guide the material discharge;
[0091] Mode 3: S1 Mode 2 + S3 Scenario 1. In this mode, the spiral cutter 12 is used for dredging operations, and the first side plate 36 and the second side plate 37 are used to achieve dredging and hole expansion operations.
[0092] Mode 4: S1 Mode 2 + S3 Scenario 2. In this mode, the spiral cutter 12 is used for dredging operations, and the dredging guide channel formed by the first side plate 36, the second side plate 37 and the second chamber 35 is used to guide material discharge.
[0093] A plurality of vibration motors are arranged on the side wall of the second chamber 35. The vibration motors are of commonly used models on the market, and can vibrate the materials in the second chamber 35 to assist in unloading. The assembly and model of the vibration motors are not excessively described or limited here. The bottom of the second chamber 35 is connected to an existing driving device for dredging construction, and the driving device can realize the function of rotating the second chamber 35 and the equipment as a whole. The driving device is not described or limited here. Through the existing driving device, the second chamber 35 is caused to rotate, so as to realize the circumferential rotation of the first side plate 36, the second side plate 37 and the equipment as a whole, so as to ensure that when the first side plate 36 and the second side plate 37 are extended to the maximum limit, the holes can be rotated for rotary excavation. Cooperating with the self-rotating excavating head 5 and the wide-blade tool 11 or the spiral tool 12, the multiple excavation superposition effect of the equipment is achieved; the elastic paddle 27 is made of a material with elasticity itself, for example, the elastic paddle 27 is spring steel with a carbon content between 0.5% and 0.8%, and has a high elastic limit, strength limit and fatigue limit. The elastic paddle 27 can also be set to brass. The elastic paddle 27 has a certain elastic property to ensure that the elastic paddle 27 has sufficient strength to drive the fixed pin 22 to rotate, and is forced to bend under the blocking effect of the fixed pin 22, and then the turntable 25 drives the elastic paddle 27 to continue to rotate, so that the elastic paddle 27 is free from the blocking of the fixed pin 22 and automatically restores the vertical state, preparing for the next cycle of driving the fixed pin 22.
[0094] It is worth noting that the cylinder 43 used in the present application is a self-locking cylinder commonly used on the market, and its output end can stay at any position and be locked; the first motor 23 and the second motor 32 adopt self-locking motors commonly used on the market with output ends that can be locked. When they stop working, their output ends can be self-locked and will not rotate under external force, and the first motor 23 and the second motor 32 are forward and reverse motors commonly used on the market, and their output ends can rotate forward or reverse according to usage requirements, and they can meet the above-mentioned usage requirements; the above-mentioned existing components will not be described in detail here.
[0095] The working principle of a construction dredging treatment device and method in this embodiment is as follows:
[0096] First, adjust the equipment tool to a suitable position according to the construction environment: turn on the first motor 23 to drive the third shaft 24, the turntable 25, the second teeth 26, and the elastic paddle 27 to rotate clockwise. When the elastic paddle 27 rotates to touch the fixed pin 22 on the left, the fixed pin 22 on the left will be prompted to rotate simultaneously with the elastic paddle 27. At this time, the three adjacent first teeth 21 of the fixed pin 22 on the left rotate and mesh with the second teeth 26, so that the disc 20 and the first teeth 21 rotate counterclockwise synchronously, so as to drive the second shaft 18 and the second bevel gear 19 to rotate counterclockwise at the same time; through the rotation of the second bevel gear 19, the multiple groups of first bevel gears 9 arranged circumferentially are driven to rotate synchronously, so as to drive the first shaft 8, the first connecting seat 10, the wide blade tool 11, the spiral tool 12 and the second connecting seat 13 corresponding to each group of first bevel gears 9 to rotate synchronously, so as to adjust the positions of the wide blade tool 11 and the spiral tool 12, and adjust the appropriate tool to face the outside of the equipment for subsequent use;
[0097] When the equipment is used for construction, the turned-on second motor 32 drives the fourth rotating shaft 30 and the second gear 31 to rotate synchronously, thereby driving the first gear 29 and the rotating column 28 to rotate. The rotating column 28 rotates to drive the rotating seat 2 to rotate relative to the first chamber 1, so as to realize the synchronous circumferential rotation of the multiple sets of tools and the excavating head 5 arranged above the rotating seat 2. The rotating excavating head 5 first performs a rotary dredging operation on the construction position, thereby forming a prefabricated borehole, and then the prefabricated borehole is further expanded by the rotation of the circumferentially arranged wide-blade tool 11 or spiral tool 12.
[0098] When guiding the dredging of materials, the adjacent first side plates 36 and the second side plates 37 are in a tightly connected state, and the dredging guide channel composed of multiple groups of first side plates 36, second side plates 37 and second chambers 35 in the circumferential direction. The dredged materials enter the second chamber 35 and are discharged under the guidance of the first side plates 36 and the second side plates 37, and the second side plates 37 and the first side plates 36 in the contracted state will not contact the inner wall of the hole, thereby reducing the dredging resistance and ensuring the normal guiding function of the materials in the narrow environment operation;
[0099] Before dredging and expanding the hole with the help of the first side plate 36 and the second side plate 37, the lifting frame 42 is driven to move by the opened cylinder 43. As the lifting frame 42 moves, the bottom ends of the plurality of groups of support rods 41 arranged in the circumferential direction are driven to move synchronously, thereby prompting the slider 40 connected to the top of the support rod 41 to move along the inner cavity of the slide groove 39, so that each group of the first side plate 36 and the second side plate 37 connected to each group of the fixing seat 38 can be synchronously opened and extended outward, so as to adjust the extension angle of the first side plate 36 and the second side plate 37 to the maximum limit. At this time, the sharp ends of the first side plate 36 and the second side plate 37 face outward, which can achieve better deep digging with the inner wall of the hole during expansion, thereby enhancing the expansion effect;
[0100] The present invention can flexibly realize the simultaneous replacement of tools, save the time of tool replacement in different working environments, improve working efficiency, and the equipment can adapt to complex environments in different situations, reduce unnecessary tool loss caused by the failure to replace tools in time, reduce maintenance costs, and realize the operation of synchronous switching of multiple sets of tools more simply, avoiding mistakes caused by cumbersome operating steps, and the angles of each set of wide-blade tools 11 and spiral tools 12 after rotation are the same, ensuring that they play the same role in the circumference of the equipment. In addition, the positions of multiple sets of wide-blade tools 11 and spiral tools 12 can be adjusted, and after the adjustment is completed, it can be ensured that the positions of the wide-blade tools 11 and spiral tools 12 are facing the outside of the equipment, so that the tools are in the correct position, avoiding tool position deviation and causing Incomplete dredging is caused, and the accuracy of dredging effect is improved, thereby providing guarantee for the smooth subsequent dredging operation. In addition, the excavator head 5 and multiple groups of wide-blade tools 11 and spiral tools 12 arranged in the circumferential direction are synchronously rotated through the same driving force to ensure that their movement rhythm is completely consistent, thereby promoting a smooth connection between the prefabricated drilling and the subsequent hole expansion operation. A dredging guide channel composed of multiple groups of first side plates 36, second side plates 37 and second chambers 35 is also provided, which can flexibly meet the two construction needs of dredging hole expansion or material dredging guidance. The same component realizes multiple functions. The construction function can be switched by adjusting the opening and closing angles of the first side plate 36 and the second side plate 37. The construction needs of different construction scenes and construction stages can be met without replacing equipment components.
[0101] Through this device, the following effects can be achieved:
[0102] 1. Improve work efficiency:
[0103] Quickly switch the operation mode: Multiple sets of cutters can be replaced at the same time, whether it is switching from widening operation to dredging operation or vice versa, the cutter switching can be completed in a very short time. For example, in large-scale dredging projects, when the operation mode is frequently switched, each cutter replacement only takes a few minutes or even less time, which greatly speeds up the project progress, avoids the time waste caused by tool replacement, and the overall operation efficiency can be increased several times.
[0104] 2. Enhance equipment adaptability:
[0105] Adapt to various working environments: The cutters can be flexibly replaced, and the equipment can quickly adjust the cutter configuration according to the working requirements of different areas. For example, when encountering a narrow area that needs to be dredged, it can be replaced with a spiral cutter in time, so that the equipment can work effectively in various complex environments, ensuring that the equipment can perform at its best under different working conditions and improving the equipment's ability to adapt to complex and changeable dredging working environments.
[0106] 3. Reduce maintenance costs:
[0107] Optimize tool usage and equipment performance: The efficient tool replacement function enables the equipment to operate under the appropriate tool configuration, avoiding excessive wear and damage of the tool and reducing the tool loss rate. Moreover, the tool wear is even, which is conducive to maintaining the overall performance of the equipment. This can reduce the frequency and difficulty of equipment maintenance and repair, reduce equipment maintenance costs, and extend the service life of the equipment.
[0108] 4. Simplify the operation process:
[0109] Reduce the difficulty of operation and the error rate: the operator does not need to perform the tedious replacement operation for each set of tools separately, but only needs to perform the overall tool replacement operation once. This not only reduces the labor intensity of the operator, but also greatly reduces the possibility of operating errors. For example, it avoids problems such as loose installation of tools or wrong installation positions, ensures the normal operation of the equipment, and improves the reliability and stability of equipment operation.
[0110] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A construction dredging processing equipment, comprising a first chamber (1), characterized in that: A rotating seat (2) is rotatably arranged at the top of the first chamber (1), a cylinder (3) is fixedly installed at the top of the cylinder (3), the cylinder (3) is arranged in a hollow cylindrical shape, the top of the cylinder (3) is connected to a top seat (4), a conversion unit is arranged in the inner cavity of the cylinder (3) and the top seat (4), a plurality of groups of tool assemblies are rotatably arranged on the side wall of the top seat (4) along the circumferential direction, each group of the tool assemblies comprises a wide blade tool (11) and a spiral tool (12), and the positions of the wide blade tool (11) and the spiral tool (12) in each group of the tool assemblies are synchronously changed by the conversion unit; The conversion unit comprises a second rotating shaft (18) which is rotatably arranged in the middle of the inner cavity of the top seat (4) in the vertical direction, a second bevel gear (19) is fixedly installed on the top end of the second rotating shaft (18), a plurality of first bevel gears (9) are equidistantly arranged on the second bevel gear (19) in the circumferential direction, and each of the first bevel gears (9) is respectively meshed and connected with the second bevel gear (19), a first rotating shaft (8) is passed through and fixedly installed at the center of each of the first bevel gears (9), and the first rotating shaft (8) passes through the side wall of the top seat (4) outwardly, the top end of the first rotating shaft (8) is rotatably connected with a connecting block (7), the bottom end of the first rotating shaft (8) is fixedly connected with a first connecting seat (10), and the first connecting seat (10) is connected to the top ends of the wide blade tool (11) and the spiral tool (12); Wherein, a plurality of mounting seats (6) are installed at equal intervals along the circumferential direction at the top end of the inner wall of the top seat (4), and the number of the mounting seats (6) is the same as the number of the connecting blocks (7), and each connecting block (7) is fixedly connected to the inner cavity of the mounting seat (6) at a corresponding position.
2. A construction dredging equipment according to claim 1, characterized in that: A second connecting seat (13) is respectively installed at the bottom end of each group of the wide-blade tool (11) and the spiral tool (12); each of the second connecting seats (13) is rotatably connected to a connecting column (14) on the side facing away from the first connecting seat (10); a plurality of groups of supporting columns (15) are equidistantly arranged on the side wall of the rotating seat (2) along the circumferential direction; each of the supporting columns (15) corresponds to the position of each of the connecting columns (14); and the supporting columns (15) are fixedly connected to the connecting columns (14).
3. A construction dredging processing equipment according to claim 2, characterized in that: The angle between the wide-blade cutter (11) and the support column (15) is set to be between 60 degrees and 90 degrees.
4. A construction dredging equipment according to claim 1, characterized in that: The inner cavity of the cylinder (3) is provided with a power mechanism for driving the second rotating shaft (18) to rotate; The power mechanism comprises a motor frame (16) and a support arm (17) respectively fixedly mounted on the top of the rotating seat (2); a first motor (23) is arranged on the support arm (17); an output end of the first motor (23) is connected to a third rotating shaft (24), and the third rotating shaft (24) is rotatably connected to a side wall of the support arm (17); a rotating disk (25) is fixedly mounted on the third rotating shaft (24); a plurality of second teeth (26) are provided on the side wall of the rotating disk (25); an elastic paddle (27) is vertically mounted on the inner wall of the rotating disk (25), and the elastic paddle (27) corresponds to the second teeth (26) in position inside and outside.
5. A construction dredging equipment according to claim 4, characterized in that: The second rotating shaft (18) is vertically and rotatably arranged on the support arm (17) from top to bottom, a disc (20) is installed at the bottom end of the second rotating shaft (18), and the side wall of the disc (20) is provided with six first teeth (21), and each three first teeth (21) form a group and are symmetrically arranged on the side wall of the disc (20), and each three first teeth (21) can be rotatably embedded in the second teeth (26), and two fixing pins (22) are respectively vertically installed at the bottom end of the disc (20), and each fixing pin (22) corresponds to the position of each group of the first teeth (21); The circumferential rotation of the elastic paddle (27) can force the fixing pin (22) to rotate.
6. A construction dredging equipment according to claim 1, characterized in that: An excavator head (5) is fixedly mounted on the top of the top seat (4); a rotating column (28) is fixedly mounted in the middle of the bottom end of the rotating seat (2), and the bottom end of the rotating column (28) is rotatably connected to the inner wall of the first chamber (1); a first gear (29) is mounted on the side wall of the rotating column (28); a fourth rotating shaft (30) is vertically and rotatably connected to the bottom end of the rotating seat (2); a second gear (31) is fixedly mounted on the fourth rotating shaft (30), and the second gear (31) is meshedly connected to the first gear (29); a second motor (32) is arranged in the inner cavity of the first chamber (1), and an output end of the second motor (32) is connected to the fourth rotating shaft (30).
7. The construction dredging equipment according to claim 1, characterized in that: A fixing column (33) is vertically and fixedly installed in the middle of the bottom end of the first chamber (1), and a plurality of fixing arms (34) are installed on the side wall of the fixing column (33). A second chamber (35) is installed on the outer end of the fixing arm (34). The second chamber (35) is a hollow column, and the vertical center axis of the second chamber (35) is arranged colinearly with the vertical center axis of the first chamber (1). Four groups of first side panels (36) are rotatably arranged at the top of the second chamber (35), and a second side panel (37) is installed on the side wall of each of the first side panels (36), and the second side panel (37) is arranged in an inverted triangle shape.
8. A construction dredging equipment according to claim 7, characterized in that: The opening and closing angles of each group of the first side plate (36) and the second side plate (37) are adjusted by an adjustment unit. When the second side plate (37) is in a tightly closed state with an adjacent group of the first side plates (36), the first side plate (36), the second side plate (37) and the second chamber (35) form a dredging guide channel. When the second side plate (37) is in a separated state with an adjacent group of the first side plates (36), the second side plate (37) and the first side plate (36) extend outward to assist in dredging and expanding the hole.
9. A construction dredging equipment according to claim 8, characterized in that: The adjustment unit comprises a fixing seat (38) fixedly mounted on the side wall of each first side plate (36), a sliding groove (39) is provided on the side wall of the fixing seat (38), a sliding block (40) is slidably embedded in the sliding groove (39), one end of a support rod (41) is rotatably connected to the sliding block (40), a lifting frame (42) is slidably sleeved on the second chamber (35), and the other end of the support rod (41) is rotatably connected to the lifting frame (42), a cylinder (43) is installed on the second chamber (35), and an output end of the cylinder (43) is connected to the lifting frame (42); Wherein, the cross-sectional shape of the slide groove (39) is T-shaped.
10. A construction dredging method using the construction dredging equipment according to any one of claims 1 to 9, characterized in that: The steps include: S1: Equipment pre-adjustment According to the operation conditions of widening operation and dredging operation, adjust the corresponding tool to switch to the outside of the equipment: Mode 1: During the widening operation, a plurality of wide-blade cutters (11) arranged in the circumferential direction are synchronously adjusted to the outside through the conversion unit; Mode 2: During the dredging operation, a plurality of spiral cutters (12) arranged in the circumferential direction are synchronously adjusted to the outside through the conversion unit; S2: Construction The excavating head (5) and the plurality of groups of wide-blade cutters (11) and spiral cutters (12) arranged in the circumferential direction are synchronously rotated by the same driving force, thereby realizing the combined effect of prefabricated drilling and subsequent hole expansion operations; S3: According to the two constructions of dredging and dredging, the opening and closing angles of the first side plate (36) and the second side plate (37) need to be adjusted. Scenario 1: During dredging and hole expansion, each set of first side plates (36) and second side plates (37) are adjusted to the maximum extension through the adjustment unit; Scenario 2: During dredging and guiding, each set of first side plates (36) and second side plates (37) are adjusted and contracted to a minimum through the adjustment unit, so that each set of first side plates (36) and second side plates (37) are closely fitted together; Among them, S1 and S3 can be used in combination as follows: Method 1: S1 mode 1 + S3 scenario 1; Method 2: S1 mode 1 + S3 scenario 2; Method 3: S1 mode 2 + S3 scenario 1; Method 4: S1 mode 2 + S3 scenario 2.
Citation Information
Patent Citations
Big-climbing-degree robot foot for changing soft terrain based on drilling and digging
CN107933734A
Earthwork excavation construction device for pumped storage of dam
CN114319474A
Rake head for rapidly and automatically excavating seabed mud
CN114508137A
Processing equipment of crown-shaped spiral mud cutting device and crown-shaped spiral mud cutting tool bit
CN118060780A
Earthwork foundation pit excavating device
CN220301419U
Cited By
Quick take-out type dredging device and dredging method thereof
CN121110759A