Power operation safety analysis method based on big data
Through big data analysis of power equipment failure rate and environmental data, the problems of low manual inspection efficiency and unconsidered load changes in the existing technology are solved, and efficient and accurate early warning of power operation safety analysis is achieved.
Patent Information
- Application Number
- CN202411097240.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing power operation safety analysis methods rely too much on manual inspection, resulting in low fault diagnosis efficiency and difficulty in dealing with complex faults, and failure to consider the difference in power data in different periods, resulting in no timely warnings issued during peak load periods and during low load periods. Possible risk of false alarms.
Using a power operation safety analysis method based on big data, the power equipment failure rate and environmental monitoring data of the target area are obtained, and the power equipment failure coefficient and environmental analysis coefficient are calculated to make a power operation safety judgment and based on the judgment. As a result, a safety warning was issued.
The time pertinence and objectivity of power operation safety analysis is improved, and the timeliness and accuracy of power safety warning is ensured.
Smart Images

Figure CN119009983A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of power analysis and relates to big data technology, and specifically is a power operation safety analysis method based on big data. Background Art
[0002] The existing power operation safety analysis methods have the following defects:
[0003] 1. Over-reliance on manual inspections may lead to inefficient fault diagnosis and easy omission of potential fault points. At the same time, the fault diagnosis method is relatively simple and difficult to cope with complex and changeable fault conditions;
[0004] 2. The load of the power system will change significantly at different times. The existing power operation safety analysis method fails to take into account the differences in power data at different times, which may easily lead to the failure to issue early warnings in time during peak load periods and the risk of false alarms during low load periods.
[0005] To this end, we propose a power operation safety analysis method based on big data. Summary of the invention
[0006] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a method for analyzing the safety of power operation based on big data. The present invention is based on obtaining the regional historical power operation data corresponding to the target area, monitoring the power equipment in the target area, obtaining the regional power equipment failure coefficient, performing environmental monitoring on the target area, obtaining the regional environmental analysis coefficient, and making a power operation safety judgment on the target area according to the regional power equipment failure coefficient, the regional environmental analysis coefficient and the regional historical power operation data, and issuing a safety warning based on the judgment result.
[0007] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solution: a method for analyzing power operation safety based on big data, which also includes the following specific steps:
[0008] Step S1: Obtain historical power data, select the first sample power monitoring date to the mth sample power monitoring date in the historical power data, obtain a power monitoring period time comparison table, divide each sample power monitoring date into the first power monitoring period to the nth power monitoring period, obtain multiple first power monitoring periods to the nth power monitoring period, respectively obtain the power operation benchmark coefficient intervals corresponding to the first power monitoring period to the nth power monitoring period, and define the first to the nth power operation benchmark coefficient intervals and the power monitoring period time comparison table as regional historical power operation data;
[0009] Step S2: respectively obtaining the first category power equipment failure rate to the kth category power equipment failure rate and the first category power equipment average rated power to the kth category power equipment average rated power corresponding to the target area power supply line, and calculating the regional power equipment failure coefficient;
[0010] Step S3: respectively monitoring the environmental temperature and the environmental humidity of the target area to obtain a first environmental analysis coefficient and a second environmental analysis coefficient, and summing the first environmental analysis coefficient and the second environmental analysis coefficient to obtain a regional environmental analysis coefficient;
[0011] Step S4: Obtain the real-time power operation coefficient of the target area and make an interval existence judgment on the first to nth power operation reference coefficient interval, and divide the target area into a first power operation interval and a second power operation interval. If the target area is in the second power operation interval, further power safety judgment is made based on the regional power equipment failure coefficient and the regional environmental analysis coefficient, and a power safety warning is issued to the target area based on the judgment result.
[0012] Furthermore, the step S1 further includes the following specific steps:
[0013] Step S11: Acquire historical power data corresponding to the target area;
[0014] Step S12: randomly selecting m different dates from the historical power data as sample power monitoring dates, and naming them as the first sample power monitoring date to the mth sample power monitoring date respectively;
[0015] Step S13: Divide the first sample power monitoring date into n power monitoring periods of equal length, and mark them as the first power monitoring period to the nth power monitoring period, respectively, and obtain the specific time values corresponding to the first power monitoring period to the nth power monitoring period, respectively, to obtain a power monitoring period time comparison table;
[0016] Step S14: Divide the second sample power monitoring date to the mth sample power monitoring date into n power monitoring periods of the same length as the first sample power monitoring date, and the specific time value corresponding to each power monitoring period is the same as the first sample power monitoring date;
[0017] Step S15: obtaining a first power operation reference coefficient interval;
[0018] Step S16: Repeat the process of acquiring the power operation coefficient reference interval corresponding to the first power monitoring period, and respectively acquire the power operation coefficient reference intervals corresponding to the second power monitoring period to the nth power monitoring period, to obtain the second to nth power operation reference coefficient intervals;
[0019] Step S17: defining the first to nth power operation reference coefficient intervals and the power monitoring period time comparison table as regional historical power operation data.
[0020] Furthermore, the step S15 further includes the following specific steps:
[0021] Step S151: Analyze the power operation data of the first power monitoring period of the first sample power monitoring date to obtain the power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date;
[0022] Step S152: respectively acquiring the power operation coefficients of the first power monitoring periods corresponding to the second sample power monitoring date to the mth sample power monitoring date, to obtain the power operation coefficients corresponding to m first power monitoring periods;
[0023] Step S153: Sort the power operation coefficients corresponding to the m first power monitoring time periods according to their numerical values, mark the first-ranked power operation coefficient as the peak power operation coefficient corresponding to the first power monitoring time period, mark the last-ranked power operation coefficient as the valley power operation coefficient corresponding to the first power monitoring time period, mark the numerical interval between the peak power operation coefficient corresponding to the first power monitoring time period and the valley power operation coefficient corresponding to the first power monitoring time period as the power operation coefficient reference interval corresponding to the first power monitoring time period, and name it the first power operation reference coefficient interval.
[0024] Furthermore, the step S151 further includes the following specific steps:
[0025] Step S1511: Acquire the peak power supply power of the power supply line corresponding to the first power monitoring period according to the historical power data, and obtain the peak power supply power during the monitoring period;
[0026] Step S1512: In the first power monitoring period, mark a plurality of power monitoring time points respectively, obtain the power supply power of the power supply line corresponding to the target area at each power monitoring time point respectively, obtain the power supply power at a plurality of times, calculate the average of the power supply power at a plurality of times, and obtain the average power supply power during the monitoring period;
[0027] Step S1513: Calculate the ratio of the average power supply power during the monitoring period to the peak power supply power during the monitoring period to obtain the power factor during the monitoring period;
[0028] Step S1514: in the first power monitoring period, mark a plurality of current monitoring time points respectively, obtain the current value of the power supply line corresponding to the target area at each current monitoring time point respectively, obtain a plurality of current values at a time, average the plurality of current values at a time, and obtain an average current value of the monitoring period;
[0029] Step S1515: acquiring the cumulative power supply of the power supply line corresponding to the target area in the first power monitoring period according to the historical power data, and obtaining the cumulative power supply in the monitoring period;
[0030] Step S1516: Calculate the power factor during the monitoring period, the average current value during the monitoring period, and the accumulated power supply during the monitoring period to obtain a power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date;
[0031] The power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date is calculated, and the specific formula configuration is as follows:
[0032] Dyy=Gly+Dlp+Lgl*a1;
[0033] Among them, Dyy is the power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date, Gly is the power factor of the monitoring period, Dlp is the average current value of the monitoring period, Lgl is the cumulative power supply during the monitoring period, and a1 is the set proportional coefficient and a1 is greater than 0.
[0034] Furthermore, the step S2 further includes the following specific steps:
[0035] Step S21: obtaining the power equipment connected to the power supply line corresponding to the target area, dividing them into K different categories of power equipment according to the functions of the equipment, and naming them as first category power equipment to kth category power equipment respectively;
[0036] Step S22: performing fault monitoring on the first category of power equipment to obtain the first category of power equipment failure rate;
[0037] Step S23: performing fault monitoring on the second category power equipment to the kth category power equipment respectively, and obtaining the fault rate of the second category power equipment to the kth category power equipment;
[0038] Step S24: respectively obtaining numerical values of the rated powers of j first-category electrical devices in the test sample to obtain j device rated power values, and calculating the average of the j device rated power values to obtain the average rated power of the first-category electrical devices;
[0039] Step S25: acquiring the average rated power of the power equipment of the second category to the kth category respectively, and obtaining the average rated power of the power equipment of the second category to the average rated power of the power equipment of the kth category;
[0040] Step S26: Obtain a regional power equipment failure coefficient by calculating the failure rate of the first category power equipment to the kth category power equipment and the average rated power of the first category power equipment to the kth category power equipment;
[0041] Calculate the regional power equipment failure coefficient, the specific formula configuration is as follows:
[0042] Qgz=Gl1×Eg1+Gl2×Eg2+·······+Glk×Egk;
[0043] Among them, Qgz is the regional power equipment failure coefficient, Gl1 to Glk are the failure rates of the first category of power equipment to the kth category of power equipment, and Eg1 to Egk are the average rated power of the first category of power equipment to the average rated power of the kth category of power equipment;
[0044] The step S22 further includes the following specific steps:
[0045] Step S221: Select j first-category power equipments as test samples in the power supply lines corresponding to the target area;
[0046] Step S222: performing fault judgment on j first-category electric power devices in the test sample respectively, and counting the number of first-category electric power devices with faults to obtain the number of first-category electric power device sample faults;
[0047] Step S223: Calculate the ratio of the number of sample failures of the first category of electric power equipment to m to obtain the failure rate of the first category of electric power equipment.
[0048] Furthermore, the step S3 further includes the following specific steps:
[0049] Step S31: Mark z environmental monitoring feature points in the target area respectively, and name them as the first environmental monitoring feature point to the zth environmental monitoring feature point respectively;
[0050] Step S32: performing temperature monitoring on the environmental monitoring feature point to obtain a first environmental analysis coefficient;
[0051] Step S33: monitoring the humidity of the environmental monitoring feature points to obtain a second environmental analysis coefficient;
[0052] Step S34: summing the first environment analysis coefficient and the second environment analysis coefficient to obtain a regional environment analysis coefficient;
[0053] The step S33 further includes the following specific steps:
[0054] Step S331: respectively acquiring the real-time humidity values corresponding to the first environmental monitoring feature point to the z-th environmental monitoring feature point, and obtaining the first monitoring humidity value to the z-th monitoring humidity value;
[0055] Step S332: Calculate the average of the first monitoring humidity value to the zth monitoring humidity value to obtain the average value of the environmental monitoring humidity;
[0056] Step S333: Calculate the variance of the first monitoring humidity value to the zth monitoring humidity value to obtain the environmental monitoring humidity variance;
[0057] Step S334: obtaining a second environmental analysis coefficient corresponding to the target area by calculating the average value of the environmental monitoring humidity and the variance of the environmental monitoring humidity;
[0058] Calculate the second environment analysis coefficient, the specific formula configuration is as follows:
[0059]
[0060] Among them, Sjx2 is the second environmental analysis coefficient, Sdp is the average value of environmental monitoring humidity, Sdf is the variance of environmental monitoring humidity, b2 is the set proportional coefficient and b2 is greater than 0.
[0061] Furthermore, the step S32 further includes the following specific steps:
[0062] Step S321: respectively acquiring the real-time temperatures corresponding to the first environmental monitoring characteristic point to the z-th environmental monitoring characteristic point, to obtain the first monitoring temperature value to the z-th monitoring temperature value;
[0063] Step S322: Calculate the average of the first monitoring temperature value to the zth monitoring temperature value to obtain the average value of the environmental monitoring temperature;
[0064] Step S323: Obtaining a power operation reference temperature value;
[0065] Step S324: Calculate the variance of the first monitoring temperature value to the zth monitoring temperature value to obtain the environmental monitoring temperature variance;
[0066] Step S325: Calculate the power operation reference temperature value, the average value of the environmental monitoring temperature, and the variance of the environmental monitoring temperature to obtain a first environmental analysis coefficient corresponding to the target area;
[0067] Calculate the first environmental analysis coefficient, and the specific formula configuration is as follows:
[0068] Hjx1=|Wdp-Wdj|×b1+Wdf;
[0069] Among them, Hjx1 is the first environmental analysis coefficient, Wdj is the power operation reference temperature value, Wdp is the average value of the environmental monitoring temperature, Wdf is the variance of the environmental monitoring temperature, b1 is the set proportional coefficient and b1 is greater than 0.
[0070] Furthermore, the step S4 further includes the following specific steps:
[0071] Step S41: Acquire historical power operation data of the region, and acquire a first to nth power operation reference coefficient interval and a power monitoring period time comparison table according to the historical power operation data of the region;
[0072] Step S42: Perform real-time power monitoring on the target area to obtain the real-time power operation coefficient of the target area;
[0073] Step S43: Acquire the time value corresponding to the current moment to obtain the time value of the current moment;
[0074] Step S44: obtaining the power monitoring period corresponding to the current time value according to the power monitoring period time comparison table;
[0075] Step S45: if the power monitoring period corresponding to the current time value is the first power monitoring period;
[0076] Step S46: the first power operation reference coefficient interval and the target area real-time power operation coefficient are judged for interval existence:
[0077] Step S461: If the real-time power operation coefficient of the target area exists in the first power operation reference coefficient interval, it is determined to be the first power operation interval;
[0078] Step S462: If the real-time power operation coefficient of the target area does not exist in the first power operation reference coefficient interval, it is determined to be the second power operation interval;
[0079] Step S47: If the target area is in the second power operation range, further power safety assessment is performed.
[0080] Furthermore, the step S42 further includes the following specific steps:
[0081] Step S421: obtaining a characteristic time length before the current moment as a real-time power monitoring period;
[0082] Step S422: In the real-time power monitoring period, a plurality of power monitoring time points are marked respectively, and the power supply power of the power supply line corresponding to the target area at each power monitoring time point is obtained respectively, so as to obtain the power supply power at a plurality of times, and the power supply power at a plurality of times is averaged to obtain the current average power supply power;
[0083] Step S423: Obtain the peak power supply power of the power supply line corresponding to the real-time power monitoring period to obtain the current peak power supply power;
[0084] Step S424: Calculate the ratio of the current average power supply power to the current peak power supply power to obtain the real-time power factor of the circuit;
[0085] Step S425: in the real-time power monitoring period, mark a plurality of current monitoring time points respectively, obtain the current value of the power supply line corresponding to the target area at each current monitoring time point respectively, obtain a plurality of current values at a time, average the plurality of current values at a time, and obtain the average current value of the current period;
[0086] Step S426: Obtain the cumulative power supply of the power supply line corresponding to the target area during the real-time power monitoring period to obtain the cumulative power supply in the current period;
[0087] Step S427: The real-time power operation coefficient of the target area is obtained by calculating the real-time power factor of the circuit, the average current value of the current period, and the accumulated power supply of the current period.
[0088] Furthermore, the step S47 further includes the following specific steps:
[0089] Step S471: obtaining the target area's real-time power operation coefficient, regional power equipment failure coefficient, and regional environmental analysis coefficient;
[0090] Step S472: Calculate the target area real-time power operation coefficient, the regional power equipment failure coefficient, and the regional environmental analysis coefficient to obtain a regional power operation safety judgment coefficient;
[0091] The regional power operation safety judgment coefficient is calculated, and the specific formula configuration is as follows:
[0092] Aqx=Dys+Qgz+Hjx*c1;
[0093] Among them, Aqx is the regional power operation safety judgment coefficient, Dys is the real-time power operation coefficient of the target area, Qgz is the regional power equipment failure coefficient, Hjx is the regional environmental analysis coefficient, c1 is the set proportional coefficient and c1 is greater than 0;
[0094] Step S473: obtaining a regional power operation safety judgment coefficient threshold, performing a numerical comparison between the regional power operation safety judgment coefficient and the regional power operation safety judgment coefficient threshold, and issuing a power operation safety warning according to the numerical comparison result;
[0095] Step S4731: respectively obtaining the target area real-time power operation coefficient threshold, the regional power equipment failure coefficient threshold and the regional environment analysis coefficient threshold, and calculating the regional power operation safety judgment coefficient threshold;
[0096] Step S4732: When the regional power operation safety judgment coefficient is greater than or equal to the regional power operation safety judgment coefficient threshold, a target regional power operation safety warning is issued;
[0097] Step S4733: When the regional power operation safety judgment coefficient is less than the regional power operation safety judgment coefficient threshold, the power analysis of the target area is completed.
[0098] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0099] 1. The present invention obtains the real-time power operation coefficient of the target area and the first to nth power operation reference coefficient interval to make an interval existence judgment, and performs a safety analysis based on the judgment result. Compared with manual inspection, the time pertinence and objectivity of the power operation safety analysis can be improved;
[0100] 2. The present invention obtains the real-time power operation coefficient of the target area, the regional power equipment failure coefficient and the regional environmental analysis coefficient to further evaluate the power operation safety in the second power operation range, which can effectively ensure the timeliness and accuracy of the power safety warning. BRIEF DESCRIPTION OF THE DRAWINGS
[0101] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0102] Figure 1 It is a diagram of the implementation steps of the present invention;
[0103] Figure 2 is the overall system block diagram of the present invention;
[0104] Figure 3 The present invention is a flow chart of the method. DETAILED DESCRIPTION
[0105] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0106] Embodiment 1
[0107] See also Figure 1 and Figure 3 The present invention provides a technical solution: a method for analyzing power operation safety based on big data, comprising the following specific steps:
[0108] Step S1: Acquire historical power operation data of the target area;
[0109] Step S11: Acquire historical power data corresponding to the target area;
[0110] Step S12: randomly selecting m different dates from the historical power data as sample power monitoring dates, and naming them as the first sample power monitoring date to the mth sample power monitoring date respectively;
[0111] Step S13: Divide the first sample power monitoring date into n power monitoring periods of equal length, and mark them as the first power monitoring period to the nth power monitoring period, respectively, and obtain the specific time values corresponding to the first power monitoring period to the nth power monitoring period, respectively, to obtain a power monitoring period time comparison table;
[0112] Step S14: Divide the second sample power monitoring date to the mth sample power monitoring date into n power monitoring periods of the same length as the first sample power monitoring date, and the specific time value corresponding to each power monitoring period is the same as the first sample power monitoring date;
[0113] Step S15: obtaining a first power operation reference coefficient interval;
[0114] The step S15 further includes the following specific steps:
[0115] Step S151: Analyze the power operation data of the first power monitoring period of the first sample power monitoring date to obtain the power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date;
[0116] The step S151 further includes the following specific steps:
[0117] Step S1511: Acquire the peak power supply power of the power supply line corresponding to the first power monitoring period according to the historical power data, and obtain the peak power supply power during the monitoring period;
[0118] Step S1512: In the first power monitoring period, mark a plurality of power monitoring time points respectively, obtain the power supply power of the power supply line corresponding to the target area at each power monitoring time point respectively, obtain the power supply power at a plurality of times, calculate the average of the power supply power at a plurality of times, and obtain the average power supply power during the monitoring period;
[0119] Step S1513: Calculate the ratio of the average power supply power during the monitoring period to the peak power supply power during the monitoring period to obtain the power factor during the monitoring period;
[0120] Step S1514: in the first power monitoring period, mark a plurality of current monitoring time points respectively, obtain the current value of the power supply line corresponding to the target area at each current monitoring time point respectively, obtain a plurality of current values at a time, average the plurality of current values at a time, and obtain an average current value of the monitoring period;
[0121] Step S1515: acquiring the cumulative power supply of the power supply line corresponding to the target area in the first power monitoring period according to the historical power data, and obtaining the cumulative power supply in the monitoring period;
[0122] Step S1516: Calculate the power factor during the monitoring period, the average current value during the monitoring period, and the accumulated power supply during the monitoring period to obtain a power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date;
[0123] The power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date is calculated, and the specific formula configuration is as follows:
[0124] Dyy=Gly+Dlp+Lgl*a1;
[0125] Wherein, Dyy is the power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date, Gly is the power factor of the monitoring period, Dlp is the average current value of the monitoring period, Lgl is the cumulative power supply during the monitoring period, and a1 is the set proportional coefficient and a1 is greater than 0;
[0126] Step S152: Repeat the process of acquiring the power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date, respectively acquire the power operation coefficients of the first power monitoring period corresponding to the second sample power monitoring date to the mth sample power monitoring date, and obtain the power operation coefficients corresponding to m first power monitoring periods;
[0127] Step S153: sort the power operation coefficients corresponding to the m first power monitoring time periods according to the numerical values, mark the first power operation coefficient as the peak power operation coefficient corresponding to the first power monitoring time period, mark the last power operation coefficient as the valley power operation coefficient corresponding to the first power monitoring time period, mark the numerical interval between the peak power operation coefficient corresponding to the first power monitoring time period and the valley power operation coefficient corresponding to the first power monitoring time period as the power operation coefficient reference interval corresponding to the first power monitoring time period, and name it as the first power operation reference coefficient interval;
[0128] Step S16: Repeat the process of acquiring the power operation coefficient reference interval corresponding to the first power monitoring period, and respectively acquire the power operation coefficient reference intervals corresponding to the second power monitoring period to the nth power monitoring period, to obtain the second to nth power operation reference coefficient intervals;
[0129] Step S17: defining the first to nth power operation reference coefficient intervals and the power monitoring period time comparison table as regional historical power operation data;
[0130] Step S2: Monitor the power equipment in the target area to obtain the regional power equipment failure coefficient;
[0131] Step S21: obtaining the power equipment connected to the power supply line corresponding to the target area, dividing them into K different categories of power equipment according to the functions of the equipment, and naming them as first category power equipment to kth category power equipment respectively;
[0132] Step S22: performing fault monitoring on the first category of power equipment to obtain the first category of power equipment failure rate;
[0133] The step S22 further includes the following specific steps:
[0134] Step S221: Select j first-category power equipments as test samples in the power supply lines corresponding to the target area;
[0135] Step S222: performing fault judgment on j first-category electric power devices in the test sample respectively, and counting the number of first-category electric power devices with faults to obtain the number of first-category electric power device sample faults;
[0136] Step S223: Calculate the ratio of the number of sample failures of the first category of power equipment to m to obtain the failure rate of the first category of power equipment;
[0137] Step S23: performing fault monitoring on the second category power equipment to the kth category power equipment respectively, and obtaining the fault rate of the second category power equipment to the kth category power equipment;
[0138] Step S24: respectively obtaining numerical values of the rated powers of j first-category electrical devices in the test sample to obtain j device rated power values, and calculating the average of the j device rated power values to obtain the average rated power of the first-category electrical devices;
[0139] Step S25: acquiring the average rated power of the power equipment of the second category to the kth category respectively, and obtaining the average rated power of the power equipment of the second category to the average rated power of the power equipment of the kth category;
[0140] Step S26: Obtain a regional power equipment failure coefficient by calculating the failure rate of the first category power equipment to the kth category power equipment and the average rated power of the first category power equipment to the kth category power equipment;
[0141] Calculate the regional power equipment failure coefficient, the specific formula configuration is as follows:
[0142] Qgz=Gl1×Eg1+Gl2×Eg2+·······+Glk×Egk;
[0143] Among them, Qgz is the regional power equipment failure coefficient, Gl1 to Glk are the failure rates of the first category of power equipment to the kth category of power equipment, and Eg1 to Egk are the average rated power of the first category of power equipment to the average rated power of the kth category of power equipment;
[0144] Step S3: Perform environmental monitoring on the target area to obtain a regional environmental analysis coefficient;
[0145] Step S31: Mark z environmental monitoring feature points in the target area respectively, and name them as the first environmental monitoring feature point to the zth environmental monitoring feature point respectively;
[0146] Step S32: performing temperature monitoring on the environmental monitoring feature point to obtain a first environmental analysis coefficient;
[0147] The step S32 further includes the following specific steps:
[0148] Step S321: respectively acquiring the real-time temperatures corresponding to the first environmental monitoring characteristic point to the z-th environmental monitoring characteristic point, and obtaining the first monitoring temperature value to the z-th monitoring temperature value;
[0149] Step S322: Calculate the average of the first monitoring temperature value to the zth monitoring temperature value to obtain the average value of the environmental monitoring temperature;
[0150] Step S323: Obtaining a power operation reference temperature value;
[0151] Step S324: Calculate the variance of the first monitoring temperature value to the zth monitoring temperature value to obtain the environmental monitoring temperature variance;
[0152] Step S325: Calculate the power operation reference temperature value, the average value of the environmental monitoring temperature, and the variance of the environmental monitoring temperature to obtain a first environmental analysis coefficient corresponding to the target area;
[0153] Calculate the first environmental analysis coefficient, and the specific formula configuration is as follows:
[0154] Hjx1=|Wdp-Wdj|×b1+Wdf;
[0155] Wherein, Hjx1 is the first environmental analysis coefficient, Wdj is the power operation reference temperature value, Wdp is the average value of the environmental monitoring temperature, Wdf is the environmental monitoring temperature variance, b1 is the set proportional coefficient and b1 is greater than 0;
[0156] Step S33: monitoring the humidity of the environmental monitoring feature points to obtain a second environmental analysis coefficient;
[0157] The step S33 further includes the following specific steps:
[0158] Step S331: respectively acquiring the real-time humidity values corresponding to the first environmental monitoring feature point to the z-th environmental monitoring feature point, and obtaining the first monitoring humidity value to the z-th monitoring humidity value;
[0159] Step S332: Calculate the average of the first monitoring humidity value to the zth monitoring humidity value to obtain the average value of the environmental monitoring humidity;
[0160] Step S333: Calculate the variance of the first monitoring humidity value to the zth monitoring humidity value to obtain the environmental monitoring humidity variance;
[0161] Step S334: obtaining a second environmental analysis coefficient corresponding to the target area by calculating the average value of the environmental monitoring humidity and the variance of the environmental monitoring humidity;
[0162] Calculate the second environment analysis coefficient, the specific formula configuration is as follows:
[0163]
[0164] Among them, Sjx2 is the second environmental analysis coefficient, Sdp is the average value of environmental monitoring humidity, Sdf is the variance of environmental monitoring humidity, b2 is the set proportional coefficient and b2 is greater than 0;
[0165] Step S34: summing the first environment analysis coefficient and the second environment analysis coefficient to obtain a regional environment analysis coefficient;
[0166] Step S4: judging the power operation safety of the target area according to the regional power equipment failure coefficient, the regional environmental analysis coefficient and the regional historical power operation data, and issuing a safety warning according to the judgment result;
[0167] Step S41: Acquire historical power operation data of the region, and acquire a first to nth power operation reference coefficient interval and a power monitoring period time comparison table according to the historical power operation data of the region;
[0168] Step S42: Perform real-time power monitoring on the target area to obtain the real-time power operation coefficient of the target area;
[0169] Step S43: Acquire the time value corresponding to the current moment to obtain the time value of the current moment;
[0170] Step S44: obtaining the power monitoring period corresponding to the current time value according to the power monitoring period time comparison table;
[0171] Step S45: if the power monitoring period corresponding to the current time value is the first power monitoring period;
[0172] Step S46: the first power operation reference coefficient interval and the target area real-time power operation coefficient are judged for interval existence, as follows:
[0173] Step S461: If the real-time power operation coefficient of the target area exists in the first power operation reference coefficient interval, it is determined to be the first power operation interval;
[0174] Step S462: If the real-time power operation coefficient of the target area does not exist in the first power operation reference coefficient interval, it is determined to be the second power operation interval;
[0175] The step S42 further includes the following specific steps:
[0176] Step S421: obtaining a characteristic time length before the current moment as a real-time power monitoring period;
[0177] Step S422: In the real-time power monitoring period, a plurality of power monitoring time points are marked respectively, and the power supply power of the power supply line corresponding to the target area at each power monitoring time point is obtained respectively, so as to obtain the power supply power at a plurality of times, and the power supply power at a plurality of times is averaged to obtain the current average power supply power;
[0178] Step S423: Obtain the peak power supply power of the power supply line corresponding to the real-time power monitoring period to obtain the current peak power supply power;
[0179] Step S424: Calculate the ratio of the current average power supply power to the current peak power supply power to obtain the real-time power factor of the circuit;
[0180] Step S425: in the real-time power monitoring period, mark a plurality of current monitoring time points respectively, obtain the current value of the power supply line corresponding to the target area at each current monitoring time point respectively, obtain a plurality of current values at a time, average the plurality of current values at a time, and obtain the average current value of the current period;
[0181] Step S426: Obtain the cumulative power supply of the power supply line corresponding to the target area during the real-time power monitoring period to obtain the cumulative power supply in the current period;
[0182] Step S427: Calculate the real-time power factor of the circuit, the average current value of the current period, and the accumulated power supply of the current period to obtain the real-time power operation coefficient of the target area;
[0183] The real-time power operation coefficient of the target area is calculated, and the specific formula configuration is as follows:
[0184] Dys=Gls+Dls+Lgs*a1;
[0185] Among them, Dys is the real-time power operation coefficient of the target area, Gls is the real-time power factor of the circuit, Dls is the average current value of the current period, Lgs is the cumulative power supply of the current period, a1 is the set proportional coefficient and a1 is greater than 0;
[0186] Step S47: If the target area is in the second power operation range, further power safety assessment is performed;
[0187] The step S47 further includes the following specific steps:
[0188] Step S471: obtaining the target area's real-time power operation coefficient, regional power equipment failure coefficient, and regional environmental analysis coefficient;
[0189] Step S472: Calculate the target area real-time power operation coefficient, the regional power equipment failure coefficient, and the regional environmental analysis coefficient to obtain a regional power operation safety judgment coefficient;
[0190] The regional power operation safety judgment coefficient is calculated, and the specific formula configuration is as follows:
[0191] Aqx=Dys+Qgz+Hjx*c1;
[0192] Among them, Aqx is the regional power operation safety judgment coefficient, Dys is the real-time power operation coefficient of the target area, Qgz is the regional power equipment failure coefficient, Hjx is the regional environmental analysis coefficient, c1 is the set proportional coefficient and c1 is greater than 0;
[0193] Step S473: obtaining a regional power operation safety judgment coefficient threshold, performing a numerical comparison between the regional power operation safety judgment coefficient and the regional power operation safety judgment coefficient threshold, and issuing a power operation safety warning according to the numerical comparison result;
[0194] Step S4731: respectively obtaining the target area real-time power operation coefficient threshold, the regional power equipment failure coefficient threshold and the regional environment analysis coefficient threshold, and calculating the regional power operation safety judgment coefficient threshold;
[0195] The regional power operation safety judgment coefficient threshold is calculated, and the specific formula configuration is as follows:
[0196] Aqxy=Dysy+Qgzy+Hjxy*c1;
[0197] Among them, Aqxy is the threshold value of the regional power operation safety judgment coefficient, Dysy is the threshold value of the target area real-time power operation coefficient, Qgzy is the threshold value of the regional power equipment failure coefficient, Hjxy is the threshold value of the regional environmental analysis coefficient, c1 is the set proportional coefficient and c1 is greater than 0;
[0198] Step S4732: When the regional power operation safety judgment coefficient is greater than or equal to the regional power operation safety judgment coefficient threshold, a target regional power operation safety warning is issued;
[0199] Step S4733: When the regional power operation safety judgment coefficient is less than the regional power operation safety judgment coefficient threshold, the power analysis of the target area is completed.
[0200] In this application, if corresponding calculation formulas appear, the above calculation formulas are all dimensionless and take their numerical calculations. The weight coefficients, proportional coefficients and other coefficients in the formulas are set to a result value obtained by quantifying each parameter. The size of the weight coefficient and the proportional coefficient can be determined as long as it does not affect the proportional relationship between the parameter and the result value.
[0201] Embodiment 2
[0202] See also Figure 2 , based on another concept of the same invention, a method for analyzing the safety of power operation based on big data is now proposed, which is applied to an analysis system, wherein the analysis system includes a power data module, a device data module, an environment data module, a safety analysis module and a server, wherein the power data module, the device data module, the environment data module and the safety analysis module are respectively connected to the server, and the server controls the power data module, the device data module, the environment data module and the safety analysis module respectively;
[0203] The power data module obtains the historical power operation data of the target area;
[0204] Obtain historical power data corresponding to the target area;
[0205] Randomly select m different dates from the historical power data as sample power monitoring dates, and name them as the first sample power monitoring date to the mth sample power monitoring date respectively;
[0206] It should be noted here that:
[0207] In this application, the sample power monitoring dates involved here are all dates when the power in the target area is operating normally;
[0208] The m involved here is the quantity value corresponding to the randomly selected sample power monitoring date, and m is an integer greater than 0;
[0209] Divide the first sample power monitoring date into n power monitoring periods of equal length, and mark them as the first power monitoring period to the nth power monitoring period, respectively, and obtain the specific time values corresponding to the first power monitoring period to the nth power monitoring period, respectively, to obtain a power monitoring period time comparison table;
[0210] Divide the second sample power monitoring date to the mth sample power monitoring date into n power monitoring periods of the same length as the first sample power monitoring date, and the specific time value corresponding to each power monitoring period is the same as the first sample power monitoring date;
[0211] It should be noted here that:
[0212] In this application, n is the number value corresponding to the divided power monitoring time period, and n is an integer greater than 0;
[0213] Obtaining a first power operation reference coefficient interval;
[0214] The details are as follows:
[0215] Performing power operation data analysis on the first power monitoring period of the first sample power monitoring date to obtain a power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date;
[0216] The details are as follows:
[0217] Acquire the peak power supply power of the power supply line corresponding to the first power monitoring period according to the historical power data, and obtain the peak power supply power during the monitoring period;
[0218] In the first power monitoring period, a plurality of power monitoring time points are marked respectively, and the power supply power of the power supply line corresponding to the target area at each power monitoring time point is obtained respectively, so as to obtain the power supply power at a plurality of times, and the power supply power at a plurality of times is averaged to obtain the average power supply power during the monitoring period;
[0219] Calculate the ratio of the average power supply power during the monitoring period to the peak power supply power during the monitoring period to obtain the power factor during the monitoring period;
[0220] In the first power monitoring period, a plurality of current monitoring time points are marked respectively, and the current value of the power supply line corresponding to the target area at each current monitoring time point is obtained respectively, so as to obtain a plurality of current values at a time, and the average of the current values at a plurality of times is calculated to obtain an average current value of the monitoring period;
[0221] Acquire the cumulative power supply of the power supply line corresponding to the target area in the first power monitoring period according to the historical power data to obtain the cumulative power supply during the monitoring period;
[0222] It should be noted here that:
[0223] In this application, the power operation parameters obtained are all power data of the power supply trunk line corresponding to the target area;
[0224] The power factor during the monitoring period, the average current value during the monitoring period, and the accumulated power supply during the monitoring period are calculated to obtain the power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date;
[0225] The power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date is calculated, and the specific formula configuration is as follows:
[0226] Dyy=Gly+Dlp+Lgl*a1;
[0227] Wherein, Dyy is the power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date, Gly is the power factor of the monitoring period, Dlp is the average current value of the monitoring period, Lgl is the cumulative power supply during the monitoring period, and a1 is the set proportional coefficient and a1 is greater than 0;
[0228] Repeat the process of obtaining the power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date, and respectively obtain the power operation coefficients of the first power monitoring period corresponding to the second sample power monitoring date to the mth sample power monitoring date, to obtain the power operation coefficients corresponding to m first power monitoring periods;
[0229] It should be noted here that:
[0230] The power operation coefficients corresponding to the m first power monitoring periods involved here include the power operation coefficient corresponding to the first power monitoring period of the first sample power monitoring date;
[0231] Sort the power operation coefficients corresponding to the m first power monitoring time periods according to the numerical values, mark the first power operation coefficient as the peak power operation coefficient corresponding to the first power monitoring time period, mark the last power operation coefficient as the valley power operation coefficient corresponding to the first power monitoring time period, mark the numerical interval between the peak power operation coefficient corresponding to the first power monitoring time period and the valley power operation coefficient corresponding to the first power monitoring time period as the power operation coefficient reference interval corresponding to the first power monitoring time period, and name it as the first power operation reference coefficient interval;
[0232] Repeat the process of obtaining the power operation coefficient reference interval corresponding to the first power monitoring period, and respectively obtain the power operation coefficient reference intervals corresponding to the second power monitoring period to the nth power monitoring period, to obtain the second to nth power operation reference coefficient intervals;
[0233] The first to nth power operation benchmark coefficient intervals and the power monitoring period time comparison table are defined as regional historical power operation data;
[0234] The data acquisition module acquires the historical power operation data of the region and transmits it to the safety analysis module;
[0235] The equipment data module monitors the power equipment in the target area and obtains the regional power equipment failure coefficient;
[0236] Obtain the power equipment connected to the power supply line corresponding to the target area, divide them into K different categories of power equipment according to their functions, and name them as first category power equipment to kth category power equipment respectively;
[0237] It should be noted here that:
[0238] The k involved here is the category quantity value corresponding to the power equipment, and k is an integer greater than 0;
[0239] The power equipment involved here is specifically power equipment with safety redundancy in the power supply line, and the failure of some power equipment of the same category will not cause a short circuit or open circuit in the power supply line;
[0240] In the present application, the first category of power equipment may be substation equipment, which includes but is not limited to transformers, circuit breakers and reactors; the second category of power equipment may be distribution equipment, which includes but is not limited to distribution boxes and meters; the third category of power equipment may be protection equipment, which includes but is not limited to relays and fuses;
[0241] Performing fault monitoring on the first category of electric power equipment to obtain a fault rate of the first category of electric power equipment;
[0242] The details are as follows:
[0243] In the power supply lines corresponding to the target area, j first-category power equipment are selected as test samples;
[0244] It should be noted here that:
[0245] In this application, j is the quantity value corresponding to the first category of electrical equipment in the test sample;
[0246] Perform fault judgment on j first-category electric power equipment in the test sample respectively, and count the number of first-category electric power equipment with faults to obtain the number of faults of the first-category electric power equipment samples;
[0247] Calculate the ratio of the number of sample failures of the first category of power equipment to m to obtain the failure rate of the first category of power equipment;
[0248] It should be noted here that:
[0249] Fault diagnosis of the first category of power equipment requires specific diagnosis of the specific power equipment;
[0250] For example: if the power equipment to be judged is a transformer, then a fault judgment is performed;
[0251] The details are as follows:
[0252] Setting the transformer to an on state, obtaining a voltage value of a power line at an input end of the transformer to obtain a first voltage value, obtaining a voltage value of a power line at an output end of the transformer to obtain a second voltage value;
[0253] If the first voltage value is consistent with the value corresponding to the second voltage value, it is determined that the transformer is faulty;
[0254] If the first voltage value is inconsistent with the value corresponding to the second voltage value, then determine whether the second voltage value is consistent with the target output voltage value, if not, the transformer is faulty, if consistent, the transformer is not faulty;
[0255] Performing fault monitoring on the second category power equipment to the kth category power equipment respectively, and obtaining the fault rate of the second category power equipment to the kth category power equipment;
[0256] The rated powers of j first-category electric power devices in the test samples are respectively obtained to obtain j device rated power values, and the average of the j device rated power values is calculated to obtain the average rated power of the first-category electric power devices;
[0257] Obtain the average rated power of the power equipment of the second category to the kth category respectively, and obtain the average rated power of the power equipment of the second category to the average rated power of the power equipment of the kth category;
[0258] The regional power equipment failure coefficient is obtained by calculating the failure rate of the first category power equipment to the kth category power equipment failure rate and the average rated power of the first category power equipment to the kth category power equipment average rated power;
[0259] Calculate the regional power equipment failure coefficient, the specific formula configuration is as follows:
[0260] Qgz=Gl1×Eg1+Gl2×Eg2+·······+Glk×Egk;
[0261] Among them, Qgz is the regional power equipment failure coefficient, Gl1 to Glk are the failure rates of the first category of power equipment to the kth category of power equipment, and Eg1 to Egk are the average rated power of the first category of power equipment to the average rated power of the kth category of power equipment;
[0262] The equipment data module obtains the regional power equipment failure coefficient and transmits it to the safety analysis module;
[0263] The environmental data module conducts environmental monitoring of the target area and obtains the regional environmental analysis coefficient;
[0264] Mark z environmental monitoring feature points in the target area and name them as the first environmental monitoring feature point to the zth environmental monitoring feature point respectively;
[0265] Perform temperature monitoring on the environmental monitoring characteristic points to obtain the first environmental analysis coefficient;
[0266] The details are as follows:
[0267] Acquire the real-time temperatures corresponding to the first environmental monitoring characteristic point to the zth environmental monitoring characteristic point respectively, and obtain the first monitoring temperature value to the zth monitoring temperature value;
[0268] Calculate the average of the first monitoring temperature value to the zth monitoring temperature value to obtain the average value of the environmental monitoring temperature;
[0269] Obtain the power operation reference temperature value;
[0270] Calculate the variance of the first monitoring temperature value to the zth monitoring temperature value to obtain the environmental monitoring temperature variance;
[0271] The first environmental analysis coefficient corresponding to the target area is obtained by calculating the power operation reference temperature value, the environmental monitoring temperature average value and the environmental monitoring temperature variance;
[0272] Calculate the first environmental analysis coefficient, and the specific formula configuration is as follows:
[0273] Hjx1=|Wdp-Wdj|×b1+Wdf;
[0274] Wherein, Hjx1 is the first environmental analysis coefficient, Wdj is the power operation reference temperature value, Wdp is the average value of the environmental monitoring temperature, Wdf is the environmental monitoring temperature variance, b1 is the set proportional coefficient and b1 is greater than 0;
[0275] Monitor the humidity of the environmental monitoring feature points to obtain the second environmental analysis coefficient;
[0276] The details are as follows:
[0277] Acquire the real-time humidity values corresponding to the first environmental monitoring characteristic point to the z-th environmental monitoring characteristic point respectively, and obtain the first monitoring humidity value to the z-th monitoring humidity value;
[0278] Calculate the average of the first monitoring humidity value to the zth monitoring humidity value to obtain the average environmental monitoring humidity value;
[0279] Calculate the variance of the first monitoring humidity value to the zth monitoring humidity value to obtain the environmental monitoring humidity variance;
[0280] The second environmental analysis coefficient corresponding to the target area is obtained by calculating the average environmental monitoring humidity and the environmental monitoring humidity variance;
[0281] Calculate the second environment analysis coefficient, the specific formula configuration is as follows:
[0282]
[0283] Among them, Sjx2 is the second environmental analysis coefficient, Sdp is the average value of environmental monitoring humidity, Sdf is the variance of environmental monitoring humidity, b2 is the set proportional coefficient and b2 is greater than 0;
[0284] The first environmental analysis coefficient and the second environmental analysis coefficient are summed to obtain a regional environmental analysis coefficient;
[0285] The environmental data module obtains the regional environmental analysis coefficients and transmits them to the safety analysis module;
[0286] The safety analysis module makes a safety judgment on the power operation of the target area based on the regional power equipment failure coefficient, regional environmental analysis coefficient and regional historical power operation data, and issues a safety warning based on the judgment results;
[0287] Obtaining historical power operation data of the region, and obtaining a time comparison table of the first to nth power operation benchmark coefficient intervals and power monitoring time periods according to the historical power operation data of the region;
[0288] Conduct real-time power monitoring of the target area to obtain the real-time power operation coefficient of the target area;
[0289] Get the time value corresponding to the current moment to obtain the time value of the current moment;
[0290] Obtain the power monitoring period corresponding to the current time value according to the power monitoring period time comparison table;
[0291] If the power monitoring period corresponding to the current time value is the first power monitoring period;
[0292] The first power operation reference coefficient interval and the target area real-time power operation coefficient are judged for interval existence, as follows:
[0293] If the real-time power operation coefficient of the target area exists in the first power operation reference coefficient interval, it is determined to be the first power operation interval;
[0294] If the real-time power operation coefficient of the target area does not exist in the first power operation reference coefficient interval, it is determined to be in the second power operation interval;
[0295] It should be noted here that:
[0296] The first power operation interval includes an interval boundary of the first power operation reference coefficient interval, and if the target area corresponds to the first power operation interval, the power operation is normal;
[0297] The current time value here can be in any power monitoring period;
[0298] The real-time power operation coefficient of the target area is obtained as follows:
[0299] Obtain a characteristic time length before the current moment as a real-time power monitoring period;
[0300] It should be noted here that:
[0301] In this application, the characteristic time length is fifteen minutes;
[0302] In the real-time power monitoring period, multiple power monitoring time points are marked respectively, and the power supply power of the power supply line corresponding to the target area at each power monitoring time point is obtained respectively, and the power supply power at multiple times is obtained, and the power supply power at multiple times is averaged to obtain the current average power supply power;
[0303] Obtain the peak power supply power of the power supply line corresponding to the real-time power monitoring period to obtain the current peak power supply power;
[0304] Calculate the ratio of the current average power supply to the current peak power supply to obtain the real-time power factor of the circuit;
[0305] In the real-time power monitoring period, multiple current monitoring time points are marked respectively, and the current value of the power supply line corresponding to the target area at each current monitoring time point is obtained respectively, and multiple current values at each time are obtained, and the average of the current values at each time is calculated to obtain the average current value of the current period;
[0306] Obtain the cumulative power supply of the power supply line corresponding to the target area during the real-time power monitoring period to obtain the cumulative power supply in the current period;
[0307] The real-time power factor of the circuit, the average current value of the current period, and the accumulated power supply of the current period are calculated to obtain the real-time power operation coefficient of the target area;
[0308] The real-time power operation coefficient of the target area is calculated, and the specific formula configuration is as follows:
[0309] Dys=Gls+Dls+Lgs*a1;
[0310] Among them, Dys is the real-time power operation coefficient of the target area, Gls is the real-time power factor of the circuit, Dls is the average current value of the current period, Lgs is the cumulative power supply of the current period, a1 is the set proportional coefficient and a1 is greater than 0;
[0311] If the target area is in the second power operation range, further power safety assessment will be conducted;
[0312] The details are as follows:
[0313] Obtain the target area's real-time power operation coefficient, regional power equipment failure coefficient, and regional environmental analysis coefficient;
[0314] The regional power operation safety judgment coefficient is obtained by calculating the target area's real-time power operation coefficient, the regional power equipment failure coefficient, and the regional environmental analysis coefficient;
[0315] The regional power operation safety judgment coefficient is calculated, and the specific formula configuration is as follows:
[0316] Aqx=Dys+Qgz+Hjx*c1;
[0317] Among them, Aqx is the regional power operation safety judgment coefficient, Dys is the real-time power operation coefficient of the target area, Qgz is the regional power equipment failure coefficient, Hjx is the regional environmental analysis coefficient, c1 is the set proportional coefficient and c1 is greater than 0;
[0318] Obtaining a regional power operation safety judgment coefficient threshold, performing a numerical comparison between the regional power operation safety judgment coefficient and the regional power operation safety judgment coefficient threshold, and issuing a power operation safety warning based on the numerical comparison result;
[0319] The regional power operation safety judgment coefficient threshold is obtained as follows:
[0320] The target area real-time power operation coefficient threshold, the regional power equipment failure coefficient threshold and the regional environmental analysis coefficient threshold are respectively obtained, and the regional power operation safety judgment coefficient threshold is obtained by calculation;
[0321] The regional power operation safety judgment coefficient threshold is calculated, and the specific formula configuration is as follows:
[0322] Aqxy=Dysy+Qgzy+Hjxy*c1;
[0323] Among them, Aqxy is the threshold value of the regional power operation safety judgment coefficient, Dysy is the threshold value of the target area real-time power operation coefficient, Qgzy is the threshold value of the regional power equipment failure coefficient, Hjxy is the threshold value of the regional environmental analysis coefficient, c1 is the set proportional coefficient and c1 is greater than 0;
[0324] The numerical comparison process is as follows:
[0325] When the regional power operation safety judgment coefficient is greater than or equal to the regional power operation safety judgment coefficient threshold, the target regional power operation safety warning is issued;
[0326] When the regional power operation safety judgment coefficient is less than the regional power operation safety judgment coefficient threshold, the power analysis of the target area is completed.
[0327] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A method for analyzing power operation safety based on big data, characterized in that: include: Step S1: Obtain historical power data, select the first sample power monitoring date to the mth sample power monitoring date in the historical power data, obtain a power monitoring period time comparison table, divide each sample power monitoring date into the first power monitoring period to the nth power monitoring period, respectively obtain the power operation benchmark coefficient intervals corresponding to the first power monitoring period to the nth power monitoring period, and define the first to nth power operation benchmark coefficient intervals and the power monitoring period time comparison table as regional historical power operation data; Step S2: respectively obtaining the first category power equipment failure rate to the kth category power equipment failure rate and the first category power equipment average rated power to the kth category power equipment average rated power corresponding to the target area power supply line, and calculating the regional power equipment failure coefficient; Step S3: respectively monitoring the environmental temperature and the environmental humidity of the target area to obtain a first environmental analysis coefficient and a second environmental analysis coefficient, and calculating the first environmental analysis coefficient and the second environmental analysis coefficient to obtain a regional environmental analysis coefficient; Step S4: Obtain the real-time power operation coefficient of the target area, and make an interval existence judgment with the first to nth power operation reference coefficient intervals. Based on the interval judgment result, make a power safety judgment according to the regional power equipment failure coefficient and the regional environmental analysis coefficient, and issue a power safety warning to the target area according to the power safety judgment result.
2. According to the big data-based power operation safety analysis method of claim 1, it is characterized in that: The step S1 further includes the following specific steps: Step S11: Acquire historical power data corresponding to the target area; Step S12: randomly selecting m different dates from the historical power data as sample power monitoring dates, and naming them as the first sample power monitoring date to the mth sample power monitoring date respectively; Step S13: Divide the first sample power monitoring date into n power monitoring periods of equal length, and mark them as the first power monitoring period to the nth power monitoring period, respectively, and obtain the specific time values corresponding to the first power monitoring period to the nth power monitoring period, respectively, to obtain a power monitoring period time comparison table; Step S14: Divide the second sample power monitoring date to the mth sample power monitoring date into n power monitoring periods of the same length as the first sample power monitoring date, and the specific time value corresponding to each power monitoring period is the same as the first sample power monitoring date; Step S15: obtaining a first power operation reference coefficient interval; Step S16: respectively acquiring the power operation coefficient reference intervals corresponding to the second power monitoring period to the nth power monitoring period to obtain the second to nth power operation reference coefficient intervals; Step S17: defining the first to nth power operation reference coefficient intervals and the power monitoring period time comparison table as regional historical power operation data.
3. The method for analyzing power operation safety based on big data according to claim 2 is characterized in that: The step S15 further includes the following specific steps: Step S151: Analyze the power operation data of the first power monitoring period of the first sample power monitoring date to obtain a power operation coefficient; Step S152: respectively acquiring the power operation coefficients of the first power monitoring period corresponding to the second sample power monitoring date to the mth sample power monitoring date, to obtain m power operation coefficients; Step S153: Sort the m power operation coefficients according to their numerical values, mark the first power operation coefficient as the peak power operation coefficient, mark the last power operation coefficient as the valley power operation coefficient, mark the numerical interval between the peak power operation coefficient and the valley power operation coefficient as the power operation coefficient reference interval corresponding to the first power monitoring period, and name it the first power operation reference coefficient interval.
4. The method for analyzing power operation safety based on big data according to claim 3 is characterized in that: The step S151 further includes the following specific steps: Step S1511: Acquire the peak power supply power of the power supply line corresponding to the first power monitoring period according to the historical power data, and obtain the peak power supply power during the monitoring period; Step S1512: In the first power monitoring period, mark a plurality of power monitoring time points respectively, obtain the power supply power of the power supply line at each power monitoring time point respectively, obtain the power supply power at a plurality of times, calculate the average of the power supply power at a plurality of times, and obtain the average power supply power during the monitoring period; Step S1513: Calculate the ratio of the average power supply power during the monitoring period to the peak power supply power during the monitoring period to obtain the power factor during the monitoring period; Step S1514: in the first power monitoring period, mark a plurality of current monitoring time points respectively, obtain a current value of the power supply line at each current monitoring time point respectively, obtain a plurality of current values at a time, average the plurality of current values at a time, and obtain an average current value of the monitoring period; Step S1515: acquiring the cumulative power supply of the power supply line corresponding to the target area in the first power monitoring period according to the historical power data, and obtaining the cumulative power supply in the monitoring period; Step S1516: Calculate the power factor during the monitoring period, the average current value during the monitoring period, and the accumulated power supply during the monitoring period to obtain the power operation coefficient; To calculate the power operation coefficient, the specific formula is as follows: Dyy=Gly+Dlp+Lgl*a1; Among them, Dyy is the power operation coefficient, Gly is the power factor during the monitoring period, Dlp is the average current value during the monitoring period, Lgl is the cumulative power supply during the monitoring period, and a1 is the set proportional coefficient and a1 is greater than 0.
5. The method for analyzing power operation safety based on big data according to claim 1 is characterized in that: The step S2 further comprises the following specific steps: Step S21: obtaining the power equipment connected to the power supply line corresponding to the target area, dividing them into K different categories of power equipment according to the functions of the equipment, and naming them as first category power equipment to kth category power equipment respectively; Step S22: performing fault monitoring on the first category of power equipment to obtain the first category of power equipment failure rate; Step S23: performing fault monitoring on the second category power equipment to the kth category power equipment respectively, and obtaining the fault rate of the second category power equipment to the kth category power equipment; Step S24: respectively obtaining numerical values of the rated powers of j first-category electrical devices in the test sample to obtain j device rated power values, and calculating the average of the j device rated power values to obtain the average rated power of the first-category electrical devices; Step S25: acquiring the average rated power of the power equipment of the second category to the kth category respectively, and obtaining the average rated power of the power equipment of the second category to the average rated power of the power equipment of the kth category; Step S26: Obtain a regional power equipment failure coefficient by calculating the failure rate of the first category power equipment to the kth category power equipment and the average rated power of the first category power equipment to the kth category power equipment; Calculate the regional power equipment failure coefficient, the specific formula configuration is as follows: Qgz=Gl1×Eg1+Gl2×Eg2+·······+Glk×Egk; Among them, Qgz is the regional power equipment failure coefficient, Gl1 to Glk are the failure rates of the first category of power equipment to the kth category of power equipment, and Eg1 to Egk are the average rated power of the first category of power equipment to the average rated power of the kth category of power equipment; The step S22 further includes the following specific steps: Step S221: Select j first-category power equipments as test samples in the power supply lines corresponding to the target area; Step S222: performing fault judgment on j first-category electric power devices in the test sample respectively, and counting the number of first-category electric power devices with faults to obtain the number of first-category electric power device sample faults; Step S223: Calculate the ratio of the number of sample failures of the first category of electric power equipment to m to obtain the failure rate of the first category of electric power equipment.
6. The method for analyzing power operation safety based on big data according to claim 1 is characterized in that: The step S3 further includes the following specific steps: Step S31: Mark z environmental monitoring feature points in the target area respectively, and name them as the first environmental monitoring feature point to the zth environmental monitoring feature point respectively; Step S32: performing temperature monitoring on the environmental monitoring feature point to obtain a first environmental analysis coefficient; Step S33: monitoring the humidity of the environmental monitoring feature points to obtain a second environmental analysis coefficient; Step S34: summing the first environment analysis coefficient and the second environment analysis coefficient to obtain a regional environment analysis coefficient; The step S33 further includes the following specific steps: Step S331: respectively acquiring the real-time humidity values corresponding to the first environmental monitoring feature point to the z-th environmental monitoring feature point, and obtaining the first monitoring humidity value to the z-th monitoring humidity value; Step S332: Calculate the average of the first monitoring humidity value to the zth monitoring humidity value to obtain the average value of the environmental monitoring humidity; Step S333: Calculate the variance of the first monitoring humidity value to the zth monitoring humidity value to obtain the environmental monitoring humidity variance; Step S334: obtaining a second environmental analysis coefficient corresponding to the target area by calculating the average value of the environmental monitoring humidity and the variance of the environmental monitoring humidity; Calculate the second environment analysis coefficient, the specific formula configuration is as follows: Among them, Sjx2 is the second environmental analysis coefficient, Sdp is the average value of environmental monitoring humidity, Sdf is the variance of environmental monitoring humidity, b2 is the set proportional coefficient and b2 is greater than 0.
7. The method for analyzing power operation safety based on big data according to claim 6 is characterized in that: The step S32 further includes the following specific steps: Step S321: respectively acquiring the real-time temperatures corresponding to the first environmental monitoring characteristic point to the z-th environmental monitoring characteristic point, to obtain the first monitoring temperature value to the z-th monitoring temperature value; Step S322: Calculate the average of the first monitoring temperature value to the zth monitoring temperature value to obtain the average value of the environmental monitoring temperature; Step S323: Obtaining a power operation reference temperature value; Step S324: Calculate the variance of the first monitoring temperature value to the zth monitoring temperature value to obtain the environmental monitoring temperature variance; Step S325: Calculate the power operation reference temperature value, the average value of the environmental monitoring temperature, and the variance of the environmental monitoring temperature to obtain a first environmental analysis coefficient corresponding to the target area; Calculate the first environmental analysis coefficient, and the specific formula configuration is as follows: Hjx1=|Wdp-Wdj|×b1+Wdf; Among them, Hjx1 is the first environmental analysis coefficient, Wdj is the power operation reference temperature value, Wdp is the average value of the environmental monitoring temperature, Wdf is the variance of the environmental monitoring temperature, b1 is the set proportional coefficient and b1 is greater than 0.
8. The method for analyzing power operation safety based on big data according to claim 1 is characterized in that: The step S4 further includes the following specific steps: Step S41: Acquire historical power operation data of the region, and acquire a first to nth power operation reference coefficient interval and a power monitoring period time comparison table according to the historical power operation data of the region; Step S42: Perform real-time power monitoring on the target area to obtain the real-time power operation coefficient of the target area; Step S43: Acquire the time value corresponding to the current moment to obtain the time value of the current moment; Step S44: obtaining the power monitoring period corresponding to the current time value according to the power monitoring period time comparison table; Step S45: if the power monitoring period corresponding to the current time value is the first power monitoring period; Step S46: the first power operation reference coefficient interval and the target area real-time power operation coefficient are judged for interval existence: If the real-time power operation coefficient of the target area exists in the first power operation reference coefficient interval, it is determined to be the first power operation interval; If the real-time power operation coefficient of the target area does not exist in the first power operation reference coefficient interval, it is determined to be in the second power operation interval; Step S47: If the target area is in the second power operation range, further power safety assessment is performed.
9. The method for analyzing power operation safety based on big data according to claim 8, characterized in that: The step S42 further includes the following specific steps: Step S421: obtaining a characteristic time length before the current moment as a real-time power monitoring period; Step S422: In the real-time power monitoring period, a plurality of power monitoring time points are marked respectively, and the power supply power of the power supply line corresponding to the target area at each power monitoring time point is obtained respectively, so as to obtain the power supply power at a plurality of times, and the power supply power at a plurality of times is averaged to obtain the current average power supply power; Step S423: Obtain the peak power supply power of the power supply line corresponding to the real-time power monitoring period to obtain the current peak power supply power; Step S424: Calculate the ratio of the current average power supply power to the current peak power supply power to obtain the real-time power factor of the circuit; Step S425: in the real-time power monitoring period, mark a plurality of current monitoring time points respectively, obtain the current value of the power supply line corresponding to the target area at each current monitoring time point respectively, obtain a plurality of current values at a time, average the plurality of current values at a time, and obtain the average current value of the current period; Step S426: Obtain the cumulative power supply of the power supply line corresponding to the target area during the real-time power monitoring period to obtain the cumulative power supply in the current period; Step S427: The real-time power operation coefficient of the target area is obtained by calculating the real-time power factor of the circuit, the average current value of the current period, and the accumulated power supply of the current period.
10. The method for analyzing power operation safety based on big data according to claim 8, characterized in that: The step S47 further includes the following specific steps: Step S471: obtaining the target area's real-time power operation coefficient, regional power equipment failure coefficient, and regional environmental analysis coefficient; Step S472: Calculate the target area real-time power operation coefficient, the regional power equipment failure coefficient, and the regional environmental analysis coefficient to obtain a regional power operation safety judgment coefficient; The regional power operation safety judgment coefficient is calculated, and the specific formula configuration is as follows: Aqx=Dys+Qgz+Hjx*c1; Among them, Aqx is the regional power operation safety judgment coefficient, Dys is the real-time power operation coefficient of the target area, Qgz is the regional power equipment failure coefficient, Hjx is the regional environmental analysis coefficient, c1 is the set proportional coefficient and c1 is greater than 0; Step S473: obtaining a regional power operation safety judgment coefficient threshold, performing a numerical comparison between the regional power operation safety judgment coefficient and the regional power operation safety judgment coefficient threshold, and issuing a power operation safety warning according to the numerical comparison result; Step S4731: respectively obtaining the target area real-time power operation coefficient threshold, the regional power equipment failure coefficient threshold and the regional environment analysis coefficient threshold, and calculating the regional power operation safety judgment coefficient threshold; Step S4732: When the regional power operation safety judgment coefficient is greater than or equal to the regional power operation safety judgment coefficient threshold, a target regional power operation safety warning is issued; Step S4733: When the regional power operation safety judgment coefficient is less than the regional power operation safety judgment coefficient threshold, the power analysis of the target area is completed.
Citation Information
Patent Citations
Power distribution network operation situation prediction method based on big data
CN111144638A
Regional energy internet multi-agent distributed control and efficiency evaluation method
CN114336704A
Power cable fault diagnosis and early warning system and method based on data analysis
CN115378141A
Full-automatic aging monitoring system for photovoltaic grid-connected inverter
CN116014902A
Power transformer asset management device and method therefor
US20190392360A1