WBS line three-dimensional layout construction system and flexible warehouse-in and warehouse-out method
Through the WBS line three-dimensional layout construction system and intelligent management system, the lift and accumulation conveyor are used for vertical transmission and classified storage of products. Combined with robot relay and RFID technology, the traditional logistics transmission method has large footprint and poor scheduling flexibility. The problem has achieved a more ground space-saving and more efficient production process.
Patent Information
- Application Number
- CN202411466106.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-21
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-10-21
AI Technical Summary
The logistics transmission method of traditional motorcycle frames and fuel tank welding and coating processes covers a large area, has complex channels, and poor scheduling flexibility, making it difficult to adapt to the fast-paced production model, requiring a lot of manpower to carry, affecting production efficiency and cost.
Adopt WBS line three-dimensional layout construction system, including three-dimensional layout, conveying system and intelligent management system, and realize vertical transmission and classified storage of products through lifts and accumulation conveyors, use robot reeling technology for automatic interaction, and combine RFID technology for hanging It has classified management and scheduling.
It has achieved a three-dimensional layout with a more cost-effective land area and smoother logistics, reduced manual labor, improved production efficiency and flexibility, and adapted to the fast-paced production model.
Smart Images

Figure CN118997557A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of welding and painting intelligent workshops, and in particular to a WBS line three-dimensional layout construction system and a flexible warehousing and unloading method. Background Art
[0002] Lean production mode, also known as just-in-time production. Its purpose is to eliminate various actions without added value, so as to adapt to the changes in customer order demand more flexibly and achieve the management goal of no overproduction and less inventory. WBS (Welding Body Storge) refers to the buffer and storage area between the welding workshop and the painting workshop in the automobile or two-wheeled vehicle factory; the WBS conveying system is the bridge connecting the welding and painting workshops, and is the guarantee for the smooth operation of the body or frame painting production line. Due to the difference in the economic rhythm of frame welding production and painting production, in order to facilitate production management and meet the needs of subsequent painting rhythms, and improve the utilization rate of the painting production line, generally speaking, the automobile body-in-white or two-wheeled frame welding production lines must be equipped with WBS systems.
[0003] In the motorcycle manufacturing industry, frames and fuel tanks are key welding parts, and the connection efficiency between their welding and painting processes directly affects the production capacity and cost of the entire production line. Logistics are required for transfer between the frame and fuel tank welding line and the electrophoretic coating line. Traditional production lines generally adopt flat storage or ramp transmission, which occupies a large area, has complex logistics channels, poor scheduling flexibility, and is difficult to adapt to the fast-paced production mode of motorcycle frames and fuel tank products. A large amount of manpower is required for handling and hanging for painting. Therefore, the present invention proposes a three-dimensional layout construction system and method of a WBS line for welding production to solve the problems existing in the prior art. Summary of the invention
[0004] In view of the above problems, the present invention proposes a three-dimensional layout construction system of a WBS line and a flexible warehousing and unloading method. The three-dimensional layout construction system of the WBS line adopts a three-dimensional layout method which saves more space and has the least impact on the ground logistics channel. That is, the first layer is used as the production level exchange layer, the second layer is used as the production transfer layer, and the third layer is used as the storage area. This structural form can realize the classified storage of different types of fully loaded welding products without falling to the ground, and can be flexibly dispatched out of the warehouse according to the painting requirements.
[0005] To achieve the purpose of the present invention, the present invention is implemented through the following technical solutions: a three-dimensional layout construction system of a WBS line, including a three-dimensional layout, a conveying system and an intelligent management system, the three-dimensional layout is composed of a workshop steel structure, the conveying system is installed on the workshop steel structure, the conveying system includes an accumulation conveyor and an elevator, the three-dimensional layout includes a first layer, a second layer and a third layer from bottom to top, the first layer is a painting outbound and robot transfer channel, with a low-level loading station of the elevator, the second layer is a welding production circulation area, with a high-level loading station of the elevator, a welding loading station and an accumulation conveyor, the third layer is a hanger warehouse area, including an empty hanger warehouse and a full hanger warehouse; In the first layer, during the welding line, the empty hangers sent from the empty hanger warehouse are received by the elevator, and the welding products are hung at the low-level loading station of the elevator. After the loading is completed, the elevator returns to the high-level circulation station. The accumulation conveyor receives the hangers from the high-level circulation station on the second layer and transports them to the buffer area or the welding assembly loading station. After the welding assembly loading station is fully loaded, it is sent to the fully loaded hanger warehouse. The conveyor transports the fully loaded hangers in the fully loaded hanger warehouse to the first layer, and then The robot transfers the completed workpiece to the painting line, and another robot at the next workstation transfers the painted empty hanger from the painting line to the empty accumulation trolley of the accumulation conveyor, and sends it to the empty hanger warehouse on the third floor. The empty hanger warehouse is used to store the empty hangers received from the first floor and exchanged after painting. The fully loaded hanger warehouse is used to receive the fully loaded hangers that have completed assembly loading from the second floor and store them in categories. The intelligent management system is used to coordinate and control the entire process.
[0006] Further improvements are as follows: the painting outbound and robot transfer channels are equipped with automated robots, which transfer the fully loaded hangers with completed assembly to the painting line, and at the same time transfer the empty hangers after painting to the empty accumulation trolley of the accumulation conveyor at the next workstation, thereby completing the production interaction between the welding line and the painting line.
[0007] Further improvements are as follows: the low-level loading station of the elevator is set at the post-quality inspection station of the welding production line. When the elevator is in a low position, it is used to load the welding workpieces that have completed quality inspection onto empty hangers. When the elevator is raised to a high position, the accumulation conveyor on the second floor is used to transfer hangers loaded with one product to the area of another product loading station, or to transport the fully loaded hangers that have completed combined loading at the welding loading station to the exit of the second floor, and then transport them to the fully loaded hanger storage area on the third floor for classification and accumulation.
[0008] A further improvement is that an outbound channel is directly connected between the third layer and the first layer, and the outbound channel is used to transport the products in the fully loaded hanger warehouse to the robot transfer channel for transfer to the painting line. After completion, the empty hangers after painting are transferred again to the empty accumulation trolley of the accumulation conveyor and transported to the empty hanger warehouse. Cleaning equipment is provided in the empty hanger warehouse for cleaning the hangers used for painting as empty hangers for subsequent use.
[0009] Further improvements are: the conveying system is suspended on the steel structure of the workshop, the accumulation conveyor is used to transfer hangers between the second floor and the elevator, or to transfer fully loaded hangers and empty hangers between the third floor and the first floor; the elevator is used for vertically transferring welding production hangers between the first floor and the second floor.
[0010] A further improvement is that: the elevators are provided with multiple groups, and the multiple groups of elevators are arranged in parallel and in series during operation. The parallel arrangement is used for processing the same kind of workpieces, and the series arrangement is used for combining different workpieces. The elevators rise to the second floor to receive empty hangers and send them to the low-level loading station, or receive hangers with one kind of workpiece at a high position and send them to the low-level loading station for another kind of workpiece, and finally pass the fully loaded hangers with completed combined loading to the accumulation conveyor and send them to the fully loaded hanger warehouse on the third floor.
[0011] Further improvements are as follows: the intelligent management system includes a robot transfer unit and a scheduling management unit. The robot transfer unit is used to transfer the empty hangers back to the workstation after welding and painting, set the control logic, and display the real-time dynamic model on the control terminal of the management office, thereby realizing automatic interaction of workpieces, and controlling the robot in real time to transfer the welded workpieces from the welding line to the painting line, and transfer the empty hangers that have completed painting to the empty accumulation cart of the accumulation conveyor.
[0012] A further improvement is that the scheduling management unit is used to classify and manage the hangers and schedule them out of the warehouse, and to identify different types of workpieces through RFID tags to achieve positioning and scheduling of the hangers and workpieces.
[0013] A further improvement is that the scheduling management unit has a built-in management variable logic, which schedules the entry and exit of fully loaded hangers and empty hangers according to the production demand variables of the painting line and the welding line, and simultaneously monitors the hanger status of each storage area and workstation in real time.
[0014] A flexible warehousing and unloading method for a WBS line three-dimensional layout construction system comprises the following steps: After the painting is completed, the empty hangers are transferred from the painting line to the accumulation conveyor by a robot and transported to the empty hanger warehouse on the third floor; On the first level, the elevator lowers the empty hanger to the low-level loading station. After the manual loading is completed, a confirmation command is issued to make it run to the high-level transfer station. Finally, the combined loading is completed and it is sent to the fully loaded hanger warehouse as a fully loaded hanger. The accumulation conveyor transports the fully loaded hangers to the fully loaded hanger warehouse on the third floor for classified storage and waits for dispatch to be dispatched; After the assembly is completed, the fully loaded hanger is transported to the fully loaded hanger storage area on the third floor. At the same time, the empty hanger is replenished from the empty hanger storage area to the high-position loading station of the elevator for the next cycle.
[0015] The beneficial effects of the present invention are: 1. The present invention adopts a three-dimensional layout method that saves space and has the least impact on ground logistics channels, that is, the first floor is used as a production level exchange layer, the second floor is used as a production transfer layer, and the third floor is used as a storage area. This structural form can realize the classified storage of different types of fully loaded welding products without falling to the ground, and can be flexibly dispatched out of the warehouse according to painting requirements. It also uses elevators as a means to realize the transfer layer. Compared with the common ramp-type transfer, it has the advantages of making the production line more compact, saving space, and smoother logistics.
[0016] 2. The present invention adopts the outbound channel as the dividing axis of the welding and painting workshop, and applies advanced robot transfer and hanging technology to automatically interact with the products in the welding and painting workshop, making the overall logistics process smoother, saving a lot of manual labor for hanging, and applying RFID technology to realize the classification management of hangers and flexible dispatch of outbound functions, which is more accurate and improves production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the three-layer structure of the present invention; Figure 2 It is a side view schematic diagram of the present invention; Figure 3 This is a schematic diagram of the layout of the third-layer storage area and the first-layer robot transfer and hanging plane of the present invention; Figure 4 This is a schematic diagram of the layout of the second-layer welding production hangers in and out of the warehouse and the elevators of the present invention, wherein the first phase refers to the first set of coordinated channels and multiple groups of elevators, and the second phase refers to the second set of coordinated channels and multiple groups of elevators, and the multiple sets operate in coordination with each other. DETAILED DESCRIPTION
[0018] In order to deepen the understanding of the present invention, the present invention will be further described in detail below in conjunction with examples. The examples are only used to explain the present invention and do not constitute a limitation on the protection scope of the present invention.
[0019] Embodiment 1 according to Figure 1 , 2As shown in Figures 3 and 4, this embodiment proposes a three-dimensional layout construction system for a WBS line, including a three-dimensional layout, a conveying system and an intelligent management system. The three-dimensional layout is composed of a workshop steel structure, and the conveying system is installed on the workshop steel structure. The conveying system includes an accumulation conveyor and an elevator. The three-dimensional layout includes the first layer, the second layer and the third layer from bottom to top. The first layer is a painting outbound and robot transfer channel, which has a low-level loading station of an elevator. The second layer is a welding production circulation area, which has a high-level loading station of an elevator, a welding loading station and an accumulation conveyor. The third layer is a hanger warehouse area, including an empty hanger warehouse and a fully loaded hanger warehouse. In the first layer, during the welding line, the empty hangers sent from the empty hanger storage area are received by the elevator to the low-level loading station of the elevator, and the welded workpieces are manually loaded onto the empty hangers to complete the hanging of the welded products. In particular, different lines can be connected in series to carry out combined loading of different types of workpieces such as frames and fuel tanks. After loading is completed, the elevator returns to the high-level circulation station. The accumulation conveyor receives the hangers from the high-level circulation station on the second layer and transports them to the cache area or the welding combination loading station. After the welding combination loading station is fully loaded, it is sent to the full The hanger warehouse is loaded with hangers. The conveyor transports the full hangers in the full hanger warehouse to the first floor. The robot transfers the welded parts that have been loaded to the painting line. Another robot transfers the empty hangers that have been painted from the painting line to the empty accumulation trolley of the accumulation conveyor at the next workstation, and sends them to the empty hanger warehouse on the third floor. The empty hanger warehouse is used to store the empty hangers that have been exchanged after painting received from the first floor. The full hanger warehouse is used to receive the full hangers that have completed assembly loading from the second floor and store them in a classified manner. The intelligent management system is used to coordinate and control the entire process. A three-dimensional layout is adopted which takes up less space and has the least impact on ground logistics channels. That is, the first floor is used as the production level exchange layer, the second floor is used as the production transfer layer, and the third floor is used as the storage area. This structural form can realize the classified storage of different types of fully loaded welding products without falling to the ground, and can be flexibly dispatched out of the warehouse according to the painting requirements. The elevator is used as the means to realize the transfer layer. Compared with the common ramp-type transfer, it has the advantages of making the production line more compact and taking up less space.
[0020] The painting outbound and robot transfer channel is equipped with an automated robot, which transfers the fully loaded hangers that have completed the assembly loading to the painting line, and at the same time transfers the empty hangers after the painting to the empty accumulation cart of the accumulation conveyor at the next station, thereby completing the production interaction between the welding line and the painting line. The low-level loading station of the elevator is set at the post-quality inspection station of the welding production line. When the elevator is in the low position, it is used to load the welding workpieces that have completed the quality inspection onto the empty hangers. When the elevator is raised to the high position, the accumulation conveyor on the second floor is used to transfer the hangers loaded with one product to the area of the loading station of another product, or to transport the fully loaded hangers that have completed the assembly loading at the welding assembly loading station to the exit of the second floor, and then transport them to the fully loaded hanger storage area on the third floor for classification and accumulation. The robot realizes the rapid transfer of workpieces and hangers through precise operation.
[0021] There is an outbound channel directly connected between the third layer and the first layer, and the outbound channel is used to transport the products in the fully loaded hanger warehouse to the robot transfer channel for transfer to the painting line. After completion, the empty hangers after painting are transferred to the empty accumulation trolley of the accumulation conveyor again, and sent to the empty hanger warehouse. Cleaning equipment is provided in the empty hanger warehouse for cleaning the hangers used for painting as empty hangers for subsequent use.
[0022] The conveying system is suspended on the steel structure of the workshop. The accumulation conveyor is used to transfer the hangers between the second floor and the elevator, or to transfer the fully loaded hangers and the empty hangers between the third floor and the first floor. The elevator is used to vertically transfer the welding production hangers between the first floor and the second floor. The conveying system is suspended on the steel structure of the workshop to ensure that there are no ground columns in the production area, improve space utilization and production safety. The conveying system adopts intelligent control and can automatically adjust the speed and path according to production needs.
[0023] The elevators are provided with multiple groups, and the multiple groups of elevators are arranged in parallel and in series during operation. The parallel arrangement is used for processing the same product, and the series arrangement is used for combining different workpieces. The elevators rise to the second floor to receive empty hangers and send them to the low-level loading station, or receive hangers with one workpiece at a high level and send them to the low-level loading station of another workpiece, and finally pass the fully loaded hangers with completed combined loading to the accumulation conveyor and send them to the fully loaded hanger warehouse on the third floor.
[0024] The intelligent management system includes a robot transfer unit and a scheduling management unit. The robot transfer unit is used to transfer the empty hanger back to the workstation after welding and painting, set the control logic, and display the real-time dynamic model on the control terminal of the management office, thereby realizing the automatic interaction of workpieces, controlling the robot in real time to transfer the welded workpiece from the welding line to the painting line, and transfer the empty hanger that has been painted to the empty accumulation trolley of the accumulation conveyor. The real-time dynamic model is displayed to facilitate management personnel to understand the operation status in real time.
[0025] The scheduling management unit is used to classify and manage the hangers and schedule them out of the warehouse, and to identify different types of workpieces through RFID tags to achieve positioning and scheduling of the hangers and workpieces, which is more accurate and improves production efficiency.
[0026] The scheduling management unit has built-in management variable logic. According to the production demand variables of the coating line and welding line, it schedules the entry and exit of full-load hangers and empty hangers based on the management variable logic, and simultaneously monitors the hanger status of each storage area and workstation in real time. It automatically optimizes the scheduling plan to ensure the continuous and stable operation of the production line.
[0027] Embodiment 2 according to Figure 1 , 2 As shown in Figures 3 and 4, this embodiment proposes a three-dimensional layout construction system for a WBS line, which consists of a three-layer three-dimensional structure, with independent fully loaded hanger outbound channels and empty hanger inbound channels that adapt to the coating line, and an independent welding line production channel. It can be flexibly dispatched in and out of the warehouse according to the coating line requirements and welding line production needs, greatly improving production flexibility. The project covers an area of about 2,400 square meters and is arranged in a steel structure factory building that is 80 meters long and 30 meters wide. All conveying systems are suspended from the steel structure of the workshop, and there are no ground columns in the production area of the factory building. The line body is arranged in three layers. The first floor is the transfer channel for the painting outbound robot and the loading station for low-level workpieces (motorcycle frames or fuel tanks) of the welding production area elevator; the second floor is the hanger circulation buffer area, where the empty hangers are transported to the high position of the elevator by the accumulation conveyor, and then the empty hangers are lowered to the first-floor loading height by the elevator. After the workers complete the loading, the elevator returns to the high position again, and the cycle continues; the third floor is the hanger storage area, which is divided into 4 empty hanger storage areas and 4 full-load hanger storage areas. The empty hanger storage area is used to receive the empty hangers that have been exchanged from the painting line on the first floor, and the full-load hanger storage area is used to receive the fully loaded hangers that have been loaded from the welding line from the second floor. In this way, the painting production and welding production are relatively completely independent, which is a flexible production model.
[0028] Embodiment 3 according to Figure 1 , 2 As shown in , 3, and 4, this embodiment proposes a flexible warehousing method for a WBS line three-dimensional layout construction system, including the following steps: After the painting is completed, the empty hangers are transferred from the painting line to the accumulation conveyor by a robot and transported to the empty hanger warehouse on the third floor; On the first level, the elevator lowers the empty hanger to the low-level loading station. After the manual loading is completed, a confirmation command is issued to make it run to the high-level transfer station. Finally, the combined loading is completed and it is sent to the fully loaded hanger warehouse as a fully loaded hanger. The accumulation conveyor transports the fully loaded hangers to the fully loaded hanger warehouse on the third floor for classified storage and waits for dispatch to be dispatched; After the assembly is completed, the fully loaded hangers are transported to the fully loaded hanger storage area on the third floor, while the empty hangers are replenished from the empty hanger storage area to the high-level transfer station of the elevator for the next cycle. A three-dimensional layout method with less land occupation and minimal impact on the ground logistics channel is adopted, that is, the first floor is used as the production level exchange layer, the second floor is used as the production transfer layer, and the third floor is used as the storage area. This structural form facilitates flexible dispatching of the warehouse according to the coating requirements.
[0029] The present invention adopts a three-dimensional layout method which takes up less space and has the least impact on the ground logistics channel, that is, the first layer is used as the production level exchange layer, the second layer is used as the production transfer layer, and the third layer is used as the storage area. This structural form can realize the classified storage of different types of fully loaded welding products without falling to the ground, and can be flexibly dispatched out of the warehouse according to the painting requirements. It adopts an elevator as a means to realize the transfer layer, which has the advantages of making the production line more compact and taking up less space compared with the common ramp-type transfer. The present invention adopts the outbound channel as the dividing axis of the welding and painting workshop, applies advanced robot transfer technology, and automatically interacts with the products in the welding and painting workshop, making the overall logistics process smoother. It also applies RFID technology to realize the classification management of hangers and the flexible dispatching of outbound products, which is more accurate and improves production efficiency.
[0030] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A three-dimensional layout construction system for a WBS line, including a three-dimensional layout, a conveying system and an intelligent management system, characterized in that: The three-dimensional layout is composed of a workshop steel structure, and the conveying system is installed on the workshop steel structure. The conveying system includes an accumulation conveyor and an elevator. The three-dimensional layout includes the first floor, the second floor and the third floor from bottom to top. The first floor is a painting outbound and robot transfer channel, and includes a low-level loading station of the elevator. The second floor is a welding production circulation area, which is equipped with a high-level circulation station of the elevator, a welding loading station and an accumulation conveyor. The third floor is a hanger warehouse area, including an empty hanger warehouse and a fully loaded hanger warehouse; In the first layer, during the welding line, the empty hangers sent from the empty hanger warehouse are received by the elevator, and the welding workpieces are hung at the low-level loading station of the elevator. After the loading is completed, the elevator returns to the high-level circulation station. The accumulation conveyor receives the hangers from the high-level circulation station on the second layer and transports them to the buffer area or the welding assembly loading circulation station. After the welding assembly loading station is fully loaded, it is sent to the fully loaded hanger warehouse; the conveyor transports the fully loaded hangers in the fully loaded hanger warehouse to the first layer, and then the hangers are transported to the first layer. The robot transfers the completed welded workpieces to the painting line, and another robot at the next workstation transfers the empty hangers after painting from the painting line to the empty accumulation trolley of the accumulation conveyor, and sends them to the empty hanger warehouse on the third floor. The empty hanger warehouse is used to store the empty hangers received from the first floor and exchanged after painting. The fully loaded hanger warehouse is used to receive the fully loaded hangers that have completed assembly loading from the second floor and store them in categories. The intelligent management system is used to coordinate and control the entire process.
2. A WBS line three-dimensional layout construction system according to claim 1, characterized in that: The painting outbound and robot transfer channel is equipped with an automated robot, which transfers the fully loaded hangers with completed assembly to the painting line, and at the same time transfers the empty hangers after painting to the empty accumulation cart of the accumulation conveyor at the next workstation, thereby completing the production interaction between the welding line and the painting line.
3. A WBS line three-dimensional layout construction system according to claim 2, characterized in that: The low-level loading station of the elevator is set at the post-quality inspection station of the welding production line. When the elevator is in the low position, it is used to load the welding workpieces that have completed quality inspection onto empty hangers. When the elevator is raised to the high position, the accumulation conveyor on the second floor is used to transfer the hangers loaded with one product to the area of another product loading station, or to transport the fully loaded hangers that have completed combined loading at the welding loading station to the exit of the second floor, and then transport them to the fully loaded hanger storage area on the third floor for classification and accumulation.
4. A WBS line three-dimensional layout construction system according to claim 3, characterized in that: There is an outbound channel directly connected between the third layer and the first layer, and the outbound channel is used to transport the products in the fully loaded hanger warehouse to the robot transfer channel for transfer to the painting line. After completion, the empty hangers after painting are transferred to the empty accumulation trolley of the accumulation conveyor again and sent to the empty hanger warehouse. Cleaning equipment is provided in the empty hanger warehouse for cleaning the hangers used for painting as empty hangers for subsequent use.
5. A WBS line three-dimensional layout construction system according to claim 4, characterized in that: The conveying system is suspended on the steel structure of the workshop. The accumulation conveyor is used to transfer hangers between the second floor and the elevator, or to transfer fully loaded hangers and empty hangers between the third floor and the first floor, or to classify and store them in the third floor storage area; the elevator is used for vertical transportation of welding production hangers between the first and second floors.
6. A WBS line three-dimensional layout construction system according to claim 5, characterized in that: The elevators are provided with multiple groups, and the multiple groups of elevators are arranged in parallel and in series during operation. The parallel arrangement is used for processing the same kind of workpieces, and the series arrangement is used for combining different workpieces. The elevators rise to the second floor to receive empty hangers and then send them to the low-level loading station, or receive hangers with one kind of workpiece at a high level and send them to the low-level loading station for another kind of workpiece, and finally pass the fully loaded hangers with completed combined loading to the accumulation conveyor and send them to the fully loaded hanger warehouse on the third floor.
7. A WBS line three-dimensional layout construction system according to claim 1, characterized in that: The intelligent management system includes a robot transfer unit and a scheduling management unit. The robot transfer unit is used to transfer the empty hangers back to the workstation after welding and painting, set the control logic, and display the real-time dynamic model on the control terminal of the management office, thereby realizing automatic interaction of workpieces, and controlling the robot in real time to transfer the welded workpieces from the welding line to the painting line, and transfer the empty hangers that have completed painting to the empty accumulation cart of the accumulation conveyor.
8. A WBS line three-dimensional layout construction system according to claim 7, characterized in that: The scheduling management unit is used to classify and manage the hangers and workpieces and schedule them out of the warehouse, and to identify different types of workpieces through RFID tags to achieve the positioning and scheduling of the hangers and workpieces.
9. A WBS line three-dimensional layout construction system according to claim 8, characterized in that: The scheduling management unit has built-in management variable logic. According to the production demand variables of the painting line and the welding line, based on the management variable logic, it schedules the entry and exit of fully loaded hangers and empty hangers, and simultaneously monitors the hanger status of each storage area and workstation in real time.
10. A flexible storage and retrieval method of a WBS line three-dimensional layout construction system, using a WBS line three-dimensional layout construction system according to any one of claims 1 to 9, characterized in that: The following steps are involved: After the painting is completed, the empty hangers are transferred from the painting line to the accumulation conveyor by a robot and transported to the empty hanger warehouse on the third floor; On the first level, the elevator lowers the empty hanger to the low-level loading station. After the manual loading is completed, a confirmation command is issued to make it run to the high-level transfer station. Finally, the combined loading is completed and it is sent to the fully loaded hanger warehouse as a fully loaded hanger. The accumulation conveyor transports the fully loaded hangers to the fully loaded hanger warehouse on the third floor for classified storage, and waits for the coating production scheduling to be dispatched; After the assembly is completed, the fully loaded hangers are transported to the fully loaded hanger storage area on the third floor. At the same time, the empty hangers are replenished from the empty hanger storage area to the high-level transfer station of the elevator for the next cycle.
Citation Information
Patent Citations
Automobile workpiece intelligent hanging, conveying and control method
CN111453330A
Carriage assembly hanging conveying method, system and device based on MES system
CN115709867A
Truck-mounted crane automatic production line intelligent logistics system
CN116835192A
Automatic gluing management system and method for unmanned carrying vehicle
CN116891084A
Materials handling module and overhead conveyor which can be designed modularly
WO2024108242A1