Tunnel high-temperature hot water seepage and waterproof and drainage system crystallization simulation test device and method

By designing a simulation test device in the tunnel high-temperature hot water seepage and drainage prevention system, simulating the form and location of hot water seepage, and analyzing the risk of crystallization blockage, the problem of crystallization blockage risk assessment of tunnel drainage prevention system under high temperature conditions in the prior art is solved. The system is optimized and cost-reduced.

CN119000780APending Publication Date: 2024-11-22CHONGQING UNIV
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411198228.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing tunnel drainage prevention and drainage system is difficult to simulate different hot water seepage forms and locations under high-temperature hot water conditions, resulting in the inability to effectively evaluate and optimize the risk of crystallization blockage, especially in Sichuan-Tibet Railway tunnels, high-temperature ion precipitation rate and crystallization. The quantitative influence law is unclear.

Method used

A crystal simulation test device for high-temperature hot water seepage and drainage prevention system in tunnel was designed, including tunnel model, initial support damage simulation mechanism and hot water seepage mechanism. These mechanisms can be moved through double-row tracks to simulate underground hot water seepage and explore the crystallization proportion of drainage plates, longitudinal blind tubes and transverse blind tubes at different hot water temperatures.

Benefits of technology

It realizes that different hot water seepage forms and locations are simulated at low cost and high efficiency, analyzes the risk of crystallization blockage, guides the optimized design of tunnel drainage prevention and drainage system, reduces the actual exploration costs, and provides a diversified experimental plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119000780A_ABST
    Figure CN119000780A_ABST
Patent Text Reader

Abstract

The invention discloses a tunnel high-temperature hot water seepage and waterproof and drainage system crystallization simulation test device, which comprises a tunnel model, a primary support damage simulation mechanism and a hot water seepage mechanism, and is characterized in that the primary support damage simulation mechanism can be arranged outside the tunnel model in a sleeving manner and is used for cutting the tunnel model; the hot water seepage mechanism can be arranged outside the tunnel model in a sleeving manner so as to simulate a damaged seepage channel on the tunnel model, and the hot water seepage mechanism can also be arranged outside the tunnel model in a sleeving manner and is used for spraying hot water to the outer surface of the tunnel model, so that the hot water can permeate into the tunnel model through the damaged seepage channel from the outer surface of the tunnel model. The seepage form and seepage position of underground hot water can be simulated, the proportion of the crystallization amount of the waterproof and drainage plate, the longitudinal blind pipe and the transverse blind pipe at different hot water seepage positions and hot water temperatures is explored, the crystallization blockage risk position is analyzed, and the design of a tunnel waterproof and drainage system is optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel water seepage test equipment, and in particular relates to a tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device and method. Background Art

[0002] Crystallization is a common type of disaster that causes failure of tunnel drainage systems.

[0003] When groundwater seeps through karst strata, a large amount of crystalline ions (such as Ca2+, Mg2+, CO32-, SO42-, HCO3-) precipitate into the groundwater. Groundwater rich in crystalline ions flows into the drainage ditch through the tunnel's drainage system and is then drained out of the cave. In the process of groundwater passing through the annular blind pipe, longitudinal blind pipe, and transverse blind pipe, the crystalline ions combine with each other to form crystals and deposit and adhere to the inner wall of the blind pipe. As time goes by, the crystals inside the blind pipe gradually accumulate or even block it, causing the tunnel drainage system to fail, resulting in an increase in water pressure on the outside of the lining, and the lining structure is at risk of cracking.

[0004] The Sichuan-Tibet Railway tunnel uses drainage plates, longitudinal blind pipes, and transverse blind pipes as the main components of the drainage system. That is, drainage plates are used to replace traditional annular blind pipes to form a new type of drainage system. The existing tunnel drainage system crystallization test device is mainly composed of three parts: annular blind pipes, longitudinal blind pipes, and transverse blind pipes. The proportion of crystallization in each part is studied. For the tunnel drainage system using drainage plates, the location of crystallization blockage risk cannot be known.

[0005] In addition, the high geothermal sections of the Sichuan-Tibet Railway tunnel are widely distributed, the form and location of underground hot water seepage are unknown, and the influence of high temperature on the rate and amount of ion crystallization is still unclear. How to simulate different forms of hot water seepage, explore the proportion of crystallization of drainage plates, longitudinal blind pipes, and transverse blind pipes at different hot water seepage locations and hot water temperatures, analyze the risk location of crystallization blockage, and guide the optimization design of the drainage system of the Sichuan-Tibet Railway tunnel are key issues that need to be urgently addressed in the prevention and control of crystallization in high-temperature hot water tunnels.

[0006] Based on this, the applicant considered designing a tunnel high-temperature hot water seepage and drainage system crystallization simulation test device and method. Summary of the invention

[0007] In view of the above problems, the present invention provides a tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device and method that overcome the above problems or at least partially solve the above problems. The technical solution is as follows:

[0008] A tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device, characterized in that it includes a tunnel model, an initial support damage simulation mechanism, a hot water seepage mechanism and a double-row track, wherein the initial support damage simulation mechanism can be sleeved on the outside of the tunnel model to cut the tunnel model so as to simulate a damaged seepage channel on the tunnel model, and the hot water seepage mechanism can also be sleeved on the outside of the tunnel model to spray hot water onto the outer surface of the tunnel model so that the hot water can penetrate into the tunnel model from the outer surface of the tunnel model through the damaged seepage channel, and the double-row track includes two sections of relatively arranged expansion rails and a running rail connected between the two sections of the expansion rails, the tunnel model is fixedly installed on the running rails, the initial support damage simulation mechanism and the hot water seepage mechanism are respectively slidably installed on the two sections of the expansion rails, and the initial support damage simulation mechanism and the hot water seepage mechanism can both move from the corresponding expansion rails to the running rails to be sleeved on the outside of the tunnel model respectively.

[0009] Compared with the prior art, the tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device of the present invention has the following advantages:

[0010] Through the set tunnel model, initial support damage simulation mechanism and hot water seepage mechanism, it is possible to simulate the underground hot water seepage form and seepage location, explore the proportion of crystallization of drainage plates, longitudinal blind pipes and transverse blind pipes at different hot water seepage locations and hot water temperatures, analyze the risk location of crystallization blockage, and optimize the design of tunnel drainage system. Through the set double-row track, the initial support damage simulation mechanism and the hot water seepage mechanism can move on the double-row track, with better movement stability, and can better maintain the spacing of the outer surface of the tunnel model.

[0011] The above-mentioned tunnel high-temperature hot water seepage and drainage system crystallization simulation test device and method have the advantages of simple structure and easy implementation. They are suitable for installation and use in existing tunnel seepage simulations, and have low cost of use, which can improve benefits.

[0012] The present invention also provides a tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test method, comprising the following steps:

[0013] S1, weigh and record the net weight of the drainage board, the longitudinal blind pipe, and the transverse blind pipe;

[0014] S2, assembling the initial support damage simulation mechanism, the tunnel model, the hot water seepage mechanism and the double-row track;

[0015] S3, moving the initial support damage simulation mechanism along the double-row track to the tunnel model via the first movable chassis, and moving the cutting head to a predetermined point-shaped hot water seepage position;

[0016] S4, turning on the cutting head, using the cutting head to cut the tunnel model, and simulating the point-shaped damaged seepage channel;

[0017] S5, resetting and moving the initial support damage simulation mechanism to an initial position along the double-row track via the first movable chassis;

[0018] S6, moving the hot water seepage mechanism along the double-row track to the tunnel model via the second movable chassis, and opening the corresponding partitioned water seepage module;

[0019] S7, injecting a crystallized ion aqueous solution into the second water tank, turning on the heater to heat the crystallized ion aqueous solution to a set temperature value, and spraying the crystallized ion aqueous solution into the damaged seepage channel on the tunnel model through a partitioned water seepage module;

[0020] S8, the crystallized ion aqueous solution flows into the ditch after passing through the anti-drainage board, the longitudinal blind pipe and the transverse blind pipe;

[0021] S9, after the crystalline ion aqueous solution is precipitated and attached to the anti-drainage board, the longitudinal blind pipe and the transverse blind pipe, stop injecting the crystalline ion aqueous solution, remove the anti-drainage board, the longitudinal blind pipe and the transverse blind pipe, dry and weigh them, calculate the difference between their respective weights and the corresponding net weight in S1, analyze the proportion of crystallization on the anti-drainage board, the longitudinal blind pipe and the transverse blind pipe, and propose a predicted position of crystallization blockage risk according to the proportion of crystallization.

[0022] Compared with the prior art, the tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test method of the present invention has the following advantages:

[0023] Through simulation test methods, different forms of hot water seepage can be simulated, and the proportion of crystallization in drainage plates, longitudinal blind pipes, and transverse blind pipes at different hot water seepage locations and hot water temperatures can be explored. The risk of crystallization blockage can be analyzed to reduce the expensive cost of actual exploration. Moreover, simulation tests can be carried out in a diversified manner to obtain more test schemes, which is convenient for guiding the optimal design of the drainage system of the Sichuan-Tibet Railway tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0025] Figure 2 This is a schematic diagram of the tunnel model structure;

[0026] Figure 3 It is a schematic diagram of the cross-sectional structure of the tunnel model;

[0027] Figure 4 This is a schematic diagram of the drainage structure on the tunnel model;

[0028] Figure 5 This is a schematic diagram of the structure of the initial support damage simulation mechanism;

[0029] Figure 6 It is a schematic diagram of the structure of the water jet cutting assembly;

[0030] Figure 7 It is a schematic diagram of the structure of the water jet drive assembly;

[0031] Figure 8 It is a schematic diagram of the limiter structure;

[0032] Fig. 9 It is a schematic diagram of the cutting head structure;

[0033] Fig.10 It is a schematic diagram of the pulling module structure;

[0034] Fig.11 It is a schematic diagram of the hot water seepage mechanism structure;

[0035] Fig.12 It is a schematic diagram of the structure of the partition water seepage module;

[0036] Fig.13 It is a schematic diagram of the structure of the water seepage unit;

[0037] Fig.14 It is a structural schematic diagram of the second water tank and the hot water pipeline;

[0038] Fig.15 It is a structural schematic diagram of the second mobile chassis.

[0039] Description of Reference Numerals

[0040] 110 initial support model, 120 secondary lining model, 130 drainage board, 140 longitudinal blind pipe, 150 transverse blind pipe, 160 ditch, 170 baffle, 180 support;

[0041] 210 first moving chassis, 220 annular guide rail, 230 longitudinal guide rail, 240 annular slider, 250 first motor, 260 second motor, 270 cable reel;

[0042] 310 cutting head, 320 first water tank, 330 high pressure corrugated pipeline, 340 pulling module, 350 stopper, 360 linear motor, 370 driving shaft;

[0043] 410 second mobile chassis, 420 second water tank, 430 hot water pipeline, 440 partition water infiltration module, 450 heater;

[0044] 510 running rail, 520 extension rail. DETAILED DESCRIPTION

[0045] The present invention will be further described in detail below in conjunction with the accompanying drawings.

[0046] When implementing: Figure 1-15 As shown, a tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device is characterized in that it includes a tunnel model, an initial support damage simulation mechanism, a hot water seepage mechanism and a double-row track. The initial support damage simulation mechanism can be sleeved on the outside of the tunnel model to cut the tunnel model so as to simulate a damaged seepage channel on the tunnel model. The hot water seepage mechanism can also be sleeved on the outside of the tunnel model to spray hot water on the outer surface of the tunnel model so that the hot water can penetrate into the tunnel model from the outer surface of the tunnel model through the damaged seepage channel. The double-row track includes two sections of relatively arranged expansion rails 520 and a running rail 510 connected between the two sections of the expansion rails 520. The tunnel model is fixedly installed on the running rail 510. The initial support damage simulation mechanism and the hot water seepage mechanism are respectively slidably installed on the two sections of the expansion rails 520. The initial support damage simulation mechanism and the hot water seepage mechanism can both move from the corresponding expansion rails 520 to the running rails 510 to be sleeved on the outside of the tunnel model respectively.

[0047] Compared with the prior art, the tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device and method of the present invention have the following advantages:

[0048] Through the set tunnel model, initial support damage simulation mechanism and hot water seepage mechanism, it is possible to simulate the underground hot water seepage form and seepage location, explore the crystallization ratio of the drainage board 130, longitudinal blind pipe 140 and transverse blind pipe 150 at different hot water seepage locations and hot water temperatures, analyze the risk position of crystallization blockage, and optimize the design of the tunnel drainage system. Through the set double-row track, the initial support damage simulation mechanism and the hot water seepage mechanism can move on the double-row track, with better movement stability, and can better maintain the spacing of the outer surface of the tunnel model.

[0049] The above-mentioned tunnel high-temperature hot water seepage and drainage system crystallization simulation test device and method have the advantages of simple structure and easy implementation. They are suitable for installation and use in existing tunnel seepage simulations, and have low cost of use, which can improve benefits.

[0050] In this embodiment, Figure 1-15As shown, the tunnel model includes an initial support model 110, a secondary lining model 120, a drainage board 130, a longitudinal blind pipe 140, a transverse blind pipe 150 and a ditch 160, a baffle 170 and a support 180. The secondary lining model 120 is sleeved on the inner surface of the initial support model 110. The drainage board 130 is located between the initial support model 110 and the secondary lining model 120 and is arranged close to the outer surface of the secondary lining model 120. The longitudinal blind pipe 140 It is connected to the bottom end of the drainage board 130, one end of the longitudinal blind pipe 140 is connected to the transverse blind pipe 150, and the other end is closed. The ditch 160 is located below the water outlet of the transverse blind pipe 150. The baffle 170 is arranged at both ends of the initial support model 110 and covers between the initial support model 110 and the secondary lining model 120. The support 180 is fixedly connected to the inner side wall of the double-row track, and the initial support model 110 is fixedly connected to the support 180.

[0051] In this way, by setting up the initial support model 110, the secondary lining model 120, the drainage board 130, the longitudinal blind pipe 140, the transverse blind pipe 150 and the ditch 160, the baffle 170 and the support 180, the tunnel model can discharge the injected hot water into the drainage board 130, the longitudinal blind pipe 140, the transverse blind pipe 150 and the ditch 160 to simulate the tunnel drainage process, and the conclusions drawn from the experiment are more effective.

[0052] In this embodiment, Figure 1-15 As shown, the initial support damage simulation mechanism includes a water jet cutting component and a water jet driving component. The water jet cutting component is used to spray water to cut the tunnel model, and the water jet driving component is used to drive the water jet cutting component to move to adjust the cutting position.

[0053] In this way, by setting up the water jet cutting assembly and the water jet driving assembly, the initial support damage simulation mechanism can not only cut the tunnel model, but also adjust the cutting position, with better adaptability.

[0054] In this embodiment, Figure 1-15As shown, the water jet drive assembly includes a first movable base 210, an annular guide rail 220 and a longitudinal guide rail 230. The first movable base 210 has two pieces, and the two first movable bases 210 are respectively arranged side by side on the double-row track and can slide along the double-row track. The annular guide rails 220 have two pieces, and the two annular guide rails 220 are respectively installed on the two ends of the first movable base 210, and the two ends of each annular guide rail 220 are respectively connected to the two first movable bases 210 at corresponding positions. The two ends of the longitudinal guide rail 230 are respectively connected to the two annular guide rails 220, and the water jet cutting assembly is installed on the longitudinal guide rail 230.

[0055] In this way, by providing the first movable chassis 210, the annular guide rail 220 and the longitudinal guide rail 230, the water jet cutting assembly can be more reliably moved on the water jet driving assembly, the structure is relatively simple, and the operation is more efficient.

[0056] During implementation, rollers are provided at the bottom of the first movable chassis 210, and the first movable chassis 210 is slidably arranged on the double-row tracks through the rollers.

[0057] In this embodiment, Figure 1-15 As shown, the water jet drive assembly also includes two annular sliders 240 and a power module. The two annular sliders 240 are respectively slidably set on the two annular guide rails 220, and the two ends of the longitudinal guide rail 230 are respectively connected to the two annular sliders 240. The power module is installed on the first movable base frame 210 and is used to drive the two annular sliders 240 to move along the corresponding annular guide rails 220.

[0058] In this way, by providing two annular sliders 240 and a power module, the water jet cutting assembly can be moved in an annular manner along the outer circumferential surface of the tunnel model, the moving structure is relatively simple, and the movement is more efficient.

[0059] In this embodiment, Figure 1-15 As shown, the power module includes two motor groups, and the two motor groups correspond to the two annular sliders 240 respectively. Each motor group includes a first motor 250 and a second motor 260. The first motor 250 and the second motor 260 are respectively arranged on two pieces of the first moving base frame 210. The first motor 250 and the second motor 260 are provided with a winding drum 270, and the windings on the two winding drums 270 are respectively connected to the two ends of the corresponding annular slider 240.

[0060] In this way, the two motor groups are provided to provide power for driving the annular slider 240, so that the annular slider 240 can move on the annular guide rail 220, the transmission structure is relatively simple, the manufacturing cost is low, and the stability is higher.

[0061] In this embodiment, Figure 1-15 As shown, the water jet cutting assembly includes a cutting head 310, a first water tank 320, a high-pressure corrugated pipe 330, a pulling module 340 and a limiter 350. The cutting head 310 is transmission-mounted on the longitudinal guide rail 230. There are two first water tanks 320, which are respectively arranged on the two first movable base frames 210. The high-pressure corrugated pipe 330 includes two first input pipe sections and one first output pipe section. The two first input pipe sections are respectively connected to the two first water tanks 320, and one first output pipe section is connected to the cutting head 310. There are two pulling modules 340, which are respectively installed in the two first water tanks 320. One end of each pulling module 340 is connected to the inner wall of the corresponding first water tank 320, and the other end is connected to the corresponding first input pipe section. There are two limiters 350, which are respectively arranged on the outer walls of the two first water tanks 320 and are respectively sleeved outside the two first input pipe sections of the high-pressure corrugated pipe 330.

[0062] In this way, through the setting of the cutting head 310, the first water tank 320, the high-pressure bellows pipe 330, the pulling module 340 and the limiter 350, the cutting head 310 can draw water from the first water tank 320 for jet cutting, and can move elastically under the action of the pulling module 340, so that the cutting head 310 is more adaptable when moving.

[0063] During implementation, the cutting head 310 includes a nozzle, a longitudinal drive module, a water jet control system and a booster pump. The longitudinal drive module is installed on the longitudinal guide rail 230 and can move along the longitudinal guide rail 230. The nozzle, water jet control system and booster pump are fixed on the longitudinal drive device and connected to the first output pipe section.

[0064] During implementation, the longitudinal drive module includes a linear motor 360 and a drive shaft 370. The linear motor 360 is fixedly mounted on the annular slider 240. The drive shaft 370 is inserted into the linear motor 360 and connected to the cutting head 310 at one end, and the other end is a free end. A magnet is arranged in the drive shaft 370. The linear motor 360 is provided with an electromagnetic coil around the outer ring of the drive shaft 370. Repulsion is generated between the electromagnetic coil and the magnet through electromagnetic induction to drive the drive shaft 370 to move linearly.

[0065] During implementation, the pulling module 340 includes a fixed block and a compression spring, one end of the compression spring is connected to the corresponding inner wall of the first water tank 320, the fixed block is fixed to the other end of the compression spring, and a first input pipe section is connected to the corresponding fixed block.

[0066] During implementation, the limiter 350 includes a limit arm and support rods vertically arranged at both ends of the limit arm.

[0067] In this embodiment, Figure 1-15 As shown, the hot water seepage mechanism includes a second movable base frame 410 and water seepage components arranged in sequence on the second movable base frame 410. The second movable base frame 410 has two pieces, and the two second movable base frames 410 are arranged side by side on the double-row track and can slide along the double-row track. The water seepage components are used to spray hot water onto the outer surface of the tunnel model.

[0068] In this way, by providing the second moving base frame 410 and the water seepage components arranged in sequence on the second moving base frame 410, it is possible to spray hot water onto the tunnel model to simulate water seepage.

[0069] During implementation, a fixed bracket is arranged above the second movable base frame 410, and the fixed bracket is used to support the water seepage component. Rollers are also arranged at the bottom of the second movable base frame 410, and are slidably arranged on the double-row track through the rollers.

[0070] In this embodiment, Figure 1-15 As shown, the water seepage assembly includes a second water tank 420, a hot water pipeline 430 and a partitioned water seepage module 440. There are two second water tanks 420, which are respectively arranged on two second movable base frames 410 opposite to each other. The hot water pipeline 430 includes two second input pipe sections and one second output pipe section. The two second input pipe sections are respectively connected to the two second water tanks 420. The partitioned water seepage module 440 is fixedly connected to the top of the hot water pipeline 430 and is connected to the second output pipe section. The partitioned water seepage module 440 is used to inject hot water into the tunnel model in different areas. The two second water tanks 420 are both installed with a pulling module 340 and a heater 450.

[0071] In this way, by providing the second water tank 420, the hot water pipeline 430 and the partitioned water seepage module 440, the partitioned water seepage module 440 can pump water from the second water tank 420, and the pumping efficiency is relatively high.

[0072] During implementation, the partitioned water seepage module 440 has an arc-shaped plate surface, and the partitioned water seepage module 440 includes multiple water seepage units. Each water seepage unit includes a liquid storage tank, a retractable nozzle, an image recognition module, and a three-dimensional laser scanner. The retractable nozzle, the image recognition module, and the three-dimensional laser scanner are all fixedly arranged at the bottom of the liquid storage tank. The image recognition module can realize intelligent recognition of the damage of the initial support model 110 caused by water jet cutting, and accurately determine the damage position, damage length, opening and other parameters through the three-dimensional laser scanner, and finally realize intelligent control of the partitioned water seepage module 440 to complete the injection of hot water into the tunnel model. The liquid storage tanks on the multiple water seepage units are connected by hoses.

[0073] During implementation, the pulling module 340 and the heater 450 are installed in each of the two second water tanks 420 , and one end of the pulling module 340 is connected to the inner wall of the corresponding second water tank 420 , and the other end is connected to the corresponding second input pipe section.

[0074] During implementation, a water pump is disposed in each of the two second water tanks 420 , for pumping water in the two second water tanks 420 into the partitioned water infiltration module 440 .

[0075] During implementation, the outer walls of the two second water tanks 420 are also provided with limiters 350 , and the two limiters 350 are respectively sleeved on the two second input pipe sections.

[0076] The tunnel high temperature hot water seepage and waterproofing and drainage system crystallization simulation test method includes the following steps:

[0077] S1, weigh and record the net weight of the drainage board 130, the longitudinal blind pipe 140, and the transverse blind pipe 150;

[0078] During implementation, the anti-drainage plate 130, the longitudinal blind pipe 140 and the transverse blind pipe 150 together form an anti-drainage structure on the tunnel model.

[0079] S2, assembling the initial support damage simulation mechanism, the tunnel model, the hot water seepage mechanism and the double-row track;

[0080] S3, the initial support damage simulation mechanism is moved to the tunnel model along the double-row track through the first moving chassis 210, and the cutting head 310 is moved to a predetermined point-shaped hot water seepage position; the high-pressure corrugated pipeline 330 is pulled by the cutting head 310 and the pulling module 340 and constrained by the limiter 350 during the movement, so that there will be no motion interference with other components;

[0081] During implementation, the cutting head 310 is a damage manufacturing structure on the initial support damage simulation mechanism.

[0082] S4, turning on the cutting head 310, using the cutting head 310 to cut the tunnel model, and simulating the point-shaped damaged seepage channel;

[0083] The water jet control system and the booster pump are turned on. The booster pump draws abrasive and tap water in the water jet tank through the high-pressure corrugated pipe 330 and boosts the pressure. The water jet control system adjusts the water flow pressure and the nozzle aperture size. After the high-pressure water flow is ejected, the initial support model 110 is cut to cause damage to the initial support model 110, simulating the seepage channel of point-shaped hot water. The water jet control system and the booster pump are turned off.

[0084] S5, resetting and moving the initial support damage simulation mechanism to an initial position along the double-row track through the first movable chassis 210;

[0085] S6, moving the hot water seepage mechanism along the double-row track to the tunnel model through the second movable chassis 410, and opening the corresponding water seepage unit;

[0086] The image recognition module is turned on to intelligently identify the damage of the initial support model 110 caused by the water jet cutting, and the three-dimensional laser scanner is turned on to accurately determine the damage position, damage length, opening and other parameters;

[0087] The retractable nozzles near the damaged part of the initial support model 110 are turned on and extended into the damaged part, while the retractable nozzles at other positions remain closed. The image recognition module, the three-dimensional laser scanner, and the circumferential drive slider are turned off.

[0088] S7, injecting a crystallized ion aqueous solution into the second water tank 420, turning on the heater 450 to heat the crystallized ion aqueous solution to a set temperature value, and injecting the crystallized ion aqueous solution into the damaged seepage channel on the tunnel model through the partitioned water seepage module 440;

[0089] During implementation, the partitioned water seepage module is a water seepage structure on the hot water seepage mechanism.

[0090] S8, the crystallized ion aqueous solution flows into the ditch 160 after passing through the anti-drainage board 130, the longitudinal blind pipe 140 and the transverse blind pipe 150, and flows out from the ditch 160;

[0091] As the crystallized ion aqueous solution is injected, crystals gradually precipitate and deposit on the drainage board 130, the longitudinal blind pipe 140 and the transverse blind pipe 150 and adhere to their surfaces;

[0092] S9, after the crystallized ion aqueous solution is precipitated and attached to the anti-drainage board 130, the longitudinal blind tube 140 and the transverse blind tube 150, the injection of the crystallized ion aqueous solution is stopped, the anti-drainage board 130, the longitudinal blind tube 140 and the transverse blind tube 150 are removed, dried and weighed, and the difference between each weight and the corresponding net weight in S1 is calculated respectively, and the proportion of crystallization on the anti-drainage board 130, the longitudinal blind tube 140 and the transverse blind tube 150 is analyzed, and the crystallization blockage risk prediction position is proposed according to the proportion of the crystallization;

[0093] In S3, the cutting head 310 is controlled by the power module and the longitudinal drive device to move along the outer surface of the initial support model 110 according to a predetermined route, and the nozzle is controlled by the water jet control system to spray high-pressure water to cut the initial support model 110 to cause damage to the initial support model 110 (such as cracks, initial support peeling), simulating the linear hot water seepage channel (cracks) and the surface hot water seepage channel (initial support peeling). Further explore the quality of crystals attached to the drainage board 130, the longitudinal blind pipe 140 and the transverse blind pipe 150 under different water seepage forms (point hot water seepage, linear hot water seepage, surface hot water seepage), analyze the proportion of crystals in each part, and propose the predicted risk position of crystal blockage.

[0094] The above are only preferred implementations of the present invention. It should be pointed out that a number of modifications and improved technical solutions made by those skilled in the art without departing from the technical solution should also be deemed to fall within the scope of protection required by the claims.

Claims

1. Tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device, characterized by: It includes a tunnel model, an initial support damage simulation mechanism, a hot water seepage mechanism and a double-row track. The initial support damage simulation mechanism can be mounted on the outside of the tunnel model to cut the tunnel model so as to simulate a damaged seepage channel on the tunnel model. The hot water seepage mechanism can also be mounted on the outside of the tunnel model to spray hot water onto the outer surface of the tunnel model so that the hot water can penetrate into the tunnel model from the outer surface of the tunnel model through the damaged seepage channel. The double-row track includes two sections of relatively arranged extension rails and a running rail connected between the two sections of the extension rails. The tunnel model is fixedly installed on the running rails. The initial support damage simulation mechanism and the hot water seepage mechanism are respectively slidably installed on the two sections of the extension rails. The initial support damage simulation mechanism and the hot water seepage mechanism can both move from their respective corresponding extension rails to the running rails so as to be respectively mounted on the outside of the tunnel model.

2. The tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device according to claim 1 is characterized by: The tunnel model includes an initial support model, a secondary lining model, a drainage board, a longitudinal blind pipe, a transverse blind pipe and a ditch, a baffle and a support. The secondary lining model is sleeved on the inner surface of the initial support model. The drainage board is located between the initial support model and the secondary lining model and is arranged close to the outer surface of the secondary lining model. The longitudinal blind pipe is connected to the bottom end of the drainage board. One end of the longitudinal blind pipe is connected to the transverse blind pipe and the other end is closed. The ditch is located below the water outlet of the transverse blind pipe. The baffle is arranged at both ends of the initial support model and covers between the initial support model and the secondary lining model. The support is fixed to the inner side wall of the double-row track, and the initial support model is fixed to the support.

3. The tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device according to claim 2 is characterized by: The initial support damage simulation mechanism includes a water jet cutting component and a water jet driving component. The water jet cutting component is used to spray water to cut the tunnel model, and the water jet driving component is used to drive the water jet cutting component to move to adjust the cutting position.

4. The tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device according to claim 3 is characterized by: The water jet drive assembly includes a first movable base, an annular guide rail and a longitudinal guide rail. The first movable base has two pieces, and the two first movable bases are respectively arranged side by side on the double-row rails and can slide along the double-row rails. There are two annular guide rails, and the two annular guide rails are respectively installed on the two ends of the first movable base, and the two ends of each annular guide rail are respectively connected to the two first movable bases at corresponding positions. The two ends of the longitudinal guide rail are respectively connected to the two annular guide rails, and the water jet cutting assembly is installed on the longitudinal guide rail.

5. The tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device according to claim 4 is characterized by: The water jet drive assembly also includes two annular sliders and a power module. The two annular sliders are respectively slidably set on the two annular guide rails. The two ends of the longitudinal guide rails are respectively connected to the two annular sliders. The power module is installed on the first movable chassis and is used to drive the two annular sliders to move along the corresponding annular guide rails.

6. The tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device according to claim 5 is characterized by: The power module includes two motor groups, and the two motor groups correspond to the two annular sliders respectively. Each motor group includes a first motor and a second motor. The first motor and the second motor are respectively arranged on the two first movable base frames. The first motor and the second motor are provided with winding reels, and the windings on the two winding reels are respectively connected to the two ends of the corresponding annular sliders.

7. The tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device according to claim 6 is characterized by: The water jet cutting assembly includes a cutting head, a first water tank, a high-pressure corrugated pipe, a pulling module and a limiter. The cutting head is driven and installed on the longitudinal guide rail. There are two first water tanks, which are respectively arranged on the two first movable base frames. The high-pressure corrugated pipe includes two first input pipe sections and one first output pipe section. The two first input pipe sections are respectively connected to the two first water tanks, and one first output pipe section is connected to the cutting head. There are two pulling modules, which are respectively installed in the two first water tanks. One end of each pulling module is connected to the corresponding inner wall of the first water tank, and the other end is connected to the corresponding first input pipe section. There are two limiters, which are respectively arranged on the outer walls of the two first water tanks and are respectively sleeved outside the two first input pipe sections of the high-pressure corrugated pipe.

8. The tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device and method according to any one of claim 7, characterized in that: The hot water seepage mechanism includes a second movable base frame and water seepage components arranged in sequence on the second movable base frame. The second movable base frame has two pieces, and the two second movable base frames are arranged side by side on the double-row track and can slide along the double-row track. The water seepage components are used to spray hot water onto the outer surface of the tunnel model.

9. The tunnel high-temperature hot water seepage and waterproofing and drainage system crystallization simulation test device according to claim 8, characterized in that: The water seepage assembly includes a second water tank, a hot water pipeline and a partitioned water seepage module. There are two second water tanks, which are respectively arranged on two second movable base frames opposite to each other. The hot water pipeline includes two second input pipe sections and one second output pipe section. The two second input pipe sections are respectively connected to the two second water tanks. The partitioned water seepage module is fixedly connected to the top of the hot water pipeline and is connected to the second output pipe section. The partitioned water seepage module is used to spray hot water into different areas of the tunnel model. A pulling module and a heater are installed in the two second water tanks.

10. Tunnel high temperature hot water seepage and waterproofing and drainage system crystallization simulation test method, characterized in that: The following steps are involved: S1, weighing and recording the net weight of the drainage structure on the tunnel model; S2, assembling the initial support damage simulation mechanism, the tunnel model, the hot water seepage mechanism and the double-row track; S3, moving the initial support damage simulation mechanism along the double-row track to the tunnel model, and moving the damage manufacturing structure on the initial support damage simulation mechanism to a predetermined point-shaped hot water seepage position; S4, using the damage manufacturing structure on the initial support damage simulation mechanism to cut the tunnel model and simulate the point-shaped damaged seepage channel; S5, resetting and moving the initial support damage simulation mechanism along the double-row track to an initial position; S6, moving the hot water seepage mechanism along the double-row track to the tunnel model, and opening the corresponding water seepage structure on the hot water seepage mechanism; S7, injecting a crystalline ion aqueous solution into the hot water seepage mechanism, heating the crystalline ion aqueous solution to a set temperature value, and spraying the crystalline ion aqueous solution into the damaged seepage channel on the tunnel model through the corresponding water seepage structure on the hot water seepage mechanism; S8, the crystalline ion aqueous solution flows out after passing through the anti-drainage structure on the tunnel model; S9, after the crystalline ion aqueous solution precipitates and adheres to the anti-drainage structure on the tunnel model, stop injecting the crystalline ion aqueous solution, remove the anti-drainage structure on the tunnel model, dry and weigh it, calculate the difference between each weight and the corresponding net weight in S1, analyze the crystallization ratio of the anti-drainage structure on the tunnel model, and propose a predicted position of crystallization blockage risk according to the crystallization ratio.

Citation Information

Cited By

  • Tunnel water gushing simulation test equipment

    CN119936353A

  • Device and method for testing influence of ditch cover plate on temperature and humidity in tunnel hole

    CN120102618A

  • A test device and method for the influence of a water ditch cover plate on the temperature and humidity in a tunnel hole

    CN120102618B