Building disassembling method based on digital building model

Through the method based on digital building model, the problems of high costs and high losses during the demolition process of building are solved, the dismantling time and cost optimization are achieved, the integrity of building components is retained, and it is suitable for the reconstruction of historical and cultural buildings.

CN119026226AActive Publication Date: 2024-11-26SHANGHAI CONSTRUCTION GROUP CO LTD

Patent Information

Application Number
CN202411506679.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-28
Publication Date
2024-11-26
Estimated Expiration
2044-10-28

AI Technical Summary

Technical Problem

During the dismantling of buildings, the existing technology adopts destructive dismantling methods, resulting in high costs and large losses, and the dismantled components cannot be reused, especially historical and cultural buildings, which cannot be restored to their original appearance after dismantling, affecting reconstruction Effect.

Method used

Using a digital building model method, by establishing a digital model of the building, dividing it into a dismantling module, and planning the optimal dismantling sequence route in the model, calculating the dismantling time and cost, and selecting the optimal dismantling plan for Actual dismantling and dynamically supervise the dismantling process.

Benefits of technology

It reduces the cost and time of dismantling, reduces the working time of machinery and carbon emissions, protects the environment, and retains the integrity of building components, making them reusable, and has great significance for reconstruction of historical and cultural buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026226A_ABST
    Figure CN119026226A_ABST
Patent Text Reader

Abstract

The invention discloses a building dismantling method based on a digital building model. The building dismantling method comprises the steps that the digital building model of a building is established according to building component units; building component units are divided into disassembling modules; a disassembling sequence route of each disassembling module is planned in the digital building model for virtual disassembling, the disassembling time and the disassembling cost of each disassembling sequence route are calculated, and the optimal disassembling sequence route is selected; dividing the building according to the disassembling modules of the digital building model, and actually disassembling the building according to the optimal disassembling sequence route and the divided disassembling modules; and updating the actual disassembly data into the digital building model, and dynamically monitoring the actual disassembly process of the building. According to the invention, the dismantling time cost and cost of the building can be reduced, the working time of dismantling machinery can be reduced, the carbon emission can be reduced, the environment can be protected, and each building component can be integrally reserved, so that the dismantled building component can be reused.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a building disassembly method based on a digital building model. Background Art

[0002] In the process of urban renewal and reconstruction, the appearance of the original buildings is renovated and the original buildings are dismantled and rebuilt. In the dismantling of buildings, it is usually destructive dismantling, and the dismantling route is random, resulting in high dismantling costs and large losses. It is impossible to preserve the integrity of the building components, resulting in the inability to reuse the building components after demolition. In particular, historical and cultural buildings cannot be reused after the destructive demolition of the dismantled building components in the reconstruction construction, which affects the restoration of the historical style of the reconstructed buildings. Summary of the invention

[0003] The purpose of the present invention is to provide a building disassembly method based on a digital building model to solve the problems of high cost and large loss of destructive disassembly and inability to reuse building components after disassembly.

[0004] In order to solve the above technical problems, the present invention provides a technical solution: a building disassembly method based on a digital building model, comprising: Step S1, each building component of the building is regarded as a unit, and a digital building model of the building is established according to the building component units; Step S2, dividing the digital building model into disassembly modules according to the building component units; Step S3, planning the disassembly sequence routes of each disassembly module in the digital building model, virtually disassembling each disassembly module, calculating the disassembly time and disassembly cost of each disassembly sequence route, and selecting the optimal disassembly sequence route; Step S4, dividing the building according to the disassembly modules of the digital building model, and actually disassembling the building according to the divided disassembly modules at the construction site where the building is located according to the optimal disassembly sequence route in the digital building model; Step S5, updating the actual disassembly data into the digital building model, and dynamically monitoring the actual disassembly process of the building.

[0005] Furthermore, the building disassembly method based on the digital building model provided by the present invention calculates the total disassembly time of the digital building model according to formula (1): (1); in, T is the total dismantling time of the building, k To evaluate the complexity of the disassembly sequence route, n The order of disassembling modules is numbered. Pn is the structural complexity evaluation coefficient of each disassembled module, T n is the disassembly time of each disassembly module.

[0006] Furthermore, the building disassembly method based on the digital building model provided by the present invention calculates the total disassembly cost of the digital building model according to formula (2): (2); in, F is the total demolition cost of the building, k To evaluate the complexity of the disassembly sequence route, n The order of disassembling modules is numbered. P n is the structural complexity evaluation coefficient of each disassembled module, F n is the dismantling cost of each dismantled module.

[0007] Furthermore, the digital building model-based building disassembly method provided by the present invention divides a plurality of adjacent building component units into a disassembly module.

[0008] Furthermore, the building disassembly method based on the digital building model provided by the present invention decomposes a disassembly module into multiple sub-disassembly modules.

[0009] Furthermore, in the building disassembly method based on the digital building model provided by the present invention, if there are common connecting parts between two adjacent disassembly modules, they shall be dismantled in the disassembly module in the next order. / / Common connecting parts include but are not limited to building components, metal parts, etc. Furthermore, in the building disassembly method based on the digital building model provided by the present invention, the building components include one or more of walls, beams, plates, columns, doors and windows.

[0010] Furthermore, the present invention provides a building disassembly method based on a digital building model, wherein the digital building model includes structural information, spatial information, demolition information and time information of the building, wherein the structural information is the structural form of the building components of the building, the spatial information is the location distribution of the building components, the demolition information is the demolition machinery of the building components, the corresponding demolition costs and time consumption, and the time information is the dynamic evolution of the evolution process of the building along the disassembly sequence route over time.

[0011] Furthermore, in the building disassembly method based on the digital building model provided by the present invention, the actual disassembly data includes actual disassembly time, actual disassembly cost, actual disassembly machinery, and structural information and spatial information of the building components of the disassembled building.

[0012] Compared with the prior art, the present invention has the following beneficial effects: The building disassembly method based on the digital building model provided by the present invention establishes a digital building model, divides the disassembly modules according to the building component units in the digital building model, and plans the disassembly sequence route of each disassembly module for virtual disassembly, calculates the disassembly time and disassembly cost, and thus selects the optimal disassembly sequence route to actually disassemble the building according to the method of the disassembly modules divided in the digital building model, thereby reducing the time cost and cost cost of disassembly of the building, reducing the working time of the disassembly machinery, reducing carbon emissions, and protecting the environment.

[0013] The building disassembly method based on the digital building model provided by the present invention disassembles the building using the building component units as disassembly modules, and can retain the integrity of each building component so that the disassembled building components can be reused, thus avoiding the problems of large loss, serious waste and large amount of construction waste caused by destructive disassembly, and is of great significance to the demolition and reconstruction of historical and cultural buildings.

[0014] The building disassembly method based on the digital building model provided by the present invention can dynamically monitor the actual disassembly process of the building by updating the actual disassembly data into the digital building model. On the one hand, it can monitor the safety and progress of the building disassembly process, and on the other hand, it can optimize the disassembly sequence route to further reduce costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a flow chart of the building disassembly method based on the digital building model; Figure 2 It is a preliminary division diagram of the disassembly modules and disassembly sequence of a certain area of ​​the digital building model; Figure 3 Yes Figure 2 Partition diagram during the disassembly module optimization process; Figure 4 Yes Figure 3 Final partition diagram after disassembling modules and optimizing disassembly sequence; Figure 5 to Figure 6 Yes Figure 4 Schematic diagram of the disassembly sequence route for planning the disassembly module. DETAILED DESCRIPTION

[0016] The present invention is described in detail below in conjunction with the accompanying drawings: The advantages and features of the present invention will become more apparent from the following description. It should be noted that the accompanying drawings are in very simplified form and in non-precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0017] Please refer to Figures 1 to 6, an embodiment of the present invention provides a building disassembly method based on a digital building model, comprising: Step S1, each building component of the building is regarded as a unit, and a digital building model of the building is established according to the building component unit. The digital building model includes but is not limited to the building information model BIM, and the building components include walls, beams, plates, columns, doors and windows, lamps, hardware, signboards and other components. The digital building model can be modeled according to the architectural design drawing, and the architectural design drawing is not limited to the structural drawings of the building and building components, architectural drawings, construction drawings and other engineering drawings. The digital building model includes the structural information, spatial information, demolition information and time information of the building, the structural information is the structural form of the building components of the building, the spatial information is the location distribution of the building components, the demolition information is the demolition machinery of the building components, the corresponding demolition costs and time consumption, and the time information is the dynamic evolution of the evolution process of the building along the disassembly sequence route over time.

[0018] Step S2: dividing the digital building model into disassembly modules according to the building component units.

[0019] Step S3, planning the disassembly sequence route of each disassembly module in the digital building model, virtually disassembling each disassembly module, calculating the disassembly time and disassembly cost of each disassembly sequence route, and selecting the optimal disassembly sequence route. The optimal disassembly sequence route refers to the disassembly sequence route with the shortest disassembly time and the lowest disassembly cost. In order to reduce the disassembly time, reduce the disassembly cost, and optimize the disassembly sequence route, multiple adjacent building component units can be combined and divided into a disassembly module; in order to facilitate disassembly, a disassembly module can be decomposed into multiple sub-disassembly modules. Figure 2 The digital building model is divided into 16 disassembly modules according to the building component units. Each square represents a disassembly module, and the number in each square is the disassembly sequence number. Figure 3 right Figure 2 The disassembly module has been optimized and adjusted. Figure 2 The disassembly modules 1, 2, 5, and 6 in the above are combined into one disassembly module. Figure 2 The disassembly module 16 in is decomposed into 4 sub-disassembly modules, Figure 4 Yes Figure 3 Adjust the sequence number of the disassembled modules. Figure 5 and Figure 6An example of a disassembly sequence route is given. According to the types and corresponding quantities of components contained in the disassembly module number, and according to the selected disassembly machinery, the cost and time required for disassembly of the disassembly module can be inferred. For example: the types and corresponding quantities of building components contained in disassembly module 1 are set to J1, the cost required for disassembly is set to F1, and the time is set to T1. The types and numbers of building components of the disassembly module do not include the common connecting parts adjacent to the next disassembly module number, that is, if there are common connecting parts between two adjacent disassembly modules, they will be dismantled in the disassembly module of the next sequence. The common connecting parts include but are not limited to building components and metal parts. For example: Figure 4 The disassembly module 1 is the first sequential disassembly area and is adjacent to the disassembly modules 2, 4, 6, and 7. The common connectors with the adjacent disassembly modules are set as GM1-2, GM1-4, GM1-6, and GM1-7, and these common connectors are not included in the type and quantity of the disassembly module 1. For example, Figure 4 The disassembly module 2 in the figure is the second order demolition area and is adjacent to the disassembly modules 1, 3, and 4. Then GM1-2 is included in the disassembly module 2, while the common connectors GM2-3 and GM2-4 adjacent to the disassembly modules 3 and 4 are not included in the disassembly module 2. Similarly, the component types and corresponding quantities of each demolition area can be clearly defined, and the time T and cost F spent on demolishing the corresponding area can also be determined. Due to the division of disassembly modules and the different demolition sequence routes, the structural complexity of each disassembly module and the degree of tortuosity of the demolition sequence route are also different. In general, the larger the area of ​​each disassembly module, the higher the structural complexity, and the higher the cost of demolition machinery and labor. Therefore, this model introduces the structural complexity evaluation coefficient of the disassembly module. Pn, in n It is the number of the dismantling module to correct the dismantling time and cost per unit area. Similarly, different demolition sequence lines will lead to different complexity of the construction route, and the mechanical movement and material transportation routes will also be different. In general, the longer the demolition construction route, the longer the mechanical movement and material transportation routes will be, which will lead to higher overall demolition days and costs. Therefore, the evaluation coefficient of the complexity of the dismantling sequence route is introduced. k , to correct the dismantling time and cost of the overall area, Figure 5 to Figure 6 The dismantling sequence routes are all 1→2→3→4→5→6→7→8→9→10→11→12→13→14→15→16. In this model, the dismantling construction route is regarded as the sequential connection of the geometric center of each dismantling module according to the sequential numbering of the dismantling modules, that is, the complexity evaluation coefficient of the dismantling sequence route is k It is positively correlated with the length of the disassembly construction route, where each disassembly sequence route has different kTherefore, according to formula (1) and formula (2), the total disassembly time and total disassembly cost of the digital building model can be calculated respectively: (1); in, T is the total dismantling time of the building, k To evaluate the complexity of the disassembly sequence route, n The order of disassembling modules is numbered. P n is the structural complexity evaluation coefficient of each disassembled module, T n is the disassembly time of each disassembly module. Expand formula 1 to get: T = k(P 1 T 1 +P 2 T 2 +P 3 T 3 +…+P n T n ) .

[0020] (2); in, F is the total demolition cost of the building, k To evaluate the complexity of the disassembly sequence route, n The order of disassembling modules is numbered. P n is the structural complexity evaluation coefficient of each disassembled module, F n is the disassembly cost of each disassembly module. Expand formula (2) to get: F = k(P 1 F 1 +P 2 F 2 +P 3 F 3 +…+P n F n ) By calculating the total disassembly time and total disassembly cost of all disassembly sequence routes, the optimal disassembly sequence route can be selected.

[0021] Step S4, divide the building into disassembly modules of the digital building model, and actually disassemble the building into the disassembly modules at the construction site where the building is located according to the optimal disassembly sequence route in the digital building model. The building can be actually disassembled by building a disassembly construction platform.

[0022] Step S5, update the actual disassembly data to the digital building model, and dynamically monitor the actual disassembly process of the building. The actual disassembly data includes the actual disassembly time, the actual disassembly cost, the actual disassembly machinery, and the structural information and spatial information of the building components of the disassembled building. The cloud platform can compare and analyze the statistical construction data with the virtual data generated by the building virtual model to determine whether the demolition construction data is consistent with the virtual data generated by the virtual model operation, thereby realizing dynamic supervision of the construction status and control of the entire construction process, ensuring the reliability of the construction, and reducing the construction cost. At the same time, the collected construction data can also provide feedback on the operation results of the building virtual model, which is conducive to further optimization of the model.

[0023] The building disassembly method based on the digital building model provided by the present invention establishes a digital building model, divides the disassembly modules according to the building component units in the digital building model, and plans the disassembly sequence route of each disassembly module for virtual disassembly, calculates the disassembly time and disassembly cost, and thus selects the optimal disassembly sequence route to actually disassemble the building according to the method of the disassembly modules divided in the digital building model, thereby reducing the time cost and cost cost of disassembly of the building, reducing the working time of the disassembly machinery, reducing carbon emissions, and protecting the environment.

[0024] The building disassembly method based on the digital building model provided by the present invention disassembles the building using the building component units as disassembly modules, and can retain the integrity of each building component so that the disassembled building components can be reused, thus avoiding the problems of large loss, serious waste and large amount of construction waste caused by destructive disassembly, and is of great significance to the demolition and reconstruction of historical and cultural buildings.

[0025] The building disassembly method based on the digital building model provided by the present invention can dynamically monitor the actual disassembly process of the building by updating the actual disassembly data into the digital building model. On the one hand, it can monitor the safety and progress of the building disassembly process, and on the other hand, it can optimize the disassembly sequence route to further reduce costs.

[0026] The present invention is not limited to the above-mentioned specific implementation modes. Obviously, the above-mentioned embodiments are only some embodiments of the embodiments of the present invention, but not all embodiments. Based on the described embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention. Those skilled in the art can make other levels of modifications and changes to the present invention. In this way, if these modifications and changes of the present invention fall within the scope of the claims of the present invention, the present invention is also intended to include these changes and changes.

Claims

1. A building disassembly method based on a digital building model, characterized in that: include: Step S1, each building component of the building is regarded as a unit, and a digital building model of the building is established according to the building component units; Step S2, dividing the digital building model into disassembly modules according to the building component units; Step S3, planning the disassembly sequence routes of each disassembly module in the digital building model, virtually disassembling each disassembly module, calculating the disassembly time and disassembly cost of each disassembly sequence route, and selecting the optimal disassembly sequence route; calculating the total disassembly time of the digital building model according to formula (1): (1); in, T is the total dismantling time of the building, k To evaluate the complexity of the disassembly sequence route, n The order of disassembling modules is numbered. P n is the structural complexity evaluation coefficient of each disassembled module, T n is the disassembly time of each disassembly module; Step S4, dividing the building according to the disassembly modules of the digital building model, and actually disassembling the building according to the divided disassembly modules at the construction site where the building is located according to the optimal disassembly sequence route in the digital building model; Step S5, updating the actual disassembly data into the digital building model, and dynamically monitoring the actual disassembly process of the building.

2. The building disassembly method based on digital building model according to claim 1, characterized in that: The total dismantling cost of the digital building model is calculated according to formula (2): (2); in, F is the total demolition cost of the building, k To evaluate the complexity of the disassembly sequence route, n The order of disassembling modules is numbered. P n is the structural complexity evaluation coefficient of each disassembled module, F n is the dismantling cost of each dismantled module.

3. The building disassembly method based on digital building model according to claim 1, characterized in that: A plurality of adjacent building component units are combined and divided into a disassembly module.

4. The building disassembly method based on digital building model according to claim 1, characterized in that: Decompose a disassembly module into multiple sub-disassembly modules.

5. The building disassembly method based on digital building model according to claim 1, characterized in that: If there are common connecting parts between two adjacent disassembly modules, they will be removed in the disassembly module in the next sequence.

6. The method for disassembling a building based on a digital building model according to claim 1, characterized in that: The building components include one or more of walls, beams, plates, columns, doors and windows.

7. The building disassembly method based on digital building model according to claim 1, characterized in that: The digital building model includes structural information, spatial information, demolition information and time information of the building. The structural information is the structural form of the building components of the building, the spatial information is the location distribution of the building components, the demolition information is the demolition machinery of the building components, the corresponding demolition costs and time consumption, and the time information is the dynamic evolution of the building's evolution process along the dismantling sequence route over time.

8. The method for disassembling a building based on a digital building model according to claim 1, characterized in that: The actual disassembly data includes actual disassembly time, actual disassembly cost, actual disassembly machinery, and structural information and spatial information of building components of the disassembled building.

Citation Information

Patent Citations

  • Parallel scheduling disassembly path forming method based on mixing fuzzy model

    CN105975701A

  • 3D scanning technology and MR technology-based building structure demolition method

    CN107391793A

  • Urban building demolition management method and device, computer equipment and storage medium

    CN110580671A

  • Ordered green detachment construction method for building

    CN110593602A

  • Building block splitting and reconstructing method based on BIM and RFID

    CN112241770A

Cited By

  • Building component demolition sequence safety control method integrating genetic algorithm, Bayesian reasoning and machine learning

    CN120297749A