Formwork system of floating structure foundation and rapid forming method of concrete floating foundation
Through the combination of double-layer capsule structure and high-flow concrete material, the durability and maintenance problems of steel floating structures in the marine environment are solved, and the high durability and flexibility of floating structure foundations are achieved. The construction process is simplified and costs are reduced, meeting the needs of marine development.
Patent Information
- Application Number
- CN202411452789.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-17
- Publication Date
- 2024-11-29
AI Technical Summary
The existing steel floating structures have poor durability in marine environments, are difficult to maintain and repair, and the prefabricated haul construction methods are cumbersome and costly, which cannot meet the durability, economy and flexibility of floating structures in marine development.
Using a double-layer bladder structure and high-flow concrete material combined with high-strength flexible material, the high-strength and high-durability composite material is formed through casting to improve the corrosion resistance of floating structure foundations, and the structural expansion is achieved through rigid opening connection components. and rapid molding to avoid prefabricated docking tow.
It improves the corrosion resistance and durability of floating structure foundations, simplifies construction processes, reduces costs, provides structural flexibility and scalability, and is suitable for offshore operations.
Smart Images

Figure CN119037648A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of floating structure design, and in particular to a formwork system for a floating structure foundation and a method for rapid prototyping of a concrete floating foundation. Background Art
[0002] In recent years, various regions around the world have successively supported the development of marine resources and have identified the development of the marine economy as an important economic growth point in the 21st century and the main direction of future economic development. From the current situation, a marine development planning layout has basically been formed, mainly focusing on marine wind power, marine photovoltaics, marine ranching, and marine chemicals. However, the current floating structure mainly adopts a prefabricated technology system with steel structure as the main body. The main feature of this technology system is that the steel structure is the main structure of the floating structure, and it is processed and deployed by onshore prefabrication and ocean towing.
[0003] With the operation of some floating structure demonstration projects, the industry has gradually discovered that there are many problems with the current technical solutions. First, the durability of steel floating structures, especially the serious corrosion problem, seriously restricts the service life and normal performance of floating structures. Steel is prone to corrosion in complex marine environments, resulting in a decrease in structural strength and stability, and increasing the frequency of maintenance and replacement. Secondly, the current prefabrication-towing construction method is cumbersome and has high economic costs. Prefabrication needs to be completed on shore, and then the structure is transported to the ocean by towing. This process is not only time-consuming, but also involves a lot of labor and equipment costs, which increases the economic burden.
[0004] In addition, it is currently difficult to carry out maintenance work on steel floating structures during operation, and it is impossible to expand the floating structures according to the needs of the use scenarios. Therefore, once a problem occurs during the use of the structure, it is extremely difficult to carry out on-site maintenance, and the fixed form of the steel structure also limits its flexibility and scalability in different application scenarios.
[0005] In other words, the current technical solutions cannot effectively meet the requirements of marine development for floating structures in terms of durability, economy and flexibility. Summary of the invention
[0006] In response to the problems in the prior art, the present application provides a formwork system for a floating structure foundation and a method for rapid prototyping of a concrete floating foundation, which can form a high-strength and high-durability composite material directly with a high-strength flexible material after the cast high-performance and high-fluidity concrete material hardens, thereby improving the corrosion resistance and other durability of the floating structure foundation. It does not require prefabrication in a dock for launching and towing, and can provide technical support for offshore operations.
[0007] In order to solve at least one of the above problems, the present application provides the following technical solutions:
[0008] According to a first aspect of an embodiment of the present application, the present application provides a template system for a floating structure foundation, comprising a double-layer bladder structure and a rigid opening;
[0009] The double-layer capsule structure is formed by folding two layers of flexible materials with different sizes, the top of which forms a top opening;
[0010] The top opening is connected to the rigid opening portion so that the double-layer capsule structure and the rigid opening portion form a closed internal cavity;
[0011] The rigid opening portion is made of a single or composite rigid structure, is provided with a pouring port, and can be formed into different opening types by connecting components.
[0012] According to any embodiment of the present application, the structural form of the internal cavity includes one or any combination of cylindrical, prism, conical and irregular shapes.
[0013] According to any embodiment of the present application, a plurality of flexible connectors are arranged between the inner and outer bladders of the double-layer bladder structure, and the flexible connectors are connected to the inner and outer bladders by tying or gluing, so that when the double-layer bladder structure is unfolded, each flexible connector is tensioned along the tensile direction and pulled against each other to form the internal cavity, wherein the thickness of the internal cavity is determined according to the setting method of the flexible connectors.
[0014] According to any embodiment of the present application, the inner bladder of the double-layer bladder structure is provided with a support member, and the outer bladder of the double-layer bladder structure is provided with a fastener, wherein the fastener and the support member constitute a matching connection component suitable for quality control of the double-layer bladder structure.
[0015] According to any embodiment of the present application, the support member and the fastener are both made of a flexible folding material and a rigid segmented folding material or any combination thereof.
[0016] According to any embodiment of the present application, the double-layer balloon structure can be compressed to the rigid opening by folding.
[0017] According to any embodiment of the present application, the connection component of the rigid opening portion extends outward and can be connected to the connection components of other floating structure foundation template systems to achieve structural expansion.
[0018] According to a second aspect of the embodiment of the present application, the present application provides a method for rapid prototyping of a concrete floating foundation, comprising:
[0019] Fixing the template system on the water surface or in the water through the external link assembly of the rigid opening;
[0020] pouring a high-fluidity gelling and curing material into the inner cavity of the double-layer bladder structure through a pouring port of the rigid opening until the folded flexible material is fully unfolded;
[0021] The template system is left to stand until the high-fluidity gelling solidifying material hardens and fits with the double-layer bladder structure to obtain the floating structure foundation.
[0022] According to any embodiment of the present application, the high-flowability cementitious solidifying material includes high-flowability non-separating concrete or self-compacting concrete.
[0023] According to any embodiment of the present application, after obtaining the floating structure foundation, the method further includes:
[0024] The connection components of the rigid opening part are connected with the connection components of other floating structure foundation formwork systems to be cast to achieve structural expansion;
[0025] pouring a high-fluidity gelling solidifying material into the inner cavity of the double-layer bladder structure through a pouring port of the rigid opening of the floating structure foundation formwork system to be poured, until the flexible material of the floating structure foundation formwork system to be poured is fully unfolded after being folded;
[0026] The foundation template system of the floating structure to be cast is left to stand until the high-fluidity gelling solidifying material hardens and fits with the double-layer bladder structure, thereby obtaining an expandable large-scale floating structure.
[0027] It can be seen from the above technical scheme that the present application provides a formwork system for a floating structure foundation and a rapid prototyping method for a concrete floating foundation, comprising a double-layer bladder structure and a rigid opening; the top opening of the double-layer bladder structure is fixed to the rigid opening to form a closed internal cavity with the rigid opening; the double-layer bladder structure is folded to form an inner and outer layer of flexible materials of different sizes, and the top opening of the double-layer bladder structure is formed by an opening of any shape at the top of the inner and outer flexible materials; the rigid opening is made of a single or composite rigid structure, is provided with a pouring port, and can form different opening types by connecting components; the present application can form a high-strength and high-durability composite material directly with a high-strength flexible material after the high-performance and high-fluidity concrete material is hardened, thereby improving the corrosion resistance and other durability of the floating structure foundation, without the need for prefabrication and launching in a dock, and can provide technical support for offshore operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0029] Figure 1 A schematic diagram of a double-layer bladder structure as a basis for a floating structure in an embodiment of the present application;
[0030] Figure 2 This is one of the schematic diagrams of the rigid opening portion of the floating structure foundation in the embodiment of the present application;
[0031] Figure 3 This is the second schematic diagram of the rigid opening portion of the floating structure foundation in the embodiment of the present application;
[0032] Figure 4 This is one of the schematic diagrams of the floating structure foundation of the floating structure foundation in the embodiment of the present application;
[0033] Figure 5 This is one of the flow diagrams of the rapid prototyping method for a concrete floating foundation in an embodiment of the present application;
[0034] Figure 6 This is the second flow chart of the rapid prototyping method of a concrete floating foundation in an embodiment of the present application;
[0035] Figure 7 This is the second schematic diagram of the floating structure foundation of the floating structure foundation in the embodiment of the present application. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0037] The acquisition, storage, use, and processing of data in the technical solution of this application comply with the relevant provisions of national laws and regulations.
[0038] Taking into account the problem that current technical solutions cannot effectively meet the requirements of marine development for floating structures in terms of durability, economy and flexibility, the present application provides a formwork system for a floating structure foundation and a method for rapid prototyping of a concrete floating foundation. After the cast high-performance, high-fluidity concrete material hardens, it is directly combined with a high-strength flexible material to form a high-strength and high-durability composite material, thereby improving the corrosion resistance and other durability of the floating structure foundation. There is no need for prefabrication in a dock for launching and towing, and technical support can be provided for offshore operations.
[0039] In order to form a high-strength and high-durability composite material directly with a high-strength flexible material after hardening through the poured high-performance and high-fluidity concrete material, improve the durability of the floating structure foundation, such as corrosion resistance, without the need for prefabrication and launching in a dock, and provide technical support for offshore operations, the present application provides a formwork system for the floating structure foundation, including a double-layer bladder structure and a rigid opening;
[0040] like Figure 1 As shown, the double-layer capsule structure 1 is formed by folding two layers of flexible materials with different sizes, the top of the double-layer capsule structure forms a top opening;
[0041] The top opening is Figure 2 The rigid opening portion 2 shown in the figure is connected so that the double-layer capsule structure and the rigid opening portion form a Figure 4 the enclosed interior cavity shown;
[0042] The rigid opening 2 is made of a single or composite rigid structure, is provided with a pouring port, and can be Figure 3 The connecting components 3 shown are formed with different opening patterns.
[0043] Specifically, the top opening of the double-layer bladder structure is fixed on the rigid opening part, and together with the rigid opening part, a closed internal cavity is formed. This design enables the entire structure to remain stable and form a desired shape when pouring concrete or other high-fluidity gelling and curing materials.
[0044] The double-layer capsule structure is composed of two layers of flexible materials of different sizes. The top opening of the inner and outer flexible materials can be of any shape, so that the top opening of the double-layer capsule structure can adapt to different construction requirements. The inner and outer two-layer structure not only provides sufficient strength, but can also be folded and compressed when not in use, which is convenient for transportation and storage.
[0045] The rigid opening is made of a single or composite rigid structure, and is provided with a pouring port for injecting concrete or other materials, such as high-fluidity cementitious solidifying materials, into the internal cavity during the construction process. The rigid opening can also form different opening patterns through connecting components to adapt to different construction environments and needs, so that the floating structure foundation can be adjusted and expanded according to specific usage scenarios, thereby improving construction efficiency and adaptability. In addition, the rigid opening is provided with an external connecting component to fix the floating structure to waters and seas. Further, by fixing the floating structure and placing it on the water surface or in the water for pouring and then self-floating after the pouring to form the structure, there is no need for self-floating during pouring, and stability during pouring is ensured.
[0046] In an optional embodiment, the structural form of the internal cavity includes one or any combination of cylindrical, prism, conical and irregular shapes.
[0047] Among them, the cylindrical structure provides uniform force distribution and is suitable for scenarios that require high stability. The prismatic structure can increase the strength and rigidity of the internal cavity to a certain extent, and is suitable for environments that require high pressure resistance. The conical structure provides a larger support area at the bottom of the foundation, which helps to maintain stability in an unstable seabed environment. The irregular shape design provides a flexible solution for special application scenarios, which can be customized according to specific needs to meet the needs of various complex construction environments.
[0048] In an optional embodiment, a plurality of flexible connectors are provided between the inner and outer bladders of the double-layer bladder structure, and the flexible connectors are connected to the inner and outer bladders by tying or gluing, so that when the double-layer bladder structure is unfolded, each flexible connector is tensioned along the tensile direction and pulled against each other to form the internal cavity, wherein the thickness of the internal cavity is determined according to the setting method of the flexible connectors.
[0049] Among them, a plurality of flexible connectors (flexible tension rods) are arranged between the inner and outer capsules of the double-layer capsule structure. These flexible connectors are connected to the inner and outer capsules by tying or gluing, ensuring that when the double-layer capsule structure is unfolded, each flexible connector is tensioned along the tensile direction and pulled against each other, thereby forming a stable internal cavity.
[0050] Specifically, first, the flexible connector is connected to the opposite sides of the inner and outer capsules by tying. The tying process can be achieved in a variety of ways, such as using knots, buckles, etc. to provide reliable tension. Another connection method is to fix the flexible connector to the inner and outer capsules by gluing to ensure the stability and durability of the connection. Both methods can ensure that the flexible connector withstands tension when unfolded and maintains the stable shape of the internal cavity.
[0051] When the double-layer bladder structure is unfolded, each flexible connector is tensioned in the tensile direction to form a tensile force, so that the cavity structure between the inner and outer bladders remains uniform and stable, ensuring that the internal cavity will not deform or collapse during the pouring process, thereby ensuring the quality and safety of the construction.
[0052] The thickness of the internal cavity is determined by the setting method of the flexible connectors. By adjusting the number, spacing and connection position of the flexible connectors, the thickness of the internal cavity can be precisely controlled. For example, if a thicker cavity is required, the number of flexible connectors can be increased or their spacing can be reduced; if a thinner cavity is required, the number of flexible connectors can be reduced or their spacing can be increased, so that the double-layer capsule structure can adapt to different construction requirements and provide customized solutions.
[0053] For the materials of flexible connectors, high-strength and high-durability flexible materials are usually selected, such as high-performance fibers and composite materials. These materials can maintain good performance during long-term use and are not prone to aging or breaking. The design of flexible connectors should consider both their load-bearing capacity and their flexibility to ensure smooth operation during unfolding and folding.
[0054] In an optional embodiment, the inner bladder of the double-layer bladder structure is provided with a support member, and the outer bladder of the double-layer bladder structure is provided with a fastener, wherein the fastener and the support member constitute a matching connection component suitable for quality control of the double-layer bladder structure.
[0055] Specifically, the support members and fasteners limit the lateral deformation of the double-layer bladder structure, and are both made of flexible foldable materials and rigid segmented foldable materials, which together with the flexible double-layer bladder realize the structural foldable characteristics, forming a matching connection component suitable for quality control of the double-layer bladder structure.
[0056] In an optional embodiment, the support member and the fastener are both made of a flexible folding material and a rigid segmented folding material, or any combination thereof.
[0057] In an optional embodiment, the inner bladder body is supported by round wooden boards, hollow round wooden boards and air bags to provide sufficient internal support to prevent the inner bladder body from collapsing or deforming during the pouring process. The round wooden boards and hollow round wooden boards provide a solid support base, while the air bags are adjusted by inflation to evenly distribute the internal pressure, thereby maintaining the stability of the bladder body.
[0058] The external fasteners can use fishing nets and round wood planks as the main materials. The fishing net, as a flexible material, can tightly wrap the outer bladder, provide external support and fixation, and allow moderate deformation to adapt to changes in external pressure. The round wood planks serve as rigid support materials to ensure that the outer bladder does not over-expand during the pouring process and maintains its predetermined shape and size. In addition, segmented hoops are used as rigid segmented materials for external fasteners, which can be set around the outer bladder and adjusted in tightness when needed to provide additional support.
[0059] Among them, the support members and fasteners can be made of flexible folding materials, rigid segmented folding materials or any combination of the two to ensure that they can provide stable support and fixing when in use, and can be easily folded and stored when not in use. Flexible materials such as fishing nets and airbags are foldable, which can reduce the space occupied during transportation and storage. Rigid materials such as round wood boards and segmented hoops provide the necessary strength when the structure is unfolded to ensure the stability of the bag during the casting process.
[0060] In addition, the supports and fasteners can jointly limit the lateral deformation of the double-layer bladder structure, ensuring that it maintains a stable shape and size during the pouring process, improving the pouring quality and construction safety. It not only enables the structure to be compactly folded when not in use for easy transportation and storage, but also provides necessary support when in use, enhancing the structural adaptability and durability.
[0061] In an optional embodiment, the double-layer balloon structure can be compressed to the rigid opening by folding.
[0062] The double-layer bladder structure is made of flexible materials and has good foldability. During transportation, the double-layer bladder structure can be compressed to a minimum volume and fixed in a rigid opening, thereby saving transportation space and costs. At the construction site in the waters and sea areas, the double-layer bladder structure can be quickly unfolded and restored to its predetermined shape, ready for concrete pouring. This design greatly improves construction efficiency and makes the prefabrication and transportation of floating structure foundations more convenient and economical.
[0063] In an optional embodiment, if Figure 3 and Figure 4 As shown, the connection components of the rigid opening portion extend outward and can be connected to connection components of other floating structure foundation template systems to achieve structural expansion.
[0064] Among them, the already formed floating structure foundation can be connected with the floating structure foundation to be cast, meeting the assembly requirements of multiple floating structures to form an integral structure. Specifically, the rigid opening is equipped with an extendable connection component, which can be connected with the connection components of the adjacent floating structure foundation, allowing multiple floating structure foundations to be assembled one by one during the construction process to form a continuous integral structure. Through this assembly method, a large-scale construction platform based on the floating structure foundation can be quickly constructed, which is suitable for various marine engineering projects.
[0065] The above structure not only realizes the rapid construction of the floating structure, but also provides unlimited expansion capability of the structure, so that the construction platform can be expanded and adjusted as needed to form a stable and widely applicable offshore floating platform.
[0066] In summary, the present invention uses concrete or other high-flowable gelling solidifying materials instead of steel as the main construction material for the floating structure foundation. Through the research and development of flexible material technology, a new floating structure foundation for pouring concrete is designed. The high-performance, high-flow concrete material poured directly forms a high-strength and high-durability composite material with high-strength flexible materials after hardening, thereby improving the corrosion resistance and other durability of the floating structure foundation. This technology has unlimited in-situ self-expansion capabilities and does not require prefabrication and launching in a dock for towing. It can provide technical support for marine wind and light wave energy, marine hydrogen production, marine chemical industry, marine tourism, marine health care, national defense, and scientific research.
[0067] Furthermore, the present application provides an embodiment of a method for rapid prototyping of a concrete floating foundation, see Figure 5 The concrete floating foundation rapid prototyping method specifically includes the following contents:
[0068] Step S101: Fixing the template system on the water surface or in the water through the external link assembly of the rigid opening.
[0069] Before pouring, the cast body can be fixed on a stable platform through the restraining force applied by the external connection components, so that when pouring high-flow concrete or other materials, the cast body can maintain its predetermined shape and position and will not deform or move due to external forces. The adjustability of the connection components allows the folded floating structure to be suspended on the water surface or in the water during pouring, which not only provides the necessary support force, but also ensures stability during the pouring process.
[0070] Step S102: pouring a high-fluidity gelling and curing material into the inner cavity of the double-layered bladder structure through the pouring port of the rigid opening until the folded flexible material is fully unfolded.
[0071] During the pouring process, any high-fluidity gelling solidifying material is poured into the closed space of the internal cavity through the rigid opening pouring inlet, so that no vibration is required during the pouring process. The pouring material begins to fill the cavity structure due to its high fluidity, and the compressed and folded floating structure foundation gradually unfolds under the action of the pouring material. At the same time, the double-layer capsule structure and the rigid opening limit the flow of the pouring material to form a prefabricated structural member.
[0072] Step S103: leaving the template system to stand until the high-fluidity gelling solidifying material hardens and fits with the double-layer capsule structure to obtain the floating structure foundation.
[0073] After pouring is completed, the material hardens and adheres to the double-layer bladder structure to form a composite material, that is, the floating structure foundation is completed. Combined with the construction characteristics of the floating structure foundation, such as rapid prefabrication, folding transportation, and rigid fixed casting structure forming, a set of rapid construction methods suitable for the floating structure foundation is formed.
[0074] In an optional embodiment, the high-flowability cementitious curing material includes high-flowability non-separating concrete or self-compacting concrete.
[0075] In one embodiment of the concrete floating foundation rapid prototyping method of the present application, see Figure 6 , after obtaining the floating structure foundation, it also includes:
[0076] Step S104: connecting the connection components of the rigid opening portion with other connection components of the foundation formwork system of the floating structure to be cast to achieve structural expansion.
[0077] Step S105: pouring high-fluidity gelling solidifying material into the inner cavity of the double-layer bladder structure through the pouring port of the rigid opening of the floating structure foundation formwork system to be poured, until the flexible material of the floating structure foundation formwork system to be poured is fully unfolded after folding.
[0078] Step S106: leaving the floating structure foundation formwork system to be cast still until the high-fluidity gelling solidifying material hardens and fits with the double-layer bladder structure to obtain an expandable large-scale floating structure.
[0079] When the first floating structure foundation is completed, a new set of flexible bladder structures can be fixed to the formed structure through the connection components of the rigid opening. Then, using auxiliary equipment such as the hull, the new structure is positioned and fixed in the appropriate position, ready for pouring. By pouring high-flow concrete or self-compacting concrete, the new floating structure foundation is gradually formed. After each pouring is completed, it can be connected to the next set of floating structure foundations to be poured through the connection components of the rigid opening.
[0080] The above process can be repeated to form multiple floating structure foundations one by one. Each newly formed floating structure foundation is firmly connected to the previous structure through rigid connection components to form a continuous whole. Through this assembly method, a large existing construction platform can be constructed. Not only can it be expanded as needed, but its shape and scale can also be adjusted according to the construction environment and needs.
[0081] By gradually forming the floating structure foundation in stages, the above method can complete large-scale construction tasks in a relatively short period of time. At the same time, this construction platform has theoretically unlimited expansion capabilities and can be quickly expanded to form a large floating structure when needed. Whether it is used for offshore wind power, marine ranching, marine tourism, or other marine engineering projects, it can provide efficient and reliable solutions.
[0082] From the above description, it can be seen that the rapid prototyping method of the concrete floating foundation provided in the embodiment of the present application can directly form a high-strength and high-durability composite material with a high-strength flexible material after the high-performance and high-fluidity concrete material is cast and hardened, thereby improving the corrosion resistance and other durability of the floating structure foundation. It does not require prefabrication and launching and towing in a dock, and can provide technical support for offshore operations.
[0083] In order to further illustrate the present solution, the present application also provides a specific application example of a method for realizing a rapid prototyping of a concrete floating foundation by using the above-mentioned formwork system of the floating structure foundation and its rapid construction device, which specifically includes the following contents:
[0084] Offshore wind power projects are in urgent need of floating structure foundations suitable for deep seas. The technical point of the invention of the floating structure foundation is to realize the construction method and construction method of the floating structure foundation quickly formed on water and offshore, which is not limited to structural materials and types. Therefore, this embodiment selects several materials and a structural type to demonstrate the feasibility of the content of the invention. Figure 7 As shown, the flexible material of the double-layer bladder structure of this embodiment is PVC tape, and the surface of the PVC tape is hot-melted PVC mesh cloth. The flexible pull rope is selected from cable ties, and the PVC mesh cloth is used as a connecting structure. The cable ties are tied to the connecting structure to form a pulling force. Flanges, bolts, and screws are selected for the rigid opening part. The screws and bolts are used to enhance the clamping force between the two flanges, and steel sections are arranged on the rigid opening part as external connecting parts to fix the casting of the cast body and can extend outward to connect multiple identical floating structures. Self-compacting concrete is poured through the reserved casting port of the rigid opening part to form one of the structural types of the floating structure foundation of the present invention.
[0085] The structural dimensions are dynamically adjusted through buoyancy calculations. Double-layer bladder structure: the inner bladder is designed to be 0.65m high, 0.8m in diameter, and 2.7kg in mass. The outer bladder is 0.7m high and 0.9m in diameter. A flexible bladder structure with a height of 0.1m is reserved and sandwiched between the flanges. The flexible bladder structure is 0.6m high and 3.5kg in mass. Bladder connector: The flexible pull rope is determined according to the number of points and has a mass of 1.5kg. Rigid opening: The flange thickness is the same as the cavity structure, 5cm, and the height is 5cm. , the two flanges are of the same size, the length of the steel section is the same as the symmetrical screw spacing, the total mass is 16kg, the bolt length is 50cm, the diameter is 1cm, the number is 8, the total mass is 2.5kg, the number of nuts is 8, the total mass is 1.12kg, the total mass of two solid and one hollow round wood boards is 13.1kg, the total mass of the airbag is 7kg, the concrete structure density is 2.2g / cm3, the concrete structure mass is calculated by the cavity structure size formed by the double-layer capsule, and the calculation formula is as follows:
[0086]
[0087] The total mass of the whole structure is 278.92kg. The draft is calculated based on the buoyancy:
[0088]
[0089] The design height of the flexible bladder structure is 0.6m, the draft is 0.437m, and the height above the water surface is 0.163m, which meets the basic buoyancy calculation requirements of the floating structure.
[0090] After the bottom plate and the side wall of the bladder are hot-fused, a single flexible bladder is formed. Because the hot-melt mesh cloth will fit completely on the wall surface, cable ties are used to reserve holes.
[0091] Hot melting will damage the bearing capacity of the reserved cable ties, so all the cable ties are replaced, and the connection distance is controlled at fixed points on the cable ties. First connect the bottom plate cable ties, and then gradually connect the cable ties upwards along the bottom circle to eventually form a foldable double-layer bladder structure.
[0092] like Figure 7 After the layered bladder structure shown is formed by the cable tie connection structure, the lower flange is first clamped between the two flexible bladders. Since the flange thickness and height are both 5 cm, the 10 cm reserved for the double-layer bladder is clamped on the upper surface of the lower flange, and the same hole is punched in the double-layer bladder structure at the same position as the flange hole. The screw is then inserted into the lower flange through the hole and extended to the inside of the cavity structure, and the bolt limiter at the lower flange is installed. The upper flange is pressed against the upper surface of the lower flange by the screw, and the upper flange is limited by bolts. Finally, the funnel is inserted in advance through the casting port, the lifting steel is installed, and it is also limited by bolts.
[0093] The foundation of the floating structure can be hoisted by hanging a hook on the middle steel section. It is then hoisted to the water surface and cast on site through two funnels. The hoisting device can ensure stable casting of the floating structure. As the casting progresses, the draft of the floating structure increases, and the hook is gradually lowered until the concrete structure is cast. At the same time, the air bag is deflated and removed.
[0094] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.
[0095] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.
[0096] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.
Claims
1. A formwork system for a floating structure foundation, It is characterized in that It includes a double-layer capsule structure and a rigid opening; The double-layer capsule structure is formed by folding two layers of flexible materials with different sizes, the top of which forms a top opening; The top opening is connected to the rigid opening portion, so that the double-layer capsule structure and the rigid opening portion form a closed internal cavity; The rigid opening portion is made of a single or composite rigid structure, is provided with a pouring port, and can be formed into different opening types by connecting components.
2. The formwork system for the floating structure foundation according to claim 1, It is characterized in that The structural form of the internal cavity includes one or any combination of cylindrical, prism, conical and irregular shapes.
3. The formwork system for the floating structure foundation according to claim 2, It is characterized in that A plurality of flexible connectors are arranged between the inner and outer bladders of the double-layer bladder structure, and the flexible connectors are connected to the inner and outer bladders by tying or gluing, so that when the double-layer bladder structure is unfolded, each flexible connector is tensioned along the tensile direction and pulled against each other to form the internal cavity, wherein the thickness of the internal cavity is determined according to the setting method of the flexible connectors.
4. The formwork system for the floating structure foundation according to claim 3, It is characterized in that The inner bladder body of the double-layer bladder structure is provided with a support member, and the outer bladder body of the double-layer bladder structure is provided with a fastener, wherein the fastener and the support member constitute a matching connection component suitable for quality control of the double-layer bladder structure.
5. The formwork system for the floating structure foundation according to claim 4, It is characterized in that The supporting member and the fastening member are both made of a flexible folding material and a rigid segmented folding material or any combination thereof.
6. The formwork system for the floating structure foundation according to claim 5, It is characterized in that The double-layer balloon structure can be compressed to the rigid opening by folding.
7. The formwork system for the floating structure foundation according to claim 6, It is characterized in that The connection components of the rigid opening portion extend outwardly and can be connected to connection components of other floating structure foundation template systems to achieve structural expansion.
8. A method for rapid prototyping of a concrete floating foundation. It is characterized in that The formwork system applied to the floating structure foundation of claim 7, the method comprising: Fixing the template system on the water surface or in the water through the external link assembly of the rigid opening; pouring a high-fluidity gelling and curing material into the inner cavity of the double-layer bladder structure through a pouring port of the rigid opening until the folded flexible material is fully unfolded; The template system is left to stand until the high-fluidity gelling solidifying material hardens and fits with the double-layer bladder structure to obtain the floating structure foundation.
9. The method for rapid prototyping of a concrete floating foundation according to claim 8, It is characterized in that The high-flowability cementitious solidifying material includes high-flowability non-separating concrete or self-compacting concrete.
10. The method for rapid prototyping of a concrete floating foundation according to claim 8, It is characterized in that After obtaining the floating structure foundation, the method further includes: The connection components of the rigid opening part are connected with the connection components of other floating structure foundation formwork systems to be cast to achieve structural expansion; pouring a high-fluidity gelling solidifying material into the inner cavity of the double-layer bladder structure through a pouring port of the rigid opening of the floating structure foundation formwork system to be poured, until the flexible material of the floating structure foundation formwork system to be poured is fully unfolded after being folded; The foundation template system of the floating structure to be cast is left to stand until the high-fluidity gelling solidifying material hardens and fits with the double-layer bladder structure, thereby obtaining an expandable large-scale floating structure.
Citation Information
Patent Citations
Flexible over-water floating body
CN110588910A
Concrete floating island field construction device applied to deep sea oceans and construction method
CN112550634A
Offshore wind power foundation structure of floating type prefabricated bearing platform formwork and construction method
CN117513401A
Underwater wall construction
EP0391736A2
Method for building structures in water
US4664556A