Power equipment drilling inspection device and control method thereof

By calculating and adjusting the motion speed and data extraction during the detection process in the drilling and crossing inspection device of the power equipment, the problems of the battery life of the drilling and crossing inspection robot and the data upload pressure are solved, and a more efficient inspection process is achieved.

CN119005948APending Publication Date: 2024-11-22国网山西省电力有限公司超高压变电分公司
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411106773.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing robot-based drilling and crossing inspection solutions have high intelligence, resulting in large energy consumption and limited power supply energy, and battery life problems have become the main obstacle.

Method used

By obtaining hole position and detection requirements in the power equipment drilling and crossing inspection device, calculating the theoretical detection time and movement speed, recursively adjusting the detection process based on the detection results, and using the general control platform to obtain the actual movement speed, extracting the data from the inspection end. Reduce data upload pressure and improve battery life.

Benefits of technology

With the same power supply, the battery life of the drilling and crossing inspection device is significantly improved, the data upload pressure on the inspection end is alleviated, and the working efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005948A_ABST
    Figure CN119005948A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of drilling inspection, and particularly discloses a power equipment drilling inspection device and a control method thereof, and the control method comprises the steps: carrying out the drilling detection of equipment based on a corresponding detection demand when an inspection end runs to a detection point, and carrying out the recursive adjustment of a drilling detection process according to a drilling detection result; after the inspection end completes the detection, obtaining a detection completion moment, querying the theoretical time of the next detection point, and correcting the motion instruction based on the theoretical time and the detection completion moment; the platform obtains the actual movement speed of the inspection end according to the monitoring equipment, compares the actual movement speed with the theoretical movement speed, and then extracts the drilling detection data. According to the invention, the drilling detection task is locally completed by the inspection end, and the collected data of the inspection end is selectively extracted, so that the data uploading pressure of the inspection end is relieved, and the cruising ability is greatly improved under the condition of the same power supply.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of drill-through inspection, and in particular to a drill-through inspection device for electric equipment and a control method thereof. Background Art

[0002] Power equipment drilling inspection is a method of inspection by drilling through power equipment, aiming to ensure the normal operation and safety of power equipment. In practical applications, "drilling through" is a special term, usually used in the field of power equipment inspection and maintenance. It refers to drilling and penetrating the outer protective layer of the equipment through special tools or technical means during the operation of the equipment in order to check the internal operating status and structural integrity. This method allows inspection and maintenance without shutting down the equipment, thereby improving work efficiency and reducing downtime. Using the inspection terminal to complete this work also greatly reduces the risk of workers working under uninterrupted power conditions.

[0003] In the existing robot-based drilling and inspection solutions, the robot's intelligence level is required to be extremely high, and it needs to be equipped with a large number of intelligent modules, which means that a lot of energy consumption is required. The robot itself can only carry a mobile power supply, and the energy of the mobile power supply is limited, which makes the battery life issue during the inspection process a major problem. Summary of the invention

[0004] The object of the present invention is to provide a power equipment penetration inspection device and a control method thereof to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A method for controlling drilling and inspection of electric power equipment, the method comprising:

[0007] Step S100: obtaining a hole position that needs to be inspected for drilling, determining an inspection station according to the hole position, and determining an inspection path containing inspection points based on the inspection station; the inspection points correspond to the hole positions;

[0008] Step S200: Obtain the detection requirements of the equipment corresponding to each hole position, calculate the theoretical detection time according to the detection requirements, and determine the theoretical movement speed during the inspection process and the theoretical time to reach each detection point according to the theoretical detection time of each hole position and the preset detection cycle; the theoretical time is a relative time relative to the initial time of the inspection;

[0009] Step S300: When the inspection terminal runs to the inspection point, the equipment is subjected to a drilling inspection based on the corresponding inspection requirements, and the drilling inspection process is recursively adjusted according to the drilling inspection result; the adjustment target includes at least the number of inspections;

[0010] Step S400: When the inspection end completes the inspection, the inspection completion time is obtained, the theoretical time of the next inspection point is queried, and the motion instruction is corrected based on the theoretical time and the inspection completion time;

[0011] Step S500: obtaining the actual movement speed of the inspection end according to the monitoring device, and extracting the penetration detection data according to the actual movement speed and the theoretical movement speed of each path segment;

[0012] Among them, step S100, step S200 and step S500 are executed by the master control platform, and step S300 and step S400 are executed by the inspection terminal.

[0013] As a further solution of the present invention: the steps of obtaining the hole position that needs to be drilled through detection, determining the inspection station according to the hole position, and determining the inspection path containing the detection point based on the inspection station include:

[0014] Receive the device to be detected selected by the manager, and obtain the endpoint coordinates of the device to be detected; the endpoint coordinates are the two-dimensional coordinates of the device to be detected in the map;

[0015] Query the relative coordinates of each hole position on the device to be tested relative to any endpoint coordinate, and determine the absolute coordinates based on the relative coordinates and their corresponding endpoint coordinates;

[0016] Obtain the size information of the inspection end, align the inspection probe of the inspection end based on the absolute coordinates and size information, and determine the inspection station; the alignment rule is that the inspection probe is coaxial with the hole, and the distance between the inspection probe and the device to be inspected is within a preset range;

[0017] The initial points are selected according to a preset order, and the inspection stations are connected based on a greedy algorithm to obtain an inspection path; and detection points corresponding to the inspection stations are inserted into the inspection path.

[0018] As a further solution of the present invention: the steps of obtaining the detection requirements of the equipment corresponding to each hole position, calculating the theoretical detection time according to the detection requirements, and determining the theoretical movement speed during the inspection process and the theoretical time to reach each detection point according to the theoretical detection time of each hole position and a preset detection cycle include:

[0019] Obtaining the detection requirements of the equipment corresponding to each hole position; the detection requirements include temperature measurement, visual measurement and ultrasonic detection;

[0020] Query the theoretical detection time corresponding to the detection requirements in the preset time table; the theoretical detection time is the time corresponding to a single detection, which is determined by the average time and standard deviation of the historical detection records;

[0021] Receive the detection cycle uploaded by the administrator, and calculate the theoretical movement speed based on the detection cycle and the theoretical detection time of each hole position;

[0022] Taking the initial point as the zero time point, the theoretical time to reach each detection point is determined based on the theoretical movement speed and the theoretical detection time at each hole position.

[0023] As a further solution of the present invention: when the inspection terminal runs to the detection point, the device is subjected to a drill-through detection based on the corresponding detection requirements, and the steps of recursively adjusting the drill-through detection process according to the drill-through detection result include:

[0024] When the inspection terminal runs to the inspection point, the inspection data containing the time tag is obtained based on the detector built into the inspection terminal; the detector includes a temperature measuring instrument, a visual measuring instrument and an ultrasonic detector;

[0025] Input the acquired detection data with time tags into the trained recognition and analysis model to obtain the equipment risk value;

[0026] The working time of the detector is determined according to the risk value threshold reached by the equipment risk value; wherein the working frequency of the detector is a preset fixed value.

[0027] As a further solution of the present invention: when the inspection end completes the inspection, the step of obtaining the inspection completion time, querying the theoretical time of the next inspection point, and correcting the motion instruction based on the theoretical time and the inspection completion time includes:

[0028] When the inspection end completes the inspection, obtain the inspection completion time;

[0029] Query the theoretical time of the next detection point, calculate the difference between the theoretical time of the next detection point and the detection completion time, and use it as the movement duration of the next path segment;

[0030] Query the distance of the next path segment, divide the distance by the movement time, and calculate the required speed of the next path segment;

[0031] Modify motion commands based on required speed.

[0032] As a further solution of the present invention: the step of obtaining the actual movement speed of the inspection end according to the monitoring device and extracting the penetration detection data according to the actual movement speed and the theoretical movement speed of each path segment includes:

[0033] Locate the inspection terminal according to the preset monitoring equipment to obtain the position and actual movement speed of the inspection terminal;

[0034] Obtain the theoretical moving speed of the path segment where the inspection end is located;

[0035] The ratio of the actual movement speed to the theoretical movement speed is calculated, and when the ratio reaches a preset threshold, the penetration detection data at the previous monitoring point is extracted.

[0036] The technical solution of the present invention also provides a power equipment drilling inspection device, the device comprising:

[0037] An inspection path determination module is used to obtain a hole position that needs to be drilled through detection, determine an inspection station according to the hole position, and determine an inspection path containing a detection point based on the inspection station; the detection point corresponds to the hole position;

[0038] Theoretical parameter calculation module, used to obtain the detection requirements of the equipment corresponding to each hole position, calculate the theoretical detection time according to the detection requirements, and determine the theoretical movement speed during the inspection process and the theoretical time to reach each detection point according to the theoretical detection time of each hole position and the preset detection cycle; the theoretical time is a relative time relative to the initial time of the inspection;

[0039] The drilling detection module is used to perform drilling detection on the equipment based on the corresponding detection requirements when the inspection terminal runs to the detection point, and recursively adjust the drilling detection process according to the drilling detection result; the adjustment target includes at least the number of detections;

[0040] The motion correction module is used to obtain the detection completion time after the inspection end is completed, query the theoretical time of the next detection point, and correct the motion instruction based on the theoretical time and the detection completion time;

[0041] The drilling and crossing data extraction module is used to obtain the actual movement speed of the inspection end according to the monitoring equipment, and extract the drilling and crossing detection data according to the actual movement speed and the theoretical movement speed of each path segment;

[0042] Among them, the inspection path determination module, theoretical parameter calculation module and drilling and crossing data extraction module are built into the master control platform, and the drilling and crossing detection module and motion correction module are built into the inspection end.

[0043] As a further solution of the present invention: the inspection path determination module includes:

[0044] An endpoint coordinate acquisition unit is used to receive the device to be detected selected by the management personnel and acquire the endpoint coordinates of the device to be detected; the endpoint coordinates are the two-dimensional coordinates of the device to be detected in the map;

[0045] An absolute coordinate determination unit, used to query the relative coordinates of each hole position on the device to be detected relative to any endpoint coordinate, and determine the absolute coordinates according to the relative coordinates and their corresponding endpoint coordinates;

[0046] The station registration unit is used to obtain the size information of the inspection end, and to register the detection probe of the inspection end based on the absolute coordinates and size information to determine the inspection station; the registration rule is that the detection probe is coaxial with the hole, and the distance between the detection probe and the device to be detected is within a preset range;

[0047] The station connection unit is used to select the initial point according to a preset order, connect the inspection stations based on a greedy algorithm, and obtain an inspection path; and insert the detection points corresponding to the inspection stations into the inspection path.

[0048] As a further solution of the present invention: the theoretical parameter calculation module includes:

[0049] A detection requirement acquisition unit, used to acquire the detection requirements of the equipment corresponding to each hole position; the detection requirements include temperature measurement, visual measurement and ultrasonic detection;

[0050] A theoretical duration query unit, used to query the theoretical detection duration corresponding to the detection requirement in a preset time table; the theoretical detection duration is the duration corresponding to a single detection, which is determined by the average duration and the standard deviation of the duration of historical detection records;

[0051] Theoretical speed calculation unit, used to receive the detection cycle uploaded by the administrator, and calculate the theoretical movement speed according to the detection cycle and the theoretical detection time of each hole position;

[0052] The theoretical time calculation unit is used to determine the theoretical time to reach each detection point based on the theoretical movement speed and the theoretical detection time at each hole position, taking the initial point as the zero time point.

[0053] As a further solution of the present invention: the underrun detection module includes:

[0054] A detection data acquisition unit, used for acquiring detection data containing a time tag based on a detector built into the inspection terminal when the inspection terminal runs to the inspection point; the detector includes a temperature measuring instrument, a visual measuring instrument and an ultrasonic detector;

[0055] A data recognition unit is used to input the acquired detection data containing time tags into the trained recognition and analysis model to obtain the equipment risk value;

[0056] A working time determination unit is used to determine the working time of the detector according to the risk value threshold reached by the equipment risk value; wherein the working frequency of the detector is a preset fixed value.

[0057] Compared with the prior art, the beneficial effects of the present invention are as follows: the technical solution of the present invention involves two ports, one is the inspection end, including a robot with mobile function, data transmission function and detection function, and the other is a data processing platform, which is used to interact with the inspection end and extract data from the inspection end. The present invention assigns the drilling and crossing detection task to the inspection end locally, adjusts the movement speed according to the detection result, and the data processing platform obtains the actual movement speed of the inspection end, selectively extracts the collected data of the inspection end, alleviates the data upload pressure of the inspection end, and greatly improves the battery life under the same power supply condition. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention.

[0059] Figure 1 The present invention is a flowchart of the drilling and inspection control method for electric power equipment.

[0060] Figure 2 This is a block diagram of the first sub-process of the electric power equipment penetration inspection control method.

[0061] Figure 3 The second sub-process flowchart of the method for drilling and inspecting the electric power equipment is provided.

[0062] Figure 4 The third sub-process flowchart of the method for drilling and inspecting the electric power equipment.

[0063] Figure 5 This is a fourth sub-process flowchart of the method for drilling and inspecting an electric power equipment.

[0064] Figure 6 This is a fifth sub-process flowchart of the method for drilling and inspecting an electric power equipment.

[0065] Figure 7 This is a structural block diagram of the components of the power equipment drilling inspection device system. DETAILED DESCRIPTION

[0066] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0067] Figure 1 The flowchart of the method for controlling the drilling inspection of electric equipment is shown in the figure. In the embodiment of the present invention, a method for controlling the drilling inspection of electric equipment is provided. The control method includes:

[0068] Step S100: obtaining a hole position that needs to be inspected for drilling, determining an inspection station according to the hole position, and determining an inspection path containing inspection points based on the inspection station; the inspection points correspond to the hole positions;

[0069] Step S200: Obtain the detection requirements of the equipment corresponding to each hole position, calculate the theoretical detection time according to the detection requirements, and determine the theoretical movement speed during the inspection process and the theoretical time to reach each detection point according to the theoretical detection time of each hole position and the preset detection cycle; the theoretical time is a relative time relative to the initial time of the inspection;

[0070] Step S300: When the inspection terminal runs to the inspection point, the equipment is subjected to a drilling inspection based on the corresponding inspection requirements, and the drilling inspection process is recursively adjusted according to the drilling inspection result; the adjustment target includes at least the number of inspections;

[0071] Step S400: When the inspection end completes the inspection, the inspection completion time is obtained, the theoretical time of the next inspection point is queried, and the motion instruction is corrected based on the theoretical time and the inspection completion time;

[0072] Step S500: obtaining the actual movement speed of the inspection end according to the monitoring device, and extracting the penetration detection data according to the actual movement speed and the theoretical movement speed of each path segment;

[0073] Among them, step S100, step S200 and step S500 are executed by the master control platform, and step S300 and step S400 are executed by the inspection terminal.

[0074] Obtain the hole positions that need to be drilled through detection. The hole positions are the hole positions on the base of the power equipment. The equipment that needs to be drilled through detection can be pre-drilled or drilled by the inspection end. The working position of the inspection end can be determined based on the hole positions, which is called the inspection station. The inspection stations are connected and used as detection points to obtain an inspection path containing the detection points. The detection points correspond one-to-one to the inspection stations.

[0075] Obtain the detection requirements of the equipment corresponding to each hole position. The detection requirements indicate what monitoring is required, such as infrared thermometers and ultrasonic detectors, etc. The duration of each detection is almost similar. After knowing the detection requirements, the theoretical detection duration can be calculated based on the detection requirements. The theoretical detection duration can be understood as the residence time at each detection point; receive the detection cycle entered by the administrator, such as the inspection is completed within six hours, then the theoretical movement speed can be obtained by subtracting all the theoretical detection times from six hours and then dividing by the total length of the path. In the technical solution of the present application, the inspection end travels at a uniform speed.

[0076] When the inspection terminal runs to the detection point, it performs drilling detection on the equipment based on the corresponding detection requirements, and recursively adjusts the drilling detection process according to the drilling detection results. The simplest solution to adjust the drilling detection process is to adjust the number of drilling detections. The duration of a single detection is almost the same. The more times the detection is performed, the longer the time consumed, that is, the longer the theoretical detection duration. When the inspection terminal completes the detection, it records the detection completion time, queries the theoretical time of the next detection point, takes the detection completion time as the starting time, and takes the theoretical time of the next detection point as the arrival time to calculate the actual speed, so that the inspection terminal can arrive at the next detection point at the specified time. The popular explanation of this process is that when the inspection terminal detects a problem, it will increase the number of detections, consume more detection time, and the starting time will be later. Since the arrival time is fixed, the speed will be higher. For the platform, it only needs to query the running speed of the inspection terminal to determine which path segment may have problems. The greater the movement speed, the more likely the data in the device corresponding to the head of the path segment is to be at risk.

[0077] Finally, for the platform, it is necessary to establish a connection channel with the monitoring system to obtain the actual movement speed of the inspection end. The greater the actual movement speed, the more likely that there will be risks in the data in the device corresponding to the head of the path segment. At this time, the corresponding drilling detection data can be extracted. In this process, there is no need to actually interact with the inspection end, which can greatly reduce the data upload pressure on the inspection end and improve its endurance.

[0078] It should be noted that the function of the monitoring system is to obtain the location of the inspection end. A monitoring camera with a positioning algorithm or a GPS locator can be used.

[0079] Figure 2 The first sub-process flowchart of the method for controlling drilling inspection of electric power equipment is as follows: the steps of obtaining the hole position for drilling inspection, determining the inspection station according to the hole position, and determining the inspection path containing the inspection point based on the inspection station include:

[0080] Step S101: receiving the device to be detected selected by the manager, and obtaining the endpoint coordinates of the device to be detected; the endpoint coordinates are the two-dimensional coordinates of the device to be detected in the map;

[0081] Step S102: querying the relative coordinates of each hole position on the device to be detected relative to any endpoint coordinate, and determining the absolute coordinates according to the relative coordinates and their corresponding endpoint coordinates;

[0082] Step S103: Acquire the size information of the inspection end, align the detection probe of the inspection end based on the absolute coordinates and the size information, and determine the inspection station; the alignment rule is that the detection probe is coaxial with the hole, and the distance between the detection probe and the device to be detected is within a preset range;

[0083] Step S104: Select initial points according to a preset order, connect the inspection stations based on a greedy algorithm, and obtain an inspection path; insert detection points corresponding to the inspection stations into the inspection path.

[0084] In one example of the technical solution of the present invention, the equipment that needs to be drilled and tested is called the equipment to be tested and is selected by the management personnel. After the selection, the endpoint coordinates of the equipment to be tested are obtained, and the endpoint coordinates are the coordinates in the top view; the relative coordinates of the hole positions on each equipment to be tested relative to any endpoint coordinates are queried, which are generally the coordinates on a certain surface. By combining the endpoint coordinates and the relative coordinates, the absolute coordinates of the hole can be obtained.

[0085] After the absolute coordinates of the hole are determined, the size information of the inspection end is obtained, and the detection probe of the inspection end is aligned based on the absolute coordinates and size information so that the detection probe is coaxial with the hole and the distance between the detection probe and the device to be detected is within a preset range.

[0086] An initial point is selected according to the preset order, and then the inspection stations are connected in order based on the greedy algorithm to obtain the inspection path. The greedy algorithm selects the point closest to the current point each time until all points are visited. It is very simple.

[0087] Figure 3 The second sub-flow chart of the method for the inspection device for drilling through electric equipment is as follows: the steps of obtaining the inspection requirements of the equipment corresponding to each hole position, calculating the theoretical inspection time according to the inspection requirements, and determining the theoretical movement speed during the inspection process and the theoretical time to reach each inspection point according to the theoretical inspection time of each hole position and the preset inspection cycle include:

[0088] Step S201: obtaining the detection requirements of the equipment corresponding to each hole position; the detection requirements include temperature measurement, visual measurement and ultrasonic detection;

[0089] Step S202: querying the theoretical detection time corresponding to the detection requirement in the preset time table; the theoretical detection time is the time corresponding to a single detection, which is determined by the average time and the standard deviation of the time in the historical detection records;

[0090] Step S203: receiving the detection cycle uploaded by the administrator, and calculating the theoretical movement speed according to the detection cycle and the theoretical detection time of each hole position;

[0091] Step S204: Taking the initial point as the zero time point, the theoretical time to reach each detection point is determined based on the theoretical movement speed and the theoretical detection time at each hole position.

[0092] The purpose of the above content is to calculate the residence time at each detection point, obtain the detection requirements of the equipment corresponding to each hole position, and query the theoretical detection time for each detection requirement as the residence time, which can be known through historical detection records; then, receive the detection cycle uploaded by the administrator, subtract the residence time at all detection points from the detection cycle, get the time difference, and then divide the total path length by the calculated time difference to get the theoretical movement speed; take the initial point as the zero time point, and determine the theoretical time to reach each detection point based on the theoretical movement speed and the theoretical detection time at each hole position, and the theoretical time indicates when the corresponding detection point will be reached.

[0093] It should be noted that, in order to facilitate unified processing, all times are expressed in relative time, and the start of the inspection is regarded as zero time.

[0094] Figure 4 The third sub-flow chart of the method of the electric power equipment drilling inspection device is as follows: when the inspection terminal runs to the detection point, the equipment is subjected to drilling inspection based on the corresponding detection requirements, and the steps of recursively adjusting the drilling inspection process according to the drilling inspection results include:

[0095] Step S301: When the inspection terminal runs to the inspection point, the inspection data containing the time tag is obtained based on the detector built into the inspection terminal; the detector includes a temperature measuring instrument, a visual measuring instrument and an ultrasonic detector;

[0096] Step S302: input the acquired detection data containing the time tag into the trained recognition analysis model to obtain the equipment risk value;

[0097] Step S303: determining the working time of the detector according to the risk value threshold reached by the equipment risk value; wherein the working frequency of the detector is a preset fixed value.

[0098] In one example of the technical solution of the present invention, when the inspection end runs to the inspection point, the inspection data containing the time tag is obtained based on the detector built into the inspection end, and then the inspection data is input into the trained recognition and analysis model to obtain the equipment risk value, and the working time of the detector is determined according to the threshold value (preset multiple gradients) reached by the equipment risk value; the meaning of determining the working time is that, since the working frequency of the detector is fixed, the longer the working time, the more times of detection and the more accurate the detection result, and the working time is the theoretical detection time of the inspection end at a certain inspection point.

[0099] It should be noted that, regarding the recognition and analysis model, multiple test data can be obtained, and the risk value of the equipment can be manually marked to obtain a sample set, and then a neural network model can be trained. When analysis is required, multiple test data can be input into the recognition and analysis model to obtain the risk value of the equipment. In addition, some recognition and analysis rules can be introduced. For example, the same type of test data of the same equipment is counted to obtain a database. When new data is detected, the new data is matched with similar data in the database (similar means that the difference is within a preset range), the frequency of occurrence of the corresponding data is queried, and the equipment risk value is determined based on the frequency of occurrence. The smaller the frequency of occurrence, the greater the equipment risk value.

[0100] Figure 5 The fourth sub-flow chart of the method for the electric power equipment drilling inspection device, wherein when the inspection end completes the inspection, the inspection completion time is obtained, the theoretical time of the next inspection point is queried, and the steps of correcting the motion instruction based on the theoretical time and the inspection completion time include:

[0101] Step S401: After the inspection end completes the inspection, the inspection completion time is obtained;

[0102] Step S402: query the theoretical time of the next detection point, calculate the difference between the theoretical time of the next detection point and the detection completion time, and use it as the movement duration of the next path segment;

[0103] Step S403: query the distance of the next path segment, divide the distance by the movement duration, and calculate the required speed of the next path segment;

[0104] Step S404: Correct the motion instruction based on the required speed.

[0105] The above content provides a specific motion process correction scheme. When the inspection end completes the inspection, the inspection completion time is obtained, the theoretical time of the next inspection point is queried, and the difference between the theoretical time of the next inspection point and the inspection completion time is calculated as the motion duration of the next path segment. The distance of the next path segment is queried, and the required speed of the next path segment is calculated by dividing the distance by the motion duration. The motion instruction can be corrected based on the required speed. This process is carried out in different path segments.

[0106] Figure 6 The fifth sub-flow chart of the method for the electric power equipment penetration inspection device is as follows: the step of obtaining the actual movement speed of the inspection end according to the monitoring device and extracting the penetration detection data according to the actual movement speed and the theoretical movement speed of each path segment includes:

[0107] Step S501: locate the inspection terminal according to the preset monitoring equipment, and obtain the position and actual movement speed of the inspection terminal;

[0108] Step S502: obtaining the theoretical movement speed of the path segment where the inspection terminal is located;

[0109] Step S503: Calculate the ratio of the actual movement speed to the theoretical movement speed, and when the ratio reaches a preset threshold, extract the penetration detection data at the previous monitoring point.

[0110] According to the monitoring equipment, the position of the inspection end and the actual movement speed of the inspection end are obtained, the theoretical movement speed of the path segment where the inspection end is located is obtained, and the ratio of the actual movement speed to the theoretical movement speed is calculated. The larger the ratio, the faster the actual movement speed, and the longer the stay time at the detection point corresponding to the head of the path segment. From the above content, it can be known that only when more data is obtained will there be a longer stay time. Therefore, it is easy to deduce that when the ratio is large enough, it is necessary to extract the drilling detection data at the previous monitoring point.

[0111] Figure 7 The following is a structural block diagram of a power equipment drilling inspection device system. In an embodiment of the present invention, a power equipment drilling inspection device 10 includes:

[0112] The inspection path determination module 11 is used to obtain the hole position that needs to be drilled through detection, determine the inspection station according to the hole position, and determine the inspection path containing the detection point based on the inspection station; the detection point corresponds to the hole position;

[0113] Theoretical parameter calculation module 12 is used to obtain the detection requirements of the equipment corresponding to each hole position, calculate the theoretical detection time according to the detection requirements, and determine the theoretical movement speed during the inspection process and the theoretical time to reach each detection point according to the theoretical detection time of each hole position and the preset detection cycle; the theoretical time is a relative time relative to the initial time of the inspection;

[0114] The drilling detection module 13 is used to perform drilling detection on the equipment based on the corresponding detection requirements when the inspection terminal runs to the detection point, and recursively adjust the drilling detection process according to the drilling detection result; the adjustment target includes at least the number of detections;

[0115] The motion correction module 14 is used to obtain the detection completion time after the inspection end completes the inspection, query the theoretical time of the next inspection point, and correct the motion instruction based on the theoretical time and the detection completion time;

[0116] The drilling and crossing data extraction module 15 is used to obtain the actual movement speed of the inspection end according to the monitoring equipment, and extract the drilling and crossing detection data according to the actual movement speed and the theoretical movement speed of each path segment;

[0117] Among them, the inspection path determination module 11, the theoretical parameter calculation module 12 and the penetration data extraction module 15 are built in the master control platform, and the penetration detection module 13 and the motion correction module 14 are built in the inspection end.

[0118] Furthermore, the inspection path determination module 11 includes:

[0119] An endpoint coordinate acquisition unit, used to receive the device to be detected selected by the management personnel, and acquire the endpoint coordinates of the device to be detected; the endpoint coordinates are the two-dimensional coordinates of the device to be detected in the map;

[0120] An absolute coordinate determination unit, used to query the relative coordinates of each hole position on the device to be detected relative to any endpoint coordinate, and determine the absolute coordinates according to the relative coordinates and their corresponding endpoint coordinates;

[0121] The station registration unit is used to obtain the size information of the inspection end, and to register the detection probe of the inspection end based on the absolute coordinates and size information to determine the inspection station; the registration rule is that the detection probe is coaxial with the hole, and the distance between the detection probe and the device to be detected is within a preset range;

[0122] The station connection unit is used to select the initial point according to a preset order, connect the inspection stations based on a greedy algorithm, and obtain an inspection path; and insert the detection point corresponding to the inspection station into the inspection path.

[0123] Specifically, the theoretical parameter calculation module 12 includes:

[0124] A detection requirement acquisition unit, used to acquire the detection requirements of the equipment corresponding to each hole position; the detection requirements include temperature measurement, visual measurement and ultrasonic detection;

[0125] A theoretical duration query unit, used to query the theoretical detection duration corresponding to the detection requirement in a preset time table; the theoretical detection duration is the duration corresponding to a single detection, which is determined by the average duration and the standard deviation of the duration of historical detection records;

[0126] Theoretical speed calculation unit, used to receive the detection cycle uploaded by the administrator, and calculate the theoretical movement speed according to the detection cycle and the theoretical detection time of each hole position;

[0127] The theoretical time calculation unit is used to determine the theoretical time to reach each detection point based on the theoretical movement speed and the theoretical detection time at each hole position, taking the initial point as the zero time point.

[0128] Furthermore, the underrun detection module 13 includes:

[0129] A detection data acquisition unit, used for acquiring detection data containing a time tag based on a detector built into the inspection terminal when the inspection terminal runs to the inspection point; the detector includes a temperature measuring instrument, a visual measuring instrument and an ultrasonic detector;

[0130] A data recognition unit is used to input the acquired detection data containing time tags into the trained recognition and analysis model to obtain the equipment risk value;

[0131] A working time determination unit is used to determine the working time of the detector according to the risk value threshold reached by the equipment risk value; wherein the working frequency of the detector is a preset fixed value.

[0132] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for controlling drilling and inspection of electric power equipment, characterized in that: The control method comprises: Step S100: obtaining a hole position that needs to be inspected for drilling, determining an inspection station according to the hole position, and determining an inspection path containing inspection points based on the inspection station; the inspection points correspond to the hole positions; Step S200: Obtain the detection requirements of the equipment corresponding to each hole position, calculate the theoretical detection time according to the detection requirements, and determine the theoretical movement speed during the inspection process and the theoretical time to reach each detection point according to the theoretical detection time of each hole position and the preset detection cycle; the theoretical time is a relative time relative to the initial time of the inspection; Step S300: When the inspection terminal runs to the inspection point, the equipment is subjected to a drilling inspection based on the corresponding inspection requirements, and the drilling inspection process is recursively adjusted according to the drilling inspection result; the adjustment target includes at least the number of inspections; Step S400: When the inspection end completes the inspection, the inspection completion time is obtained, the theoretical time of the next inspection point is queried, and the motion instruction is corrected based on the theoretical time and the inspection completion time; Step S500: obtaining the actual movement speed of the inspection end according to the monitoring device, and extracting the penetration detection data according to the actual movement speed and the theoretical movement speed of each path segment; Among them, step S100, step S200 and step S500 are executed by the master control platform, and step S300 and step S400 are executed by the inspection terminal.

2. The electric power equipment under-penetration inspection control method according to claim 1, characterized in that: The steps of obtaining a hole position that needs to be drilled through detection, determining an inspection station according to the hole position, and determining an inspection path containing a detection point based on the inspection station include: Receive the device to be detected selected by the manager, and obtain the endpoint coordinates of the device to be detected; the endpoint coordinates are the two-dimensional coordinates of the device to be detected in the map; Query the relative coordinates of each hole position on the device to be tested relative to any endpoint coordinate, and determine the absolute coordinates based on the relative coordinates and their corresponding endpoint coordinates; Obtain the size information of the inspection end, align the inspection probe of the inspection end based on the absolute coordinates and size information, and determine the inspection station; the alignment rule is that the inspection probe is coaxial with the hole, and the distance between the inspection probe and the device to be inspected is within a preset range; The initial points are selected according to a preset order, and the inspection stations are connected based on a greedy algorithm to obtain an inspection path; and detection points corresponding to the inspection stations are inserted into the inspection path.

3. The electric power equipment under-penetration inspection control method according to claim 2, characterized in that: The steps of obtaining the detection requirements of the equipment corresponding to each hole position, calculating the theoretical detection time according to the detection requirements, and determining the theoretical movement speed during the inspection process and the theoretical time to reach each detection point according to the theoretical detection time of each hole position and a preset detection cycle include: Obtaining the detection requirements of the equipment corresponding to each hole position; the detection requirements include temperature measurement, visual measurement and ultrasonic detection; Query the theoretical detection time corresponding to the detection requirements in the preset time table; the theoretical detection time is the time corresponding to a single detection, which is determined by the average time and standard deviation of the historical detection records; Receive the detection cycle uploaded by the administrator, and calculate the theoretical movement speed based on the detection cycle and the theoretical detection time of each hole position; Taking the initial point as the zero time point, the theoretical time to reach each detection point is determined based on the theoretical movement speed and the theoretical detection time at each hole position.

4. The electric power equipment under-penetration inspection control method according to claim 1, characterized in that: When the inspection terminal runs to the inspection point, the equipment is subjected to a drilling detection based on the corresponding detection requirements, and the steps of recursively adjusting the drilling detection process according to the drilling detection result include: When the inspection terminal runs to the inspection point, the inspection data containing the time tag is obtained based on the detector built into the inspection terminal; the detector includes a temperature measuring instrument, a visual measuring instrument and an ultrasonic detector; Input the acquired detection data with time tags into the trained recognition and analysis model to obtain the equipment risk value; The working time of the detector is determined according to the risk value threshold reached by the equipment risk value; wherein the working frequency of the detector is a preset fixed value.

5. The electric power equipment under-penetration inspection control method according to claim 4, characterized in that: When the inspection end completes the inspection, the inspection completion time is obtained, the theoretical time of the next inspection point is queried, and the motion instruction is corrected based on the theoretical time and the inspection completion time. The steps include: When the inspection end completes the inspection, obtain the inspection completion time; Query the theoretical time of the next detection point, calculate the difference between the theoretical time of the next detection point and the detection completion time, and use it as the movement duration of the next path segment; Query the distance of the next path segment, divide the distance by the movement time, and calculate the required speed of the next path segment; Modify motion commands based on required speed.

6. The electric power equipment under-penetration inspection control method according to claim 1, characterized in that: The step of obtaining the actual movement speed of the inspection end according to the monitoring device and extracting the penetration detection data according to the actual movement speed and the theoretical movement speed of each path segment includes: Locate the inspection terminal according to the preset monitoring equipment to obtain the position and actual movement speed of the inspection terminal; Obtain the theoretical moving speed of the path segment where the inspection end is located; The ratio of the actual movement speed to the theoretical movement speed is calculated, and when the ratio reaches a preset threshold, the penetration detection data at the previous monitoring point is extracted.

7. A power equipment drilling inspection device, characterized in that: The device comprises: An inspection path determination module is used to obtain a hole position that needs to be drilled through detection, determine an inspection station according to the hole position, and determine an inspection path containing a detection point based on the inspection station; the detection point corresponds to the hole position; Theoretical parameter calculation module, used to obtain the detection requirements of the equipment corresponding to each hole position, calculate the theoretical detection time according to the detection requirements, and determine the theoretical movement speed during the inspection process and the theoretical time to reach each detection point according to the theoretical detection time of each hole position and the preset detection cycle; the theoretical time is a relative time relative to the initial time of the inspection; The drilling detection module is used to perform drilling detection on the equipment based on the corresponding detection requirements when the inspection terminal runs to the detection point, and recursively adjust the drilling detection process according to the drilling detection result; the adjustment target includes at least the number of detections; The motion correction module is used to obtain the detection completion time after the inspection end is completed, query the theoretical time of the next detection point, and correct the motion instruction based on the theoretical time and the detection completion time; A drilling and crossing data extraction module is used to obtain the actual movement speed of the inspection end according to the monitoring equipment, and extract the drilling and crossing detection data according to the actual movement speed and the theoretical movement speed of each path segment; Among them, the inspection path determination module, theoretical parameter calculation module and drilling and crossing data extraction module are built into the master control platform, and the drilling and crossing detection module and motion correction module are built into the inspection end.

8. The electric power equipment drilling inspection device according to claim 7, characterized in that: The inspection path determination module comprises: An endpoint coordinate acquisition unit is used to receive the device to be detected selected by the management personnel and acquire the endpoint coordinates of the device to be detected; the endpoint coordinates are the two-dimensional coordinates of the device to be detected in the map; An absolute coordinate determination unit, used to query the relative coordinates of each hole position on the device to be detected relative to any endpoint coordinate, and determine the absolute coordinates according to the relative coordinates and their corresponding endpoint coordinates; The station registration unit is used to obtain the size information of the inspection end, and to register the detection probe of the inspection end based on the absolute coordinates and size information to determine the inspection station; the registration rule is that the detection probe is coaxial with the hole, and the distance between the detection probe and the device to be detected is within a preset range; The station connection unit is used to select the initial point according to a preset order, connect the inspection stations based on a greedy algorithm, and obtain an inspection path; and insert the detection point corresponding to the inspection station into the inspection path.

9. The electric power equipment drilling inspection device according to claim 8, characterized in that: The theoretical parameter calculation module includes: A detection requirement acquisition unit, used to acquire the detection requirements of the equipment corresponding to each hole position; the detection requirements include temperature measurement, visual measurement and ultrasonic detection; A theoretical duration query unit, used to query the theoretical detection duration corresponding to the detection requirement in a preset time table; the theoretical detection duration is the duration corresponding to a single detection, which is determined by the average duration and the standard deviation of the duration of historical detection records; Theoretical speed calculation unit, used to receive the detection cycle uploaded by the administrator, and calculate the theoretical movement speed according to the detection cycle and the theoretical detection time of each hole position; The theoretical time calculation unit is used to determine the theoretical time to reach each detection point based on the theoretical movement speed and the theoretical detection time at each hole position, taking the initial point as the zero time point.

10. The electric power equipment drilling inspection device according to claim 7, characterized in that: The drilling detection module comprises: A detection data acquisition unit, used for acquiring detection data containing a time tag based on a detector built into the inspection terminal when the inspection terminal runs to the inspection point; the detector includes a temperature measuring instrument, a visual measuring instrument and an ultrasonic detector; A data recognition unit is used to input the acquired detection data containing time tags into the trained recognition and analysis model to obtain the equipment risk value; A working time determination unit is used to determine the working time of the detector according to the risk value threshold reached by the equipment risk value; wherein the working frequency of the detector is a preset fixed value.

Citation Information

Cited By

  • Drilling machine inspection system and method

    CN119692988A

  • Drilling rig inspection system and method

    CN119692988B