Four-hole supporting type perforated brick mortar joint control device and construction method

Through the four-hole support porous brick ash joint control device and construction method, the problem of traditional manual control of ash joint error is solved, the precise adjustment and uniform beauty of ash joint are achieved, and the construction efficiency and building quality are improved.

CN119021392APending Publication Date: 2024-11-26METALLURGICAL CORP OF CHINA LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411370793.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In masonry structure construction, there are errors in traditional manual control of grey joints, resulting in uneven thickness of grey joints, affecting the stability and aesthetics of the building, and time-consuming and labor-consuming. Too large or too small grey joints will lead to structural problems.

Method used

Adopt a four-hole support porous brick ash joint control device, including four supporting foot barrels and connecting rods, precise ash joint control is carried out by positioning the holes, combined with the width of the ash joint and the give way slot to achieve vertical and horizontal ash joint evenly adjust and propose corresponding construction methods.

Benefits of technology

Accurate control of grey joints is achieved, brick waste is reduced, construction efficiency is improved, the uniformity and beauty of grey joints is ensured, and building quality is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021392A_ABST
    Figure CN119021392A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction of perforated bricks, in particular to a four-hole supporting type perforated brick mortar joint control device and a construction method.The four-hole supporting type perforated brick mortar joint control device comprises four supporting leg cylinders, the four supporting leg cylinders define a rectangle, and a transverse connecting rod is fixed between every two supporting leg cylinders in the length direction; a longitudinal connecting rod is fixed between the two supporting leg cylinders in the width direction, a mortar joint width clamping strip is fixed below the transverse connecting rod, every two shale porous bricks adjacent left and right are positioned through the four supporting leg cylinders, the bottoms of the two supporting leg cylinders are inserted into two holes in one shale porous brick, and the bottoms of the two supporting leg cylinders are inserted into the two holes in the other shale porous brick. And the bottoms of the other two supporting leg cylinders are inserted into the two holes in the other shale porous brick. According to the invention, the construction efficiency can be effectively improved, the waste of bricks is reduced, and the whole mortar joints of the wall body are more uniform.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of porous brick building construction, in particular to a four-hole support type porous brick mortar joint control device and a construction method. Background Art

[0002] When constructing masonry structures, the thickness of the mortar joints is extremely important for the surface appearance of the masonry structure. The uniform and beautiful mortar joint width and thickness also reflect the management level of a construction company to a certain extent. Secondly, masonry mortar joints that are too large or too small will have a certain impact on the building. Masonry mortar joints that are too large will lead to a decrease in the stability of the building structure. Too large mortar joints will weaken the connection between bricks, easily causing the risk of overall deformation, cracking and even collapse of the masonry; on the other hand, too small masonry mortar joints will also have an impact on the building. Too small mortar joints will cause deformation and stress concentration between bricks, increasing the risk of cracking and damage to the masonry. Traditional manual masonry mortar joint widths often have certain errors, requiring repeated manual adjustments, consuming a lot of time and manpower, and through precise mortar joint control, the brick arrangement diagram can be better matched to reduce the waste of bricks. Summary of the invention

[0003] The embodiment of the present invention provides a four-hole support type porous brick mortar joint control device and a construction method, which can effectively improve the construction efficiency, reduce the waste of bricks, and make the overall mortar joints of the wall more uniform.

[0004] On the one hand, the present invention discloses a four-hole support type porous brick mortar joint control device, which adopts the following technical solution: A four-hole support type porous brick mortar joint control device comprises four support legs, the four support legs form a rectangle, a transverse connecting rod is fixed between two support legs in the length direction, a longitudinal connecting rod is fixed between two support legs in the width direction, a mortar joint width clamping strip is fixed below the transverse connecting rod, two adjacent shale porous bricks on the left and right are positioned by the four support legs, the bottoms of two support legs are inserted into two holes on one of the shale porous bricks, and the bottoms of the other two support legs are inserted into two holes on the other shale porous brick.

[0005] Furthermore, a relief groove is provided on the mortar joint width card strip, and the gap between the two adjacent shale porous bricks on the left and right is a vertical mortar joint, and the lower part of the relief groove is directly opposite to the vertical mortar joint.

[0006] Furthermore, protrusions are provided on both sides of the clearance groove, and after the supporting foot tube is inserted into the hole, the protrusions are in contact with the shale porous bricks.

[0007] On the other hand, the present invention also discloses a construction method, comprising the following steps: S1. When building a porous brick wall, two adjacent shale porous bricks on the left and right are positioned through four supporting legs of the control device, and the bottom of the supporting legs is inserted into the hole of the shale porous brick; S2. After the support legs at the same height are installed, apply masonry mortar to the vertical and horizontal joints; S3. Lay the upper layer of shale porous bricks according to the above method until the wall is completed.

[0008] Compared with the prior art, the present invention has the following technical effects: Accurate mortar joint control can be better used for wall brick arrangement and reduce material waste; accurate positioning reduces repeated manual adjustment of bricks and can improve construction efficiency; uniform and beautiful mortar joints not only improve the quality of the building. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] The drawings described herein are used to provide a further understanding of the present invention, constitute a part of the present invention, and do not constitute a limitation of the present invention. In the drawings: Figure 1 This is a schematic diagram of the overall structure of the middle ash joint control mechanism of the present invention; Figure 2 A front view showing the mortar joint control mechanism of the present invention installed on a shale porous brick; Figure 3 A top view of a mortar joint control mechanism of the present invention installed on a shale porous brick.

[0010] Explanation of the reference numerals: 1. Support foot tube; 2. Horizontal connecting rod; 3. Longitudinal connecting rod; 4. Mortar joint width locking strip; 5. Make way groove; 51. Protrusion; 6. Shale porous brick; 61. Hole; 62. Hand grip hole; 7. Vertical mortar joint; 8. Horizontal mortar joint. DETAILED DESCRIPTION

[0011] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments and the accompanying drawings. Here, the illustrative embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention.

[0012] Reference Figure 1 , Figure 2 and Figure 3A four-hole support porous brick mortar joint control device includes four support legs 1, the wall thickness of the support legs 1 is 2mm, the four support legs 1 are surrounded by a rectangle, a transverse connecting rod 2 is fixed between the two support legs 1 in the length direction, and a longitudinal connecting rod 3 is fixed between the two support legs 1 in the width direction. The transverse connecting rod 2 and the longitudinal connecting rod 3 are at the same height, and the diameters of the transverse connecting rod 2 and the longitudinal connecting rod 3 are both 5mm. A mortar joint width clamping strip 4 is fixed below the two transverse connecting rods 2, and a clearance groove 5 is opened on the mortar joint width clamping strip 4. Both sides of the clearance groove 5 are provided with protrusions 51. The outer diameter of the support leg 1 is slightly smaller than the diameter of the hole 61 of the shale porous brick 6.

[0013] A plurality of holes 61 are provided on the shale porous brick 6, and a hand-gripping hole 62 is provided at the center of the shale porous brick 6. Two adjacent shale porous bricks 6 are positioned by the control device of the present invention, and the bottoms of the two supporting leg tubes 1 are inserted into the two holes 61 of one of the shale porous bricks 6, and the bottoms of the other two supporting leg tubes 1 are inserted into the two holes 61 of the other shale porous brick 6. The gap between the two adjacent shale porous bricks 6 is a vertical mortar joint 7, and the giving groove 5 is just opposite to the vertical mortar joint 7, and the protrusion 51 is just in contact with the side wall of the shale porous brick 6.

[0014] The gap between the upper and lower adjacent shale porous bricks 6 is a horizontal mortar joint 8, the top of the horizontal mortar joint 8 is flush with the top of the supporting foot tube 1, and the bottom of the mortar joint width card seam strip 4 is in contact with the upper surface of the shale porous brick 6 in the lower layer.

[0015] A construction method of a four-hole support type porous brick mortar joint control device comprises the following steps: S1. When building a porous brick wall, two adjacent shale porous bricks 6 on the left and right are positioned by four supporting legs 1 of the control device, the bottom of the supporting legs 1 is inserted into the hole 61 of the shale porous brick 6, and the clearance groove 5 is made to correspond to the vertical mortar joint 7; S2, after the support legs 1 of the same height are installed, masonry mortar is applied to the vertical mortar joints 7 and the horizontal mortar joints 8; S3, laying the upper layer of shale porous bricks 6 according to the above method until the wall is completed.

[0016] Through the mortar joint control device and construction method of the present invention, accurate mortar joint control can be better used for wall brick arrangement, reducing the waste of brick materials; accurate positioning can reduce manual repeated adjustment of bricks, which can improve construction efficiency; uniform and beautiful mortar joints improve the quality of the building. The mortar joint size control device is made of environmentally friendly materials through an injection molding machine to form a one-time mold, which is a disposable material. This material does not chemically react with any cement mortar.

[0017] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.

Claims

1. A four-hole support type porous brick mortar joint control device, It is characterized in that The invention comprises four supporting leg tubes (1), wherein the four supporting leg tubes (1) form a rectangle, a transverse connecting rod (2) is fixed between two supporting leg tubes (1) in the length direction, a longitudinal connecting rod (3) is fixed between two supporting leg tubes (1) in the width direction, a mortar joint width clamping strip (4) is fixed below the transverse connecting rod (2), and two adjacent shale porous bricks (6) on the left and right are positioned by the four supporting leg tubes (1), wherein the bottoms of two supporting leg tubes (1) are inserted into two holes (61) on one of the shale porous bricks (6), and the bottoms of the other two supporting leg tubes (1) are inserted into two holes (61) on the other shale porous brick (6).

2. The four-hole support type porous brick mortar joint control device according to claim 1, It is characterized in that A clearance groove (5) is provided on the mortar joint width clamping strip (4), and the gap between the two adjacent shale porous bricks (6) on the left and right is a vertical mortar joint (7), and the lower side of the clearance groove (5) is directly opposite to the vertical mortar joint (7).

3. The four-hole support type porous brick mortar joint control device according to claim 1 or 2, It is characterized in that Protrusions (51) are provided on both sides of the clearance groove (5), and after the supporting foot tube (1) is inserted into the hole (61), the protrusions (51) are in contact with the shale porous bricks (6).

4. A construction method using the four-hole support type porous brick mortar joint control device according to claim 1, It is characterized in that The steps include: S1. When building a porous brick wall, two adjacent shale porous bricks (6) on the left and right are positioned by means of four supporting legs (1) of a control device, and the bottom of the supporting legs (1) is inserted into the hole (61) of the shale porous brick (6); S2. After the support legs (1) at the same height are installed, masonry mortar is applied to the vertical mortar joints (7) and the horizontal mortar joints (8); S3. Lay the upper layer of shale porous bricks (6) according to the above method until the wall is completed.