Method for adding and reducing hydraulic supports on working face with unequal inclined lengths

By monitoring the change in the working surface inclined length and the displacement of the top plate, adjusting the number of hydraulic brackets and supplementing support, the problem of unequal inclined lengths caused by the coal seam distribution in the coal mining working surface is solved, and the stability and safety of the mining operation are improved. Avoid the risk of roof crushing and flying slag.

CN119021737APending Publication Date: 2024-11-26HUATING COAL GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411203086.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The unequal slant length caused by the coal mining surface due to the coal seam allocation conditions affects the normal operation of the hydraulic support, resulting in difficulty in walking, difficulty in roof management and increased safety risks.

Method used

By monitoring the change in the working surface incline and the displacement of the top plate, adjusting the number of hydraulic brackets, supplementing support, setting early warning range and bracket addition and reduction strategies within different ranges, and drilling pressure relief and filling treatment in sections to ensure the stability of support and security.

Benefits of technology

It improves the stability of the mining operation, avoids the risk of roof crushing and flying gangue, reduces the risk of moving brackets, and ensures the safety and efficiency of the coal mining process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021737A_ABST
    Figure CN119021737A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of coal mining methods, in particular to an unequal inclined length working face hydraulic support adding and reducing method which comprises the steps that the change condition of the inclined length of a working face is determined, when a return airway and a transportation roadway are supported, displacement monitoring is carried out on a supported top plate, and the displacement monitoring is carried out. The number of the hydraulic supports is adjusted according to the inclined length change condition of the working face and the roof displacement monitoring condition of the return airway and the transportation roadway, and the roadway close to the preset distance range of the working face open-off cut is subjected to supplementary supporting according to the roof displacement condition of the return airway and the transportation roadway. According to the method for increasing and decreasing the hydraulic supports on the unequal inclined length working face, the supports can be increased and decreased conveniently, and the stability during stoping operation is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of coal mining methods, and particularly relates to a method for adding and subtracting hydraulic supports in a working face with unequal inclined lengths. Background Art

[0002] The layout of a coal mining working face is restricted by the occurrence conditions of the coal seam, which may result in inconsistent dip lengths (inclined lengths) in local sections. When the inclined length increases or decreases beyond a certain value, it will affect the normal coal mining in the working face. If the inclined length of the working face is shortened, it will lead to insufficient working space for the hydraulic supports installed in the working face, difficult movement, and blocked exits, affecting the normal pulling of the hydraulic supports. At the same time, due to the occurrence of the coal seam, when coal mining is carried out in the way of diagonal cutting, it will also cause changes in the length of the roof that actually needs to be supported in the working face. Also, if the inclined length of the working face increases, it will lead to insufficient roof protection area of the hydraulic supports installed in the working face, causing difficulties in roof management, resulting in roof fragmentation, affecting safety in production, and in severe cases, it may lead to the inclined length of the working face being greater than the effective cutting length of the shearer, causing the working face to be unable to cut normally. Summary of the Invention

[0003] The present invention aims to solve at least one of the technical problems in the related technologies to some extent. For this purpose, an embodiment of the present invention provides a method for adding and subtracting hydraulic supports in a working face with unequal inclined lengths, which is convenient for increasing or decreasing the supports and improving the stability during the coal mining operation.

[0004] The method for adding and subtracting hydraulic supports in a working face with unequal inclined lengths according to the embodiment of the present invention includes:

[0005] Determine the change situation of the inclined length of the working face;

[0006] During the support of the return airway and the haulage roadway, monitor the displacement of the roof being supported;

[0007] Adjust the number of hydraulic supports according to the change situation of the inclined length of the working face and the roof displacement monitoring situation of the return airway and the haulage roadway;

[0008] According to the roof displacement situation of the return airway and the haulage roadway, supplement the support for the roadway within a preset distance range near the working face cut-through.

[0009] The method for adding and subtracting hydraulic supports in a working face with unequal inclined lengths according to the embodiment of the present invention is convenient for increasing or decreasing the supports and improving the stability during the coal mining operation.

[0010] In some embodiments, set an early warning range for the roof displacement, and set the change amount of the inclined length of the working face as a.

[0011] If the displacement amount of the roof is lower than the early warning range, when the change amount of the inclined length of the working face is 4m < a ≤ 7m, add or subtract the hydraulic supports;

[0012] If the roof displacement is within the warning range, when the change in the inclined length of the working face is 2.5m < a ≤ 4m, add or reduce hydraulic supports.

[0013] If the roof displacement is higher than the warning range, when the change in the inclined length of the working face is 1.75m < a ≤ 2.5m, add or reduce hydraulic supports.

[0014] In some embodiments, the warning range is 50mm to 100mm.

[0015] In some embodiments, when driving a heading face, a hoisting chamber is set up in the haulage roadway.

[0016] In some embodiments, when the roof displacement is higher than the warning range, add single props to the corresponding return airway or haulage roadway for support.

[0017] In some embodiments, before coal mining, install advanced support brackets in front of and along the return airway.

[0018] In some embodiments, if the inclined length of the working face is greater than or equal to 200m and less than or equal to 150m, fill the gob areas of the working face, haulage roadway, and return airway.

[0019] If the inclined length of the working face is less than 150m, fill the gob area of the working face, and handle the gob areas of the haulage roadway and return airway by caving method.

[0020] In some embodiments, before coal mining, divide the pressure relief area into three zones: strong pressure relief zone, weak pressure relief zone, and non-pressure relief zone according to the elastic energy index, impact energy index, dynamic failure time, and uniaxial compressive strength of the roadway surrounding rock, and drill holes for pressure relief in the strong pressure relief zone and weak pressure relief zone.

[0021] In some embodiments, when the inclined length of the working face is shortened and it is necessary to reduce the hydraulic supports installed on the working face, extract the hydraulic supports on the working face and supplement them into the advanced support.

[0022] In some embodiments, before coal mining, set up roadway filling bodies arranged at intervals along the mining direction in the return airway. Brief Description of the Drawings

[0023] Figure 1 is a schematic diagram of a working face with unequal inclined lengths according to an embodiment of the present invention.

[0024] Reference Signs:

[0025] Working face 1, working face cutting eye 2,

[0026] Return airway 3, haulage roadway 4,

[0027] Gob area 5,

[0028] Hydraulic support 6, tunnel filling body 7, single column 8. DETAILED DESCRIPTION

[0029] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0030] like Figure 1 As shown, the method for adding or subtracting hydraulic supports 6 for working faces 1 of unequal oblique lengths according to an embodiment of the present invention includes determining a change in the oblique length of the working face 1, monitoring the displacement of the supported roof when supporting the return air lane 3 and the transport lane 4, adjusting the number of hydraulic supports 6 according to the change in the oblique length of the working face 1 and the monitored displacement of the roofs of the return air lane 3 and the transport lane 4, and supplementing support for the lanes 4 within a preset distance range adjacent to the working face cut 2 according to the displacement of the roofs of the return air lane 3 and the transport lane 4.

[0031] It should be understood that the calculation of the oblique length of the working face 1 is as follows: During the excavation of the working face 1, in order to ensure the recovery of coal resources, the coal seam floor is strictly followed to deliver the tunnel 4. Due to the difference in the occurrence of the coal seams, the high tunnel 4 will fluctuate in the up and down directions, which will cause the oblique length of the working face 1 to change. The specific calculation is: the oblique length 2 of the working face 1 = (return air elevation - transportation elevation) 2 + the horizontal distance 2 of the working face 1, that is, the Pythagorean theorem is used to calculate the oblique length of the working face. The horizontal distance of the working face refers to the straight-line distance between two points on the working face measured in the horizontal direction.

[0032] When the oblique length change of the working surface 1 exceeds the width of the bracket used for the working surface 1, it needs to be increased. The width of the bracket of the working surface 1 corresponds to the front scraper conveyor one by one, and the adjustable width range is small, that is, the range of the increaseable spacing of the hydraulic bracket 6 is small, and it cannot adapt to the oblique length change exceeding a certain range. At this time, it is necessary to reduce or increase the hydraulic bracket 6.

[0033] Before mining, that is, when excavating the return air tunnel 3 and the transport tunnel 4, the return air tunnel 3 and the transport tunnel 4 are supported. For example, the tunnel 4 is supported by anchor cables and anchor rods, and single columns 8 are set for support. The spacing of the single columns 8 in the mining direction can be set to 2.5m. At the same time, before mining, hydraulic supports 6 are set for the return air tunnel 3 and the transport tunnel 4. On the one hand, advance support can be provided during coal mining. On the other hand, when the oblique length of the working face 1 increases, the hydraulic supports 6 of the transport tunnel 4 or the return air tunnel 3 can be added to the working face cut 2 to facilitate subsequent coal mining work.

[0034] During support, the displacement of the roof is monitored. For example, separation displacement sensors are set to monitor the roof displacement, and the separation displacement sensors are existing roof displacement sensors. At the same time, the number of hydraulic supports 6 is adjusted according to the change in the inclined length of the working face 1 and the roof displacement monitoring conditions of the return airway 3 and the conveyor roadway 4 to avoid problems such as roof breakage and flying gangue caused by untimely support.

[0035] At the same time, according to the roof displacement conditions of the return airway 3 and the conveyor roadway 4, partial supplementary support is carried out on the return airway 3 and the conveyor roadway 4 near the cut-through of the adjacent working face 2 to improve the support stability before and after coal mining. The cut-through of the working face 2 refers to the coal mining area of the working face 1. At the same time, the supplementary support also avoids the situation where part of the roof is stressed and broken when the number of hydraulic supports 6 increases or decreases, reducing the risk during the movement of the support.

[0036] In the method for adding or subtracting hydraulic supports 6 in the unequal inclined-length working face 1 of the embodiment of the present invention, by adjusting the number of hydraulic supports 6 according to the change in the inclined length of the working face 1 and the roof displacement monitoring conditions of the return airway 3 and the conveyor roadway 4, while moving the hydraulic support 6, the safety during the movement of the hydraulic support 6 is ensured, avoiding the influence of roof breakage and flying gangue, and improving the stability during the coal mining operation. At the same time, the supplementary support also avoids the situation where part of the roof is stressed and broken when the number of hydraulic supports 6 increases or decreases, reducing the risk during the movement of the support.

[0037] In some embodiments, a warning range for the roof displacement is set. The change in the inclined length of the working face 1 is set as a. If the roof displacement is lower than the warning range, then when the change in the inclined length of the working face 1 is 4m < a ≤ 7m, the hydraulic support 6 is added or subtracted. If the roof displacement is within the warning range, then when the change in the inclined length of the working face 1 is 2.5m < a ≤ 4m, the hydraulic support 6 is added or subtracted.

[0038] If the roof displacement is higher than the warning range, then when the change in the inclined length of the working face 1 is 1.75m < a ≤ 2.5m, the hydraulic support 6 is added or subtracted.

[0039] Specifically, the change in the inclined length of the working face 1 is set as a. For example, if the roof displacement is lower than the warning range, then when the change in the inclined length of the working face 1 is 4m < a ≤ 7m, the hydraulic support 6 is added or subtracted. If the roof displacement is within the warning range, then when the change in the inclined length of the working face 1 is 2.5m < a ≤ 4m, the hydraulic support 6 is added or subtracted.

[0040] If the displacement of the roof slab is higher than the warning range, when the change in the inclined length of the working face 1 is 1.75m < a ≤ 2.5m, the hydraulic support 6 is increased or decreased. To avoid excessive length of the unsupported part of the roof slab resulting in roof breakage, it should be understood that when the length of the inclined slab decreases to such an extent that the hydraulic support 6 can no longer support at the cutting eye 2 of the working face, the hydraulic support 6 is decreased according to the on-site situation at this time.

[0041] Furthermore, the warning range is 50mm - 100mm. By setting the roof warning range, it is convenient for underground workers to determine the increase or decrease of the hydraulic support 6 according to the warning range.

[0042] Furthermore, the warning range can also be determined according to the rock properties of the roof slab and the stress change of the bolt support.

[0043] In some embodiments, when driving the heading face 1, a hoisting chamber is set in the haulage roadway 4.

[0044] Since there are coal conveying equipment in the haulage roadway 4, it is not convenient to increase or decrease the hydraulic support 6 in the haulage roadway 4. By setting a hoisting chamber, when the hydraulic support 6 in the haulage roadway 4 is decreased, the hydraulic support 6 can be arranged in the hoisting chamber. By constructing the hoisting chamber in the haulage roadway 4 in advance, when adding a support to the working face 1, the hydraulic support 6 is assembled in advance for adding a support. When reducing a support, when the working face 1 is pushed to the hoisting chamber, the support is pulled out and disassembled for subsequent withdrawal.

[0045] In some embodiments, when the displacement of the roof slab is higher than the warning range, single props 8 are added to the corresponding return airway 3 or haulage roadway 4 for support. For example, when driving for support, the spacing between the single props 8 in the return airway 3 and the haulage roadway 4 can be 2.5m. When the displacement of the roof slab is higher than the warning range, the corresponding return airway 3 or haulage roadway 4 can be increased with single props 8 for support. For example, the spacing between the single props 8 in the coal mining direction is adjusted to 1.0m - 0.5m. The stability and safety of the support are increased.

[0046] In some embodiments, before coal mining, an advanced support bracket is installed in the return airway 3 in advance.

[0047] In some embodiments, if the inclined length of the working face 1 is greater than or equal to 200m and less than or equal to 150m, the gob 5 of the working face 1, the gob 5 of the haulage roadway 4 and the gob 5 of the return airway 3 are all filled. The filling treatment can effectively support the gob 5, reduce the risk of roof subsidence and caving, and thus reduce the pressure on the support at the coal mining end. This treatment method is beneficial to maintaining the stability of the coal mining face 1, reducing the deformation and damage of the support structure, and improving the safety of coal mining operations.

[0048] If the inclined length of the working face 1 is less than 150m, the goaf 5 of the working face 1 is backfilled, and the goaf 5 of the transport tunnel 4 and the return air tunnel 3 are caving treated. The backfilling treatment of the goaf 5 of the working face 1 still helps to support the roof, but the caving treatment of the goaf 5 of the transport tunnel 4 and the return air tunnel 3 can reduce the cost of coal mining while ensuring the stability and safety of the support of the coal mining working face 1. In some embodiments, before mining, the pressure relief area is divided into three zones: strong pressure relief area, weak pressure relief area, and non-pressure relief area according to the elastic energy index, impact energy index, dynamic failure time, and uniaxial compressive strength of the tunnel surrounding rock, and the strong pressure relief area and the weak pressure relief area are depressurized by drilling. Set the elastic energy index to W ET , the impact energy index is K E , the dynamic failure time is Dt, and the uniaxial compressive strength is Rc.

[0049] If W ET <2, K E When <1.5, Dt>500, and Rc<7 are satisfied at the same time, the tunnel surrounding rock is a non-pressure relief area. The tunnel surrounding rock can be understood as the surrounding rock around the return air tunnel or transport tunnel.

[0050] If 2≤W ET ≤5,1.5≤K E When ≤5, 50≤Dt≤500, and 7≤Rc≤14 are met at the same time, the tunnel surrounding rock is a weak pressure relief zone.

[0051] If W ET >5,K E >5, Dt≤50, 14≤Rc are satisfied at the same time, the roadway is a strong pressure relief area, as shown in the following table:

[0052] Impact hazard Non-decompression area Weak pressure relief area Strong pressure relief area Elasticity Index <![CDATA[W ET <2]]> <![CDATA[2≤W ET ≤5]]> <![CDATA[W ET >5]]> Impact Energy Index <![CDATA[K E <1.5]]> <![CDATA[1.5≤K E ≤5]]> <![CDATA[K E >5]]> Dynamic destruction time / ms Dt>500 50≤Dt≤500 Dt≤50 Uniaxial compressive strength / MPa Rc<7 7≤Rc≤14 14≤Rc

[0053] The tunnel surrounding rock is then divided into three zones: strong pressure relief zone, weak pressure relief zone, and non-pressure relief zone, to facilitate segmented pressure relief of the tunnel surrounding rock, reduce the number of pressure relief drill holes, and reduce drilling and pressure relief costs.

[0054] Furthermore, when the inclined length of the working face 1 is shortened and it is necessary to reduce the number of hydraulic supports 6 installed on the working face 1, the hydraulic supports 6 of the working face 1 are pulled out and added to the advance support. It is convenient to dismantle the hydraulic supports 6 for subsequent withdrawal.

[0055] Furthermore, before mining, tunnel filling bodies 7 are arranged at intervals in the return air tunnel 3 along the mining direction, thereby improving the stability and safety of the support.

[0056] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0057] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0058] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0059] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0060] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0061] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A method for adding and subtracting hydraulic supports on unequal inclined length working surfaces, characterized in that: Including: Determine the change of the inclined length of the working face; When supporting the return airway and the haulage roadway, monitor the displacement of the roof being supported; Adjust the number of hydraulic supports according to the change of the inclined length of the working face and the roof displacement monitoring of the return airway and the haulage roadway; According to the roof displacement of the return airway and the haulage roadway, supplement the support for the roadway within the preset distance range near the open-off cut of the adjacent working face.

2. The method for adding and subtracting hydraulic supports on unequal inclined working surfaces according to claim 1 is characterized in that: Set the warning range of roof displacement, and set the change amount of the inclined length of the working face as a. If the displacement of the roof is lower than the warning range, when the change amount of the inclined length of the working face is 4m < a ≤ 7m, increase or decrease the hydraulic supports; If the roof displacement is within the warning range, when the change amount of the inclined length of the working face is 2.5m < a ≤ 4m, increase or decrease the hydraulic supports; If the roof displacement is higher than the warning range, when the change amount of the inclined length of the working face is 1.75m < a ≤ 2.5m, increase or decrease the hydraulic supports.

3. The method for adding and subtracting hydraulic supports on unequal inclined length working surfaces according to claim 2 is characterized in that: The warning range is 50mm to 100mm.

4. The method for adding and subtracting hydraulic supports on unequal inclined length working surfaces according to claim 2 is characterized in that: When driving the heading face, set up a hoisting chamber in the haulage roadway.

5. The method for adding and subtracting hydraulic supports on unequal inclined length working surfaces according to claim 2 is characterized in that: When the roof displacement is higher than the warning range, add single props to support the corresponding return airway or haulage roadway.

6. The method for adding and subtracting hydraulic supports on unequal inclined length working surfaces according to claim 4 is characterized in that: Before coal mining, install advanced support brackets in front of the return airway.

7. The method for adding and subtracting hydraulic supports on unequal inclined working surfaces according to claim 1, characterized in that: If the inclined length of the working face is greater than or equal to 200m and less than or equal to 150m, fill the goaf of the working face, the goaf of the haulage roadway and the goaf of the return airway; If the inclined length of the working face is less than 150m, fill the goaf of the working face, and use the caving method to handle the goaf of the haulage roadway and the return airway.

8. The method for adding and subtracting hydraulic supports on unequal inclined length working surfaces according to claim 1, characterized in that: Before coal mining, divide the pressure relief area into three zones: strong pressure relief zone, weak pressure relief zone, and non-pressure relief zone according to the elastic energy index, impact energy index, dynamic failure time and uniaxial compressive strength of the roadway surrounding rock, and drill holes for pressure relief in the strong pressure relief zone and the weak pressure relief zone.

9. The method for adding and subtracting hydraulic supports on unequal inclined working surfaces according to claim 6, characterized in that: When the inclined length of the working face shortens and the number of supports installed on the working face needs to be reduced, withdraw the working face supports and supplement them into the advanced support.

10. The method for adding and subtracting hydraulic supports on unequal inclined working surfaces according to any one of claims 1 to 9, characterized in that: Before coal mining, set up roadway filling bodies arranged at intervals along the mining direction in the return airway.