Field scheduling management system for building construction
By deploying a comprehensive management system at the construction site, using big data and Internet of Things technology to monitor and analyze data in real time, optimizing resource allocation and construction plans, the problem of existing systems being unable to respond to dynamic changes is solved, construction efficiency and safety are improved, and construction efficiency and safety are reduced. risks and costs.
Patent Information
- Application Number
- CN202411176472.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing construction site management system lacks real-time and interconnectivity, and cannot effectively respond to dynamic changes at the construction site, resulting in delays in project progress, increased costs and quality impacts.
A site scheduling management system for construction was designed, including project management units, resource management units, progress tracking units, quality control units, safety management units, data management units and environmental monitoring units, using big data, machine learning, and the Internet of Things. And cloud computing technology, through real-time monitoring and analysis of data, optimize resource allocation and construction plans, and warn of potential risks.
It realizes the optimal allocation and real-time monitoring of construction site resources, improves construction efficiency and safety, reduces time and resource waste, ensures that project management decisions are based on the latest information, formulate response measures in advance, and reduces risks and costs.
Smart Images

Figure CN119026864A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of construction management, in particular to a site dispatching and management system for building construction. Background Art
[0002] In the field of modern construction, with the expansion of project scale and the advancement of construction technology, the management and scheduling of construction sites have become increasingly complex. Traditional construction site management relies heavily on manual experience and paper records, which is not only inefficient, but also prone to problems such as untimely information transmission, unreasonable resource allocation, and wrong decision-making. In addition, the construction site needs to coordinate a variety of resources, such as personnel, equipment, materials, etc., and the coordination and communication between different links are particularly important;
[0003] In the Chinese patent with publication number: CN114118703A, a construction project intelligent scheduling management system and method are mentioned, which includes a three-dimensional GIS construction deployment system, a scheduling system and a navigation system, wherein the three-dimensional GIS construction deployment system is used by engineers to plan and deploy construction plans and make GIS maps; the scheduling system obtains material management data, progress management data, construction site vehicle and equipment data, and plans navigation targets according to the data; the navigation system includes a construction site navigation and terminal mobile device and a navigation assistance system, and the construction site navigation intelligently plans the vehicle walking route and parking position, and sends the data to the navigation assistance system;
[0004] However, existing management systems often lack real-time and interconnectivity, and are unable to respond to dynamic changes on the construction site in a timely manner, resulting in project delays, increased costs, and even impacts on project quality. With the development of information technology, especially the application of the Internet of Things, big data, and cloud computing, the construction industry is in urgent need of an efficient on-site scheduling management system to achieve optimal resource allocation and real-time monitoring, thereby improving construction efficiency and safety.
[0005] To this end, technicians in this field have proposed a site scheduling management system for construction, which is used to provide a comprehensive and real-time management platform that can effectively coordinate various resources on the construction site, optimize the construction plan, and enhance decision-making support capabilities. Summary of the invention
[0006] In order to solve the above technical problems, the present invention provides a site scheduling management system for construction to solve the problems mentioned in the background technology.
[0007] A site dispatching and management system for construction, comprising:
[0008] The project management unit is responsible for the basic information management of the entire project, so that all project information can be centrally managed. It includes a planning and scheduling module, a cost control module, and a document management module;
[0009] Resource management unit, used to manage all resources on the construction site, including human resource management module, equipment management module, and material management module;
[0010] The progress tracking unit is used to monitor the project progress in real time, compare it with the plan, and conduct deviation analysis and adjustments. It includes a real-time monitoring module and a progress analysis module;
[0011] Quality control unit to monitor construction quality, record quality inspection results, and ensure that all construction activities comply with industry standards and regulatory requirements;
[0012] A safety management unit, which is used to monitor the safety status of the construction site, and includes a risk assessment module, a safety training module, and an accident response module;
[0013] Data management unit, used to collect data from each module and analyze the data using big data and machine learning technology;
[0014] Environmental monitoring unit, used to monitor the environmental conditions at the construction site to ensure that the construction environment meets the required standards;
[0015] Interactive map unit for showing construction site layout and tracking personnel and equipment locations in real time.
[0016] Preferably, the planning and scheduling module is used to formulate a detailed construction plan, adjust and optimize the work arrangement; by breaking down the entire construction project into smaller work packages, using the work breakdown structure WBS to organize tasks, and assigning a unique identifier to each task, a preliminary schedule is formulated based on project goals and constraints, including but not limited to delivery time and resource availability; and the resources required for each task, including manpower, equipment and materials, are determined, and resource balancing technology is used to ensure the continuous use of resources and reduce idle time; at the same time, the dependencies between tasks are clarified, and the critical path and floating time of the project are determined using the critical path method. The shortest completion time of the project is determined by the longest path of the project. The critical path is found by calculating the earliest start time EST and the latest start time LST of each project. The floating time is the delayed time of the project on the non-critical path, which does not affect the overall progress of the project, and is expressed as: FT = LST-EST;
[0017] The cost control module is used to monitor budget execution, predict cost trends, and control project costs. It estimates and forecasts costs by determining project budgets and cost targets. It estimates the cost of each work package in the project and then summarizes it into a total cost, which is expressed as:
[0018] C i =C i,base ×C i,adj
[0019]
[0020] Among them, C i is the estimated cost of the ith work package, C i,base represents the historical project cost of the i-th work item reference, C i,adj It represents the adjustment coefficient of the project cost of the i-th work package according to the actual situation, n is the number of work packages, and C represents the total cost;
[0021] Through the time series analysis of historical cost data, a trend prediction model is established, which is expressed as:
[0022] C t+1 =C t +(C t -C t-1 )
[0023] Among them, C t+1 is the predicted cost for a certain period in the future, C t and C t-1 are the actual costs for the current period and the previous period, respectively;
[0024] At the same time, considering the impact of risk and uncertainty on cost, a risk adjustment prediction model is developed, which is expressed as: Among them C o , C m , C p are the most optimistic, most likely, and most pessimistic cost estimates, respectively;
[0025] The document management module is used to store and manage engineering drawings, contract documents and work logs.
[0026] Preferably, the human resource management module is used to manage worker information, attendance and task allocation; the equipment management module is used to monitor equipment status, arrange maintenance and schedule equipment use; and the material management module is used to track material procurement, consumption, inventory and replenishment.
[0027] Preferably, the real-time monitoring module uses sensors and Internet of Things technology to monitor the construction progress in real time; the progress analysis module compares the actual progress with the plan, performs deviation analysis and formulates an early warning mechanism, and the progress deviation is expressed as:
[0028] SV=BCWP-BCWS
[0029] Among them, BCWP represents the budgeted cost of work performed, and BCWS represents the budgeted cost of work planned; the schedule deviation percentage is expressed as:
[0030]
[0031] The efficiency of the project schedule is evaluated by the schedule performance index, which is expressed as:
[0032]
[0033] Setting the SPI value to less than 1 indicates that the actual progress lags behind the planned progress, setting it to 1 indicates that the actual progress is in line with the plan, and setting it to greater than 1 indicates that the actual progress is ahead of schedule.
[0034] Preferably, the progress warning mechanism sends out warning information by setting the progress deviation SV to be lower than -10% or the progress performance index SPI to be lower than 0.8, and automatically sends the warning notification to the project manager via email or text message.
[0035] Preferably, the risk assessment module first creates a detailed risk list, checks each item to identify existing risk points, uses a cause-and-effect diagram to analyze the root causes and interrelationships of risks, and constructs a risk matrix for classification and assessment in combination with the likelihood and impact of risks. It then quantifies the impact of multiple uncertainties on project objectives, assesses the comprehensive consequences of each risk factor, and conducts quantitative risk analysis.
[0036] The risk matrix uses probability as the horizontal axis and impact as the vertical axis, dividing risks into low, medium, and high levels, expressed as: R = L × S, where R is the risk value, L is the possibility of an accident, and S is the severity of the consequences of the accident. The larger the R value, the greater the risk;
[0037] When conducting quantitative risk analysis, the event tree is used to analyze the different outcomes caused by a specific initial event, calculate the probability of each occurrence, and evaluate the corresponding risk value, which is expressed as: Where P(T) is the probability of the top event occurring, P(E i ) is the probability of the initial event, P(T|E i ) is the conditional probability of the top event occurring under the condition of the initial event; and the cause is analyzed from the top event downward through the fault tree, the probability of each basic event occurring is calculated, and the overall risk is evaluated, which is expressed as: Where P(T) is the probability of the top event occurring, P(B i ) is the probability of occurrence of the basic event;
[0038] The safety training module provides online safety training and educational materials;
[0039] The accident response module records and handles safety accidents, formulates preventive measures, and regularly provides emergency response skills training to employees. The training content includes escape skills and manual emergency equipment operation.
[0040] Preferably, the data management unit collects data from each module, including but not limited to construction progress, staffing, material usage, and equipment status data, uses the Spark big data processing framework to perform data cleaning and preprocessing, removes noise data and completes missing values, uses a bag-of-words model to convert text data into vector form, selects features that have an important impact on the prediction target, and randomly divides the collected data into a training set and a test set. The training set data is learned using an SVM algorithm to find the optimal hyperplane so that the interval between each class is maximized, and a penalty parameter c is set to control the balance between the proportion of misclassified samples and the complexity of the algorithm. The larger the c value, the greater the penalty for misclassification, allowing more misclassified samples to be classified into two categories. Conversely, the smaller the c value, the more misclassified samples are tolerated. At the same time, a K-fold cross-validation method is used to further divide the training set into K groups, one of which is used as a validation set in turn, and the remaining K-1 groups are used as training sets, and the model is trained and optimized multiple times.
[0041] Compared with the prior art, the present invention has the following beneficial effects:
[0042] The present invention integrates all module contents through a unified platform, reducing the time and resource waste caused by traditional decentralized management. By using cloud computing technology, the system can process and analyze large amounts of data collected from the construction site in real time, ensuring that project management decisions are based on the latest accurate information; by predicting material demand and equipment utilization, resources can be rationally allocated to reduce waste; at the same time, by using Internet of Things devices and sensors, the system can monitor the safety status of the construction site in real time, warn of potential risks, and combine historical data with real-time data to predict and evaluate possible risks in construction, and formulate response measures in advance. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 It is a block diagram of the on-site dispatching and management system for construction of the present invention. DETAILED DESCRIPTION
[0044] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0045] As attached Figure 1 As shown:
[0046] Embodiment 1: The present invention provides a construction site scheduling management system, comprising:
[0047] The project management unit is responsible for the basic information management of the entire project, so that all project information can be centrally managed. It includes a planning and scheduling module, a cost control module, and a document management module; it ensures that all project information is centrally managed and updated to provide a basis for decision-making.
[0048] The resource management unit is used to manage all resources on the construction site, including the human resources management module, equipment management module, and material management module; optimize resource allocation, reduce waste, and ensure construction efficiency.
[0049] The progress tracking unit is used to monitor the project progress in real time, compare it with the plan, and conduct deviation analysis and adjustments. It includes a real-time monitoring module and a progress analysis module; it ensures that the project is completed on time and adjusts the construction plan in time to cope with changes.
[0050] The quality control unit is used to monitor construction quality, record quality inspection results, and ensure that all construction activities meet industry standards and regulatory requirements; ensure that project quality meets standards and reduces rework and defects.
[0051] The safety management unit is used to monitor the safety status of the construction site. It includes a risk assessment module, a safety training module, and an accident response module; it prevents accidents and ensures the safety of workers.
[0052] The data management unit is used to collect data from each module and analyze the data using big data and machine learning technology; it assists managers in making decisions and improves management efficiency and decision-making quality.
[0053] Environmental monitoring units are used to monitor environmental conditions at the construction site, such as temperature, humidity, noise, dust, etc., so that the construction environment meets the prescribed standards; ensure that the construction environment meets the prescribed standards and protect the health of workers and the surrounding environment.
[0054] Interactive map unit for showing construction site layout and tracking personnel and equipment locations in real time.
[0055] The planning and scheduling module is used to develop detailed construction plans, adjust and optimize work arrangements; by breaking down the entire construction project into smaller work packages, using the work breakdown structure (WBS) to organize tasks, and assigning a unique identifier to each task, a preliminary schedule is developed based on project goals and constraints, including but not limited to delivery time and resource availability; and the resources required for each task, including manpower, equipment and materials, are determined. When allocating resources, the capacity and availability of resources are considered to avoid over-allocation, and resource balancing techniques are used to ensure the continuous use of resources and reduce idle time; at the same time, the dependencies between tasks are clarified, and the critical path method is used to determine the critical path and floating time of the project. The shortest completion time of the project is determined by the longest path of the project. By calculating the earliest start time EST and the latest start time LST of each project, the critical path is found, that is, the activities with a total floating time of zero are critical activities, and these activities constitute the critical path. The floating time is the delayed time of the project on the non-critical path, which does not affect the overall progress of the project, expressed as: FT = LST-EST;
[0056] The cost control module is used to monitor budget execution, predict cost trends, and control project costs. It estimates and forecasts costs by determining project budgets and cost targets. Project budgets refer to the total amount of money expected to be spent during the project execution. The process of developing a project budget includes determining the scope of the project, identifying all possible cost items, estimating the specific amount of each cost item, and summarizing the total budget. The cost of each work package in the project is estimated and then summarized into the total cost, which is expressed as:
[0057] C i =C i,base ×C i,adj
[0058]
[0059] Among them, C i is the estimated cost of the ith work package, C i,base represents the historical project cost of the i-th work item reference, C i,adj It represents the adjustment coefficient of the project cost of the i-th work package according to the actual situation, n is the number of work packages, and C represents the total cost;
[0060] Through the time series analysis of historical cost data, a trend prediction model is established, which is expressed as:
[0061] C t+1 =C t +(C t -C t-1 )
[0062] Among them, C t+1 is the predicted cost for a certain period in the future, Ct and C t-1 are the actual costs for the current period and the previous period, respectively;
[0063] At the same time, considering the impact of risk and uncertainty on cost, a risk adjustment prediction model is developed, which is expressed as: Among them C o , C m , C p The most optimistic, most likely and most pessimistic cost estimates are used to calculate the expected cost of the project through specific mathematical expressions, while the cost forecasting model uses historical data and multiple influencing factors to establish a scientific forecasting model to estimate future costs. The combination of the two can effectively improve the accuracy and controllability of project management.
[0064] The document management module is used to store and manage engineering drawings, contract documents and work logs.
[0065] The human resource management module is used to manage worker information, attendance and task allocation; the equipment management module is used to monitor equipment status, arrange maintenance and schedule equipment use; the material management module is used to track material procurement, consumption, inventory and replenishment.
[0066] The real-time monitoring module uses sensors and IoT technology to monitor the construction progress in real time; real-time data is collected through on-site sensors, worker input and management feedback. The progress analysis module compares the actual progress with the planned progress, identifies deviations and potential delays, conducts deviation analysis and develops an early warning mechanism. The progress deviation is expressed as:
[0067] SV=BCWP-BCWS
[0068] Among them, BCWP represents the budgeted cost of work performed, and BCWS represents the budgeted cost of work planned; the schedule deviation percentage is expressed as:
[0069]
[0070] The efficiency of the project schedule is evaluated by the schedule performance index, which is expressed as:
[0071]
[0072] Setting the SPI value to less than 1 indicates that the actual progress lags behind the planned progress, setting it to 1 indicates that the actual progress is in line with the plan, and setting it to greater than 1 indicates that the actual progress is ahead of schedule.
[0073] The progress warning mechanism sends out warning information by setting the progress deviation SV to be lower than -10% or the progress performance index SPI to be lower than 0.8, and automatically sends warning notifications to project managers through email, SMS, etc. The issuance of warnings can promptly remind project managers and relevant stakeholders to take corrective measures, adjust project plans or reallocate resources, effectively reduce the overall risks caused by progress delays, and improve the success rate of projects.
[0074] Through schedule deviation analysis, schedule performance index, critical path analysis and schedule early warning mechanism, the project team can promptly identify and resolve schedule problems and effectively control the project to proceed as planned, which not only improves the accuracy and controllability of project management, but also increases the probability of project success.
[0075] The risk assessment module first creates a detailed risk list, checks each item to identify the existing risk points, uses a cause-and-effect diagram to analyze the root causes and interrelationships of risks, and builds a risk matrix for classification and assessment based on the likelihood and impact of risks. It also quantifies the impact of multiple uncertainties on project goals, evaluates the comprehensive consequences of each risk factor, and conducts quantitative risk analysis.
[0076] The risk matrix uses probability as the horizontal axis and impact as the vertical axis, dividing risks into low, medium, and high levels, expressed as: R = L × S, where R is the risk value, L is the possibility of an accident, and S is the severity of the consequences of the accident. The larger the R value, the greater the risk;
[0077] When conducting quantitative risk analysis, the event tree is used to analyze the different outcomes caused by a specific initial event, calculate the probability of each occurrence, and evaluate the corresponding risk value, which is expressed as: Where P(T) is the probability of the top event occurring, P(E i ) is the probability of the initial event, P(T|E i ) is the conditional probability of the top event occurring under the condition of the initial event; and the cause is analyzed from the top event downward through the fault tree, the probability of each basic event occurring is calculated, and the overall risk is evaluated, which is expressed as: Where P(T) is the probability of the top event occurring, P(B i ) is the probability of occurrence of basic events; by identifying and assessing potential risks in the project, the project team can effectively control and manage risks to ensure the smooth progress of the project.
[0078] The safety training module provides online safety training and educational materials;
[0079] The accident response module records and handles safety accidents, formulates preventive measures, and regularly trains employees on emergency response skills, including escape skills, manual emergency equipment operation, etc. By establishing a sound emergency response mechanism, clarifying the division of responsibilities, recording and handling safety accidents, formulating preventive measures, evaluating the implementation of prevention and rectification measures, and post-processing and social supervision, it can ensure that the project can respond and handle emergencies quickly and effectively, minimize losses, and ensure the safety of employees and the smooth progress of the project.
[0080] The data management unit collects data from each module, including but not limited to construction progress, staffing, material usage, and equipment status data, and uses the Spark big data processing framework to clean and preprocess the data, remove noise data and complete missing values, and use the bag-of-words model to convert text data into vector form, select features that have an important impact on the prediction target, and randomly divide the collected data into training sets and test sets. The training set data is learned using the SVM algorithm to find the best hyperplane so that the interval between each class is the largest, and the penalty parameter c is set to control the balance between the proportion of misclassified samples and the complexity of the algorithm. The larger the c value, the greater the penalty for misclassification, allowing more misclassified samples to be classified into two categories. Conversely, the smaller the c value, the more misclassified samples are tolerated; at the same time, the K-fold cross-validation method is used to further divide the training set into K groups, and one of the groups is used as the validation set in turn, and the remaining K-1 groups are used as the training set. The model is trained and optimized multiple times. By analyzing the data in the on-site scheduling management system for construction through support vector machines, various problems on the construction site can be effectively predicted and solved.
[0081] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.
[0082] It will be appreciated that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but will be a routine task of design, fabrication, and production for those of ordinary skill having the benefit of this disclosure without undue experimentation.
[0083] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A site dispatching and management system for construction, It is characterized in that include: The project management unit is responsible for the basic information management of the entire project, so that all project information can be centrally managed. It includes a planning and scheduling module, a cost control module, and a document management module; Resource management unit, used to manage all resources on the construction site, including human resource management module, equipment management module, and material management module; The progress tracking unit is used to monitor the project progress in real time, compare it with the plan, and conduct deviation analysis and adjustments. It includes a real-time monitoring module and a progress analysis module; Quality control unit to monitor construction quality, record quality inspection results, and ensure that all construction activities comply with industry standards and regulatory requirements; A safety management unit, which is used to monitor the safety status of the construction site, and includes a risk assessment module, a safety training module, and an accident response module; Data management unit, used to collect data from each module and analyze the data using big data and machine learning technology; Environmental monitoring unit, used to monitor the environmental conditions at the construction site to ensure that the construction environment meets the required standards; Interactive map unit for showing construction site layout and tracking personnel and equipment locations in real time.
2. A construction site dispatching and management system as claimed in claim 1, Features: The planning and scheduling module is used to develop a detailed construction plan, adjust and optimize the work schedule; by breaking down the entire construction project into smaller work packages, using the work breakdown structure WBS to organize tasks, and assigning a unique identifier to each task, a preliminary schedule is developed based on project goals and constraints, including but not limited to delivery time and resource availability; and the resources required for each task, including manpower, equipment and materials, are determined, and resource balancing technology is used to ensure the continuous use of resources and reduce idle time; at the same time, the dependencies between tasks are clarified, and the critical path and floating time of the project are determined using the critical path method. The shortest completion time of the project is determined by the longest path of the project. The critical path is found by calculating the earliest start time EST and the latest start time LST of each project. The floating time is the delayed time of the project on the non-critical path, which does not affect the overall progress of the project, and is expressed as: FT = LST-EST; The cost control module is used to monitor budget execution, predict cost trends, and control project costs. It estimates and forecasts costs by determining project budgets and cost targets. It estimates the cost of each work package in the project and then summarizes it into a total cost, which is expressed as: C i =C i,base ×C i,adj Among them, C i is the estimated cost of the ith work package, C i,base represents the historical project cost of the i-th work item reference, C i,adj It represents the adjustment coefficient of the project cost of the i-th work package according to the actual situation, n is the number of work packages, and C represents the total cost; Through the time series analysis of historical cost data, a trend prediction model is established, which is expressed as: C t+1 =C t +(C t -C t-1 ) Among them, C t+1 is the predicted cost for a certain period in the future, C t and C t-1 are the actual costs for the current period and the previous period, respectively; At the same time, considering the impact of risk and uncertainty on cost, a risk adjustment prediction model is developed, which is expressed as: Among them C o , C m , C p are the most optimistic, most likely, and most pessimistic cost estimates, respectively; The document management module is used to store and manage engineering drawings, contract documents and work logs.
3. A construction site dispatching and management system as claimed in claim 1, Features: The human resource management module is used to manage worker information, attendance and task allocation; the equipment management module is used to monitor equipment status, arrange maintenance and schedule equipment use; the material management module is used to track material procurement, consumption, inventory and replenishment.
4. A construction site dispatching and management system as claimed in claim 1, Features: The real-time monitoring module uses sensors and Internet of Things technology to monitor the construction progress in real time; the progress analysis module compares the actual progress with the plan, performs deviation analysis and formulates an early warning mechanism, and the progress deviation is expressed as: SV=BCWP-BCWS Among them, BCWP represents the budgeted cost of work performed, and BCWS represents the budgeted cost of work planned; the schedule deviation percentage is expressed as: The efficiency of the project schedule is evaluated by the schedule performance index, which is expressed as: Setting the SPI value to less than 1 indicates that the actual progress lags behind the planned progress, setting it to 1 indicates that the actual progress is in line with the plan, and setting it to greater than 1 indicates that the actual progress is ahead of schedule.
5. A construction site dispatching and management system as claimed in claim 4, Features: The progress warning mechanism is set to send out warning information when the progress deviation SV is lower than -10% or the progress performance index SPI is lower than 0.8, and automatically sends the warning notification to the project manager via email or text message.
6. A construction site dispatching and management system as claimed in claim 1, Features: The risk assessment module first creates a detailed risk list, checks each item to identify the existing risk points, uses a cause-and-effect diagram to analyze the root causes and interrelationships of risks, and constructs a risk matrix for classification and assessment based on the likelihood and impact of risks. It also quantifies the impact of multiple uncertainties on project goals, evaluates the comprehensive consequences of each risk factor, and conducts quantitative risk analysis. The risk matrix uses probability as the horizontal axis and impact as the vertical axis, dividing risks into low, medium, and high levels, expressed as: R = L × S, where R is the risk value, L is the possibility of an accident, and S is the severity of the consequences of the accident. The larger the R value, the greater the risk; When conducting quantitative risk analysis, the event tree is used to analyze the different outcomes caused by a specific initial event, calculate the probability of each occurrence, and evaluate the corresponding risk value, which is expressed as: Where P(T) is the probability of the top event, P(Ei) is the probability of the initial event, and P(TEi) is the conditional probability of the top event under the condition of the initial event. The cause of the top event is analyzed downward through the fault tree, the probability of each basic event is calculated, and the overall risk is evaluated, which is expressed as: Where P(T) is the probability of the top event occurring, P(B i ) is the probability of occurrence of the basic event; The safety training module provides online safety training and educational materials; The accident response module records and handles safety accidents, formulates preventive measures, and regularly provides emergency response skills training to employees. The training content includes escape skills and manual emergency equipment operation.
7. A construction site dispatching and management system as claimed in claim 1, Features: The data management unit collects data from each module, including but not limited to construction progress, staffing, material usage, and equipment status data, uses the Spark big data processing framework to clean and preprocess the data, removes noise data and completes missing values, uses a bag-of-words model to convert text data into vector form, selects features that have an important impact on the prediction target, and randomly divides the collected data into a training set and a test set. The training set data is learned using an SVM algorithm to find the best hyperplane so that the interval between each class is maximized, and a penalty parameter c is set to control the balance between the proportion of misclassified samples and the complexity of the algorithm. The larger the c value, the greater the penalty for misclassification, allowing more misclassified samples to be classified into two categories. Conversely, the smaller the c value, the more misclassified samples are tolerated. At the same time, a K-fold cross-validation method is used to further divide the training set into K groups, one of which is used as a validation set in turn, and the remaining K-1 groups are used as training sets. The model is trained multiple times and optimized.
Citation Information
Cited By
Construction engineering supervision informatization platform and management and control system based on artificial intelligence
CN119809574A
Engineering management monitoring system
CN120031265A
Electric power engineering construction safety management system
CN122264471A
Safety management system for electric power engineering construction
CN122264471B
Organizations as Dissipative Structures Utilizing Cooperative Games to Dynamically Align Value, Strategy and Operations within a Probabilistic Framework
US20250265526A1