Method for optimally balancing takt time of manual tool plate production line

By rotating and ranking the manual tooling board production line, and calculating the beat time with the fluctuation curve of the number of tooling boards, the problem of the difficulty of beat balance in the manual tooling board production line and the lack of objectivity in management is solved, and the production line is efficient and objective. Balance improves corporate efficiency.

CN119026892APending Publication Date: 2024-11-26COLLEGE OF SCI & TECH NINGBO UNIV
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202411127382.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the manual work panel production line, due to the inconsistent fatigue, skill level and station operation difficulty, it is difficult to achieve optimal balance of beat data, and the management method relies too much on personal subjective factors, lacks objectivity, and increases employment costs.

Method used

By rotating N workers, the beat time of each worker at each station is obtained, the beat time combination of each station is arranged, and the beat time combination of each station is calculated, and the combination with the smallest maximum value is selected as the optimal balance plan. And calculate the real beat time based on the fluctuation curve of the number of tooling boards to reduce fatigue and eliminate human interference.

Benefits of technology

The objective and precise balance of the rhythm of the manual work panel production line has been achieved, the production capacity and efficiency of the production line has been improved, and the enterprise efficiency has been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026892A_ABST
    Figure CN119026892A_ABST
Patent Text Reader

Abstract

The invention discloses a manual tool plate production line takt time control method, in particular to a manual tool plate production line takt time optimal balance method, which comprises the following steps: S1, N workers are subjected to N times of post rotation, N is greater than or equal to 1, and takt time of each worker on each station is obtained; s2, the beat time of each worker on each station is arranged in rows and columns, the beat time of the same worker on the N stations is a row, and the beat time of the N workers on the same station is a column; the method comprises the following steps: taking one piece of beat time data from each column, deleting the row where the beat time data is located until all columns are taken to obtain a beat time data combination, listing all beat time data combinations in sequence, comparing the maximum values of the beat time in all combinations, and selecting the minimum maximum value as the optimal combination. The technical purpose of improving the productivity and efficiency of a manual tool plate production line is achieved. The device is applied to a manual tool plate production line, and enterprise revenue can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a rhythm control method for a manual tooling board production line, in particular to a rhythm optimal balancing method for a manual tooling board production line. Background Art

[0002] Beat balancing mainly involves adjusting the beat of each process in the production process to ensure the continuity and efficiency of the production line. This includes ensuring that the beat of each process is consistent with or an integer multiple of the beat of the entire production line to optimize resource utilization and production efficiency.

[0003] A manual production line refers to a production process that relies on the labor of workers to complete the product. On a manual tooling board production line, each worker is responsible for a specific work link, operates according to the workflow, and then passes the product to the next worker until the product is finally completed. This production method involves manual work in accordance with standard production processes and production processes, including a series of production processes from the delivery of raw materials to the production line, through processing, assembly, testing and other production processes to the finished product.

[0004] The characteristics of manual tooling board production lines are that they are relatively flexible and adaptable, and can adjust the production process (process) and the workers at the workstations according to demand. However, compared with machine automation production lines, factors such as manual operation fatigue, skill level and inconsistent workstation operation difficulty in manual tooling board production lines can easily affect the workstation beat data, making it difficult to achieve the optimal balance of the entire manual tooling board production line beat.

[0005] In the traditional management method of manual tooling board production lines, the line leader usually designates workers at all workstations on the production line based on their judgment of individual ability and experience, resulting in excessive reliance on individuals in the management of manual tooling board production lines. Individual subjective factors directly determine the rhythm of the entire production line, which lacks objectivity. Some companies are equipped with professional lean engineers who use tools such as stopwatches to calculate the working hours of workers and make adjustments, but the employment cost of lean engineers is high.

[0006] Therefore, the present invention is proposed. Summary of the invention

[0007] The purpose of the present invention is to solve the above-mentioned deficiencies of the prior art and to provide a method for optimally balancing the beat of a manual tooling board production line, which can improve the production capacity and efficiency of the manual tooling board production line.

[0008] In order to achieve the above object, the present invention provides an optimal balancing method for the beat of a manual tooling board production line, which comprises the following steps: Step S1, perform N shifts for N workers, N ≥ 1, and obtain the takt time of each worker at each workstation; Step S2, arranging the tact time of each worker at each workstation calculated in step S1 into rows and columns, wherein the tact time of the same worker at N workstations is a row, and the tact time of N workers at the same workstation is a column; taking a tact time data from each column and then deleting the row where the tact time data is located, until all columns are taken to obtain a tact time data combination, and thus enumerating all tact time data combinations, and comparing the maximum tact time values ​​in all combinations, the one with the smallest maximum value is selected as the optimal combination.

[0009] The above method can achieve the optimal balance of the rhythm of the manual tooling board production line in the most objective and efficient way.

[0010] In the above-mentioned method for optimal balancing the beat of a manual tooling board production line, the specific method for obtaining the beat time is preferably selected as follows: Construct fluctuation curves of the working time of each worker at each workstation and the change in the number of tooling plates at the corresponding workstation one by one; take the working time required for the number of tooling plates on each fluctuation curve to decrease from the maximum value to the minimum value, and calculate the actual cycle time of the corresponding worker at the corresponding workstation by dividing the working time by the difference between the maximum and minimum numbers of tooling plates.

[0011] The above-mentioned preferred method for obtaining the takt time fully considers the periodic working habits of personnel on the manual tooling board production line, that is, in order to help restore energy and reduce fatigue, thereby improving work efficiency and overall performance, workers will take breaks uninterruptedly during the continuous work process. This can fully eliminate human interference factors and achieve the most objective and accurate calculation of the real takt time of workers at the corresponding workstations.

[0012] Compared with the prior art, the method for optimal balancing the beat of a manual tooling board production line obtained by the present invention has the following technical effects: The method of the present invention is applied in combination with a manual tooling board production line to improve the production capacity and efficiency of the manual tooling board production line, thereby improving the benefits of the enterprise. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a matrix diagram of the real takt time of N workers at N workstations arranged in rows and columns; Figure 2 It is the calculation station C i A graphical representation of the real-time quantity y of the upper tooling plate; Figure 3 It is a schematic diagram of the fluctuation curve of the working time of workers at their workstations and the change in the number of tooling boards at the corresponding workstations. DETAILED DESCRIPTION

[0014] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0015] As an implementation mode of the present invention, a method for optimal balancing the beat of a manual tooling board production line provided in this embodiment includes the following steps: Step S1, perform N shifts for N workers, N ≥ 1, and obtain the takt time of each worker at each workstation; Step S2, arrange the takt time of each worker at each workstation calculated in step S1 in rows and columns, where the takt time of the same worker at N workstations is a row, and the takt time of N workers at the same workstation is a column, such as Figure 1 As shown; after taking a beat time data from each column, delete the row where the beat time data is located, until all columns are taken to obtain a beat time data combination, all beat time data combinations are listed in this way, and the maximum beat time values ​​in all combinations are compared, and the one with the smallest maximum value is selected as the optimal combination.

[0016] In this embodiment, the specific method for obtaining the beat time described in step S1 is as follows: Construct fluctuation curves of the working time of each worker at each workstation and the change in the number of tooling plates at the corresponding workstation one by one; take the working time required for the number of tooling plates on each fluctuation curve to decrease from the maximum value to the minimum value, and calculate the actual cycle time of the corresponding worker at the corresponding workstation by dividing the working time by the difference between the maximum and minimum numbers of tooling plates.

[0017] The real-time number of tooling plates on a workstation is obtained by counting the number of times the lifting and lowering states of the tooling plate blocking cylinders corresponding to the current workstation and the previous workstation are switched, and then further calculating the difference. Figure 2 As shown in , we assume that we want to calculate the workstation C i The real-time number of upper tooling plates y, given the known workstation C i The number of times the lifting state of the corresponding tooling plate blocking cylinder switches is x i , and the previous station C i-1 The number of times the lifting state of the corresponding tooling plate blocking cylinder switches is x i-1 , through the equation y=x i-1 -x i C can be calculated i The real-time number of tooling boards. Figure 3 As shown, let's assume that we want to construct worker 1 at workstation C iThe working time and the fluctuation curve of the number of tooling plates at the corresponding workstation only require worker 1 to work at workstation C. i The working hours above the workstation C are calculated continuously. i The real-time number y of the tooling plates can be used, and then the actual cycle time E of the corresponding worker at the corresponding workstation can be calculated by dividing the working time ‌Δt by the difference ‌Δy between the maximum and minimum number of tooling plates.

[0018] The present invention is not limited to the above-mentioned optimal implementation mode. Anyone can derive other various forms of products under the inspiration of the present invention. However, no matter what changes are made in the shape or structure, all technical solutions that are the same or similar to those of the present application fall within the protection scope of the present invention.

Claims

1. A method for optimal balancing the beat of a manual tooling board production line, characterized by: The steps include: Step S1, perform N shifts for N workers, N ≥ 1, and obtain the takt time of each worker at each workstation; Step S2, arranging the tact time of each worker at each workstation calculated in step S1 into rows and columns, wherein the tact time of the same worker at N workstations is a row, and the tact time of N workers at the same workstation is a column; taking a tact time data from each column and then deleting the row where the tact time data is located, until all columns are taken to obtain a tact time data combination, and thus enumerating all tact time data combinations, and comparing the maximum tact time values ​​in all combinations, the one with the smallest maximum value is selected as the optimal combination.

2. The method for optimally balancing the beat of a manual tooling board production line according to claim 1 is characterized in that The specific method of obtaining the beat time is as follows: Construct fluctuation curves of the working time of each worker at each workstation and the change in the number of tooling plates at the corresponding workstation one by one; take the working time required for the number of tooling plates on each fluctuation curve to decrease from the maximum value to the minimum value, and calculate the actual cycle time of the corresponding worker at the corresponding workstation by dividing the working time by the difference between the maximum and minimum numbers of tooling plates.

Citation Information

Patent Citations

  • Streamline real-time monitoring management method and streamline real-time monitoring management apparatus

    CN107065793A

  • Production line balancing apparatus and method, and computer readable record medium

    CN107728585A

  • Assembly line balancing method considering flexible beat and operator skill difference

    CN109615105A

  • Production line optimization method and device based on buffer area capacity and process rhythm

    CN111898998A

  • Method for improving production line efficiency according to average garment production rhythm

    CN117391422A