Efficient energy dissipation ecological bank protection block structure and arrangement method
By designing the structure of porous ecological bank protection blocks and precise layout methods, the high energy consumption and ecological damage caused by hard materials in the existing bank protection technology has been solved, and efficient energy dissipation and biodiversity have been achieved, which has significantly improved the bank protection. Protection and stability.
Patent Information
- Application Number
- CN202411390029.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-10-08
AI Technical Summary
The use of hard materials in existing shore protection technology leads to high energy consumption, damage to marine ecosystems and reduction of biodiversity, and cannot effectively disperse and reduce wave energy, resulting in limited protection effect.
A porous, stable and ecologically friendly ecological bank revet block structure is designed, adopting the cube block form, with guide angles designed on the top and sides, and multiple circular and long openings are opened on the top and sides to provide aquatic animals and plants. Inhabit space, increase roughness to reduce waves and climbing heights, and accurately layout according to wave energy distribution and biological habitat needs through layout methods.
It significantly improves the protection capacity and stability of the shore protection, extends its service life, promotes the biodiversity and ecological balance of marine ecosystems, and realizes efficient energy dissipation and ecologically friendly shore protection projects.
Smart Images

Figure CN119041350A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ecological revetment, and in particular to an ecological revetment block structure with high efficiency and energy dissipation and a layout method thereof. Background Art
[0002] In the existing revetment technology, hard materials such as concrete and stones are often used. These traditional structures have exposed many problems in the long-term process of resisting ocean wave erosion, such as high energy consumption, damage to biodiversity and lack of eco-friendliness. These structures have limited effects in reducing wave energy, preventing overtopping and climbing, and due to their hard characteristics, they often block the natural cycle of the marine ecosystem, leading to ecological isolation and a decline in biodiversity. Therefore, in response to the multiple challenges in the construction of offshore artificial island revetments, an innovative and efficient energy dissipation and biodiversity-promoting ecological revetment block structure and layout method are proposed; on this basis, the present invention, through in-depth research on the marine environment and biological habits, designs a porous, stable and eco-friendly block structure, which can effectively disperse and reduce wave energy, significantly reduce the overtopping and climbing of waves, thereby greatly improving the protective capacity of the revetment. Summary of the invention
[0003] The present invention overcomes the shortcomings of the prior art and provides an efficient energy dissipation ecological revetment block structure and arrangement method.
[0004] To achieve the above object, the technical solution adopted by the present invention is:
[0005] The present invention provides an efficient energy dissipation ecological revetment block structure, wherein the ecological revetment block structure is mainly in the form of a cube:
[0006] The top and side intersection edges of the cube block are designed with chamfers, and the chamfer size is 0.05 meters. The size of the cube block is 1.5 meters in length, 1.5 meters in width, and 1.1 meters in height. The size of the cube block is equivalent to the length of a single stone block of the revetment surface;
[0007] A plurality of first circular openings with two aperture specifications of 0.15 m or 0.25 m are randomly opened and distributed on the top of the ecological revetment block structure. The plurality of first circular openings are opened from the top to the bottom of the ecological revetment block structure. The arrangement of the plurality of first circular openings is used to provide a habitat for aquatic plants and animals, and the plurality of first circular openings increase the roughness of the revetment surface blocks.
[0008] Furthermore, in a preferred embodiment of the present invention, the ecological revetment block structure is provided with a plurality of longitudinally arranged long openings on both sides along the front line direction of the revetment.
[0009] Furthermore, in a preferred embodiment of the present invention, the length of each of the long openings is 1 meter, and the height of each of the long openings is 0.05 meters. The plurality of long openings can help organisms to leave the ecological revetment block structure and discharge water stored inside.
[0010] Furthermore, in a preferred embodiment of the present invention, four groups of circular opening arrays are arranged on both sides of the ecological revetment block structure perpendicular to the revetment front line direction.
[0011] Furthermore, in a preferred embodiment of the present invention, each group of the circular opening array is composed of a plurality of second circular openings, each of the second circular openings has a diameter of 0.02 meters, and all the second circular openings are symmetrically distributed, and the second circular openings are used to discharge moisture from the ecological revetment block structure.
[0012] The second aspect of the present invention provides a method for arranging an efficient energy dissipation ecological revetment block structure, which is applied to any of the efficient energy dissipation ecological revetment block structures described above, and specifically comprises the following steps:
[0013] Obtaining a target revetment area of an offshore artificial island and a wave breaking requirement of the target revetment area, and planning the target revetment area into a plurality of sub-revetment areas according to the wave breaking requirement;
[0014] Obtaining the operation and maintenance log of the target revetment area and the operation and maintenance time sequence set by the operation and maintenance decision, and extracting several historical wave energy parameters of each sub-revetment area in the operation and maintenance time sequence through the operation and maintenance log;
[0015] Constructing a two-dimensional plane grid of the target revetment area, determining the contour level of each sub-revetment area in the operation and maintenance time sequence based on the several historical wave energy parameters, fitting several historical wave energies in the two-dimensional plane grid according to the contour level, and generating a wave energy contour map of each sub-revetment area;
[0016] Creating a chromaticity peak curve of the wave energy change process in each sub-bankment area by drawing the wave energy contour map, extracting a number of chromaticity peak nodes based on the chromaticity peak curve, and obtaining the wave energy chromaticity value of each chromaticity peak node;
[0017] The central arrangement method, the interval arrangement method and the triple arrangement method of the ecological revetment block structure are obtained, and the wave energy chromaticity value of each chromaticity peak node is analyzed and matched based on the central arrangement method, the interval arrangement method and the triple arrangement method to obtain the first type of analysis results, the second type of analysis results and the third type of analysis results;
[0018] The occurrence frequencies of the first, second and third type analysis results in the chromaticity peak curve corresponding to the sub-bank protection area are counted, and only the analysis results with the maximum occurrence frequency are extracted;
[0019] If the analysis result with the highest frequency of occurrence is a type of analysis result, the central layout method is marked as the only layout method for the sub-bankment area;
[0020] If the analysis result with the highest frequency of occurrence is a Class II analysis result, the interval arrangement method is marked as the only arrangement method for the sub-bankment area;
[0021] If the analysis result with the maximum occurrence frequency is a three-category analysis result, the triple layout method is marked as the only layout method for the sub-bankment area, and the layout scheme of the ecological bank protection block structure for the target bank protection area is obtained.
[0022] Furthermore, in a preferred embodiment of the present invention, the central arrangement method, the interval arrangement method and the triple arrangement method of obtaining the ecological revetment block structure are used to analyze and match the wave energy chromaticity value of each chromaticity peak node based on the central arrangement method, the interval arrangement method and the triple arrangement method to obtain the first type of analysis results, the second type of analysis results and the third type of analysis results, which specifically include the following steps:
[0023] Obtaining a layout strategy for the ecological revetment block structure, and obtaining a central layout method, an interval layout method, and a triple layout method for the ecological revetment block structure through the layout strategy;
[0024] The wave-breaking energy chromaticity interval of the preset center arrangement method is defined as the first wave-breaking energy chromaticity interval; the wave-breaking energy chromaticity interval of the preset interval arrangement method is defined as the second wave-breaking energy chromaticity interval; and the wave-breaking energy chromaticity interval of the preset triple arrangement method is defined as the third wave-breaking energy chromaticity interval;
[0025] If the wave energy chromaticity value of the chromaticity peak node is in the first wave-breaking energy chromaticity interval, the center arrangement method is required to calibrate the chromaticity peak node, and a type of analysis result is obtained;
[0026] If the wave energy chromaticity value is in the second wave-breaking energy chromaticity interval, the interval arrangement method is required to calibrate the chromaticity peak node, and the second type of analysis results are obtained;
[0027] If the wave energy chromaticity value is in the third wave-breaking energy chromaticity interval, the triple arrangement method is required to calibrate the chromaticity peak node, and three types of analysis results are obtained.
[0028] Furthermore, in a preferred embodiment of the present invention, the following steps are also included:
[0029] The historical monitoring image data of each sub-bankment area is retrieved to construct a dynamic time-series habitat model, and based on the dynamic time-series habitat model, the covariance decomposition of multiple historical habitat characteristics is mapped to the mapping space to determine the historical habitat scale of offshore organisms in the sub-bankment area;
[0030] Obtaining the overall wave-breaking structure of the sub-bankment area and the ideal wave-breaking index specified in the wave-breaking requirements, and retrieving the established wave-breaking index of the sub-bankment area in the big data network based on the overall wave-breaking structure;
[0031] If the predetermined wave-breaking index is less than the ideal wave-breaking index, the initial arrangement density of the required ecological revetment block structure in the sub-revetment area is planned according to the initial wave-breaking index and the key wave-breaking index of the ecological revetment block structure;
[0032] Obtaining the quantity parameters of the ecological revetment block structure required under the initial arrangement density, and simultaneously obtaining the habitat scale of offshore organisms that can be allowed by a single ecological revetment block structure, and calculating the global habitat scale of the sub-revetment area by combining the quantity parameters and the habitat scale;
[0033] If the global habitat scale is smaller than the historical habitat scale of offshore organisms in the sub-revetment area, a hash state function between the global habitat scale and the historical habitat scale is calculated, and the number density of ecological revetment block structures in each sub-revetment area is increased accordingly according to the hash state function.
[0034] Furthermore, in a preferred embodiment of the present invention, the historical monitoring image data of each sub-bankment area is retrieved to construct a dynamic time-series habitat model, and the covariance decomposition of multiple historical habitat features is mapped to the mapping space based on the dynamic time-series habitat model to determine the historical habitat scale of offshore organisms in the sub-bankment area, which specifically includes the following steps:
[0035] Acquire the monitoring file of the sub-bankment area, and extract several frames of continuous historical monitoring image data of the target bank protection area within a set time period through the monitoring file;
[0036] Based on the several frames of continuous historical monitoring image data, a dynamic time-series habitat model for offshore organisms in the sub-bankment area is constructed, and historical habitat generation data displayed in the dynamic time-series habitat model is analyzed and statistically analyzed to obtain multiple historical habitat characteristics of offshore organisms in the sub-bankment area;
[0037] The historical habitat quantity when each historical habitat feature appears in the sub-bankment area is extracted through a dynamic time series habitat model, a standardized mean is preset, and the plurality of historical habitat features are standardized until the standardized mean is reached to obtain the standardized historical habitat feature;
[0038] Calculating the covariance matrix between each adjacent standardized historical habitat feature based on the historical habitat quantity, and decomposing the covariance matrix to obtain a decomposed variance value of each standardized historical habitat feature;
[0039] Preset a cumulative variance ratio threshold, sort each of the decomposed variance values in descending order, and after the descending order is completed, only extract one or more decomposed variance values that are above the cumulative variance ratio threshold, and define them as mappable decomposed variance values;
[0040] A plan view of the sub-bankment area is obtained, a mapping space is created based on the plan view, each historical habitat feature is mapped to the mapping space according to one or more mappable decomposition variance values, a mapping matrix parameter is obtained, and the historical habitat scale of offshore organisms in the sub-bankment area is determined according to the mapping matrix parameters.
[0041] The beneficial technical effects of the present invention are:
[0042] The ecological revetment block structure of the present invention significantly improves the safety and stability of the revetment project through a unique porous design and optimized layout. First, the increased roughness of the block and the opening design effectively reduce the wave overtopping and climbing phenomenon, so that the revetment can still maintain a good protective effect under extreme weather conditions; secondly, the ecological revetment block structure has high stability and can resist strong water flow impact and erosion, extend the service life of the revetment, and improve the safety and stability of the revetment project. The ecological revetment block structure of the present invention provides a rich habitat space for aquatic plants and animals. The circular holes and long openings of the ecological revetment block structure provide conditions for different types of organisms to survive and reproduce, which helps to restore and enhance the biodiversity of the marine ecosystem. In addition, the arrangement method of the ecological block takes into account the natural cycle of the ecosystem, making the revetment a habitat for marine organisms, helping to maintain ecological balance, and playing a positive role in promoting biodiversity and ecological balance, and promoting biodiversity and ecological balance. The ecological revetment block structure and arrangement method of the present invention promote the sustainable development of the field of marine engineering with its high efficiency in energy dissipation, eco-friendliness and economic applicability. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, drawings of other embodiments can be obtained based on these drawings without paying creative work.
[0044] Figure 1 It is a schematic diagram of the overall structure of an ecological revetment block structure with high efficiency energy dissipation;
[0045] Figure 2 It is a partial structural schematic diagram of an ecological revetment block structure with high efficiency and energy dissipation.
[0046] The following are the descriptions of the reference numerals:
[0047] 101. Ecological revetment block structure; 102. Chamfer; 103. First circular opening; 104. Long strip opening; 105. Circular opening array; 106. Second circular opening. DETAILED DESCRIPTION
[0048] In order to more clearly understand the above-mentioned purposes, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. These drawings are all simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the structures related to the present invention. It should be noted that the embodiments in this application and the features in the embodiments can be combined with each other without conflict.
[0049] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the scope of protection of the present application. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the invention, unless otherwise specified, "multiple" means two or more.
[0050] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood by specific circumstances.
[0051] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. The preferred embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thoroughly understood.
[0052] like Figure 1-2 As shown, the first aspect of the present invention provides an efficient energy dissipation ecological revetment block structure, wherein the ecological revetment block structure 101 is mainly in the form of a cube.
[0053] The top and side intersection edges of the cube block are designed with chamfers 102, and the size of the chamfer 102 is 0.05 meters. The sizes of the cube block are 1.5 meters in length, 1.5 meters in width, and 1.1 meters in height. The size of the cube block is equivalent to the length of a single block of the revetment surface. This design ensures the stability of the ecological revetment block structure 101 and is easy to construct and install.
[0054] A plurality of first circular openings 103 with two aperture specifications of 0.15 m or 0.25 m are randomly opened and distributed on the top of the ecological revetment block structure 101. The plurality of first circular openings 103 are opened from the top to the bottom of the ecological revetment block structure 101. The arrangement of the plurality of first circular openings 103 is used to provide a habitat for aquatic plants and animals, and the plurality of first circular openings 103 increase the roughness of the revetment surface block.
[0055] It should be noted that the ecological revetment block structure 101 is embedded in the revetment of the open sea. When the open sea waves hit the open sea revetment, the first circular opening 103 opened on the top of the ecological revetment block structure 101 can absorb the impact energy of the open sea waves and achieve a high-quality wave elimination effect; and most species of aquatic plants and animals can live, survive and reproduce inside the first circular opening 103, creating conditions for biodiversity and realizing the organic combination of structure and ecological functions. In addition, the increased roughness on the first circular opening 103 can reduce the overtopping phenomenon by up to 35% and reduce the wave climbing by up to 25%, so that the revetment can still maintain a good protection effect under extreme weather conditions, effectively improving the protection capacity of the revetment.
[0056] The ecological revetment block structure 101 is provided with a plurality of longitudinally arranged long openings 104 on both sides along the front line of the revetment.
[0057] The length of each of the long openings 104 is 1 meter, and the height of each of the long openings 104 is 0.05 meters. The plurality of long openings 104 can help organisms to leave the ecological revetment block structure 101 and the water stored inside to be discharged.
[0058] It should be noted that when wave impact or overtopping occurs on the offshore revetment, a number of long openings 104 can promptly discharge the waves impacting the ecological revetment block structure and the water stored inside, thereby significantly reducing the energy of the wave impact and further improving the wave-breaking performance of the offshore revetment; and can help the inhabitants leave the ecological revetment block structure 101, maintain the stability of the hydrological environment inside the ecological revetment block structure 101, and at the same time provide conditions for the survival and reproduction of different types of organisms, which helps to restore and enhance the biodiversity of the marine ecosystem.
[0059] Four groups of circular opening arrays 105 are arranged on both sides of the ecological revetment block structure 101 perpendicular to the revetment front line.
[0060] Each group of the circular opening array 105 is composed of a plurality of second circular openings 106 , each of the second circular openings 106 has a diameter of 0.02 meters, and all the second circular openings 106 are symmetrically distributed. The second circular openings 106 are used to discharge moisture from the ecological revetment block structure 101 .
[0061] It should be noted that when the offshore waves hit the offshore revetment, the four groups of circular opening arrays 105 opened on both sides of the ecological revetment block structure 101 can absorb the waves that are constantly transmitted and swept into the ecological revetment block structure 101 through the second circular opening 106 on one side, and can be discharged from the second circular opening 106 on the other side, thereby absorbing a large amount of wave energy from the impact, thereby effectively reducing the transmission efficiency of wave force. Experiments have shown that the setting of the second circular opening 106 can reduce the impact force of waves on the revetment by up to 30%. At the same time, the second circular opening 106 can realize the controllability of the water outflow speed, so that a certain amount of water is retained in the block, and a reaction force is generated with the continuous action of the waves, further reducing the impact of the waves on the revetment.
[0062] In summary, the ecological revetment block structure 101 of the present invention fully considers the survival needs of aquatic plants and animals, adopts a square ecological revetment block structure 101 and designs a chamfer 102 on its top and side, and randomly arranges the first circular openings 103 with a diameter of 0.15 meters or 0.25 meters, which, on the one hand, improves the wave dissipation effect, and on the other hand, creates living conditions for biodiversity, realizes the organic combination of revetment structure and ecological function, and helps to restore and enhance the biodiversity of the marine ecosystem. The roughness design increased by the first circular opening 103 can minimize the phenomenon of over-the-surface and wave climbing, reduce the revetment damage rate and the reconstruction and maintenance cost output; and the long openings 104 and four groups of second circular openings 106 designed on the two sides of the ecological revetment block structure 101 are not only convenient for biological activities and water circulation, but also can effectively control the water flow speed and reduce the impact of waves on the revetment, which makes the ecological revetment block structure 101 not only have a protective function, but also can increase the biodiversity index by more than 15%. In addition, the ecological revetment block structure 101 of the present invention is made of environmentally friendly materials and construction methods, which reduces the negative impact on the marine environment, realizes the harmonious coexistence of the revetment structure and the natural environment, and achieves good economic benefits and ecological sustainable development.
[0063] The second aspect of the present invention provides a method for arranging an efficient energy dissipation ecological revetment block structure, which is applied to any of the efficient energy dissipation ecological revetment block structures described above, and specifically comprises the following steps:
[0064] Obtaining a target revetment area of an offshore artificial island and a wave breaking requirement of the target revetment area, and planning the target revetment area into a plurality of sub-revetment areas according to the wave breaking requirement;
[0065] Obtaining the operation and maintenance log of the target revetment area and the operation and maintenance time sequence set by the operation and maintenance decision, and extracting several historical wave energy parameters of each sub-revetment area in the operation and maintenance time sequence through the operation and maintenance log;
[0066] Constructing a two-dimensional plane grid of the target revetment area, determining the contour level of each sub-revetment area in the operation and maintenance time sequence based on the several historical wave energy parameters, fitting several historical wave energies in the two-dimensional plane grid according to the contour level, and generating a wave energy contour map of each sub-revetment area;
[0067] Creating a chromaticity peak curve of the wave energy change process in each sub-bankment area by drawing the wave energy contour map, extracting a number of chromaticity peak nodes based on the chromaticity peak curve, and obtaining the wave energy chromaticity value of each chromaticity peak node;
[0068] The central arrangement method, the interval arrangement method and the triple arrangement method of the ecological revetment block structure are obtained, and the wave energy chromaticity value of each chromaticity peak node is analyzed and matched based on the central arrangement method, the interval arrangement method and the triple arrangement method to obtain the first type of analysis results, the second type of analysis results and the third type of analysis results;
[0069] The occurrence frequencies of the first, second and third type analysis results in the chromaticity peak curve corresponding to the sub-bank protection area are counted, and only the analysis results with the maximum occurrence frequency are extracted;
[0070] If the analysis result with the highest frequency of occurrence is a type of analysis result, the central layout method is marked as the only layout method for the sub-bankment area;
[0071] If the analysis result with the highest frequency of occurrence is a Class II analysis result, the interval arrangement method is marked as the only arrangement method for the sub-bankment area;
[0072] If the analysis result with the maximum occurrence frequency is a three-category analysis result, the triple layout method is marked as the only layout method for the sub-bankment area, and the layout scheme of the ecological bank protection block structure for the target bank protection area is obtained.
[0073] It should be noted that the ecological revetment block structure of the present invention has stable and high-quality wave-breaking performance characteristics, biological symbiosis and protection functions compared to traditional revetment blocks. Although the overall performance is higher than that of traditional block structures, if the ecological revetment block structure adopts the traditional layout method on the offshore revetment, it may greatly reduce or offset the original functional characteristics of the ecological revetment block structure, thereby causing the ecological revetment block structure to have a significant decrease in its wave-breaking ability for the offshore revetment, thereby causing damage to the offshore revetment and increasing the output of maintenance and reconstruction costs. Therefore, this method can construct a wave energy contour map according to the magnitude of wave energy data generated in the offshore revetment area in the past. Through the wave energy contour map, the wave situation of each sub-revetment area where the ecological revetment block structure needs to be installed can be accurately and dynamically analyzed. The wave energy chromaticity value displayed by the wave energy contour map can reflect the temporal changes of wave energy in the sub-revetment area over time, so that the impact degree of wave energy on the offshore revetment in time can be known, providing a reliable analysis basis for the precise allocation of subsequent layout methods, and increasing the layout reliability of the ecological revetment block structure. Finally, the unique layout method of each sub-revetment area is determined according to the change of wave energy chromaticity and the frequency of occurrence of the assignable layout method. Through this method, according to the wave energy intensity generated in the offshore revetment area in the past, the installation of the ecological revetment block structure in the offshore revetment area can be assigned a suitable layout method, so that the ecological revetment block structure can play its own efficient wave breaking protection performance for different wave impact changes in the offshore revetment area, achieving a dual improvement of wave breaking effect and ecological benefits, and ensuring the accuracy and stability of wave breaking protection of the ecological revetment block structure.
[0074] It should be noted that the central arrangement method is to arrange an ecological revetment block structure in the center of the cross-section protection surface, and arrange conventional block stone protection surfaces around it; the central arrangement method is suitable for areas with less wave energy and can effectively improve the ecological function of the revetment. The interval arrangement method is to arrange two ecological revetment block structures at intervals, and a block stone is sandwiched between the ecological revetment block structures; the interval arrangement method is suitable for areas with medium wave energy, and can provide a better ecological habitat while ensuring the wave breaking effect. The triple arrangement method is to arrange three ecological revetment block structures, with the middle ecological revetment block structure located in the middle of the protection surface, and a stone is separated from two adjacent ecological revetment block structures; the triple arrangement method is suitable for areas with strong wave energy and can maximize the wave breaking effect and ecological benefits. Among them, if the analysis result of the maximum occurrence frequency is a type I analysis result, it means that the wave energy often generated in the sub-bankment area is relatively small, so the central layout method can be used to deal with smaller offshore waves; if the analysis result of the maximum occurrence frequency is a type II analysis result, it means that the wave energy intensity generated by the sub-bankment area is moderate, and the interval layout method can be allocated to eliminate or reduce the moderate wave energy to the maximum extent; if the analysis result of the maximum occurrence frequency is a type I analysis result, it means that the wave energy often generated in the sub-bankment area is strong, and there may be a certain energy transfer effect, so it is necessary to arrange the ecological bank protection block structure through the triple layout method to resist the wave energy transfer phenomenon under high-intensity action.
[0075] Furthermore, in a preferred embodiment of the present invention, the central arrangement method, the interval arrangement method and the triple arrangement method of obtaining the ecological revetment block structure are used to analyze and match the wave energy chromaticity value of each chromaticity peak node based on the central arrangement method, the interval arrangement method and the triple arrangement method to obtain the first type of analysis results, the second type of analysis results and the third type of analysis results, which specifically include the following steps:
[0076] Obtaining a layout strategy for the ecological revetment block structure, and obtaining a central layout method, an interval layout method, and a triple layout method for the ecological revetment block structure through the layout strategy;
[0077] The wave-breaking energy chromaticity interval of the preset center arrangement method is defined as the first wave-breaking energy chromaticity interval; the wave-breaking energy chromaticity interval of the preset interval arrangement method is defined as the second wave-breaking energy chromaticity interval; and the wave-breaking energy chromaticity interval of the preset triple arrangement method is defined as the third wave-breaking energy chromaticity interval;
[0078] If the wave energy chromaticity value of the chromaticity peak node is in the first wave-breaking energy chromaticity interval, the center arrangement method is required to calibrate the chromaticity peak node, and a type of analysis result is obtained;
[0079] If the wave energy chromaticity value is in the second wave-breaking energy chromaticity interval, the interval arrangement method is required to calibrate the chromaticity peak node, and the second type of analysis results are obtained;
[0080] If the wave energy chromaticity value is in the third wave-breaking energy chromaticity interval, the triple arrangement method is required to calibrate the chromaticity peak node, and three types of analysis results are obtained.
[0081] It should be noted that if the wave energy chromaticity value of the chromaticity peak node is in the first wave-breaking energy chromaticity interval, it means that the wave energy intensity generated by the sub-bankment area at the chromaticity peak node meets the wave-breaking effect of the central arrangement method, that is, the central arrangement method can cope with and eliminate the wave energy generated by the chromaticity peak node, so the central arrangement method is required to calibrate the chromaticity peak node. If the wave energy chromaticity value is in the second wave-breaking energy chromaticity interval, it means that the wave-breaking processing performance of the interval arrangement method meets the wave energy intensity generated by the chromaticity peak node, so the interval arrangement method is required to calibrate the chromaticity peak node. If the wave energy chromaticity value is in the third wave-breaking energy chromaticity interval, it means that the triple arrangement method can withstand and eliminate the wave energy generated by the chromaticity peak node, so the triple arrangement method is required to calibrate the chromaticity peak node. This method can accurately assign appropriate layout methods for the layout of ecological revetment block structures in the sub-revetment area, making the final layout method of the ecological revetment block structure more accurate and reliable, further improving the wave-breaking protection quality of the ecological revetment block structure for offshore revetment, and promoting the sustainable development of the marine ecological environment while ensuring the safety of the revetment.
[0082] Furthermore, in a preferred embodiment of the present invention, the following steps are also included:
[0083] The historical monitoring image data of each sub-bankment area is retrieved to construct a dynamic time-series habitat model, and based on the dynamic time-series habitat model, the covariance decomposition of multiple historical habitat characteristics is mapped to the mapping space to determine the historical habitat scale of offshore organisms in the sub-bankment area;
[0084] Obtaining the overall wave-breaking structure of the sub-bankment area and the ideal wave-breaking index specified in the wave-breaking requirements, and retrieving the established wave-breaking index of the sub-bankment area in the big data network based on the overall wave-breaking structure;
[0085] If the predetermined wave-breaking index is less than the ideal wave-breaking index, the initial arrangement density of the required ecological revetment block structure in the sub-revetment area is planned according to the initial wave-breaking index and the key wave-breaking index of the ecological revetment block structure;
[0086] Obtaining the quantity parameters of the ecological revetment block structure required under the initial arrangement density, and simultaneously obtaining the habitat scale of offshore organisms that can be allowed by a single ecological revetment block structure, and calculating the global habitat scale of the sub-revetment area by combining the quantity parameters and the habitat scale;
[0087] If the global habitat scale is smaller than the historical habitat scale of offshore organisms in the sub-revetment area, a hash state function between the global habitat scale and the historical habitat scale is calculated, and the number density of ecological revetment block structures in each sub-revetment area is increased accordingly according to the hash state function.
[0088] It should be noted that the density of ecological blocks in the direction parallel to the front of the revetment is arranged according to the actual needs of the project, but the construction of some projects does not fully consider the characteristics and scale of biological habitats to reasonably set the layout density of ecological revetment blocks, resulting in large-scale biological migration and habitat in the offshore revetment area. The ecological revetment blocks are unable to accommodate larger biological populations, resulting in crowding phenomena such as limited living and activity space inside the ecological revetment block structure, affecting the quality effect of the ecological revetment block structure for the habitat and reproduction of different organisms, and deviating from the setting concept of the present invention. Therefore, this method can analyze whether the global habitat scale that can be accommodated by the planned and adjusted layout density of the offshore revetment structure can meet the previous habitat scale of aquatic organisms in the offshore revetment, so as to judge whether the density of the ecological revetment blocks arranged according to the project engineering construction can meet the habitat needs of aquatic organisms in the offshore revetment, and then optimize the error tolerance of the ecological revetment block structure layout density error set by the project engineering construction that affects the habitat and survival of aquatic organisms in the offshore revetment area, improve the survival and habitat quality of aquatic organisms in the offshore revetment area, and help to restore and enhance the biodiversity of the marine ecosystem. At the same time, the flexibility of this layout density adjustment enables the present invention to adapt to the specific needs of different projects, and has strong practicality and broad application prospects. Among them, if the established wave breaking index is less than the ideal wave breaking index, it means that the overall wave breaking structure of the sub-revetment area cannot achieve the ideal wave breaking effect, so the layout density of the ecological revetment block structure needs to be increased accordingly. If the global habitat scale is smaller than the historical habitat scale of offshore organisms in the sub-revetment area, it means that the habitat scale available for aquatic organisms after adding the corresponding ecological revetment block structure to achieve the ideal wave-breaking effect cannot meet the actual habitat scale of aquatic organisms in the offshore revetment area, so the layout density of the added ecological revetment block structure needs to be adjusted accordingly.
[0089] Furthermore, in a preferred embodiment of the present invention, the historical monitoring image data of each sub-bankment area is retrieved to construct a dynamic time-series habitat model, and the covariance decomposition of multiple historical habitat features is mapped to the mapping space based on the dynamic time-series habitat model to determine the historical habitat scale of offshore organisms in the sub-bankment area, which specifically includes the following steps:
[0090] Acquire the monitoring file of the sub-bankment area, and extract several frames of continuous historical monitoring image data of the target bank protection area within a set time period through the monitoring file;
[0091] Based on the several frames of continuous historical monitoring image data, a dynamic time-series habitat model for offshore organisms in the sub-bankment area is constructed, and historical habitat generation data displayed in the dynamic time-series habitat model is analyzed and statistically analyzed to obtain multiple historical habitat characteristics of offshore organisms in the sub-bankment area;
[0092] The historical habitat quantity when each historical habitat feature appears in the sub-bankment area is extracted through a dynamic time series habitat model, a standardized mean is preset, and the plurality of historical habitat features are standardized until the standardized mean is reached to obtain the standardized historical habitat feature;
[0093] Calculating the covariance matrix between each adjacent standardized historical habitat feature based on the historical habitat quantity, and decomposing the covariance matrix to obtain a decomposed variance value of each standardized historical habitat feature;
[0094] Preset a cumulative variance ratio threshold, sort each of the decomposed variance values in descending order, and after the descending order is completed, only extract one or more decomposed variance values that are above the cumulative variance ratio threshold, and define them as mappable decomposed variance values;
[0095] A plan view of the sub-bankment area is obtained, a mapping space is created based on the plan view, each historical habitat feature is mapped to the mapping space according to one or more mappable decomposition variance values, a mapping matrix parameter is obtained, and the historical habitat scale of offshore organisms in the sub-bankment area is determined according to the mapping matrix parameters.
[0096] It should be noted that since aquatic plants and animals can move with the waves in the offshore revetment, they often form a large-scale group when they inhabit the block structure of the ecological revetment. Therefore, this method constructs a dynamic time-series habitat model that represents the past movement of aquatic plants and animals with the waves to perform covariance mapping of the mapping space. Finally, the scale of aquatic plants and animals moving with the waves in the dynamic time-series habitat model can be determined according to the matrix parameters mapped to the mapping space. Among them, the cumulative variance ratio threshold is a criterion for determining the interpretable historical habitat characteristics in the dynamic time-series habitat model. If the decomposed variance value is above the cumulative variance ratio threshold, it means that the decomposed variance value can clearly show the mappable habitat scale characteristics of aquatic plants and animals. This method can quickly calculate and determine the habitat scale of aquatic plants and animals in the offshore revetment, replacing the cumbersome process of traditional manual statistics one by one, avoiding the errors caused by manual statistics, and reducing the calculation steps, improving the planning efficiency and accuracy of the layout density of the block structure of the ecological revetment, and having high reliability.
[0097] The above is based on the ideal embodiment of the present invention, and its description is relatively specific and detailed, but it cannot be understood as limiting the scope of the invention patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be based on the attached claims.
Claims
1. An efficient energy dissipation ecological revetment block structure, the ecological revetment block structure is mainly in the form of a cube, characterized by: The top and side intersection edges of the cube block are designed with chamfers, and the chamfer size is 0.05 meters. The size of the cube block is 1.5 meters in length, 1.5 meters in width, and 1.1 meters in height. The size of the cube block is equivalent to the length of a single stone block of the revetment surface; A plurality of first circular openings with two aperture specifications of 0.15 m or 0.25 m are randomly opened and distributed on the top of the ecological revetment block structure. The plurality of first circular openings are opened from the top to the bottom of the ecological revetment block structure. The arrangement of the plurality of first circular openings is used to provide a habitat for aquatic plants and animals, and the plurality of first circular openings increase the roughness of the revetment surface blocks.
2. According to claim 1, a highly efficient energy dissipation ecological revetment block structure is characterized in that: The ecological revetment block structure is provided with a plurality of longitudinally arranged long openings on both sides along the front line of the revetment.
3. The highly efficient energy dissipation ecological revetment block structure according to claim 1 is characterized in that: The length of each of the long openings is 1 meter, and the height of each of the long openings is 0.05 meters. The plurality of long openings can help organisms to leave the ecological revetment block structure and the water stored inside to be discharged.
4. The highly efficient energy dissipation ecological revetment block structure according to claim 1 is characterized in that: The two sides of the ecological revetment block structure perpendicular to the revetment front line are arranged with four groups of circular opening arrays.
5. The highly efficient energy dissipation ecological revetment block structure according to claim 1 is characterized in that: Each group of the circular opening arrays is composed of a plurality of second circular openings, each of the second circular openings has a diameter of 0.02 meters, and all the second circular openings are symmetrically distributed. The second circular openings are used to discharge moisture from the ecological revetment block structure.
6. A method for arranging an efficient energy dissipation ecological revetment block structure, applied to an efficient energy dissipation ecological revetment block structure as claimed in any one of claims 1 to 5, characterized in that: The specific steps include: Obtaining a target revetment area of an offshore artificial island and a wave breaking requirement of the target revetment area, and planning the target revetment area into a plurality of sub-revetment areas according to the wave breaking requirement; Obtaining the operation and maintenance log of the target revetment area and the operation and maintenance time sequence set by the operation and maintenance decision, and extracting several historical wave energy parameters of each sub-revetment area in the operation and maintenance time sequence through the operation and maintenance log; Constructing a two-dimensional plane grid of the target revetment area, determining the contour level of each sub-revetment area in the operation and maintenance time sequence based on the several historical wave energy parameters, fitting several historical wave energies in the two-dimensional plane grid according to the contour level, and generating a wave energy contour map of each sub-revetment area; Creating a chromaticity peak curve of the wave energy change process in each sub-bankment area by drawing the wave energy contour map, extracting a number of chromaticity peak nodes based on the chromaticity peak curve, and obtaining the wave energy chromaticity value of each chromaticity peak node; The central arrangement method, the interval arrangement method and the triple arrangement method of the ecological revetment block structure are obtained, and the wave energy chromaticity value of each chromaticity peak node is analyzed and matched based on the central arrangement method, the interval arrangement method and the triple arrangement method to obtain the first type of analysis results, the second type of analysis results and the third type of analysis results; The occurrence frequencies of the first, second and third type analysis results in the chromaticity peak curve corresponding to the sub-bank protection area are counted, and only the analysis results with the maximum occurrence frequency are extracted; If the analysis result with the highest frequency of occurrence is a type of analysis result, the central layout method is marked as the only layout method for the sub-bankment area; If the analysis result with the highest frequency of occurrence is a Class II analysis result, the interval arrangement method is marked as the only arrangement method for the sub-bankment area; If the analysis result with the maximum occurrence frequency is a three-category analysis result, the triple layout method is marked as the only layout method for the sub-bankment area, and the layout scheme of the ecological bank protection block structure for the target bank protection area is obtained.
7. The method for arranging a highly efficient energy dissipation ecological revetment block structure according to claim 6 is characterized in that: The central arrangement method, the interval arrangement method and the triple arrangement method for obtaining the ecological revetment block structure are used to analyze and match the wave energy chromaticity value of each chromaticity peak node based on the central arrangement method, the interval arrangement method and the triple arrangement method to obtain the first type of analysis results, the second type of analysis results and the third type of analysis results, which specifically include the following steps: Obtaining a layout strategy for the ecological revetment block structure, and obtaining a central layout method, an interval layout method, and a triple layout method for the ecological revetment block structure through the layout strategy; The wave-breaking energy chromaticity interval of the preset center arrangement method is defined as the first wave-breaking energy chromaticity interval; the wave-breaking energy chromaticity interval of the preset interval arrangement method is defined as the second wave-breaking energy chromaticity interval; and the wave-breaking energy chromaticity interval of the preset triple arrangement method is defined as the third wave-breaking energy chromaticity interval; If the wave energy chromaticity value of the chromaticity peak node is in the first wave-breaking energy chromaticity interval, the center arrangement method is required to calibrate the chromaticity peak node, and a type of analysis result is obtained; If the wave energy chromaticity value is in the second wave-breaking energy chromaticity interval, the interval arrangement method is required to calibrate the chromaticity peak node, and the second type of analysis results are obtained; If the wave energy chromaticity value is in the third wave-breaking energy chromaticity interval, the triple arrangement method is required to calibrate the chromaticity peak node, and three types of analysis results are obtained.
8. The method for arranging a highly efficient energy dissipation ecological revetment block structure according to claim 6 is characterized in that: The following steps are also included: The historical monitoring image data of each sub-bankment area is retrieved to construct a dynamic time-series habitat model, and based on the dynamic time-series habitat model, the covariance decomposition of multiple historical habitat characteristics is mapped to the mapping space to determine the historical habitat scale of offshore organisms in the sub-bankment area; Obtaining the overall wave-breaking structure of the sub-bankment area and the ideal wave-breaking index specified in the wave-breaking requirements, and retrieving the established wave-breaking index of the sub-bankment area in the big data network based on the overall wave-breaking structure; If the predetermined wave-breaking index is less than the ideal wave-breaking index, the initial arrangement density of the required ecological revetment block structure in the sub-revetment area is planned according to the initial wave-breaking index and the key wave-breaking index of the ecological revetment block structure; Obtaining the quantity parameters of the ecological revetment block structure required under the initial arrangement density, and simultaneously obtaining the habitat scale of offshore organisms that can be allowed by a single ecological revetment block structure, and calculating the global habitat scale of the sub-revetment area by combining the quantity parameters and the habitat scale; If the global habitat scale is smaller than the historical habitat scale of offshore organisms in the sub-revetment area, a hash state function between the global habitat scale and the historical habitat scale is calculated, and the number density of ecological revetment block structures in each sub-revetment area is increased accordingly according to the hash state function.
9. The method for arranging a highly efficient energy dissipation ecological revetment block structure according to claim 8 is characterized in that: The method of constructing a dynamic time-series habitat model by retrieving historical monitoring image data of each sub-bankment area, and mapping the covariance decomposition of multiple historical habitat features to a mapping space based on the dynamic time-series habitat model to determine the historical habitat scale of offshore organisms in the sub-bankment area, specifically includes the following steps: Acquire the monitoring file of the sub-bankment area, and extract several frames of continuous historical monitoring image data of the target bank protection area within a set time period through the monitoring file; Based on the several frames of continuous historical monitoring image data, a dynamic time-series habitat model for offshore organisms in the sub-bankment area is constructed, and historical habitat generation data displayed in the dynamic time-series habitat model is analyzed and statistically analyzed to obtain multiple historical habitat characteristics of offshore organisms in the sub-bankment area; The historical habitat quantity when each historical habitat feature appears in the sub-bankment area is extracted through a dynamic time series habitat model, a standardized mean is preset, and the plurality of historical habitat features are standardized until the standardized mean is reached to obtain the standardized historical habitat feature; Calculating the covariance matrix between each adjacent standardized historical habitat feature based on the historical habitat quantity, and decomposing the covariance matrix to obtain a decomposed variance value of each standardized historical habitat feature; Preset a cumulative variance ratio threshold, sort each of the decomposed variance values in descending order, and after the descending order is completed, only extract one or more decomposed variance values that are above the cumulative variance ratio threshold, and define them as mappable decomposed variance values; A plan view of the sub-bankment area is obtained, a mapping space is created based on the plan view, each historical habitat feature is mapped to the mapping space according to one or more mappable decomposition variance values, a mapping matrix parameter is obtained, and the historical habitat scale of offshore organisms in the sub-bankment area is determined according to the mapping matrix parameters.
Citation Information
Patent Citations
Ecological revetment block suitable for surf beat area and revetment structure in surf beat area
CN111379242A
Ecological frame bank protection construction method based on BIM
CN116516897A
Ecological bank protection structure capable of dissipating energy
CN210368852U
Wave-dissipating ecological caisson
CN214460556U
Cited By
Coastal ecological block structure
WO2026137151A1