Air supply heating equipment based on coal mine exhaust waste heat

Through the combination of rotating structure and cleaning structure, the problem of dust and impurities residues during atomization and backlash is solved, and a cleaner cleaning and more efficient filtration effect is achieved.

CN118997829APending Publication Date: 2024-11-22ORDOS HAOHUA CLEAN COAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411394116.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

During the atomization and recoil recoil, the air supply and heating equipment for traditional coal mines will flush the dust and impurities inside the discharge pipe, resulting in residual inner walls and difficulty in cleaning.

Method used

A kind of air supply heating equipment based on exhaust waste heat of coal mine mines is designed, using a rotary structure and cleaning structure, and through combinations of belt trays, second conical gear sets, rotary disks and through holes, drives water to sprinkle evenly during recoiling. Connect the inner wall of the tube, rinse the impurities with centrifugal force, and clean the impurities on the filter plate through the reciprocating screw and brush.

Benefits of technology

Effectively prevent dust and impurities from remaining on the inner wall of the exhaust duct, simplifying the cleaning process, and improving the cleanliness and filtration efficiency of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997829A_ABST
    Figure CN118997829A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of coal mines, and provides air supply heating equipment based on coal mine exhaust waste heat. A fan is mounted on one side in the exhaust pipe, a filter screen is mounted on one side of the fan, a barrier plate is mounted on one side of the filter screen, a fixing shaft is movably mounted at the rear end of the exhaust pipe, a first atomizing nozzle is mounted at the top end in the exhaust pipe, and a collecting box is mounted at the bottom end of the exhaust pipe. Through cooperative use of a belt disc and a mounting disc, a connecting rod can be driven to rotate through a second bevel gear set, and when the connecting rod rotates, a rotating disc is driven to rotate through a third bevel gear set, so that part of water can be left at the top end of the rotating disc when the intercepting net is backflushed, and through rotation of the rotating disc, the intercepting net can be backflushed; and water is thrown out through the through holes under the action of centrifugal force, so that the water is uniformly sprayed on the inner wall of the connecting pipe, and residual dust and impurities on the inner wall of the connecting pipe are flushed, so that the water is cleaner during cleaning.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mines, and in particular to an air supply heating device based on exhaust waste heat from coal mines. Background Art

[0002] The coal mine exhaust waste heat air supply heating equipment is an innovative mine waste heat utilization equipment. It heats the supply air by recovering the waste heat in the mine exhaust, thereby increasing the temperature in the mine and ensuring the safety and comfort of the miners. This equipment belongs to the field of mine waste heat utilization. Through efficient heat exchange technology, the low-grade heat energy in the mine exhaust is converted into high-grade heat energy for heating the supply air. This equipment can not only effectively increase the temperature in the mine, but also significantly reduce energy consumption and operating costs, which is in line with the development trend of green mines and energy conservation and emission reduction; However, there are still some problems in the use of traditional coal mine exhaust waste heat air supply heating equipment. The traditional coal mine exhaust waste heat air supply heating equipment will wash down the dust and impurities on the interception net inside the discharge pipe during atomization recoil, which makes it easy for dust and impurities to remain on the inner wall of the discharge pipe, making it more troublesome for the staff to carry out subsequent cleaning. Therefore, an air supply heating equipment based on coal mine exhaust waste heat is needed to solve the above problems. Summary of the invention

[0003] The purpose of the present invention is to provide an air supply heating device based on the waste heat of coal mine exhaust, so as to solve the defect that the existing air supply heating device based on the waste heat of coal mine exhaust will flush the dust and impurities on the interception net inside the discharge pipe during atomization recoil, causing the flushed dust and impurities to adhere to the inner wall of the exhaust pipe and be inconvenient to clean.

[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: an air supply heating device based on the waste heat of coal mine exhaust, comprising: an exhaust pipe and a recoil head, a fan is installed on one side of the exhaust pipe, a filter is installed on one side of the fan, a baffle is installed on one side of the filter, a fixed shaft is movably installed at the rear end of the exhaust pipe, a first atomizing nozzle is installed at the top of the exhaust pipe, a collection box is installed at the bottom end of the exhaust pipe, and a water storage tank is installed at the rear end of the collection box; A cleaning structure is provided at the top of the collection box, a connecting pipe is installed on one side of the exhaust pipe, a second atomizing nozzle is installed at the bottom end of the connecting pipe, a rotating structure is installed at the top of the second atomizing nozzle, and the recoil head is installed at the bottom end of the connecting pipe; An interception net is installed at the bottom end of the recoil head, an air supply pipe is arranged at the rear end of the connecting pipe, a heat exchanger is arranged inside the air supply pipe, a heat pump assembly is arranged on one side of the air supply pipe, and the rotating structure includes a belt pulley, a second bevel gear set, a connecting rod, a third bevel gear set, a mounting plate, a rotating disk, a through hole and a mounting disk, the belt pulley is fixed to one end of the fixed shaft, the mounting disk is installed on one side of the connecting pipe, and a second bevel gear set is installed on one end of the mounting disk.

[0005] Preferably, a connecting rod is installed on one side of the second bevel gear set, the mounting plate is fixed at the middle position inside the connecting tube, a rotating disk is installed on the top of the mounting plate, a through hole is opened on the outer side of the top of the rotating disk, and a third bevel gear set is installed on one end of the connecting rod, and the top of the third bevel gear set is installed on the outer side of the bottom end of the rotating disk.

[0006] Preferably, the bottom end of the rotating disk is inserted into the interior of the mounting plate, and a movable connection is formed between the rotating disk and the mounting plate.

[0007] Preferably, a plurality of through holes are provided, and the plurality of through holes are distributed in a ring shape on the outer side of the rotating disk.

[0008] Preferably, the cleaning structure includes a connecting disk, a connecting belt, a fixed disk, a first bevel gear set, a filter plate, a screw sleeve, a reciprocating screw and a brush, the connecting disk is fixed to the outer side of one end of the fixed shaft, the filter plate is installed on the top of the collecting box, the reciprocating screw is installed on one side of the top of the collecting box, a screw sleeve is installed on the outer side of the reciprocating screw, a brush is installed on one side of the screw sleeve, a first bevel gear set is installed on one end of the reciprocating screw, a fixed disk is installed on one side of the first bevel gear set, and the fixed disk is connected to the outer side of one end of the fixed shaft through a connecting belt.

[0009] Preferably, the screw sleeve is sleeved on the outer side of the reciprocating screw rod, and a threaded connection is formed between the screw sleeve and the reciprocating screw rod.

[0010] Preferably, a plurality of bristles are provided at the bottom end of the brush, and the plurality of bristles are arranged at equal intervals at the bottom end of the brush.

[0011] Preferably, the baffle plates are provided in a plurality of groups, and the baffle plates are arranged at equal intervals inside the exhaust duct.

[0012] Preferably, a plurality of the first atomizing nozzles are provided, and the plurality of the first atomizing nozzles are arranged at equal intervals on the top of the baffle plate.

[0013] The invention provides an air supply heating device based on waste heat from coal mine exhaust, which has the following advantages: Through the coordinated use of the belt pulley and the mounting disk, the connecting rod can be driven to rotate through the second bevel gear set. When the connecting rod rotates, the rotating disk is driven to rotate through the third bevel gear set, so that when the intercepting net is recoiled, a part of the water can be retained on the top of the rotating disk. Through the rotation of the rotating disk, the water is thrown out through the through hole by centrifugal force and evenly sprinkled on the inner wall of the connecting pipe, so as to flush the dust and impurities remaining on the inner wall, making it cleaner when cleaning.

[0014] The coordinated use of the connecting disk, the fixed disk and the first bevel gear set can drive the reciprocating screw to rotate. The rotating reciprocating screw cooperates with the screw sleeve to drive the brush to move back and forth to clean the surface of the filter plate, so that impurities are accumulated on both sides of the filter plate and will not accumulate on the surface of the filter plate to affect the filtering effect, making it more convenient to clean impurities. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the front view three-dimensional structure of the present invention; Figure 2 It is a schematic diagram of the three-dimensional structure of the present invention when viewed from above; Figure 3 It is a schematic diagram of the front cross-sectional three-dimensional structure of the present invention; Figure 4 It is a left-view three-dimensional structural schematic diagram of the present invention; Figure 5 It is a right-side partial cross-sectional three-dimensional structural schematic diagram of the present invention; Figure 6 It is a schematic diagram of the three-dimensional structure of the cleaning structure of the present invention; Figure 7 It is a schematic diagram of a three-dimensional structure of a partial cross-section of a cleaning side view of the present invention; Figure 8 It is a schematic diagram of a partial three-dimensional structure in a front view of the present invention.

[0016] Explanation of the reference numerals in the figure: 1. exhaust duct; 2. fan; 3. connecting pipe; 4. air supply duct; 5. heat pump assembly; 6. water storage tank; 7. collecting box; 8. filter screen; 9. first atomizing nozzle; 10. baffle plate; 11. second atomizing nozzle; 12. recoil head; 13. interception net; 14. cleaning structure; 141. connecting plate; 142. connecting belt; 143. fixed plate; 144. first bevel gear set; 145. filter plate; 146. screw sleeve; 147. reciprocating screw rod; 148. brush; 15. rotating structure; 151. belt pulley; 152. second bevel gear set; 153. connecting rod; 154. third bevel gear set; 155. mounting plate; 156. rotating disk; 157. through hole; 158. mounting disk; 16. fixed shaft; 17. heat exchanger. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] See also Figure 1-Figure 8 The present invention provides an air supply heating device based on the waste heat of coal mine exhaust, comprising an exhaust pipe 1 and a recoil head 12, a fan 2 is installed on one side of the exhaust pipe 1, a filter screen 8 is installed on one side of the fan 2, a baffle plate 10 is installed on one side of the filter screen 8, a fixed shaft 16 is movably installed at the rear end of the exhaust pipe 1, a first atomizing nozzle 9 is installed at the top of the exhaust pipe 1, a collecting box 7 is installed at the bottom end of the exhaust pipe 1, and a water storage tank 6 is installed at the rear end of the collecting box 7; A cleaning structure 14 is provided at the top of the box 7, a connecting pipe 3 is installed on one side of the exhaust pipe 1, a second atomizing nozzle 11 is installed at the bottom end inside the connecting pipe 3, a rotating structure 15 is installed at the top of the second atomizing nozzle 11, and a recoil head 12 is installed at the bottom end inside the connecting pipe 3; an interception net 13 is installed at the bottom end of the recoil head 12, an air supply pipe 4 is provided at the rear end of the connecting pipe 3, a heat exchanger 17 is provided inside the air supply pipe 4, and a heat pump assembly 5 is provided on one side of the air supply pipe 4.

[0019] Reference Figure 1 and Figure 8 As shown: the cleaning structure 14 includes a connecting plate 141, a connecting belt 142, a fixed plate 143, a first bevel gear set 144, a filter plate 145, a screw sleeve 146, a reciprocating screw rod 147 and a brush 148. The connecting plate 141 is fixed to the outer side of one end of the fixed shaft 16, the filter plate 145 is installed on the top of the collecting box 7, the reciprocating screw rod 147 is installed on one side of the top of the collecting box 7, the screw sleeve 146 is installed on the outer side of the reciprocating screw rod 147, and the brush 148 is installed on one side of the screw sleeve 146. The first bevel gear set 144 is installed at one end of the reciprocating screw rod 147. A fixed plate 143 is installed on one side of 4, and the fixed plate 143 is connected to the outer side of one end of the fixed shaft 16 through a connecting belt 142. A screw sleeve 146 is sleeved on the outer side of the reciprocating screw rod 147, and a threaded connection is formed between the screw sleeve 146 and the reciprocating screw rod 147. A plurality of bristles are arranged at the bottom end of the brush 148, and the bristles are arranged at equal intervals at the bottom end of the brush 148. A plurality of groups of baffle plates 10 are provided, and the plurality of baffle plates 10 are arranged at equal intervals inside the exhaust pipe 1. A plurality of first atomizing nozzles 9 are provided, and the plurality of first atomizing nozzles 9 are arranged at equal intervals at the top end of the baffle plate 10.

[0020] Specifically, in the present embodiment, when exchanging the internal heat of the exhaust pipe 1, the water in the water storage tank 6 is first injected into the collecting box 7. After the injection is completed, the water in the collecting box 7 is pumped into the heat pump assembly 5 by the water pump, and heat exchange is performed by the heat pump assembly 5. When the heat exchange is performed, the heat pump assembly 5 sprays the water through the first atomizing nozzle 9 and the second atomizing nozzle 11. The atomized water will combine with the hot air in the exhaust pipe 1 to exchange the heat in the hot air. At this time, a part of the water with heavier heat absorption will fall into the collecting box 7, and a part of the water mist will float upward and be intercepted. The net 13 is intercepted. During the atomization heat exchange, the baffle plate 10 is set to block the air, so that the air flows more slowly inside the exhaust pipe 1, so that it has a better effect in absorbing heat. The water after absorbing heat will flow to the inside of the collection box 7, and then be pumped to the inside of the heat pump component 5. The above work is repeated. The heat pump component 5 will increase the collected heat to a higher temperature level when working, and then heat the air passing through the air supply pipe 4 through the medium inside the circulating heat exchanger 17, thereby realizing heating of the mine and completing the air supply work of utilizing waste heat; When the atomized heat-absorbing water flows into the interior of the collection box 7, the use of the filter plate 145 can filter the heat-absorbing water, thereby screening out impurities in the water to prevent impurities from entering the interior of the heat pump assembly 5 and affecting the operation. When the fan 2 rotates inside the exhaust duct 1 to supply air, the fan 2 will drive the connecting disk 141 to rotate, and the connecting disk 141 will drive the fixed shaft 16 to rotate when rotating. The fixed shaft 16 will drive the fixed disk 143 to rotate through the surface connecting belt 142 when rotating. The fixed disk 143 will drive the reciprocating screw 147 to rotate through the first bevel gear set 144 when rotating. When the reciprocating screw 147 rotates, it will cooperate with the screw sleeve 146 to drive the brush 148 to reciprocate on the top of the filter plate 145, thereby cleaning the impurities filtered off the surface of the filter plate 145 to both sides of the filter plate 145, preventing impurities from accumulating on the surface of the filter plate 145 and affecting the filtering effect, thereby completing the filtering and cleaning work.

[0021] Reference Figure 1 and Figure 8As shown, the rotating structure 15 includes a belt pulley 151, a second bevel gear set 152, a connecting rod 153, a third bevel gear set 154, a mounting plate 155, a rotating disk 156, a through hole 157 and a mounting plate 158. The belt pulley 151 is fixed to one end of the fixed shaft 16, the mounting plate 158 is installed on one side of the connecting pipe 3, the second bevel gear set 152 is installed on one end of the mounting plate 158, the connecting rod 153 is installed on one side of the second bevel gear set 152, and the mounting plate 155 is fixed to the middle of the connecting pipe 3. Position, a rotating disk 156 is installed on the top of the mounting plate 155, and a through hole 157 is opened on the outer side of the top of the rotating disk 156. A third bevel gear set 154 is installed on one end of the connecting rod 153. The top of the third bevel gear set 154 is installed on the outer side of the bottom end of the rotating disk 156. The bottom end of the rotating disk 156 is inserted into the interior of the mounting plate 155. A movable connection is formed between the rotating disk 156 and the mounting plate 155. A plurality of through holes 157 are provided, and the plurality of through holes 157 are distributed in a ring shape on the outer side of the rotating disk 156.

[0022] Specifically, in the present embodiment, the fixed shaft 16 will also drive the pulley 151 to rotate when rotating, and the pulley 151 will drive the mounting plate 158 to rotate when rotating. When the mounting plate 158 rotates, it will drive the connecting rod 153 to rotate through the second bevel gear set 152, and the connecting rod 153 will drive the rotating plate 156 to rotate through the third bevel gear set 154 when rotating. When the rotating plate 156 rotates, when the recoil head 12 draws water from the inside of the heat pump assembly 5 to recoil and clean the impurities on the surface of the interception net 13, part of the water can flow to the top of the rotating plate 156. At this time, the rotating rotating plate 156 can throw the water out through the through hole 157, so that it can be evenly thrown on the inner wall of the connecting pipe 3, so that the water can flow evenly along the inner wall of the connecting pipe 3, thereby washing away the impurities on the inside of the connecting pipe 3, making it more convenient to clean the impurities on the inside of the connecting pipe 3.

[0023] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An air supply heating device based on waste heat from coal mine exhaust, comprising: an exhaust pipe (1) and a recoil head (12), Features: A fan (2) is installed on one side of the exhaust pipe (1), a filter screen (8) is installed on one side of the fan (2), a baffle plate (10) is installed on one side of the filter screen (8), a fixed shaft (16) is movably installed at the rear end of the exhaust pipe (1), a first atomizing nozzle (9) is installed at the top end of the exhaust pipe (1), a collection box (7) is installed at the bottom end of the exhaust pipe (1), and a water storage tank (6) is installed at the rear end of the collection box (7); A cleaning structure (14) is provided at the top of the collection box (7); a connecting pipe (3) is installed on one side of the exhaust pipe (1); a second atomizing nozzle (11) is installed at the bottom end of the connecting pipe (3); a rotating structure (15) is installed at the top of the second atomizing nozzle (11); and the recoil head (12) is installed at the bottom end of the connecting pipe (3); An interception net (13) is installed at the bottom end of the recoil head (12); an air supply pipe (4) is arranged at the rear end of the connecting pipe (3); a heat exchanger (17) is arranged inside the air supply pipe (4); a heat pump assembly (5) is arranged on one side of the air supply pipe (4); the rotating structure (15) comprises a belt pulley (151), a second bevel gear set (152), a connecting rod (153), a third bevel gear set (154), a mounting plate (155), a rotating disk (156), a through hole (157) and a mounting disk (158); the belt pulley (151) is fixed to one end of the fixed shaft (16); the mounting disk (158) is installed on one side of the connecting pipe (3); and the second bevel gear set (152) is installed on one end of the mounting disk (158).

2. The air supply heating device based on the waste heat of coal mine exhaust according to claim 1 is characterized in that: A connecting rod (153) is mounted on one side of the second bevel gear set (152); the mounting plate (155) is fixed at a middle position inside the connecting pipe (3); a rotating disk (156) is mounted on the top end of the mounting plate (155); a through hole (157) is provided on the outer side of the top end of the rotating disk (156); a third bevel gear set (154) is mounted on one end of the connecting rod (153); and the top end of the third bevel gear set (154) is mounted on the outer side of the bottom end of the rotating disk (156).

3. The air supply heating device based on the waste heat of coal mine exhaust according to claim 1 is characterized in that: The bottom end of the rotating disk (156) is inserted into the interior of the mounting plate (155), and a movable connection is formed between the rotating disk (156) and the mounting plate (155).

4. The air supply heating device based on the waste heat of coal mine exhaust according to claim 1 is characterized in that: A plurality of through holes (157) are provided, and the plurality of through holes (157) are distributed in a ring shape on the outer side of the rotating disk (156).

5. The air supply heating device based on the waste heat of coal mine exhaust air according to claim 1 is characterized in that: The cleaning structure (14) comprises a connecting disk (141), a connecting belt (142), a fixed disk (143), a first bevel gear set (144), a filter plate (145), a screw sleeve (146), a reciprocating screw rod (147) and a brush (148); the connecting disk (141) is fixed to the outside of one end of the fixed shaft (16); the filter plate (145) is mounted on the top of the collecting box (7); the reciprocating screw rod (147) is mounted on one side of the top of the collecting box (7); the screw sleeve (146) is mounted on the outside of the reciprocating screw rod (147); the brush (148) is mounted on one side of the screw sleeve (146); the first bevel gear set (144) is mounted on one end of the reciprocating screw rod (147); the fixed disk (143) is mounted on one side of the first bevel gear set (144); the fixed disk (143) is connected to the outside of one end of the fixed shaft (16) via a connecting belt (142).

6. The air supply heating device based on the waste heat of coal mine exhaust according to claim 5 is characterized in that: The screw sleeve (146) is sleeved on the outer side of the reciprocating screw rod (147), and a threaded connection is formed between the screw sleeve (146) and the reciprocating screw rod (147).

7. The air supply heating device based on the waste heat of coal mine exhaust air according to claim 5 is characterized in that: A plurality of bristles are arranged at the bottom end of the brush (148), and the plurality of bristles are arranged at equal intervals at the bottom end of the brush (148).

8. The air supply heating device based on waste heat from coal mine exhaust according to claim 1 is characterized in that: The baffle plates (10) are provided in a plurality of groups, and the baffle plates (10) are arranged at equal intervals inside the exhaust pipe (1).

9. The air supply heating device based on waste heat from coal mine exhaust according to claim 1 is characterized in that: A plurality of the first atomizing nozzles (9) are provided, and the plurality of the first atomizing nozzles (9) are arranged at equal intervals on the top of the baffle plate (10).