Underwater rock drilling process optimization method based on entropy weight method
The entropy weight method optimizes the underwater rock drilling process, combined with orthogonal tests and numerical simulations, and solves the problem that traditional construction parameters are difficult to take into account both the quality of rock breaking and the efficiency of rock drilling efficiency, achieving efficient and high-quality effects of underwater rock drilling construction.
Patent Information
- Application Number
- CN202411157000.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-26
AI Technical Summary
The selection of construction parameters of traditional underwater rock drilling technology depends on experience, which makes it difficult to take into account both rock breaking quality and rock drilling efficiency, and there are problems such as low construction efficiency, serious wear of rock drilling rods and excessive under-excavation.
The optimization method of underwater rock drilling process based on the entropy weight method is adopted. Through orthogonal experiments and comprehensive evaluation, combined with the actual situation on site and numerical simulation, the construction parameters are optimized to improve rock breaking quality and rock drilling efficiency, and avoid artificial arbitraryness.
High-quality and efficient advancement of underwater rock drilling construction is achieved, ensuring the balance between rock breaking quality and rock drilling efficiency, and avoiding the uncertainty and arbitrary nature of the selection of construction parameters.
Smart Images

Figure CN119026362A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a rock drilling process optimization method in the field of rock mechanics, and in particular to an underwater rock drilling process optimization method based on an entropy weight method. Background Art
[0002] The rock drilling process is a reef clearing process that uses the gravitational potential energy of the rock drill rod to convert into impact energy after the rock drill rod is lifted to a certain height and then falls freely, so as to cause the rock to break and shatter. Compared with the traditional blasting process, its significant advantages are that it has little impact on the environment, does not affect normal navigation, has simple construction procedures, and can accurately control the boundaries of the construction area. However, it also has obvious shortcomings: low construction efficiency. In the actual construction process, in order to ensure the quality of rock breaking, there are often too many single-point chiseling times and the distance between the rock drilling points is too small, which can easily lead to delays in the construction period and affect the smooth completion of the project.
[0003] At present, there are few construction cases involving underwater rock drilling, and there are no directly relevant technical standards to follow during the construction process. The selection of construction technology often relies on on-site experience. Due to the complex construction site environment and many influencing factors, even projects with similar rock properties have very different rock drilling technologies. The few existing rock drilling cases have shown that unreasonable selection of rock drilling technology will lead to low reef clearing efficiency, severe wear of the rock drill rod, and over-excavation and under-excavation.
[0004] The rock drilling process mainly includes the following four parameters: lifting height, number of chiseling, row spacing, and position spacing. The higher the lifting height, the more chiseling times, and the smaller the row spacing, the better the rock breaking quality, but at the same time the rock drilling efficiency is lower. The actual construction needs to take into account both the rock breaking quality and the rock drilling efficiency to achieve an optimal construction effect.
[0005] At present, the construction parameters of rock drilling technology are mainly selected based on construction experience, which has great uncertainty and human arbitrariness. How to optimize the underwater rock drilling technology to take into account both rock breaking quality and rock drilling efficiency is a technical problem that needs to be solved urgently. Summary of the invention
[0006] Purpose of the invention: In view of the problem that the basis for selecting construction parameters of traditional underwater rock drilling technology is unclear and it is difficult to take into account both rock breaking quality and rock drilling efficiency, the present invention proposes an underwater rock drilling technology optimization method based on the entropy weight method. The rock drilling technology is optimized through orthogonal experiments and comprehensive evaluation methods, which solves the current problem that it is difficult to comprehensively consider rock breaking quality and rock drilling efficiency. It also combines the actual on-site conditions with numerical simulation to ensure high-quality and efficient advancement of underwater rock drilling construction, and avoids the uncertainty and arbitrariness of artificially determined rock drilling technology.
[0007] Technical solution: The underwater rock drilling process optimization method based on the entropy weight method of the present invention comprises the following steps:
[0008] Step (1), determining the orthogonal test scheme of construction parameters including lifting height, number of single-point chiseling, row spacing and position spacing, conducting in-situ tests and numerical simulations, and obtaining the reef clearing thickness, rock drilling efficiency, rock damage volume and average penetration degree of each orthogonal test scheme;
[0009] Step (2), optimizing the rock drilling process according to the rock breaking quality and the rock drilling efficiency, and determining the rock drilling process applicability index including the rock breaking quality index and the rock drilling efficiency; wherein the rock breaking quality index includes the reef clearance thickness, the rock damage volume and the average penetration degree;
[0010] Step (3), using the entropy weight method to calculate the weight of the rock breaking quality index, and calculating the rock breaking quality of different orthogonal test schemes;
[0011] The steps for calculating the weight of the rock breaking quality index using the entropy weight method are as follows:
[0012] Step (3.1) standardizes the rock breaking quality indicators of reef clearance thickness, rock damage volume and average penetration degree to form a standardized judgment matrix R = (r ij ) m×3 ;
[0013]
[0014] Among them, r ij is the value after the standardized processing of each indicator, m is the number of schemes, a ij is the value of the rock breaking quality index of the jth item of the i-th scheme, a max is the maximum value of the rock breaking quality index under the same construction parameter category, a min It is the minimum value of rock breaking quality index under the same construction parameter category.
[0015] Step (3.2), the entropy value e of rock breaking quality index under different construction parameter categories is calculated. j Calculate and obtain the entropy matrix E of different parameter categories = (e j ) m×3 .
[0016]
[0017] in,
[0018] Among them, m is the number of solutions, e j is the entropy value of the j-th rock breaking quality index, f ij is the weight of the rock breaking quality index of the jth item of the i-th scheme, and it is also stipulated that when f ij =0, lnf ij =0.
[0019] Step (3.3), according to the entropy value matrix, the entropy weight of the rock breaking quality index is calculated to obtain the entropy weight matrix W = (w j ) 1×n and w j .
[0020]
[0021] Where n is the number of categories of rock breaking quality parameters, w j is the entropy weight of the j-th indicator.
[0022] In the above step (3), the steps for calculating the rock breaking quality of different schemes are as follows:
[0023] The rock breaking quality is calculated by using the standardized judgment matrix R and the entropy weight matrix W, and the obtained rock breaking quality matrix is recorded as P = (p i ) 1×n .
[0024] P=RW (5)
[0025] Among them, p i It represents the rock breaking quality of the i-th solution.
[0026] Step (4), using the entropy weight method to calculate the weights of the rock breaking quality and rock drilling efficiency, which are indicators of rock drilling process suitability, and calculate the rock drilling process suitability of different solutions;
[0027] Among them, the steps of using the entropy weight method to calculate the weights of the rock breaking quality and rock drilling efficiency of the rock drilling process suitability indicators are as follows:
[0028] Step (4.1) standardizes the rock breaking quality and rock drilling efficiency of the rock drilling process applicability indicators to form a standardized judgment matrix R' = (r ij ') m'×2 .
[0029]
[0030] Among them, r ij ' is the value after the standardized processing of each indicator, m' is the number of schemes, a i ' j is the value of the rock drilling technology suitability index of the jth item of the ith scheme, a' max is the maximum value of the rock drilling technology suitability index under the same rock drilling technology suitability index category, a' min It is the minimum value of the rock drilling technology suitability index under the same rock drilling technology suitability index category.
[0031] Step (4.2), the entropy value e' of the rock drilling process suitability index under different rock drilling process suitability index categoriesj Calculate and obtain the entropy matrix E'=(e' j ) m'×2 ;
[0032]
[0033] in,
[0034] Among them, m' is the number of solutions, e' j is the entropy value of the j-th rock drilling technology suitability index, f ij ' is the weight of the rock drilling technology applicability index of the jth item of the i-th scheme, and it is also stipulated that when f ij '=0, lnf ij '=0.
[0035] Step (4.3), according to the entropy value matrix, the entropy weight of the rock drilling process suitability index is calculated to obtain the entropy weight matrix W'=(w' j ) 1×n' and w' j .
[0036]
[0037] Among them, n' is the number of categories of rock drilling technology applicability indicators, w' j is the entropy weight of the j-th indicator.
[0038] In the above step (4), the steps for calculating the applicability of different rock drilling processes are as follows:
[0039] The rock drilling process suitability is calculated by the standardized judgment matrix R' and the entropy weight matrix W', and the rock drilling process suitability is obtained as P' = (p i ') 1×n' .
[0040] P'=R'W' (5)
[0041] Among them, p i ' represents the suitability of the rock drilling process of the ith solution.
[0042] (5) Calculate the average rock drilling process suitability of different parameter values in different construction parameter categories, and select the parameter value corresponding to the maximum rock drilling process suitability in each construction parameter category as the optimal value of the construction parameter category; combine the optimal values of each construction category to obtain the optimal construction parameter.
[0043] (6) Perform numerical simulation on the optimized rock drilling process and verify the optimal rock drilling process. The method for verifying the optimal rock drilling process is: according to the construction parameters obtained by the optimal rock drilling process, establish the corresponding numerical model and perform numerical simulation. The optimal rock drilling process is verified by the damage development of the rock.
[0044] The process of step (1) is as follows:
[0045] Step (1.1), according to the on-site construction conditions and test costs, a four-factor three-level orthogonal test plan including lifting height, single-point chiseling times, row spacing and position spacing was formulated;
[0046] Step (1.2), according to the test plan, lift the rock drill to the specified height and then release it to drill the rock, and drill the rock at that location for a specified number of times according to the single-point drill number. After the rock drilling at that location is completed, move the rock drill according to the set row spacing and position and drill again. The drilling area of a single test plan is ≥10m×10m. According to the construction parameters of different test plans, complete all tests and obtain the reef clearance thickness and rock drilling efficiency of different plans;
[0047] Step (1.3) is to perform numerical simulation according to the orthogonal test scheme, and establish a rock drilling numerical model based on the on-site rock mechanical properties, water depth, and rock drilling rod shape. According to different test schemes, the lifting height of the rock drilling rod, the number of single-point chiseling, the lifting height of the row spacing and the position spacing are adjusted, and numerical simulations of different test schemes are performed to obtain rock damage cloud maps. Subsequently, the numerical simulation post-processing file is read to determine the rock damage volume and calculate the average rock penetration degree.
[0048] In step (1.2), the method for determining the reef clearance thickness is as follows: before the in-situ test, use multi-beam to measure the water depth of the test area; after the in-situ test, use multi-beam to measure the water depth of the in-situ test area again; the difference between the two water depths is the reef clearance thickness of the in-situ test.
[0049] In step (1.2), the method for determining the rock drilling efficiency is: record the start time before the in-situ test, record the number of completed rock drilling points during the test, and record the end time of the test after the test is completed. The rock drilling time is the average time required to complete multiple rock drilling points, the rock drilling area is the average construction area included in multiple rock drilling points, and the rock drilling efficiency is the ratio of the rock drilling time to the rock drilling area.
[0050] In step (1.3), the method for determining the rock damage volume is: reading the numerical simulation post-processing file, deriving the number of damage units, and accumulating the volume of each damage unit to obtain the rock damage volume.
[0051] In step (1.3), the method for calculating the average penetration degree of rock is: determine the average penetration degree of rock through the rock damage cloud map, the average penetration degree of rock is the minimum damage value that makes the damage cloud map between the rock drilling points critically penetrated, and the average penetration degree is the average of the penetration degree in the row spacing direction and the penetration degree in the position distance direction. When the minimum damage value is 0 and the damage zone between the two rock drilling points is still not penetrated, the average penetration degree is determined as the negative value of the ratio of the average distance between the damage boundaries of the two drilling points and the row spacing or position distance.
[0052] In the above step (5), the method for calculating the average rock drilling process suitability for different parameter values in different construction parameter categories is: according to the orthogonal test, all rock drilling process suitability for one construction parameter value is averaged to obtain the average rock drilling process suitability. Then, according to this method, the average rock drilling process suitability for different parameter values in different construction parameter categories is calculated.
[0053] Beneficial effect: Compared with the existing rock drilling process determination method, the advantages of the present invention are: the rock drilling process is optimized and designed through orthogonal experiments and comprehensive evaluation methods, which solves the current problem of difficulty in comprehensively considering the rock breaking quality and rock drilling efficiency, and combines the actual on-site conditions with numerical simulation, avoiding the uncertainty and arbitrariness of artificial determination of the rock drilling process, and taking into account both the rock breaking quality and the rock drilling efficiency in the optimization process, ensuring high-quality and efficient advancement of underwater rock drilling construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 This is a flow chart of the underwater rock drilling process optimization method based on the entropy weight method of the present invention;
[0055] Figure 2 Schematic diagram of a method for calculating average penetration degree in an embodiment of the present invention;
[0056] Figure 3 The numerical simulation damage cloud diagrams of different test schemes in the embodiments of the present invention;
[0057] Figure 4 This is a damage cloud diagram of the numerical simulation of the optimized rock drilling process in the embodiment of the present invention. DETAILED DESCRIPTION
[0058] like Figures 1 to 4 As shown, the underwater rock drilling process optimization method based on the entropy weight method of the present invention comprises the following steps:
[0059] Step (1), according to the rock breaking quality being affected by lifting height, single point chiseling number, row spacing and position spacing, a four-factor multi-level orthogonal test scheme including the above factors is designed, and in-situ tests and numerical simulations are carried out to obtain the actual reef clearing thickness, rock drilling efficiency and rock damage volume.
[0060] This step specifically includes steps (1.1) to (1.3):
[0061] Step (1.1), according to the on-site construction conditions and test costs, a four-factor multi-level orthogonal test plan including lifting height, single-point chiseling times, row spacing and position spacing was formulated;
[0062] Step (1.2), conduct in-situ tests according to the orthogonal test scheme, and record the actual reef clearance thickness and rock drilling efficiency of different schemes;
[0063] Step (1.3), perform numerical simulation according to the orthogonal experimental scheme and derive the rock damage volume of different schemes.
[0064] In step (1.2), the method for determining the reef clearance thickness is: before the in-situ test, use multi-beam to measure the water depth of the test area; after the in-situ test, use multi-beam to measure the water depth of the test area again, and the difference between the two water depths is the reef clearance thickness of the in-situ test.
[0065] In step (1.2), the method for determining the rock drilling efficiency is as follows: record the start time before the in-situ test, record the number of completed rock drilling points during the test, and record the end time of the test after the test. The rock drilling time is the average time required to complete 4 rock drilling points, and the rock drilling area is the average construction area covered by the 4 rock drilling points. The rock drilling efficiency is the ratio of the rock drilling time to the rock drilling area.
[0066] In step (1.3), the method for determining the rock damage volume is: reading the numerical simulation post-processing file, deriving the number of damage units, and accumulating the volume of each damage unit to obtain the rock damage volume;
[0067] In step (1.3), the method for calculating the average penetration degree of rock is: determine the average penetration degree of rock through the rock damage cloud map, the average penetration degree of rock is the minimum damage value that makes the damage cloud map between the rock drilling points critically penetrated, and the average penetration degree is the average of the penetration degree in the row spacing direction and the penetration degree in the position distance direction. When the minimum damage value is 0 and the damage zone between the two rock drilling points is still not penetrated, the average penetration degree is determined as the negative value of the ratio of the average distance between the damage boundaries of the two drilling points and the row spacing or position distance.
[0068] Step (2), determining rock drilling process suitability index rock breaking quality index and rock drilling efficiency, wherein the rock breaking quality index includes reef clearance thickness, rock damage volume and average penetration degree;
[0069] The rock breaking quality indicators include the reef clearance thickness, rock damage volume and average penetration degree. The rock drilling efficiency is calculated by the rock drilling time and rock drilling area.
[0070] Step (3), using the entropy weight method to calculate the weight of the rock breaking quality index, and calculating the rock breaking quality of the orthogonal test scheme; the process of calculating the weight of the rock breaking quality index using the entropy weight method includes steps (3.1) to (3.5):
[0071] Step (3.1) standardizes the rock breaking quality indicators of reef clearance thickness, rock damage volume and average penetration degree to form a standardized judgment matrix R1 = (r ij ) m×3 .
[0072]
[0073] Among them, r ij is the value after the standardized processing of each indicator value, m is the number of schemes, a ij is the value of the jth indicator of the ith solution, a max is the maximum value of the rock breaking quality index under the same construction parameter category, a min It is the minimum value of rock breaking quality index under the same construction parameter category.
[0074] Step (3.2), calculate the entropy value of the rock breaking quality index, and obtain the entropy value matrix E1 of different indicators = (e j ) 1×3 .
[0075]
[0076] Among them, m is the number of solutions, e j is the entropy value of the jth indicator, f ij is the weight of the jth indicator of the ith scheme, and it is also stipulated that when f ij =0, lnf ij =0.
[0077] Step (3.3), according to the entropy value matrix, the entropy weight of the rock breaking quality index is calculated to obtain the entropy weight matrix of different indicators W1 = (w j ) 1×3 and w j .
[0078]
[0079] Among them, w j is the entropy weight of the j-th indicator.
[0080] Step (3.4), the rock breaking quality index data of different schemes are calculated based on the standardized matrix of rock breaking quality and the entropy weight matrix. The rock breaking quality matrix is recorded as P1 = (p i ) 1×n .
[0081] P1=R1W1 (5)
[0082] Among them, p i represents the rock breaking quality index data of the i-th scheme, R is the standardized judgment matrix, and W is the weight matrix.
[0083] (3.5) Based on the obtained rock breaking quality index data, the construction effect comprehensive calculation index (rock breaking quality and rock drilling efficiency) is further calculated according to formula (1) to formula (4) to obtain R = (r ij ) m×2 , E=(e j ) 1×2 and W = (w j ) 1×2 , the rock breaking quality is calculated according to formula (6).
[0084] P=RW (6)
[0085] (4) The entropy weight method is used to calculate the weights of the rock breaking quality and rock drilling efficiency, which are the indicators of rock drilling technology suitability, and the rock drilling technology suitability of different schemes is calculated.
[0086] Among them, the steps of using the entropy weight method to calculate the weights of the rock breaking quality and rock drilling efficiency of the rock drilling process suitability indicators are as follows:
[0087] Step (4.1) standardizes the rock breaking quality and rock drilling efficiency of the rock drilling process applicability indicators to form a standardized judgment matrix R' = (r ij ') m'×2 .
[0088]
[0089] Among them, r ij ' is the value after the standardized processing of each indicator, m' is the number of schemes, a i ' j is the value of the rock drilling technology suitability index of the jth item of the ith scheme, a' max is the maximum value of the rock drilling technology suitability index under the same rock drilling technology suitability index category, a' min It is the minimum value of the rock drilling technology suitability index under the same rock drilling technology suitability index category.
[0090] Step (4.2), the entropy value e' of the rock drilling process suitability index under different rock drilling process suitability index categories j Calculate and obtain the entropy matrix E'=(e' j ) m'×2 ;
[0091]
[0092] in,
[0093] Among them, m' is the number of solutions, e' j is the entropy value of the j-th rock drilling technology suitability index, f ij ' is the weight of the rock drilling technology applicability index of the jth item of the i-th scheme, and it is also stipulated that when f ij '=0, lnf ij '=0.
[0094] Step (4.3), according to the entropy value matrix, the entropy weight of the rock drilling process suitability index is calculated to obtain the entropy weight matrix W'=(w' j ) 1×n' and w' j .
[0095]
[0096] Among them, n' is the number of categories of rock drilling technology applicability indicators, w' j is the entropy weight of the j-th indicator.
[0097] In the above step (4), the steps for calculating the applicability of different rock drilling processes are as follows:
[0098] The rock drilling process suitability is calculated by the standardized judgment matrix R' and the entropy weight matrix W', and the rock drilling process suitability is obtained as P' = (p i ') 1×n' .
[0099] P'=R'W' (5)
[0100] Among them, p i ' represents the suitability of the rock drilling process of the ith solution.
[0101] (5) Calculate the average rock drilling process suitability of different parameter values in different construction parameter categories, and select the parameter value corresponding to the maximum rock drilling process suitability in each construction parameter category as the optimal value of the construction parameter category; combine the optimal values of each construction category to obtain the optimal construction parameter.
[0102] (6) Perform numerical simulation on the optimized rock drilling process to verify the rock breaking quality.
[0103] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments, wherein the embodiment is an underwater rock drilling construction project in Guangdong.
[0104] (1) According to the on-site construction conditions of the underwater rock drilling project, a four-factor three-level orthogonal test plan was formulated. The specific size of each level is shown in Table 1, and the orthogonal test plan is shown in Table 2.
[0105] Table 1 Different factor levels
[0106]
[0107] Table 2 Four-factor three-level orthogonal test plan
[0108]
[0109]
[0110] (2) Carry out in-situ tests according to the orthogonal test scheme, and record the actual reef clearance thickness and rock drilling efficiency of different schemes. Carry out numerical simulation according to the orthogonal test scheme, and derive the rock damage volume of different schemes. Take Scheme 5 as an example to illustrate the damage calculation method. Figure 2 (a) shows the damage area with a damage interval of 0.9 to 1. At this time, the damage area in the distance direction is not connected. Figure 2 (b) is the damage area with a damage interval of 0.8 to 1. The damage area shown in the figure gradually increases, but the damage area in the distance direction is still not completely connected. Figure 2 (c) is the damage area with a damage interval of 0.7 to 1. It can be seen that the damage area is in a critical penetration state, so the penetration degree in the distance direction is considered to be 0.7; Figure 2 (d) is a damaged area with a damage interval of 0 to 1. It can be seen from the figure that the row spacing direction is still not penetrated, so it is considered that the penetration degree in the row spacing direction is -l / c=-0.1, so the average penetration degree is 0.3.
[0111] After calculation, the reef clearance thickness, rock drilling efficiency, rock damage volume and average penetration degree of the underwater rock drilling construction project are shown in Table 3, and the damage cloud diagram is shown in Figure 3 shown.
[0112] Table 3 Statistics of results of different test schemes
[0113]
[0114] (3) According to the reef clearance thickness, rock drilling efficiency and rock damage volume, the comprehensive calculation index composition of the construction effect is determined, and the index is quantified. For underwater rock drilling construction, the comprehensive calculation index of the construction effect is divided into two primary indicators: rock breaking quality and rock drilling efficiency. Among them, the rock breaking quality is further subdivided into three secondary indicators: reef clearance thickness, rock damage volume, and average penetration degree.
[0115] (4) For this underwater rock drilling construction project, the rock breaking quality is first calculated by combining the entropy weight method, and then the rock drilling efficiency is combined to calculate the applicability of the rock drilling process. The calculation results are shown in Table 4.
[0116] Table 4 Applicability of rock drilling technology in different test schemes
[0117] Solution No. Rock breaking quality <![CDATA[Drilling efficiency (m 2 / min)]]> Rock drilling technology suitability Solution 1 0.391 0.94 0.244 Solution 2 0.348 1.54 0.426 Solution 3 0.186 1.52 0.301 Solution 4 0.803 0.67 0.452 Solution 5 0.244 1.73 0.416 Solution 6 0.426 1.36 0.421 Solution 7 0.771 1.15 0.597 Solution 8 1.000 0.81 0.646 Solution 9 0.332 1.81 0.510
[0118] (5) The suitability of rock drilling technology under different levels of various factors was statistically analyzed. The results are shown in Table 5. The optimal level is determined to be a lifting height of 34 m, a row spacing of 2.5 m, a position spacing of 1.4 m, and two drilling times.
[0119] Table 5 Applicability of rock drilling technology at different levels of each factor
[0120]
[0121] (6) The optimized underwater rock drilling process was simulated to verify the rationality and reliability of the optimized process. The results are as follows: Figure 4 As shown. It can be seen from the figure that the rock damage volume and damage degree in the chiseling area are relatively high, and the rock breaking quality is relatively good; along the row spacing and position spacing directions, the rock damage volumes between the two chiseling points are interconnected, basically in a critical penetration state, and the rock drilling efficiency is relatively high. Overall, under the optimized rock drilling process, the overall construction effect is good. The rock drilling process optimization method based on comprehensive evaluation proposed in the present invention objectively optimizes the underwater rock drilling construction process, combines the on-site in-situ test and numerical simulation results, and takes into account the rock breaking quality and rock drilling efficiency, which promotes the development of underwater rock drilling technology.
Claims
1. An underwater rock drilling process optimization method based on entropy weight method, characterized in that: The following steps are involved: Step (1), conducting in-situ tests and numerical simulations on orthogonal test schemes including lifting height, single-point chiseling times, row spacing and position spacing to determine reef clearing thickness, rock drilling efficiency and rock damage volume; Step (2), determining rock drilling process suitability indicators including rock breaking quality and rock drilling efficiency, wherein the rock breaking quality indicators include reef clearance thickness, rock damage volume and average penetration degree; Step (3), using the entropy weight method to calculate the weight of the rock breaking quality index, and calculate the rock breaking quality of the orthogonal test scheme; the process of calculating the weight of the rock breaking quality index using the entropy weight method is: Step (3.1) standardizes the rock breaking quality indicators of reef clearance thickness, rock damage volume and average penetration degree to form a standardized judgment matrix R = (r ij ) m×3 ; Among them, r ij is the value after the standardized processing of each indicator, m is the number of schemes, a ij is the value of the rock breaking quality index of the jth item of the i-th scheme, a max is the maximum value of the rock breaking quality index under the same construction parameter category, a min It is the minimum value of rock breaking quality index under the same construction parameter category; Step (3.2), the entropy value e of rock breaking quality index under different construction parameter categories is calculated. j Calculate and obtain the entropy matrix E of different parameter categories = (e j ) m×3 : in, Among them, m is the number of solutions, e j is the entropy value of the j-th rock breaking quality index, f ij is the weight of the rock breaking quality index of the jth item of the i-th scheme, and it is also stipulated that when f ij =0, lnf ij =0; Step (3.3), according to the entropy value matrix, the entropy weight of the rock breaking quality index is calculated to obtain the entropy weight matrix W = (w j ) 1×n and w j ; Where n is the number of categories of rock breaking quality parameters, w j is the entropy weight of the j-th indicator; The process of calculating the rock breaking quality of different schemes is: The rock breaking quality is calculated by using the standardized judgment matrix R and the entropy weight matrix W, and the obtained rock breaking quality matrix is recorded as P = (p i ) 1×n : P=RW (5) Among them, p i represents the rock breaking quality of the i-th solution; Step (4), using the entropy weight method to calculate the weights of the rock breaking quality and rock drilling efficiency of the rock drilling process suitability indicators, and calculate the rock drilling process suitability of different schemes; the process is: Step (4.1) standardizes the rock breaking quality and rock drilling efficiency of the rock drilling process applicability indicators to form a standardized judgment matrix R' = (r' ij ) m'×2 ; Among them, r' ij is the value after the standardized processing of each indicator, m' is the number of schemes, a' ij is the value of the rock drilling technology suitability index of the jth item of the ith scheme, a' max is the maximum value of the rock drilling technology suitability index under the same rock drilling technology suitability index category, a' min It is the minimum value of the rock drilling technology suitability index under the same rock drilling technology suitability index category; Step (4.2), the entropy value e' of the rock drilling process suitability index under different rock drilling process suitability index categories j Calculate and obtain the entropy matrix E'=(e' j ) m'×2 ; in, Among them, m' is the number of solutions, e' j is the entropy value of the j-th rock drilling process suitability index, f' ij is the weight of the rock drilling technology applicability index of the jth item of the i-th scheme, and it is also stipulated that when f' ij = 0, ln f' ij =0; Step (4.3), according to the entropy value matrix, the entropy weight of the rock drilling process suitability index is calculated to obtain the entropy weight matrix W'=(w' j ) 1×n' and w' j ; Among them, n' is the number of categories of rock drilling technology applicability indicators, w' j is the entropy weight of the j-th indicator; Step (5), calculating the average rock drilling process suitability of different parameter values in different construction parameter categories, and selecting the parameter value corresponding to the maximum rock drilling process suitability in each construction parameter category as the optimal value of the construction parameter category; combining the optimal values of each construction category as the optimal construction parameter; Step (6), numerically simulate the optimized rock drilling process and verify the optimal rock drilling process: according to the construction parameters obtained by the optimal rock drilling process, establish a corresponding numerical model, perform numerical simulation, and verify the optimal rock drilling process.
2. The underwater rock drilling process optimization method based on entropy weight method according to claim 1 is characterized in that: The process of step (1) is: Step (1.1), formulate a four-factor three-level orthogonal test plan including lifting height, number of single-point chiseling, row spacing and position spacing; Step (1.2), after lifting the rock drill rod to a specified height, release it to drill the rock, and drill the rock a specified number of times according to the single-point drilling number; after the rock drilling is completed, move the rock drill rod according to the set row spacing and position and drill again to obtain the rock drilling efficiency and reef clearance thickness; Step (1.3), perform numerical simulation according to the orthogonal test scheme and establish a rock drilling numerical model; adjust the lifting height of the rock drill rod, the number of single-point chiseling, the lifting height of the row spacing and the position spacing to obtain a rock damage cloud map; read the numerical simulation post-processing file, determine the rock damage volume, and calculate the average rock penetration degree.
3. The underwater rock drilling process optimization method based on entropy weight method according to claim 2 is characterized in that: In step (1.2), the rock drilling efficiency and reef clearing thickness of different test schemes are obtained according to the construction parameters of different test schemes.
4. The underwater rock drilling process optimization method based on entropy weight method according to claim 2 is characterized in that: In step (1.2), the method for determining the reef clearance thickness is: before the in-situ test, use multi-beam to measure the water depth of the test area; after the in-situ test, use multi-beam to measure the water depth of the in-situ test area, and the difference between the two water depths is the reef clearance thickness of the in-situ test.
5. The underwater rock drilling process optimization method based on entropy weight method according to claim 2 is characterized in that: In step (1.2), the rock drilling efficiency is the ratio of the rock drilling time to the rock drilling area, the rock drilling time is the average time required to complete multiple rock drilling points, and the rock drilling area is the average construction area of the multiple rock drilling points.
6. The underwater rock drilling process optimization method based on entropy weight method according to claim 2 is characterized in that: In step (1.3), a numerical model of rock drilling is established based on the mechanical properties of rock, water depth and the shape of the rock drilling rod.
7. The underwater rock drilling process optimization method based on entropy weight method according to claim 2 is characterized in that: In step (1.3), the method for determining the rock damage volume is: reading the numerical simulation post-processing file, deriving the number of damage units, and accumulating the volume of each damage unit to obtain the rock damage volume.
8. The underwater rock drilling process optimization method based on entropy weight method according to claim 2 is characterized in that: In step (1.3), the method for calculating the average penetration degree of rock is: determine the average penetration degree of rock through the rock damage cloud map, the average penetration degree of rock is the minimum damage value that makes the damage cloud map between the rock drilling points critically penetrated, and the average penetration degree is the average of the penetration degree in the row spacing direction and the penetration degree in the position distance direction. When the minimum damage value is 0 and the damage zone between the two rock drilling points is still not penetrated, the average penetration degree is determined as the negative value of the ratio of the average distance between the damage boundaries of the two drilling points and the row spacing or position distance.
9. The underwater rock drilling process optimization method based on entropy weight method according to claim 1 is characterized in that: In step (4), the process of calculating the applicability of different rock drilling technology schemes is as follows: The rock drilling process suitability is calculated by the standardized judgment matrix R' and the entropy weight matrix W', and the rock drilling process suitability is obtained as P' = (p' i ) 1×n' . P'=R'W' (5) Among them, p' i Indicates the suitability of the rock drilling technology of the i-th solution.
10. The underwater rock drilling process optimization method based on entropy weight method according to claim 1 is characterized in that: In step (5), the process of calculating the average rock drilling process suitability for different parameter values in different construction parameter categories is as follows: according to the orthogonal test, all rock drilling process suitabilities for the construction parameter values are averaged to obtain the average rock drilling process suitability; and then the average rock drilling process suitability for different parameter values in different construction parameter categories is calculated.