Method for judging sliding surface of landslide by combining drilling and high-density electrical method

Through the combination of drilling and high-density electrical method, combined with satellite remote sensing and electrode module data, landslide sliding surface analysis and BIM modeling are carried out, which solves the problem of inconvenience in landslide control construction, and achieves more accurate landslide sliding surface judgment and management design. Improves the accuracy and convenience of construction.

CN119024457APending Publication Date: 2024-11-26SHENZHEN DASHENG HI TECH ENG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411134679.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the prior art, landslide treatment construction is inconvenient and lack of simulation and prediction, resulting in the inability to provide effective guidance on landslide treatment design and construction.

Method used

Using drilling and high-density electrical method, the landslide geological disaster characteristic information is obtained through satellite remote sensing geological interpretation, multiple electrode modules are set up to obtain three-dimensional sliding surface data, combined with geological drilling and in-hole testing, comprehensive analysis and BIM modeling are carried out. Guide the design and construction of landslide treatment.

Benefits of technology

More accurately determine the position and shape of the landslide sliding surface, provide more accurate landslide disaster risks and control conditions, and improve the convenience and accuracy of landslide control construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119024457A_ABST
    Figure CN119024457A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of landslide sliding surface judgment, and discloses a method for judging a landslide sliding surface by combining drilling and a high-density electrical method, which comprises the following steps of: (1) carrying out satellite remote sensing geological interpretation to obtain landslide geological disaster information; (2) a plurality of electrode modules are arranged between the slope toe and the rear edge, and data of a three-dimensional sliding surface of the landslide are obtained and analyzed; (3) geological drilling is carried out, geological real object information is obtained, and in-hole testing and indoor rock testing are carried out at the same time; and (4) comprehensively analyzing and comparing, judging the specific position and form of the sliding surface, carrying out BIM modeling, and guiding landslide control design and construction. According to the method, information is obtained through satellite remote sensing, drilling and a high-density electrical method are combined, mutual comparison and length complementation are carried out, the position and form of the landslide sliding face are determined more accurately, more accurate conditions are provided for next landslide disaster risk and treatment, then BIM modeling is carried out, treatment and construction of the landslide are guided based on BIM modeling, and treatment and construction of the landslide are facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of landslide sliding surface determination, and more specifically, to a method for determining a landslide sliding surface by combining drilling with high-density electrical methods. Background Art

[0002] Drilling is a method of using a drilling rig to drill downward from the surface to form a cylindrical borehole in the stratum to identify and divide the strata. It is a method that can obtain cores, mineral samples, and soil samples from different depths in the borehole for analysis and research. High-density electrical method is a geophysical prospecting method that infers the resistivity distribution of underground media by supplying power to the underground and measuring the potential difference between different electrodes.

[0003] For landslide risk warning and landslide control, determining the sliding surface is the key. The traditional drilling used in the early stage has certain limitations. On the one hand, drilling is a "one-hole view", while the sliding surface is generally a three-dimensional arc surface. On the other hand, the drilling construction and sampling process will cause certain disturbances to the soil samples, which may cause misjudgment of the soil samples in the broken zone of the sliding surface.

[0004] As an indirect geophysical exploration method, high-density electrical method has certain errors, but it is more spatial. In addition, this method has strong discrimination ability for sliding surface aquifers.

[0005] In the existing technology, the strata are analyzed by combining drilling with high-density electrical methods to improve the accuracy of data acquisition. However, due to the lack of simulation and prediction, effective guidance cannot be provided for the design and construction of landslide control, resulting in inconvenience in the construction of landslide control. Summary of the invention

[0006] The purpose of the present invention is to provide a method for determining the sliding surface of a landslide by combining drilling with a high-density electrical method, aiming to solve the problem of inconvenience in the construction of landslide control in the prior art.

[0007] The present invention is implemented in this way: a method for determining the sliding surface of a landslide by combining drilling with a high-density electrical method, the steps are as follows:

[0008] (1) Use satellite remote sensing geological interpretation to obtain characteristic information of landslide geological hazards;

[0009] (2) Multiple electrode modules are set between the foot and the rear edge of the landslide. The electrode modules obtain data on the three-dimensional sliding surface of the landslide based on the difference in resistivity between the broken zone of the sliding surface of the landslide and the surrounding soil, and further analyze the data;

[0010] (3) Based on the geological information obtained, geological drilling is carried out at the top of the slope to obtain physical geological information, and in-hole testing and indoor rock testing are carried out at the same time;

[0011] (4) Based on the geological information obtained from steps (1) to (3), a comprehensive analysis and comparison is performed to determine the specific location and shape of the sliding surface, and BIM modeling is performed to guide the design and construction of landslide control.

[0012] Furthermore, the method for determining the sliding surface of a landslide by combining drilling with high-density electrical method includes a project database, wherein the project database stores terrain data of the entire project. Before the BIM modeling, the terrain data of the slope is first retrieved and interpreted as a three-dimensional terrain; then, based on the geological information obtained in steps (1) to (3), the three-dimensional terrain data is updated to form the BIM modeling.

[0013] Furthermore, based on the terrain data, a slope area and a slope top area are formed respectively, and the two ends of the slope area form a slope foot and a slope top respectively. The electrode module includes a slope electrode, and the slope foot and the slope top are respectively provided with the slope electrodes, and each of the slope electrodes is respectively arranged to be signal-connected with the host. The slope length of the slope area is judged by the slope electrodes at the slope foot and the slope top and fed back to the terrain data. The terrain data outputs each surface pole part based on the slope length of the slope area, and each of the surface pole parts is respectively provided with the slope electrode.

[0014] Furthermore, the slope electrode includes a positive electrode column, a negative electrode column and a connecting column, the connecting column is insulated, the host outputs voltage to the positive electrode column and the negative electrode column, the two ends of the connecting column are respectively connected to the positive electrode column and the negative electrode column, and the connecting column causes the bottom of the positive electrode column and the bottom of the negative electrode column to be arranged flush, and the measurement depths of the positive electrode column and the negative electrode column are arranged consistently.

[0015] Furthermore, the method for combining drilling with high-density electrical method to determine the sliding surface of a landslide includes a pole clamp, which includes a pole clamp motor, a pole clamp shaft, a positive clamp plate, a fixed clamp plate and a negative clamp plate. The pole clamp motor is used to drive the pole clamp shaft to rotate, the fixed clamp plate is located between the positive clamp plate and the negative clamp plate, the positive clamp plate and the negative clamp plate are respectively threadedly connected to the pole clamp shaft, and the pole clamp shaft is used to synchronously drive the positive clamp plate and the negative clamp plate to move in opposite directions relative to the fixed clamp plate, the positive clamp plate and the fixed clamp plate are used to clamp the positive pole column, and the negative clamp plate and the fixed clamp plate are used to clamp the negative pole column.

[0016] Furthermore, the method for determining the sliding surface of a landslide by combining drilling with high-density electrical method includes a moving device, which includes two moving wheel groups, a moving frame and a presser, wherein the two moving wheel groups are arranged on both sides of the moving frame, and the two moving wheel groups are used to move along the slope area, and the presser is arranged on the moving frame, and the presser is docked with the positive clamp, and is used to apply downward pressure to the clamp.

[0017] Furthermore, the electrode module includes a plurality of slope top electrodes, and each of the slope top electrodes is arranged equidistantly in the slope top area.

[0018] Furthermore, a drilling portion is formed between adjacent slope top electrodes, the drilling portion is located in the middle of adjacent slope top electrodes, the drilling portion is used for drilling and sampling, and the drilling portion drills to form a borehole.

[0019] Furthermore, the drilling is combined with the high-density electrical method to determine the sliding surface of the landslide, which includes a borehole detector, and the borehole detector includes a measuring rope and a borehole electrode block. The borehole electrode block is used for horizontal resistivity testing. The measuring rope and the borehole electrode block are butt-jointed, the measuring rope has a scale line, and the borehole electrode block is lowered into the borehole.

[0020] Furthermore, the hole detector includes a sonicator, which is installed in the hole pole block, the measuring rope is hollow, and the electric wire is arranged to be signal-connected with the sonicator through the inside of the measuring rope; the sonicator detects the broken zone of the sliding surface based on the speed of sound waves.

[0021] Compared with the prior art, the method for determining the sliding surface of a landslide by combining drilling with high-density electrical method provided by the present invention first uses satellite remote sensing geological interpretation to obtain characteristic information of landslide geological disasters, and then combines drilling with high-density electrical method to compare with each other and complement each other's strengths and weaknesses, so as to more accurately determine the position and shape of the sliding surface of the landslide, and provide more accurate conditions for the next step of landslide disaster risk and control, and then conducts BIM modeling. Based on BIM modeling, it guides the control and construction of the landslide, and facilitates the control and construction of the landslide. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the construction process of the method for determining the sliding surface of a landslide by combining drilling with a high-density electrical method provided by the present invention;

[0023] Figure 2 It is a construction plane schematic diagram of the method for determining the sliding surface of a landslide by combining drilling with a high-density electrical method provided by the present invention;

[0024] Figure 3 It is a cross-sectional schematic diagram of a clamping device in the method for determining the sliding surface of a landslide by combining drilling with a high-density electrical method provided by the present invention. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0026] The implementation of the present invention is described in detail below in conjunction with specific embodiments.

[0027] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0028] Reference Figure 1-3 The figure shows a preferred embodiment of the present invention.

[0029] The method of combining drilling with high-density electrical method to determine the sliding surface of the landslide is as follows:

[0030] (1) Use satellite remote sensing geological interpretation to obtain characteristic information of landslide geological hazards;

[0031] (2) A plurality of electrode modules 3 are arranged between the foot 1 and the rear edge 2 of the landslide. The electrode modules 3 obtain data of the three-dimensional sliding surface 4 of the landslide according to the difference in resistivity between the broken zone of the sliding surface 4 of the landslide and the surrounding soil, and further analyze the data;

[0032] (3) Based on the geological information obtained, geological drilling is carried out at the top of the slope to obtain physical geological information, and in-hole testing and indoor rock testing are carried out at the same time;

[0033] (4) Based on the geological information obtained in steps (1) to (3), a comprehensive analysis and comparison is performed to determine the specific location and shape of the sliding surface 4, and BIM modeling is performed to guide the design and construction of landslide control.

[0034] The above-mentioned method of combining drilling with high-density electrical method to determine the sliding surface of the landslide first uses satellite remote sensing geological interpretation to obtain the characteristic information of the landslide geological disaster, and then combines drilling with high-density electrical method to compare with each other and complement each other's strengths and weaknesses, so as to more accurately determine the position and shape of the landslide sliding surface 4, and provide more accurate conditions for the next step of landslide disaster risk and control, and then carry out BIM modeling. Based on BIM modeling, the control and construction of the landslide are guided, which is convenient for the control and construction of the landslide.

[0035] In step (1), remote sensing image data of the landslide area with a recent imaging time and an imaging resolution better than 1 m is obtained, such as IKONOS satellite images with a resolution of 1 m, WorldView satellite images with a resolution of 0.47 m, and digital aerial images with higher resolution.

[0036] High-resolution remote sensing images should be accompanied by rational function sensor model (RPC) parameters.

[0037] Digital elevation data mainly include contour line data on large-scale topographic maps, high-resolution satellite image stereo pair data, and elevation data obtained by airborne laser radar (LIDAR).

[0038] LIDAR data should carry attitude positioning parameters such as global positioning (GPS) and inertial measurement unit (IMU).

[0039] The method for determining the landslide sliding surface 4 by combining drilling with high-density electrical method includes a project database, which stores the terrain data of the entire project. Before BIM modeling, the terrain data of the slope is first retrieved and interpreted as a three-dimensional terrain; then, based on the geological information obtained in steps (1) to (3), the three-dimensional terrain data is updated to form a BIM model; in this way, BIM modeling is facilitated and the accuracy of BIM modeling is improved.

[0040] The data storage module is used to store data, wherein the data includes project information table, drilling borehole 5 data, and high-density electrical method data.

[0041] Satellite remote sensing technology provides data with relatively recent imaging time and excellent imaging resolution, which is stored in the data storage module.

[0042] Data extraction module, used to import terrain data.

[0043] The interpretation module is used to automatically interpret the data to obtain interpretation information.

[0044] Based on the terrain data, a slope area and a slope top area are formed respectively, and the two ends of the slope area form a slope foot 1 and a slope top respectively. The electrode module 3 includes a slope electrode, and the slope foot 1 and the slope top are respectively provided with slope electrodes. Each slope electrode is arranged in signal connection with the host. The slope length of the slope area is judged by the slope electrodes at the slope foot 1 and the slope top and fed back to the terrain data. The terrain data outputs each surface pole part based on the slope length of the slope area, and each surface pole part is respectively provided with a slope electrode.

[0045] In this way, the various slope electrodes are arranged according to the slope length of the slope area, the layout of the various slope electrodes is more orderly, the feedback detection data is more accurate, and the detection accuracy of each slope electrode is improved.

[0046] The slope electrode includes a positive pole, a negative pole and a connecting pole. The connecting pole is insulated. The host outputs voltage to the positive pole and the negative pole. The two ends of the connecting pole are respectively connected to the positive pole and the negative pole. The connecting pole causes the bottom of the positive pole and the bottom of the negative pole to be flush, and the measurement depths of the positive pole and the negative pole are arranged consistently.

[0047] Under the action of the positive and negative poles, the soil layer of the slope is detected and judged, and the data of the broken zone of the sliding surface 4 is extracted based on the difference in resistivity between the broken zone of the landslide sliding surface 4 and the surrounding soil. Under the action of the connecting column, the measurement depths of the positive and negative poles are made consistent, which improves the measurement accuracy and the accuracy of judging the position of the broken zone of the sliding surface 4.

[0048] The method for combining drilling with high-density electrical method to determine the sliding surface 4 of the landslide includes a clamp 6, which includes a clamp motor 61, a clamp shaft 62, a positive clamp plate 63, a fixed clamp plate 64 and a negative clamp plate 65. The clamp motor 61 is used to drive the clamp shaft 62 to rotate, and the fixed clamp plate 64 is located between the positive clamp plate 63 and the negative clamp plate 65. The positive clamp plate 63 and the negative clamp plate 65 are respectively threadedly connected to the clamp shaft 62. The clamp shaft 62 is used to synchronously drive the positive clamp plate 63 and the negative clamp plate 65 to move in opposite directions relative to the fixed clamp plate 64. The positive clamp plate 63 and the fixed clamp plate 64 are used to clamp the positive pole column, and the negative clamp plate 65 and the fixed clamp plate 64 are used to clamp the negative pole column.

[0049] In this way, the positive pole and the negative pole can be set automatically, manual construction on the slope surface can be avoided, safety accidents can be avoided, and construction safety can be improved. Specifically, the driving force is output by the pole clamping motor 61 to drive the pole clamping shaft 62 to rotate, and then the positive clamping plate 63 and the negative clamping plate 65 are synchronously driven to be arranged to move respectively, and the threads of the positive clamping plate 63 and the negative clamping plate 65 are arranged in opposite directions. When the pole clamping shaft 62 rotates, the positive clamping plate 63 and the negative clamping plate 65 are driven to move toward the fixed clamping plate 64 respectively, so as to achieve synchronous clamping of the positive pole and the negative pole. When the positive pole and the negative pole are in place, the positive clamping plate 63 and the negative clamping plate 65 are driven to move away from the fixed clamping plate 64 respectively, so as to achieve separation of the pole clamp 6 from the positive pole and the negative pole, and achieve automated installation of the positive pole and the negative pole.

[0050] The clamp 6 includes a calibrator, which is arranged horizontally and is used to emit horizontal light. The positive pole has a positive pole hole, and the negative pole has a negative pole hole. The positive pole hole and the negative pole hole are arranged through each other, and the positive pole hole and the negative pole hole are arranged correspondingly to the calibrator. The calibrator is used to detect the placement accuracy of the positive pole and the negative pole.

[0051] The method for determining the sliding surface 4 of a landslide by combining drilling with high-density electrical method includes a moving device, which includes two moving wheel groups, a moving frame and a down-pressor. The two moving wheel groups are installed on both sides of the moving frame. The two moving wheel groups are used to move along the slope area. The down-pressor is installed on the moving frame. The down-pressor is docked with the positive clamping plate 63, and the down-pressor is used to apply downward pressure to the clamp 6.

[0052] In this way, under the action of the moving device, movement on the slope surface is achieved, and slope electrodes are automatically set along the slope foot 1, each surface pole part and the slope top.

[0053] The moving device includes a return spring, the down-pressing device includes a down-pressing shaft, the return spring is sleeved on the down-pressing shaft, the upper part of the return spring is docked with the down-pressing device, and the lower part of the return spring is docked with the positive clamping plate 63. When the down-pressing operation is performed, the return spring is in a compressed state; in this way, once the down-pressing force is withdrawn, the return spring facilitates the resetting of the down-pressing shaft and facilitates the cyclic layout of each slope electrode.

[0054] The electrode module 3 includes a plurality of slope top electrodes, and each slope top electrode is equidistantly arranged in the slope top area; with the cooperation of each slope top electrode, equidistant detection of the slope is achieved, thereby improving detection accuracy.

[0055] A drilling section is formed between adjacent slope top electrodes. The drilling section is located in the middle of the adjacent slope top electrodes. The drilling section is used for drilling and sampling. The drilling section drills to form a borehole 5, which is convenient for the drilling operation data to correct the detection data of the electrode module 3 and improve the accuracy of data acquisition.

[0056] The combination of drilling and high-density electrical method to determine the sliding surface of the landslide 4 includes a borehole detector, which includes a measuring rope and a borehole electrode block. The borehole electrode block is used to test the resistivity horizontally. The measuring rope and the borehole electrode block are butt-jointed, the measuring rope has a scale line, and the borehole electrode block is lowered into the borehole 5.

[0057] The borehole block detects the soil layer based on the difference in resistivity between the 4th broken zone of the landslide sliding surface and the surrounding soil, and obtains the borehole detection data. The borehole detection data corrects the data obtained by drilling and high-density electrical method, improves the data accuracy of subsequent BIM modeling, and facilitates landslide control and construction.

[0058] The borehole detector includes a sonicator, which is installed in the borehole block. The measuring rope is arranged in a hollow shape, and the wire is arranged to be connected to the sonicator through the inside of the measuring rope in signal communication. The sonicator detects the broken zone of the sliding surface 4 based on the sonic wave velocity. The sonic wave value of the sonicator is used for auxiliary analysis to improve the data accuracy of subsequent BIM modeling, which is convenient for landslide control and construction.

[0059] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for determining the sliding surface of a landslide by combining drilling with high-density electrical method, characterized in that: Here are the steps: (1) Use satellite remote sensing geological interpretation to obtain characteristic information of landslide geological hazards; (2) Multiple electrode modules are set between the foot and the rear edge of the landslide. The electrode modules obtain data on the three-dimensional sliding surface of the landslide based on the difference in resistivity between the broken zone of the sliding surface of the landslide and the surrounding soil, and further analyze the data; (3) Based on the geological information obtained, geological drilling is carried out at the top of the slope to obtain physical geological information, and in-hole testing and indoor rock testing are carried out at the same time; (4) Based on the geological information obtained from steps (1) to (3), a comprehensive analysis and comparison is performed to determine the specific location and shape of the sliding surface, and BIM modeling is performed to guide the design and construction of landslide control.

2. The method for determining the sliding surface of a landslide by combining drilling with high-density electrical method as claimed in claim 1, characterized in that: The method for determining the sliding surface of a landslide by combining drilling with a high-density electrical method includes a project database, wherein the project database stores terrain data of the entire project. Before the BIM modeling, the terrain data of the slope is first retrieved and interpreted as a three-dimensional terrain; then, based on the geological information obtained in steps (1) to (3), the three-dimensional terrain data is updated to form the BIM modeling.

3. The method for determining the sliding surface of a landslide by combining drilling with high-density electrical method as claimed in claim 2, characterized in that: Based on the terrain data, a slope area and a slope top area are formed respectively, and the two ends of the slope area form a slope foot and a slope top respectively. The electrode module includes a slope electrode, and the slope foot and the slope top are respectively provided with the slope electrodes, and each of the slope electrodes is arranged in signal communication with the host. The slope length of the slope area is judged by the slope electrodes at the slope foot and the slope top and fed back to the terrain data. The terrain data outputs each surface pole part based on the slope length of the slope area, and each of the surface pole parts is respectively provided with the slope electrode.

4. The method for determining the sliding surface of a landslide by combining drilling with high-density electrical method as claimed in claim 3, characterized in that: The slope electrode includes a positive pole, a negative pole and a connecting pole, the connecting pole is insulated, the host outputs voltage to the positive pole and the negative pole, the two ends of the connecting pole are respectively connected to the positive pole and the negative pole, and the connecting pole causes the bottom of the positive pole and the bottom of the negative pole to be flush, and the measurement depths of the positive pole and the negative pole are arranged consistently.

5. The method for determining the sliding surface of a landslide by combining drilling with high-density electrical method as claimed in claim 4, characterized in that: The method for combining drilling with high-density electrical method to determine the sliding surface of a landslide includes a pole clamp, which includes a pole clamp motor, a pole clamp shaft, a positive clamp plate, a fixed clamp plate and a negative clamp plate. The pole clamp motor is used to drive the pole clamp shaft to rotate, the fixed clamp plate is located between the positive clamp plate and the negative clamp plate, the positive clamp plate and the negative clamp plate are respectively threadedly connected to the pole clamp shaft, the pole clamp shaft is used to synchronously drive the positive clamp plate and the negative clamp plate to move in opposite directions relative to the fixed clamp plate, the positive clamp plate and the fixed clamp plate are used to clamp the positive pole column, and the negative clamp plate and the fixed clamp plate are used to clamp the negative pole column.

6. The method for determining the sliding surface of a landslide by combining drilling with high-density electrical method as claimed in claim 5, characterized in that: The method for determining the sliding surface of a landslide by combining drilling with high-density electrical method includes a moving device, which includes two moving wheel groups, a moving frame and a presser. The two moving wheel groups are arranged on both sides of the moving frame, and the two moving wheel groups are used to move along the slope area. The presser is arranged on the moving frame, and the presser is docked with the positive clamping plate. The presser is used to apply downward pressure to the clamp.

7. The method for determining the sliding surface of a landslide by combining drilling with high-density electrical method according to any one of claims 1 to 6, characterized in that: The electrode module includes a plurality of slope top electrodes, and each of the slope top electrodes is arranged equidistantly in the slope top area.

8. The method for determining the sliding surface of a landslide by combining drilling with high-density electrical method as claimed in claim 7, characterized in that: A drilling portion is formed between adjacent slope top electrodes. The drilling portion is located in the middle of the adjacent slope top electrodes. The drilling portion is used for drilling and sampling. The drilling portion drills to form a borehole.

9. The method for determining the sliding surface of a landslide by combining drilling with high-density electrical method as claimed in claim 8, characterized in that: The drilling combined with high-density electrical method to determine the sliding surface of the landslide includes a borehole detector, the borehole detector includes a measuring rope and a borehole electrode block, the borehole electrode block is used for horizontal resistivity testing, the measuring rope and the borehole electrode block are butt-jointed, the measuring rope has a scale line, and the borehole electrode block is lowered into the borehole.

10. The method for determining the sliding surface of a landslide by combining drilling with high-density electrical method as claimed in claim 9, characterized in that: The hole detector includes a sonicator, which is installed in the hole pole block, the measuring rope is hollow, and the electric wire is arranged to be signal-connected with the sonicator through the inside of the measuring rope; the sonicator detects the broken zone of the sliding surface based on the speed of sound waves.