Rapid mechanical piling cultivation device for seedling planting
By designing a rapid mechanized pile driving device combining pneumatic pile drivers and threaded pipes in seedling planting, the problems of traditional pile driving efficiency and pile body damage are solved, and an efficient and low-cost seedling pile driving process is achieved.
Patent Information
- Application Number
- CN202411201651.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional method of seedling planting and pile driving is inefficient, artificial hammers are time-consuming and labor-intensive, and pneumatic pile drivers need to increase their strength when the pile body penetrates deep into the soil, resulting in damage to the pile body, and the cost of taking out and adjusting is high.
A rapid mechanized pile driving cultivation device for seedling planting was designed. Through the cooperation of the main body of the pneumatic pile driver, the conversion mechanism, the pneumatic valve assembly, the internal threaded pipe and the external threaded pipe, the impact force of the pneumatic pile driver is converted into high-pressure gas and loosen the soil. It also reduces the impact force on the pile body, is suitable for a variety of pile body lengths, and loosens the soil for removal when removed or adjusted.
It improves pile driving efficiency, reduces the risk of pile body damage, reduces labor intensity and cost, and the device is detachable and easy to transport.
Smart Images

Figure CN119014153A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of seedling planting equipment, and in particular to a rapid mechanized piling cultivation device for seedling planting. Background Art
[0002] In the current nursery planting industry, traditional pile driving methods mainly include manual hammering and pneumatic pile drivers. However, both methods have significant shortcomings. Manual hammering is not only time-consuming and labor-intensive, but also requires two people to work together (one person holding the pile and the other person exerting force), which is inefficient and easily leads to fatigue and injury. The main components of a pneumatic pile driver include a hammer head, a hammer seat and a hammer rod, a driving mechanism and an air compressor. Its working principle is: using compressed air as a power source, the hammer head is driven to rise and fall by controlling the flow direction and pressure of the compressed air, and the pile body is driven into the ground through the impact force applied by the hammer head to the pile body. Although this has improved work efficiency to a certain extent, there are still some defects: First, as the pile body penetrates deeper into the soil, the ground directly below the pile body becomes more and more compact, and the force required for piling also needs to be increased accordingly, which means that the amount of compressed air injected into the pneumatic pile driver increases synchronously, and the pressure of the hammer head on the pile body can easily cause deformation or even damage to the top of the pile body; and once the pile body is driven into the soil, if it needs to be taken out for position adjustment or replacement, the cost is high and the existing equipment is difficult to cooperate effectively. For this reason, we propose a rapid mechanized piling cultivation device for seedling planting. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a rapid mechanized piling cultivation device for seedling planting, comprising a pneumatic piling machine body connected to an air compressor, and further comprising:
[0004] A first fixing ring, wherein the first fixing ring is sleeved on a main body of the pneumatic pile driver;
[0005] a collar fixed on the first fixing ring;
[0006] Internally threaded tubes, the internally threaded tubes are in a plurality, all of which are installed through the first fixing ring and are distributed in a circular pattern;
[0007] Externally threaded pipes, there are several externally threaded pipes, all of which are installed through the internally threaded pipes, and the threads between them and the internally threaded pipes are opposite;
[0008] A conversion mechanism, which is installed on the pneumatic pile driver body and connected to the collar and the first fixing ring, and converts part of the impact force generated when the hammer head in the pneumatic pile driver body falls, so that this part of the force is converted into power for compressing the air inside the collar, the internal threaded tube, and the external threaded tube;
[0009] A pneumatic valve assembly, wherein the pneumatic valve assembly is installed in the external threaded pipe and is located at the bottom of the external threaded pipe;
[0010] A connecting ring, the connecting ring is sleeved on the bottom of the external threaded pipe;
[0011] An adjusting mechanism, the adjusting mechanism is mounted on the connecting ring and connected to the pneumatic valve assembly, the adjusting mechanism limits the position of the pneumatic valve assembly and adjusts the air pressure required for starting the pneumatic valve assembly;
[0012] The first steel pipe is installed through the connecting ring, a conical head is fixed at the bottom of the first steel pipe, and a side of the first steel pipe facing the axis of the pneumatic pile driver body is provided with a plurality of air holes.
[0013] Preferably, the conversion mechanism includes a second fixed ring sleeved on the pneumatic pile driver body, a telescopic rod is installed on the second fixed ring, there are multiple groups of telescopic rods, and a blocking block is fixed to the top of each group of telescopic rods, a partition is fixed in the ring, there are several partitions, the other end of the partition is fixed to the pneumatic pile driver body, and each of the blocking blocks corresponds to the space between two partitions.
[0014] Preferably, a one-way valve is installed through each of the blocking blocks.
[0015] Preferably, a support ring is installed at the bottom of the pneumatic pile driver body, a first screw rod is relatively penetrated and installed on the support ring, and an arc plate is fixed on the top end of the first screw rod.
[0016] Preferably, the pneumatic valve assembly includes a second steel pipe slidably arranged in an externally threaded pipe, a sealing plate is fixed at the bottom of the second steel pipe, a first groove is opened on the second steel pipe, the first groove is connected to the interior of the second steel pipe, a second groove is opened on the second steel pipe, the second groove is connected to the first groove, a sealing rod is installed through the second steel pipe, the sealing rod and the second steel pipe are slidably connected, and the length of the sealing rod is less than the distance from the top of the sealing plate to the top of the first groove.
[0017] Preferably, the adjustment mechanism comprises a support frame fixed in the connecting ring, a second screw rod is installed through the support frame, and the second screw rod penetrates the sealing plate.
[0018] Preferably, the internal threaded tube and the first fixing ring are detachable.
[0019] Preferably, the support ring is detachable from the pneumatic pile driver body.
[0020] Preferably, the number of the internally threaded tubes, the externally threaded tubes, the blocking blocks, the connecting rings and the adjusting mechanisms is equal and is three or more.
[0021] Preferably, there are four internally threaded tubes.
[0022] The present invention has at least the following beneficial effects:
[0023] 1. This device, with the cooperation of the conversion mechanism, the pneumatic valve assembly, the internally threaded pipe, the externally threaded pipe and the first steel pipe, converts part of the impact force of the pneumatic pile driver body on the pile body into the compression of the gas, thereby loosening the soil that the pile body is about to contact with through the compressed high-pressure gas, making it easier for the pile body to penetrate the soil, while avoiding damage to the pile body caused by excessive impact force;
[0024] 2. The cooperation between the internal threaded tube and the external threaded tube can make the overall device suitable for piles of most lengths, with strong applicability;
[0025] 3. The detachable design between the internal threaded tube and the first fixing ring makes the device occupy a smaller area during transportation, which is convenient for transportation;
[0026] 4. When the pile body needs to be removed or adjusted, this device can loosen the soil around the pile body, making it easier and more labor-saving to remove the pile body. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0028] Figure 2 It is a schematic diagram of the top view structure of the present invention;
[0029] Figure 3 For the present invention Figure 2 Schematic diagram of the structure at A in the middle;
[0030] Figure 4 It is a schematic diagram of a partial cross-sectional structure of the present invention;
[0031] Figure 5 For the present invention Figure 4 Schematic diagram of the structure at B in the middle;
[0032] Figure 6 It is a bottom view structural schematic diagram of the present invention;
[0033] Figure 7 For the present invention Figure 6 Schematic diagram of the structure at C in the middle;
[0034] Figure 8 For the present invention Figure 6 Schematic diagram of the structure at point D in the middle.
[0035] In the figure: 1. pneumatic pile driver body; 11. support ring; 12. first screw; 13. arc plate; 20. first fixing ring; 21. collar; 22. internal threaded pipe; 23. external threaded pipe; 3. conversion mechanism; 31. second fixing ring; 32. telescopic rod; 33. blocking block; 34. partition; 35. one-way valve; 4. pneumatic valve assembly; 41. second steel pipe; 42. blocking plate; 43. first groove; 44. second groove; 45. blocking rod; 50. connecting ring; 6. adjustment mechanism; 61. support frame; 62. second screw; 70. first steel pipe; 71. conical head; 72. air hole. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] See also Figure 1-8 The present invention provides a technical solution: a rapid mechanized piling cultivation device for seedling planting, comprising a pneumatic piling machine body 1 connected to an air compressor, and also comprising:
[0038] A first fixing ring 20, the first fixing ring 20 is sleeved on the pneumatic pile driver body 1;
[0039] A collar 21, the collar 21 is fixed on the first fixing ring 20;
[0040] Internally threaded tubes 22, there are a plurality of internally threaded tubes 22, all of which are installed through the first fixing ring 20 and are distributed in a circular pattern;
[0041] Externally threaded tubes 23, there are a plurality of externally threaded tubes 23, all of which are installed through the internally threaded tube 22, and the threads between the externally threaded tubes 23 and the internally threaded tube 22 are opposite;
[0042] The conversion mechanism 3 is installed on the pneumatic pile driver body 1 and connected to the collar 21 and the first fixing ring 20. The conversion mechanism 3 converts part of the impact force generated when the hammer head in the pneumatic pile driver body 1 falls, so that this part of the force is converted into power for compressing the air inside the collar 21, the internal threaded tube 22, and the external threaded tube 23;
[0043] A pneumatic valve assembly 4, which is installed in the external threaded tube 23 and is located at the bottom of the external threaded tube 23;
[0044] A connecting ring 50, which is sleeved on the bottom of the externally threaded tube 23;
[0045] The regulating mechanism 6 is mounted on the connecting ring 50 and connected to the pneumatic valve assembly 4. The regulating mechanism 6 limits the position of the pneumatic valve assembly 4 and adjusts the air pressure required for starting the pneumatic valve assembly 4.
[0046] The first steel pipe 70 is installed through the connecting ring 50 . A conical head 71 is fixed to the bottom of the first steel pipe 70 . A plurality of air holes 72 are provided on the side of the first steel pipe 70 facing the axis of the pneumatic pile driver body 1 .
[0047] The conversion mechanism 3 includes a second fixing ring 31 sleeved on the pneumatic pile driver body 1, and a telescopic rod 32 is installed on the second fixing ring 31. There are multiple groups of telescopic rods 32, and a blocking block 33 is fixed to the top of each group of telescopic rods 32. A partition 34 is fixed in the ring 21. There are several partitions 34, and the other end of the partition 34 is fixed to the pneumatic pile driver body 1, and each blocking block 33 corresponds to the space between two partitions 34.
[0048] When the pile body needs to be driven into the soil, the external threaded tube 23 is first rotated. Under the cooperation of the threads on the internal threaded tube 22, the distance between the internal threaded tube 22 and the external threaded tube 23 is large, until the distance between the top of the internal threaded tube 22 and the conical head 71 is greater than the length of the pile body, ensuring that the soil into which the pile body is subsequently inserted is in a loose soil state. Then, the pile body is inserted into the middle of the multiple internal threaded tubes 22, so that the pile body is opposite to the axis of the pneumatic pile driver body 1, and the air compressor and the pneumatic pile driver body 1 are turned on. The air compressor injects high-pressure gas into the pneumatic pile driver body 1, driving the hammer head part to fall quickly, and at the same time, the speed is further increased under the action of the hammer head part's own gravity. In this process, the telescopic rod 32 will first be driven to shrink;
[0049] During the falling process of the hammer, its gravitational potential energy (Ep=mgh, where Ep is the gravitational potential energy, m is the mass of the hammer, g is the acceleration of gravity, and h is the falling height) is converted into kinetic energy, further increasing the falling speed;
[0050] During this process, due to the contraction of the telescopic rod 32, the height h of the hammer head falling increases, thereby effectively utilizing the gravitational potential energy of the hammer head itself. When the telescopic rod 32 is contracted to the shortest state, as the hammer head part of the pneumatic pile driver body 1 continues to move downward, the telescopic rod 32 drives the blocking block 33 to move in the space formed between the ring 21 and the partition 34, and compresses the gas inside. The partition 34 can prevent different pressures between the internal threaded tubes 22, and the air pressure is output from a single internal threaded tube 22.
[0051] A one-way valve 35 is installed through each of the blocking blocks 33 .
[0052] The presence of the one-way valve 35 allows the space below the blocking block 33 to be replenished with gas in time during the rising process of the blocking block 33, thereby reducing the resistance encountered by the hammer head of the pneumatic pile driver body 1 during the rising process.
[0053] A support ring 11 is installed at the bottom of the pneumatic pile driver body 1 , and a first screw rod 12 is relatively penetrated and installed on the support ring 11 , and an arc plate 13 is fixed on the top of the first screw rod 12 .
[0054] Before piling, the pile body is first inserted into the support ring 11, and then the first screw 12 is rotated to drive the arc plates 13 fixed to the first screw 12 to approach each other to clamp the pile body to prevent the pile body from shifting or tilting during the piling process.
[0055] The pneumatic valve assembly 4 includes a second steel tube 41 slidably arranged in the external threaded tube 23. The second steel tube 41 and the external threaded tube 23 can only slide up and down, and the second steel tube 41 cannot rotate by itself. This part can be achieved through the cooperation of the slide groove and the slider. A sealing plate 42 is fixed to the bottom of the second steel tube 41, and a first groove 43 is provided on the second steel tube 41. The first groove 43 is connected to the inside of the second steel tube 41. A second groove 44 is provided on the second steel tube 41, and the second groove 44 is connected to the first groove 43. A sealing rod 45 is installed through the second steel tube 41, and the sealing rod 45 and the second steel tube 41 are slidably connected. The length of the sealing rod 45 is less than the distance from the top of the sealing plate 42 to the top of the first groove 43.
[0056] The adjusting mechanism 6 includes a supporting frame 61 fixed in the connecting ring 50 . A second screw rod 62 is installed through the supporting frame 61 . The second screw rod 62 penetrates the blocking plate 42 .
[0057] The support frame 61 limits the position of the second steel pipe 41 through the second screw rod 62 and the blocking plate 42. When the blocking block 33 squeezes the gas between the collar 21 and the partition plate 34, this part of the gas enters the internal threaded tube 22 and the external threaded tube 23. At this time, the pressure in the internal threaded tube 22 and the external threaded tube 23 increases, driving the blocking rod 45 to move downward. During the downward movement of the blocking rod 45, the part below the first groove 43 on the second steel pipe 41 is sealed. As the blocking block 33 continues to move downward, the air pressure inside the internal threaded tube 22 and the external threaded tube 23 continues to increase, and the blocking rod 45 continues to move downward synchronously. At this time, the blocking rod 45 completely blocks the first groove 43. Since the enclosed air pressure is isobaric, the blocking rod 45 itself can slide, and the air pressure above the blocking rod 45 is equal to the air pressure below. When the gas volume above the blocking rod 45 is originally 100cm 3 , the volume of gas below is 10cm 3 If the volume of the gas above is compressed to 10cm 3 , then the corresponding change of the gas below is 1cm 3By rotating the second screw 62, the volume inside the second steel pipe 41 can be adjusted, thereby controlling the pressure required when the top of the blocking rod 45 overlaps with the first groove 43. In the process of the blocking rod 45 continuing to move downward, the top of the blocking rod 45 finally overlaps with the first groove 43, and the strong air pressure enters the second groove 44 through the first groove 43, and then enters the first steel pipe 70, and is ejected from the air hole 72 of the first steel pipe 70 to loosen the soil directly below the pile body. At the same time, the falling process of the hammer head of the pneumatic pile driver body 1 will exert an impact force on the pile body and the second fixing ring 31, ensuring that the pile body and the parts connected by the second fixing ring 31 move downward synchronously. In the process of continuously driving the pile body, the soil below the pile body is loosened, and the conical head 71 can reduce the friction of the first steel pipe 70 and the connecting parts penetrating into the ground.
[0058] The internal threaded tube 22 and the first fixing ring 20 are detachable.
[0059] When the device is transported, the connection between the first fixing ring 20 and the internal threaded tube 22 is released. At this time, the device is in a disassembled state, occupies a small area, and is convenient for transportation.
[0060] The support ring 11 is detachable from the pneumatic pile driver body 1 .
[0061] When the pile body needs to be removed or adjusted, the device is placed above the pile body so that the axis of the pneumatic pile driver body 1 is opposite to the axis of the pile body, and the air compressor and the pneumatic pile driver body 1 are turned on. At this time, the impact force generated by the hammer head part of the pneumatic pile driver body 1 acts on the conical head 71 to penetrate into the soil and loosen the soil around the pile body. After the soil around the pile body is loosened, the connection between the support ring 11 and the pneumatic pile driver body 1 is released, and the arc plate 13 is clamped and fixed to the pile body by rotating the first screws 12 on both sides. Then, the two first screws 12 are held and applied upward force to easily remove the pile body.
[0062] The number of the internal threaded tube 22 , the external threaded tube 23 , the blocking block 33 , the connecting ring 50 , and the adjusting mechanism 6 is equal, and is three or more.
[0063] Three internally threaded pipes 22 and the connected parts can make the device run stably, with the lowest cost and convenient transportation. Increasing the number can increase the overall stability of the device.
[0064] There are four internally threaded pipes 22 .
[0065] Because the land where the seedlings are planted is uneven, the support formed by three poles is not very stable, and workers need to use greater force to support it in the early stage of piling. Four poles are relatively stable and of moderate quality. They are convenient for transportation and have moderate cost, making them the best choice.
[0066] The working principle of the present invention is as follows: when the required pile body is driven into the soil, the external threaded tube 23 is first rotated, and under the cooperation of the threads on the internal threaded tube 22, the distance between the internal threaded tube 22 and the external threaded tube 23 is large, until the distance between the top of the internal threaded tube 22 and the conical head 71 is greater than the length of the pile body, ensuring that the soil into which the pile body is subsequently inserted is in a loose soil state, the pile body is inserted into the support ring 11, and then the first screw rod 12 is rotated to drive the arc plate 13 fixed to the first screw rod 12 to approach each other, and the pile body is clamped to avoid the pile body from being offset or tilted during the piling process;
[0067] Turn on the air compressor and the pneumatic pile driver body 1. The air compressor injects high-pressure gas into the pneumatic pile driver body 1, driving the hammer head part to fall rapidly. At the same time, the speed is further increased under the action of the hammer head part's own gravity. In this process, the telescopic rod 32 is first driven to contract.
[0068] During the falling process of the hammer, its gravitational potential energy (Ep=mgh, where Ep is the gravitational potential energy, m is the mass of the hammer, g is the acceleration of gravity, and h is the falling height) is converted into kinetic energy, further increasing the falling speed;
[0069] During this process, due to the contraction of the telescopic rod 32, the height h of the hammer head falling increases, thereby effectively utilizing the gravity potential energy of the hammer head itself. When the telescopic rod 32 is contracted to the shortest state, as the hammer head part of the pneumatic pile driver body 1 continues to move downward, the telescopic rod 32 drives the blocking block 33 to move in the space formed between the collar 21 and the partition 34, and compresses the gas inside. The partition 34 can prevent the pressure between the internal threaded tubes 22 from being different, and the air pressure is output from the single internal threaded tube 22. The presence of the one-way valve 35 allows the space below the blocking block 33 to be replenished with gas in time during the rising process of the blocking block 33, thereby reducing the resistance encountered by the hammer head part of the pneumatic pile driver body 1 when it rises.
[0070] The support frame 61 limits the position of the second steel pipe 41 through the second screw rod 62 and the blocking plate 42. When the blocking block 33 squeezes the gas between the collar 21 and the partition plate 34, this part of the gas enters the internal threaded tube 22 and the external threaded tube 23. At this time, the pressure in the internal threaded tube 22 and the external threaded tube 23 increases, driving the blocking rod 45 to move downward. During the downward movement of the blocking rod 45, the part below the first groove 43 on the second steel pipe 41 is sealed. As the blocking block 33 continues to move downward, the air pressure inside the internal threaded tube 22 and the external threaded tube 23 continues to increase, and the blocking rod 45 continues to move downward synchronously. At this time, the blocking rod 45 completely blocks the first groove 43. Since the enclosed air pressure is isobaric, the blocking rod 45 itself can slide, and the air pressure above the blocking rod 45 is equal to the air pressure below. When the gas volume above the blocking rod 45 is originally 100cm 3 , the volume of gas below is 10cm3 If the volume of the gas above is compressed to 10cm 3 , then the corresponding change of the gas below is 1cm 3 , the volume inside the second steel pipe 41 can be adjusted by rotating the second screw 62, thereby controlling the pressure required when the top of the blocking rod 45 overlaps with the first groove 43, so as to make corresponding adjustments according to the different hardness of the soil. In the process of the blocking rod 45 continuously moving downward, the top of the blocking rod 45 finally overlaps with the first groove 43, and the strong air pressure enters the second groove 44 through the first groove 43, and then enters the first steel pipe 70, and is ejected from the air hole 72 of the first steel pipe 70 to loosen the soil directly below the pile body. At the same time, the falling process of the hammer head of the pneumatic pile driver body 1 will exert an impact force on the pile body and the second fixing ring 31, ensuring that the parts connected to the pile body and the second fixing ring 31 move downward synchronously, and in the process of continuously driving the pile body, the soil below the pile body is loosened, and the conical head 71 can reduce the friction force of the first steel pipe 70 and the connecting parts penetrating into the soil;
[0071] When the pile body needs to be removed or adjusted, the device is placed above the pile body so that the axis of the pneumatic pile driver body 1 is opposite to the axis of the pile body, and the air compressor and the pneumatic pile driver body 1 are turned on. At this time, the impact force generated by the hammer head part of the pneumatic pile driver body 1 acts on the conical head 71 to penetrate into the soil and loosen the soil around the pile body. After the soil around the pile body is loosened, the connection between the support ring 11 and the pneumatic pile driver body 1 is released, and the arc plate 13 is clamped and fixed to the pile body by rotating the first screws 12 on both sides. Then, the two first screws 12 are held and applied upward force to easily remove the pile body.
[0072] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0073] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A rapid mechanized piling cultivation device for seedling planting, comprising a pneumatic piling machine body (1) connected to an air compressor, characterized in that: Also includes: A first fixing ring (20), the first fixing ring (20) being sleeved on the pneumatic pile driver body (1); A collar (21), wherein the collar (21) is fixed on the first fixing ring (20); Internally threaded tubes (22), the internally threaded tubes (22) being in plurality and all being installed through the first fixing ring (20) and being distributed in a circular pattern relative to each other; Externally threaded pipes (23), there are a plurality of externally threaded pipes (23), all of which are installed through the internally threaded pipe (22), and the threads between the externally threaded pipes (23) and the internally threaded pipe (22) are opposite; A conversion mechanism (3), the conversion mechanism (3) is installed on the pneumatic pile driver body (1) and connected to the collar (21) and the first fixing ring (20), the conversion mechanism (3) converts part of the impact force generated when the hammer head in the pneumatic pile driver body (1) falls, so that this part of the force is converted into power for compressing the air inside the collar (21), the internal threaded tube (22) and the external threaded tube (23); A pneumatic valve assembly (4), wherein the pneumatic valve assembly (4) is installed in the externally threaded tube (23) and is located at the bottom of the externally threaded tube (23); A connecting ring (50), wherein the connecting ring (50) is sleeved on the bottom of the externally threaded tube (23); an adjusting mechanism (6), the adjusting mechanism (6) being mounted on the connecting ring (50) and connected to the pneumatic valve assembly (4), the adjusting mechanism (6) limiting the position of the pneumatic valve assembly (4) and adjusting the air pressure required for starting the pneumatic valve assembly (4); A first steel pipe (70), the first steel pipe (70) is installed through the connecting ring (50), a conical head (71) is fixed at the bottom end of the first steel pipe (70), and a side of the first steel pipe (70) facing the axis of the pneumatic pile driver body (1) is provided with a plurality of air holes (72).
2. The rapid mechanized piling cultivation device for seedling planting according to claim 1 is characterized in that: The conversion mechanism (3) comprises a second fixing ring (31) sleeved on the pneumatic pile driver body (1), a telescopic rod (32) is installed on the second fixing ring (31), the telescopic rod (32) has multiple groups, and a blocking block (33) is fixed to the top of each group of telescopic rods (32), a partition (34) is fixed inside the sleeve ring (21), there are multiple partitions (34), the other end of the partition (34) is fixed to the pneumatic pile driver body (1), and each of the blocking blocks (33) corresponds to the space between two partitions (34).
3. The rapid mechanized piling cultivation device for seedling planting according to claim 2 is characterized in that: A one-way valve (35) is installed through each of the blocking blocks (33).
4. The rapid mechanized piling cultivation device for seedling planting according to claim 3 is characterized in that: A support ring (11) is installed at the bottom of the pneumatic pile driver body (1), a first screw rod (12) is relatively penetrated and installed on the support ring (11), and an arc plate (13) is fixed at the top end of the first screw rod (12).
5. The rapid mechanized piling cultivation device for seedling planting according to claim 4 is characterized in that: The pneumatic valve assembly (4) comprises a second steel tube (41) slidably arranged in the external threaded tube (23); the second steel tube (41) and the external threaded tube (23) can only slide up and down, and the second steel tube (41) cannot rotate by itself, which can be achieved by the cooperation of the slide groove and the slider; a blocking plate (42) is fixed to the bottom of the second steel tube (41); a first groove (43) is provided on the second steel tube (41); the first groove (43) is connected to the inside of the second steel tube (41); a second groove (44) is provided on the second steel tube (41); the second groove (44) is connected to the first groove (43); a blocking rod (45) is installed through the second steel tube (41); the blocking rod (45) and the second steel tube (41) are slidably connected; the length of the blocking rod (45) is less than the distance from the top of the blocking plate (42) to the top of the first groove (43).
6. The rapid mechanized piling cultivation device for seedling planting according to claim 5, characterized in that: The adjustment mechanism (6) comprises a support frame (61) fixed in the connecting ring (50), a second screw rod (62) is installed through the support frame (61), and the second screw rod (62) penetrates the sealing plate (42).
7. The rapid mechanized piling cultivation device for seedling planting according to claim 6 is characterized in that: The internally threaded tube (22) and the first fixing ring (20) are detachable.
8. The rapid mechanized piling cultivation device for seedling planting according to claim 7 is characterized in that: The support ring (11) and the pneumatic pile driver body (1) are detachable.
9. The rapid mechanized piling cultivation device for seedling planting according to claim 8, characterized in that: The number of the internally threaded tube (22), the externally threaded tube (23), the blocking block (33), the connecting ring (50), and the adjusting mechanism (6) is equal and is three or more.
10. The rapid mechanized piling cultivation device for seedling planting according to claim 9, characterized in that: There are four internally threaded pipes (22).