Ship oily sewage and waste oil recovery treatment equipment and treatment method thereof
By using steam pipes and electromagnetic coil-driven water removal sliders in ship oil-containing sewage treatment equipment, combined with deemulsifier and deaze-depositioning agent, rapid cyclone heating and separation are achieved, solving the cumbersome and cost of cyclone in the prior art The high problem improves oil-water separation efficiency and product quality.
Patent Information
- Application Number
- CN202411399517.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-10-09
AI Technical Summary
In the existing ship oil-containing sewage treatment methods, the cyclone and heating process are cumbersome, time-consuming, increase separation costs, and it is difficult to effectively reduce indicators such as moisture, total sinking, and ash, which affects the quality of production raw materials for recycled fuel oil and petroleum asphalt.
A ship oil-containing waste oil recycling and treatment equipment was designed, using steam pipes and tank structures, and the water removal slider driven by high-temperature and high-pressure steam injection and electromagnetic coils were realized to achieve rapid swirl heating and oil-water separation, combining deemulsifier and decomposition. The use of ash settlement agent is used to gradually separate oil, water and ash.
It achieves rapid and effective oil-water separation, reduces steam heat loss, improves the demulsification effect and cyclone power, reduces process complexity and cost, and meets the quality requirements of production raw materials for recycled fuel oil and petroleum asphalt.
Smart Images

Figure CN119038809A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ship sewage treatment, in particular to a ship oily sewage waste oil recovery and treatment device. Background Art
[0002] Ship oily wastewater refers to ship oily ballast water, tank washing water and tank cleaning water; there is also waste oil water generated by dehydration of oily water from the automatic backwash filter of the ship fuel system; the oil separator automatically discharges waste oil. Most indicators of waste oil after dehydration of ship oily wastewater meet the standard requirements of recycled fuel oil, petroleum asphalt production raw materials, and refinery raw materials. Only a few indicators such as moisture, total sedimentation, and ash content exceed the standard. As long as the non-ideal components such as moisture, total sedimentation (mechanical impurities), and ash content are reduced, the quality requirements of recycled fuel oil, petroleum asphalt production, and refinery raw materials can be met.
[0003] At present, ship waste oil is recycled using traditional treatment methods. Ship sewage is placed in an oily sewage treatment tank for cyclone centrifugal separation. The cyclone and heating of the separation device are two working processes, which increases the time consumption of oily sewage separation, increases the complexity of the process, and increases the separation cost. Summary of the invention
[0004] In view of the deficiencies of the prior art mentioned in the background technology, the present invention provides a ship oily wastewater and waste oil recovery and treatment equipment, which has the advantages of saving time and protecting the environment, and solves the problems raised in the above background technology.
[0005] The present invention provides the following technical solution: a ship oily wastewater waste oil recovery and treatment equipment, comprising a steam pipe and a tank body, three circles of steam pipes are set up in an annular manner inside the tank body, the three steam pipes are arranged in layers from top to bottom, a plurality of steam nozzles are arranged in an annular manner at equal intervals on the top of the steam pipe, the plurality of steam nozzles are inclined at an angle of 45° along the tangent direction of the steam pipe, an air inlet is arranged on one side of the steam pipe, the three air inlets converge into a main pipeline, high-temperature and high-pressure steam is pumped into the main pipeline, and the steam is sprayed into the tank body through the steam nozzles.
[0006] Preferably, the axial direction of the air inlet is tangentially the same as the connection point of the steam pipe.
[0007] Preferably, a plurality of electromagnetic coils are arranged in a clockwise circular array on the periphery of the steam pipe, each of the electromagnetic coils is located between two adjacent steam nozzles, a groove is opened at the bottom of the inner cavity of the steam pipe, a dewatering slider is slidably connected in the groove, a bar magnet is embedded in the top of the dewatering slider, and the electromagnetic coil is energized to generate magnetic force on the bar magnet to push the dewatering slider to slide, a condensate pipe is arranged at the bottom of the steam pipe and at a horizontally symmetrical position of the entry point of the air inlet, and both ends of the condensate pipe are respectively connected to the steam pipe and the condensate storage bin.
[0008] Preferably, the top end surface of the dewatering slider is located at the horizontal diameter position of the steam pipe, and the dewatering slider occupies a semicircular space of the cross-section of the steam pipe.
[0009] Preferably, bus bars are embedded on both side walls of the groove of the steam pipe, a conductive wire is provided on the outside of the steam pipe, the bottom of the water removal slider is set as a metal conductor, the bus bar is used to connect the electromagnetic coil at the corresponding position, and when the metal conductor slides to the bus bar position, the electromagnetic coil at the corresponding position is energized.
[0010] Preferably, the busbar extends forward in the direction opposite to the sliding direction of the water removal slider.
[0011] Preferably, the steam pipe is equally divided into a plurality of arc segments, and the plurality of arc segments are sealed and connected by flanges.
[0012] Preferably, a drain net is provided at the connection position between the condensate storage bin and the condensate pipe, and a through hole which is narrow at the top and wide at the bottom is provided on the drain net, and the through hole has a damping effect on the condensate.
[0013] A method for treating waste oil recovery equipment of ship oily sewage, comprising the following steps: S1. Pump the oily wastewater to be treated into the tank; S2, pump high-temperature and high-pressure steam into each air inlet from the main pipeline; S3, connect the conductive wire to the load and energize it; heat the oily wastewater cyclone for 20 to 22 hours until it reaches 45°C; S4. Inject demulsifier into the oily wastewater at a dosage of 0.02%, continue cyclonic heating for 3 hours to raise the temperature to 50°C, stop steam entry, and stop power supply; S5, standing for 10 hours, the oily wastewater is separated into oil and water, and the bottom water is discharged in layers through the diversion pipe arranged at the bottom of the tank body, and the separated oil remains in the tank body; S6, the oil after dehydration in step S5 is continuously heated by swirl stirring for 6 hours until the temperature rises to 60°C, and the guide wire is powered during the process; S7. Inject deashing and settling agent into the tank body through a pump at a dosage of 0.2 ten-thousandths. Let it stand and settle for 24 hours to remove impurities and deash. The waste residue at the bottom is discharged into the sludge pool for further treatment. From the top to the bottom of the tank body, the product coming out of the first layer is recycled fuel oil, the product coming out of the second layer is asphalt raw material, the product coming out of the third layer is heavy oil, which needs further separation and treatment, and the product coming out of the fourth part is hazardous mineral oil.
[0014] Preferably, in the steps S3 and S6, after the conductive wire supplies power, the water removal slider is discharged into the condensed water storage bin through the condensed water pipe, and when the stored water is full, part of the condensed water is recovered for reuse.
[0015] The present invention has the following beneficial effects: 1. The present invention uses steam pipes, and steam drives the oily wastewater to rotate and flow, so as to evenly heat the oily wastewater, reduce steam loss, and have a stirring effect. Due to the difference in specific gravity, centrifugal rotation can be used to quickly separate oil and water.
[0016] 2. The present invention sets an electromagnetic coil. When the electromagnetic coil is energized, a magnetic field is generated to drive the internal dehydration slider to slide. The dehydration slider will scrape off the condensed water generated by the cooling of the steam on the inner wall of the steam pipe and discharge it from the condensed water pipe in time, thereby reducing the heat loss of steam. At the same time, when the dehydration slider passes through each air outlet, the steam at the air outlet will be accumulated and then released, thereby increasing the swirl power and improving the demulsification effect.
[0017] 3. The present invention adopts a design in which a hole that is narrow at the top and wide at the bottom is provided inside the hydrophobic mesh. Condensed water will fall on the hydrophobic mesh, but will not immediately enter the condensed water storage tank. Instead, it will gradually accumulate on the hydrophobic mesh, thus forming a water wall that isolates water vapor and prevents reactive power loss of water vapor. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural overview diagram of the present invention; Figure 2 It is a schematic diagram of the steam pipe structure arrangement of the present invention; Figure 3 For the present invention Figure 2 A front view of Figure 4 It is a cross-sectional view of the internal structure of the present invention; Figure 5 For the present invention Figure 4 A local enlarged view of point A; Figure 6 This is a schematic diagram of the structure of the arc-shaped component of the steam pipe of the present invention; Figure 7 This is a schematic diagram of the installation of the conductive wire of the present invention; Figure 8 For the present invention Figure 4A partial enlarged view of point B.
[0019] In the figure: 1. Steam pipe; 2. Electromagnetic coil; 3. Steam nozzle; 4. Conductive wire; 5. Condensate storage bin; 6. Air inlet; 7. Valve; 8. Condensate drain outlet; 9. Condensate pipe; 10. Water removal slider; 11. Drain net; 12. Diversion pipe; 13. Tank body. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] See also Figure 1 and Figure 2 A ship oily wastewater waste oil recovery and treatment equipment includes a tank body 13, three circles of steam pipes 1 are set up in a ring inside the tank body 13, the three steam pipes 1 are arranged in layers from top to bottom, and the heights of the three steam pipes 1 are 0.3 meters, 2.5 meters, and 5 meters respectively. A plurality of steam nozzles 3 are arranged in a ring at equal intervals at the top of the steam pipe 1, and the plurality of steam nozzles 3 are inclined along the tangent direction at their locations, and form an angle of 45° with the top surface of the steam pipe 1. Three diversion pipes 12 are arranged at the outer bottom of the tank body 13, and the three diversion pipes 12 are arranged vertically from top to bottom in sequence, and the three diversion pipes 12 are used to discharge the fluid after centrifugal separation and precipitation in the steam pipe 1. An air inlet 6 is provided on one side of the steam pipe 1. The axial direction of the air inlet 6 is tangentially the same as that of the connection point of the steam pipe 1. The three air inlets 6 converge into a main pipeline, and high-temperature and high-pressure steam is pumped into the main pipeline. The steam is sprayed into the tank body 13 through the steam nozzle 3. Since the steam nozzle 3 is arranged obliquely, the steam obliquely enters the oily sewage, which will drive the sewage to produce a rotating flow, so that the steam completes the rotation drive and uniform heating of the sewage, reduces steam loss, and improves thermal efficiency; due to the difference in specific gravity of substances such as oil, water, and ash in the sewage, under the centrifugal effect of the cyclone, centrifugal rotation is achieved to achieve rapid oil-water separation, and a part of mechanical impurities and ash are separated from the waste oil.
[0022] Among them, a one-way valve is provided at the main pipeline, which can prevent the oily wastewater in the tank 13 from flowing from the steam pipe 1 to the steam source while ensuring that the steam enters the tank 13 normally. When the oily wastewater is heated to 45 degrees, a demulsifier is injected into it, and the cyclone heating is continued to rise to 50 degrees, and the steam is stopped from entering. After standing for 10 hours, the oily wastewater is separated from the oil and water, and the water is discharged. Subsequently, the dehydrated oil that meets the dehydration standard is further heated by cyclone heating with a deashing sedimentation agent, and the subsequent separation operation is performed.
[0023] See also Figure 2 , Figure 3 and Figure 4 , starting from the position of the air inlet 6, a number of electromagnetic coils 2 are arranged in a circular array in a clockwise direction on the outer periphery of the steam pipe 1, and each electromagnetic coil 2 is located between two adjacent steam nozzles 3. A groove is provided at the bottom of the inner cavity of the steam pipe 1, and a dewatering slider 10 is slidably connected in the groove. The edge of the dewatering slider 10 is adapted to the inner wall of the steam pipe 1, and the dewatering slider 10 slides in a circular manner inside the steam pipe 1 along the groove. A bar magnet is embedded at the top of the dewatering slider 10. The electromagnetic coils 2 are energized in turn along the instantaneous clockwise direction of the steam pipe 1, and magnetic attraction is generated on the bar magnet, which can push the dewatering slider 10 to slide inside the steam pipe 1, thereby scraping off the accumulated condensed water on the inner wall of the steam pipe 1. A condensate pipe 9 (see FIG. 1 ) is provided at the bottom of the steam pipe 1 and at a horizontally symmetrical position at the entry point of the air inlet 6. Figure 2 and Figure 4 As shown in the figure, the top inner cavity of the condensate pipe 9 is connected to the groove of the inner cavity of the steam pipe 1, the bottom end of the condensate pipe 9 is connected to the top inner cavity of the lower steam pipe 1, and the bottom end of the condensate pipe 9 located below is connected to the condensate storage bin 5, which is located inside the tank body 13 and below the steam pipe 1. The condensate scraped off and accumulated in the steam pipe 1 is pushed by the water removal slider 10 and flows into the condensate storage bin 5 through the condensate pipe 9.
[0024] The three condensate pipes 9 may also be arranged independently and directly connected to the condensate storage bin 5 without passing through the adjacent steam pipes 1 .
[0025] Since the steam pipe 1 is immersed in the oily wastewater, after the high-temperature and high-pressure steam is pumped in through the air inlet 6, part of the steam will be condensed in the steam pipe 1 in advance due to heat conduction. The condensed water will be lower than the steam temperature and absorb heat from the steam, thereby reducing the total heat of the steam pumped into the wastewater. The longer the heating time, the greater the heat loss. The internal condensed water is accumulated and discharged in time through the dewatering slider 10, which can effectively reduce this part of the heat loss.
[0026] Among them, the top end surface of the dehydrating slider 10 is located at the horizontal diameter position of the steam pipe 1, and the dehydrating slider 10 occupies the semicircular space of the cross-section of the steam pipe 1, and the top end surface of the dehydrating slider 10 and the inner top surface of the steam pipe 1 form a semicircular space. On the one hand, the inner top arc of the steam pipe 1 forms a longitudinal limit for the dehydrating slider 10 to prevent the dehydrating slider 10 from escaping the groove when sliding. On the other hand, the dehydrating slider 10 occupies part of the inner cavity cross-section of the steam pipe 1, so that the high-pressure steam is in an accumulation state at the end surface of the dehydrating slider 10. When the dehydrating slider 10 slides past the steam nozzle 3, the high-pressure steam will be released once instantly. As a result, in the clockwise direction of the steam pipe 1, as the dehydrating slider 10 slides, intermittent steam bulging pulses appear from the steam nozzle 3, which strengthens the swirl power and improves the demulsification effect.
[0027] For energy saving and power saving considerations, the electromagnetic coil 2 can be powered by the following methods in addition to the intermittent power supply of the controller: Figure 6 and Figure 7 , busbars are embedded on both side walls of the groove of the steam pipe 1, and a conductive wire 4 is provided on the outside of the steam pipe 1. The conductive wire 4 is fixed by screws and connected to the busbar. The bottom of the dewatering slider 10 is set as a metal conductor. The busbar is connected to the electromagnetic coil 2 at the corresponding position. When the metal conductor slides to the busbar position, the electromagnetic coil 2 at the corresponding position can be energized. Therefore, only the electromagnetic coil 2 at the position of the dewatering slider 10 will be energized, and the electromagnetic coils 2 at other positions will not generate useless energy consumption.
[0028] In order to make the dewatering slider 10 slide more smoothly between the two electromagnetic coils 2, the busbar is extended forward in the opposite direction of the sliding direction of the dewatering slider 10, and the extension distance is half the distance between the two adjacent electromagnetic coils 2. In principle, the dewatering slider 10 can be switched between the two electromagnetic coils 2 in a power-off state.
[0029] To facilitate the construction and installation of the steam pipe 1, please refer to Figure 6 , the steam pipe 1 is equally divided into a plurality of arc segments, and the plurality of arc segments are sealed and connected by flanges.
[0030] A drain screen 11 is provided at the connection position between the condensate storage bin 5 and the condensate pipe 9. A through hole with a narrow top and a wide bottom is provided on the drain screen 11. The through hole has a damping effect, so that when the condensate passes through the drain screen 11, there is a damping effect and part of it is temporarily stored in the condensate pipe 9, thereby preventing the water vapor in the steam pipe 1 from leaking into the condensate storage bin 5. A condensate drain port 8 is provided at a lower position on one side of the condensate storage bin 5. A valve 7 is provided on the condensate drain port 8 for controlling drainage.
[0031] The method of use (working principle) of the present invention is as follows: first, steam will enter the steam pipe 1 from the air inlet 6, the steam will quickly spread in the steam pipe 1 in the direction of the steam advance, and will be ejected from the steam nozzle 3 at the upper end of the steam pipe 1. The ejection of steam will exert a thrust on the oily wastewater, and the oily wastewater will have a centrifugal vortex effect according to the influence of the thrust. Since the temperature of the water vapor itself is very high, the oily wastewater will evenly contact the water vapor during the vortex process, and the water vapor will evenly heat the oily wastewater; the dewatering slider 10 rotates and moves in the steam pipe 1 along the direction of the steam advance, and the dewatering slider 10 itself is subjected to two forces, one is a thrust generated by the steam on the dewatering slider 10, and the other is It is a kind of mutual attraction force generated by the magnetic field generated by the electromagnetic coil 2 when it is energized on the dewatering slider 10. The dewatering slider 10 is not completely sealed in the steam pipe 1. There is space above the dewatering slider 10 and the upper end of the inner wall of the steam pipe 1. When the dewatering slider 10 reaches the lower part of the steam nozzle 3, the steam flow cross-section in the pipe below the steam nozzle 3 changes suddenly, and the steam in the pipe is accumulated and then released. The air flow pressure of the steam nozzle 3 is higher than that of the previous period, and the swirl is strengthened due to the pulse effect; since water vapor will continuously generate condensed water when it is cooled, especially when water vapor just starts to enter the steam pipe 1, the oily sewage and the steam pipe 1 are both at room temperature, and a lot of condensed water will be generated. The dewatering slider 10 will also play the role of scraping off the condensed water.
[0032] The front busbar will make the dewatering slider 10 connect to the electromagnetic coil 2 at the corresponding position in advance, thereby connecting the power of the previous electromagnetic coil 2, so that the dewatering slider 10 obtains a cyclic action process of suction acceleration, sliding deceleration, and then sliding acceleration.
[0033] The condensed water generated in the steam pipe 1 moves in the direction of the steam inside the steam pipe 1 according to the dehydration slider 10. The dehydration slider 10 fits against the inner wall of the steam pipe 1. The dehydration slider 10 will scrape the condensed water attached to the inner wall of the steam pipe 1 to the bottom of the steam pipe 1, and then the dehydration slider will push the condensed water to the condensed water pipe 9. The condensed water will fall from the condensed water pipe 9 to the top of the hydrophobic net 11. The hydrophobic net 11 is provided with a hole that is narrow at the top and wide at the bottom. Due to the damping effect, the condensed water will not fall into the condensed water storage tank 5 quickly, and a water wall is formed above the hydrophobic net 11 to prevent water vapor from entering the condensed water storage tank 5, thereby preventing excessive loss of steam.
[0034] A method for treating waste oil recovery equipment of ship oily sewage, comprising the following steps: S1, pumping the oily wastewater to be treated into the tank 13; S2, pumping high-temperature and high-pressure steam from the main pipeline to each air inlet 6; S3, connect the conductive wire 4 to the load and energize it; heat the oily wastewater vortex for 20 to 22 hours until it reaches 45°C; S4. Inject demulsifier into the oily wastewater at a dosage of 0.02%, continue cyclonic heating for 3 hours to raise the temperature to 50°C, stop steam entry, and stop power supply; S5. Let the oily wastewater stand for 10 hours, and separate the oil and water. The bottom water is discharged in layers through the diversion pipe 12 arranged at the bottom of the tank body 13, and the separated oil remains in the tank body 13. The separated wastewater is discharged to a sewage treatment station or a storage tank. The quality index of the separated oil reaches ≤1% in water content and ≤1% in ash content. S6, the oil after dehydration in step S5 is continuously heated by cyclone stirring for 6 hours until the temperature rises to 60° C., and the guide wire 4 is powered during the process; S7. Inject deashing and settling agent into the tank body 13 through a pump at a dosage of 0.2 ten-thousandth, let it stand and settle for 24 hours to remove impurities and deash. The waste residue at the bottom is discharged into the sludge pool and entrusted to a qualified unit for further treatment. From the top to the bottom of the tank body 13, the product coming out of the first layer is recycled fuel oil (indicators: moisture <0.5%, ash <0.1%), which can be sold directly, and the product coming out of the second layer is asphalt raw material (indicators: moisture <0.5%, ash <0.3%), which can be sold directly. The product coming out of the third layer is heavy oil. High-ash oil with an ash content greater than 0.3% is pumped into the subsequent fine filtration workshop for high-efficiency fine filtration. The heavy oil that meets the indicators (indicators: moisture <1%, ash <0.5%) can be sold directly. The product coming out of the fourth part is hazardous mineral oil (indicators: moisture >3%, ash >2%), which is entrusted to a qualified unit for recycling.
[0035] Among them, in steps S3 and S6, after the conductive wire 4 supplies power, the water removal slider 10 is discharged into the condensed water storage bin 5 through the condensed water pipe 9, and part of the condensed water is recovered for reuse when the stored water is full.
Claims
1. A ship oily wastewater waste oil recovery and treatment device, comprising a steam pipe (1) and a tank body (13), characterized in that: Three circles of steam pipes (1) are arranged in an annular manner inside the tank body (13). The three steam pipes (1) are arranged in layers from top to bottom. A plurality of steam nozzles (3) are arranged in an annular manner at equal intervals at the top of the steam pipes (1). The plurality of steam nozzles (3) are inclined along the tangent direction of the steam pipes (1). An air inlet (6) is provided on one side of the steam pipe (1). The three air inlets (6) converge into a main pipeline. High-temperature and high-pressure steam is pumped into the main pipeline, and the steam is sprayed into the tank body (13) through the steam nozzles (3).
2. The ship oily wastewater waste oil recovery and treatment equipment according to claim 1 is characterized by: The axial direction of the air inlet (6) is tangentially the same as the connection point of the steam pipe (1).
3. The ship oily wastewater waste oil recovery and treatment equipment according to claim 1 is characterized by: A plurality of electromagnetic coils (2) are arranged in a clockwise circular array on the outer circumference of the steam pipe (1), each of the electromagnetic coils (2) being located between two adjacent steam nozzles (3). A groove is provided at the bottom of the inner cavity of the steam pipe (1), a dewatering slider (10) is slidably connected in the groove, a bar magnet is embedded at the top of the dewatering slider (10), and the electromagnetic coil (2) generates magnetic force on the bar magnet when electricity is supplied to push the dewatering slider (10) to slide. A condensate pipe (9) is provided at the bottom of the steam pipe (1) and at a horizontally symmetrical position of the entry point of the air inlet (6), and the two ends of the condensate pipe (9) are respectively connected to the steam pipe (1) and the condensate storage bin (5).
4. The ship oily wastewater waste oil recovery and treatment equipment according to claim 3 is characterized by: The top end surface of the dewatering slider (10) is located at a horizontal diameter position of the steam pipe (1), and the dewatering slider (10) occupies a semicircular space of the cross section of the steam pipe (1).
5. The ship oily wastewater waste oil recovery and treatment equipment according to claim 3 is characterized by: Busbars are embedded in the two side walls of the groove of the steam pipe (1), a conductive wire (4) is provided outside the steam pipe (1), the bottom of the water removal slider (10) is provided as a metal conductor, the busbar is used to connect the electromagnetic coil (2) at the corresponding position, and when the metal conductor slides to the busbar position, the electromagnetic coil (2) at the corresponding position is energized.
6. The ship oily wastewater waste oil recovery and treatment equipment according to claim 5 is characterized by: The busbar extends forward in the direction opposite to the sliding direction of the water removal slider (10).
7. The ship oily wastewater waste oil recovery and treatment equipment according to claim 3 is characterized by: The steam pipe (1) is equally divided into a plurality of arc segments, and the plurality of arc segments are sealed and connected via flanges.
8. The ship oily wastewater waste oil recovery and treatment equipment according to claim 3 is characterized by: A drain screen (11) is provided at the connection position between the condensate storage bin (5) and the condensate pipe (9), and a through hole which is narrow at the top and wide at the bottom is provided on the drain screen (11), and the through hole has a damping effect on the condensate.
9. A method for treating ship oily wastewater using the waste oil recovery treatment equipment according to claim 5, characterized in that The following steps are involved: S1, pumping the oily wastewater to be treated into the tank (13); S2, pumping high-temperature and high-pressure steam from the main pipeline to each air inlet (6); S3, connecting the conductive wire (4) to the load and energizing it; heating the oily wastewater cyclone for 20 to 22 hours until the temperature reaches 45°C; S4. Inject demulsifier into the oily wastewater at a dosage of 0.02%, continue cyclonic heating for 3 hours to raise the temperature to 50°C, stop steam entry, and stop power supply; S5, leaving the wastewater to stand for 10 hours, separating the oil and water, and draining the bottom water in layers through the diversion pipe (12) provided at the bottom of the tank body (13), while the separated oil remains in the tank body (13); S6, the oil after dehydration in step S5 is continuously heated by cyclone stirring for 6 hours until the temperature rises to 60° C., and power is supplied to the guide wire (4) during the process; S7. A deashing and settling agent is injected into the tank body (13) by means of a pump at a dosage of 0.02 ten-thousandth. The mixture is allowed to settle for 24 hours to remove impurities and ash. The waste residue at the bottom is discharged into a sludge pool for further treatment. From the top to the bottom of the tank body (13), the product coming out of the first layer is recycled fuel oil, the product coming out of the second layer is asphalt raw material, the product coming out of the third layer is heavy oil, which is to be further separated and treated, and the product coming out of the fourth layer is hazardous mineral oil.
10. The method for treating oily wastewater from ships according to claim 9, characterized in that: In the steps S3 and S6, after the conductive wire (4) supplies power, the water removal slider (10) is discharged into the condensed water storage bin (5) through the condensed water pipe (9), and when the stored water is full, part of the condensed water is recovered for reuse.
Citation Information
Patent Citations
Waste liquid recovery treatment device
CN114516668A
A separator for oily water
CN207175535U
Energy-saving electromagnetic heating type steam generation mechanism
CN216744293U
Device for electromagnetic treatment of liquids, particularly water
EP0336346A1
Cited By
Ship oil-containing ballast water and tank washing water waste residue separation equipment and separation process thereof
CN119551849A
