Wind power construction safety risk assessment method based on multi-parameter fusion
Through the multi-parameter fusion of wind power construction safety risk assessment method, combined with sensor array and meteorological data, the problem of inaccurate wind power construction safety risk assessment is solved, the accuracy and comprehensiveness of the assessment are improved, and the construction safety of wind farms is ensured.
Patent Information
- Application Number
- CN202411022026.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-07-29
AI Technical Summary
The existing technology cannot fully consider various factors affecting wind power construction safety, resulting in inaccurate assessment of wind power construction safety risks.
The wind power construction safety risk assessment method based on multi-parameter fusion is adopted, and the wind power unit layout plan, sensor array layout, settlement monitoring, meteorological continuous monitoring data and construction serialization weight fusion analysis are obtained, combined with settlement deviation coefficient and meteorological monitoring data. risk assessment.
The accuracy and comprehensiveness of wind farm construction safety risk assessment has been improved, and construction safety is ensured by monitoring geological settlement risks and environmental factors.
Smart Images

Figure CN119005683A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of safety risk assessment, and in particular to a wind power construction safety risk assessment method based on multi-parameter fusion. Background Art
[0002] As the global demand for renewable energy continues to increase, the development and utilization of wind energy as a clean and renewable energy has received widespread attention. The construction and operation of wind farms are key links in the utilization of wind energy, and the construction safety of wind farms is the basis for ensuring the efficient and stable operation of wind farms. In the construction process of wind farms, the hoisting operation of wind turbines is a core step with complex technology and high safety risks. In recent years, with the continuous expansion and rapid growth of the scale of new energy business, the safety management of wind turbine hoisting operations faces unprecedented challenges. Although the existing safety management methods can ensure the smooth progress of hoisting operations to a certain extent, there are significant shortcomings in risk identification, management methods and risk response capabilities. The frequent occurrence of production safety accidents highlights the shortcomings in hoisting safety management, which has a serious impact on the construction and operation of wind farms. At present, the existing assessment methods cannot fully reflect the settlement risk of each wind turbine during the construction process, which limits the comprehensiveness and accuracy of risk management decisions.
[0003] In summary, the prior art has a technical problem of inaccurate safety risk assessment of wind power construction due to failure to fully consider various factors affecting safety. Summary of the invention
[0004] The purpose of this application is to provide a wind power construction safety risk assessment method based on multi-parameter fusion, so as to solve the technical problem in the prior art that the wind power construction safety risk assessment is inaccurate due to the failure to fully consider various factors affecting safety.
[0005] In view of the above problems, the present application provides a wind power construction safety risk assessment method based on multi-parameter fusion, wherein the wind power construction safety risk assessment method based on multi-parameter fusion includes: obtaining a wind power layout plan for K wind turbines in a target wind farm, wherein the wind power layout plan includes K wind turbine positions and K wind turbine specifications; laying out a sensor array in the target wind farm according to the K wind turbine positions and the K wind turbine specifications to obtain a settlement monitoring sensor array, wherein the settlement monitoring sensor includes M settlement monitoring sensors and M sensor positions; determining K component stacking areas of the K wind turbines, combining the M sensor positions and the K wind turbines; Sensors are divided at different locations to obtain K settlement monitoring sensor clusters, wherein each settlement monitoring sensor cluster corresponds to a wind turbine; meteorological continuous monitoring data is called to obtain a meteorological monitoring data sequence; according to the wind power construction plan of the target wind farm, the wind turbine construction sequence is determined, and according to the wind turbine construction sequence, a serialized weight fusion analysis is performed on the K settlement monitoring sensor clusters to obtain K sequence settlement deviation coefficients; based on the K sequence settlement deviation coefficients, the meteorological monitoring data sequence is called to obtain K simultaneous meteorological monitoring data sets; risk assessment is performed on the K sequence settlement deviation coefficients and the K simultaneous meteorological monitoring data sets to obtain a target construction safety risk assessment result.
[0006] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0007] By obtaining a wind power layout plan of K wind turbines of a target wind farm, wherein the wind power layout plan includes K wind turbine positions and K wind turbine specifications; the sensor array of the target wind farm is laid out according to the K wind turbine positions and the K wind turbine specifications to obtain a settlement monitoring sensor array, wherein the settlement monitoring sensor includes M settlement monitoring sensors and M sensor positions; K component stacking areas of the K wind turbines are determined, and sensors are divided in combination with the M sensor positions and the K wind turbine positions to obtain K settlement monitoring sensor clusters, wherein each settlement The monitoring sensor cluster corresponds to a wind turbine; the meteorological continuous monitoring data is called to obtain a meteorological monitoring data sequence; according to the wind power construction plan of the target wind farm, the wind turbine construction sequence is determined, and according to the wind turbine construction sequence, the K settlement monitoring sensor clusters are subjected to serialized weight fusion analysis to obtain K sequence settlement deviation coefficients; based on the K sequence settlement deviation coefficients, the meteorological monitoring data sequence is called to obtain K simultaneous meteorological monitoring data sets; the K sequence settlement deviation coefficients and the K simultaneous meteorological monitoring data sets are subjected to risk assessment to obtain the target construction safety risk assessment result. In other words, by monitoring the geological settlement safety risk of the region, combining the environmental factors and personnel safety factors in the hoisting process for evaluation, the construction safety risk is obtained, and the accuracy and comprehensiveness of the wind farm construction safety risk assessment are improved.
[0008] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented according to the contents of the specification, and in order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are specifically cited below. It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present application, nor is it intended to limit the scope of the present application. Other features of the present application will become easy to understand through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] In order to more clearly illustrate the technical solutions in the present application or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0010] Figure 1 This is a flow chart of a wind power construction safety risk assessment method based on multi-parameter fusion in this application;
[0011] Figure 2This is a flow chart of obtaining the settlement deviation coefficient in the wind power construction safety risk assessment method based on multi-parameter fusion in this application. DETAILED DESCRIPTION
[0012] This application solves the technical problem of inaccurate wind power construction safety risk assessment in the prior art due to failure to fully consider various factors affecting safety by providing a wind power construction safety risk assessment method based on multi-parameter fusion. By monitoring the geological subsidence safety risk in the region and evaluating the environmental factors and personnel safety factors during the hoisting process, the construction safety risk is obtained, which improves the accuracy and comprehensiveness of the wind farm construction safety risk assessment.
[0013] Below, the technical solutions in the present application will be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments of the present application. It should be understood that the present application is not limited to the example embodiments described herein. Based on the embodiments of the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application. It should also be noted that, for the convenience of description, only the parts related to the present application are shown in the accompanying drawings, rather than all of them.
[0014] For examples, please see the attached Figure 1 The present application provides a wind power construction safety risk assessment method based on multi-parameter fusion, wherein the wind power construction safety risk assessment method based on multi-parameter fusion specifically includes the following steps:
[0015] Step 1: Obtain a wind power layout plan for K wind turbines of a target wind farm, wherein the wind power layout plan includes K wind turbine positions and K wind turbine specifications.
[0016] Specifically, various information related to the target wind farm is collected, including topographic maps, wind direction and speed data, grid access point location, environmental restrictions, etc. At the same time, the mutual influence between wind turbines, such as wake effects, is considered. The layout of wind turbines in the target wind farm is determined to determine an efficient and safe wind power layout plan. The specific location of each wind turbine in the wind farm is determined based on factors such as terrain, wind direction, wind speed, and environmental restrictions; the specifications of wind turbines, including the size, capacity, and other technical parameters of each wind turbine, are determined based on power generation requirements, the scale of the wind farm, local wind resources, and other technical and economic factors. Reasonable location and specification selection can maximize power generation efficiency while ensuring the safety and economy of construction and operation.
[0017] Step 2: Deploy the sensor array of the target wind farm according to the positions of the K wind turbines and the specifications of the K wind turbines to obtain a subsidence monitoring sensor array, wherein the subsidence monitoring sensor includes M subsidence monitoring sensors and M sensor positions.
[0018] Specifically, the effective coverage area of each settlement monitoring sensor is determined according to the type, performance and deployment environment of the sensor. The effective coverage area refers to the range that the sensor can accurately monitor, and the determination of this range is crucial for the subsequent sensor deployment. According to the effective coverage area of each sensor, the location and specifications of each wind turbine, the initial deployment plan of the sensor array is generated. In order to improve the settlement monitoring coverage rate of the area around the wind turbine and reduce the deployment cost of the settlement monitoring sensor, the initial deployment plan is optimized and adjusted, the number and location of the sensors are adjusted, and the deployment plan is adjusted and evaluated multiple times, and finally the target deployment plan is obtained, including M settlement monitoring sensors and M sensor locations. Sensors are deployed in the wind farm according to the target deployment plan to generate a settlement monitoring sensor array. According to the location and specifications of the wind turbine, the settlement monitoring sensor array is deployed in the target wind farm. The optimized deployment plan can improve the monitoring coverage rate, thereby more effectively monitoring the settlement around the wind turbine.
[0019] Step three: determine K component stacking areas of the K wind turbines, divide the sensors based on the M sensor positions and the K wind turbine positions, and obtain K settlement monitoring sensor clusters, where each settlement monitoring sensor cluster corresponds to one wind turbine.
[0020] Specifically, the design drawings and specifications of the wind turbine are analyzed to determine the size, weight and installation requirements of each component. Considering the size and shape of the construction site, as well as the availability of transportation and lifting equipment, the component stacking area is determined. Ensure the safety of the stacking area, including avoiding the stacking area from being affected by wind, and the reasonable distance between the stacking area and the construction area. According to the locations of M sensors and K wind turbines, the sensors are divided and assigned to K wind turbines to ensure that each unit has sufficient monitoring coverage. Through division, K settlement monitoring sensor clusters are generated, each cluster corresponding to a wind turbine. Each sensor cluster includes a group of sensors, which are arranged at a position that can effectively monitor the foundation settlement of the corresponding unit, ensuring that each sensor cluster can cover the monitoring area of the wind turbine. By reasonably dividing the sensors, it is ensured that the key areas of each unit can be effectively monitored, and each sensor cluster corresponds to a specific wind turbine, ensuring the pertinence and accuracy of the monitoring.
[0021] Step 4: Call the continuous meteorological monitoring data to obtain the meteorological monitoring data sequence.
[0022] Specifically, obtain data from meteorological stations or meteorological monitoring equipment near the wind farm, including key meteorological parameters such as wind speed, wind direction, temperature, humidity, precipitation, visibility, etc. Meteorological conditions have a significant impact on the safety of wind power construction. For example, extreme weather such as strong winds and heavy rains may increase construction risks and affect construction progress and quality. Continuous monitoring of data means that data is collected continuously over a period of time, which helps capture the changing trends and periodic characteristics of meteorological conditions. These continuously monitored data series can be obtained by calling a meteorological monitoring system or service. The data series can be arranged in chronological order, and each data point corresponds to a specific time point, forming a continuous time series for subsequent risk assessment and analysis.
[0023] Step 5: According to the wind power construction plan of the target wind farm, determine the construction sequence of the wind turbines, and perform serialized weight fusion analysis on the K settlement monitoring sensor clusters according to the wind turbine construction sequence to obtain K sequence settlement deviation coefficients.
[0024] Specifically, according to the wind power construction plan, the construction sequence of wind turbines is determined by considering multiple factors such as terrain, unit type, construction resources, safety requirements, etc. According to the construction sequence, the K settlement monitoring sensor clusters are subjected to serialized weight fusion analysis. When each wind turbine is under construction, its related settlement monitoring sensor cluster will be taken into account. According to the position and importance of each wind turbine in the construction sequence, the corresponding weight is assigned, and safety risk assessment is required for each wind turbine during construction. The settlement deviation value of each settlement monitoring sensor cluster is multiplied by its corresponding weight to perform serialized weight fusion analysis. Through serialized weight fusion analysis, a serial settlement deviation coefficient is generated for each wind turbine. Through serialized weight fusion analysis, the settlement risk of each wind turbine during construction can be more accurately assessed, so that corresponding risk control measures can be taken.
[0025] Step 6: Call the meteorological monitoring data sequence based on the K sequence sedimentation deviation coefficients to obtain K simultaneous meteorological monitoring data sets.
[0026] Specifically, according to the timestamps of the wind turbine construction sequence and the settlement monitoring data sequence, the corresponding meteorological monitoring data is matched to ensure that the settlement monitoring data in each construction sequence corresponds to the corresponding meteorological monitoring data in time. Based on the sequence settlement deviation coefficient, the meteorological monitoring data of the same sequence is called, which means that the meteorological monitoring data in the time period corresponding to the settlement deviation coefficient of each sequence will be retrieved to form a set of meteorological monitoring data of the same sequence. K sets of meteorological monitoring data of the same sequence are obtained, each set contains a set of settlement deviation coefficients and a set of meteorological monitoring data, which are synchronized in time. By combining the sequence settlement deviation coefficient and the meteorological monitoring data of the same sequence, the safety risks in the construction process can be more accurately assessed to ensure the safe progress of the construction.
[0027] Step 7: Perform risk assessment on the K sequence settlement deviation coefficients and the K simultaneous sequence meteorological monitoring data sets to obtain target construction safety risk assessment results.
[0028] Specifically, the sequence settlement deviation coefficient reflects the settlement trend of each wind turbine during the construction process, while the sequence meteorological monitoring data provides the meteorological conditions during the construction period. The combination of the two can more comprehensively evaluate the safety risks in the construction process. A risk assessment model is established that can integrate the sequence settlement deviation coefficient and meteorological monitoring data to assess construction risks. The model includes statistical analysis, machine learning or deep learning technology to identify potential safety risks. The integrated data set is analyzed using the risk assessment model to generate the target construction safety risk assessment results, including risk level, risk probability, risk impact, potential risk factors, risk prediction and other indicators. Based on the risk assessment results, corresponding risk management strategies are formulated, including adjusting the construction plan, strengthening safety measures, preparing emergency response plans, etc. Through risk assessment, safety risks in the construction process are identified and quantified, and preventive measures are taken to avoid potential risk events and protect the safety of personnel and property.
[0029] Further, step 2 of this application includes:
[0030] Acquire the effective coverage area of the subsidence monitoring sensors; determine the initial layout plan of the sensor array according to the effective coverage area, the positions of the K wind turbines and the specifications of the K wind turbines, and generate an initial layout plan; with the improvement of the subsidence monitoring coverage rate of the areas around the wind turbines and the reduction of the layout cost of the subsidence monitoring sensors as the optimization goals, optimize the direction of the initial layout plan and generate a target layout plan, wherein the target layout plan includes M subsidence monitoring sensors and M sensor positions; layout the sensor array based on the target layout plan to generate the subsidence monitoring sensor array.
[0031] Specifically, different types of settlement monitoring sensors have different detection principles and technical parameters. The range determines the maximum distance or change that the sensor can monitor, while the accuracy affects the reliability of the monitoring data. Based on the technical parameters of the sensor, the theoretical maximum coverage area is calculated. In actual monitoring, the monitoring environment and monitoring requirements will cause the actual effective coverage area to be smaller than the theoretical coverage area. The terrain and landforms will affect the layout and coverage of the sensors. For example, in complex terrain, more sensors are required to ensure full coverage. In addition, climatic conditions, such as temperature, humidity, rain and snow, will affect the performance of the sensor and the accuracy of the data. According to different monitoring needs, such as monitoring the settlement of wind turbines and monitoring the overall stability of wind farms, the frequency and duration of monitoring are determined. For example, in areas with complex terrain or poor climatic conditions, more intensive deployment is required to ensure effective coverage. According to the monitoring range of the sensor and the site conditions, the effective coverage area is finally determined.
[0032] According to the geographic information of the wind farm, the location and specifications of the wind turbines, and the effective coverage area of the sensors, select a suitable model, such as a neural network model, to initially determine the layout plan. Use historical data to train the neural network model. The input parameters include the location and specifications of the wind turbines and the effective coverage area of the sensors. The output is the initial layout location of the sensors. Iterate the training process and continuously adjust the weights and biases of the model to achieve a satisfactory performance level. Use the trained model to generate the initial layout plan of the sensor array. The initial layout plan should be based on layout principles, such as uniform layout, encryption in key areas, etc., to ensure the accuracy and comprehensiveness of the monitoring data.
[0033] Set the optimization goal, that is, to increase the settlement monitoring coverage rate of the area around the wind turbine and reduce the cost of setting up settlement monitoring sensors. Select a suitable optimization algorithm, such as particle swarm optimization algorithm. According to the optimization algorithm, randomly adjust the initial layout plan, consider the monitoring coverage rate and cost-effectiveness, and adjust the number and location of sensors. Generate multiple adjustment layout plans, calculate the fitness of each layout plan, compare them, optimize the direction of the plan, and finally obtain the target layout plan, which should be the best fitness at present. The target layout plan includes M settlement monitoring sensors and M sensor locations. According to the target layout plan, determine the actual layout location of the sensor. Consider the site conditions, such as terrain, soil type, surrounding environment, etc., to ensure the rationality and feasibility of sensor layout. Install M settlement monitoring sensors at appropriate locations in the wind farm to ensure that the sensors are firmly fixed and not interfered by external factors. After installation, test the settlement monitoring system to ensure that all sensors are working properly and data transmission is correct. After completing the sensor layout and system testing, generate a settlement monitoring sensor array to monitor the settlement of the wind turbine foundation and surrounding ground in real time or regularly. By rationally planning the number and location of sensors, unnecessary sensor deployment can be reduced, and the construction and maintenance costs of the settlement monitoring system can be reduced. The settlement monitoring sensor array generated based on the target deployment plan can monitor the settlement of the wind turbine foundation and the surrounding ground in real time or regularly, providing data support for the construction safety risk assessment of the wind farm.
[0034] Furthermore, the present application also includes the following steps:
[0035] The initial layout scheme is retrieved with the number of sensors and the position of sensors as indexes to generate the initial number of sensors and the initial sensor position; the layout fitness analysis of the initial layout scheme is performed according to the initial number of sensors and the initial sensor position to obtain the initial layout fitness; a first adjustment scale is obtained according to the initial layout fitness, wherein the first adjustment scale is the size of a single adjustment of the number of initial sensors and the displacement amplitude of a single movement of the initial sensor position when performing directional optimization adjustment; the initial layout scheme is randomly adjusted multiple times based on the first adjustment scale to generate multiple adjusted layout schemes; the multiple adjusted layout schemes are directional optimized and adjusted to generate the target layout scheme.
[0036] Specifically, the two key parameters of sensor quantity and sensor position are used to quickly locate and identify the initial deployment plan, determine the initial number of sensors used in this deployment plan, and the positions of these initial sensors. Construct a fitness analysis unit, input the initial number of sensors, initial sensor positions, and effective coverage area into the fitness analysis unit for evaluation, and obtain the initial deployment fitness based on the evaluation results. Determine the degree of optimization required based on the initial deployment fitness. Set the first adjustment scale, including the size of a single adjustment of the number of sensors and the displacement amplitude of the sensor position. According to the first adjustment scale, randomly adjust the initial deployment plan to increase or decrease the number of sensors, and change the position of the sensors. After each random adjustment, generate a new adjustment deployment plan.
[0037] Use the particle optimization algorithm to optimize the adjustment layout scheme, use the fitness analysis unit to perform fitness analysis on multiple adjustment layout schemes, calculate the fitness value of each particle, that is, the objective function value corresponding to the particle position, and obtain multiple adjustment layout fitnesses. Compare the fitness of these adjustment layout schemes to find the adjustment layout scheme with the largest fitness. Compare the maximum fitness with the initial layout fitness value. If the maximum value among the multiple adjustment layout fitnesses is greater than or equal to the initial layout fitness, the adjustment layout scheme corresponding to this maximum value is used as the optimization direction. Otherwise, two random numbers are randomly generated. If the first random number is greater than or equal to the second random number, the initial layout scheme is used as the optimization direction for optimization adjustment. If the first random number is less than the second random number, the adjustment layout scheme corresponding to the maximum value is used as the optimization direction, and other schemes are optimized.
[0038] Each solution is evaluated, and the number and location of sensors are adjusted according to the evaluation results. The purpose of optimization and adjustment is to improve monitoring coverage and reduce costs while ensuring the rationality of the layout. Through multiple iterations and optimization adjustments, the fitness score of the layout scheme can be gradually improved, thereby obtaining a higher quality layout scheme. Particle search optimization algorithm (PSO) is an optimization algorithm based on swarm intelligence. The basic idea is to find the optimal solution of the problem through the interaction of individuals in the particle swarm. In the particle search optimization algorithm, each particle represents a candidate solution to the problem, and each particle has its corresponding objective function value, that is, the fitness value. Each particle in the particle swarm updates its position by tracking two "extreme values": one is the optimal solution found by the particle itself so far, called the individual extreme value; the other is the optimal solution found by the entire particle swarm so far, called the global extreme value. The introduction of randomness and particle search optimization algorithm can avoid the optimization process from falling into the local optimal solution and ensure the possibility of searching for the global optimal solution. By optimizing the layout scheme, it can ensure that the monitoring coverage is maximized while reducing the number of unnecessary sensors, thereby improving the monitoring efficiency.
[0039] Furthermore, the present application also includes the following steps:
[0040] Constructing a fitness analysis unit; inputting the initial number of sensors, initial sensor positions and the effective coverage area into the fitness analysis unit to obtain the initial layout fitness.
[0041] Specifically, the indicators for evaluating the layout scheme are clarified, and the specific form of the fitness function is determined, such as linear combination, weighted summation or other complex functions. Mathematical modeling methods, such as linear programming, integer programming or heuristic algorithms, are used to establish the evaluation model. In the model, the evaluation index is used as the objective function, and constraints, such as the effective coverage area of the sensor, the location and specifications of the wind turbine, etc., are considered. Simulation software or algorithms are used to simulate the layout scheme of the sensor array and evaluate its performance, including simulating sensor data, analyzing monitoring coverage and cost-effectiveness, etc. The fitness analysis unit is an integrated system for analyzing the layout scheme of the sensor array to determine its fitness, which usually includes an input module, a simulation and evaluation module, an optimization algorithm module and an output module. The initial number of sensors, the initial sensor location and the effective coverage area are input into the fitness analysis unit for evaluation, and the initial layout fitness is obtained according to the evaluation results. This fitness is a comprehensive indicator used to measure the advantages and disadvantages of the layout scheme. A scheme with a high fitness means that it can better meet the monitoring needs and has better performance. Through fitness analysis, the performance of the initial layout scheme can be determined, and a basis for subsequent optimization and adjustment can be provided.
[0042] Furthermore, the present application also includes the following steps:
[0043] Utilize the fitness analysis unit to perform fitness analysis on the multiple adjustment layout schemes to obtain multiple adjustment layout fitnesses; determine whether the maximum value among the multiple adjustment layout fitnesses is greater than or equal to the initial layout fitness; if so, use the adjustment layout scheme corresponding to the maximum value among the multiple adjustment layout fitnesses as the optimization direction, and perform directional optimization adjustment on the remaining multiple adjustment layout schemes according to the first adjustment scale until a preset optimization number is met to obtain the target layout scheme; if not, call a random number generator to generate a first random number and a second random number; when the first random number is greater than or equal to the second random number, use the initial layout scheme as the optimization direction to perform directional optimization adjustment until a preset optimization number is met to obtain the target layout scheme.
[0044] Furthermore, the present application also includes the following steps:
[0045] When the first random number is smaller than the second random number, the adjustment layout scheme corresponding to the maximum value of multiple adjustment layout fitnesses is accepted as the optimization direction, and the remaining multiple adjustment layout schemes are optimized and adjusted in direction according to the first adjustment scale until the preset optimization times are met to obtain the target layout scheme.
[0046] Specifically, the number of sensors, sensor positions and effective coverage area of each adjustment layout scheme are input into the fitness analysis unit. Based on the input data, the simulation and evaluation module is used to simulate the layout scheme of the sensor array and evaluate its performance. The evaluation model will output the fitness of each layout scheme, which is a comprehensive indicator used to measure the pros and cons of the layout scheme. Sort the multiple adjustment layout fitnesses, find the maximum value, and compare it with the initial layout fitness. If the maximum value of the multiple adjustment layout fitnesses is greater than the initial layout fitness, it means that the adjustment layout scheme corresponding to the maximum value is better than the initial scheme, and it is used as the optimization direction. According to the first adjustment scale, the remaining multiple adjustment layout schemes are optimized and adjusted in direction, such as increasing or decreasing the number of sensors, or fine-tuning the sensor position. The preset optimization number is a pre-set iteration number limit in the optimization process, which ensures that the optimization process will not go on indefinitely, but will be completed within a limited number of times. Repeat these steps for multiple iterations. In each iteration, the direction optimization adjustment is performed based on the first adjustment scale, and the fitness of each new scheme is re-evaluated. Continue optimizing until the preset number of optimizations is met, and use the current adjusted layout plan as the target layout plan.
[0047] If the maximum value among multiple adjustment layout fitness is less than or equal to the initial layout fitness, it means that the adjustment layout schemes generated after these random adjustments are not better than the initial scheme. At this time, it is necessary to call the random number generator to generate two random numbers, namely the first random number and the second random number. The RAND function can be used to generate random numbers. If the first random number is greater than or equal to the second random number, the initial layout scheme is still used as the optimization direction for directional optimization adjustment. This process is iterated until the preset number of optimizations is met to obtain the target layout scheme. Conversely, if the first random number is less than the second random number, the adjustment layout scheme corresponding to the maximum fitness value is used as the optimization direction, and the remaining multiple adjustment layout schemes are directional optimized according to the first adjustment scale. Repeat this process until the preset number of optimizations is met, and finally determine the target layout scheme.
[0048] In a specific example, suppose that a wind farm needs to deploy settlement monitoring sensors. The initial deployment plan includes 10 sensors distributed in specific locations, and the effective coverage area of each sensor is 100 square meters. The fitness of the initial deployment is calculated by the fitness analysis unit to be 0.75. Now, this plan is randomly adjusted to generate 5 adjusted deployment plans, each of which adjusts the number and position of sensors. After fitness analysis of these plans, the following fitness scores are obtained: 0.80, 0.78, 0.76, 0.74, 0.79. The maximum fitness value is 0.80, which is greater than the initial deployment fitness, so this plan is selected as the optimization direction. The remaining plans are adjusted according to the first adjustment scale, such as increasing or decreasing the number of sensors, or changing the sensor position. Repeat this process 10 times until the optimal deployment plan is found. However, in a certain round of iterations, it is found that the maximum fitness score does not exceed the initial deployment fitness. Therefore, the first random number and the second random number are randomly generated, the first random number is 0.5, and the second random number is 0.6. Since the first random number is smaller than the second random number, the adjustment layout scheme with the maximum fitness of 0.80 is accepted as the new optimization direction. According to the first adjustment scale, the direction of the other multiple adjustment layout schemes is optimized and adjusted. This process is repeated 10 times to finally determine the target layout scheme.
[0049] In summary, the layout scheme is optimized through the fitness analysis unit to determine which layout schemes are better than the initial scheme in performance. The introduction of randomness can prevent the optimization process from falling into the local optimal solution and ensure the possibility of searching for the global optimal solution. The layout scheme is continuously optimized to adapt to different environmental conditions, and finally an efficient and economical layout scheme is obtained, which helps to improve the adaptability and robustness of the monitoring system.
[0050] Further, as attached Figure 2 As shown, step five of this application includes:
[0051] Extract the first wind turbine group from the construction sequence of the wind turbine groups; take the first wind turbine group as the center, assign weights according to the distances from the K settlement monitoring sensor clusters to the first wind turbine group, and obtain K first weights; obtain the first construction window of the first wind turbine group, and retrieve K settlement monitoring data sets of the K settlement monitoring sensor clusters based on the first construction window; perform difference calculations on the K settlement monitoring data sets and K initial monitoring data respectively, and generate K settlement deviation value sets; perform concentrated value screening on the K settlement deviation value sets respectively, and generate K concentrated settlement deviation values; perform serialized weight fusion analysis on the K concentrated settlement deviation values using the K first weights, and generate K first settlement deviation coefficients; use the K first settlement deviation coefficients as the K sequence settlement deviation coefficients.
[0052] Specifically, the first wind turbine is extracted from the determined construction sequence of wind turbines, which is usually the first installed unit. With the first wind turbine as the core, weights are allocated according to the distance from the settlement monitoring sensor cluster to the first wind turbine, reflecting the degree of influence of different settlement monitoring sensor clusters on the construction safety of the first wind turbine. Sensor clusters with closer distances have a greater impact on the safety of the first wind turbine, so they should be given higher weights. According to the weight allocation rule, the first weight of each settlement monitoring sensor cluster is calculated. The first construction window of the first wind turbine is determined according to the construction plan, weather forecast and other relevant factors. The construction window refers to the time period suitable for wind power construction, which is usually determined by factors such as meteorological conditions, construction resources and safety requirements. The first construction window refers to the construction time window for the first wind turbine. Based on the determined first construction window, the data set of the corresponding settlement monitoring sensor cluster is retrieved, including all settlement monitoring data of each sensor cluster collected during the first construction window.
[0053] Initial monitoring data refers to the settlement monitoring data before the start of construction or at a certain reference time point. These data are used as a benchmark for comparison with the data during the construction process. For each settlement monitoring sensor cluster, the data set collected during the first construction window is calculated by difference with the initial monitoring data. The difference calculation is used to determine the change in the settlement monitoring data over a period of time, that is, the settlement deviation value, which usually includes a subtraction operation, that is, the new data minus the initial data. Through the difference calculation, a settlement deviation value set is generated for each settlement monitoring sensor cluster. These sets contain the settlement changes of each sensor cluster relative to the initial state during the first construction window. The K settlement deviation value sets are screened for concentrated values, the mode is extracted from multiple settlement deviation value sets, and the mean shift algorithm is used for concentrated value screening. Through screening, outliers or noise can be removed to improve the reliability and accuracy of the data. Through the screening of the mean shift algorithm, a concentrated settlement deviation value is generated for each settlement deviation value set, representing the main trends and characteristics of the set. After screening, K concentrated settlement deviation values are generated.
[0054] K first weights are used to perform serialized weight fusion analysis on K concentrated settlement deviation values, and the importance of different settlement monitoring points and their settlement deviation values are combined to generate a comprehensive settlement deviation coefficient. Each settlement deviation value is multiplied by its corresponding first weight for serialized weight fusion analysis. This analysis method takes into account the importance of different monitoring points to generate a comprehensive settlement deviation coefficient. Through serialized weight fusion analysis, a first settlement deviation coefficient is generated for each monitoring point, and K first settlement deviation coefficients are obtained, which reflect the settlement risk level of each wind turbine relative to other turbines during construction. The K first settlement deviation coefficients are used as K serial settlement deviation coefficients. By performing difference calculation, concentrated value screening and serialized weight fusion analysis on settlement monitoring data, the settlement of wind turbines during construction can be accurately evaluated, settlement anomalies can be discovered in time, and corresponding measures can be taken to prevent potential safety risks and reduce construction risks.
[0055] Furthermore, the present application also includes the following steps:
[0056] The modes are respectively extracted from the K settlement deviation value sets to obtain K settlement deviation value modes; taking the K settlement deviation value modes as the starting point, the mean shift algorithm is used to perform concentrated value screening in the K settlement deviation value sets to generate the K concentrated settlement deviation values.
[0057] Specifically, the mode, that is, the value with the most occurrences, is extracted from the K sedimentation deviation value sets to obtain the K sedimentation deviation value modes. Starting from the extracted mode, the mean shift algorithm is used to screen the concentrated values in the sedimentation deviation value set. In this process, the algorithm gradually adjusts the center point to reflect the main distribution characteristics of the data. The mean shift algorithm is a non-parametric density estimation method that finds the pattern of data distribution through an iterative process. The basic idea of the algorithm is to move in the direction of the rising density gradient in the feature space until the local maximum of the density function is reached. These maximum values usually represent the cluster centers in the data set. A random point is selected as the center point, and the weighted average position of all points within a certain range around the current center point is calculated. This position is called the offset mean. The weight is usually inversely proportional to the distance from the point to the center point, that is, the closer the point is, the greater the influence on the offset mean. Through the screening of the mean shift algorithm, a concentrated sedimentation deviation value is generated for each sedimentation deviation value set. This value should be able to best represent the main trends and characteristics of the set. The mean shift algorithm can improve the reliability and accuracy of the data and ensure the quality of the monitoring data.
[0058] In summary, the wind power construction safety risk assessment method based on multi-parameter fusion provided in this application has the following technical effects:
[0059] By obtaining a wind power layout plan of K wind turbines of a target wind farm, wherein the wind power layout plan includes K wind turbine positions and K wind turbine specifications; the sensor array of the target wind farm is laid out according to the K wind turbine positions and the K wind turbine specifications to obtain a settlement monitoring sensor array, wherein the settlement monitoring sensor includes M settlement monitoring sensors and M sensor positions; K component stacking areas of the K wind turbines are determined, and sensors are divided in combination with the M sensor positions and the K wind turbine positions to obtain K settlement monitoring sensor clusters, wherein each settlement The monitoring sensor cluster corresponds to a wind turbine; the meteorological continuous monitoring data is called to obtain a meteorological monitoring data sequence; according to the wind power construction plan of the target wind farm, the wind turbine construction sequence is determined, and according to the wind turbine construction sequence, the K settlement monitoring sensor clusters are subjected to serialized weight fusion analysis to obtain K sequence settlement deviation coefficients; based on the K sequence settlement deviation coefficients, the meteorological monitoring data sequence is called to obtain K simultaneous meteorological monitoring data sets; the K sequence settlement deviation coefficients and the K simultaneous meteorological monitoring data sets are subjected to risk assessment to obtain the target construction safety risk assessment result. In other words, by monitoring the geological settlement safety risk of the region, combining the environmental factors and personnel safety factors in the hoisting process for evaluation, the construction safety risk is obtained, and the accuracy and comprehensiveness of the wind farm construction safety risk assessment are improved.
[0060] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
[0061] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application belong to the scope of the present application and its equivalent technology, the present application is also intended to include these modifications and variations.
Claims
1. A wind power construction safety risk assessment method based on multi-parameter fusion, characterized in that: include: Obtaining a wind power layout plan of K wind turbines of a target wind farm, wherein the wind power layout plan includes positions of the K wind turbines and specifications of the K wind turbines; Arrange the sensor array of the target wind farm according to the positions of the K wind turbines and the specifications of the K wind turbines to obtain a subsidence monitoring sensor array, wherein the subsidence monitoring sensor includes M subsidence monitoring sensors and M sensor positions; Determine K component stacking areas of the K wind turbines, divide the sensors based on the M sensor positions and the K wind turbine positions, and obtain K settlement monitoring sensor clusters, wherein each settlement monitoring sensor cluster corresponds to one wind turbine; Call the meteorological continuous monitoring data to obtain the meteorological monitoring data sequence; According to the wind power construction plan of the target wind farm, a wind turbine construction sequence is determined, and according to the wind turbine construction sequence, a serialized weight fusion analysis is performed on the K settlement monitoring sensor clusters to obtain K sequence settlement deviation coefficients; Calling the meteorological monitoring data sequence based on the K sequence sedimentation deviation coefficients to obtain K simultaneous sequence meteorological monitoring data sets; A risk assessment is performed on the K sequence settlement deviation coefficients and the K simultaneous sequence meteorological monitoring data sets to obtain a target construction safety risk assessment result.
2. The wind power construction safety risk assessment method based on multi-parameter fusion according to claim 1 is characterized in that: include: Obtain the effective coverage area of the settlement monitoring sensor; Determine an initial layout plan of the sensor array according to the effective coverage area, the positions of the K wind turbines and the specifications of the K wind turbines, and generate an initial layout plan; Taking improving the settlement monitoring coverage rate of the area around the wind turbine and reducing the settlement monitoring sensor deployment cost as the optimization goal, the initial deployment plan is optimized and adjusted in direction to generate a target deployment plan, wherein the target deployment plan includes M settlement monitoring sensors and M sensor positions; The sensor array is deployed based on the target deployment plan to generate the settlement monitoring sensor array.
3. The wind power construction safety risk assessment method based on multi-parameter fusion according to claim 2 is characterized in that: include: Using the number of sensors and the positions of sensors as indexes, the initial deployment plan is retrieved to generate the initial number of sensors and the initial positions of sensors; Performing a layout fitness analysis of the initial layout scheme according to the initial number of sensors and the initial sensor positions to obtain an initial layout fitness; Obtaining a first adjustment scale according to the initial layout adaptability, wherein the first adjustment scale is the size of a single adjustment of the number of initial sensors and the displacement amplitude of a single movement of the initial sensor position when performing direction optimization adjustment; Based on the first adjustment scale, the initial layout scheme is randomly adjusted multiple times to generate multiple adjusted layout schemes; Directionally optimize and adjust the multiple adjustment layout schemes to generate the target layout scheme.
4. The wind power construction safety risk assessment method based on multi-parameter fusion according to claim 3 is characterized in that: include: Construct a fitness analysis unit; The initial number of sensors, initial sensor positions and the effective coverage area are input into the fitness analysis unit to obtain the initial layout fitness.
5. The wind power construction safety risk assessment method based on multi-parameter fusion according to claim 4 is characterized in that: include: Using the fitness analysis unit to perform fitness analysis on the multiple adjustment layout schemes to obtain multiple adjustment layout fitnesses; Determine whether the maximum value among the multiple adjusted layout fitnesses is greater than or equal to the initial layout fitness; if so, use the adjusted layout scheme corresponding to the maximum value among the multiple adjusted layout fitnesses as the optimization direction, and perform directional optimization adjustment on the remaining multiple adjusted layout schemes according to the first adjustment scale until the preset optimization times are met to obtain the target layout scheme; If not, call the random number generator to generate a first random number and a second random number. When the first random number is greater than or equal to the second random number, perform directional optimization adjustment with the initial layout plan as the optimization direction until the preset optimization times are met to obtain the target layout plan.
6. The wind power construction safety risk assessment method based on multi-parameter fusion according to claim 5 is characterized in that: include: When the first random number is smaller than the second random number, the adjustment layout scheme corresponding to the maximum value of multiple adjustment layout fitnesses is accepted as the optimization direction, and the remaining multiple adjustment layout schemes are optimized and adjusted in direction according to the first adjustment scale until the preset optimization times are met to obtain the target layout scheme.
7. The wind power construction safety risk assessment method based on multi-parameter fusion according to claim 1, characterized in that: include: Extracting a first wind turbine generator set from the wind turbine generator set construction sequence; Taking the first wind turbine generator set as the center, weights are allocated according to the distances from the K settlement monitoring sensor clusters to the first wind turbine generator set to obtain K first weights; Acquire a first construction window of the first wind turbine generator set, and retrieve K settlement monitoring data sets of the K settlement monitoring sensor clusters based on the first construction window; Perform difference calculations on the K settlement monitoring data sets and the K initial monitoring data sets respectively to generate K settlement deviation value sets; Performing concentrated value screening on the K settlement deviation value sets respectively to generate K concentrated settlement deviation values; Using the K first weights, performing serialized weight fusion analysis on the K concentrated settlement deviation values to generate K first settlement deviation coefficients; The K first sedimentation deviation coefficients are used as the K sequence sedimentation deviation coefficients.
8. The wind power construction safety risk assessment method based on multi-parameter fusion according to claim 7, characterized in that: include: Extracting modes from the K settlement deviation value sets respectively to obtain K settlement deviation value modes; Taking the modes of the K settlement deviation values as a starting point, a mean shift algorithm is used to perform concentrated value screening in the K settlement deviation value sets to generate the K concentrated settlement deviation values.
Citation Information
Patent Citations
Heterogeneous directed sensor network deployment method
CN105163325A
Underground engineering construction safety real-time online monitoring cloud platform based on big data analysis and online monitoring method
CN112947645A
Wireless sensor network coverage rate optimization method and system
CN113242563A
Reservoir ecological environment real-time monitoring method
CN116405874A
Intelligent state evaluation method and system for water-turbine generator set
CN116881658A
Cited By
Aviation composite material hot press molding productivity evaluation method considering interval grey number and working hours
CN119443731A
Offshore wind power operation safety prediction system based on data analysis
CN119783958A
Wind power hoisting safety monitoring system and method based on big data
CN121390878A