Bridge pier pouring steel formwork reinforcing structure for bridge construction
By designing an adjustable specification of the pier cast steel formwork reinforcement structure, using the retractable rod and damping components to buffer the pressure, combined with the design of the reinforcement plate and limit plate, the problems of excessive pressure and poor applicability of the steel formwork in the pier casting are solved, and the problem of excessive pressure and poor applicability of the steel formwork in the pier casting is improved. Pouring quality and construction efficiency.
Patent Information
- Application Number
- CN202411181726.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing steel formwork of the pier pouring is under too much pressure during the pouring process, which affects the pouring quality and cannot adapt to the piers of different sizes, and has poor applicability.
Design a reinforcement structure for cast steel formwork of bridge construction pier, including assembly plate, support assembly and reinforcement assembly, adjust the specification inner diameter through telescopic rod, equipped with damping rod and damping spring for pressure cushioning, reinforcement plate and limit plate for limit fixation and Strengthen again.
It improves the applicability and construction efficiency of steel formwork, reduces the time for formwork replacement and adjustment, reduces the number of bubbles and holes during concrete pouring, and enhances the stability and overall strength of the concrete structure.
Smart Images

Figure CN119021101A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of a pier casting steel formwork reinforcement structure, and in particular to a pier casting steel formwork reinforcement structure for bridge construction. Background Art
[0002] When pouring bridge piers during construction, the piers are constructed by pouring concrete. After the pier steel formwork is built, instability often occurs due to the impact of concrete during pouring. The pier steel formwork needs to be reinforced on the outside to improve the strength and stability of the pier and ensure that the concrete maintains the desired shape during the pouring process.
[0003] When in use, the existing steel formwork for pouring bridge piers cannot support and buffer the poured concrete, causing it to be subjected to excessive pressure during the pouring process. Problems affect the pouring quality, and the pier steel formwork cannot be uniformly reinforced according to different pier sizes. The reinforcement structure is often only applicable to one size of pier steel formwork, and has poor applicability.
[0004] Therefore, in order to solve the problem that the steel formwork is subjected to excessive pressure during the pouring process, which affects the pouring quality, a steel formwork reinforcement structure for pouring piers in bridge construction can be designed. Summary of the invention
[0005] In order to overcome the problem that the steel formwork is subjected to excessive pressure during the pouring process, affecting the pouring quality.
[0006] The technical solution of the present invention is: a steel formwork reinforcement structure for casting bridge piers in bridge construction, including an assembly plate; it also includes a support component and a reinforcement component, the bottom end of the assembly plate is provided with a support component, the outer side of the assembly plate is movably connected with the reinforcement component, the support component includes a base, a support rod and a telescopic rod, the bottom end of the assembly plate is fixedly connected with the base, the support rod is symmetrically arranged below the center of the base, and the telescopic rod is slidably connected inside the support rod.
[0007] Preferably, by pulling the telescopic rod and withdrawing it from the support rod to a suitable width, a new specification inner diameter is formed between the assembled plates to adapt to different pier designs, reduce the time for template replacement and adjustment, and at the same time improve the usability of the reinforced structure and improve construction efficiency.
[0008] Preferably, arc-shaped support rods are fixedly connected to the left and right sides of the telescopic rod, two groups of damping rods are relatively arranged between the base and the arc-shaped support rod, damping springs are sleeved on the outer sides of the damping rods, and two groups of damping rods are relatively arranged between the telescopic rod and the arc-shaped support rod. The pressure generated by concrete pouring squeezes the damping rods and the damping springs downward, and the damping rods and the damping springs buffer and reduce the pressure transmitted by them, thereby reducing the number of bubbles and holes generated inside the concrete during pouring.
[0009] Preferably, a jack is provided in the middle position of the top end of the support rod, a movable plate is installed on the top end of the jack, and the movable plate is movably connected between the bases, and a bottom plate is installed on the bottom end of the support rod. When the concrete pier is demolded, the jack pushes the concrete template upward and removes the reinforcement structure at the same time, so as to facilitate the demolding of the concrete pier.
[0010] Preferably, the reinforcement assembly includes a slider, an arc groove, a socket, a limit plate, a reinforcement plate, a slide groove, an assembly groove, a fixing ring, a threaded rod and a buffer block, and sliders are provided at both upper and lower ends of the outer side wall of the assembly plate.
[0011] Preferably, an arc groove is symmetrically provided at the center of the middle position of the outer side wall of the assembly plate, and the arc groove is provided between the sliders, and insertion holes are relatively provided inside the arc groove.
[0012] Preferably, the arc groove is internally slidably connected to a limit plate, and a plug rod is relatively arranged on the side of the limit plate close to the assembly plate. The plug rod on the limit plate is movably connected to the plug hole, and the plug rod on the limit plate is inserted into the plug hole, so that the slider is installed on the steel template to limit and fix the steel template.
[0013] Preferably, a reinforcement plate is symmetrically slidably connected to the outer side of the assembly plate, a sliding groove is provided in the middle position of the reinforcement plate close to one side of the assembly plate, and the slider is slidably connected in the sliding groove, an assembly groove is provided in an annular distribution of the reinforcement plate close to one side of the assembly plate, and the limit plate is movably connected in the assembly groove.
[0014] Preferably, the outer side of the reinforcement plate is movably connected with two sets of fixing rings, threaded rods are threadedly connected between the fixing rings, and buffer blocks are symmetrically arranged on the surface of the threaded rods. The fixing rings are installed and fixed by the threaded rods, thereby reinforcing the steel formwork, reducing deformation and cracking of concrete, and improving the overall strength and durability of the structure.
[0015] Beneficial effects of the present invention:
[0016] 1. Through the cooperation of the base, support rod and telescopic rod, the inner diameter of the reinforcement structure can be adjusted to adapt to steel formworks of different sizes, improve the usability of the reinforcement structure, reduce the time for template replacement and adjustment, reduce the later finishing work, and improve construction efficiency;
[0017] 2. The pressure generated by concrete pouring squeezes the damping rod and damping spring downwards, and the damping rod and damping spring buffer and reduce the pressure transmitted by them, reducing the number of bubbles and holes generated inside the concrete during pouring, while increasing the overall stability and rigidity of the concrete structure and reducing deformation and damage of the structure;
[0018] 3. Slide the limit plate into the arc groove, insert the plug rod on the limit plate into the plug hole, and then install the slider on the steel formwork to limit and fix the steel formwork; align the slide groove on the reinforcement plate with the slider, so that the reinforcement plate is installed on the outside of the assembly plate, and the fixing ring is sleeved on the outside of the reinforcement plate. The fixing rings are installed and fixed by threaded rods, so as to reinforce the steel formwork again, reduce the deformation and cracking of the concrete, and improve the overall strength and durability of the structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 What is shown is a first three-dimensional structural schematic diagram of a steel formwork reinforcement structure for pier casting in bridge construction according to the present invention;
[0020] Figure 2 What is shown is a schematic diagram of the first three-dimensional structure of the split steel formwork reinforcement structure for pier casting in bridge construction according to the present invention;
[0021] Figure 3 The diagram shows a second three-dimensional structure of the split steel formwork reinforcement structure for pier casting in bridge construction according to the present invention;
[0022] Figure 4 What is shown is a schematic diagram of the first three-dimensional structure of the support assembly in the steel formwork reinforcement structure for pier casting in bridge construction according to the present invention;
[0023] Figure 5 Shown is a second three-dimensional structural schematic diagram of the support assembly in the steel formwork reinforcement structure for pier casting in bridge construction according to the present invention;
[0024] Figure 6 What is shown is a schematic diagram of a three-dimensional structure of a cross-section of a steel formwork reinforcement structure for pouring bridge piers in the present invention;
[0025] Figure 7 The steel formwork reinforcement structure for pier casting in bridge construction according to the present invention is shown. Figure 1 Schematic diagram of the three-dimensional structure of local A in the middle.
[0026] Explanation of the reference numerals: 1. Assembling plate; 201. Base; 202. Support rod; 203. Telescopic rod; 204. Arc support rod; 205. Damping rod; 206. Damping spring; 207. Jack; 208. Movable plate; 209. Bottom plate; 301. Slider; 302. Arc groove; 303. Socket; 304. Limiting plate; 305. Reinforcement plate; 306. Slide groove; 307. Assembly groove; 308. Fixing ring; 309. Threaded rod; 310. Buffer block. DETAILED DESCRIPTION
[0027] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0028] See also Figure 1-Figure 7 The present invention provides an embodiment: a bridge construction pier casting steel formwork reinforcement structure, including an assembling plate 1; also including a support component and a reinforcement component, the bottom end of the assembling plate 1 is provided with a support component, the outer side of the assembling plate 1 is movably connected with the reinforcement component, the support component includes a base 201, a support rod 202 and a telescopic rod 203, the bottom end of the assembling plate 1 is fixedly connected with the base 201, the lower center of the base 201 is symmetrically provided with a support rod 202, and the inner side of the support rod 202 is slidably connected with the telescopic rod 203.
[0029] See also Figure 2-Figure 4 In this embodiment, the left and right sides of the telescopic rod 203 are fixedly connected with an arc-shaped support rod 204, two groups of damping rods 205 are relatively arranged between the base 201 and the arc-shaped support rod 204, and the outer side of the damping rod 205 is sleeved with a damping spring 206, and two groups of damping rods 205 are relatively arranged between the telescopic rod 203 and the arc-shaped support rod 204; a jack 207 is arranged at the middle position of the top of the support rod 202, and a movable plate 208 is installed on the top of the jack 207, and the movable plate 208 is movably connected between the base 201, and a bottom plate 209 is installed at the bottom end of the support rod 202. The pressure generated by concrete pouring squeezes the damping rod 205 and the damping spring 206 downward, and the damping rod 205 and the damping spring 206 buffer and shock the pressure transmitted by them, thereby reducing the number of bubbles and holes generated inside the concrete during pouring, while increasing the overall stability and rigidity of the concrete structure, and reducing the deformation and damage of the structure.
[0030] See also Figure 3-Figure 4In this embodiment, the reinforcement assembly includes a slider 301, an arc groove 302, a socket 303, a limit plate 304, a reinforcement plate 305, a slide groove 306, an assembly groove 307, a fixing ring 308, a threaded rod 309 and a buffer block 310. The sliders 301 are provided at both ends of the outer wall of the assembly plate 1; the arc groove 302 is symmetrically provided at the middle position of the outer wall of the assembly plate 1, and the arc groove 302 is provided between the sliders 301. A socket 303 is relatively opened inside 302; the arc groove 302 is slidably connected to a limit plate 304 inside, and a plug rod is relatively set on the side of the limit plate 304 close to the assembly plate 1, and the plug rod on the limit plate 304 is movably connected to the socket 303; a reinforcing plate 305 is slidably connected to the outer center of the assembly plate 1, and a slide groove 306 is opened in the middle position of the reinforcing plate 305 close to the assembly plate 1, and the slider 301 is slidably connected to the slide groove 306 The reinforcing plate 305 is provided with an assembly groove 307 in an annular distribution near one side of the assembling plate 1, and the limiting plate 304 is movably connected in the assembly groove 307; the outer side of the reinforcing plate 305 is movably connected with two sets of fixing rings 308, and threaded rods 309 are threadedly connected between the fixing rings 308, and buffer blocks 310 are symmetrically arranged on the surface center of the threaded rod 309. By sliding the limiting plate 304 in the arc groove 302, the insertion rod on the limiting plate 304 is inserted into the insertion hole 303, so that the slider 301 is installed on the steel formwork, and the steel formwork is limited and fixed; the sliding groove 306 on the reinforcing plate 305 is aligned with the slider 301, so that the reinforcing plate 305 is installed on the outer side of the assembling plate 1, the fixing ring 308 is sleeved on the outer side of the reinforcing plate 305, and the fixing rings 308 are installed and fixed by the threaded rod 309, so that the steel formwork is reinforced again, the deformation and cracking of the concrete are reduced, and the overall strength and durability of the structure are improved.
[0031] When working, the spacing between the assembly plates 1 is adjusted according to the casting needs of the bridge piers, and the telescopic rod 203 is pulled in the opposite direction and pulled out from the support rod 202 to a suitable width, so that a new specification inner diameter is formed between the assembly plates 1. The steel templates of the bridge piers of different specifications are placed, and the movable plate 208 of the corresponding specifications is placed on the base 201 according to the size of the specifications, and is installed and connected to the top of the jack 207, and the steel templates of the corresponding size specifications are placed in the assembly plate 1; after the installation is completed, the limit plate 304 is slid and installed in the arc groove 302, and the plug rod on the limit plate 304 is inserted into the socket 303, so that the slider 301 is installed on the steel template, and the steel template is limited and fixed; the slide groove 306 on the reinforcement plate 305 is aligned with the slider 301, so that the reinforcement plate 305 is installed on the outside of the assembly plate 1, and fixed. The ring 308 is sleeved on the outside of the reinforcement plate 305, and the fixing rings 308 are installed and fixed by the threaded rod 309, so as to reinforce the steel formwork again, reduce the deformation and cracking of the concrete, and improve the overall strength and durability of the structure; concrete is poured into the reinforced steel formwork. During the concrete pouring process, pressure and impact force are generated on the movable plate 208, so that it squeezes the damping rod 205 and the damping spring 206 downward. The damping rod 205 and the damping spring 206 buffer and shock the pressure transmitted by them, reduce the number of bubbles and holes generated inside the concrete during pouring, and at the same time increase the overall stability and rigidity of the concrete structure, and reduce the deformation and damage of the structure; when demolding the concrete pier, the jack 207 pushes the concrete formwork upward, and at the same time removes the reinforcement structure, so as to facilitate the demolding of the concrete pier.
[0032] Through the above steps, with the cooperation of the base 201, the support rod 202 and the telescopic rod 203, the inner diameter of the reinforcement structure can be adjusted to adapt to steel formworks of different sizes, thereby improving the usability of the reinforcement structure, reducing the time for formwork replacement and adjustment, reducing later finishing work, and improving construction efficiency; so as to solve the problem that the steel formwork is subjected to excessive pressure during the pouring process, affecting the pouring quality.
[0033] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the spirit of the present invention.
Claims
1. A bridge construction pier casting steel formwork reinforcement structure, comprising an assembly plate (1); Features: The invention also comprises a support component and a reinforcement component, wherein the bottom end of the assembly plate (1) is provided with the support component, the outer side of the assembly plate (1) is movably connected with the reinforcement component, the support component comprises a base (201), a support rod (202) and a telescopic rod (203), the bottom end of the assembly plate (1) is fixedly connected with the base (201), the support rod (202) is symmetrically arranged below the center of the base (201), and the telescopic rod (203) is slidably connected inside the support rod (202).
2. The steel formwork reinforcement structure for pier casting in bridge construction according to claim 1, Features: The left and right sides of the telescopic rod (203) are fixedly connected with arc-shaped support rods (204); two groups of damping rods (205) are arranged relatively between the base (201) and the arc-shaped support rod (204); damping springs (206) are sleeved on the outer sides of the damping rods (205); and two groups of damping rods (205) are arranged relatively between the telescopic rod (203) and the arc-shaped support rod (204).
3. The steel formwork reinforcement structure for pier casting in bridge construction according to claim 2, Features: A jack (207) is arranged at the middle position of the top of the support rod (202), a movable plate (208) is installed at the top of the jack (207), and the movable plate (208) is movably connected between the bases (201), and a bottom plate (209) is installed at the bottom end of the support rod (202).
4. The steel formwork reinforcement structure for pier casting in bridge construction according to claim 1, Features: The reinforcement assembly comprises a slider (301), an arc groove (302), a plug hole (303), a limit plate (304), a reinforcement plate (305), a slide groove (306), an assembly groove (307), a fixing ring (308), a threaded rod (309) and a buffer block (310). The sliders (301) are arranged at both upper and lower ends of the outer side wall of the assembly plate (1).
5. The steel formwork reinforcement structure for pier casting in bridge construction according to claim 1, Features: An arc groove (302) is symmetrically provided at the center of the outer wall of the assembly plate (1), and the arc groove (302) is provided between the sliders (301). Insertion holes (303) are relatively provided inside the arc groove (302).
6. The steel formwork reinforcement structure for pier casting in bridge construction according to claim 5, Features: The arc-shaped groove (302) is internally slidably connected to a limit plate (304), and a plug rod is relatively arranged on one side of the limit plate (304) close to the assembly plate (1), and the plug rod on the limit plate (304) is movably connected to the insertion hole (303).
7. The steel formwork reinforcement structure for pier casting in bridge construction according to claim 1, Features: A reinforcing plate (305) is slidably connected to the outer side of the assembly plate (1) in a centrally symmetrical manner; a sliding groove (306) is provided at a middle position of the reinforcing plate (305) close to one side of the assembly plate (1); and the slider (301) is slidably connected in the sliding groove (306); an annular arrangement of assembly grooves (307) is provided on the reinforcing plate (305) close to one side of the assembly plate (1); and the limiting plate (304) is movably connected in the assembly groove (307).
8. The steel formwork reinforcement structure for pier casting in bridge construction according to claim 7, Features: Two sets of fixing rings (308) are movably connected to the outer side of the reinforcing plate (305), threaded rods (309) are threadedly connected between the fixing rings (308), and buffer blocks (310) are symmetrically arranged on the surface of the threaded rods (309).