Karst mountainous area three-dimensional water network construction method
Through the three-dimensional water network construction method, combining the topography and water resources characteristics of the karst mountainous areas, the water demand area and strategic water resource reserve area are divided, and groundwater resources are used to solve the problem of uneven temporal and spatial distribution of water resources in the karst mountainous areas and realize the water resources Rational configuration and efficient transportation improve the resilience and response capabilities of the water network.
Patent Information
- Application Number
- CN202410664960.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-27
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-05-27
AI Technical Summary
Due to the special terrain and landforms of the Karst Mountains, the water resources are not uniform in time and space distribution, which leads to the construction of water networks facing high and low water, poor water storage and water retention capabilities, and unfavorable conditions for large storage and storage. The existing technology lacks a targeted standard system, making it difficult to effectively utilize water resources. , affect economic and social development.
A three-dimensional water network construction method is proposed. By determining the level and backbone engineering of the construction area, combining topographic analysis, river and lake water system structure, underground karst landform and current water resources, it divides water demand areas, water scarcity areas and strategic water resources reserves. Area, use groundwater resources to supplement and build a three-dimensional water network of river and lake water systems-groundwater systems-drainage channels.
It has achieved rational allocation and efficient transportation of water resources, improved the resilience of the water network, enhanced its adaptability to climate change and emergencies, and solved the problems of water resources development and utilization in karst mountainous areas.
Smart Images

Figure CN119005480A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of water network construction, and in particular relates to a method for constructing a three-dimensional water network in a karst mountain area. Background Art
[0002] The water network is a comprehensive system based on natural rivers and lakes, with diversion and drainage projects as channels, regulation and storage projects as nodes, and intelligent regulation as means. From the perspective of building a regional water network, the water network is formed by the coupling of the natural river and lake water system network and the artificial intake-supply-use-drainage network. The two are connected through water intake points and drainage points, and are a coupled and nested composite system. Most water networks have the optimization of water resources allocation as their main function, taking into account the flood prevention and disaster reduction of the river basin and the protection of the water ecosystem. Accelerating the construction of water networks at the national, provincial, municipal and county levels and building a modern high-quality water conservancy infrastructure network are important foundations for ensuring water security.
[0003] In typical karst mountainous areas, mountains and hills account for a high proportion of the country's land area, carbonate rock layers are widely distributed, mountains are continuous and gullies are crisscrossed, and the landforms are mainly peak cluster depressions, peak forest valleys, peak forest hill basins, and alternating plains. Due to the deep terrain cutting, large altitude difference, rugged and broken surface, crisscrossing caves, the karst mountainous areas have developed river systems, many underground river tributaries and large drainage areas, and frequent alternations between surface rivers and underground rivers, with light and dark alternations along the way, laying the foundation for the joint utilization of surface water and groundwater.
[0004] Although the karst mountainous areas have relatively abundant rainfall, the spatial and temporal distribution of water resources is uneven, with rainfall mainly concentrated in the summer and autumn flood seasons. In addition, the scattered settlements of rural residents in mountainous areas, the scattered distribution of flat fields, and the stepped distribution of cultivated land make it difficult to develop and utilize water resources, resulting in the inability to fully utilize local water resources. Affected by the special topography and landforms, the construction of water networks in karst mountainous areas faces many difficulties, such as high fields and low water, poor water storage and retention capacity, unfavorable conditions for large reservoirs, and fragile rocky desertification ecology. Engineering water shortages have become a prominent shortcoming that restricts economic and social development.
[0005] There are few studies on the construction of water networks for different types of terrain and landforms in existing water network research, and there is basically no research on the construction of water networks in karst mountainous areas. There is no relevant standard for water network construction in the existing technical standard system. In order to effectively solve the water shortage problem in karst mountainous areas, it is urgent to propose corresponding methods based on the characteristics of regional water conditions and provide corresponding technical support for the construction of water networks in karst mountainous areas. Summary of the invention
[0006] In view of the above-mentioned deficiencies in the prior art, the present invention provides a method for constructing a three-dimensional water network in a karst mountainous area, which improves the resilience of the water network based on a natural solution and enhances its adaptability to uncertainties such as climate change and emergencies.
[0007] In order to achieve the above-mentioned invention object, the technical solution adopted by the present invention is: a method for constructing a three-dimensional water network in a karst mountain area, comprising the following steps:
[0008] S1. Determine the construction area of the three-dimensional water network in the karst mountainous area, the level of the regional water network, and the current level year and planning level year for analyzing water-deficient areas and selecting water network backbone projects;
[0009] S2. Collect basic information about the construction area;
[0010] S3. Based on the basic data of the construction area, the mountain terrain analysis, river and lake water system structure analysis, underground karst landform and karst water status analysis, water resources and their development and utilization status analysis and major water supply projects status analysis are carried out to obtain the status analysis results of the water network construction in the construction area;
[0011] S4. Based on the analysis results of the current status of regional water network construction, the current level year and the planned level year, based on the water resources supply and demand balance analysis, combined with the land space development and protection pattern, divide the main water demand areas, key water shortage areas, water resources strategic reserve areas and emergency backup water source areas;
[0012] S5. Based on the basic data of the construction area, through the analysis of ecological sensitive areas, the ecological protection red line that needs to be avoided in the construction of the three-dimensional water network in the karst mountain area is clearly defined, and the core protection area in the ecological sensitive area is obtained;
[0013] S6. Based on the regional water network level, major water-demanding areas, key water-deficient areas, strategic water resource reserve areas and core protection areas in ecologically sensitive areas, the backbone projects for building a three-dimensional water network in karst mountainous areas shall be selected based on the scale and importance of the projects. The backbone rivers and lakes for building a three-dimensional water network in karst mountainous areas shall also be selected based on the scale of the river and lake basins where the rivers and lakes are located and the rivers and lakes where the backbone projects are located;
[0014] S7. Based on the main water-demanding areas, key water-deficient areas, strategic water resource reserve areas, emergency backup water source areas, and the backbone projects and rivers and lakes of the three-dimensional water network in the karst mountainous areas, and considering the elevation relationship between the water supply source and the water receiving area, a three-dimensional water network with moderate connectivity between the river and lake water system, groundwater system, and water supply and drainage channels is constructed.
[0015] Furthermore, the level of the regional water network constructed in step S1 is determined based on the administrative level of the construction area, which are, from high to low, the first-level main water network, the second-level main water network and the third-level main water network.
[0016] Furthermore, the step S4 is specifically as follows:
[0017] S401, based on the administrative districts of the construction area, obtain important administrative districts requiring water, and obtain major water-requiring areas;
[0018] S402. Based on the analysis results of the current status of regional water network construction, the water sources to be newly built in the planning level year are supplemented on the basis of the water sources already built in the current level year to obtain the conventional water source area;
[0019] S403, setting a water shortage rate threshold, and combining with conventional water source areas, listing major water demand areas whose water shortage rates exceed the water shortage rate threshold as key water shortage areas;
[0020] S404. Based on the analysis results of the current status of regional water network construction, rivers that can be stored and utilized and groundwater in karst mountainous areas are designated as strategic water resource reserves;
[0021] S405. For cities at or above the county level that are supplied by a single water source within the construction area, newly built surface water source projects and groundwater in karst mountainous areas will be used as emergency backup water source areas.
[0022] Furthermore, the step S401 is specifically as follows:
[0023] S4011. Sort the areas of the administrative districts in the construction area from large to small, and determine a score sorting set from large to small according to the proportion of the areas of the administrative districts in the construction area to the total area of the construction area:
[0024] G = {g z},z=1,2,...n
[0025]
[0026] Among them, G is a set of scores sorted from large to small; g z is the zth score of the constructed area; z is the score number; n is the total number of scores; RA z is the area of the administrative district corresponding to the zth score of the constructed area; RA is the total area of the constructed area;
[0027] S4012. Using permanent population, per capita GDP and urbanization rate as evaluation criteria, and based on the proportion of the administrative districts in the constructed region in a single evaluation criterion to the total value of the constructed region evaluation criterion, obtain the dimensionless ranking index of each evaluation criterion for each administrative district:
[0028]
[0029] Among them, Z ij is the dimensionless ranking index of the jth evaluation standard in the i-th administrative district; i is the administrative district number; j is the evaluation standard number; Q ij is the value of the jth evaluation criterion in the ith administrative district;
[0030] S4013. Sort the dimensionless ranking index of each evaluation standard of each administrative district from large to small to obtain the ranking result, and assign points according to the ranking result by sorting the scores from large to small in the corresponding ranking to obtain the importance score of each administrative district:
[0031]
[0032] Among them, G i is the importance score of the i-th administrative district; g ij Assign a score to the jth evaluation criterion for the i-th administrative district;
[0033] S4014. Sort the importance scores of each administrative area from large to small, and take the administrative areas before the median and the administrative areas with large irrigation areas with an irrigation area of ≥ 500,000 mu as the main water-demanding areas I.
[0034] Furthermore, the expression of the key water-deficient area in step S403 is:
[0035] SS={I in R s ≥α area}
[0036]
[0037] Among them, SS is the key water-deficient area; I is the main water-demanding area; R s is the water shortage rate of the administrative area; α is the water shortage rate threshold; W d is the water demand of the administrative area; W s The amount of water supplied to the administrative area that supplies water to the conventional water source area.
[0038] Furthermore, the step S5 is specifically as follows:
[0039] According to the basic data of the construction area, through the analysis of ecological sensitive areas, the core protection area and the general control area in the ecological sensitive area are obtained:
[0040] ES f ={CP f ,NR f}
[0041] ES l ={CP l ,NR l ,NP,AG}
[0042] Among them, ES f It is a core protection area in an ecologically sensitive area; CP f It is the core protected area of the national park; NR f It is the core protection area of the nature reserve; ES l It is a general control area in the ecologically sensitive area; CPl It is the general control area of the National Park; NR l It is the general control area of the nature reserve; NP is the nature park; AG is the aquatic germplasm resources protection area.
[0043] Furthermore, the step S6 is specifically as follows:
[0044] S601. Based on the regional water network level, major water demand areas and core protection areas in ecologically sensitive areas, select the backbone surface water source projects for the construction of a three-dimensional water network in the karst mountainous area based on the project scale and importance:
[0045]
[0046] Among them, BS a is the corresponding backbone surface water source project when the regional water network level is the first-level main water network or the second-level main water network; V is the total storage capacity of the reservoir; ES f It is a core protection area in an ecologically sensitive area; BS b It is the corresponding backbone surface water source project when the regional water network level is the third-level main water network; ∩ is the intersection symbol; is the non-intersection operator symbol;
[0047] S602. Obtain the backbone water diversion and lifting projects for building a three-dimensional water network in karst mountainous areas:
[0048] BC=M∪N
[0049] M={large and medium-sized water diversion projects with W≥1}
[0050] N={γ≤W<1 and L i' ≤δ water diversion projects}∩{water supply targets belong to the main water demand areas}
[0051]
[0052] Among them, BC is the backbone water diversion and lifting project for building a three-dimensional water network in karst mountainous areas; M is a large or medium-sized water diversion and lifting project; N is a small water diversion and lifting project that meets the project conditions and the importance of the water supply object; W is the annual water supply of the water diversion and lifting project; γ is the annual water supply threshold; δ is the engineering condition coefficient threshold; L i' is the engineering condition coefficient of the i'th water diversion project; m is the number of water diversion projects; i' is the number of water diversion projects; H i' D is the head of the i'th water diversion project; i' is the water transfer distance of the i'th water diversion project; ∪ is the conjunction symbol;
[0053] S603, obtaining groundwater utilization projects located in key water-deficient areas and emergency backup water source areas, and obtaining groundwater utilization projects for constructing a three-dimensional water network in karst mountainous areas;
[0054] S604, according to the backbone surface water source projects, backbone water diversion and regulation projects and groundwater utilization projects for constructing the three-dimensional water network in the karst mountainous area, the backbone projects for constructing the three-dimensional water network in the karst mountainous area are obtained;
[0055] S605. Based on the scale of the river and lake basins and the rivers and lakes where the key projects are located, select the key rivers and lakes for constructing the three-dimensional water network in the karst mountainous areas.
[0056] Furthermore, the expression of the backbone rivers and lakes for constructing the three-dimensional water network in the karst mountain area in step S605 is:
[0057] BR = {BR r ,BR l}
[0058]
[0059] Among them, BR is the backbone river and lake for constructing the three-dimensional water network in karst mountainous areas; BR r It is the backbone river for building a three-dimensional water network in karst mountainous areas; BR l is the backbone lake for constructing the three-dimensional water network in karst mountainous areas; A is the river basin area; R is the proportion of the river basin area in the construction area to the construction area; φ is the threshold of the river basin area in the construction area; A r is the river basin area within the construction area; RA is the total area of the construction area.
[0060] The beneficial effects of the present invention are as follows: the present invention aims at the water resource optimization allocation function of the water network, and for the first time proposes a method for constructing a three-dimensional water network in the karst mountainous area, comprehensively considering the regional topographic conditions, water resource endowment, economic and social development needs, and protection requirements for ecologically sensitive areas, relying on natural river and lake water systems, and using groundwater resources as a supplement, the present invention makes overall arrangements and deployments for water supply sources, water supply volumes, water transmission lines, and receiving areas in the karst mountainous area, and innovatively proposes a method for constructing a water network under special topographic and hydrogeological conditions, so as to achieve reasonable allocation of water resources and efficient transportation; by making full use of the abundant groundwater resources in the karst mountainous area, the water network resilience is improved based on nature-based solutions, and the adaptability to uncertainties such as climate change and emergencies is enhanced. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] Figure 1 The figure is a flow chart of the method of the present invention. DETAILED DESCRIPTION
[0062] The specific implementation modes of the present invention are described below so that those skilled in the art can understand the present invention. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations utilizing the concept of the present invention are protected.
[0063] like Figure 1 As shown, in one embodiment of the present invention, a method for constructing a three-dimensional water network in a karst mountain area includes the following steps:
[0064] S1. Determine the construction area of the three-dimensional water network in the karst mountainous area, the level of the regional water network, and the current level year and planning level year for analyzing water-deficient areas and selecting water network backbone projects;
[0065] S2. Collect basic information about the construction area;
[0066] S3. Based on the basic data of the construction area, the mountain terrain analysis, river and lake water system structure analysis, underground karst landform and karst water status analysis, water resources and their development and utilization status analysis and major water supply projects status analysis are carried out to obtain the status analysis results of the water network construction in the construction area;
[0067] S4. Based on the analysis results of the current status of regional water network construction, the current level year and the planned level year, based on the water resources supply and demand balance analysis, combined with the land space development and protection pattern, divide the main water demand areas, key water shortage areas, water resources strategic reserve areas and emergency backup water source areas;
[0068] S5. Based on the basic data of the construction area, through the analysis of ecological sensitive areas, the ecological protection red line that needs to be avoided in the construction of the three-dimensional water network in the karst mountain area is clearly defined, and the core protection area in the ecological sensitive area is obtained;
[0069] S6. Based on the regional water network level, major water-demanding areas, key water-deficient areas, strategic water resource reserve areas and core protection areas in ecologically sensitive areas, the backbone projects for building a three-dimensional water network in karst mountainous areas shall be selected based on the scale and importance of the projects. The backbone rivers and lakes for building a three-dimensional water network in karst mountainous areas shall also be selected based on the scale of the river and lake basins where the rivers and lakes are located and the rivers and lakes where the backbone projects are located;
[0070] S7. Based on the main water-demanding areas, key water-deficient areas, strategic water resource reserve areas, emergency backup water source areas, and the backbone projects and rivers and lakes of the three-dimensional water network in the karst mountainous areas, and considering the elevation relationship between the water supply source and the water receiving area, a three-dimensional water network with moderate connectivity between the river and lake water system, groundwater system, and water supply and drainage channels is constructed.
[0071] The level of the regional water network constructed in step S1 is determined based on the administrative level of the place where the construction area belongs, and from high to low, they are the first-level main water network, the second-level main water network, and the third-level main water network. In this embodiment, the first-level main water network is a provincial water network; the second-level main water network is a municipal water network; and the third-level main water network is a county water network. Determine the current level year and the planning level year for analyzing water-scarce areas and screening water network backbone projects. The planning level year should be coordinated and connected with the medium- and long-term planning level years of the regional land space planning and the national economic and social development planning.
[0072] Bijie City, Guizhou Province is used as an example construction area for the implementation example of the method for constructing a three-dimensional water network in a karst mountain area, with 2020 as the current level year and 2035 as the planning level year.
[0073] In this embodiment, step S2 specifically includes: collecting maps, statistical data, and planning schemes of the construction area's topography, river systems, hydrogeology, economy and society, water resources and their development and utilization, water supply projects, land space development and protection patterns, and ecologically sensitive areas. With the support of the geographic information system (ArcGIS), the software is used to pre-process and visualize the spatial basic data required for the construction of a three-dimensional water network in karst mountainous areas. The data and maps required for the construction of a three-dimensional water network in karst mountainous areas can be collected through the following channels:
[0074] 1. Topography and river system data. Digital elevation models (DEMs) can be obtained from public sources on the Internet or from natural resources departments or water conservancy departments.
[0075] 2. Hydrogeological data: You can refer to the hydrogeological map of the construction area.
[0076] 3. Economic and social data. Current economic and social statistics can be obtained from statistical yearbooks, national economic and social development plans and statistical bulletins available online. The economic and social development layout and forecast results of major indicators for the planning year can be obtained from the development and reform departments.
[0077] 4. Data on water resources and their development and utilization. The amount of water resources can be obtained from the survey and evaluation results of the water conservancy department, the current water supply and use and structure can be obtained from the statistical bulletin of the water conservancy department, the current water environment quality can be collected from the ecological environment department, and the water demand forecast, water supply forecast, water resource supply and demand analysis and allocation plan results for the planned horizontal year can be collected from the water conservancy department.
[0078] 5. Water supply project information. Information on various types of water supply projects that have been built and are planned to be built can be obtained from the data statistics and planning plans of the water conservancy department.
[0079] 6. Data on the pattern of land space development and protection. The patterns of agriculture, towns, and ecological space can come from the land space planning organized and compiled by the natural resources department.
[0080] 7. Data on ecologically sensitive areas: This can come from the national land space planning of the natural resources department, the optimization and adjustment plan of natural reserves of the forestry and grassland departments, etc., and be analyzed in combination with the ecological protection red line.
[0081] In this embodiment, step S3 specifically includes: using the collected basic data to analyze and construct the regional river and lake system structure, underground karst landforms and karst water conditions, the current status of surface water development and utilization, the current status of groundwater development and utilization, and the current status of major water supply project construction. The current status analysis of water network construction in karst mountainous areas mainly includes the following aspects:
[0082] ① Mountain terrain analysis: Based on DEM data analysis, the overall terrain trend of the construction area is judged to provide basic support for the elevation of key projects in water network construction and the analysis of the route trend of water resource allocation projects.
[0083] ②Analysis of river and lake water system structure. Based on DEM data analysis, extract and construct the regional river system distribution, clarify the relationship between the main and tributary rivers, analyze the main rivers and lakes in the water network construction, and analyze the background conditions of the natural water system.
[0084] ③ Analysis of underground karst landforms and karst water conditions. Use hydrogeological maps to analyze geological structural characteristics and underground karst development.
[0085] ④ Analysis of the current status of water resources and their development and utilization. Analyze the quantity and spatial distribution of surface water resources, groundwater resources and total water resources in the construction area. Analyze the water quality of the main rivers in the water network construction. Based on the current status of surface water and groundwater development and utilization, with a focus on population and industrial concentration areas, analyze the main water supply targets.
[0086] ⑤ Analysis of the current status of major water supply projects. Focusing on water supply reservoirs, power station reservoirs with water supply functions, and water diversion and lifting projects, statistics are collected on the distribution, quantity, scale, and routes of the major water supply projects currently under construction.
[0087] In this embodiment, Bijie City is taken as the construction area:
[0088] ① Mountainous terrain. Bijie City is high in the west and low in the east, descending in a stepped manner. There are many mountains and gullies in the area, and the terrain is steep. The mountainous and hilly area accounts for 92%, with an average altitude of about 1,700m. It is known as the "Roof of Guizhou".
[0089] ② River and lake water system structure. Bijie City is the source of Wujiang River, Chishui River and Beipanjiang River. The rivers in the city belong to the Yangtze River and Pearl River basins, accounting for 95.4% and 4.6% of the basin area respectively. The Wujiang River, Chishui River, Niulanjiang and Hengjiang River systems belong to the Yangtze River basin, and the tributaries of the Beipanjiang River system belong to the Pearl River basin.
[0090] ③ Underground karst landforms and karst water conditions. Bijie City has developed karst karst landforms, accounting for 62.2% of the city's land area. The groundwater in the territory is mainly carbonate karst water, followed by bedrock fissure water. There are many karst springs with a flow rate of ≥100L / s, and several underground rivers.
[0091] ④ Current status of water resources and their development and utilization. According to the 2020 Bijie City Water Resources Bulletin, the average annual water resources in Bijie City are 13.44 billion m 3 (including 3.64 billion m of groundwater 3 ), per capita water resources 2119m 3 The river has obvious mountainous characteristics, with deep rivers and low water levels. The distribution of people, water and soil varies greatly in altitude. The per capita water resources in the western and eastern parts of Bijie City are less than 2000m 3 The per capita water resources in the central region are relatively abundant. The water supply in 2020 is 1.031 billion m 3 , of which surface water supplies 1.007 billion m 3 , accounting for 97.6% of the total water supply; groundwater supply is 0.09 billion m 3 , other water sources supply 150 million m 3 The current water resource utilization rate is 7.1%. Of the water consumption, 519 million m3 is used for agriculture. 3 , industrial water use 294 million m 3 , domestic water 206 million m 3 , ecological water use 0.12 billion m 3 , mainly for farmland irrigation and industrial water use. Through the analysis of water supply and water consumption, the main water supply targets of Bijie City are the central urban area, the western mountain characteristic agricultural base, and the eastern county seat. According to the "Bijie City 2020 Ecological Environment Bulletin", the river sections were generally excellent in 2020, and the proportion of excellent water quality was 96.4%. Among the 55 surface water sections: 4 Class I (accounting for 7.3%), 31 Class II (accounting for 56.4%), 18 Class III (accounting for 32.7%), and 2 Class IV (accounting for 3.6%, both located in the Baifu River flowing through the central urban area).
[0092] ⑤ Status of major water supply projects. The current water supply in Bijie City is mainly small-scale projects. The large-scale reservoirs that have been built and are under construction include the Jiayan Water Conservancy Project, the Qianzhong Water Conservancy Project, and the Hongjiadu Power Station Reservoir. There are 12 medium-sized reservoirs and 189 small reservoirs that have been built. Water diversion and water transfer projects such as the Luoze River water diversion have been built and are under construction. It is a typical engineering water shortage area.
[0093] In this embodiment, the step S4 is specifically as follows:
[0094] S401, based on the administrative districts of the construction area, obtain important administrative districts requiring water, and obtain major water-requiring areas;
[0095] S402. Based on the analysis results of the current status of regional water network construction, the water sources to be newly built in the planning level year are supplemented on the basis of the water sources already built in the current level year to obtain the conventional water source area;
[0096] S403, setting a water shortage rate threshold, and combining with conventional water source areas, listing major water demand areas whose water shortage rates exceed the water shortage rate threshold as key water shortage areas;
[0097] S404. Based on the analysis results of the current status of regional water network construction, rivers that can be stored and utilized and groundwater in karst mountainous areas are designated as strategic water resource reserves;
[0098] S405. For cities at or above the county level that are supplied by a single water source within the construction area, newly built surface water source projects and groundwater in karst mountainous areas will be used as emergency backup water source areas.
[0099] In this embodiment, the rivers that can be reserved and utilized are rivers with abundant water resources and a runoff development and utilization rate of ≤40%; the surface water source projects include large, medium and small reservoir projects.
[0100] The step S401 is specifically as follows:
[0101] S4011. Sort the areas of the administrative districts in the construction area from large to small, and determine a score sorting set from large to small according to the proportion of the areas of the administrative districts in the construction area to the total area of the construction area:
[0102] G = {g z},z=1,2,...n
[0103]
[0104] Among them, G is a set of scores sorted from large to small; g z is the zth score of the constructed area; z is the score number; n is the total number of scores; RA z The area of the administrative district corresponding to the zth score of the constructed region, in km 2 RA is the total area of the construction area, in km 2 ;
[0105] S4012. Using permanent population, per capita GDP and urbanization rate as evaluation criteria, and based on the proportion of the administrative districts in the constructed region in a single evaluation criterion to the total value of the constructed region evaluation criterion, obtain the dimensionless ranking index of each evaluation criterion for each administrative district:
[0106]
[0107] Among them, Z ijis the dimensionless ranking index of the jth evaluation standard in the i-th administrative district; i is the administrative district number; j is the evaluation standard number; Q ij is the value of the jth evaluation criterion in the ith administrative district;
[0108] S4013. Sort the dimensionless ranking index of each evaluation standard of each administrative district from large to small to obtain the ranking result, and assign points according to the ranking result by sorting the scores from large to small in the corresponding ranking to obtain the importance score of each administrative district:
[0109]
[0110] Among them, G i is the importance score of the i-th administrative district; g ij Assign a score to the jth evaluation criterion for the i-th administrative district;
[0111] S4014. Sort the importance scores of each administrative area from large to small, and take the administrative areas before the median and the administrative areas with large irrigation areas with an irrigation area of ≥ 500,000 mu as the main water-demanding areas I.
[0112] In this embodiment, the total number of scores in the score sorting set from large to small is the same as the number of administrative districts.
[0113] The expression of the key water-deficient area in step S403 is:
[0114] SS={I in R s ≥α area}
[0115]
[0116] Among them, SS is the key water-deficient area; I is the main water-demanding area; R s is the water shortage rate of the administrative area; α is the water shortage rate threshold; W d is the water demand of the administrative area, in billion m 3 ; W s The amount of water supplied to the administrative area for the conventional water source area, in billion m 3 .
[0117] In this embodiment, step S4 is specifically as follows: based on the water resources supply and demand balance analysis, combined with the land space development and protection pattern, the main water demand area, conventional water source area, key water shortage area, water resources strategic reserve area and emergency backup water source area are divided. Analyze key areas such as conventional water source areas, key water shortage areas, and water resources strategic reserve areas to connect water source areas and reserve areas with the demand side, and further clarify the backbone projects and backbone rivers and lakes for building a three-dimensional water network in the karst mountain area to lay the foundation for ensuring water resources security and water supply and use security.
[0118] The main water-demanding areas: Taking the administrative districts within the construction area as analysis units, the important administrative districts with water demand are analyzed.
[0119] The conventional water source area: with the purpose of ensuring normal water supply, combined with natural conditions such as river systems, topography, landforms, geology, hydrology and meteorology, on the basis of the existing water supply sources, supplement the planned new water supply sources in the horizontal year, and analyze the water supply sources under normal circumstances.
[0120] The key water-deficient areas: Statistics on the water supply capacity of water supply projects in major water-demanding areas, including surface water source projects, water diversion and lifting projects, and groundwater utilization projects. Water resource supply and demand analysis is conducted in major water-demanding areas. A water shortage rate threshold is set. If the water shortage rate of a major water-demanding area exceeds the water shortage rate threshold, it will be included in the key water shortage area.
[0121] The strategic water resource reserve area: In combination with the strategic direction of regional economic and social development, in order to improve the resilience of the water supply system in the medium and long term, provide buffer space for urban and rural water supply, and cope with many uncertainties such as climate change and economic and social development, the analysis proposes the construction of a regional water resource strategic reserve area, including water source types and locations. In karst mountainous areas, groundwater close to the water receiving area can be used as a strategic water resource reserve.
[0122] The emergency backup water source area is to deal with sudden water pollution, as well as water quantity or water quality problems such as extreme drought or seasonal waterlogging, which result in insufficient or unavailable water from common water sources. Combined with the emergency backup water supply needs, an emergency backup water source is analyzed and proposed. Groundwater in karst mountainous areas can be used as one of the emergency backup water sources.
[0123] In this embodiment, Bijie City is used as the construction area:
[0124] ①Main water-demanding areas. In combination with the Outline of the National Economic and Social Development Plan of Bijie City and the results of the national land and space planning, and according to the Bijie Statistical Yearbook 2021, the three economic and social indicators of permanent population, per capita GDP, and urbanization rate are used to prioritize the administrative areas of counties and districts in Bijie City. Combined with the fact that the proposed new Jiayan large-scale irrigation area is located in Dafang County, Qianxi City, and Jinsha County, and the Hengjiang (Shuanghe) large-scale irrigation area is located in Weining County and Hezhang County, the analysis shows that the main water-demanding areas in Bijie City include Qixingguan District, Jinsha County, Zhijin County, Qianxi City, Dafang County, Weining County, and Hezhang County.
[0125] ② Key water-deficient areas. According to the analysis of water resources supply and demand, the water shortage threshold is set at 45%. In the absence of new water supply projects, the water shortage rate in Bijie City will be as high as 48.3% in 2035, making it the most severely water-deficient prefecture-level city in Guizhou Province. Key water-deficient areas include Weining County (76%), Zhijin County (60%), Hezhang County (57%), and Qixingguan District (central urban area) (48%).
[0126] ③ Conventional water source areas. After analysis, the conventional water source areas of Bijie City’s water network include rivers where large and medium-sized reservoirs have been built and are planned to be newly built, and where large and medium-sized water diversion and lifting projects are located.
[0127] ④ Strategic water resource reserve area. In order to improve the subsequent reserve capacity of the Jiayan water diversion project in the Bijie water network, the Qianjia connection project was planned to connect the two largest reservoirs in Guizhou Province, the Qianzhong Water Conservancy Hub (with a total storage capacity of 1.089 billion m 3 ) and Jiayan Water Conservancy Project (total storage capacity 1.323 billion m 3 ) and use Sancha River, an important tributary of Wujiang River, as a strategic water resource reserve area to provide strategic water resource reserves for dry years or consecutive dry years when water inflow to Liuchong River Basin is insufficient. As one of the regions with the richest groundwater resources in Guizhou Province, Bijie City can use groundwater as a strategic water resource reserve.
[0128] ⑤ Emergency backup water source area. For cities at or above the county level that have a single water source or insufficient backup water supply capacity, necessary surface water emergency backup water sources should be newly built in combination with the water demand of urban development. In areas with suitable conditions, groundwater can be used as an emergency backup water source.
[0129] The step S5 is specifically as follows:
[0130] According to the basic data of the construction area, through the analysis of ecological sensitive areas, the core protection area and the general control area in the ecological sensitive area are obtained:
[0131] ES f ={CP f ,NR f}
[0132] ES l ={CP l ,NR l ,NP,AG}
[0133] Among them, ES f It is a core protection area in an ecologically sensitive area; CP f It is the core protected area of the national park; NR f It is the core protection area of the nature reserve; ES l It is a general control area in the ecologically sensitive area; CP l It is the general control area of the National Park; NR l It is the general control area of the nature reserve; NP is the nature park; AG is the aquatic germplasm resource protection area;
[0134] In principle, human activities are prohibited in the core protection areas of ecologically sensitive areas. Under the condition that the main protected objects and ecological environment are not damaged, the following activities may be carried out or permitted:
[0135] ① Management and protection patrol, investigation and monitoring, disaster prevention and mitigation, emergency rescue and other activities and necessary facility construction, as well as ecological restoration and cleaning of pests and animals and plants due to harmful biological control and invasion of alien species;
[0136] ② The original residents who cannot be relocated temporarily can carry out production activities such as planting, grazing, gathering, fishing, breeding and other production activities necessary for life without expanding the existing scale, and repair production and living facilities;
[0137] In general control areas within ecologically sensitive areas, human activities are restricted.
[0138] In this embodiment, step S5 is specifically as follows: through the analysis of ecologically sensitive areas, clarify the ecological protection red lines that need to be avoided in the construction of a three-dimensional water network in karst mountainous areas. Focusing on national parks and nature reserves, combined with various types of natural parks such as forest parks, geological parks, wetland parks, and taking into account aquatic germplasm resource protection areas, it is proposed to construct a list of regional ecologically sensitive areas. Taking into account the zoning management and control of national parks and nature reserves, in principle, human activities are prohibited in core protection areas, and human activities are restricted in general control areas. The spatial scope of the core protection areas and general control areas of national parks and nature reserves is clarified in ArcGIS. Other nature reserves such as natural parks and aquatic germplasm resource protection areas are managed as general control areas in principle.
[0139] According to the "Guizhou Provincial Land and Space Planning", the ecologically sensitive areas of Bijie City include Caohai National Nature Reserve, Bijie Nayong Gongtong Provincial Nature Reserve, Bijie National Forest Park, Bijie Jinsha Sanzhangshui Forest Park, etc.
[0140] The step S6 is specifically as follows:
[0141] S601. Based on the regional water network level, major water demand areas and core protection areas in ecologically sensitive areas, select the backbone surface water source projects for the construction of a three-dimensional water network in the karst mountainous area based on the project scale and importance:
[0142]
[0143]
[0144] Among them, BS a is the corresponding backbone surface water source project when the regional water network level is the first-level main water network or the second-level main water network; V is the total storage capacity of the reservoir, in billion m 3 ;ES f It is a core protection area in an ecologically sensitive area; BS b It is the corresponding backbone surface water source project when the regional water network level is the third-level main water network; ∩ is the intersection symbol; is the non-intersection operator symbol;
[0145] S602. Obtain the backbone water diversion and lifting projects for building a three-dimensional water network in karst mountainous areas:
[0146] BC=M∪N
[0147] M={large and medium-sized water diversion projects with W≥1}
[0148] N={γ≤W<1 and L i' ≤δ water diversion projects}∩{water supply targets belong to the main water demand areas}
[0149]
[0150] Among them, BC is the backbone water diversion and lifting project for building a three-dimensional water network in karst mountainous areas; M is a large or medium-sized water diversion and lifting project; N is a small water diversion and lifting project that meets the project conditions and the importance of the water supply object; W is the annual water supply of the water diversion and lifting project, in billion m 3 ; γ is the annual water supply threshold, in units of 100 million m 3 ;δ is the engineering condition coefficient threshold; L i' is the engineering condition coefficient of the i'th water diversion project; m is the number of water diversion projects; i' is the number of water diversion projects; H i' is the head of the ith water diversion project, in meters; D i' is the water transfer distance of the ith water diversion project, in km; ∪ is the symbol of the conjunction operation;
[0151] S603, obtaining groundwater utilization projects located in key water-deficient areas and emergency backup water source areas, and obtaining groundwater utilization projects for constructing a three-dimensional water network in karst mountainous areas;
[0152] S604, according to the backbone surface water source projects, backbone water diversion and regulation projects and groundwater utilization projects for constructing the three-dimensional water network in the karst mountainous area, the backbone projects for constructing the three-dimensional water network in the karst mountainous area are obtained;
[0153] S605. Based on the scale of the river and lake basins and the rivers and lakes where the key projects are located, select the key rivers and lakes for constructing the three-dimensional water network in the karst mountainous areas.
[0154] The expression for constructing the backbone rivers and lakes of the three-dimensional water network in the karst mountain area in step S605 is:
[0155] BR = {BR r ,BR l}
[0156]
[0157] Among them, BR is the backbone river and lake for constructing the three-dimensional water network in karst mountainous areas; BR rIt is the backbone river for building a three-dimensional water network in karst mountainous areas; BR l It is the backbone lake for constructing the three-dimensional water network in karst mountainous areas; A is the river basin area, unit is km 2 ; R is the ratio of the river basin area in the construction area to the construction area; φ is the threshold of the river basin area ratio in the construction area; A r is the river basin area within the construction area, in km 2 RA is the total area of the construction area, in km 2 .
[0158] The step S6 is specifically as follows: according to the scale and importance of the project, the backbone projects for constructing the three-dimensional water network in the karst mountainous area are selected, including surface water source projects, water diversion and lifting projects, groundwater utilization projects, etc. The backbone rivers and lakes for constructing the three-dimensional water network in the karst mountainous area are selected according to the scale of the river and lake basins where the rivers and lakes are located, the rivers and lakes where the backbone projects are located, and other factors.
[0159] The screening of the backbone projects is specific: on the basis of the preliminary list of existing and planned major water supply projects, in accordance with the principle of "real need, ecological safety, and sustainability", analyze the necessity and feasibility of the projects, give priority to projects that are of overall concern and have mature conditions, combine the analysis of the water network construction level and project scale, include important projects for water supply into the candidate list of backbone projects for the construction of three-dimensional water networks, further analyze the spatial relationship between the project layout and ecologically sensitive areas, and except for special circumstances, projects involving the core protection areas of nature reserves will not be included in the list of backbone projects.
[0160] ① Backbone projects. Focusing on the main water-demanding areas and key water-deficient areas, combined with the results of the spatial relationship analysis between ecologically sensitive areas and water supply project layout, backbone projects are selected from the major water supply projects that have been built and are planned to be newly built.
[0161] Among the backbone surface water source projects, large reservoirs include Jiayan Reservoir, Yulong Reservoir, Shuanghe Reservoir, and Hongjiadu Power Station Reservoir; medium-sized reservoirs such as Bainipo, Aoshuhe, and Xiangshui were selected in the eastern part of Bijie City to strengthen the water resource regulation and storage capacity of Jinsha, Qianxi and other counties; medium-sized reservoirs such as Hekou, Pingshan, and Erdaoba were selected in the western part to improve the water supply capacity and stability of Nayong-Weining-Hezhang.
[0162] In the backbone water diversion and lifting projects, the annual water supply threshold is 100 million m 3 The threshold value of the engineering condition coefficient is taken as 0.03. Make full use of the Jiayan water diversion, Qianjia connection, Hongjiadu water lifting and other projects to ensure the safety of urban and rural water supply in Bijie-Dafang, Qianxi City, Jinsha County and other regions; use the Yulong water supply, Shuanghe water supply, Luozehe water lifting and other projects to solve the engineering water shortage problem in the western part of Bijie City.
[0163] In the groundwater utilization project, combined with the analysis results of key water-deficient areas and emergency backup water source areas, groundwater and large karst springs are utilized to provide supplementary water sources for areas lacking surface water resources and areas with insufficient surface water supply.
[0164] The selection of key rivers and lakes is specific: taking into account the scale of the river and lake basins, the rivers and lakes where the key projects are located, the importance of the water supply objects and other factors, a comprehensive analysis is conducted to determine the list of key rivers and lakes. In addition to the existence of a certain river and lake basin area in the construction area, the selection of the key rivers and lakes list must meet the following conditions:
[0165] (1) Basin area: 3000km 2 The above rivers and their main tributaries are basically backbone rivers; the drainage area is 200-3000km 2 Small and medium-sized rivers include rivers where backbone projects are located, rivers that cross the administrative districts of the next level under the construction area, and rivers that pass through major urban areas; and rivers with a drainage area of less than 200km 2 Rivers are analysed in relation to their importance to the objects they supply water to.
[0166] (2) Ecologically degraded lakes outside uninhabited areas that are important water sources or have important ecological functions and status and require ecological water replenishment.
[0167] (3) The rivers and lakes where the water sources of the strategic water resource reserve area are located shall be included in the backbone rivers and lakes.
[0168] In this embodiment, Liuchong River, Sancha River, Niulan River, Luoze River, Chishui River, Baifu River, etc. are selected as backbone rivers, and Caohai is selected as a backbone lake based on the scale of the river and lake basins, the rivers and lakes where the backbone projects are located, the importance of the water supply objects, etc.
[0169] The step S7 is specifically as follows: based on the main water-demanding areas, key water-deficient areas, strategic water resource reserve areas, emergency backup water source areas, and the backbone projects and backbone rivers and lakes for constructing a three-dimensional water network in karst mountainous areas, in accordance with the principles of high water use and moderate water extraction, a three-dimensional water network with moderate connectivity between river and lake water systems, groundwater systems, and water supply and drainage channels that meets the four conditions is constructed.
[0170] The four conditions are specifically high mountain source construction, river-reservoir connection, underground source replenishment and three-dimensional allocation;
[0171] The high mountain source construction mentioned above is to give priority to meeting the water needs of high mountain areas and divert water to surrounding plain areas and other economic and social development concentrated areas to meet their water needs growth, and to build new reservoirs and water sources in high-altitude mountainous areas;
[0172] The river-reservoir connection mentioned above is to focus on rivers that have the conditions for reservoir construction but insufficient water resources, make full use of surrounding rivers with sufficient water resources to improve the water supply guarantee rate, carry out river-to-river connection, river-reservoir connection, reservoir-to-reservoir connection, and interconnection of urban and rural water supply pipelines;
[0173] The underground replenishment mentioned above is to utilize the abundant groundwater resources in the karst mountainous areas, utilize them nearby according to local conditions, optimize the layout of groundwater resource development and utilization, and serve as an important supplement to conventional water source areas, strategic water resource reserve areas and emergency backup water source areas;
[0174] The three-dimensional allocation is to combine high-water high-use with low-water low-use, gravity water transfer with moderate water lifting, high-mountain source construction with hill networking. Through intra-regional networking, network supplementation, chain strengthening and water diversion from outside the region, the comprehensive water flow allocation pattern is integrated with the construction of the regional natural geographical pattern, national space pattern, and economic and social pattern. Water sources are coordinated and allocated among regions, water potential is scientifically adjusted at different altitudes, and the rhythm is orderly controlled in time to achieve comprehensive allocation of water flow in four dimensions of time and space.
[0175] In this embodiment, step S7 is specifically as follows: based on the three-dimensional topography and landforms of the karst mountainous area, respecting the natural laws of water flow, and on the basis of analyzing the key areas, backbone projects, and backbone rivers and lakes in the water network construction, adhering to the principle of gravity diversion as the main method, combining storage, diversion, lifting and regulation, and building a three-dimensional water network system that meets the urban and rural water supply needs in different elevation areas through three-dimensional water flow allocation. Taking full account of the different topographic and geomorphological features of the karst mountainous area, such as mountains, hills, dam areas, river valleys, and karst karst underground, in accordance with the principle of high water use and moderate water lifting, a three-dimensional water network in the karst mountainous area with four conditions of "high mountain source construction, river-reservoir connection, underground source replenishment, and three-dimensional allocation" is built to form a natural-artificial composite three-dimensional system driven by water flow.
[0176] ①Build water sources in high mountains. In high-altitude mountainous areas, fully tap the potential of existing water sources, build necessary reservoirs and water sources according to local conditions, give priority to meeting water needs in high mountainous areas, and divert water to surrounding plains and other economic and social development concentrated areas to meet their water use growth, while taking into account the demand for gravity diversion in a larger area.
[0177] ② River-reservoir connectivity. Focus on rivers that have the conditions for reservoir construction but are short of water, make full use of surrounding rivers with sufficient water resources, and build an urban and rural water supply engineering system with river-to-river connectivity, river-reservoir connectivity, reservoir-to-reservoir connectivity, and urban and rural water supply pipeline interconnection as the link, improve the water supply guarantee rate, enhance the level of water resources regulation and water supply guarantee capabilities, achieve adjustment between flood and drought, and complementarity of multiple sources, and solve the problem of mismatch between water resource distribution and population and productivity.
[0178] ③ Underground replenishment. Utilize the abundant groundwater resources in the karst mountainous areas, divert springs, intercept underground rivers, build underground reservoirs, etc., and optimize the layout of groundwater resource development and utilization in areas with suitable conditions, as an important supplement to conventional water source areas, strategic water resource reserve water source areas, and emergency backup water source areas, enhance the resilience of regional water supply systems, and give full play to the due role of groundwater resources.
[0179] ④ Three-dimensional allocation. Adhere to the combination of high water use and low water use, gravity water delivery and moderate water lifting, high mountain source construction and hilly networking, through intra-regional networking, network supplementation, chain strengthening and water diversion from outside the region, integrate the comprehensive water flow allocation pattern with the construction of regional natural geographical pattern, national land space pattern, economic and social pattern, coordinate the allocation of water sources among regions, scientifically regulate water potential at different altitudes, and orderly control rhythm in time to achieve comprehensive allocation of water flow in four dimensions of time and space.
[0180] In this embodiment, the natural geographical conditions, water resources carrying capacity, economic and social development priorities of Bijie City are comprehensively considered, centering on the development strategy positioning of Bijie City and the requirements for land space development and protection, combined with the urban spatial pattern of "one circle with two wings, three axes stringing seven beads" of Bijie City, the agricultural spatial pattern of "two belts and four districts", the ecological spatial pattern of "one circle, four districts, seven veins, and multiple patches" and the water conservancy development pattern of Bijie City of "one core, two wings, and multiple corridors", according to the screening results of key areas, backbone projects and backbone rivers and lakes for water network construction, the overall layout of Bijie City's water network of "one lake, four reservoirs, five horizontal and six vertical, west water transfer to east, and north-south mutual assistance" is formulated.
Claims
1. A method for constructing a three-dimensional water network in a karst mountain area, characterized in that: The following steps are involved: S1. Determine the construction area of the three-dimensional water network in the karst mountainous area, the level of the regional water network, and the current level year and planning level year for analyzing water-deficient areas and selecting water network backbone projects; S2. Collect basic information about the construction area; S3. Based on the basic data of the construction area, the mountain terrain analysis, river and lake water system structure analysis, underground karst landform and karst water status analysis, water resources and their development and utilization status analysis and major water supply projects status analysis are carried out to obtain the status analysis results of the water network construction in the construction area; S4. Based on the analysis results of the current status of regional water network construction, the current level year and the planned level year, based on the water resources supply and demand balance analysis, combined with the land space development and protection pattern, divide the main water demand areas, key water shortage areas, water resources strategic reserve areas and emergency backup water source areas; S5. Based on the basic data of the construction area, through the analysis of ecological sensitive areas, the ecological protection red line that needs to be avoided in the construction of the three-dimensional water network in the karst mountain area is clearly defined, and the core protection area in the ecological sensitive area is obtained; S6. Based on the regional water network level, major water-demanding areas, key water-deficient areas, strategic water resource reserve areas and core protection areas in ecologically sensitive areas, the backbone projects for building a three-dimensional water network in karst mountainous areas shall be selected based on the scale and importance of the projects. The backbone rivers and lakes for building a three-dimensional water network in karst mountainous areas shall also be selected based on the scale of the river and lake basins where the rivers and lakes are located and the rivers and lakes where the backbone projects are located; S7. Based on the main water-demanding areas, key water-deficient areas, strategic water resource reserve areas, emergency backup water source areas, and the backbone projects and rivers and lakes of the three-dimensional water network in the karst mountainous areas, and considering the elevation relationship between the water supply source and the water receiving area, a three-dimensional water network with moderate connectivity between the river and lake water system, groundwater system, and water supply and drainage channels is constructed.
2. The method for constructing a three-dimensional water network in a karst mountain area according to claim 1, characterized in that: The level of the regional water network constructed in step S1 is determined based on the administrative level of the construction area, which are, from high to low, the first-level main water network, the second-level main water network and the third-level main water network.
3. The method for constructing a three-dimensional water network in a karst mountain area according to claim 1, characterized in that: The step S4 is specifically as follows: S401, based on the administrative districts of the construction area, obtain important administrative districts requiring water, and obtain major water-requiring areas; S402. Based on the analysis results of the current status of regional water network construction, the water sources to be newly built in the planning level year are supplemented on the basis of the water sources already built in the current level year to obtain the conventional water source area; S403, setting a water shortage rate threshold, and combining with conventional water source areas, listing major water demand areas whose water shortage rates exceed the water shortage rate threshold as key water shortage areas; S404. Based on the analysis results of the current status of regional water network construction, rivers that can be stored and utilized and groundwater in karst mountainous areas are designated as strategic water resource reserves; S405. For cities at or above the county level that are supplied by a single water source within the construction area, newly built surface water source projects and groundwater in karst mountainous areas will be used as emergency backup water source areas.
4. The method for constructing a three-dimensional water network in a karst mountain area according to claim 3, characterized in that: The step S401 is specifically as follows: S4011. Sort the areas of the administrative districts in the construction area from large to small, and determine a score sorting set from large to small according to the proportion of the areas of the administrative districts in the construction area to the total area of the construction area: G={g z },z=1,2,...n Among them, G is a set of scores sorted from large to small; g z is the zth score of the constructed area; z is the score number; n is the total number of scores; RA z is the area of the administrative district corresponding to the zth score of the constructed area; RA is the total area of the constructed area; S4012. Using permanent population, per capita GDP and urbanization rate as evaluation criteria, and based on the proportion of the administrative districts in the constructed region in a single evaluation criterion to the total value of the constructed region evaluation criterion, obtain the dimensionless ranking index of each evaluation criterion for each administrative district: Among them, Z ij is the dimensionless ranking index of the jth evaluation standard in the i-th administrative district; i is the administrative district number; j is the evaluation standard number; Q ij is the value of the jth evaluation criterion in the ith administrative district; S4013. Sort the dimensionless ranking index of each evaluation standard of each administrative district from large to small to obtain the ranking result, and assign points according to the ranking result by sorting the scores from large to small in the corresponding ranking to obtain the importance score of each administrative district: Among them, G i is the importance score of the i-th administrative district; g ij Assign a score to the jth evaluation criterion for the i-th administrative district; S4014. Sort the importance scores of each administrative area from large to small, and take the administrative areas before the median and the administrative areas with large irrigation areas with an irrigation area of ≥ 500,000 mu as the main water-demanding areas I.
5. The method for constructing a three-dimensional water network in a karst mountain area according to claim 3, characterized in that: The expression of the key water-deficient area in step S403 is: SS={I in R s ≥α area} Among them, SS is the key water-deficient area; I is the main water-demanding area; R s is the water shortage rate of the administrative area; α is the water shortage rate threshold; W d is the water demand of the administrative area; W s The amount of water supplied to the administrative area that supplies water to the conventional water source area.
6. The method for constructing a three-dimensional water network in a karst mountain area according to claim 1, characterized in that: The step S5 is specifically as follows: According to the basic data of the construction area, through the analysis of ecological sensitive areas, the core protection area and the general control area in the ecological sensitive area are obtained: ES f ={CP f ,NR f } IT l ={CP l ,NR l ,NP,AG} Among them, ES f It is a core protection area in an ecologically sensitive area; CP f It is the core protected area of the national park; NR f It is the core protection area of the nature reserve; ES l It is a general control area in the ecologically sensitive area; CP l It is the general control area of the National Park; NR l It is the general control area of the nature reserve; NP is the nature park; AG is the aquatic germplasm resources protection area.
7. The method for constructing a three-dimensional water network in a karst mountain area according to claim 1, characterized in that: The step S6 is specifically as follows: S601. Based on the regional water network level, major water demand areas and core protection areas in ecologically sensitive areas, select the backbone surface water source projects for the construction of a three-dimensional water network in the karst mountainous area based on the project scale and importance: Among them, BS a is the corresponding backbone surface water source project when the regional water network level is the first-level main water network or the second-level main water network; V is the total storage capacity of the reservoir; ES f It is a core protection area in an ecologically sensitive area; BS b It is the corresponding backbone surface water source project when the regional water network level is the third-level main water network; ∩ is the intersection symbol; is the non-intersection operator symbol; S602. Obtain the backbone water diversion and lifting projects for building a three-dimensional water network in karst mountainous areas: BC=M∪N M={large and medium-sized water diversion projects with W≥1} N={γ≤W<1 and L i' ≤δ water diversion projects}∩{water supply targets belong to the main water demand areas} Among them, BC is the backbone water diversion and lifting project for building a three-dimensional water network in karst mountainous areas; M is a large or medium-sized water diversion and lifting project; N is a small water diversion and lifting project that meets the project conditions and the importance of the water supply object; W is the annual water supply of the water diversion and lifting project; γ is the annual water supply threshold; δ is the engineering condition coefficient threshold; L i' is the engineering condition coefficient of the i'th water diversion project; m is the number of water diversion projects; i' is the number of water diversion projects; H i' D is the head of the i'th water diversion project; i' is the water transfer distance of the i'th water diversion project; ∪ is the conjunction symbol; S603, obtaining groundwater utilization projects located in key water-deficient areas and emergency backup water source areas, and obtaining groundwater utilization projects for constructing a three-dimensional water network in karst mountainous areas; S604, according to the backbone surface water source projects, backbone water diversion and regulation projects and groundwater utilization projects for constructing the three-dimensional water network in the karst mountainous area, the backbone projects for constructing the three-dimensional water network in the karst mountainous area are obtained; S605. Based on the scale of the river and lake basins and the rivers and lakes where the key projects are located, select the key rivers and lakes for constructing the three-dimensional water network in the karst mountainous areas.
8. The method for constructing a three-dimensional water network in a karst mountain area according to claim 7, characterized in that: The expression for constructing the backbone rivers and lakes of the three-dimensional water network in the karst mountain area in step S605 is: BR={BR r ,BR l } Among them, BR is the backbone river and lake for constructing the three-dimensional water network in karst mountainous areas; BR r It is the backbone river for building a three-dimensional water network in karst mountainous areas; BR l is the backbone lake for constructing the three-dimensional water network in karst mountainous areas; A is the river basin area; R is the proportion of the river basin area in the construction area to the construction area; φ is the threshold of the river basin area in the construction area; A r is the river basin area within the construction area; RA is the total area of the construction area.
Citation Information
Patent Citations
Karst region territorial space development suitability evaluation method and system
CN111882243A
Method for delimiting two-dimensional boundary of village ecosystem in karst plateau stony desertification region
CN117708255A
Cited By
Intelligent scheduling method and system for hydraulic engineering
CN119886497A
Ecological security pattern construction method and system for karst region
CN122509489A
A method and system for constructing an ecological security pattern for karst areas
CN122509489B