Construction method adopting overload pressure stabilizing pile end pre-sedimentation

Through the overload-stable stabilization pile end pre-settlement method and long and short core pile combination technology, the shortcomings in the construction of existing composite piles in terms of bearing capacity and stability are solved, and efficient settlement control and load transfer are achieved, which is suitable for complex geological conditions and high-rise buildings. Construction.

CN119021214APending Publication Date: 2024-11-26JIANGSU TONGJINXIN CONSTR ENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411436639.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing composite pile construction has shortcomings in terms of construction convenience, overall bearing capacity and stability. Especially under complex geological conditions and in high-rise building construction, the pile body has the risk of instability and further settlement during the settlement process.

Method used

The construction method of pre-settlement at the end of the overload and stable pile is adopted. Through the combination of long-core piles and short-core piles, piles of different lengths and types are used for joint construction, so as to achieve ultra-high vertical and horizontal bearing capacity, and actively settle pre-settlement. Reduce late settlement and verify pile end bearing capacity and stability through overload pre-pressure.

Benefits of technology

It significantly improves the overall bearing capacity and stability, reduces late settlement, enhances the mechanical properties of pile body materials, optimizes the stress distribution, improves the bearing capacity and soil stability at the pile end, and is suitable for complex geological conditions and high-rise buildings. construction.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The construction method comprises the steps that a central composite pile is constructed, a core pile of the central composite pile is a long core pile, overload pressure-stabilizing pre-sedimentation is carried out during construction of the long core pile, the pile end pressure reaches the designed pile end pressure through large-tonnage pressure, pressure stabilization is carried out, and active pre-sedimentation in construction is achieved; and then a plurality of short core piles are sequentially constructed around the central composite pile to form a long and short core pile combined pile group. According to the construction method, the overall bearing capacity and stability can be effectively improved, and the overload pressure stabilizing pile end pre-sedimentation construction method is adopted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a pile construction method. Background Art

[0002] The existing composite pile construction generally adopts the form of the core pile and the outer pile being basically equal in length. This has shortcomings in terms of construction convenience, overall bearing capacity and stability of the pile, and needs to be further improved.

[0003] The plastic concrete piles driven by existing technology wait until the strength is increased before pressing on the pile. When pressing, the pile is pressed down to 75% of the limit value, and then sinks another 30 to 40 centimeters to stabilize the surrounding soil. In this case, the soil is in a relatively weak state and will have further settlement. Summary of the invention

[0004] The object of the present invention is to provide a construction method using overload stabilizing pile end pre-settlement which can effectively improve the overall bearing capacity and stability.

[0005] The technical solution of the present invention is: A construction method using overload and pressure-stabilizing pile end pre-settlement is characterized by: including the construction of a central composite pile, the core pile of the central composite pile is a long core pile, overload and pressure-stabilizing pre-settlement is performed during the construction of the long core pile, the pile end pressure is brought to the designed pile end pressure by large tonnage pressure, and the pressure is stabilized to achieve active pre-settlement during construction; then, multiple short core piles are sequentially constructed around the central composite pile to form a combined pile group of long and short core piles.

[0006] The short core piles are constructed by dry process diagenesis; the long core piles of the central composite piles are constructed by geopolymer diagenesis or concrete diagenesis.

[0007] The length-to-diameter ratio of the core pile is ≥60, and the length-to-diameter ratio of the short core pile is ≤30.

[0008] During the construction of the central composite pile, cement soil is used to soften the soil. When the cement soil is not hard yet, the thickened ultra-high-strength long core pile with a particularly high pile body material strength is pressed down, and 75% of the limit value pressure is used to forcibly press it in and reach a limit value. During construction, targeted and precise stress is concentrated on the end of the long core pile. In the later stage, the combined gradient stress is dispersed to mainly friction resistance, and "stress redistribution" optimizes and reshapes the constitutive relationship.

[0009] The present invention adopts a diagenetic long-short combined composite pile system, which is an innovative pile foundation engineering system. It combines piles of different lengths and types to fully utilize the advantages of various pile types and improve the overall bearing capacity and stability. This system includes long core piles and short core piles. Short core piles usually adopt dry process diagenetic piles, and long core piles usually adopt a partial dry process and can be diagenetic piles or non-diagenetic piles. The long and short core piles are connected by a specific connection method to form a combined grid integration, jointly bear the load, and the long core pile controls the settlement. This composite pile system achieves ultra-high vertical bearing capacity and horizontal bearing capacity, active settlement and pre-settlement, reduces later settlement, and in-situ soil-formed building materials pile diagenesis. It has significant advantages especially in complex geological conditions and the construction of high-rise buildings.

[0010] During the construction process of the present invention, the method of pre-settlement of the overloaded and stabilized pile end is adopted, which is also called the "running pile method", and the process of bearing settlement and diagenesis can be completed. This method causes the pile body material to experience stress concentration at the pile end while bearing the load by overloading and pre-pressing the pile end, thereby achieving the adjustment of the pile end settlement and bearing capacity. This process is equivalent to a preliminary test, which can verify the bearing capacity of the pile end and the stability of the pile body. In addition, the running pile method can also absorb the energy of pile pressing, and through the pile end overload verification, it is equivalent to an in-situ full-scale measured spiral plate (deep) load test. The running pile method has two important functions of pre-detection and pre-pile end settlement. It softens first and then hardens. The in-situ soil body becomes a cement soil plastic processing softening and densification, hardening diagenesis long and short super-mechanical, physical, chemical, thermal coupling, super-structure, low-carbon, high-strength concrete system, which absorbs the energy of the pile body and verifies the bearing capacity of the pile end. The long core pile in the long-short core composite pile is longer, and the interaction with the surrounding soil and the mechanical properties of the pile body material change the bearing layer properties, modulus and thickness of the soil around the pile. The pile body material of the long core pile will experience stress concentration during the overload preloading process, and then the stress will be dispersed after the short core piles harden together in the later stage. To give full play to the advantages of the diagenetic long-short combined composite pile system, it is necessary to reasonably determine the number, position and connection method of various pile types, stress gradient and material strength variable section, so as to achieve the best settlement control and load transfer effect.

[0011] The diagenetic long and short composite pile system is a pile foundation engineering system that uses piles of different lengths and types together, aiming to make full use of the advantages of various pile types and improve the overall bearing capacity and stability. The long and short core piles of this system are connected to form an integrated grid structure to jointly bear the load. For the "stress bubble" range at the pile end (such as UHC500-600 reinforcement and thickening for pile pressure of 500 tons to 900 tons), the ultra-high-strength pipe pile and the soil around the pile end balance the common deep resistance. Matching the heavy-duty 1260-ton steady-pressure penetration detection and verification all-in-one machine (maximum pile pressure of about 900 tons), the pile pressure reaches the pile end directly. The energy of pile driving needs to reach a certain tonnage, especially in deep spiral plate detection, soil diagenesis creates an artificial bearing layer, the pile end settles at the most unfavorable point, overload preloading settlement hardening, increased modulus, super consolidation self-balance, stress bubble and cylindrical expansion theory, overload preloading pre-settlement hardening, overload extrusion and expansion of dense pile side cement soil, soil diagenesis, deformation modulus under ultra-high pressure, the pile end bearing layer cement soil and soil body settle under three-way confining pressure, the pile end is overloaded, stabilized and re-pressed, and self-balanced after penetrating into the bearing layer depth. It is also based on the constraint friction resistance of dry and wet cement soil to lock the "residual stress" to maintain the pressure stable for a long time, high pressure, stress bubble range, settlement plastic deformation does not rebound, and absorb large energy. The construction data of each pile at different time and space depths are compared with historical data, applied and analyzed, and the constitutive relationship is reshaped. The energy is concentrated in the hard cement soil to lock the residual pile end stress. The plastic cement soil absorbs the pressure-induced phase change, high temperature, high pressure and high humidity to split the fresh water vapor and fully react chemically to form rocks. After the cement soil solidifies, the side friction of the pile body continues to increase, and the bearing capacity becomes mainly side friction. After 15 days, the vertical bearing capacity will be greatly increased by more than 2 times. During the construction process, the pile end is used for in-situ full-scale probing and overload stabilization. During the construction, large strain and small strain detection, cement soil property detection, in-situ full-scale static probing, precast pile body bending indentation test measurement, precast pile body material strength test and pile body ultimate bearing capacity measurement, verification of pile end bearing layer reliability (equivalent to spiral plate deep load test), verification of pile surrounding soil layer, pile side friction and horizontal force detection, cement soil pile body integrity detection and other inspections, precast piles are embedded with fiber gratings, stress boxes, load boxes and other inspections to verify the pile end load and deep bearing layer.

[0012] This composite pile system has significant advantages in the construction of complex geological conditions and high-rise buildings.

[0013] The diagenetic long and short composite pile system can be applied to various fields, such as 1. High-rise building foundation engineering: The diagenetic long-short composite pile system is adopted to achieve effective control of settlement by optimizing parameters such as pile type, pile diameter, and pile length, thereby improving the stability and safety of the overall structure.

[0014] 2. Highway bridge foundation engineering: adopting the diagenetic long and short composite pile system, by reasonably determining the pile spacing and pile body materials, the advantages of the composite pile system are fully utilized to improve the overall stability.

[0015] 3. Subway station foundation engineering: The diagenetic long-short composite pile system is adopted. Through the optimized design scheme, the settlement of the pile body is significantly reduced, and the stability and safety of the overall structure are improved.

[0016] 4. LNG tank foundation project: The diagenetic long and short composite pile system is adopted. By optimizing the pile type, pile diameter, pile length and other parameters, the settlement of the pile body is significantly reduced, the vertical and horizontal bearing capacity is greatly improved, the special geological foundation treatment is improved, and the stability and safety of the overall structure are improved.

[0017] The present invention will be further described below in conjunction with the embodiments. DETAILED DESCRIPTION

[0018] A construction method using overload and pressure-stabilizing pile end pre-settlement includes the construction of a central composite pile, the core pile of the central composite pile is a long core pile, and overload and pressure-stabilizing pre-settlement is performed during the construction of the long core pile. The pile end pressure is brought to the designed pile end pressure through large-tonnage pressure, and the pressure is stabilized to achieve active pre-settlement during construction; then, multiple short core piles are constructed in sequence around the central composite pile to form a combined pile group of long and short core piles.

[0019] The short core piles are constructed by using a partial dry method or a dry process diagenesis construction method; the long core piles of the central composite piles are constructed by using a geopolymer diagenesis method or a concrete diagenesis method.

[0020] The length-to-diameter ratio of the core pile is ≥60, and the length-to-diameter ratio of the short core pile is ≤30.

[0021] During the construction of the central composite pile, cement soil is used to soften the soil. When the cement soil is not hard yet, the thickened ultra-high-strength long core pile with a particularly high pile body material strength is pressed down, and 75% of the limit value pressure is used to forcibly press it in and reach a limit value. During construction, targeted and precise stress is concentrated on the end of the long core pile. In the later stage, the combined gradient stress is dispersed to mainly friction resistance, and "stress redistribution" optimizes and reshapes the constitutive relationship.

[0022] It should be noted that when the diagenetic long-short composite pile system is applied in actual engineering, it needs to be optimized and adjusted according to the specific situation. For example, the design of super-long single piles under different geological conditions, different pile types and different construction processes may need further research and improvement.

[0023] The interaction between the pile and the soil is an important factor in the diagenetic long-short composite pile system, which has an important impact on the bearing capacity and settlement deformation of the pile. In the diagenetic long-short composite pile system, the interaction between the pile and the soil mainly includes the pile side friction and pile end resistance. The pile side friction refers to the friction between the pile and the surrounding soil, which increases with the increase of the length and diameter of the pile. The pile end resistance refers to the bearing capacity between the pile end and the soil, which increases with the increase of the pile end area and the pile end bearing capacity.

[0024] In the diagenetic long-short composite pile system, the interaction between the pile body and the soil can be controlled by optimizing the pile type, pile diameter, pile length and other parameters. For example, by increasing the length and diameter of the pile body, the pile side friction and pile end resistance can be increased, thereby improving the bearing capacity of the pile body and the settlement deformation control effect. At the same time, by reasonably determining the pile spacing and pile body materials, the advantages of the composite pile system can be fully utilized to improve the overall stability.

[0025] The interaction between the pile body and the soil is an important factor in the diagenetic long-short composite pile system, which has a significant impact on the bearing capacity and settlement deformation of the pile body. In actual engineering, it is necessary to optimize and adjust according to the specific situation to achieve the best settlement control and load transfer effect.

Claims

1. A construction method using overloaded stabilizing pile tip pre-settlement, characterized by: It includes the construction of central composite piles. The central composite piles are long-core piles. During the construction of the long-core piles, overload, pressure stabilization and pre-settlement are carried out. The pile end pressure is increased to the designed pile end pressure through large-tonnage pressure, and the stress is concentrated at the pile end and the pressure is stabilized to achieve active pre-settlement during construction. Then, around the central composite pile, multiple short-core piles are constructed in sequence with side resistance as the main pressure stabilization value to form a combined pile group of long and short core piles.

2. The construction method using overloaded and pressure-stabilizing pile tip pre-settlement according to claim 1 is characterized in that: The short core piles are constructed by using a partial dry method or a dry process diagenesis construction method; the long core piles of the central composite piles are constructed by using a geopolymer diagenesis method or a concrete diagenesis method.

3. The construction method using overloaded pressure-stabilizing pile tip pre-settlement according to claim 1 or 2, characterized in that: The length-to-diameter ratio of the core pile is ≥60, and the length-to-diameter ratio of the short core pile is ≤30.

4. The construction method using overloaded pressure-stabilizing pile tip pre-settlement according to claim 1 or 2 is characterized in that: During the construction of the central composite pile, cement soil is used to soften the soil. When the cement soil is not hard yet, the thickened ultra-high-strength long core pile with a particularly high pile body material strength is pressed down, and 75% of the limit value pressure is used to force it in and reach a limit value. During construction, targeted and precise stress is concentrated on the end of the long core pile, and the combined gradient stress is dispersed to mainly friction resistance in the later stage.