Construction method for joint structure of newly-built basement and existing basement

CN119021504APending Publication Date: 2024-11-26GUANGZHOU DI ER CONSTRUCTION & ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411281672.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

There is a water leakage problem at the connection between the new basement and the existing basement, which is mainly due to cracks caused by the shrinkage and settlement of concrete, as well as the lack of waterproofing measures on the back water surface, resulting in damage to the structure.

Method used

A construction method is adopted for the connection between the new basement and the existing basement, including chiseling of the interface, planting tendons, pouring fine stone concrete, laying waterproof coils, setting up foam plastic rods and water stops, embedded steel plates and anchors, And the use of sealing paste to form a multi-layer waterproof structure, avoid cracks from joints and improve waterproofing capabilities.

Benefits of technology

It effectively avoids cracks between the connecting passage and the existing basement joints, improves waterproofing capabilities, ensures construction quality and efficiency, and prevents water from entering the structure and causing damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021504A_ABST
    Figure CN119021504A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for a joint structure of a newly-built basement and an existing basement, the construction method mainly comprises 28 construction steps, the scientific construction method is formed by the steps S1 to S28 (the steps S1 to S28 are specifically seen in the specification), and the construction method is correspondingly designed for a novel waterproof structure. The construction method specifically relates to construction treatment of a waterproof structure in the process of newly building a basement connecting channel and pouring and forming the connecting channel. By means of the construction method, people can be scientifically guided to construct a newly-built basement connecting channel and a connecting channel, meanwhile, a newly-designed waterproof structure is constructed, and the quality of the structure of the connecting position of the newly-built basement and an existing basement is more reliable; the construction method is specific and meticulous, and the construction quality problem caused by insufficient cognition and wrong construction sequence of people can be avoided; and meanwhile, the construction method can improve the construction efficiency and standardize the construction behavior.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a construction method for a connection structure between a newly built basement and an existing basement. Background Art

[0002] Since the new basement and the existing basement were not built at the same time, a connecting passage is needed to connect the two. At present, the joints between the connecting passage and the existing basement have no pre-buried water-stop steel plates (that is, no relevant waterproofing measures were taken in the early stage), and the basement top plate was backfilled with green plants and the bottom plate elevation was low in the later stage, which will cause water leakage at the joints. At present, the new basements of some projects need to be connected to the existing basements. The waterproofing effect of the existing construction plan is general, and the water leakage caused by shrinkage cracks and settlement cracks of the new and old concrete is not considered (that is, the existing construction plan does not have corresponding measures to solve such problems), and the water on the back water surface enters the joints between the connecting passage and the existing basement to cause damage to the structure (where the back water surface includes the bottom of the top plate, the top of the bottom plate, and the inside of the side wall). Therefore, it can be clearly known that there are currently three technical problems in connecting the new basement and the existing basement through the connecting passage:

[0003] (1) The concrete of the connecting tunnel will shrink, and cracks will appear at the joint between the connecting tunnel and the existing basement.

[0004] (2) Since they were not built at the same time, settlement cracks will occur in the concrete of the connecting channel.

[0005] (3) The back water surface is not waterproofed.

[0006] Therefore, a waterproof structure for the connection between the new basement and the existing basement has been invented to improve the waterproof ability of the connection between the new basement and the existing basement, while avoiding cracks in the joints between the connecting passage and the existing basement to the greatest extent. However, at present, people are unclear about the construction method of the new structure for the connection between the new basement and the existing basement, that is, there is currently a lack of a corresponding construction method to guide people to scientifically construct the new structure, improve construction quality, and ensure construction efficiency.

[0007] Therefore, a new technology is needed to solve the problem of lacking "a construction method for the connection structure between a new basement and an existing basement" in the prior art. Summary of the invention

[0008] In order to solve the above problems in the prior art, the present invention provides a construction method for the connection structure between a new basement and an existing basement, which can guide people to carry out scientific construction of the new structure, improve construction quality and ensure construction efficiency.

[0009] The present invention adopts the following technical solutions:

[0010] A construction method for a structure at a connection between a new basement and an existing basement, comprising the following construction steps:

[0011] S1, roughening of the interface;

[0012] S2, tendon implantation;

[0013] S3, pouring bottom surface fine stone concrete for leveling;

[0014] S4. Lay the bottom waterproof membrane;

[0015] S5. Lay additional waterproof membrane on the bottom surface, including laying below the deformation joint of the bottom plate;

[0016] S6. Install bottom foam plastic rods along the length direction of the bottom plate deformation joint;

[0017] S7, pouring bottom fine stone concrete protective layer;

[0018] S8. Install the bottom plate external water stop along the length direction of the bottom plate deformation joint;

[0019] S9, installation of bottom plate reinforcement, and pre-embedded first anchor rods with steel plates at set intervals on the back surface of the bottom plate;

[0020] S10, first set the bottom polystyrene board at the bottom plate deformation joint to fill the lower part of the bottom plate deformation joint, then set the bottom plate embedded water stop, and finally set the bottom polystyrene board to fill the upper part of the bottom plate deformation joint;

[0021] S11, installing the steel bars of the side walls on both sides, and pre-embedding the first anchor rods with steel plates at set intervals on the back surface of the side walls;

[0022] S12, along the height direction of the deformation joints of the side walls on both sides, first set the side wall external water stop, then set the side wall polystyrene board to fill the outside of the side wall deformation joint, then set the side wall embedded water stop, and finally set the side wall polystyrene board to fill the inside of the side wall deformation joint;

[0023] S13, pouring the bottom slab concrete and the side wall concrete with planned height;

[0024] S14, erecting formwork support;

[0025] S15, top plate reinforcement installation, and first anchor rods pre-embedded with steel plates at set intervals on the back surface of the top plate;

[0026] S16, at the top plate deformation joint, first set the top polystyrene board to fill the lower part of the top plate deformation joint, then set the top plate embedded water stop, then set the top polystyrene board to fill the upper part of the top plate deformation joint, and finally set the top plate external water stop along the length direction of the top plate deformation joint;

[0027] S17, pouring top slab and side wall concrete;

[0028] S18, maintenance;

[0029] S19. Set mortar leveling on the outer sides of both side walls;

[0030] S20, firstly set the side foam plastic rods along the height direction of the side wall, then lay the side additional waterproof membrane, and finally lay the side waterproof membrane;

[0031] S21, brickwork waterproof protection on both side walls;

[0032] S22, pouring top surface fine stone concrete for leveling;

[0033] S23, arranging the top foam plastic rod along the length direction of the top plate deformation joint, then laying the top additional waterproofing membrane, and finally laying the top waterproofing membrane;

[0034] S24, pouring the top surface fine stone concrete protective layer;

[0035] S25. Apply sealing paste to seal the deformation joint along the annular direction on the back surface of the deformation joint;

[0036] S26, at the back of the water, drill holes at set intervals on the existing basement exterior wall;

[0037] S27, second anchor construction;

[0038] S28. Lay an L-shaped external waterstop along the circumferential direction of the back water surface, and use a first steel pressing piece and a first anchor nut to fix the L-shaped external waterstop.

[0039] Furthermore, in the step S3, a 150 mm thick bottom surface fine stone concrete is poured for leveling;

[0040] In the step S22, a 150 mm thick top surface fine stone concrete is poured for leveling.

[0041] Furthermore, in the step S5, the laying width of the additional waterproofing membrane on the bottom surface is 1000 mm;

[0042] In the step S20, the laying width of the additional waterproof membrane on the side is 1000 mm;

[0043] In the step S23, the laying width of the additional waterproof membrane on the top surface is 1000 mm.

[0044] Furthermore, in the step S7, the thickness of the bottom fine stone concrete protective layer after pouring is 50 mm;

[0045] In the step S24, the thickness of the top fine stone concrete protective layer after pouring is 50 mm.

[0046] Furthermore, in the step S9, a first anchor rod with a steel plate is pre-buried every 200 mm on the back surface of the bottom plate;

[0047] In the step S11, a first anchor rod with a steel plate is pre-buried every 200 mm on the back surface of the side wall;

[0048] In the step S15, a first anchor rod with a steel plate is pre-buried every 200 mm on the back surface of the top plate;

[0049] In the step S26, holes are drilled every 200 mm on the outer wall of the existing basement;

[0050] The second anchor rod in step S27 is arranged in the hole drilled in step S26.

[0051] Further, in step S13, the planned height is 300 mm.

[0052] Further, in the step S9, the step S11, and the step S15, the first anchor rod is an M8 anchor rod having a hook portion at the front end, wherein the steel plate and the first anchor rod are welded as one body;

[0053] In the step S27, the second anchor rod is an M8 straight anchor rod.

[0054] Furthermore, in the step S10, the width of the bottom plate deformation seam is 10 mm to 20 mm;

[0055] In the step S12, the width of the side wall deformation joint is 10 mm to 20 mm;

[0056] In the step S16, the width of the top plate deformation joint is 10 mm to 20 mm;

[0057] Among them, the width of the bottom plate deformation joint, the width of the side wall deformation joint, and the width of the top plate deformation joint are equal.

[0058] Furthermore, the bottom plate external waterstop, the side wall external waterstop and the top plate external waterstop are all made of rubber materials.

[0059] Furthermore, in the step S6, the diameter of the bottom foam plastic rod is 30 mm to 60 mm;

[0060] In the step S20, the diameter of the side foam plastic rod is 30 mm to 60 mm;

[0061] In the step S23, the diameter of the top foam plastic rod is 30 mm to 60 mm.

[0062] Compared with the prior art, the present invention has the following beneficial effects:

[0063] A construction method for the connection between a new basement and an existing basement is developed for a new waterproof structure. It can guide people to scientifically construct new basement connection passages, connection passages and new waterproof structures, standardize construction behaviors, improve construction quality and efficiency, and is of great significance to "improving the waterproofing ability of the connection between a new basement and an existing basement, while avoiding cracks in the joints between the connection passage and the existing basement to the greatest extent" (this matter). The emergence of this construction method can avoid construction quality problems caused by people's lack of cognition and confusion of construction procedures. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] The technology of the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments:

[0065] Figure 1 It is a plan layout of the new basement connected to the existing basement through the new basement connecting passage and connecting passage (in which the existing basement is partially schematically shown);

[0066] Figure 2 Figure 1 Cross-sectional view at FF ( Figure 2 is a schematic elevation diagram after side section);

[0067] Figure 2a yes Figure 2 A partial enlarged view of

[0068] Figure 3 This is a schematic diagram of the bottom plate back water surface waterproof component, the side wall back water surface waterproof component, and the top plate back water surface waterproof component forming an overall annular waterproof component ( Figure 3 yes Figure 1 A cross-sectional view at GG, showing only the first waterproof structure, without showing the connecting channel bottom plate, two connecting channel side walls, and connecting channel top plate);

[0069] Figure 4 It is the layout relationship diagram (elevation diagram) (partial schematic diagram) of the new basement connecting passage bottom plate, connecting passage bottom plate, existing basement exterior wall, bottom plate waterproof structure, and bottom plate back surface waterproof components;

[0070] Figure 5 yes Figure 4 A top view of the newly built basement connecting passage floor, the external water stop of the floor, and the connecting passage floor;

[0071] Figure 6 This is the plan layout relationship diagram of the walls on the left and right sides of the base plate ( Figure 6 yes Figure 2aSectional view at KK) (Partial schematic diagram) ( Figure 6 It is the layout relationship diagram of the new basement connecting passage side wall, connecting passage side wall, existing basement exterior wall, side wall waterproof structure, and side wall back surface waterproof component);

[0072] Figure 6a yes Figure 6 A partial schematic diagram of one side wall;

[0073] Figure 6b yes Figure 6a A more detailed partial schematic diagram (mainly to show the side waterproofing membrane and the side additional waterproofing membrane in detail);

[0074] Figure 7 yes Figure 6 Elevation drawings of the new basement connecting passage side walls, side wall external water stop, and connecting passage side walls;

[0075] Figure 8 It is a layout relationship diagram (elevation diagram) (partial schematic diagram) of the newly built basement connecting passage top plate, connecting passage top plate, existing basement exterior wall, top plate waterproof structure, and top plate back surface waterproof components;

[0076] Fig. 9 yes Figure 8 A top view of the newly built basement connecting passage top plate, external waterstop on the top plate, and connecting passage top plate.

[0077] Reference numerals:

[0078] 1-first waterproof structure; 11-bottom plate back water surface waterproof assembly; 12-side wall back water surface waterproof assembly; 13-top plate back water surface waterproof assembly; Q-spacing;

[0079] 14- Annular waterproof assembly;

[0080] 15-L type external waterstop;

[0081] 16-first anchor assembly; 161-first anchor rod; 162-steel plate; 163-first steel pressing piece; 164-first anchor rod nut;

[0082] 17-second anchor assembly; 171-second anchor rod; 172-second steel pressing piece; 173-second anchor rod nut;

[0083] 2-deformation joint; 21-bottom plate deformation joint; 22-side wall deformation joint; 23-top plate deformation joint; W-seam width; Y-length direction; Z-height direction;

[0084] 3- Second waterproof structure;

[0085] 31-base waterproof structure; 311-bottom fine stone concrete; 312-bottom waterproofing membrane; 313-bottom additional waterproofing membrane; 314-bottom foam plastic rod; 315-bottom fine stone concrete protective layer; 316-bottom external water stop; 317-bottom polystyrene board; 318-bottom embedded water stop; 319-bottom sealing paste;

[0086] 32-side wall waterproof structure; 321-brickwork protective layer; 322-side waterproofing membrane; 323-side additional waterproofing membrane; 324-side foam plastic rod; 325-mortar layer; 326-side wall external water stop; 327-side wall polystyrene board; 328-side wall embedded water stop; 329-side wall sealing paste;

[0087] 33-top plate waterproof structure; 331-top surface fine stone concrete protective layer; 332-top surface waterproofing membrane; 333-top surface additional waterproofing membrane; 334-top surface foam plastic rod; 335-top surface fine stone concrete; 336-top plate external water stop; 337-top polystyrene board; 338-top plate embedded water stop; 339-top plate sealing paste;

[0088] 4-connecting channel; 41-connecting channel bottom plate; 42-connecting channel side wall; 43-connecting channel top plate;

[0089] 5-existing basement; 51-existing basement exterior wall; R-joint;

[0090] 6-new basement; 61-new basement connecting passage bottom plate; 62-new basement connecting passage side wall; 63-new basement connecting passage top plate; 64-new basement bottom plate; 65-new basement top plate;

[0091] A-dorsal surface; B-downward direction; C-upward direction; D-outer direction; E-inner direction; FF-section symbol; GG-section symbol; KK-section symbol. DETAILED DESCRIPTION

[0092] The following will be combined with the embodiments and drawings to clearly and completely describe the concept, specific structure and technical effects of the present invention, so as to fully understand the purpose, scheme and effect of the present invention. It should be noted that the embodiments in this application and the features in the embodiments can be combined with each other without conflict. The same reference numerals used throughout the drawings indicate the same or similar parts.

[0093] It should be noted that, unless otherwise specified, when a feature is referred to as being "fixed" or "connected" to another feature, it may be directly fixed or connected to the other feature, or it may be indirectly fixed or connected to the other feature. In addition, the descriptions of up, down, left, right, etc. used in the present invention are only relative to the relative positional relationship of the components of the present invention in the drawings.

[0094] Reference Figures 1 to 9 , a construction method for the connection structure between a new basement and an existing basement, comprising the following construction steps:

[0095] S1, roughening the interface; for example, roughening the interface of the existing basement outer wall 51;

[0096] S2, planting reinforcement; such as planting reinforcement on the interface of the existing basement exterior wall 51, paving the way for the installation of bottom plate reinforcement, installation of reinforcement on both sides of the wall, and installation of top plate reinforcement;

[0097] S3, pour the bottom surface fine stone concrete 311 leveling (refer to Figure 4 );

[0098] S4, lay the bottom waterproof membrane 312 (refer to Figure 4 );

[0099] S5, laying the additional waterproof membrane 313 on the bottom surface, including laying below the bottom plate deformation joint 21 (refer to Figure 4 );

[0100] S6, along the length direction Y of the bottom plate deformation joint 21, set the bottom foam plastic rod 314 (refer to Figure 4 "Bottom foam plastic rod 314" and Figure 5 to understand the “length direction Y” in the figure);

[0101] S7, pouring bottom surface fine stone concrete protective layer 315 (refer to Figure 4 );

[0102] S8, along the length direction Y of the bottom plate deformation joint 21, set the bottom plate external water stop strip 316 (refer to Figure 5 );

[0103] S9, the bottom plate (such as the new basement connecting channel bottom plate 61, the connecting channel bottom plate 41) reinforcement installation, and the bottom plate back water surface A every set interval Q embedded with the first anchor 161 of the steel plate 162 (refer to Figure 4 The back surface A and Figure 6 The “first anchoring assembly 16” in FIG.

[0104] S10, first set the bottom polystyrene board 317 at the bottom plate deformation joint 21 to fill the lower part of the bottom plate deformation joint 21 (refer to Figure 4B in the figure is understood as "lower part"), then the embedded water stop strip 318 in the bottom plate is set, and finally the bottom polystyrene board 317 is set to fill the upper part of the bottom plate deformation joint 21 (refer to Figure 4 The C in understands "upper part");

[0105] S11, both sides (press Figure 6 "Both sides of the bottom plate" means "both sides", there are two side walls) side wall (such as the new basement connecting passage side wall 62, connecting passage side wall 42) steel bar installation, and the side wall back water surface A is embedded with the first anchor rod 161 of the steel plate 162 at a set interval Q (refer to Figure 2 and Figure 6 );

[0106] S12, along the height direction Z of the deformation joints 22 of the side walls on both sides, first set the side wall external water stop 326 (refer to Figure 6 , Figure 6a , Figure 6b and Figure 7 ), and then set the side wall polystyrene board 327 to fill the outer side of the side wall deformation joint 22 (refer to Figure 6 D is understood as "outside"), then the embedded water stop 328 is set in the side wall, and finally the side wall polystyrene board 327 is set to fill the inner side of the side wall deformation joint 22 (refer to Figure 6 E understands "inside");

[0107] S13, pouring concrete for the bottom plate (such as the new basement connecting passage bottom plate 61, the connecting passage bottom plate 41) and the side walls with a planned height (such as the new basement connecting passage side wall 62, the connecting passage side wall 42);

[0108] S14, erecting formwork support;

[0109] S15, top plate (such as the top plate 63 of the newly built basement connecting channel, the top plate 43 of the connecting channel) reinforcement installation, and the first anchor rod 161 of the top plate back water surface A embedded with steel plate 162 at a set interval Q (refer to Figure 8 Understand "back side A");

[0110] S16, top polystyrene board 337 is first set at the top plate deformation joint 23 to fill the lower part of the top plate deformation joint 23 (refer to Figure 8 B understands "lower part"), then set the buried water stop 338 in the top plate, and then set the top polystyrene board 337 to fill the upper part of the top plate deformation joint 23 (refer to Figure 8 Finally, the top plate external water stop 336 is set along the length direction Y of the top plate deformation joint 23 (refer to Fig. 9 Understand "length direction Y");

[0111] S17, pouring concrete on the top plate (such as the top plate 63 of the new basement connecting passage, the top plate 43 of the connecting passage) and the side walls (such as the side walls 62 of the new basement connecting passage, the side walls 42 of the connecting passage);

[0112] S18, (concrete) curing;

[0113] S19, set mortar leveling on the outer side of both side walls (refer to Figure 6 The mortar layer 325 in the embodiment is understood);

[0114] S20, first set the side foam plastic rod 324 along the side wall height direction Z, then lay the side additional waterproof membrane 323, and finally lay the side waterproof membrane 322 (refer to Figure 6 ,and Figure 7 “Height direction Z” to understand);

[0115] S21, waterproof protection of brickwork on both side walls (refer to Figure 6 The brickwork protective layer 321 is understood);

[0116] S22, pour top surface fine stone concrete 335 leveling (refer to Figure 8 );

[0117] S23, set the top foam plastic rod 334 along the length direction Y of the top plate deformation joint 23, then lay the top additional waterproofing coiled material 333, and finally lay the top waterproofing coiled material 332 (refer to Figure 8 ,and Fig. 9 The “length direction Y” of the

[0118] S24, pouring top surface fine stone concrete protective layer 331 (refer to Figure 8 );

[0119] S25, seal the deformation joint 2 with sealing paste along the annular direction on the back surface A (refer to Figure 4 Baseboard sealing paste, Figure 6 Side wall sealant, Figure 8 Top plate sealant, and Figure 2 to understand);

[0120] S26, back water surface (refer to Figure 4 The back surface A, Figure 6 The back surface A, Figure 8 Back water surface A), drill holes at set intervals Q on the existing basement outer wall 51 (combined with Figure 3 to understand);

[0121] S27, construction of the second anchor rod 171 (refer to Figure 4 , Figure 6 , Figure 8 and Figure 3The second anchor rod 171 of the second anchor assembly 17 is understood);

[0122] S28, lay the L-shaped external water stop 15 along the annular direction of the back water surface A, and use the first steel pressing piece 161 and the first anchor nut 164, and the second steel pressing piece 172 and the second anchor nut 173 to fix the L-shaped external water stop 15 (combined with Figure 4 The back surface A, Figure 6 The back surface A, Figure 8 The back surface A and Figure 3 The annular waterproof component 14 in the embodiment is understood).

[0123] In one embodiment, in the step S3, 150 mm thick bottom fine stone concrete 311 is poured for leveling (refer to Figure 4 );

[0124] In the step S22, pour 150 mm thick top surface fine stone concrete 335 for leveling (refer to Figure 8 ).

[0125] In one embodiment, in the step S5, the laying width of the bottom additional waterproofing membrane 313 is 1000 mm;

[0126] In the step S20, the laying width of the additional side waterproofing membrane 323 is 1000 mm;

[0127] In the step S23, the laying width of the additional waterproof membrane 333 on the top surface is 1000 mm.

[0128] In one embodiment, in the step S7, the thickness of the bottom fine stone concrete protective layer 315 after pouring is 50 mm (refer to Figure 4 );

[0129] In the step S24, the thickness of the top fine stone concrete protective layer 331 after pouring is 50 mm (refer to Figure 8 ).

[0130] In one embodiment, in the step S9, the bottom plate back water surface A is pre-buried with a first anchor rod 161 with a steel plate 162 every 200 mm (spacing Q) (refer to Figure 4 and Figure 6 );

[0131] In the step S11, the side wall back water surface A is pre-buried with a first anchor rod 161 with a steel plate 162 every 200 mm (spacing Q) (refer to Figure 6 , Figure 2 and Figure 2a );

[0132] In the step S15, a first anchor rod 161 with a steel plate 162 is pre-buried every 200 mm (spacing Q) on the back surface A of the top plate;

[0133] In the step S26, holes are drilled every 200 mm (spacing Q) in the existing basement outer wall 51;

[0134] The second anchor rod 171 in step S27 is set in the hole drilled in step S26 (refer to Figure 4 , Figure 6 , Figure 8 and Figure 3 ).

[0135] In one embodiment, in step S13, the planned height is 300 mm.

[0136] In one embodiment, in the step S9, the step S11, and the step S15, the first anchor rod 161 is an M8 anchor rod with a hook portion at the front end, wherein the steel plate 162 is welded to the first anchor rod 161 as a whole (refer to Figure 4 , Figure 6 and Figure 8 );

[0137] In the step S27, the second anchor rod 171 is an M8 straight anchor rod (refer to Figure 4 , Figure 6 and Figure 8 ).

[0138] In one embodiment, in the step S10, the width W of the bottom plate deformation seam 21 is 10 mm to 20 mm (refer to Figure 6 and Figure 4 );

[0139] In the step S12, the width W of the side wall deformation joint 22 is 10 mm to 20 mm (refer to Figure 6 , Figure 2 and Figure 2a );

[0140] In the step S16, the width W of the top plate deformation seam 23 is 10 mm to 20 mm (refer to Figure 8 , Figure 2 and Figure 2a );

[0141] The width W of the bottom plate deformation joint 21, the width W of the side wall deformation joint 22, and the width W of the top plate deformation joint 23 are equal.

[0142] Reference Figures 4 to 9In one embodiment, the bottom plate external waterstop 316, the side wall external waterstop 326, and the top plate external waterstop 336 are all made of rubber materials.

[0143] Reference Figure 4 , Figure 6 , Figure 6a , Figure 6b and Figure 8 In one embodiment, the bottom plate embedded waterstop 318, the side wall embedded waterstop 328, and the top plate embedded waterstop 338 are all made of rubber materials.

[0144] Reference Figure 2 , Figure 2a and Figure 3 In one embodiment, the L-shaped external waterstop 15 is made of rubber material or steel.

[0145] Another object of the present invention is to provide a waterproof structure at the connection between a new basement and an existing basement to improve the waterproof ability of the connection between the new basement 6 and the existing basement 5, while avoiding cracks in the joints between the connecting passage 4 and the existing basement 5 to the greatest extent.

[0146] Reference Figures 1 to 9 A waterproof structure for the connection between a newly built basement and an existing basement is constructed based on the invention "a construction method for the connection between a newly built basement and an existing basement", and is characterized by comprising a first waterproof structure 1, a deformation joint 2 and a second waterproof structure 3; a connecting passage 4 is connected to an existing basement 5, and a back surface A of the connection R thereof is provided with the first waterproof structure 1 (wherein the back surface A includes the lower side of the top plate, the upper side of the bottom plate, and the inner side of the side wall); a deformation joint 2 is provided between the connecting passage 4 and the newly built basement connecting passage; the second waterproof structure 3 is provided in the deformation joint 2 and its vicinity; a newly built basement 6 is connected to the existing basement 5 through the newly built basement connecting passage and the connecting passage 4, and after the connection, the interior is accessible for people and vehicles to pass through;

[0147] The first waterproof structure 1 includes a bottom plate back surface waterproof component 11, a side wall back surface waterproof component 12 and a top plate back surface waterproof component 13;

[0148] The back surface A of the connection point R between the connecting passage bottom plate 41 and the existing basement 5 is provided with the back surface waterproof component 11 (refer to Figure 3 and Figure 4 );

[0149] The back surface A of the connection point R between the side wall 42 of the connecting passage and the existing basement 5 is provided with the side wall back surface waterproof component 12 (refer to Figure 2 , Figure 2a , Figure 3 and Figure 6 );

[0150] The back surface A of the connection point R between the top plate 43 of the connecting passage and the existing basement 5 is provided with the top plate back surface waterproof component 13 (refer to Figure 3 and Figure 8 );

[0151] The bottom plate back surface waterproof assembly 11, the side wall back surface waterproof assembly 12, and the top plate back surface waterproof assembly 13, after the three are arranged, form a circular waterproof assembly 14 as a whole (refer to Figure 3 );

[0152] Any of the bottom plate back water surface waterproofing assembly 11, the side wall back water surface waterproofing assembly 12, and the top plate back water surface waterproofing assembly 13 comprises an L-shaped external water stop 15, a first anchoring assembly 16, and a second anchoring assembly 17;

[0153] One plate surface of the L-shaped external water stop 15 is fixed to the connecting channel 4 through the first anchoring assembly 16;

[0154] The other plate surface of the L-shaped external water stop 15 is fixed to the existing basement outer wall 51 through the second anchor assembly 17;

[0155] The first anchor assembly 16 includes a first anchor rod 161, a steel plate 162, a first steel pressing piece 163 and a first anchor rod nut 164; the first anchor rod 161 and the steel plate 162 are connected, and the first anchor rod 161 and the steel plate 162 are pre-buried in the connecting channel 4; a plate surface of the L-shaped external water stop 15 is fixed to the first anchor rod 161 and the steel plate 162 through the first steel pressing piece 163 and the first anchor rod nut 164;

[0156] The second anchor assembly 17 includes a second anchor rod 171, a second steel pressing piece 172, and a second anchor rod nut 173; the other plate surface of the L-shaped external water stop 15 is fixed to the existing basement outer wall 51 through the second anchor rod 171, the second steel pressing piece 172, and the second anchor rod nut 173;

[0157] The second waterproof structure 3 includes a bottom plate waterproof structure 31, a side wall waterproof structure 32 and a top plate waterproof structure 33;

[0158] The deformation joint 2 includes a bottom plate deformation joint 21, a side wall deformation joint 22 and a top plate deformation joint 23;

[0159] The newly built basement floor 64 is connected to the newly built basement connecting passage floor 61; the floor deformation joint 21 is provided between the newly built basement connecting passage floor 61 and the connecting passage floor 41;

[0160] The newly built basement side wall is connected to the newly built basement connecting passage side wall 62; the side wall deformation joint 22 is provided between the newly built basement connecting passage side wall 62 and the connecting passage side wall 42;

[0161] The newly built basement top plate 65 is connected to the newly built basement connecting passage top plate 63; the top plate deformation joint 23 is provided between the newly built basement connecting passage top plate 63 and the connecting passage top plate 43;

[0162] The base waterproof structure 31 is arranged at the base deformation joint 21, below the basement connecting passage basement 61, and below the connecting passage basement 41;

[0163] The side wall waterproof structure 32 is arranged at the side wall deformation joint 22, the outer side of the new basement connecting passage side wall 62, and the outer side of the connecting passage side wall 42;

[0164] The places where the roof waterproof structure 33 is arranged include the roof deformation joint 23, above the newly built basement connecting channel roof 63, and above the connecting channel roof 43;

[0165] The bottom plate waterproof structure 31 includes bottom surface fine stone concrete 311, bottom surface waterproofing coiled material 312, bottom surface additional waterproofing coiled material 313, bottom surface foam plastic rod 314, bottom surface fine stone concrete protective layer 315, bottom plate external water stop 316, bottom polystyrene board 317, bottom plate embedded water stop 318 and bottom plate sealing paste 319;

[0166] The bottom fine stone concrete 311 is arranged below the newly built basement connecting passage bottom plate 61 and the connecting passage bottom plate 41 (refer to Figure 4 B in the sentence understands “below”);

[0167] The bottom waterproofing membrane 312 is arranged on the bottom fine stone concrete 311, and specifically relates to the waterproofing of the paving of the water-facing surface of the connection R between the connecting channel bottom plate 41 and the existing basement outer wall 51;

[0168] The bottom additional waterproofing membrane 313 is arranged on the bottom waterproofing membrane 312, and specifically relates to the waterproofing of the paving on the water-facing surface of the connection R between the connecting passage bottom plate 41 and the existing basement outer wall 51;

[0169] The bottom foam plastic rod 314 is arranged on the bottom additional waterproof coiled material 313;

[0170] The bottom fine stone concrete protective layer 315 is arranged on the bottom waterproof membrane 312 and the bottom additional waterproof membrane 313, and the top of the bottom fine stone concrete protective layer 315 is connected to the bottom of the new basement connecting passage bottom plate 61 and the bottom of the connecting passage bottom plate 41, and the bottom fine stone concrete layer 315 maintains a set seam width directly below the bottom plate deformation joint 21;

[0171] The bottom plate external water stop 316 is arranged on the bottom fine stone concrete protective layer 315, and one side is connected to the newly built basement connecting channel bottom plate 61, and the other side is connected to the connecting channel bottom plate 41, and seals the bottom of the bottom plate deformation joint 21 (refer to Figure 4 B understands "below");

[0172] The bottom polystyrene board 317 is filled in the bottom plate deformation joint 21, and the bottom plate embedded water stop 318 is provided in the bottom plate deformation joint 21, and the bottom plate embedded water stop 318 is connected to the newly built basement connecting channel bottom plate 61 on one side and to the connecting channel bottom plate 41 on the other side;

[0173] The bottom plate sealing paste 319 is disposed on the bottom polystyrene plate 317 and seals the top of the bottom plate deformation joint 21 (refer to Figure 4 Middle C understands "above");

[0174] The side wall waterproof structure 32 includes a brickwork protective layer 321, a side waterproofing membrane 322, a side additional waterproofing membrane 323, a side foam plastic rod 324, a mortar layer 325, a side wall external water stop 326, a side wall polystyrene board 327, a side wall embedded water stop 328, and a side wall sealing paste 329;

[0175] The brickwork protective layer 321 is arranged on the outer side of the newly built basement connecting passage side wall 62 and the connecting passage side wall 42 (refer to Figure 6 D in the middle understands "outside");

[0176] The side waterproofing membrane 322 is arranged on the inner side of the brickwork protective layer 321 (refer to Figure 6 E in the text is understood as “inside”), and specifically relates to waterproofing of the pavement on the water-facing surface of the connection R between the connecting passage side wall 42 and the existing basement exterior wall 51;

[0177] The side additional waterproofing membrane 323 is arranged on the inner side of the side waterproofing membrane 322 (refer to Figure 6 E in the text is understood as “inside”), and specifically relates to waterproofing of the pavement on the water-facing surface of the connection R between the connecting passage side wall 42 and the existing basement exterior wall 51;

[0178] The side foam plastic rod 324 is arranged on the inner side of the side additional waterproof membrane 323 (refer to Figure 6Middle E understands "inside");

[0179] The mortar layer 325 is arranged on the inner side of the side waterproofing membrane 322 and the side additional waterproofing membrane 323, and the inner side of the mortar layer 325 is connected to the outer side of the new basement connecting passage side wall 62 and the outer side of the connecting passage side wall 42, and the mortar layer 325 maintains a set seam width just outside the side wall deformation joint 22;

[0180] The side wall external water stop 326 is arranged inside the mortar layer 325, and one side is connected to the new basement connecting passage side wall 62, and the other side is connected to the connecting passage side wall 42, and seals the outer side of the side wall deformation joint 22 (refer to Figure 6 D in the middle understands "outside");

[0181] The side wall polystyrene board 327 is filled in the side wall deformation joint 22, and the side wall embedded water stop 328 is provided in the side wall deformation joint 22. One side of the side wall embedded water stop 328 is connected to the new basement connecting passage side wall 62, and the other side is connected to the connecting passage side wall 42;

[0182] The side wall sealing paste 329 is arranged on the inner side of the side wall polystyrene board 327 and seals the inner side of the side wall deformation joint 22;

[0183] The roof waterproof structure 33 includes a top fine stone concrete protective layer 331, a top waterproofing coiled material 332, a top additional waterproofing coiled material 333, a top foam plastic rod 334, a top fine stone concrete 335, a top external water stop 336, a top polystyrene board 337, a top buried water stop 338 and a top sealing paste 339;

[0184] The top polystyrene board 337 is filled in the top plate deformation joint 23, and the top plate embedded water stop 338 is provided in the top plate deformation joint 23. One side of the top plate embedded water stop 338 is connected to the top plate 63 of the newly built basement connecting passage, and the other side is connected to the connecting passage top plate 43;

[0185] The top plate external water stop strip 336 is arranged above the top plate deformation joint 23 (refer to Figure 8 C in the figure means "above"), and one side is connected to the top plate 63 of the newly built basement connecting passage, and the other side is connected to the top plate 43 of the connecting passage;

[0186] The top surface fine stone concrete 335 is arranged above the top plate 63 of the newly built basement connecting passage, above the top plate external water stop 336, and above the connecting passage top plate 43, and the top surface fine stone concrete 335 maintains a set seam width just above the top plate deformation joint 23;

[0187] The top foam plastic rod 334, the top additional waterproofing membrane 333, and the top waterproofing membrane 332 are arranged above the top fine stone concrete 335, and the top additional waterproofing membrane 333 and the top waterproofing membrane 332 are specifically related to the waterproofing of the paving of the water-facing surface of the connection R between the connecting passage top plate 43 and the existing basement outer wall 51;

[0188] The top surface fine stone concrete protective layer 331 is arranged on the top surface waterproofing membrane 332;

[0189] The top plate sealing paste 339 is arranged below the top polystyrene plate 337 and seals the bottom of the top plate deformation joint 23 (refer to Figure 8 B in the sentence understands “below”).

[0190] In the past, there was no deformation joint 2, and the joint R at the connection between the connecting passage 4 and the existing basement 5 was prone to cracks due to (concrete) shrinkage deformation or settlement deformation, which caused water leakage at the joint. The "waterproof structure at the connection between a new basement and an existing basement" of the present invention can solve the problem of cracks at the joint R at the connection between the connecting passage 4 and the existing basement 5 after the deformation joint 2 is set, thereby avoiding the water leakage caused by cracks at the joint R at the connection between the connecting passage 4 and the existing basement 5. Furthermore, the present invention also sets a first waterproof structure 1 on the back surface A of the connection R at the connection between the connecting passage 4 and the existing basement 5, and the first waterproof structure 1 can further improve the anti-seepage and anti-leakage capabilities of the joint R at the connection between the connecting passage 4 and the existing basement 5; because the present invention sets a deformation joint 2, the second waterproof structure 3 is designed in series to improve the anti-seepage and anti-leakage capabilities of the deformation joint 2 and its vicinity. The emergence of the present invention improves the anti-seepage and anti-leakage capabilities of the connection between the new basement 6 and the existing basement 4, which is conducive to protecting the safety of the structure.

[0191] In one embodiment, referring to Figure 2 , the first anchoring assembly 16 is provided in a plurality of groups; two adjacent groups of the first anchoring assembly 16 maintain a set spacing Q; similarly, referring to Figure 3 The second anchoring components 17 are also provided in a plurality of groups, and two adjacent groups of the second anchoring components 17 also maintain a set spacing Q. In one embodiment, the set spacing Q is 200 mm.

[0192] Reference Figure 4 , Figure 6 and Figure 2 In one embodiment, the steel plate 162 is a square steel plate, and its length×width×thickness dimensions are: 100mm×100mm×8mm.

[0193] Reference Figure 4In one embodiment, the first steel pressing member 163 and the second steel pressing member 172 are circular steel plates with a diameter × thickness dimension of 50 mm × 4 mm; or the first steel pressing member 163 and the second steel pressing member 172 are square steel plates with a length × width × thickness dimension of 50 mm × 50 mm × 4 mm.

[0194] In one embodiment, the diameters of the bottom foam plastic rod 314 , the side foam plastic rod 324 , and the top foam plastic rod 334 are 30 mm to 60 mm.

[0195] Reference Figure 4 , Figure 6 and Figure 8 In one embodiment, the deformation joint 2 is arranged 500 mm away from the joint between the connecting passage and the existing basement (ie, 500 mm away from the connection point R); the width W of the deformation joint 2 is 10 mm to 20 mm.

[0196] A waterproof structure at the connection between a newly built basement and an existing basement, which effectively prevents shrinkage and settlement from causing cracks in the structure by setting a deformation joint and a second waterproof structure, and avoids water leakage at cracks and connection joints; the present invention also has a first waterproof structure on the back surface of the water, which can effectively prevent water from entering the joint between the connection channel and the existing basement and causing damage to the structure. The present invention is conducive to preventing and controlling cracks in the structure, is easy to ensure quality, and has good anti-seepage and anti-leakage effects.

[0197] The first waterproof structure 1, expansion joint 2 and second waterproof structure 3 of the present invention can be technically transferred to other building structures for use, that is, the waterproof structure of the present invention is not limited to use in basement building structures, that is, the "new basement" and "existing basement" of the present invention can be building structures in a broad sense.

[0198] The other contents of the construction method of the connection structure between the new basement and the existing basement described in the present invention can be found in the prior art and will not be described in detail here.

[0199] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Therefore, any modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the technical solution of the present invention shall still fall within the scope of the technical solution of the present invention.

Claims

1. A construction method for the connection structure between a new basement and an existing basement, characterized in that: The construction steps include: S1, roughening of the interface; S2, tendon implantation; S3, pouring bottom surface fine stone concrete for leveling; S4. Lay the bottom waterproof membrane; S5. Lay additional waterproof membrane on the bottom surface, including laying below the deformation joint of the bottom plate; S6. Install bottom foam plastic rods along the length direction of the bottom plate deformation joint; S7, pouring bottom fine stone concrete protective layer; S8. Install the bottom plate external water stop along the length direction of the bottom plate deformation joint; S9, installation of bottom plate reinforcement, and pre-embedded first anchor rods with steel plates at set intervals on the back surface of the bottom plate; S10, first set the bottom polystyrene board at the bottom plate deformation joint to fill the lower part of the bottom plate deformation joint, then set the bottom plate embedded water stop, and finally set the bottom polystyrene board to fill the upper part of the bottom plate deformation joint; S11, installing the steel bars of the side walls on both sides, and pre-embedding the first anchor rods with steel plates at set intervals on the back surface of the side walls; S12, along the height direction of the deformation joints of the side walls on both sides, first set the side wall external water stop, then set the side wall polystyrene board to fill the outside of the side wall deformation joint, then set the side wall embedded water stop, and finally set the side wall polystyrene board to fill the inside of the side wall deformation joint; S13, pouring the bottom slab concrete and the side wall concrete with planned height; S14, erecting formwork support; S15, top plate reinforcement installation, and first anchor rods pre-embedded with steel plates at set intervals on the back surface of the top plate; S16, at the top plate deformation joint, first set the top polystyrene board to fill the lower part of the top plate deformation joint, then set the top plate embedded water stop, then set the top polystyrene board to fill the upper part of the top plate deformation joint, and finally set the top plate external water stop along the length direction of the top plate deformation joint; S17, pouring top slab and side wall concrete; S18, maintenance; S19. Set mortar leveling on the outer sides of both side walls; S20, firstly set the side foam plastic rods along the height direction of the side wall, then lay the side additional waterproof membrane, and finally lay the side waterproof membrane; S21, brickwork waterproof protection on both side walls; S22, pouring top surface fine stone concrete for leveling; S23, arranging the top foam plastic rod along the length direction of the top plate deformation joint, then laying the top additional waterproofing membrane, and finally laying the top waterproofing membrane; S24, pouring the top surface fine stone concrete protective layer; S25. Apply sealing paste to seal the deformation joint along the annular direction on the back surface of the deformation joint; S26, at the back of the water, drill holes at set intervals on the existing basement exterior wall; S27, second anchor construction; S28. Lay an L-shaped external waterstop along the circumferential direction of the back water surface, and use a first steel pressing piece and a first anchor nut to fix the L-shaped external waterstop.

2. The construction method of the connection structure between a new basement and an existing basement according to claim 1 is characterized in that: In the step S3, pour 150mm thick bottom fine stone concrete for leveling; In the step S22, a 150 mm thick top surface fine stone concrete is poured for leveling.

3. The construction method of the connection structure between a new basement and an existing basement according to claim 1, characterized in that: In the step S5, the laying width of the additional waterproof membrane on the bottom surface is 1000 mm; In the step S20, the laying width of the additional waterproof membrane on the side is 1000 mm; In the step S23, the laying width of the additional waterproof membrane on the top surface is 1000 mm.

4. The construction method of the connection structure between a new basement and an existing basement according to claim 1 is characterized in that: In the step S7, the thickness of the bottom fine stone concrete protective layer after pouring is 50 mm; In the step S24, the thickness of the top fine stone concrete protective layer after pouring is 50 mm.

5. The construction method of the connection structure between a new basement and an existing basement according to claim 1, characterized in that: In the step S9, a first anchor rod with a steel plate is pre-buried every 200 mm on the back surface of the bottom plate; In the step S11, a first anchor rod with a steel plate is pre-buried every 200 mm on the back surface of the side wall; In the step S15, a first anchor rod with a steel plate is pre-buried every 200 mm on the back surface of the top plate; In the step S26, holes are drilled every 200 mm on the outer wall of the existing basement; The second anchor rod in step S27 is arranged in the hole drilled in step S26.

6. The construction method of the connection structure between a new basement and an existing basement according to claim 1, characterized in that: In step S13, the planned height is 300 mm.

7. The construction method of the connection structure between a new basement and an existing basement according to claim 1, characterized in that: In the step S9, the step S11, and the step S15, the first anchor rod is an M8 anchor rod having a hook portion at the front end, wherein the steel plate and the first anchor rod are welded as one body; In the step S27, the second anchor rod is an M8 straight anchor rod.

8. The construction method of the connection structure between a new basement and an existing basement according to claim 1, characterized in that: In the step S10, the width of the bottom plate deformation seam is 10 mm to 20 mm; In the step S12, the width of the side wall deformation joint is 10 mm to 20 mm; In the step S16, the width of the top plate deformation joint is 10 mm to 20 mm; Among them, the width of the bottom plate deformation joint, the width of the side wall deformation joint, and the width of the top plate deformation joint are equal.

9. The construction method of the connection structure between a new basement and an existing basement according to claim 1, characterized in that: The bottom plate external waterstop, the side wall external waterstop and the top plate external waterstop are all made of rubber materials.

10. The construction method of the connection structure between a new basement and an existing basement according to claim 1, characterized in that: In the step S6, the diameter of the bottom foam plastic rod is 30 mm to 60 mm; In the step S20, the diameter of the side foam plastic rod is 30 mm to 60 mm; In the step S23, the diameter of the top foam plastic rod is 30 mm to 60 mm.