Emergency control method for microfilament type sludge bulking

By adding effective chlorine disinfectant and coagulant to the return sludge of the sewage treatment plant, combined with process monitoring, the rapid emergency control problem of microfilament type sludge expansion is solved, and efficient control is achieved under existing conditions , lowering the threshold for technical application and equipment transformation costs.

CN119038827AActive Publication Date: 2024-11-29BEIJING CAPITAL CO LTD

Patent Information

Application Number
CN202411344463.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-11-29
Estimated Expiration
2044-09-25

AI Technical Summary

Technical Problem

The prior art is difficult to effectively and quickly deal with the problem of microfilament type sludge expansion, especially in different treatment plants, the cost of equipment transformation, and the difficulty in achieving rapid response and emergency control.

Method used

By adding chlorine-containing disinfectant with an effective chlorine content of 10-15% to the reflux sludge, adjusting the dosage and dosage time according to the setting process and monitoring indicators, and using it in combination with the coagulant, it can directly inhibit microscopy in the biochemical tank. The sludge of swells expands, and the amount of agent input and total duration of dosing are adjusted through process monitoring.

Benefits of technology

It realizes rapid and effective control of microfilament-type sludge expansion in sewage treatment plants without adding new instruments and no production reduction/stop production, reduces the threshold for technical application, improves treatment efficiency, shortens suppression time, and ensures water quality stability .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119038827A_ABST
    Figure CN119038827A_ABST
Patent Text Reader

Abstract

The invention relates to an emergency control method for microfilament type sludge bulking, which comprises the following steps of: adding an agent, namely adding the agent into returned sludge according to a first set process; process monitoring: monitoring once at the end of each adding period, wherein monitoring indexes include but are not limited to total effluent quality, sedimentation performance of a mixed solution in a biochemical pool and microscopic examination of the mixed solution at a water outlet of the biochemical pool; if the last monitoring index in the step S2 is qualified, ending the addition of the medicament; and if the last monitoring index in S2 is unqualified, starting a second stage to add the agent into the returned sludge: adding the agent into the returned sludge according to a second set process. The method has the beneficial effects that the time for inhibiting the bulking of microfilament type sludge is greatly shortened; and the technical scheme can be immediately applied under the current technological condition of sewage treatment, the technological working condition and technological parameters do not need to be additionally adjusted, the implementation risk is safe and controllable, and popularization and application are facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of sewage treatment, and in particular to an emergency control method for microthallic sludge bulking. Background Art

[0002] Sludge bulking is very common in sewage treatment systems using the activated sludge method, especially in biological nutrient removal (BNR) systems with anaerobic / anoxic / aerobic alternating environments. Among the causes of sludge bulking, Microthrips-type sludge bulking has a seasonal characteristic of occurring much more frequently in winter and spring than in summer and autumn. It is the main cause of sludge bulking in BNR systems, and its seasonal characteristics are consistent with the time pattern of sludge bulking in most domestic sewage treatment plants. Once sludge bulking occurs, it will make it difficult to separate mud and water, thus affecting the effluent quality.

[0003] At present, the control methods and technologies of sludge bulking include: load adjustment, process mode adjustment, coagulant addition and disinfectant addition. Among them, the control methods of load adjustment and process mode adjustment have slow effects and long cycle time, and cannot achieve rapid emergency treatment of sludge bulking; the control method of coagulant addition has good short-term effect and short cycle time, but this method only treats the symptoms and not the root cause, so it will return to its original state after stopping the addition of drugs, and continuous addition of drugs is easy to cause equipment failure and blockage, and cannot achieve the purpose of stable control; disinfectant addition technology can kill micro-trichol hyphae and restore the normal sedimentation performance of sludge flocs. It is an ideal emergency control method for micro-trichol sludge bulking problems. The existing disinfectant addition technology requires the purchase and installation of auxiliary instruments, or the technology application is limited by the hardware conditions of the sewage treatment plant and cannot be implemented; in addition, it is difficult to achieve rapid response and emergency control for micro-trichol sludge bulking problems. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides an emergency control method for Microtrichum type sludge bulking, which solves the problems existing in the existing emergency control methods for Microtrichum type sludge bulking, such as the low applicability of the methods in different treatment plants, the high cost of equipment modification, and the difficulty in realizing rapid response and emergency control technology for Microtrichum type sludge bulking.

[0006] (II) Technical solution

[0007] In order to achieve the above object, the main technical solutions adopted by the present invention include:

[0008] In a first aspect, an embodiment of the present invention provides an emergency control method for microfilamentous sludge bulking, comprising the following steps:

[0009] S1, adding reagents: adding reagents to the return sludge according to the first set process;

[0010] S2. Process monitoring: monitoring is carried out once at the end of each dosing cycle. The monitoring indicators include but are not limited to the total effluent quality, the sedimentation performance of the mixed liquid in the biochemical pool, and the microscopic examination of the mixed liquid at the outlet of the biochemical pool;

[0011] S3. If the last monitoring index in S2 is qualified, end the reagent addition; if the last monitoring index in S2 is unqualified, start the second stage of reagent addition in the return sludge: according to the second set process, add the reagent to the return sludge.

[0012] As a preferred embodiment of the present invention, in the emergency control method for microthalline sludge bulking, the agent is a chlorine-containing disinfectant with an effective chlorine content of 10-15%.

[0013] As a preferred embodiment of the present invention, the emergency control method for microthalline sludge bulking, in S1, the first setting process is a total of 15 days, and the specific process is: on the first day, a dosage of 3g Cl / kg MLSS effective chlorine is used;

[0014] On days 2-7, a maintenance dose of 2 g Cl / kg MLSS available chlorine was used;

[0015] On the 8th to 15th day, make a judgment based on the total effluent quality. If the total effluent quality remains stable, increase the maintenance dose of available chlorine to 4g Cl / kg MLSS. If the total effluent quality fluctuates, continue to add available chlorine at a maintenance dose of 2g Cl / kg MLSS until the total effluent quality stabilizes, then increase the maintenance dose of available chlorine to 4g Cl / kg MLSS.

[0016] As a preferred embodiment of the present invention, the emergency control method for microthalline sludge bulking, if the second stage of agent addition is started in S3, the second round of process monitoring is performed with reference to S2 at the same time, and the specific process of the second setting process is: on the first day, a dosage of 6g Cl / kg MLSS effective chlorine is used;

[0017] On days 2-6, a maintenance dose of 3 g Cl / kg MLSS available chlorine was used;

[0018] After the 6th day, if the monitoring indicators are qualified, stop adding the agent.

[0019] As a preferred embodiment of the present invention, in the emergency control method for microfilamentous sludge bulking, in S3, if the monitoring indicators are unqualified after the 6th day in the second setting process, the second setting process needs to continue to add the agent, and the specific process is: on the 7th to 15th day, the total effluent water quality is combined to make a judgment. If the total effluent water quality remains stable, the maintenance dose of effective chlorine is increased to 4g Cl / kg MLSS; if the total effluent water quality fluctuates, the maintenance dose of effective chlorine of 3g Cl / kg MLSS continues to be added until the total effluent water quality is stable, and then the maintenance dose of effective chlorine is increased to 4g Cl / kg MLSS.

[0020] As a preferred embodiment of the present invention, in the emergency control method for Microthrips type sludge bulking, in S3, during the 7th to 15th day of the second set process, if the process monitoring index is qualified, the agent addition is terminated.

[0021] As a preferred embodiment of the present invention, in the emergency control method for Microthrips type sludge bulking, the location for adding the agent into the return sludge is selected as the sludge return pump outlet or the sludge return channel.

[0022] As a preferred embodiment of the present invention, the emergency control method for Microthrips type sludge bulking is divided into three dosing cycles per day, and in each cycle, the drug is added for 3-5 hours and stopped for 3-5 hours.

[0023] As a preferred embodiment of the present invention, in the emergency control method for Microthrips type sludge bulking, the agent is a mixture of a disinfectant and a coagulant.

[0024] The amount of the agent added is referred to the amount in other embodiments. In addition, the amount of the coagulant added is 5-500 mg coagulant / kg MLSS, and the coagulant is selected from one or more of polyaluminium chloride, aluminium sulfate, ferric chloride and polyacrylamide.

[0025] As a preferred embodiment of the present invention, in the emergency control method for microfilamentous sludge bulking, in S2, the total effluent water quality monitoring includes COD, TN, TP, and ammonia nitrogen;

[0026] The sedimentation performance of the mixed liquid in the biochemical pool is the sedimentation ratio of the mixed liquid in the aeration pool in 30 minutes;

[0027] Microscopic examination of the mixed liquid at the outlet of the biochemical pool includes changes in mycelium, sludge floc status and interstitial water transparency.

[0028] (III) Beneficial effects

[0029] The beneficial effects of the present invention are as follows: an emergency control method for microfilamentous sludge swelling of the present invention, because the agent is directly added into the return sludge, the agent enters the biochemical pool along with the return sludge, thereby inhibiting the swelling of microfilamentous sludge in the biochemical pool; at the same time, process monitoring is implemented during the agent addition process, so as to timely adjust the agent input amount and the total duration of drug administration according to the current status of the mixed liquid in the biochemical pool. Compared with the prior art, it can realize the emergency control of microfilamentous sludge swelling in the sewage treatment plant without adding new instruments and meters and without reducing / stopping production; reasonably control the agent input amount and the total duration of drug administration, improve the treatment efficiency, and greatly shorten the time of inhibiting microfilamentous sludge swelling; reduce the threshold for technical application, and the technical solution can be immediately carried out under the current process conditions of sewage treatment when applied, without additional adjustment of process conditions and process parameters, and the implementation risk is safe and controllable, which is conducive to promotion and application.

[0030] The agent is a chlorine-containing disinfectant with an effective chlorine content of 10-15%. The chlorine-containing disinfectant can kill the hyphae of microthrips and restore the normal sedimentation performance of sludge flocs.

[0031] The first set process lasts for a total of 15 days. On the first day, a dose of 3g Cl / kg MLSS effective chlorine is used. Under the premise of not inhibiting nitrifying bacteria in the biochemical pool, a larger dose is used to stimulate the filamentous bacteria in the sludge system to cause their hyphae to break. On the 2nd to 7th day, a maintenance dose of 2g Cl / kg MLSS effective chlorine is used, with the main purpose of inhibiting the growth of filamentous bacteria and taming the tolerance of the functional bacteria in the system to disinfectants. On the 8th to 15th day, the total effluent quality is judged. If the total effluent quality remains stable, the maintenance dose of effective chlorine is increased to 4g Cl / kg MLSS; if the total effluent quality fluctuates, the maintenance dose of 2g Cl / kgMLSS effective chlorine is continued to be added until the total effluent quality is stable, and then the maintenance dose of effective chlorine is increased to 4gCl / kg MLSS. The total effluent quality is monitored, and the total effluent quality (the stability of the reaction water treatment system) is ensured while the hyphae are quickly and effectively killed, without affecting the normal water treatment operation.

[0032] After the first stage of treatment, the monitoring indicators were unqualified, and the second stage was started to add the agent to the return sludge. On the first day, the dosage of 6g Cl / kg MLSS effective chlorine was used. At the beginning of the second stage, the effect of killing microfilamentous mycelium was enhanced by increasing the starting dose. From the 2nd to the 6th day, the maintenance dose of 3g Cl / kg MLSS effective chlorine was used. The main purpose of this stage was still to inhibit the growth of filamentous fungi, while taming and enhancing the tolerance of the system functional bacteria to disinfectants.

[0033] If the monitoring indicators are unqualified after the 6th day in the second set process, the second set process needs to continue to add chemicals. On the 7th to 15th day, the total effluent quality will be combined to make a judgment. If the total effluent quality remains stable, the maintenance dose of effective chlorine will be increased to 4g Cl / kg MLSS; if the total effluent quality fluctuates, it will continue to be added at a maintenance dose of 3g Cl / kg MLSS effective chlorine until the total effluent quality is stable and then the maintenance dose of effective chlorine will be increased to 4g Cl / kg MLSS. Monitor the total effluent quality to ensure the total effluent quality while quickly and effectively killing the mycelium, without affecting normal water treatment operations. On the 7th to 15th day, if the process monitoring indicators are qualified, stop the addition of chemicals at any time, and implement dynamic process monitoring, which is conducive to adjusting the dosing strategy at any time, and the method is flexible.

[0034] The location for adding reagents to the return sludge is the outlet of the sludge return pump or the sludge return channel. The hydraulic mixing effect of these two places is good, and the reagents can be evenly distributed to the biochemical pool. At the same time, the operation is simple. Among them, the outlet of the sludge return pump is the first choice.

[0035] The dosing time is 3 hours, and the dosing time is 3 hours. ...

[0036] The agent is a mixture of disinfectant and coagulant. The coagulant assists the disinfectant in improving the sedimentation performance of the sludge and synergistically improves the efficiency of the disinfectant in treating sludge swelling.

[0037] Microscopic examination of the mixed liquid at the outlet of the biochemical pool includes changes in mycelium, the state of sludge flocs and the transparency of interstitial water. The mycelium changes are monitored during the process to determine the situation of killing mycelium so as to adjust the dosing strategy; the sludge floc state and interstitial water transparency are comprehensively considered: healthy sludge flocs indicate that the microbial community is in an active state, which is conducive to the degradation of pollutants; the higher the transparency of interstitial water, the more stable the water quality is, which helps to indicate whether the sewage treatment system is operating normally. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 This is a microscopic examination picture of the mixed liquid at the outlet of the biochemical pool where microthalline sludge bulking occurs in Example 1 of the present invention, magnified 100 times under a microscope;

[0039] Figure 2 This is a microscopic examination picture of the mixed liquid at the outlet of the biochemical pool where microthalline sludge bulking occurs in Example 1 of the present invention, magnified 400 times under a microscope;

[0040] Figure 3 The images are 400 times magnified microscopic images of the mixed liquid at the outlet of the biochemical pool corresponding to different days after the addition of the agent in Example 1 of the present invention;

[0041] Figure 4These are pictures of sludge settling of mixed liquor at two outlets of the biochemical pool corresponding to different days after the addition of the agent in Example 1 of the present invention. DETAILED DESCRIPTION

[0042] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.

[0043] The embodiment of the present invention proposes an emergency control method for microfilamentous sludge swelling of the present invention, which aims at the existing emergency control methods for microfilamentous sludge swelling, such as the low applicability of the methods in different treatment plants, the high cost of equipment modification, and the difficulty in realizing the rapid response and emergency control technical problems for sludge swelling; since the reagent is directly added to the return sludge, the reagent enters the biochemical pool with the return sludge, thereby inhibiting the microfilamentous sludge swelling in the biochemical pool; at the same time, the process monitoring is implemented during the reagent addition process, so as to timely adjust the reagent input amount and the total dosing time according to the current status of the mixed liquid in the biochemical pool. Compared with the prior art, it can realize the emergency control of microfilamentous sludge swelling in the sewage treatment plant without adding new instruments and meters and without reducing production / stopping production; reasonably control the reagent input amount and the total dosing time, improve the treatment efficiency, and greatly shorten the time of inhibiting microfilamentous sludge swelling; reduce the threshold for technical application, and the technical solution can be immediately carried out under the current process conditions of sewage treatment when applied, without additional adjustment of process conditions and process parameters, and the implementation risk is safe and controllable, which is conducive to promotion and application.

[0044] In order to better understand the above technical solution, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a clearer and more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.

[0045] Example 1

[0046] This embodiment provides an emergency control method for microthalline sludge bulking. Taking sewage treatment plant A as an example, the specific steps are as follows:

[0047] (1) After discovering sludge bulking in the biochemical pool of sewage treatment plant A, refer to Figure 1 and Figure 2 In the mixed liquid at the outlet of the biochemical pool, the filamentous bacteria in the picture are Gram-positive, with coiled hyphae and no branches. Most of the hyphae extend out of the sludge flocs, and the hyphae are intertwined and bridged to form open flocs. There are filamentous bacteria in all flocs in the field of view, and the number is greater than 20 per floc. According to the identification method of filamentous bacteria, Figure 1The types of filamentous fungi that appeared in the sample met the basic characteristics of Microthrips, and the abundance of filamentous fungi was level 5.

[0048] Sodium hypochlorite solution with an effective chlorine content of 10% is used as the reagent. The reagent addition point is selected in the return sludge after the secondary sedimentation tank. The specific addition position is selected at the outlet of the sludge return pump. The reagent is added according to the following process:

[0049] The first stage lasted 15 days. On the first day, an initial dose of 3g Cl / kg MLSS available chlorine (3g available chlorine per kilogram of mixed liquid suspended solids) was used, and the dosing was done three times a day. The dosing pump was turned on for 5 hours and stopped for 3 hours.

[0050] On the 2nd to 7th day, a maintenance dose of 2g Cl / kg MLSS effective chlorine was used, which was added three times a day. The dosing pump was turned on for 5 hours and stopped for 3 hours.

[0051] On the 8th to 15th day, the effluent quality was judged. When the effluent quality was not significantly affected, the maintenance dose of effective chlorine was increased to 4g Cl / kg MLSS and added three times a day. The dosing pump was turned on for 3 hours and stopped for 5 hours.

[0052] (2) Process monitoring: According to the dosing method and frequency of step (1), process monitoring is performed at the end of each 8-hour dosing cycle. The specific inspection indicators include the following:

[0053] 1) Outlet water quality: mainly based on the total effluent online instrument data, including COD, TN, TP, and ammonia nitrogen. The above indicators all meet the emission standards or internal control standards of the water plant.

[0054] At the same time, pay attention to the change of DO (dissolved oxygen) in the biochemical pool. If the DO in the aeration pool increases abnormally, the sampling and detection of ammonia nitrogen in the effluent at the end of the first aerobic pool and the end of the biochemical pool should be supplemented to ensure the normal operation of nitrifying bacteria. In this embodiment, the DO in the biochemical pool remains stable.

[0055] 2) Sedimentation performance: The last monitored sedimentation ratio values ​​of the mixed liquid in the aeration tank were 40% and 47% in 30 minutes (SV30). Note that the mixed liquid should be left in a dark place for 30 minutes.

[0056] At the same time, monitor the changes in the sludge concentration (MLSS) at the outlets on the east and west sides of the biochemical pool to control the balance of the sludge concentration at all outlets, so that the dosage can be approximately considered as the average distribution of the biochemical pool. The sedimentation ratio (SV30) and sludge concentration (MLSS) of the mixed liquid at the outlet of the biochemical pool after different days of dosing are shown in Table 1.

[0057] 3) Microscope examination: Take the mixed liquid at the outlet of the biochemical pool as the observation sample. For details, see Figure 3The last monitoring result was that the mycelium of filamentous bacteria retreated, and at the same time, the structure of sludge flocs was stable and the interstitial water was clear. On the 15th day, the microscopic examination was combined to determine that when the mycelium outside the sludge flocs retreated, the dosing was stopped.

[0058] The analysis for Example 1 is as follows: Figure 3 The following is a microscopic photograph of the morphological changes of sludge flocs and microfilamentous fungi in the mixed liquor at the outlet of the biochemical pool after 15 days of dosing (magnification 400 times); after the initial addition of 3g Cl / kg MLSS effective chlorine on the first day, the hyphae bridging between the flocs had been significantly improved (the abundance of filamentous fungi dropped to level 4); after changing to a maintenance dose of 2g Cl / kgMLSS effective chlorine, the hyphae in the flocs began to break on the third day, while the number and morphological characteristics of the hyphae in the flocs had not changed significantly from the 5th to the 7th day (the abundance of filamentous fungi was level 3), which reflects that the tolerance of microfilamentous fungi to this dose of effective chlorine concentration has increased; after the effective chlorine dose was increased to 4g Cl / kg MLSS on the 8th day, the hyphae in the sludge flocs began to break for the second time, and the hyphae outside the sludge flocs had basically retreated on the 13th day (the abundance of filamentous fungi was level 2); on the 15th day, the hyphae outside the sludge flocs had completely retreated, so chlorine was no longer added, refer to Figure 4 At this time, the activated sludge flocs are loose but the interstitial water is relatively clear, indicating that the activated sludge system has basically returned to normal.

[0059] Table 1 shows the 30-minute settling ratio (SV30) and sludge concentration (MLSS) of the mixed liquor at the outlet of the biochemical pool after different days of dosing. Figure 3 The abundance of filamentous bacteria observed by microscopic examination showed a positive correlation, that is, as the abundance of filamentous bacteria decreased, SV30 also gradually decreased until it returned to normal levels. Table 1 shows that in terms of sludge concentration, there was a short-term difference in sludge concentration between the east and west sides from the 3rd to the 5th day. During production, the sludge concentration on both sides was restored to be close to the same by adjusting the opening of the internal return channel gate; and the sludge concentration before and after the addition of sodium hypochlorite was not much different, so the influence of sludge concentration on SV30 detection can also be ruled out.

[0060] Table 1: Sedimentation ratio (SV30) and sludge concentration (MLSS) of the mixed liquor at the outlet of the biochemical pool after different days of dosing

[0061]

[0062] Example 2

[0063] This embodiment provides an emergency control method for microthalline sludge bulking. Taking sewage treatment plant B as an example, the specific steps are as follows:

[0064] (1) After sludge swelling was found in the biochemical pool of sewage treatment plant B, sodium hypochlorite solution with an effective chlorine content of 15% was used as the reagent. The reagent addition point was selected in the return sludge after the secondary sedimentation tank. The specific addition location was selected at the outlet of the sludge return pump. The reagent was added according to the following process:

[0065] The first stage lasted 15 days. On the first day, an initial dose of 3g Cl / kg MLSS available chlorine (3g available chlorine per kilogram of mixed liquid suspended solids) was used, and the dosing was done three times a day. The dosing pump was turned on for 5 hours and stopped for 3 hours.

[0066] On the 2nd to 7th day, a maintenance dose of 2g Cl / kg MLSS effective chlorine was used, which was added three times a day. The dosing pump was turned on for 5 hours and stopped for 3 hours.

[0067] On the 8th to 15th day, the effluent quality was judged. When the effluent quality was not significantly affected, the maintenance dose of effective chlorine was increased to 4g Cl / kg MLSS, which was added 3 times a day, and the dosing pump was on for 3 hours and off for 5 hours. On the 9th day, the effluent quality fluctuated significantly, so the maintenance dose of 2g Cl / kg MLSS effective chlorine was continued to be added, which was added 3 times a day, and the dosing pump was on for 3 hours and off for 5 hours. This was continued until the 12th day, when the effluent was stabilized and then increased to 4g Cl / kg MLSS.

[0068] (2) Process monitoring: According to the dosing method and frequency of step (1), process monitoring is performed at the end of each 8-hour dosing cycle. The specific inspection indicators include the following:

[0069] 1) Outlet water quality: mainly based on the total effluent online instrument data, including COD, TN, TP, and ammonia nitrogen. The above indicators all meet the emission standards or internal control standards of the water plant.

[0070] At the same time, pay attention to the change of DO (dissolved oxygen) in the biochemical pool. If the DO in the aeration pool increases abnormally, the sampling and detection of ammonia nitrogen in the effluent at the end of the first aerobic pool and the end of the biochemical pool should be supplemented to ensure the normal operation of nitrifying bacteria. In this embodiment, the DO in the biochemical pool remains stable.

[0071] 2) Sedimentation performance: The 30-minute sedimentation ratio (SV30) of the mixed liquid in the aeration tank was 70% at the last monitoring on the 15th day. The mixed liquid was left to stand in the backlight for 30 minutes, and the supernatant was observed to be slightly turbid and the mud-water stratification interface was blurred.

[0072] At the same time, monitor the changes in sludge concentration (MLSS) at all outlets of the biochemical pool and control the balance of sludge concentration at all outlets, which can be approximately considered as the average distribution of the dosage in the biochemical pool.

[0073] 3) Microscope examination: The mixed liquid at the outlet of the biochemical pool was taken as the observation sample. The last monitoring result on the 15th day showed that some filamentous fungi hyphae had not yet retreated.

[0074] (3) According to the process monitoring results of step (2), the killing of filamentous fungi hyphae is not up to standard, and it is necessary to start the second stage of adding agents. The second stage lasts for 15 days. After the 6th day, the situation is judged by combining microscopic observation. When the hyphae outside the sludge flocs are basically eliminated, the chlorination can be stopped at any time. The specific steps are as follows:

[0075] On the first day, the starting dose of 6g Cl / kg MLSS effective chlorine was used, and it was added three times a day. The dosing pump was turned on for 5 hours and stopped for 3 hours. That is, the effect of killing microtrichol mycelium was enhanced by increasing the starting dose;

[0076] On the 2nd to 6th day, a maintenance dose of 3g Cl / kg MLSS effective chlorine was used, which was added three times a day, and the dosing pump was turned on for 5 hours and stopped for 3 hours. The main purpose of this stage was still to inhibit the growth of filamentous bacteria, while taming and enhancing the tolerance of the system's functional bacteria to the disinfectant;

[0077] On the 7th to 15th day, make a judgment based on the effluent quality. When the effluent quality is not significantly affected, increase the maintenance dose of available chlorine to 4g Cl / kg MLSS, and add it 3 times a day, with the dosing pump running for 3 hours and stopping for 5 hours. If the effluent quality fluctuates significantly, continue to add the available chlorine at a maintenance dose of 3g Cl / kg MLSS, and add it 3 times a day, with the dosing pump running for 3 hours and stopping for 5 hours, until the effluent stabilizes and then increases it to 4g Cl / kg MLSS.

[0078] (4) Process monitoring: According to the dosing method and frequency of step (3), process monitoring is performed at the end of each 8-hour dosing cycle. The specific inspection indicators include the following:

[0079] 1) Outlet water quality: mainly based on the total outlet water online instrument data, including COD, TN, TP, and ammonia nitrogen. The above indicators meet the standards.

[0080] At the same time, pay attention to the change of DO (dissolved oxygen) in the biochemical pool. If the DO in the aeration pool increases abnormally, the sampling and detection of ammonia nitrogen in the effluent at the end of the first aerobic pool and the end of the biochemical pool should be supplemented to ensure the normal operation of nitrifying bacteria. In this embodiment, the DO in the biochemical pool remains stable.

[0081] 2) Sedimentation performance: The sedimentation ratio of the mixed liquid in the aeration tank in 30 minutes (SV30) was 39% at the last monitoring on the 15th day. Note that the mixed liquid should be left in a dark place for 30 minutes, and the supernatant should be clear and the mud-water stratification interface should be clear.

[0082] At the same time, the changes in the sludge concentration (MLSS) at all outlets of the biochemical pool are monitored to control the balance of the sludge concentration at all outlets, which can be approximately considered as the average distribution of the dosage in the biochemical pool.

[0083] 3) Microscope examination: Take the mixed liquid at the outlet of the biochemical pool as the observation sample. The last monitoring result on the 15th day is that the mycelium of filamentous fungi retreated. At the same time, the sludge floc structure was stable and the interstitial water was clear. Stop adding the medicine.

[0084] Example 3

[0085] This embodiment provides an emergency control method for microthalline sludge bulking. Taking the C sewage treatment plant as an example, the specific steps are as follows:

[0086] (1) After sludge swelling was found in the biochemical pool of the C sewage treatment plant, a sodium hypochlorite solution with an effective chlorine content of 12% was used as the reagent. The reagent addition point was selected in the return sludge after the secondary sedimentation tank. The specific addition location was selected at the outlet of the sludge return pump. The reagent was added according to the following process:

[0087] The first stage lasted 15 days. On the first day, an initial dose of 3g Cl / kg MLSS available chlorine (3g available chlorine per kilogram of mixed liquid suspended solids) was used, and the dosing was done three times a day. The dosing pump was turned on for 5 hours and stopped for 3 hours.

[0088] On the 2nd to 7th day, a maintenance dose of 2g Cl / kg MLSS effective chlorine was used, which was added three times a day. The dosing pump was turned on for 5 hours and stopped for 3 hours.

[0089] On the 8th to 15th day, the effluent quality was judged. When the effluent quality was not significantly affected, the maintenance dose of effective chlorine was increased to 4g Cl / kg MLSS, which was added 3 times a day, and the dosing pump was on for 3 hours and off for 5 hours. On the 12th day, the effluent quality fluctuated significantly, so the maintenance dose of 2g Cl / kg MLSS effective chlorine was continued to be added, which was added 3 times a day, and the dosing pump was on for 3 hours and off for 5 hours. This was continued until the 14th day, when the effluent was stabilized and then increased to 4g Cl / kg MLSS.

[0090] (2) Process monitoring: According to the dosing method and frequency of step (1), process monitoring is performed at the end of each 8-hour dosing cycle. The specific inspection indicators include the following:

[0091] 1) Outlet water quality: mainly based on the total effluent online instrument data, including COD, TN, TP, and ammonia nitrogen. The above indicators all meet the emission standards or internal control standards of the water plant.

[0092] At the same time, pay attention to the change of DO (dissolved oxygen) in the biochemical pool. If the DO in the aeration pool increases abnormally, the sampling and detection of ammonia nitrogen in the effluent at the end of the first aerobic pool and the end of the biochemical pool should be supplemented to ensure the normal operation of nitrifying bacteria. In this embodiment, the DO in the biochemical pool remains stable.

[0093] 2) Sedimentation performance: The 30-minute sedimentation ratio (SV30) of the mixed liquid in the aeration tank was 68% at the last monitoring on the 15th day. The mixed liquid was left to stand in the backlight for 30 minutes to observe whether the supernatant was turbid and the mud-water interface was blurred.

[0094] At the same time, monitor the changes in sludge concentration (MLSS) at all outlets of the biochemical pool and control the balance of sludge concentration at all outlets, which can be approximately considered as the average distribution of the dosage in the biochemical pool.

[0095] 3) Microscope examination: The mixed liquid at the outlet of the biochemical pool was taken as the observation sample. The last monitoring result on the 15th day showed that some filamentous fungi hyphae had not yet retreated.

[0096] (3) According to the process monitoring results of step (2), the killing of filamentous fungi mycelium has not reached the standard, and it is necessary to start the second stage of adding agents. The second stage lasts for 12 days. The specific steps are as follows:

[0097] On the first day, the starting dose of 6g Cl / kg MLSS effective chlorine was used, and it was added three times a day. The dosing pump was turned on for 5 hours and stopped for 3 hours. That is, the effect of killing microtrichol mycelium was enhanced by increasing the starting dose;

[0098] On the 2nd to 6th day, a maintenance dose of 3g Cl / kg MLSS effective chlorine was used, which was added three times a day, and the dosing pump was turned on for 5 hours and stopped for 3 hours. The main purpose of this stage was still to inhibit the growth of filamentous bacteria, while taming and enhancing the tolerance of the system's functional bacteria to the disinfectant;

[0099] On the 7th to 12th day, the effluent quality was judged. When the effluent quality was not significantly affected, the maintenance dose of effective chlorine was increased to 4g Cl / kg MLSS and added three times a day. The dosing pump was turned on for 3 hours and stopped for 5 hours, and the effluent quality was stable.

[0100] (4) Process monitoring: According to the dosing method and frequency of step (3), process monitoring is performed at the end of each 8-hour dosing cycle. The specific inspection indicators include the following:

[0101] 1) Outlet water quality: mainly based on the total outlet water online instrument data, including COD, TN, TP, and ammonia nitrogen. The above indicators meet the standards.

[0102] At the same time, pay attention to the change of DO (dissolved oxygen) in the biochemical pool. If the DO in the aeration pool increases abnormally, the sampling and detection of ammonia nitrogen in the effluent at the end of the first aerobic pool and the end of the biochemical pool should be supplemented to ensure the normal operation of nitrifying bacteria. In this embodiment, the DO in the biochemical pool remains stable.

[0103] 2) Sedimentation performance: The sedimentation ratio of the mixed liquid in the aeration tank in 30 minutes (SV30) was 38% at the last monitoring on the 12th day. Note that the mixed liquid should be left in a dark place for 30 minutes, and the supernatant should be clear and the mud-water stratification interface should be clear.

[0104] At the same time, monitor the changes in sludge concentration (MLSS) at all outlets of the biochemical pool and control the balance of sludge concentration at all outlets, which can be approximately considered as the average distribution of the dosage in the biochemical pool.

[0105] 3) Microscope examination: Take the mixed liquid at the outlet of the biochemical pool as the observation sample. The last monitoring result on the 12th day was that the mycelium of filamentous fungi retreated. At the same time, the sludge floc structure was stable and the interstitial water was clear. Stop adding the medicine.

[0106] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. An emergency control method for microfilamentous sludge bulking, characterized in that: The following steps are involved: S1, adding reagents: adding reagents to the return sludge according to the first set process; S2. Process monitoring: monitoring is carried out once at the end of each dosing cycle. The monitoring indicators include but are not limited to the total effluent quality, the sedimentation performance of the mixed liquid in the biochemical pool, and the microscopic examination of the mixed liquid at the outlet of the biochemical pool; S3. If the last monitoring index in S2 is qualified, end the reagent addition; if the last monitoring index in S2 is unqualified, start the second stage of reagent addition in the return sludge: according to the second set process, add the reagent to the return sludge.

2. The emergency control method for Microthrips type sludge bulking according to claim 1, characterized in that: The agent is a chlorine-containing disinfectant with an effective chlorine content of 10-15%.

3. The emergency control method for Microthrips sludge bulking according to claim 2, characterized in that: In S1, the first set process is a total of 15 days, and the specific process is as follows: on the first day, a dosage of 3 g Cl / kg MLSS available chlorine is used; On days 2-7, a maintenance dose of 2 g Cl / kg MLSS available chlorine was used; On the 8th to 15th day, the total effluent quality is combined for judgment. If the total effluent quality remains stable, the maintenance dose of available chlorine is increased to 4g Cl / kg MLSS; If the total effluent quality fluctuates, continue to add 2g Cl / kg MLSS of available chlorine at a maintenance dose until the total effluent quality stabilizes and then increase the maintenance dose of available chlorine to 4g Cl / kg MLSS.

4. The emergency control method for Microthrips sludge bulking according to claim 2, characterized in that: If the second stage of reagent addition is started in S3, the second round of process monitoring is carried out with reference to S2. The specific process of the second setting process is as follows: On the first day, a dosage of 6g Cl / kg MLSS effective chlorine is used; On days 2-6, a maintenance dose of 3 g Cl / kg MLSS available chlorine was used; After the 6th day, if the monitoring indicators are qualified, stop adding the agent.

5. The emergency control method for Microthrips sludge bulking according to claim 4, characterized in that: In S3, if the monitoring index is unqualified after the 6th day in the second setting process, the second setting process needs to continue to add the agent. The specific process is: on the 7th to 15th day, the total effluent water quality is combined for judgment. If the total effluent water quality remains stable, the maintenance dose of effective chlorine is increased to 4gCl / kg MLSS; If the total effluent water quality fluctuates, continue to add 3g Cl / kg MLSS of available chlorine at a maintenance dose until the total effluent water quality stabilizes and then increase the maintenance dose of available chlorine to 4g Cl / kg MLSS.

6. The emergency control method for Microthrips sludge bulking according to claim 5, characterized in that: In S3, during the 7th to 15th days of the second set process, if the process monitoring indicators are qualified, the reagent addition is terminated.

7. The emergency control method for Microthrips sludge bulking according to claim 1, characterized in that: The location for adding reagents to the return sludge is the sludge return pump outlet or the sludge return channel.

8. The emergency control method for Microthrips sludge bulking according to claim 2, characterized in that: The dosage is divided into 3 cycles per day, and in each cycle, the dosage is added for 3-5 hours and then stopped for 3-5 hours.

9. The emergency control method for Microthrips sludge bulking according to claim 1, characterized in that: The agent is a mixture of disinfectant and coagulant.

10. The emergency control method for Microthrips sludge bulking according to claim 1, characterized in that: In S2, total effluent quality monitoring includes COD, TN, TP, and ammonia nitrogen; The sedimentation performance of the mixed liquid in the biochemical pool is the sedimentation ratio of the mixed liquid in the aeration pool in 30 minutes; Microscopic examination of the mixed liquid at the outlet of the biochemical pool includes changes in mycelium, sludge floc status and interstitial water transparency.

Citation Information

Patent Citations

  • Biochemical sludge swelling control system and control method thereof

    CN104591378A

  • Sectional water inlet multistage A / O process sludge bulking control system and method

    CN111675336A

  • Sewage treatment plant virtual debugging operation method

    CN112723649A

  • Fungicide and method for solving bulking and scumming of activated sludge

    JP2004217565A

  • Floc-forming agent, bulking prevention method and activated sludge treatment method

    JP2005177715A

Cited By

  • Method and system for early warning and controlling sludge bulking of sewage treatment system in coal chemical industry

    CN119930060A

  • Intelligent sewage treatment method and system based on data fusion

    CN120774555A