Large overwater part floating low-position hoisting device and operation method

By using a combined device of transport ship, support platform and sling during the lifting of large water components, the efficient lifting of small transport ships in a dense environment of multi-pile, solving the problems of high cost and low efficiency in the prior art , reduces kinetic energy and collision energy, and is suitable for offshore engineering with dense piles.

CN119018797APending Publication Date: 2024-11-26CCCC FIRST HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410952700.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The prior art has problems of high cost and low efficiency in the lifting process of large water components, especially under the limitations of large lifting devices and transport vessels, and the collision energy-absorbing coupling devices of conventional floating support solutions are expensive and cannot be recycled.

Method used

The floating support low-level lifting device including a transport ship, a support platform, an upper support and lifting device is adopted. The water components are lifted and accurately positioned on the offshore pile foundation through a sling. The small transport ship is used to drive between the pile foundations for installation. Reduced dependence on large lifting devices and expensive couplers.

Benefits of technology

It reduces lifting costs, improves working efficiency, reduces kinetic energy and collision energy, and has a simple structure and flexible configuration, which is suitable for offshore projects with dense piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119018797A_ABST
    Figure CN119018797A_ABST
Patent Text Reader

Abstract

The invention discloses a large overwater component floating low-position hoisting device and an operation method, and the large overwater component floating low-position hoisting device comprises a transport ship, a supporting platform, an upper support, a sling and a lifting device; a lifting device is fixedly installed on the transport ship, and a sling used for lifting and lowering the upper support is connected to the lifting device; the bottom end of the upper support is detachably installed on the transport ship, the top end of the upper support is fixedly provided with a supporting platform used for placing water components, and the upper support is connected with the sling. The sling is used for hoisting the overwater part, so that the overwater part is in a flexible sling hoisting state, compared with a hydraulic cylinder which directly jacks the overwater part, the degree of freedom in each direction is large, that is, when the overwater part needs to be finely adjusted, the overwater part is not required to be lifted by the sling; the position of the overwater part can be adjusted only by moving the position of the transport ship, and the position of the overwater part can be directly adjusted through relevant manual operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of offshore hoisting, and in particular relates to a floating low-position hoisting device for large-scale water components and an operating method. Background Art

[0002] The installation of large above-water components of marine structures, such as upper modules of offshore oil platforms or offshore booster stations, offshore photovoltaic brackets, etc., is usually completed by floating crane installation, and a small number of them are installed by floating method; both have certain disadvantages, which restrict the application and development of the industry.

[0003] For large-scale water components, if a lifting solution is used, a large-tonnage floating crane is required. Disadvantages include: 1. The high configuration requirements of the floating crane lead to increased costs, because large-scale components require the floating crane to have a sufficiently large lifting radius and lifting height, so the selected floating crane must have a high configuration, and even some tens of thousands of tons of components cannot find a floating crane that can operate worldwide; second, the characteristics of certain types of projects determine that the lifting solution is inefficient or not very applicable, such as offshore pile-based photovoltaic projects, where the number of piles is large and the distance between piles is very close. Large floating cranes cannot enter the pile area for lifting operations due to their large width. They can only drive a row of piles outside the pile area and then install a row of photovoltaic brackets immediately after the piling process, resulting in the piling and photovoltaic bracket installation not being able to maximize their efficiency.

[0004] If a conventional floating solution is used, the total mass of the floating transport ship and the water components rigidly connected to the ship is very large, and the kinetic energy under the action of waves is enormous. When the legs of the components come into contact with the piles during the falling process, a large collision will occur. The collision energy absorption coupling device used in conventional floating is very expensive and cannot be recovered. For engineering projects that require a large amount of installation, this will greatly increase the cost. Summary of the invention

[0005] The present invention is mainly to overcome the deficiencies of the prior art and provides a floating low-position hoisting device for large-scale water components and an operating method.

[0006] The present invention is achieved through the following technical solutions:

[0007] A floating low-position lifting device for large-scale water components, comprising: a transport ship, a support platform, an upper support, a sling and a lifting device;

[0008] A lifting device is fixedly installed on the transport ship, and a sling for lifting and lowering the upper support is connected to the lifting device; the bottom end of the upper support is detachably installed on the transport ship, and a supporting platform for placing the above-water components is fixedly installed on the top end, and the upper support is connected to the sling.

[0009] In the above technical solution, the lifting device is a lower support fixedly installed on the transport ship and a winch installed on the top of the lower support, the winch is connected to the sling, and the lifting device is a hydraulic cylinder fixedly installed on the transport ship, and the action end of the hydraulic cylinder is connected to the sling.

[0010] In the above technical solution, there are multiple lower supports, which are fixedly installed on the transport ship in a matrix manner.

[0011] In the above technical solution, the upper support is L-shaped, including a horizontal rod and a vertical rod bent at a 90° angle thereto.

[0012] In the above technical solution, there are multiple upper supports, which are fixedly installed on the bottom surface of the support platform in a matrix manner.

[0013] An operating method for a floating low-position hoisting device for a large-scale aquatic component comprises the following steps:

[0014] Step 1: first, fix the lifting device on the transport ship, and then fix the upper support with the support platform fixed on it on the transport ship, so as to ensure the stability of the transportation of the water-borne components. Then, connect one end of the sling to the lifting device and the other end to the upper support, with the sling in a relaxed state; stably place the water-borne components on the support platform, and then transport the water-borne components to the pile foundation position at the offshore site;

[0015] Step 2: Remove the connecting parts between the upper support and the transport ship, tighten the slings with the lifting device, and then lift the upper support, the supporting platform and the above-water parts thereon to the specified height;

[0016] Step 3: Adjust the position of the transport ship so that the positioning rod below the above-water component is aligned with the top of the offshore pile foundation;

[0017] Step 4: The lifting device loosens the slings, and then lowers the upper support, the support platform and the above-water components thereon, until the positioning rods of the above-water components are seated on the offshore pile foundation, completing the docking installation;

[0018] Step 5: The lifting device further loosens the slings until the top surface of the support platform is separated from the bottom surface of the above-water component, and the upper support falls back onto the transport ship. The upper support is then fixedly connected to the transport ship, and finally the large above-water component floating low-level lifting device is withdrawn from under the above-water component to complete the operation.

[0019] The advantages and beneficial effects of the present invention are:

[0020] (1) The present invention places the support platform, lifting device, upper support, and slings between the water component and the deck of the transport ship. When the transport ship arrives near the installation position, the device can lift the water component to a certain height through the slings, and then the transport ship can accurately position the water component and then lower the water component through the slings to install the water component on the pile. This overcomes the problem of needing to use large lifting devices and large transport ships to lift large water components, saving lifting costs. At the same time, in offshore pile-based photovoltaic projects with a large number of piles and very close spacing between piles, large floating cranes cannot enter the piles in the pile area for lifting operations due to their large width. The present invention uses a small transport ship to travel between the pile foundations, and there is no need to lift the water component while driving the piles. The pile foundation can be lifted after the pile driving is completed, thereby improving work efficiency.

[0021] (2) The present invention adopts slings to lift the water components, so that the water components are in a flexible sling lifting state. Compared with the hydraulic cylinder directly supporting the water components, the water components have a large degree of freedom in all directions. That is to say, when it is necessary to make fine adjustments to the water components, the position of the water components can be adjusted not only by moving the position of the transport ship, but also by performing relevant manual operations to directly adjust the position of the water components. In addition, by adopting slings for lifting, the kinetic energy of the water components is small and they are less affected by the ship. The collision energy during the docking process is small, and there is no need to configure expensive couplers.

[0022] (3) The present invention has a simple structure, and the number of configurations can be flexibly determined according to the weight of the above-water components, etc., which greatly saves costs compared to floating cranes, and has considerable technical advantages and industry application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the state of the present invention when transporting from the dock to the sea.

[0024] Figure 2 This is a schematic diagram of the state of the present invention after being transported to the offshore site.

[0025] In the figure, there is a transport ship 1, an above-water component 2, a positioning rod 2.1, a supporting platform 3, a winch 4, an upper support 5, a sling 6, a lower support 7, and a pile foundation 8.

[0026] For ordinary technicians in this field, other relevant drawings can be obtained based on the above drawings without any creative work. DETAILED DESCRIPTION

[0027] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is further described below in conjunction with specific embodiments.

[0028] Embodiment 1

[0029] A floating low-position lifting device for large water-based components, see attached Figure 1-2 , including: a transport ship 1, a supporting platform 3, an upper support 5, a sling 6 and a lifting device.

[0030] A lifting device is fixedly installed on the transport ship 1, and a sling 6 for lifting and lowering the upper support 5 is connected to the lifting device; the bottom end of the upper support 5 is detachably installed on the transport ship 1, and the top end is fixedly installed on a supporting platform 3 for placing the above-water component 2, and the upper support 5 is connected to the sling 6. When the upper support 5 is fixedly installed on the transport ship 1, the sling 6 is in a relaxed state; further, the lifting device can lift or lower the upper support 5 and the supporting platform 3 fixedly connected to the upper support 5 by tightening or loosening the sling 6, and thus can lift or lower the above-water component 2 placed on the supporting platform 3.

[0031] Among them, the lifting device can be a lower support 7 fixedly installed on the transport ship 1 and a winch 4 installed on the top of the lower support 7, the winch 4 is connected to the sling 6, and the lifting device can also be a hydraulic cylinder fixedly installed on the transport ship 1, and the action end of the hydraulic cylinder is connected to the sling 6.

[0032] There are four lower supports 7 , which are fixedly installed on the transport ship 1 in a matrix manner.

[0033] The upper support 7 is L-shaped, including a horizontal rod and a vertical rod bent at a 90° angle thereto.

[0034] There are four upper supports 5 , which are fixedly installed on the bottom surface of the support platform 3 in a matrix manner.

[0035] Embodiment 2

[0036] This embodiment provides an operation method of a floating low-position hoisting device for a large-scale water component on the basis of the first embodiment, including the following steps:

[0037] Step 1: first, fix the lifting device on the transport ship 1, and then fix the upper support 5 with the support platform 3 fixedly installed on the transport ship 1, so as to ensure the stability of the transportation of the water component, and then connect one end of the sling 6 to the lifting device and the other end to the upper support 5, and the sling 6 is in a relaxed state; stably place the water component 2 on the support platform 3, and then transport the water component 2 to the pile foundation 8 position at the offshore site;

[0038] Step 2: remove the connection parts between the upper support 5 and the transport ship 1, tighten the sling 6 with the lifting device, and then lift the upper support 5, the supporting platform 3 and the above-water component 2 thereon to a specified height;

[0039] Step 3: adjust the position of the transport ship 1 so that the positioning rod 2.1 below the above-water component 2 is aligned with the top of the offshore pile foundation 8;

[0040] Step 4: The lifting device loosens the sling 6, and then lowers the upper support 5, the support platform 3 and the above-water component 2 thereon, until the positioning rod 2.1 of the above-water component 2 is seated on the offshore pile foundation 8, completing the docking installation;

[0041] Step five, the lifting device further loosens the sling 6 until the top surface of the support platform 3 is separated from the bottom surface of the above-water component 2, and the upper support 5 falls back onto the transport ship 1, and then the upper support is fixedly connected to the transport ship, and finally the large above-water component floating low-level lifting device is withdrawn from under the above-water component 2 to complete the operation.

[0042] For ease of explanation, spatial relative terms such as "upper", "lower", "left", "right" and the like are used in the embodiments to illustrate the relationship of one element or feature shown in the figure relative to another element or feature. It should be understood that, in addition to the orientation shown in the figure, the spatial terms are intended to include different orientations of the device in use or operation. For example, if the device in the figure is inverted, the element described as being "under" other elements or features will be positioned "on" other elements or features. Therefore, the exemplary term "under" can include both upper and lower orientations. The device can be positioned in other ways (rotated 90 degrees or in other orientations), and the spatial relative descriptions used here can be interpreted accordingly.

[0043] Furthermore, relational terms such as “first” and “second” and the like are merely used to distinguish one component from another having the same name, but do not necessarily require or imply any such actual relationship or order between these components.

[0044] The present invention is described above by way of example. It should be noted that, without departing from the core of the present invention, any simple deformation, modification or other equivalent replacement that can be made by those skilled in the art without inventive effort falls within the protection scope of the present invention.

Claims

1. A floating low-position hoisting device for large-scale water-based components, characterized in that: Includes transport vessel, support platform, upper support, slings and lifting devices; A lifting device is fixedly installed on the transport ship, and a sling for lifting and lowering the upper support is connected to the lifting device; The bottom end of the upper support is detachably mounted on the transport ship, and the top end is fixedly mounted with a support platform for placing the above-water components. The upper support is connected with the sling.

2. A floating low-position hoisting device for large-scale water-based components according to claim 1, characterized in that: The lifting device is a lower support fixedly installed on the transport ship and a winch installed on the top of the lower support, and the winch is connected to the sling; the lifting device may also be a hydraulic cylinder fixedly installed on the transport ship, and the action end of the hydraulic cylinder is connected to the sling.

3. A floating low-position hoisting device for large-scale water-based components according to claim 2, characterized in that: There are multiple lower supports, which are fixedly installed on the transport ship in a matrix manner.

4. The floating low-position hoisting device for large-scale water-based components according to claim 1, characterized in that: The upper support is L-shaped, and includes a horizontal rod and a vertical rod bent at a 90° angle thereto.

5. The floating low-position hoisting device for large-scale water-based components according to claim 1, characterized in that: There are multiple upper supports, which are fixedly installed on the bottom surface of the support platform in a matrix manner.

6. The method for operating the floating low-position hoisting device for large-scale water-based components according to any one of claims 1 to 5, characterized in that: The following steps are involved: Step 1: first, fix the lifting device on the transport ship, and then fix the upper support with the support platform fixed on it on the transport ship, so as to ensure the stability of the transportation of the water-borne components. Then, connect one end of the sling to the lifting device and the other end to the upper support, with the sling in a relaxed state; stably place the water-borne components on the support platform, and then transport the water-borne components to the pile foundation position at the offshore site; Step 2: Remove the connecting parts between the upper support and the transport ship, tighten the slings with the lifting device, and then lift the upper support, the supporting platform and the above-water parts thereon to the specified height; Step 3: Adjust the position of the transport ship so that the positioning rod below the above-water component is aligned with the top of the offshore pile foundation; Step 4: The lifting device loosens the slings, and then lowers the upper support, the support platform and the above-water components thereon, until the positioning rods of the above-water components are seated on the offshore pile foundation, completing the docking installation; Step 5: The lifting device further loosens the slings until the top surface of the support platform is separated from the bottom surface of the above-water component, and the upper support falls back onto the transport ship. The upper support is then fixedly connected to the transport ship, and finally the large above-water component floating low-level lifting device is withdrawn from under the above-water component to complete the operation.