Layered rock mass side wall presplitting blasting design method
Through ground stress testing and numerical simulation, the diameter of the medicine roll, the air interval length and the spacing between the gun holes were optimized, and the non-uniform charge structure was designed, and the air interval was set at the interface of the rock formation, which solved the difficulty of pre-cracking and cracking in the layered rock mass and the formation of fractures. The problem of uneven seams improves the flatness of the retaining surface of the rock mass and reduces the problem of excessive under-excavation.
Patent Information
- Application Number
- CN202411193380.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-26
AI Technical Summary
During the excavation of side walls of underground factory buildings, conventional pre-crack blasting design cannot effectively deal with the difficulties in the crack formation and uneven crack formation problems caused by stress concentration and lithologic differences in layered rock mass, resulting in uneven retaining surface of the rock mass and Extremely under-digging problem.
Through preliminary geological exploration and geostress testing, a numerical model of rock mass physical and mechanical parameters and explosives are determined, a layered excavation numerical model was established, a three-dimensional porous pre-cracking blasting simulation was carried out, and the diameter of the medicine roll, the length of the air interval and the spacing of the gun hole were adjusted, and the design was non-uniform. Boil the structure and set air spacing at the rock formation interface to avoid local damage.
The flatness of the retaining surface of the rock mass is improved, the problem of excessive under-excavation is reduced, the uniform forming of pre-cracks is ensured, the number of on-site tests is reduced, and the cost is reduced. It is suitable for different lithologies and side wall bottom corner stress concentration conditions.
Smart Images

Figure CN119026367A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy and hydropower engineering, in particular to a layered rock mass side wall pre-splitting blasting design method. Background Art
[0002] As a contour-controlled blasting technology, pre-splitting blasting has been widely used in the excavation of underground powerhouse side walls. Pre-splitting blasting forms pre-cracks at the excavation contour of the side wall, which can reduce shock and prevent crack expansion, reduce the impact of blasting in the main blasting area on the retained rock mass, and ensure that the side wall contour surface is smooth and beautiful, with less over-excavation and under-excavation. However, when excavating the lower and middle parts of the underground powerhouse, there is an obvious stress concentration phenomenon in the rock mass at the bottom corner of the side wall, and the closer to the bottom corner of the side wall, the higher the stress concentration. The influence of ground stress is not considered in the design of conventional pre-splitting blasting. For example, patent CN108999613A believes that part of the ground stress can be released through deep hole pre-splitting blasting under high ground stress conditions, and does not consider the effect of pre-splitting blasting when stress is concentrated. Because the pre-splitting hole is located at the bottom corner of the side wall, the compressive stress is significantly increased. The line charge density obtained by conventional pre-splitting blasting design is low, the spacing between blastholes is large, and pre-splitting is difficult.
[0003] In addition, when the pre-crack holes of the side wall pass through different rock types (especially soft and hard interlayered rock), the stress concentration area will shift to the interface of the rock strata, affecting the overall uniformity of the crack formation. If a conventional uniform charge structure is used, the pre-cracks are narrow in the hard rock area and wide in the soft rock area. The detonation wave is likely to cause local damage to the interface of the rock strata. At the same time, the infiltration of the explosive gas is likely to cause the interface to open and slip. As a result, the overall pre-crack formation is uneven, the rock mass retention surface has a large unevenness, the rock strata interface slips, and the over-excavation problem is serious. For example, the blasting methods proposed by patents CN10738327A, CN106679522A, and CN111879194A for soft and hard interlayered rock are only applicable to step blasting. When excavating underground powerhouses, the three-dimensional stress concentration at the bottom corner of the side wall is not conducive to pre-crack formation, and an applicable blasting design method is urgently needed. Summary of the invention
[0004] The purpose of the present invention is to overcome the above-mentioned shortcomings and provide a layered rock side wall pre-splitting blasting design method to solve the problems of difficulty in pre-splitting and uneven pre-crack formation when using conventional pre-splitting blasting design methods for layered rock side wall pre-splitting blasting, improve the flatness of the rock retention surface, and reduce the problems of over-excavation and under-excavation.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a layered rock mass side wall pre-splitting blasting design method, which comprises the following steps:
[0006] Step 1: Through preliminary geological survey and geostress testing, determine the geostress level σ of the underground powerhouse and the lithology distribution in the sidewall area, preliminarily determine the physical and mechanical parameters of the rock mass, and determine the performance of the explosives used. The physical and mechanical parameters of the rock mass include the compressive strength σ c and tensile strength σ t , the explosive properties include the type of explosive, the density of explosive ρ0, the length of the explosive roll l e ;
[0007] Step 2: Establish a numerical model of layered excavation of underground powerhouse according to the underground powerhouse excavation layout and excavation plan; set pre-crack holes at the contour surface of the side wall in the model, and comprehensively consider the on-site construction machinery conditions and geological conditions to determine the reasonable drilling diameter d and pre-crack hole depth l;
[0008] Step 3: Set the rock mass physical and mechanical parameters σ of the numerical model c , σ t According to the ground stress level σ of the underground powerhouse, the numerical model is subjected to ground stress balance, and then the underground powerhouse excavation simulation is carried out step by step, which is terminated before the side wall layer excavation. The three-dimensional stress σ faced by the side wall pre-crack hole at the bottom corner before the side wall layer excavation is obtained. x , σ y , σ z The degree of concentration and specific distribution characteristics of
[0009] Step 4: Perform a three-dimensional multi-hole pre-splitting blasting simulation on the numerical model under the action of the three-dimensional stress field at the bottom corner of the side wall, and analyze the e , air gap length l a , the crushing of the blasthole wall when the blasthole spacing is a, the distribution of axial cracks in the blastholes, and the penetration of radial cracks between the blastholes;
[0010] Step 5: Adjust three parameters d e , l a , a and then repeat step 4; the parameter adjustment priority level is: d e > a >a; The parameter adjustment principle is: if the blast hole wall is crushed, the diameter of the cartridge d e decreases, otherwise increases; if the axial cracks of the blasthole are unevenly distributed, the air gap length l a If the radial cracks between the blast holes are not connected, the blast hole spacing a is reduced, otherwise it is increased; when the blast hole wall is not crushed, the axial cracks of the blast holes are evenly distributed and the cracks between the blast holes are connected, the parameter adjustment is terminated and the next step is carried out;
[0011] Step 6: Adjust the three parameters d according to step 5 e , l a , a calculate the line charge density q;
[0012] Step 7: According to different ground stress levels σ and different rock mass physical and mechanical parameters σ c , σ t , repeat steps 2 to 6 to obtain the calculation function of the linear charge density q and the blasthole spacing a;
[0013] Step 8: Design the charge structure. When the pre-cracked hole is located in two or more lithologies, different line charge densities should be used in the charge sections of different lithologies. Use taphole mud to plug the hole mouth, and set air intervals at the interface of the rock layer to avoid local damage. Calculate the charge amount for a single hole.
[0014] Step 9, drill pre-split holes along the side wall excavation contour line at the blasthole interval a, connect the cartridges in series with detonating cords, and then tie the cartridges and detonating cords to bamboo pieces or plastic plates, do not arrange cartridges at the interface of the rock strata, and then fix the bamboo pieces or plastic plates at the center of the blastholes, place them on one side of the reserved area, and plug the hole openings with gun mud;
[0015] Step 10, using detonating cords to connect the detonation network in parallel in sections, and after confirming that the detonation network is safe, detonating by detonators;
[0016] Step 11: After the pre-splitting blasting is completed, check the quality of the side wall forming, and measure and observe the flatness, semi-porosity, and whether there is local crushing of the pre-splitting surface.
[0017] Furthermore, in step 6, the line charge density q is:
[0018]
[0019] In the formula, l e Represents the length of the medicine roll; l a represents the air gap length; d e represents the diameter of the explosive roll; ρ0 represents the density of the explosive.
[0020] Furthermore, in step 7, the calculation function of the linear charge density q and the blasthole spacing a is:
[0021] q ij =f1(σ i ,σ cj ,σ tj ) (Formula 2)
[0022] a ij =f2(σ i ,σ cj ,σ tj ,q ij ) (Formula 3)
[0023] In the formula, i represents different in-situ stress levels, and j represents different lithologies.
[0024] Furthermore, in step 8, the single hole dosage calculation formula is:
[0025] Q=Σq ij l j (Formula 4)
[0026] l=∑l j +l s (Formula 5)
[0027] In the formula, i represents different ground stress levels; j represents different lithology; l represents the depth of the pre-fracture hole; l j Represents the length of the charging section; l s Represents the length of the blocked section.
[0028] Beneficial effects of the present invention:
[0029] 1. The traditional pre-splitting blasting design method for the side wall of an underground powerhouse is to determine blasting parameters, charge structure, etc. through empirical formulas and engineering analogies. It is restricted by the inductive conditions and has a limited scope of application. Under different rock types and stress concentration conditions at the bottom angle of the side wall, it generally requires multiple tests for adjustment, which is economically and time-intensive and is not conducive to construction. The present invention mainly determines parameters such as line charge density, charge structure, and blasthole spacing through numerical simulation, and can adjust and optimize the pre-splitting blasting design parameters according to the simulation results. It is better than the traditional pre-splitting blasting design method and can reduce the number of pre-splitting seam formation verifications through field tests. It solves the problems of difficulty in pre-splitting seams and uneven seam formation when the conventional pre-splitting blasting design method is used for pre-splitting blasting of the side wall of a layered rock mass, improves the flatness of the rock mass retention surface, and reduces the problems of over-excavation and under-excavation.
[0030] 2. The present invention determines the charge density of the pre-splitting blasting line and the spacing between blastholes according to the different lithologies of the layered rock mass and the three-dimensional stress concentration degree of the bottom angle of the side wall, thereby ensuring smooth formation of pre-cracks and uniform cracking of different rock layers.
[0031] 3. The present invention sets an air gap at the interface of the rock strata to ensure that no local damage occurs at the interface of the rock strata.
[0032] 4. The present invention is easy to operate and construct without adding extra costs.
[0033] 5. The present invention numerically analyzes the problems of difficulty and uneven seam formation caused by three-dimensional stress concentration at the bottom angle of the side wall and difference in rock strata strength during pre-splitting blasting of layered rock mass. It can ensure pre-crack formation in hard rock areas and quality control of retained rock mass in soft rock areas in soft and hard interlayered rock mass, prevent local damage at the interface of rock strata in the retained rock mass, and improve the quality of side wall formation. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1This is a schematic diagram of underground powerhouse excavation and lithology distribution;
[0035] Figure 2 It is a schematic diagram of the charging structure of the pre-crack hole passing through two types of rock masses along the axial direction;
[0036] In the figure, 101 is the roof arch of the factory building; 102 is the hard rock layer 1; 103 is the side wall 1 of the factory building; 104 is the pre-crack hole 1; 105 is the weak rock layer 1; 1 is the side wall 2 of the factory building; 2 is the pre-crack hole 2; 3 is the hard rock layer 2; 4 is the rock layer interface; 5 is the weak rock layer 2; 6 is the detonating cord and bamboo strips; 7 is the blocking section; 8 is the upper reinforced charge section; 9 is the lower weakened charge section. DETAILED DESCRIPTION
[0037] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0038] Example 1: Figure 1-2 As shown, a method for designing pre-splitting blasting of layered rock mass side walls comprises the following steps:
[0039] Step 1: Determine the ground stress level σ of the underground powerhouse and the rock distribution in the sidewall area through preliminary geological survey and ground stress test, and preliminarily determine the physical and mechanical parameters of the rock mass such as compressive strength σ c and tensile strength σ t etc., and determine the properties of the explosives used, such as the type of explosives, the density of explosives ρ0, the length of the explosive roll l e wait.
[0040] Step 2: Establish a numerical model of underground powerhouse layered excavation based on the underground powerhouse excavation layout and excavation plan. Pre-crack holes are set at the contour surface of the side wall in the model, and the reasonable drilling diameter d and pre-crack hole depth l are determined by comprehensively considering the on-site construction machinery conditions, geological conditions, etc.
[0041] Step 3: Set the rock mass physical and mechanical parameters σ of the numerical model c , σ t According to the ground stress level σ of the underground powerhouse, the numerical model is subjected to ground stress balance, and then the underground powerhouse excavation simulation is performed step by step, which is terminated before the side wall layer excavation. The three-dimensional stress σ faced by the side wall pre-crack hole at the bottom corner before the side wall layer excavation is obtained. x , σ y , σ z The degree of concentration and specific distribution characteristics.
[0042] Step 4: Perform a three-dimensional multi-hole pre-splitting blasting simulation on the numerical model under the action of the three-dimensional stress field at the bottom corner of the side wall to analyze the e , air gap length l a, the crushing of the borehole wall when the borehole spacing is a, the distribution of axial cracks in the boreholes, and the penetration of radial cracks between the boreholes.
[0043] Step 5: Adjust the three parameters d e , l a , a and then repeat step 4. The parameter adjustment priority level is: d e > a >a. The principle of parameter adjustment is: if the blast hole wall is crushed, the diameter of the cartridge d e should be reduced, otherwise it can be appropriately increased; if the axial cracks of the blasthole are unevenly distributed, the air gap length l a If the radial cracks between the blast holes are not connected, the blast hole spacing a should be reduced, otherwise it can be appropriately increased. When the blast hole wall is not crushed, the axial cracks of the blast holes are evenly distributed and the cracks between the blast holes are connected, the parameter adjustment is terminated and the next step is carried out.
[0044] Step 6: Adjust the three parameters d according to step 5 e , l a , a. Calculate the line charge density q.
[0045]
[0046] In the formula, l e Represents the length of the medicine roll; l a represents the air gap length; d e represents the diameter of the explosive roll; ρ0 represents the density of the explosive.
[0047] Step 7: According to different ground stress levels σ and different rock mass physical and mechanical parameters σ c , σ t Etc., repeat steps 2 to 6 to obtain the calculation function of linear charge density q and borehole spacing a.
[0048] q ij =f1(σ i ,σ cj ,σ tj ) (Formula 2)
[0049] a ij =f2(σ i ,σ cj ,σ tj ,q ij ) (Formula 3)
[0050] In the formula, i represents different in-situ stress levels and j represents different lithologies.
[0051] Step 8, design the charge structure. When the pre-cracked hole is located in two or more lithologies, different linear charge densities need to be used in the charge sections of different lithologies. Use taphole mud to block the hole mouth, and set air gaps at the interface of the rock layer to avoid local damage. The single hole charge calculation formula is:
[0052] Q=∑q ij l j (Formula 4)
[0053] l=∑l j +l s (Formula 5)
[0054] In the formula, i represents different ground stress levels; j represents different lithology; l represents the depth of the pre-fracture hole; l j Represents the length of the charging section; l s Represents the length of the blocked section.
[0055] Step 9, drill pre-crack holes along the side wall excavation contour line at the blasthole interval a, connect the cartridges in series with detonating cord, and then bundle the cartridges and detonating cord on bamboo strips or plastic plates. Do not arrange cartridges at the interface between rock strata, and then fix the bamboo strips or plastic plates at the center of the blasthole, place it on one side of the reserved area, and plug the hole mouth with gun mud.
[0056] Step 10, using detonating cord to segmentally connect the detonating network in parallel, after confirming the safety of the detonating network, detonate through the detonator.
[0057] Step 11, after the pre-splitting blasting is completed, check the quality of the side wall forming, mainly measuring and observing the flatness of the pre-splitting surface, semi-porosity, whether there is local crushing, etc.
[0058] The above three-dimensional stress concentration takes into account the change in stress conditions at the bottom corner of the side wall as the underground powerhouse is excavated layer by layer. When the ground stress level σ is constant, the three-dimensional stress concentration at the bottom corner of the side wall becomes more significant as the number of side wall excavation layers increases.
[0059] The above-mentioned charge density q takes into account the influence of the three-dimensional stress concentration degree at the bottom corner of the side wall and the physical and mechanical parameters of the rock mass. When the three-dimensional stress concentration degree at the bottom corner of the side wall is constant, the rock mass compressive strength σ c and tensile strength σ t The larger the value, the larger the corresponding line charge density q; when the rock mass compressive strength σ c and tensile strength σ t When the value is constant, the more significant the three-dimensional stress concentration at the bottom corner of the side wall is, the greater the corresponding line charge density q is.
[0060] The above-mentioned wire charge density calculation function f1 takes into account the influence of the three-dimensional stress concentration degree at the bottom angle and rock characteristics during the excavation of the side wall of the underground powerhouse, and establishes the relationship between the above-mentioned influencing factors and the wire charge density during pre-splitting blasting through numerical simulation methods.
[0061] The above-mentioned blasthole spacing calculation function f2 takes into account the influence of the three-dimensional stress concentration degree at the bottom angle, rock characteristics and linear charge density during the excavation of the side wall of the underground powerhouse, and establishes the relationship between the above-mentioned influencing factors and the blasthole spacing during pre-splitting blasting through numerical simulation methods.
[0062] The above-mentioned charge structure design takes into account the situation when the pre-crack hole passes through the rock interface. An air gap is set at the rock interface to weaken the effects of the detonation wave and the explosive gas at the interface, so as to reduce the local damage such as slippage and opening caused by the detonation wave and the explosive gas to the interface.
[0063] Example 2: The side wall of the fourth floor of the underground powerhouse of a pumped storage power station was excavated. The ground stress level σ was about 20MPa. There was a gently inclined rock layer with a distribution of "hard on top and soft on the bottom". Figure 1 The upper part is thick limestone and dolomite, σ c1 =50~80MPa, the lower part is argillaceous dolomite, σ c2 =20~50MPa. Pre-splitting hole diameter d=76mm, hole depth l=7.0m, plugging length l s =2.0m, using 2# rock emulsion explosive, explosive density ρ0 = 1000kg / m 3 , medicine roll length l e =300mm. The specific steps include:
[0064] Step 1: According to the underground powerhouse excavation layout and lithology distribution map, a numerical model of underground powerhouse layered excavation is established, the physical and mechanical parameters of the rock mass of different rock layers are set, and the ground stress balance and underground powerhouse step-by-step excavation simulation are performed to obtain the stress concentration level σ at the bottom corner after the excavation of the third layer. x , σ y Around 25 to 35 MPa.
[0065] Step 2: Perform a three-dimensional multi-hole pre-splitting blasting simulation on the numerical model under the action of three-dimensional stress concentration at the bottom corner of the side wall. The diameter d of the charge roll is adjusted based on the principle that the hole wall is not crushed, the axial cracks of the hole are evenly distributed, and the cracks between the holes are connected. e , air gap length l a , blasthole spacing a, and the final values are shown in Table 1.
[0066] Table 1 Pre-splitting blasting parameters
[0067]
[0068] Step 3, design the charge structure. The pre-split hole plugging section is 2m long, the upper hard rock charge section is 2.55m long, the air interval at the rock interface is 0.35m, the lower soft rock charge section is 2.1m long, the single hole charge is 2.9kg, and the hole mouth is plugged with taphole mud. The charge structure is shown in Figure 2 .
[0069] Step 4, drill pre-crack holes at intervals of 0.75m along the side wall excavation contour line, connect the cartridges in series with detonating cord, and then tie the cartridges and detonating cord to bamboo strips or plastic plates. Do not arrange cartridges at the interface between the rock strata, and then fix the bamboo strips or plastic plates at the center of the blasthole, place them on one side of the reserved area, and plug the hole mouth with blasthole mud.
[0070] Step 5, use detonating cord to segment and parallelly detonate the network, and after confirming the safety of the detonating network, detonate with detonators.
[0071] Step 6: After the pre-splitting blasting is completed, check the quality of the side wall forming, mainly measuring and observing the flatness of the pre-splitting surface, semi-porosity, whether there is local crushing, etc.
[0072] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A method for designing pre-splitting blasting of layered rock mass sidewalls, characterized in that: It includes the following steps: Step 1: Through preliminary geological survey and geostress testing, determine the geostress level σ of the underground powerhouse and the lithology distribution in the sidewall area, preliminarily determine the physical and mechanical parameters of the rock mass, and determine the performance of the explosives used. The physical and mechanical parameters of the rock mass include the compressive strength σ c and tensile strength σ t , the explosive properties include the type of explosive, the density of explosive ρ0, the length of the explosive roll l e ; Step 2: Establish a numerical model of layered excavation of underground powerhouse according to the underground powerhouse excavation layout and excavation plan; set pre-crack holes at the contour surface of the side wall in the model, and comprehensively consider the on-site construction machinery conditions and geological conditions to determine the reasonable drilling diameter d and pre-crack hole depth l; Step 3: Set the rock mass physical and mechanical parameters σ of the numerical model c , σ t According to the ground stress level σ of the underground powerhouse, the numerical model is subjected to ground stress balance, and then the underground powerhouse excavation simulation is carried out step by step, which is terminated before the side wall layer excavation. The three-dimensional stress σ faced by the side wall pre-crack hole at the bottom corner before the side wall layer excavation is obtained. x , σ y , σ z The degree of concentration and specific distribution characteristics of Step 4: Perform a three-dimensional multi-hole pre-splitting blasting simulation on the numerical model under the action of the three-dimensional stress field at the bottom corner of the side wall, and analyze the e , air gap length l a , the crushing of the blasthole wall when the blasthole spacing is a, the distribution of axial cracks in the blastholes, and the penetration of radial cracks between the blastholes; Step 5: Adjust three parameters d e , l a , a and then repeat step 4; the parameter adjustment priority level is: d e > a >a; The parameter adjustment principle is: if the blast hole wall is crushed, the diameter of the cartridge d e decreases, otherwise increases; if the axial cracks of the blasthole are unevenly distributed, the air gap length l a If the radial cracks between the blast holes are not connected, the blast hole spacing a is reduced, otherwise it is increased; when the blast hole wall is not crushed, the axial cracks of the blast holes are evenly distributed and the cracks between the blast holes are connected, the parameter adjustment is terminated and the next step is carried out; Step 6: Adjust the three parameters d according to step 5 e , l a , a calculate the line charge density q; Step 7: According to different ground stress levels σ and different rock mass physical and mechanical parameters σ c , σ t , repeat steps 2 to 6 to obtain the calculation function of the linear charge density q and the blasthole spacing a; Step 8: Design the charge structure. When the pre-cracked hole is located in two or more lithologies, different line charge densities should be used in the charge sections of different lithologies. Use taphole mud to plug the hole mouth, and set air intervals at the interface of the rock layer to avoid local damage. Calculate the charge amount for a single hole. Step 9, drill pre-split holes along the side wall excavation contour line at the blasthole interval a, connect the cartridges in series with detonating cords, and then tie the cartridges and detonating cords to bamboo pieces or plastic plates, do not arrange cartridges at the interface of the rock strata, and then fix the bamboo pieces or plastic plates at the center of the blastholes, place them on one side of the reserved area, and plug the hole openings with gun mud; Step 10, using detonating cords to connect the detonation network in parallel in sections, and after confirming that the detonation network is safe, detonating by detonators; Step 11: After the pre-splitting blasting is completed, check the quality of the side wall forming, and measure and observe the flatness, semi-porosity, and whether there is local crushing of the pre-splitting surface.
2. A layered rock mass side wall pre-splitting blasting design method according to claim 1, characterized in that: In step 6, the line charge density q is: In the formula, l e Represents the length of the medicine roll; l a represents the air gap length; d e represents the diameter of the explosive roll; ρ0 represents the density of the explosive.
3. A layered rock mass side wall pre-splitting blasting design method according to claim 1, characterized in that: In step 7, the calculation function of the linear charge density q and the blasthole spacing a is: q ij = f1(σ i , σ cj , σ tj ) (Equation 2) a ij = f2(σ i , σ cj , σ tj , q ij )(Formula 3) In the formula, i represents different in-situ stress levels and j represents different lithologies.
4. A layered rock mass side wall pre-splitting blasting design method according to claim 1, characterized in that: In step 8, the single hole dosage calculation formula is: Q=Σq ij l j (Formula 4) l=Σl j +l s (Formula 5) In the formula, i represents different ground stress levels; j represents different lithology; l represents the depth of the pre-fracture hole; l j Represents the length of the charging section; l s Represents the length of the blocked section.
Citation Information
Patent Citations
Deep-buried tunnel stress relieving pre-splitting blasting method
CN104482817A
Excavation method for middle and lower portion of underground cavern in high-crustal-stress area
CN108999613A
Rock anchor beam underground workshop excavation construction method under high ground stress condition
CN109778876A
Urban deep foundation pit shallow layer loosening control blasting construction method
CN111121575A
Downward large-diameter deep hole presplitting blasting method
CN117128821A