Efficient desorption device for rapidly measuring gas parameters

By setting the inner cavity, outer cavity, piston plate and sealing mechanism in the gas desorption device, the continuous desorption of gas is achieved, and the circulation cavity function of the metering mechanism is used to solve the problem of incomplete and time-consuming gas desorption data in the prior art. , realizes fast and accurate gas parameter determination.

CN119023499APending Publication Date: 2024-11-26CHINA COAL TECH & ENG GRP SHENYANG ENG CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410997340.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

When the existing gas desorption meter has a high gas desorption capacity, all the water in the measuring tube flows out and needs to stop desorption and re-add water, resulting in incomplete and time-consuming gas desorption data, and it is impossible to quickly and accurately determine gas parameters.

Method used

An efficient desorption device is designed, including a testing mechanism and a metering mechanism, which realizes continuous and uninterrupted desorption of gas through the adjustment of the inner cavity, the outer cavity, the piston plate and the sealing mechanism, and a circulating cavity is set up in the metering mechanism to circulate the metering water. , reduce manual operations.

Benefits of technology

It realizes rapid and accurate measurement of gas parameters, improves the fluency of the adsorption and measurement accuracy, reduces manual operation, improves the test efficiency, and improves the convenience of the device through the use of circulating water.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119023499A_ABST
    Figure CN119023499A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of gas measurement, in particular to an efficient desorption device for rapidly measuring gas parameters, which comprises a support, and a coal sample tank, a testing mechanism, a metering mechanism and a water supply cylinder which are fixedly arranged on the support, the testing mechanism is communicated with the water supply cylinder through a hose; the number of the metering mechanisms is two, the two metering mechanisms are both communicated with the testing mechanism through hoses, the two metering mechanisms are both connected with the water supply cylinder through hoses, the water supply cylinder supplies water to the testing mechanism, water of the testing mechanism enters the metering mechanisms to be metered, and the metered water enters the water supply cylinder again. According to the gas desorption device, gas can be continuously desorbed, parameters of the gas can be rapidly and accurately measured under the cooperation of the metering mechanism, and the gas desorption smoothness is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of gas determination, in particular to a high-efficiency desorption device for rapid determination of gas parameters. Background Art

[0002] Coalbed methane (gas) refers to hydrocarbon gas stored in coal seams with methane as the main component, mainly adsorbed on the surface of coal matrix particles, and partially free in coal pores or dissolved in coal seam water. It is a companion mineral resource of coal and an unconventional natural gas. It is a clean, high-quality energy and chemical raw material that has emerged internationally in the past 10 to 20 years. When mining coalbed methane, it is necessary to quickly and accurately measure the coal seam gas content, gas pressure and drill cuttings gas desorption indicators, which can reflect the size of the coal and gas outburst hazard and ensure the safety of gas mining.

[0003] At present, a gas desorption instrument is needed to measure coal seam gas parameters. The existing desorption instrument places the coal sample in a desorption chamber, and then connects the desorption chamber to a measuring tube filled with water through an air pipe. The desorbed gas enters the measuring tube and squeezes the water out of the measuring cylinder. Then, the desorbed gas parameters are calculated according to the scale line displayed on the liquid level. However, when encountering a large amount of gas desorption, that is, when all the water in the measuring tube flows out, this method needs to stop the desorption work and add water to the measuring tube again. In this process, the gas desorption data will be incomplete, resulting in a large error in the obtained gas parameters. In addition, a lot of time will be wasted in changing the water, and the gas parameters cannot be measured quickly and accurately.

[0004] Therefore, it is necessary to provide an efficient desorption device for rapid determination of gas parameters to solve the problems raised in the above background technology. Summary of the invention

[0005] To achieve the above-mentioned object, the present invention provides the following technical solutions: an efficient desorption device for rapid determination of gas parameters, comprising a bracket and a coal sample tank, a test mechanism, a metering mechanism and a water supply cylinder fixedly arranged on the bracket, wherein the coal sample tank is connected to the test mechanism through a ventilation pipe, and the test mechanism is connected to the water supply cylinder through a hose; the metering mechanism is configured with two, both of which are connected to the test mechanism through a hose, and both of which are connected to the water supply cylinder through a hose, and the water supply cylinder supplies water to the test mechanism, and the water of the test mechanism enters the metering mechanism for metering, and the metered water re-enters the water supply cylinder;

[0006] The testing mechanism comprises a shell and an annular plate, wherein the annular plate is fixedly arranged in the shell and divides the shell into an inner cavity and an outer cavity of the same size, a piston plate 1 is sealingly and slidably arranged in the inner cavity, a piston plate 2 is sealingly and slidably arranged in the outer cavity, and the piston plate 1 and the piston plate 2 are fixedly connected by a connecting rod;

[0007] A gas transmission channel is provided on the annular plate, and the gas transmission channel is connected with the coal sample tank through a ventilation pipe, the input end of the gas transmission channel is connected with the outer cavity, and the output end of the gas transmission channel is connected with the inner cavity. A blocking mechanism is slidably provided on the gas transmission channel to realize that the inner cavity and the outer cavity are alternately connected with the gas transmission channel, and the gas desorption work can be carried out continuously and uninterruptedly.

[0008] The inner cavity is provided with a water inlet 1, a water outlet 1 and a gas outlet 1, wherein the water inlet 1 is connected to the water supply cylinder through a hose, and the water outlet 1 is connected to the metering mechanism through a hose;

[0009] And the water inlet 1, the water outlet 1 and the air outlet 1 are all provided with a one-way valve 1.

[0010] The outer cavity is provided with a second water inlet, a second water outlet and a second air outlet, wherein the second water inlet is connected to the water supply cylinder through a hose, and the second water outlet is connected to the metering mechanism through a hose;

[0011] And the second water inlet, the second water outlet and the second air outlet are all provided with a second one-way valve.

[0012] The blocking mechanism includes a blocking rod, a deflection telescopic rod, a push block 1 and a push block 2, wherein the blocking rod is hollow and seals and slides along the outer side of the gas transmission channel, the deflection telescopic rod is configured in two, the two deflection telescopic rods are respectively rotatably arranged at the input end and the output end of the shell and the two deflection telescopic rods are hinged to the blocking rod, the push block 1 and the push block 2 are respectively seals and slides at the input end and the output end of the shell, and the push block 1 penetrates the shell and extends into the inner cavity, the push block 2 penetrates the shell and extends into the outer cavity, and the other ends of the two deflection telescopic rods are respectively hinged to the push block 1 and the push block 2.

[0013] The metering mechanism includes a cylinder, a partition and a push plate, wherein the partition is fixedly arranged in the cylinder and divides the cylinder into a measuring chamber and a circulation chamber of the same size, and the push plate is sealingly slidably arranged in the circulation chamber and a hydraulic rod is arranged between the cylinder.

[0014] The partition is provided with a connecting hole, the connecting hole communicates the measuring chamber with the circulation chamber, and a one-way valve three is provided in the connecting hole.

[0015] The size of the measuring cavity is the same as that of the inner cavity and the outer cavity, and scale lines are provided on the measuring cavity;

[0016] The measuring cavity is provided with a vent hole 1 and a water inlet 3, wherein the water inlets 3 on the two metering mechanisms are respectively connected with the inner cavity and the outer cavity through a hose, and the vent hole 1 is located above the measuring cavity and is controlled by a solenoid valve;

[0017] The circulation chamber is provided with a drain port three and a vent hole two, wherein the drain port three is located at the top of the circulation chamber and is connected to the water supply cylinder through a hose, a one-way valve four is provided at the drain port three, and the vent hole two is located at the bottom of the circulation chamber.

[0018] Compared with the prior art, the present invention provides an efficient desorption device for rapid determination of gas parameters, which has the following features:

[0019] Beneficial effects:

[0020] In the present invention, the inner cavity, outer cavity, piston plate one, piston plate two and the regulating action of the sealing mechanism arranged in the test mechanism can enable the gas to be desorbed continuously and uninterruptedly, and with the cooperation of the metering mechanism, the gas parameters can be measured quickly and accurately, thereby improving the fluency of gas desorption, and no manual secondary operation is required, thereby effectively improving the test efficiency and measurement accuracy. In addition, a circulation chamber is provided in the metering mechanism, and the circulation chamber can be used to re-transport the metered water to the water supply cylinder, so that the metered water can be recycled, further improving the convenience of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0022] Figure 2 It is a structural schematic diagram of the testing mechanism in the present invention;

[0023] Figure 3 for Figure 2 A magnified schematic diagram of part A;

[0024] Figure 4 for Figure 2 An enlarged schematic diagram of part B;

[0025] Figure 5 It is a structural schematic diagram of the metering mechanism in the present invention;

[0026] In the figure: 1. bracket; 2. coal sample tank; 3. testing mechanism; 31. shell; 32. annular plate; 321. gas transmission channel; 33. inner cavity; 331. water inlet 1; 332. drain outlet 1; 333. exhaust outlet 1; 34. outer cavity; 341. water inlet 2; 342. drain outlet 2; 343. exhaust outlet 2; 35. piston plate 1; 36. piston plate 2; 37. connecting rod; 38. blocking mechanism; 381. blocking rod; 382. deflection telescopic rod; 383. push block 1; 384. push block 2; 4. metering mechanism; 41. cylinder; 42. partition; 421. connecting hole; 43. push plate; 44. measuring cavity; 441. vent hole 1; 442. water inlet 3; 45. circulation cavity; 451. drain outlet 3; 452. vent hole 2; 5. water supply cylinder. DETAILED DESCRIPTION

[0027] The present invention will be described in detail below with reference to the accompanying drawings.

[0028] See also Figure 1 to Figure 5 In an embodiment of the present invention, a high-efficiency desorption device for rapid determination of gas parameters includes a bracket 1 and a coal sample tank 2, a test mechanism 3, a metering mechanism 4 and a water supply cylinder 5 fixedly arranged on the bracket 1, wherein the coal sample tank 2 is connected to the test mechanism 3 through a vent pipe, and the test mechanism 3 is connected to the water supply cylinder 5 through a hose; the metering mechanism 4 is configured with two, both of which are connected to the test mechanism 3 through a hose, and both of which are connected to the water supply cylinder 5 through a hose, and the water supply cylinder 5 supplies water to the test mechanism 3, and the water of the test mechanism 3 enters the metering mechanism 4 for metering, and the metered water re-enters the water supply cylinder 5;

[0029] The testing mechanism 3 comprises a housing 31 and an annular plate 32, wherein the annular plate 32 is fixedly arranged in the housing 31 to separate the housing 31 into an inner cavity 33 and an outer cavity 34 of the same size, a piston plate 1 35 is sealingly and slidably arranged in the inner cavity 33, a piston plate 2 36 is sealingly and slidably arranged in the outer cavity 34, and the piston plate 1 35 and the piston plate 2 36 are fixedly connected by a connecting rod 37;

[0030] A gas delivery channel 321 is provided on the annular plate 32, and the gas delivery channel 321 is connected to the coal sample tank 2 through a ventilation pipe, the input end of the gas delivery channel 321 is connected to the outer cavity 34, and the output end of the gas delivery channel 321 is connected to the inner cavity 33. A blocking mechanism 38 is slidably provided on the gas delivery channel 321 to achieve alternating communication between the inner cavity 33 and the outer cavity 34 and the gas delivery channel 321, so that the gas desorption work can be carried out continuously and uninterruptedly.

[0031] During implementation, in the initial state, the piston plate 1 35 and the piston plate 2 36 are located at the output end of the shell 31, the outer cavity 34 is full of water, and there is no water in the inner cavity 33, the gas transmission channel 321 is connected with the outer cavity 34 but not connected with the inner cavity 33, and then the coal sample is placed in the coal sample tank 2, and the coal sample gas is desorbed and input into the testing mechanism 3 through the ventilation pipe, and the piston plate 2 36 slides under the action of air pressure to squeeze the water in the outer cavity 34 into the metering mechanism 4, and drives the piston plate 1 35 to slide under the action of the connecting rod 37, so that the water in the water supply cylinder 5 enters the inner cavity 33 under the action of suction, and when the water in the outer cavity 34 is completely squeezed, that is, the piston plate 2 36 touches the output end of the outer cavity 34, the push block 2 384 slides under the action of the piston plate 2 36, thereby driving the blocking rod 381 to slide, so that the gas transmission The channel 321 is connected with the inner cavity 33 and closed with the outer cavity 34, and then the desorbed gas enters the inner cavity 33 and pushes the piston plate 35 to slide, squeezing the water in the inner cavity 33 into the metering mechanism 4, and drives the piston plate 2 36 to slide under the action of the connecting rod 37, so that the water in the water supply cylinder 5 enters the outer cavity 34 under the action of suction. When the water in the inner cavity 33 is completely squeezed, that is, the piston plate 35 touches the input end of the inner cavity 33, the push block 383 slides under the action of the piston plate 35, and then drives the blocking rod 381 to slide, so that the gas transmission channel 321 is closed with the inner cavity 33 and connected with the outer cavity 34, and then the desorbed gas enters the outer cavity 34, so that the gas desorption process can be carried out continuously and uninterruptedly in this cycle, and there is no need for manual secondary water change, which makes the test efficiency and measurement accuracy higher.

[0032] In this embodiment, Figure 2 The inner cavity 33 is provided with a water inlet 331, a water outlet 332 and a gas outlet 333, wherein the water inlet 331 is connected to the water supply cylinder 5 through a hose, and the water outlet 332 is connected to the metering mechanism 4 through a hose;

[0033] The water inlet 331 , the water outlet 332 and the air outlet 333 are all provided with a one-way valve 1.

[0034] In this embodiment, Figure 2 The outer cavity 34 is provided with a second water inlet 341, a second water outlet 342 and a second air outlet 343, wherein the second water inlet 341 is connected to the water supply cylinder 5 through a hose, and the second water outlet 342 is connected to the metering mechanism 4 through a hose;

[0035] The second water inlet 341 , the second water outlet 342 and the second air outlet 343 are all provided with a second one-way valve.

[0036] In particular, the one-way valve 1 and the one-way valve 2 are arranged so that the water inlet 1 331 and the water inlet 2 341 can only take in water but not drain water, the drain outlet 1 332 and the drain outlet 2 342 can only transport water to the metering mechanism 4 in one direction, and the exhaust port 1 333 and the exhaust port 2 343 can only discharge the gas entering the inner cavity 33 and the outer cavity 34 but will not inhale the external air, thereby ensuring that the drainage and water supply of the inner cavity 33 and the outer cavity 34 are achieved only by the sliding of the piston plate 1 35 and the piston plate 2 36, thereby ensuring that the gas desorption work is carried out continuously and uninterruptedly.

[0037] In this embodiment, Figure 3 and Figure 4 The blocking mechanism 38 includes a blocking rod 381, a deflection telescopic rod 382, ​​a push block 1 383 and a push block 2 384, wherein the blocking rod 381 is hollow and seals and slides along the outer side of the gas transmission channel 321, and the deflection telescopic rod 382 is configured in two, and the two deflection telescopic rods 382 are respectively rotatably arranged at the input end and the output end of the shell 31 and the two deflection telescopic rods 382 are hinged to the blocking rod 381, the push block 1 383 and the push block 2 384 are respectively seal-slidably arranged at the input end and the output end of the shell 31, and the push block 1 383 penetrates the shell 31 and extends into the inner cavity 33, and the push block 2 384 penetrates the shell 31 and extends into the outer cavity 34, and the other ends of the two deflection telescopic rods 382 are respectively hinged to the push block 1 383 and the push block 2 384.

[0038] During implementation, when the piston plate 2 36 touches the output end of the outer chamber 34, that is, when all the water in the outer chamber 34 is squeezed out, the push block 2 384 slides under the action of the piston plate 2 36, thereby driving the deflection telescopic rod 382 to deflect, so that the blocking rod 381 slides toward the input end of the shell 31, thereby connecting the gas transmission channel 321 with the inner chamber 33 and sealing the gas transmission channel 321 with the outer chamber 34, and at this time, the desorbed gas can continuously enter the inner chamber 33. , and pushes the piston plate 35 to slide. When the water in the inner cavity 33 is completely squeezed out, the piston plate 35 slides to the input end of the inner cavity 33, causing the push block 383 to slide, thereby driving the deflection telescopic rod 382 to deflect, causing the blocking rod 381 to slide toward the output end of the shell 31, thereby connecting the gas transmission channel 321 with the outer cavity 34 and closing the gas transmission channel 321 with the inner cavity 33. This cycle allows the gas desorption work to be carried out continuously and uninterruptedly.

[0039] In this embodiment, Figure 5The metering mechanism 4 includes a cylinder 41, a partition 42 and a push plate 43, wherein the partition 42 is fixedly arranged in the cylinder 41 and divides the cylinder 41 into a measuring chamber 44 and a circulation chamber 45 of the same size, and the push plate 43 is sealingly slidably arranged in the circulation chamber 45 and a hydraulic rod is arranged between the cylinder 41.

[0040] In this embodiment, Figure 5 The partition plate 42 is provided with a connecting hole 421 , the connecting hole 421 connects the measuring chamber 44 and the circulation chamber 45 , and a one-way valve 3 is provided in the connecting hole 421 .

[0041] In this embodiment, the size of the measuring cavity 44 is the same as that of the inner cavity 33 and the outer cavity 34, and a scale line is provided on the measuring cavity 44;

[0042] The measuring cavity 44 is provided with a vent hole 1 441 and a water inlet 3 442, wherein the water inlets 3 442 on the two metering mechanisms 4 are respectively connected with the inner cavity 33 and the outer cavity 34 through hoses, and the vent hole 1 441 is located above the measuring cavity 44 and is controlled by a solenoid valve;

[0043] The circulation chamber 45 is provided with a drain outlet 3 451 and a vent hole 2 452, wherein the drain outlet 3 451 is located at the top of the circulation chamber 45 and is connected to the water supply cylinder 5 through a hose, a one-way valve 4 is provided at the drain outlet 3 451, and the vent hole 2 452 is located at the bottom of the circulation chamber 45.

[0044] During implementation, first control the solenoid valve to open the vent hole 441. When all the water in the outer cavity 34 enters the measuring cavity 44, record the liquid level at this time. At this time, the desorbed gas enters the inner cavity 33 and squeezes the water in the inner cavity 33 into another metering mechanism 4. During this process, the push plate 43 is driven by the hydraulic rod to slide downward to draw the water in the measuring cavity 44 into the circulation cavity 45 through the connecting hole 421. Then, the push plate 43 is driven to slide upward to squeeze the water in the circulation cavity 45 into the water supply cylinder 5 through the drain port 3 451, so that the metering mechanism 4 can automatically discharge the water after completing one metering to facilitate the next metering. Similarly, when the water in the inner cavity 33 completely enters the measuring cavity 44 in another metering mechanism 4, the measured water is discharged in this way, and the uninterrupted metering work is performed in this cycle, thereby effectively improving the fluency of the test and improving the measurement accuracy.

[0045] To sum up, when the present invention is implemented, it is only necessary to place the coal sample in the coal sample tank 2, and then the gas can be continuously and uninterruptedly desorbed through the adjustment of the inner cavity 33, the outer cavity 34, the piston plate 1 35, the piston plate 2 36 and the sealing mechanism 38 arranged in the test mechanism 3, and with the cooperation of the metering mechanism 4, the gas parameters can be measured quickly and accurately, thereby improving the smoothness of gas desorption, and no manual secondary operation is required, thereby effectively improving the test efficiency and measurement accuracy, and a circulation chamber 45 is provided in the metering mechanism 4, and the circulation chamber 45 can be used to re-transport the metered water to the water supply cylinder 5, so that the metered water can be recycled, further improving the convenience of the present invention.

[0046] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An efficient desorption device for rapid determination of gas parameters, characterized in that: It comprises a bracket and a coal sample tank, a test mechanism, a metering mechanism and a water supply cylinder fixedly arranged on the bracket, wherein the coal sample tank is connected to the test mechanism through a vent pipe, and the test mechanism is connected to the water supply cylinder through a hose; the metering mechanism is provided with two, both of which are connected to the test mechanism through a hose, and both of which are connected to the water supply cylinder through a hose, and the water supply cylinder supplies water to the test mechanism, and the water of the test mechanism enters the metering mechanism for metering, and the measured water re-enters the water supply cylinder; The testing mechanism comprises a shell and an annular plate, wherein the annular plate is fixedly arranged in the shell and divides the shell into an inner cavity and an outer cavity of the same size, a piston plate 1 is sealingly and slidably arranged in the inner cavity, a piston plate 2 is sealingly and slidably arranged in the outer cavity, and the piston plate 1 and the piston plate 2 are fixedly connected by a connecting rod; A gas transmission channel is provided on the annular plate, and the gas transmission channel is connected with the coal sample tank through a ventilation pipe, the input end of the gas transmission channel is connected with the outer cavity, and the output end of the gas transmission channel is connected with the inner cavity. A blocking mechanism is slidably provided on the gas transmission channel to realize that the inner cavity and the outer cavity are alternately connected with the gas transmission channel, and the gas desorption work can be carried out continuously and uninterruptedly.

2. The high-efficiency desorption device for rapid determination of gas parameters according to claim 1 is characterized in that: The inner cavity is provided with a water inlet 1, a water outlet 1 and a gas outlet 1, wherein the water inlet 1 is connected to the water supply cylinder through a hose, and the water outlet 1 is connected to the metering mechanism through a hose; And the water inlet 1, the water outlet 1 and the air outlet 1 are all provided with a one-way valve 1.

3. The high-efficiency desorption device for rapid determination of gas parameters according to claim 1 is characterized in that: The outer cavity is provided with a second water inlet, a second water outlet and a second air outlet, wherein the second water inlet is connected to the water supply cylinder through a hose, and the second water outlet is connected to the metering mechanism through a hose; And the second water inlet, the second water outlet and the second air outlet are all provided with a second one-way valve.

4. The high-efficiency desorption device for rapid determination of gas parameters according to claim 1 is characterized in that: The blocking mechanism includes a blocking rod, a deflection telescopic rod, a push block 1 and a push block 2, wherein the blocking rod is hollow and seals and slides along the outer side of the gas transmission channel, the deflection telescopic rod is configured in two, the two deflection telescopic rods are respectively rotatably arranged at the input end and the output end of the shell and the two deflection telescopic rods are hinged to the blocking rod, the push block 1 and the push block 2 are respectively seals and slides at the input end and the output end of the shell, and the push block 1 penetrates the shell and extends into the inner cavity, the push block 2 penetrates the shell and extends into the outer cavity, and the other ends of the two deflection telescopic rods are respectively hinged to the push block 1 and the push block 2.

5. The high-efficiency desorption device for rapid determination of gas parameters according to claim 1 is characterized in that: The metering mechanism includes a cylinder, a partition and a push plate, wherein the partition is fixedly arranged in the cylinder and divides the cylinder into a measuring chamber and a circulation chamber of the same size, and the push plate is sealingly slidably arranged in the circulation chamber and a hydraulic rod is arranged between the cylinder.

6. The high-efficiency desorption device for rapid determination of gas parameters according to claim 5, characterized in that: The partition is provided with a connecting hole, the connecting hole communicates the measuring chamber with the circulation chamber, and a one-way valve three is provided in the connecting hole.

7. The high-efficiency desorption device for rapid determination of gas parameters according to claim 1, characterized in that: The size of the measuring cavity is the same as that of the inner cavity and the outer cavity, and scale lines are arranged on the measuring cavity.

8. The high-efficiency desorption device for rapid determination of gas parameters according to claim 1, characterized in that: The measuring cavity is provided with a vent hole 1 and a water inlet 3, wherein the water inlets 3 on the two metering mechanisms are connected with the inner cavity and the outer cavity respectively through a hose, and the vent hole 1 is located above the measuring cavity and is controlled by a solenoid valve.

9. The high-efficiency desorption device for rapid determination of gas parameters according to claim 1, characterized in that: The circulation chamber is provided with a drain port three and a vent hole two, wherein the drain port three is located at the top of the circulation chamber and is connected to the water supply cylinder through a hose, a one-way valve four is provided at the drain port three, and the vent hole two is located at the bottom of the circulation chamber.