PE bent pipe machining device and method
By using a combination of elbow mold, base, docking assembly and clamping assembly in the PE pipe bending processing device, the adjustment and support are achieved using the drive member, and the problem of specification mismatch in the prior art is solved and the production efficiency is improved and adaptability.
Patent Information
- Application Number
- CN202411469048.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-21
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing PE bend processing devices cannot adapt to different specification requirements, resulting in low production efficiency and an adjustable processing device is required to achieve efficient production.
A processing device including an elbow mold, a base, a docking assembly and a clamping assembly are designed, and the spindle and the elbow mold, a docking assembly and a clamping assembly are adjusted by a combination of a linear drive member, a rotating drive member and a swing drive member. The spacing and position of the two forms a sealing space and support structure suitable for different specifications.
It realizes efficient processing of PE bends of different specifications, and improves production efficiency, adaptability and production flexibility.
Smart Images

Figure CN119036823A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of PE pipe bending processing, and specifically relates to a PE pipe bending processing device and method. Background Art
[0002] PE elbow is a pipe made of polyethylene (PE) material, and its main characteristics are large bending angle and large radius; specifically, PE elbow usually refers to a pipe with an angle greater than or equal to 90 degrees and a radius greater than or equal to twice the diameter of the turning point.
[0003] In the existing PE elbow processing process, after the elbow is discharged from the rubber extruder and initially formed, it will be pulled by a traction device to form a pipe body structure with an arc cross section; wherein, the moving trajectory of the traction device is set according to the processing specifications of the PE elbow (bending angle, etc.), and the desired finished product can be obtained.
[0004] The inventors found that in the production process of PE bent pipes, a supporting device is also needed to support and shape the formed PE bent pipes. The common supporting device is a plurality of supporting tables arranged on the lower side of the moving trajectory of the PE bent pipe and at intervals along the bending trajectory of the PE bent pipe; however, the supporting tables cannot move with the traction device. Therefore, when producing PE bent pipes with different bending angles, the number and positions of the supporting tables need to be manually controlled by on-site staff, which causes a technical defect of reduced production efficiency and is not conducive to the actual production process.
[0005] That is to say, there is an urgent need in the prior art for an adjustable processing device that can adapt to PE elbows of different specifications to achieve efficient production operations of PE elbows. Summary of the invention
[0006] The embodiments of the present application provide a PE elbow processing device and method, which are intended to adapt to the processing of PE elbows with different specifications and realize efficient production operations of PE elbows.
[0007] To achieve the above purpose, the technical solution adopted in this application is:
[0008] Provided is a PE pipe bending processing device, comprising:
[0009] The elbow mold is used to be fixedly arranged at the outlet of the rubber extruder to receive the rubber discharged from the rubber extruder, so that the outer peripheral wall of the rubber fits the inner peripheral wall of the elbow mold under the action of the internal high-pressure gas to form a tubular structure; the opening of the elbow mold is defined to face forward;
[0010] A base is used to be arranged in parallel on the outer side of the rubber extruder in the left-right direction, a positioning seat is slidably connected to the base in the left-right direction, and a linear driving member is connected to the positioning seat in a transmission manner; the positioning seat has a main shaft extending upward, the main shaft is connected to the upper side of the positioning seat in a vertical direction, and the main shaft is connected to the rotation driving member in a transmission manner;
[0011] A docking assembly is arranged outside the main shaft and connected to the main shaft through a fixed arm; the docking assembly can move along the length direction of the fixed arm to increase or decrease the distance between the docking assembly and the main shaft, so that the docking assembly can be connected to the open end of the elbow mold to form a sealed space; and a first locking structure is also provided between the docking assembly and the fixed arm; and
[0012] A plurality of clamping assemblies are arranged around the main shaft at intervals on the outside of the main shaft and are connected to the main shaft through a swing arm; the swing arm is hinged to the main shaft and is transmission-connected with a first swing driving component so that the clamping assembly can avoid the traction track setting of the PE elbow; and the clamping assembly can move along the length direction of the swing arm to increase the distance between the clamping assembly and the main shaft, so that the clamping assembly can swing with the swing arm to connect with the PE elbow, and each of the clamping assemblies has a second locking structure between the corresponding swing arm.
[0013] In a possible implementation, the elbow mold includes:
[0014] A mounting plate, which adopts an annular structure and is used to be connected to the output end face of the rubber extruder;
[0015] An inner sleeve, fixedly connected to a side of the mounting plate facing away from the rubber extruder;
[0016] An outer sleeve, fixedly connected to a side of the mounting plate facing away from the extruder, is sleeved on the outer periphery of the inner sleeve, and one end facing away from the mounting plate is connected to the inner sleeve, so that a cavity structure is formed between the outer sleeve and the inner sleeve;
[0017] The outer sleeve has an upwardly opening water inlet and a downwardly opening water outlet; the water inlet is connected to a water inlet component, and the water inlet component is used to communicate with a water source to inject water into the cavity structure and reduce the temperature of the inner sleeve; the water outlet is connected to a drain pipe, and the drain pipe is extended downward;
[0018] In addition, the water inlet component is connected to a water spray component through a hose; when the docking component pulls the PE elbow to exit the elbow mold, the water spray component can be pulled toward the PE elbow to spray water toward the outer wall of the PE elbow.
[0019] In a possible implementation, the PE pipe bending processing device further includes:
[0020] The recovery piece is used to be fixed on the lower side of the outer sleeve, and has a structure with a hollow interior and an upward opening to recover the liquid discharged through the drain pipe; and a filter screen for limiting the passage of impurities is arranged on the open surface of the recovery piece.
[0021] In a possible implementation, the docking component includes:
[0022] an alignment plate, slidably disposed on the fixed arm along the length direction of the fixed arm, and the first locking structure is disposed between the alignment plate and the fixed arm;
[0023] A docking sleeve is arranged on a side of the alignment plate facing away from the fixed arm and connected to the alignment plate through a connecting arm; the docking sleeve adopts a structure that is hollow inside and open facing away from the fixed arm, and a plurality of reserved holes are provided on its inner bottom surface; at least one pressure relief hole is provided on the outer peripheral wall of the docking sleeve, and the pressure relief hole penetrates the open surface of the docking sleeve along the axial direction of the docking sleeve; and
[0024] A reinforcement sleeve is coaxially sleeved on the outer circumference of the docking sleeve, and its inner circumference is connected to the outer circumference of the docking sleeve; the end of the reinforcement sleeve facing the fixed arm has a limit ring extending inward, the limit ring is connected to the end surface of the docking sleeve facing the fixed arm, and the limit ring is provided with a plurality of threaded holes corresponding to the plurality of reserved holes;
[0025] Wherein, each of the threaded holes is threadedly connected with a connecting bolt; the connecting bolt is used to enter the docking tube through the corresponding reserved hole and be connected to the end of the PE elbow.
[0026] In a possible implementation, the first locking structure includes:
[0027] Two groups of connecting rods are respectively disposed on the upper and lower sides of the fixed arm and are connected to the alignment plate; each group of connecting rods includes a plurality of connecting rods spaced apart along the length direction of the fixed arm, and each connecting rod extends toward the fixed arm to a side of the fixed arm facing away from the alignment plate; and
[0028] A support plate is arranged on a side of the fixed arm facing away from the alignment plate, and the support plate has two groups of through holes arranged in parallel along the up-down direction and corresponding to the two groups of connecting rods one by one; each group of through holes includes a plurality of through holes arranged at intervals along the length direction of the fixed arm and corresponding to the corresponding plurality of connecting rods one by one;
[0029] Wherein, each of the connecting rods is suitable for passing through the corresponding through hole and extending out, and a nut for abutting against the support plate is threadedly connected to the extending end thereof.
[0030] In a possible implementation, the clamping assembly includes:
[0031] a sliding member, slidably connected to the swing arm along the length direction of the swing arm, and the second locking structure is arranged between the sliding member and the swing arm;
[0032] an upper clamping plate, which is disposed on the lower side of the sliding member and is detachably connected to the sliding member, and whose thickness direction is parallel to the left-right direction; and
[0033] A lower clamping plate is arranged on the lower side of the upper clamping plate, the thickness direction of which is parallel to the left-right direction, and one end of the lower clamping plate is hinged to the upper clamping plate along the left-right direction;
[0034] Among them, the vertical cross-section of the upper clamping plate is an arc-shaped structure with an opening facing downward, and the vertical cross-section of the lower clamping plate is an arc-shaped structure with an opening facing upward; a notch is formed between the swinging end of the upper clamping plate and one of the swinging ends of the lower clamping plate, and a second swinging drive component is provided between the upper clamping plate and the lower clamping plate, and the second swinging drive component can drive the lower clamping plate to swing relative to the upper clamping plate to increase or decrease the notch.
[0035] In a possible implementation, the upper clamping plate and the lower clamping plate are each provided with a plurality of protrusions, each of the protrusions extends outward in the left-right direction, and the protrusions are provided with guide holes radially penetrating along the corresponding arc-shaped structure; an adjustment arm is slidably connected in the guide hole, and a third locking structure is provided between the adjustment arm and the corresponding protrusion;
[0036] Wherein, when the third locking structure connects the adjusting arm and the protrusion, one end of the adjusting arm is suitable for abutting against the outer wall of the PE elbow.
[0037] In a possible implementation, the third locking structure includes:
[0038] A locking nut, fixedly connected to the protrusion and axially arranged toward the adjusting arm;
[0039] a plurality of positioning holes, which are provided on the adjusting arm and are spaced apart along the length direction of the adjusting arm, and each of the positioning holes is adapted to be coaxially connected to the locking nut; and
[0040] A stop bolt is threadedly connected to the locking nut and is suitable for being inserted into any one of the positioning holes to limit the movement of the adjustment arm relative to the protrusion.
[0041] In a possible implementation, the sliding member adopts a sleeve structure suitable for being slidably sleeved on the swing arm, and the sliding member is slidably sleeved on the swing arm; the second locking structure includes:
[0042] A plurality of jacks are provided on the sliding member and are connected to the interior of the sliding member; and
[0043] A plurality of fixing nuts, all fixedly connected to the outer wall of the sliding member and connected to the plurality of the insertion holes in a one-to-one correspondence;
[0044] Wherein, each of the fixing nuts is threadedly connected with a retaining bolt; and the retaining bolt is used to connect with the outer wall of the swing arm through the corresponding insertion hole to limit the sliding of the sliding member relative to the swing arm.
[0045] In the embodiment of the present application, the sealed space formed by the combination of the elbow mold and the docking assembly can realize the reception and preliminary shaping of the rubber discharged from the rubber extruder; then, by rotating the driving component to drive the main shaft to rotate, the rubber can be pulled out along an arc trajectory driven by the docking assembly to form a PE elbow; at the same time, by driving the swing arm to swing through the first swing driving component, the corresponding clamping assembly can be moved to connect with the PE elbow, thereby realizing support for the PE elbow.
[0046] In the above process, the linear driving component drives the positioning seat to move, so as to adjust the distance between the main shaft and the elbow mold; based on this, by adjusting the relative position of the docking assembly and the fixed arm, and the relative position of each clamping assembly and the corresponding swing arm, and fixing them by the first locking structure and the second locking structure respectively, the distance between the main shaft and the elbow mold, the distance between the main shaft and the docking assembly, and the distance between the main shaft and each clamping assembly can be made equal to each other, so as to adapt to PE elbows with different production requirements.
[0047] Compared with the prior art, the PE elbow processing device provided in this embodiment can adapt to the processing of PE elbows with different specifications and realize efficient production operations of PE elbows.
[0048] The technical solution adopted in the present application also provides a PE elbow processing method, based on the processing device proposed in any of the above items, comprising the following steps:
[0049] A. According to the specifications of the PE elbow to be produced, the linear drive member is controlled to adjust the distance between the main shaft and the elbow mold; at the same time, the relative position of the docking assembly and the fixed arm, and the relative position of each clamping assembly and the corresponding swing arm are adjusted, and they are fixed by the first locking structure and the second locking structure respectively, so that the distance between the main shaft and the elbow mold, the distance between the main shaft and the docking assembly, and the distance between the main shaft and each clamping assembly are equal in pairs;
[0050] B. The swing arm is driven to swing by the first swing driving member, so that each group of the clamping components avoids the traction track of the PE elbow; at the same time, the docking component is moved to connect with the elbow mold with the rotation of the main shaft by the rotation driving member to form the sealed space;
[0051] C. Start the rubber extruder to allow the rubber to enter the sealed space and fit the inner wall of the elbow mold to form a tubular structure under the action of the high-pressure gas inside the rubber; at the same time, connect the docking assembly to the tubular structure;
[0052] D. driving the main shaft to rotate by the rotating driving member, so that the docking assembly moves around the main shaft and away from the elbow mold, and pulls out the tubular structure to form a bent pipe structure;
[0053] Wherein, during step D, when the bent pipe structure passes through the area of one of the clamping assemblies, by controlling the corresponding first swing drive component, the swing arm can be swung until the clamping assembly is connected to the bent pipe structure, so that the bent pipe structure is supported.
[0054] The beneficial effects of the PE elbow processing method provided in this embodiment are the same as the beneficial effects of the aforementioned processing device, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0056] Figure 1 A schematic diagram of the three-dimensional structure of a PE pipe bending processing device provided in an embodiment of the present application;
[0057] Figure 2 for Figure 1 A partial enlarged schematic diagram of the middle circle A;
[0058] Figure 3 A schematic diagram of the combined structure of the upper clamping plate and the lower clamping plate used in the embodiment of the present application;
[0059] Figure 4 A schematic cross-sectional view of a second locking structure used in an embodiment of the present application;
[0060] Figure 5 A partial cross-sectional view of an upper splint used in an embodiment of the present application;
[0061] Figure 6 This is a schematic diagram of the combined structure of the fixed arm and the docking assembly used in the embodiment of the present application;
[0062] Figure 7 A schematic diagram of the combined structure of the docking assembly and the first locking structure used in the embodiment of the present application;
[0063] Figure 8 This is a schematic diagram of the exploded structure of the docking sleeve and the reinforcement sleeve used in the embodiment of the present application;
[0064] Fig. 9 A schematic diagram of the combined structure of the elbow mold used in the embodiment of the present application;
[0065] Fig.10 This is a schematic cross-sectional view of the elbow mold used in the embodiment of the present application;
[0066] Fig.11 A schematic diagram of the structure of the recycling component used in the embodiment of the present application;
[0067] Fig.12 A schematic diagram of the structure of the rotary drive component used in the embodiment of the present application;
[0068] Fig.13 This is a schematic diagram of the structure of the linear drive component used in the embodiment of the present application;
[0069] Description of reference numerals: 1. elbow mold; 11. mounting plate; 12. inner sleeve; 13. outer sleeve; 131. water inlet member; 132. water spray member; 1321. hose; 14. drain pipe; 2. base; 21. positioning seat; 211. linear drive member; 22. spindle; 221. rotation drive member; 222. fixed arm; 223. swing arm; 224. first swing drive member; 3. docking assembly; 31. alignment plate; 32. docking sleeve; 321. connecting arm; 322. reserved hole; 323. pressure relief hole; 33. reinforcement sleeve; 331. limiting ring; 332. threaded hole; 333. connecting bolt; 4. first locking structure; 41. connecting rod; 411. nut; 42. support plate; 421. through hole; 5. clamping assembly; 51. sliding member; 52. upper clamping plate; 521. second swing driving member; 53. lower clamping plate; 6. bump; 61. guide hole; 62. adjusting arm; 7. third locking structure; 71. locking nut; 72. positioning hole; 73. stop bolt; 8. second locking structure; 81. socket; 82. fixing nut; 821. retaining bolt; 9. recovery member; 91. filter screen; 100. rubber extruder. DETAILED DESCRIPTION
[0070] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0071] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0072] It should be understood that the orientation or position relationship indicated by terms such as "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0073] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0074] Please also read Figures 1 to 13 The PE pipe bending processing device provided in the present application is now described. The PE pipe bending processing device proposed in the present application comprises an elbow mold 1, a base 2, a docking assembly 3 and a plurality of clamping assemblies 5.
[0075] The elbow mold 1 is used to be fixedly arranged at the outlet of the rubber extruder 100 to receive the rubber discharged from the rubber extruder 100, so that the outer wall of the rubber fits against the inner wall of the elbow mold 1 under the action of the high-pressure gas inside it to form a tubular structure; it should be noted that the high-pressure gas proposed here is realized based on the function of the rubber extruder 100, that is, the rubber discharged from the rubber extruder 100 is tubular, and there is high-pressure gas inside the tubular structure; when such rubber enters the elbow mold 1, the high-pressure gas will cause the rubber to swell rapidly to abut the inner wall of the elbow mold 1, thereby forming a tube body structure that meets the pipe diameter requirements.
[0076] In this embodiment, for the convenience of description, the opening direction of the elbow mold 1 is defined as the front.
[0077] The base 2 is used to be arranged in parallel on the outside of the rubber extruder 100 along the left-right direction, and extends in a direction away from the rubber extruder 100 ; in this embodiment, the base 2 is located on the left side of the rubber extruder 100 .
[0078] A positioning seat 21 is slidably connected to the base 2 along the left-right direction, and a linear driving component 211 is transmission-connected to the positioning seat 21 for controlling the movement thereof.
[0079] It should be noted that the linear drive component 211 includes a rack fixed on the base 2 and extending in the left-right direction, and a motor fixed on the positioning seat 21, with the power output axis parallel to the front-to-back direction and the power output end connected to a gear meshing with the rack; when the motor is started, the gear rotates, so that the positioning seat 21 moves relative to the base 2 under the reaction force of the rack.
[0080] The positioning seat 21 has a main shaft 22 extending upward. The main shaft 22 is rotatably connected to the upper side of the positioning seat 21 along the up-down direction. The main shaft 22 is transmission-connected to a rotation driving member 221 for controlling its rotation.
[0081] It should be noted that the rotating drive component 221 includes a first gear fixedly mounted on the outer periphery of the main shaft 22, and a second gear rotatably connected to the upper side of the positioning seat 21; the two gears are meshed with each other, so driving the latter can drive the former to rotate, and then drive the main shaft 22 to rotate; based on this, the second gear has an upwardly extending rod shaft, the upper end of which is coaxially connected to a third gear, and a motor is also fixed on the other side of the upper surface of the positioning seat 21, the power output shaft of the motor is parallel to the up and down directions, and the power output end is connected to a fourth gear; wherein the third gear and the fourth gear are connected by a transmission belt, so that when the motor is started, the third gear drives the second gear to rotate through the rod shaft, thereby achieving the driving conditions for the first gear and the main shaft 22.
[0082] The docking assembly 3 is arranged outside the main shaft 22 and connected to the main shaft 22 through a fixed arm 222; specifically, one end of the fixed arm 222 is fixedly connected to the outer peripheral wall of the main shaft 22 and extends outward in the radial direction of the main shaft 22. In addition, the docking assembly 3 is slidably connected to the fixed arm 222, so that the docking assembly 3 can move along the length direction of the fixed arm 222, thereby increasing or decreasing the distance between the docking assembly 3 and the main shaft 22.
[0083] When the distance between the docking assembly 3 and the main shaft 22 is equal to the distance between the main shaft 22 and the elbow mold 1, the main shaft 22 is controlled to rotate by rotating the driving member 221, so that the docking assembly 3 can be connected to the open end of the elbow mold 1 under the drive of the fixed arm 222, thereby forming a sealed space to prevent gas loss and facilitate the execution of the aforementioned high-pressure gas expansion process of the rubber.
[0084] There is also a first locking structure 4 between the docking component 3 and the fixed arm 222; after the docking component 3 and the fixed arm 222 move relative to each other, the docking component 3 and the fixed arm 222 can be connected by the first locking structure 4 to limit the relative movement of the two.
[0085] A plurality of clamping assemblies 5 are arranged around the main shaft 22 at intervals on the outside of the main shaft 22, and are connected to the main shaft 22 through a swing arm 223; specifically, one end of the swing arm 223 is hinged to the main shaft 22, and the hinge axis is perpendicular to the up-down direction and the length direction of the swing arm 223. Based on this, the swing arm 223 is also connected to a first swing driving member 224; the first swing driving member 224 drives the swing arm 223 to swing, so that the corresponding clamping assembly 5 can avoid the traction track of the PE elbow, or overlap with the traction track of the PE elbow.
[0086] It should be noted that the first swing drive component 224 here is a cylinder fixed between the swing arm 223 and the main shaft 22; wherein the base of the cylinder and the end of the hydraulic rod are respectively hinged to the outer wall of the main shaft 22 and the swing arm 223, and the hinge axes are parallel to each other, so that when the cylinder is started, the hydraulic rod is extended or retracted, and the swing arm 223 swings relative to the main shaft 22.
[0087] The clamping assembly 5 is slidably arranged on the swing arm 223 so that the clamping assembly 5 can move along the length direction of the swing arm 223, thereby increasing the distance between the clamping assembly 5 and the main shaft 22, and finally making the clamping assembly 5 connect with the PE elbow when the traction trajectory of the clamping assembly 5 and the PE elbow coincides.
[0088] A second locking structure 8 is provided between each clamping assembly 5 and the corresponding swing arm 223; after the clamping assembly 5 and the swing arm 223 move relative to each other, the clamping assembly 5 and the swing arm 223 can be connected by the second locking structure 8 to limit the relative movement of the two.
[0089] In the embodiment of the present application, the sealed space formed by the combination of the elbow mold 1 and the docking assembly 3 can realize the reception and preliminary shaping of the rubber discharged from the rubber extruder 100; then, by rotating the driving member 221 to drive the main shaft 22 to rotate, the rubber can be pulled out along an arc trajectory driven by the docking assembly 3 to form a PE elbow; at the same time, by driving the swing arm 223 to swing through the first swinging driving member 224, the corresponding clamping assembly 5 can be moved to connect with the PE elbow, thereby supporting the PE elbow.
[0090] In the above process, the linear driving member 211 drives the positioning seat 21 to move, so that the distance between the main shaft 22 and the elbow mold 1 can be adjusted; based on this, by adjusting the relative position of the docking component 3 and the fixed arm 222, the relative position of each clamping component 5 and the corresponding swing arm 223, and fixing them respectively through the first locking structure 4 and the second locking structure 8, the distance between the main shaft 22 and the elbow mold 1, the distance between the main shaft 22 and the docking component 3, and the distance between the main shaft 22 and each clamping component 5 can be made equal to each other, so as to adapt to PE elbows with different production requirements.
[0091] Compared with the prior art, the PE elbow processing device provided in this embodiment can adapt to the processing of PE elbows with different specifications and realize efficient production operations of PE elbows.
[0092] In some embodiments, Fig. 9 and Fig.10 As shown, the elbow mold 1 includes a mounting plate 11 , an inner sleeve 12 and an outer sleeve 13 .
[0093] The mounting plate 11 adopts an annular structure and is used to be connected to the output end face of the rubber extruder 100; the reason for this design is that the connection and disassembly between the faces are more convenient, so as to be suitable for replacing different elbow molds 1 for PE elbows with different pipe diameter requirements.
[0094] The inner sleeve 12 is fixedly connected to the side of the mounting plate 11 facing away from the rubber extruder 100 ; in actual use, the inner circumferential wall of the inner sleeve 12 adopts a curved tube structure that matches the outer circumferential wall of the PE curved pipe.
[0095] The outer sleeve 13 is fixedly connected to the side of the mounting plate 11 facing away from the extruder, and is sleeved on the outer periphery of the inner sleeve 12, and one end facing away from the mounting plate 11 is connected to the inner sleeve 12 (during production, the inner sleeve 12 and the outer sleeve 13 can be integrally formed, and the molded part can be welded to the mounting plate 11) to form an annular cavity structure between the outer sleeve 13 and the inner sleeve 12.
[0096] It should be noted that a hole structure is provided on the mounting plate 11 , which is connected to the inner sleeve 12 and is used to be connected to the output port of the rubber extruder 100 , so as to realize the transfer of rubber between the rubber extruder 100 and the inner sleeve 12 .
[0097] The outer sleeve 13 has an upwardly-opening water inlet and a downwardly-opening water outlet; wherein the water inlet and the water outlet are both connected to the aforementioned cavity structure, and the water inlet is connected to a water inlet component 131, which is used to communicate with an external water source to inject water into the cavity structure and reduce the temperature of the inner sleeve 12, which is beneficial to the initial molding of the rubber. The water outlet is connected to a drain pipe 14, and the drain pipe 14 is extended downward to achieve a diversion effect on the liquid after participating in the heat exchange.
[0098] The water inlet component 131 is also connected to a water spray component 132 for a person to hold by hand through a hose 1321; when the docking component pulls the PE elbow out of the elbow mold 1, the water spray component 132 can be pulled toward the PE elbow under human power to spray water toward the outer wall of the PE elbow, further enhancing the shaping effect of the initially formed elbow.
[0099] In some embodiments, Figure 1 and Fig.11 As shown, the PE bending pipe processing device also includes a recovery component 9, which is used to be fixed on the lower side of the outer sleeve 13, and has a structure with a hollow interior and an upward opening to recover the liquid discharged through the drain pipe 14; in actual use, the recovered liquid can be reused after cooling to improve resource utilization efficiency.
[0100] In addition, a filter screen 91 for limiting the passage of impurities is provided on the open surface of the recovery member 9 to prevent the impurities from contaminating the water source and affecting the recycling of the water source.
[0101] In some embodiments, Figures 6 to 8 As shown, the docking assembly 3 includes an alignment plate 31 , a docking sleeve 32 and a reinforcement sleeve 33 .
[0102] The alignment plate 31 is slidably set on the fixed arm 222 along the length direction of the fixed arm 222, and the first locking structure 4 is set between the alignment plate 31 and the fixed arm 222, that is, the relative position of the alignment plate 31 and the fixed arm 222 is fixed, so that the relative position of the fixed arm 222 and the docking component 3 can be locked.
[0103] The docking tube 32 is arranged on the side of the alignment plate 31 facing away from the fixed arm 222, and is connected to the alignment plate 31 through a connecting arm 321; specifically, the length direction of the connecting arm 321 is perpendicular to the length direction of the fixed arm 222, and the connecting arm 321 is fixedly connected to the side of the alignment plate 31 facing away from the fixed arm 222 and extends outward in the horizontal direction (the direction facing away from the alignment plate 31), and the docking tube 32 is fixedly connected to the extended end of the connecting arm 321.
[0104] The docking tube 32 has a hollow interior and an open structure facing away from the fixed arm 222, and a plurality of reserved holes 322 are provided on its inner bottom surface (the side opposite to the open surface); in the present embodiment, the plurality of reserved holes 322 are spaced apart around the central axis of the docking tube 32, and all of them pass through from the inner bottom surface of the docking tube 32 to the outer bottom surface of the docking tube 32.
[0105] At least one pressure relief hole 323 is provided on the outer peripheral wall of the docking sleeve 32, and the pressure relief hole 323 penetrates the open surface of the docking sleeve 32 along the axial direction of the docking sleeve 32; when actual production occurs, the pressure relief hole 323 serves to release the pressure generated by the high-pressure gas in the rubber, thereby avoiding the influence of the force generated by the expansion of the rubber on the docking sleeve 32.
[0106] The reinforcing sleeve 33 is coaxially sleeved on the outer circumference of the docking sleeve 32 , and its inner circumference is in contact with the outer circumference of the docking sleeve 32 , thereby preventing the docking sleeve 32 from continuing to bulge outward, thereby further strengthening the structural strength of the docking sleeve 32 .
[0107] The end of the reinforcing sleeve 33 facing the fixed arm 222 has a limiting ring 331 extending inwardly, and the limiting ring 331 is connected to the end surface of the docking sleeve 32 facing the fixed arm 222, and the limiting ring 331 is provided with a plurality of threaded holes 332 corresponding to the plurality of reserved holes 322.
[0108] Among them, each threaded hole 332 is threadedly connected with a connecting bolt 333; the connecting bolt 333 is used to enter the docking sleeve 32 through the corresponding reserved hole 322, and is connected to the end of the PE elbow (during the expansion of the rubber, the connecting bolt 333 rotates to drill into the rubber end surface), so that when the docking sleeve 32 rotates around the main axis 22, the rubber tube is subjected to traction to form a PE elbow product.
[0109] In some embodiments, Figure 6 and Figure 7 As shown, the first locking structure 4 includes two groups of connecting rods 41 and a supporting plate 42 .
[0110] The two groups of connecting rods 41 are respectively arranged on the upper and lower sides of the fixed arm 222, and are respectively abutted against the upper and lower sides of the fixed arm 222; in this embodiment, in order to improve the abutment effect, two pads are respectively connected to the upper and lower sides of the fixed arm 222, and when the fixed arm 222 and the pads are abutted, the connection points on the pads are deformed and sunken.
[0111] Both groups of connecting rods 41 are connected to the alignment plate 31, and each group of connecting rods 41 includes multiple connecting rods 41 arranged at intervals along the length direction of the fixed arm 222; wherein each connecting rod 41 extends toward the fixed arm 222, and the extended end is located on the side of the fixed arm 222 facing away from the alignment plate 31.
[0112] The support plate 42 is arranged on the side of the fixed arm 222 facing away from the alignment plate 31, and has two groups of through holes 421 arranged in parallel along the up and down directions and corresponding one-to-one with the two groups of connecting rods 41; each group of through holes 421 includes multiple through holes 421 arranged at intervals along the length direction of the fixed arm 222 and corresponding one-to-one with the corresponding multiple connecting rods 41.
[0113] Each connecting rod 41 is suitable for passing through the corresponding through hole 421 and extending out, and a nut 411 for abutting against the support plate 42 is threadedly connected to the extending end thereof.
[0114] By adopting the above technical solution, the two sets of connecting rods 41 are used to limit the movement of the docking assembly 3 in the up and down directions, as well as the movement along the length direction of the fixed arm 222; the support plate 42 and the alignment plate 31 cooperate to limit the movement of the docking assembly 3 in the horizontal direction perpendicular to the fixed arm 222.
[0115] In some embodiments, Figure 3 As shown, the clamping assembly 5 includes a sliding member 51 , an upper clamping plate 52 and a lower clamping plate 53 .
[0116] The sliding member 51 is slidably connected to the swing arm 223 along the length direction of the swing arm 223, and the second locking structure 8 is arranged between the sliding member 51 and the swing arm 223 to connect the sliding member 51 and the swing arm 223 and limit the movement of the sliding member 51 relative to the swing arm 223.
[0117] The upper clamping plate 52 is disposed on the lower side of the sliding member 51 and is detachably connected to the sliding member 51, and its thickness direction is parallel to the left-right direction; specifically, as Figure 2 As shown, the connection between the sliding member 51 and the upper clamping plate 52 is achieved by means of a T-shaped connecting block, the horizontal surface of which is connected to the lower side surface of the sliding member 51 and the vertical extension end of which is connected to the upper clamping plate 52.
[0118] The lower clamping plate 53 is disposed at the lower side of the upper clamping plate 52 , and its thickness direction is parallel to the left-right direction. The lower clamping plate 53 is hinged to one end of the upper clamping plate 52 along the left-right direction.
[0119] Among them, the vertical cross-section of the upper clamp plate 52 is an arc-shaped structure with an opening facing downward, and the vertical cross-section of the lower clamp plate 53 is an arc-shaped structure with an opening facing upward; based on this, a gap is formed between the swing end of the upper clamp plate 52 and one of the swing ends of the lower clamp plate 53, and a second swing driving component 521 is provided between the upper clamp plate 52 and the lower clamp plate 53; in actual use, the second swing driving component 521 can drive the lower clamp plate 53 to swing relative to the upper clamp plate 52, so as to enlarge or reduce the gap for the PE bent pipe to pass through.
[0120] It should be noted that the second swing drive component 521 here is a cylinder fixed between the upper clamp plate 52 and the lower clamp plate 53; wherein the base of the cylinder and the end of the hydraulic rod are respectively hinged to the upper clamp plate 52 and the lower clamp plate 53, and the hinge axes are parallel to each other, so that when the cylinder is started, the hydraulic rod is extended or retracted, and the lower clamp plate 53 swings relative to the upper clamp plate 52.
[0121] In some embodiments, Figure 3 and Figure 5 As shown, the upper clamping plate 52 and the lower clamping plate 53 are each provided with a plurality of protrusions 6, each protrusion 6 extends outward in the left-right direction, and the protrusion 6 is provided with a guide hole 61 radially penetrating along the corresponding arc-shaped structure; an adjusting arm 62 is slidably connected in the guide hole 61, and a third locking structure 7 is provided between the adjusting arm 62 and the corresponding protrusion 6; the adjusting arm 62 and the protrusion 6 can be connected through the third locking structure 7 to limit the movement of the adjusting arm 62 relative to the protrusion 6.
[0122] By adopting the above technical solution, when the third locking structure 7 connects the adjusting arm 62 and the protrusion 6, one end of the adjusting arm 62 is suitable for abutting against the outer wall of the PE elbow, thereby achieving the effect of supporting PE elbows of different specifications.
[0123] In some embodiments, Figure 3 As shown, the third locking structure 7 includes a locking nut 71 , a plurality of positioning holes 72 and a stop bolt 73 .
[0124] The locking nut 71 is fixedly connected to the protrusion 6 and is axially arranged toward the adjustment arm 62; specifically, a hole body connected to the guide hole 61 is opened on the protrusion 6, and the locking nut 71 is fixedly connected to the outer side surface of the protrusion 6 and connected to the aforementioned hole body.
[0125] A plurality of positioning holes 72 are provided on the adjusting arm 62 , and are spaced apart along the length direction of the adjusting arm 62 ; as the adjusting arm 62 moves relative to the protrusion 6 , each positioning hole 72 is adapted to be coaxially connected to the locking nut 71 .
[0126] The stop bolt 73 is threadedly connected to the locking nut 71 and is suitable for being inserted into any one of the positioning holes 72 to limit the movement of the adjustment arm 62 relative to the protrusion 6 .
[0127] It is necessary to add that, if Figure 5 As shown, a sinking groove facing the locking nut 71 is opened on the inner wall of the guide hole 61; after the stop bolt 73 is inserted into the positioning hole 72, it can extend into the sinking groove to enhance the matching strength between the structures.
[0128] In some embodiments, Figure 2 and Figure 4 As shown, the sliding member 51 adopts a sleeve structure suitable for being slidably mounted on the swing arm 223, and the sliding member 51 is slidably mounted on the swing arm 223 to be suitable for moving relative to the swing arm 223 and along the length direction of the swing arm 223.
[0129] Based on this, the second locking structure 8 includes a plurality of insertion holes 81 and a plurality of fixing nuts 82 .
[0130] The plurality of insertion holes 81 are all formed on the sliding member 51 and are communicated with the interior of the sliding member 51 .
[0131] The plurality of fixing nuts 82 are all fixedly connected to the outer wall of the sliding member 51 , and are connected to the plurality of insertion holes 81 in a one-to-one correspondence.
[0132] A retaining bolt 821 is threadedly connected to each fixing nut 82 ; and the retaining bolt 821 is used to connect with the outer wall of the swing arm 223 through the corresponding insertion hole 81 to limit the sliding of the sliding member 51 relative to the swing arm 223 .
[0133] Based on any of the processing devices proposed in the foregoing, the embodiment of the present application further provides a PE elbow processing method, comprising the following steps:
[0134] A. According to the specifications of the PE elbow to be produced, the linear drive member 211 is controlled to adjust the distance between the main shaft 22 and the elbow mold 1; at the same time, the relative position of the docking assembly 3 and the fixed arm 222, and the relative position of each clamping assembly 5 and the corresponding swing arm 223 are adjusted, and they are fixed by the first locking structure 4 and the second locking structure 8 respectively, so that the distance between the main shaft 22 and the elbow mold 1, the distance between the main shaft 22 and the docking assembly 3, and the distance between the main shaft 22 and each clamping assembly 5 are equal in pairs;
[0135] B. The first swing driving member 224 drives the swing arm 223 to swing, so that each group of clamping components 5 avoids the traction track of the PE elbow; at the same time, the driving member 221 is rotated to make the docking component 3 move to connect with the elbow mold 1 with the rotation of the main shaft 22, so as to form a sealed space;
[0136] C. Start the rubber extruder 100 to allow the rubber to enter the sealed space and fit the inner wall of the elbow mold 1 under the action of the high-pressure gas inside the rubber to form a tubular structure; at the same time, connect the docking assembly 3 to the tubular structure;
[0137] D. The main shaft 22 is driven to rotate by rotating the driving member 221, so that the docking assembly 3 moves around the main shaft 22 and away from the elbow mold 1, and pulls out a tubular structure to form a bent pipe structure;
[0138] During step D, when the bent pipe structure passes through the area of one of the clamping assemblies 5, the swing arm 223 can be swung until the clamping assembly 5 connects with the bent pipe structure by controlling the corresponding first swing drive member 224, so that the bent pipe structure is supported.
[0139] The beneficial effects of the PE elbow processing method provided in this embodiment are the same as the beneficial effects of the aforementioned processing device, and will not be repeated here.
[0140] The above content is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. PE pipe bending processing device, It is characterized in that include: The elbow mold is used to be fixedly arranged at the outlet of the rubber extruder to receive the rubber discharged from the rubber extruder, so that the outer peripheral wall of the rubber fits the inner peripheral wall of the elbow mold under the action of the internal high-pressure gas to form a tubular structure; the opening of the elbow mold is defined to face forward; A base is used to be arranged in parallel on the outer side of the rubber extruder in the left-right direction, a positioning seat is slidably connected to the base in the left-right direction, and a linear driving member is connected to the positioning seat in a transmission manner; the positioning seat has a main shaft extending upward, the main shaft is connected to the upper side of the positioning seat in a vertical direction, and the main shaft is connected to the rotation driving member in a transmission manner; A docking assembly is arranged outside the main shaft and connected to the main shaft through a fixed arm; the docking assembly can move along the length direction of the fixed arm to increase or decrease the distance between the docking assembly and the main shaft, so that the docking assembly can be connected to the open end of the elbow mold to form a sealed space; and a first locking structure is also provided between the docking assembly and the fixed arm; and A plurality of clamping assemblies are arranged around the main shaft at intervals on the outside of the main shaft and are connected to the main shaft through a swing arm; the swing arm is hinged to the main shaft and is transmission-connected with a first swing driving component so that the clamping assembly can avoid the traction track setting of the PE elbow; and the clamping assembly can move along the length direction of the swing arm to increase the distance between the clamping assembly and the main shaft, so that the clamping assembly can swing with the swing arm to connect with the PE elbow, and each of the clamping assemblies has a second locking structure between the corresponding swing arm.
2. The PE pipe bending processing device according to claim 1, It is characterized in that The elbow mold comprises: A mounting plate, which adopts an annular structure and is used to be connected to the output end face of the rubber extruder; An inner sleeve, fixedly connected to a side of the mounting plate facing away from the rubber extruder; An outer sleeve, fixedly connected to a side of the mounting plate facing away from the extruder, is sleeved on the outer periphery of the inner sleeve, and one end facing away from the mounting plate is connected to the inner sleeve, so that a cavity structure is formed between the outer sleeve and the inner sleeve; The outer sleeve has an upwardly opening water inlet and a downwardly opening water outlet; the water inlet is connected to a water inlet component, and the water inlet component is used to communicate with a water source to inject water into the cavity structure and reduce the temperature of the inner sleeve; the water outlet is connected to a drain pipe, and the drain pipe is extended downward; In addition, the water inlet component is connected to a water spray component through a hose; when the docking component pulls the PE elbow to exit the elbow mold, the water spray component can be pulled toward the PE elbow to spray water toward the outer wall of the PE elbow.
3. The PE pipe bending processing device according to claim 2, It is characterized in that The PE pipe bending processing device also includes: The recovery piece is used to be fixed on the lower side of the outer sleeve, and has a structure with a hollow interior and an upward opening to recover the liquid discharged through the drain pipe; and a filter screen for limiting the passage of impurities is arranged on the open surface of the recovery piece.
4. The PE pipe bending processing device according to claim 1, It is characterized in that The docking assembly comprises: an alignment plate, slidably disposed on the fixed arm along the length direction of the fixed arm, and the first locking structure is disposed between the alignment plate and the fixed arm; A docking sleeve is arranged on a side of the alignment plate facing away from the fixed arm and connected to the alignment plate through a connecting arm; the docking sleeve adopts a structure that is hollow inside and open facing away from the fixed arm, and a plurality of reserved holes are provided on its inner bottom surface; at least one pressure relief hole is provided on the outer peripheral wall of the docking sleeve, and the pressure relief hole penetrates the open surface of the docking sleeve along the axial direction of the docking sleeve; and A reinforcement sleeve is coaxially sleeved on the outer circumference of the docking sleeve, and its inner circumference is connected to the outer circumference of the docking sleeve; the end of the reinforcement sleeve facing the fixed arm has a limit ring extending inward, the limit ring is connected to the end surface of the docking sleeve facing the fixed arm, and the limit ring is provided with a plurality of threaded holes corresponding to the plurality of reserved holes; Wherein, each of the threaded holes is threadedly connected with a connecting bolt; the connecting bolt is used to enter the docking tube through the corresponding reserved hole and be connected to the end of the PE elbow.
5. The PE pipe bending processing device as claimed in claim 4, It is characterized in that The first locking structure comprises: Two groups of connecting rods are respectively disposed on the upper and lower sides of the fixed arm and are connected to the alignment plate; each group of connecting rods includes a plurality of connecting rods spaced apart along the length direction of the fixed arm, and each connecting rod extends toward the fixed arm to a side of the fixed arm facing away from the alignment plate; and A support plate is arranged on a side of the fixed arm facing away from the alignment plate, and the support plate has two groups of through holes arranged in parallel along the up-down direction and corresponding to the two groups of connecting rods one by one; each group of through holes includes a plurality of through holes arranged at intervals along the length direction of the fixed arm and corresponding to the corresponding plurality of connecting rods one by one; Wherein, each of the connecting rods is suitable for passing through the corresponding through hole and extending out, and a nut for abutting against the support plate is threadedly connected to the extending end thereof.
6. The PE pipe bending processing device according to claim 1, It is characterized in that The clamping assembly comprises: a sliding member, slidably connected to the swing arm along the length direction of the swing arm, and the second locking structure is arranged between the sliding member and the swing arm; an upper clamping plate, which is disposed on the lower side of the sliding member and is detachably connected to the sliding member, and whose thickness direction is parallel to the left-right direction; and A lower clamping plate is arranged on the lower side of the upper clamping plate, the thickness direction of which is parallel to the left-right direction, and one end of the lower clamping plate is hinged to the upper clamping plate along the left-right direction; Among them, the vertical cross-section of the upper clamping plate is an arc-shaped structure with an opening facing downward, and the vertical cross-section of the lower clamping plate is an arc-shaped structure with an opening facing upward; a notch is formed between the swinging end of the upper clamping plate and one of the swinging ends of the lower clamping plate, and a second swinging drive component is provided between the upper clamping plate and the lower clamping plate, and the second swinging drive component can drive the lower clamping plate to swing relative to the upper clamping plate to increase or decrease the notch.
7. The PE pipe bending processing device according to claim 6, It is characterized in that The upper clamping plate and the lower clamping plate are each provided with a plurality of protrusions, each of the protrusions extends outward in the left-right direction, and the protrusions are provided with guide holes radially penetrating along the corresponding arc-shaped structure; an adjusting arm is slidably connected in the guide hole, and a third locking structure is provided between the adjusting arm and the corresponding protrusion; Wherein, when the third locking structure connects the adjusting arm and the protrusion, one end of the adjusting arm is suitable for abutting against the outer wall of the PE elbow.
8. The PE pipe bending processing device according to claim 7, It is characterized in that The third locking structure comprises: A locking nut, fixedly connected to the protrusion and axially arranged toward the adjusting arm; a plurality of positioning holes, which are provided on the adjusting arm and are spaced apart along the length direction of the adjusting arm, and each of the positioning holes is adapted to be coaxially connected to the locking nut; and A stop bolt is threadedly connected to the locking nut and is suitable for being inserted into any one of the positioning holes to limit the movement of the adjustment arm relative to the protrusion.
9. The PE pipe bending processing device according to claim 6, It is characterized in that The sliding member adopts a sleeve structure suitable for slidingly sleeved on the swing arm, and the sliding member is slidably sleeved on the swing arm; the second locking structure includes: A plurality of jacks are provided on the sliding member and are connected to the interior of the sliding member; and A plurality of fixing nuts, all fixedly connected to the outer wall of the sliding member and connected to the plurality of the insertion holes in a one-to-one correspondence; Wherein, each of the fixing nuts is threadedly connected with a retaining bolt; and the retaining bolt is used to connect with the outer wall of the swing arm through the corresponding insertion hole to limit the sliding of the sliding member relative to the swing arm.
10. A PE pipe bending processing method, based on the processing device according to any one of claims 1 to 9, It is characterized in that The following steps are involved: A. According to the specifications of the PE elbow to be produced, the linear drive member is controlled to adjust the distance between the main shaft and the elbow mold; at the same time, the relative position of the docking assembly and the fixed arm, and the relative position of each clamping assembly and the corresponding swing arm are adjusted, and they are fixed by the first locking structure and the second locking structure respectively, so that the distance between the main shaft and the elbow mold, the distance between the main shaft and the docking assembly, and the distance between the main shaft and each clamping assembly are equal in pairs; B. The swing arm is driven to swing by the first swing driving member, so that each group of the clamping components avoids the traction track of the PE elbow; at the same time, the docking component is moved to connect with the elbow mold with the rotation of the main shaft by the rotation driving member to form the sealed space; C. Start the rubber extruder to allow the rubber to enter the sealed space and fit the inner wall of the elbow mold to form a tubular structure under the action of the high-pressure gas inside the rubber; at the same time, connect the docking assembly to the tubular structure; D. driving the main shaft to rotate by the rotating driving member, so that the docking assembly moves around the main shaft and away from the elbow mold, and pulls out the tubular structure to form a bent pipe structure; Wherein, during step D, when the bent pipe structure passes through the area of one of the clamping assemblies, by controlling the corresponding first swing drive component, the swing arm can be swung until the clamping assembly is connected to the bent pipe structure, so that the bent pipe structure is supported.